SUSTAINABILITY IN ASSET MANAGEMENT:
The Practical Approach
Presenter: A.I.Che-Ani
Team : W.H.W.Badaruzzaman T.Z.T.MahmoodM.S.I.Syahrial
UKM Perunding Kejuruteraan dan Arkitek Sdn. Bhd.
WHAT IS SUSTAINABLE ASSET MANAGEMENT?
Manage asset in sustainable way means reuse, recycle, maintain, fixing, avoid waste, upgrade so that maintenance can be optimize while minimizing their impact on environment.
In short, the paradigm of “cradle to the grave”
Among the purpose:a. to reduce maintenance cost and improve serviceb. minimize impact on environment
Asset refers:c. Aset Alihd. Aset Tak Alihe. Aset Hidupf. Harta Intelek
The government
hope via TAMTAM model for infrastructure/ building assets
PENGURUSAN
PERMIN
TAAN
PENGURUSAN NILAI & RISIKO
PENGURUSAN
SUMBER M
ANUSIA
PE
NG
UR
US
AN
KE
WA
NG
AN
PENGURUSAN
DATA
PE
NG
UR
US
AN
PR
ES
TAS
IFAEDAH
ASET YANGOPTIMUM
PERMINTAAN
KOMUNITI
PERMIN
TAAN
KOMUNIT
I
PERMIN
TAAN
KOMUNIT
I
PERMINTAAN
KOMUNITI
PELUPUSAN
PERANCANGAN
PERANCANGAN
REKA BENTUK
PEROLEHAN
PEMBINAAN
PENTAULIAHAN
PENERIMAAN
OPERASI&
SENGGARA
PENILAIAN
PEMULIHAN&
NAIK TARAF
PELUPUSAN
PENGGUNAAN ASET
PE
WU
JU
DA
N A
SE
T
HOW?
BUSSINESS PROCESS
HUMAN
SYSTEM(IT MECHANISM)
Architectural Engineering Construction Operation
Asset life cycle
Building Performance Evaluation
Effectiveness review
Program review
Design review
Commissioning
Post - occupancy evaluation
Market/need analysis
Building Performance
Criteria
Feed forward into next building
cycle
Planning Programming
Recycle
Post occupancy evaluation
construction
Design
Building Performance Evaluation
CONSTRUCTION OPERATIONS
BUILDING INFORMATION EXCHANGE (COBIE): a FOUNDATION for
sustainable facilities
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
Problem Building Documentation Is Fragmented Construction Operations & Maintenance submittals in unorganized, usable format
Results1. Data quickly lost2. Poor preventive maintenance3. More costly repairs4. Warranties not maintained or lost
Adverse impact on mission of the building occupant
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
COBIE/ BIM FOR LIFE LIFE- CYCLE INFORMATION MANAGEMENT
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
CRITICAL DATA LOST IN BUILDING PROCESS
1. Decisions made as ideas & parts are
transformed into designs & buildings are not captured
2. Translation of information for downstream use looses much of what is known during the previous phase
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
COBIE GOALS
1. capture product, equipment, system, and warranty data as created during construction
2. transfer to maintainer’s, operator’s, and asset manager’s systems.
3. produce format and specification4. demonstrate software for captured
during construction and exchange with commercial software
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
WHAT COBIE DOES . . .
1. gather information during construction submittal
2. define min. required information submittals to verify performance
3. direct import to CMMS’s4. integration with building space model
existing contract exchange
points
Transfer informationnot e-paper
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
MEASURING COBIE RESULTS . . .
• costs less to create & manage than current paper/e- paper methods
• easy & authorized access to capture, use, and review information
• information captured as work is being accomplished
• acceptable to all tiers of contractors, suppliers, subs, etc..
• requirements are clearly identified in specifications
• use existing legal framework (i.e. deliverables/contracts)
• demonstrate framework for exchange/retrieval
• import of data included in commercial systems
• import users all data provided
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
PREVAILING BUSINESS CASE – The Nature of The Business Space
Every Business Begins With An Investment in Assets or Infrastructure. Example as Follows :
# Nature Of Business Infrastructure Primary Returns Secondary Returns
1 Healthcare Hospitals Medical Fees and other fees related to Healthcare
The Value of the Healthcare company
2 Education Schools, Universities Student fees , Boarding Fees etc..
The Value of the Company, appreciated value of the assets
3 Properties Accommodations, Office space and surrounding support infrastructures
Rental and Service Fees Appreciated value over time, out-right sales of the properties
4 Government Infrastructures Al types of government offices, living quarters, parks and utilities
Services rendered to citizens from taxes, quit rents, assessments etc..
Via extended useful life of the assets
5 Manufacturing Plants and machineries Goods produced from plants and machineries
The Value of the assets based on the efficient use of the plants and machineries
6 Other Types Of Businesses. Eg Telecommunications, Utilities and others
General Assets, specialized equipments and mobile infrastructures / assets
Services rendered to customers Extended value of the company based on ability to sustain services rendered
7 Passive Property Investment
Properties Rental Yield Incremental Value
PREVAILING BUSINESS CASE – The Keyword is Building Infrastructures All development starts with development and construction involving an investor and builders. Other parties, mainly be, supporting professionals and authorities.
The Property(s)
Inve
stm
ent
Val
ueD
evel
opm
ent
Sta
ges
PlanningApproval
Authorities
Construction
Contractors
CAPITAL EXPENDITURE
COMPLETION
Architects
Authorities
Civil Engineers
M & E Engineers
EquipmentsNon Mechanical Assets
Suppliers and Installers
PREVAILING BUSINESS CASE – Investment Ready for Stream Of ReturnsOnce construction completes, revenue stream will start , but with it also operational cost which is divided into two main categories, fixed and variable. Where variable is total cost to maintain the developed properties
Ret
urn
Str
eam
Ope
ratio
n C
ost
Revenue Generated From The Assets
Cost Incurred To Operate The Assets
Fixed Cost
Variable Cost
Minor RepairsUsage Issue
VandalismEquipment Faults
Breakdowns
REVENUE
(COST)
Net Revenue
PREVAILING BUSINESS CASE – Combining Investment Development and Stream Of ReturnsWhen both stages combined the issues became noticeable.
CostRelated To Upkeep Of The Property(s)
Investment Cost Investment Returns
Ensuring Sustainable Return
Monitor Investment Expenditure
Monitor Project Cost
The issue:Cost Of Maintenance
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
Example Of Maintenance Management Failure…The Star 28th April 2009
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
Example Of Maintenance Management Failure…The Star 28th April 2009
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
Example Of Maintenance Management Failure…The Star 28th April 2009
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
It wasn’t hit by the massive earthquake. In true fashion of the Ripley Legacy, it was built to reflect the odd 1812
earthquake that measured 8.0 on the rick. The building has now become one of the most photographed in the world.
PREVAILING BUSINESS CASE R
etur
n S
trea
mO
pera
tion
Cos
t Simple RepairMajor Failure
Major ReplacementEquipment Failure
Other types of damages
THE BEST WAY TO HANDLE THIS ISSUE IS TO PLAN MAINTENANCE MANAGEMENT EARLY BY WAY OF
THE RIGHT STRATEGY USING CMMS AS THE TOOL.
WHICH IS WHAT WE DO ….COMPUTERIZED
MAINTENANCE MANAGEMENT SOLUTION
(CMMS)
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
PREVAILING BUSINESS CASE – The result in having a good CMMS would simply be managed cost, keeping customer satisfaction level high hence sustainable revenue with extended life cycle of asset…This is something investor willing to pay for.
Ret
urn
Str
eam
Ope
ratio
n C
ost
Customer Satisfaction level high
Better cost control through good CMMS solution
1. Translate to reduce and manageable maintenance cost
2. Better profit margin 3. Sustained to incremental
asset value
1. Deployment of appropriate corrective maintenance
2. Well planned preventive maintenance
3. Accurate predictive maintenance
HOW
THE BENEFIT
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
Human aspect in implementing the idea (with reflect to malaysian
construction industry)
Core business/services Professional service provider (based from programme outcome outlined by MQA)
a. Building designb. Engineering/Structure/Infra.c. Cost and contract admin.d. Valuation and estate agente. Town and regional planningf. Lanscapeg. Land surveyh. Interior designi. Building control/performance
ARCHITECTENGINEERQUANTITY SURVEYORVALUATION SURVEYORTOWN PLANNERLANDSCAPE ARCHITECTLAND SURVEYORINTERIOR ARCHITECTUREBUILDING SURVEYOR
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
One man show....does it really work??
Sustainable asset management...who’s who
Core business/services Professional service provider (based from programme outcome outlined by MQA)
a. Building designb. Engineering/Structure/Infra.c. Cost and contract admin.d. Valuation and estate agente. Town and regional planningf. Lanscapeg. Land surveyh. Interior designi. Building control/performance
ARCHITECTENGINEERQUANTITY SURVEYORVALUATION SURVEYORTOWN PLANNERLANDSCAPE ARCHITECTLAND SURVEYORINTERIOR ARCHITECTUREBUILDING SURVEYOR
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
- ALL OF US -
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Reactive Maintenance“Run it until it breaks”
Preventive Maintenance“Scheduled or planned maintenance”
Predictive Maintenance “Strives to detect failures before they occur with testing”
Reliability Centered Maintenance “Based on assessment of condition and serviced in context to operating requirements”
HOW
BUSSINESS PROCESSHUMAN
SYSTEM(IT MECHANISM)
To strive maintenance management towards excellence through Best Practices
The move in practice can only be realized with a very experience embedded system (in this case we are using WebTMA)
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Some Key Benefits And Advantages Are As Follows :
Extend the Useful Life of Assets. • Reduced assets/facilities/equipment down time through
improved scheduling.• Improved reliability through better tracking and repair of
failures.• Allows staff to be proactive through automatically
generated preventive maintenance.
Efficiency in Inventory. • Reduce inventories needs 15% to 20%.• Reduced inventory costs through better tracking and
restocking process.• Control of material ordering reduces stock costs.
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Preventive Maintenance.• Extend the useful life of equipment.• Keep maintenance jobs to a minimum number.• Increase reliability of equipment and systems.• Provide adequate justification to regulatory agencies.
Benchmarking / KPI / KRA• Increase management feasibility through benchmarking
and KPI (Key Performance Index).• Better understanding though KRA (Key Area Analysis)
and pin-point of areas need for improvement.• Preparation of budgeting and cost projection for yearly
actual budgeting projection.
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Some Key Benefits And Advantages Are As Follows :
Prevailing Elements From Keywords Translated To Ideas In Generating Value Proposition
KEYWORDS ELEMENTS
HELP AND FACILITATE
AWARENESS
CHALLENGES AND SUSTAINABILITY
STANDARD AND PERFORMANCE
Facility management practice in Malaysia is still in developing stage if not infant. Facilitating best practices are very much needed to ensure a proper practices in place.
To ensure a progressive and systematic facilitation, awareness creation must be put in place in full and categorically.
Years of practicing traditional method in managing assets still prevails until unexpected incidences occurred. Forging ahead in countering challenges and sustain stability will require a mind-set change backed by best practices
Standard and performance will facilitate sustainability of best practices.
IDEAS
Knowledge database of experience in managing facilities based on business best practices based on others’ experiences.
Provide consultancy services on facility management
Provide option on ways to counter issues to manage and contain challenges and to sustain them thereafter.
Assured Solution to maintain standard and performance
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Assuming Facility Manager Request For Maintenance or Services From Maintenance and Services Contractor(s)
Facility Manager
Buy Side
Maintenance Contractor
The Request requires the maintenance contractor to procure parts and labour with certain level of expertise Of which they do not have
• The Contractor will need to procure parts and material
• The contractor need to engage a specific labour
Parts Supplier Supply
Special Labour Engaged
Performance Of Work
Completion Of Work And Delivery
Delivery Of Work – May Necessary On Time at The Most Optimal Cost Why ?• The Maintenance Contractor may just go for one parts supplier – Issue on the best price
• Labour will hike the price as due to speciality requirement
• Time is of essence – urgency will naturally hike the price
Urgent Demand
Based Price
Specialty Based Fees
Time Factor
Demand and Time = Money
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Painting The Picture Clearer – Typical Current Practice
Assuming Facility Manager Request For Maintenance or Services From Maintenance and Services Contractor(s)
Parts Suppliers
Assets Supplier
Vendors
Education Outfit
Technician and Engineers
Maintenance Contractors Register their
Value Services in the Portal and access the portal via system download
Provide Price List ,
Task Listing ,
Capabilities,
Locations
Certifications
Etc..
Facility Management
Portal
Knowledge
Best Practice
Business Process
System and Solution
UKM
Register as user by subscribing to the portal and access via system
download
System Download
Department ofDevelopment
Management (JPP)
Select the Best Maintenance Contractor For The JobFrom The Portal
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Painting The Picture Clearer – Portal Based Idea
Awareness Utilize Capitalize
Set-up FM Portal filled with Knowledge Enrichment and Best
Practice. Get stakeholders to participate
• Promotion• Members Recruitment• Trial Stage• Put Action To Test• Online Articles Begin to execute transactions.
Members actively participate in the value chain
Shall Begin to realize the full benefit Ability to fully practice FM best
practices and perhaps able to market services out of the UKM
Practices based on actual Data
UKM is now here
CASE STUDY: UKM SOLUTIONMaintenance Approach of UKM
Future Prospect Roadmap
…and to leapfrog