Sustainable public transport – electric transport development project for the capital.

12
Sustainable public transport – electric transport development project for the capital

Transcript of Sustainable public transport – electric transport development project for the capital.

Page 1: Sustainable public transport – electric transport development project for the capital.

Sustainable public transport – electric transport development project for the capital

Page 2: Sustainable public transport – electric transport development project for the capital.

4.5.1. Specific Aid Objective „Developing Sustainable Public Transport Infrastructure” 4.5.1.1. Measure „Developing Sustainable Public Transport

Infrastructure (Rail Transport)”

Objective : promote the use of sustainable public transport and increasing the number of sustainable public transport passengers.

Major project of the Cohesion Fund: Riga tram infrastructure improvement.

(Provision of electric transport movement on Skanstes Street - construction of a new tram line, reconstruction of the existing one and acquisition of new low-

floor trams)With the development of Skanstes Neighbourhood and Skanstes Street as a business

centre with a fast-growing number of jobs, the population and the working people will be provided with a direct connection to the city important transportation hubs - Riga Port, Riga International Coach Terminal, Riga Railway Station, and will be developed a

circular route around the protection zone of the Riga historical centre and a tram route network bypassing the city centre.

Riga Tram Infrastructure Improvement

Page 3: Sustainable public transport – electric transport development project for the capital.

Objective: provision of sustainable transport in the growing capital development area - Skanstes Street in RigaBenefits: • reduced air pollution in the capital• reduced private car flow, while offering the most

convenient alternative - tram• preventive transport planning as a prerequisite for the

development of the capital• a prerequisite for national investments

4.5.1. Specific Aid Objective „Developing Sustainable Public Transport Infrastructure” 4.5.1.1. Measure „Developing Sustainable Public Transport Infrastructure (Rail Transport)”

Riga Tram Infrastructure Improvement

Page 4: Sustainable public transport – electric transport development project for the capital.

Tasks:• provision of the most modern and convenient form of

public transport on Skanstes Street• reconstruction of the existing tram line• construction of a new tram line - to have the existing route

network expanded and connected while unclogging the city centre (Jugla - Mežaparks; Riga Port, Riga International Coach Terminal, Riga Railway Station)

• rolling stock (low-floor trams) purchase, thus making public transport more accessible to passengers with disabilities.

Riga Tram Infrastructure Improvement

Page 5: Sustainable public transport – electric transport development project for the capital.

CF financing – 76 mln euro Co-financing – 14 mln euroo A – B newly constructed tram line of

3.65 km;o B – C reconstructed tram line – 3 km;o purchased 12 low-floor trams.

Project Management o Establishment of the Project

Management Group is currently in the process.

o By order of Riga City Council Transport Department is determined the Project Coordinator.

Riga Tram Infrastructure Improvement

o By order of the Rīgas satiksmes Board Chairman is established the Project Working Group.

Page 6: Sustainable public transport – electric transport development project for the capital.

In cooperation with JASPERS experts are working on the development of documents necessary for the Project application :

Accomplishments:

o developed a financial analysis model,o developed three options of the tram line placing on the layout, determined

principal transverse profiles of the street, the selected options agreed with JASPERS experts,

o determined the tram line placement option to be further subjected to deeper analysis with micro simulation,

o identified real estates located near the existing tram line segment and their owners,

o completed the traffic intensity counting; created the current and future (up to 2052) traffic flow simulation for Skanstes Neighbourhood,

o completed the traffic flow simulation in accordance with the planned tram construction options,

o for all three tram line placing options are determined preliminary volumes of rebuilding of utility facilities and developed plan of combined utility lines,

o conducted in situ measurements of noise generated by old-type trams and low-floor trams,

Project Status

Page 7: Sustainable public transport – electric transport development project for the capital.

Accomplishments:

o in cooperation with the City Development Department of Riga City Council, conducted EMME programme macro simulation with setting road transport changes in Skanstes Neighbourhood based on Skanstes Neighbourhood local plan (author - SIA „Grupa 93”) 1st version data,

o created the current and future (up to 2052) traffic flow micro simulation for the main option,

o completed VISSIM programme micro simulation of traffic flow for the main option, performed data analysis according to the instructions of JASPERS experts.

Project Status

Page 8: Sustainable public transport – electric transport development project for the capital.

In cooperation with JASPERS experts are working on the development of documents necessary for the Project application:

In progress:o performance of economic analysis, estimates of time savings and vehicle costs,

estimates of alternative scenarios,o in accordance with JASPERS instructions (04.11.2015), commenced the traffic

flow simulation (private transport + public transport) for the city of Riga,o the final stage of the necessary information extraction for creating a noise and

pollution simulation for Skanstes Neighbourhood,o will continue a cost - benefit analysis; indicative date: February 2016,o are working on a feasibility study (FS) development; indicative date: February

2016,o started preparation of the Project application.

Project Status

Page 9: Sustainable public transport – electric transport development project for the capital.

- The European Commission approved the Riga traffic application and forwarded the Project for inclusion in the Integrity Pact pilot project "Integrity Pacts - Civil Control Mechanism for Safeguarding EU Funds".

- A Memorandum of Cooperation signed with the Association "Society for transparency – Delna".

- According to the Memorandum, the parties set the objective to work closely together and achieve the highest standards of integrity and transparency with regard to the implementation of the Project, and for that purpose it is intended to use the concept of the Integrity Pact developed by Transparency International for all the applicants, bidders and contractors participating in the procurement procedure within the Project.

Project Status

Page 10: Sustainable public transport – electric transport development project for the capital.

Indicative Timetable for the Implementation of the Project**

** Regulation (EU) No 1303/2013 of the European Parliament and of the Council, p. 101 ** Will be specified. In accordance with JASPERS instructions (04.11.2015), commenced the traffic flow simulation (private transport + public transport) for the city of Riga.

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 41. Project management group establishment

2. Ownership issues (including redemption) 30.06.

3. Exploration, development of the necessary documentation*

4. Cost-benefit analysis

5. Environmental impact assessment

6. Feasibil ity study (FS)

7. Decision on financing the project

8. Securing funding for the project

9. Preparing the EC project proposal

10. JASPERS quality check (IQR - Independent Quality Review)

11. Call for project proposal (call from the CFCA)

12. CFCA decision on approval of the project

13. Conclusion of the contract with the CFCA

14. Design procurement 01.08.

15. Construction design development 01.08. 31.12.

16. Build procurement 01.06. 30.06.

17. Construction 01.07. 01.06.

18. Roll ing stock tender (including preparation of necessary documentation) 01.12. 01.02.

19. Roll ing stock manufacture and supply 01.02. 31.08.

20. Roll ing stock commissioning 01.07. 01.06.

21. Commissioning construction works 01.12. 01.06.

22. Payment of invoices, arrangement of accounting records 01.06. 31.07.

23. Submission of the final report to the CFCA 31.08.

2022Activities

2015 2016 2017 2018 2019 2020 2021

Page 11: Sustainable public transport – electric transport development project for the capital.

Identified risks, an action plan to address them

Disposal of private property

• cooperation between national and local government institutions

• necessary financing for the disposal of real estate

Non-approval of the Skanstes Neighbourhood detailed planning

• cooperation with the Riga City Council

The number of passengers carried exceeds the planned forecasts

• cooperation with state and municipal institutions for attracting investments

• The probability of occurrence of the risk as medium high

• The probability of the occurrence of risk is low

• The probability of the occurrence of risk is low

Page 12: Sustainable public transport – electric transport development project for the capital.

PROJECT TIME FRAME: planned vs actual

2015/november

Act

ual t

ime

fram

ePr

ojec

t pip

elin

e

2015 2016 2017 2015/ december

Exploration & CBA

Exploration & CBA

Preparing PP

Preparing PP

Sketch project & construction design development

Design procurement & construction design development

Build procurement

Build procurement

Rolling stock tender

Rolling stock tender

2018-2022Constraction & Rolling stock manufacture and supply