Survey ofTactical Methods
XONITEK Consulting Group Int’lFriday, August 13, 2010
Kaizen
What Is Kaizen?
Kaizen is the fundamental framework within with Lean-style process improvement happens.
It is a collaborative, team-centric method for analyzing and reducing the waste within a particular area of the business.
Presented by XONITEK Corporation 3
XONITEK Corporation 4
Types of Kaizens
Target Kaizen A focused event using a specific Lean tool Formal Value Stream Map (VSM) created during or immediately before
event Focused on a specific improvement area within the whole environment
Impact Kaizen (“Blitz”) An approach to identify “low hanging fruit” in waste reduction. Often done in lieu of a VSM – roughly overviews entire process area or
facility and interfacing groups. Fluid, fast moving framework to capture easy process gains – designed
to collect data in an informal fashion.
Process Steps of a Target Kaizen
Kaizen - new - no red.igx
How to Define a Target Kaizen Project
Process Analysis
Improvement Implementation
Standardization
XONITEK Corporation 6
Project Scope Document
The initiation of the Target Kaizen should be presented in a (semi-)formal proposal
The “Project Scope Document” is one such format to initiate this process
Presented by XONITEK Corporation 7
Project Scope Document sample
XONITEK Corporation 8
Reviewing the Process with the Team
Start with a rough walk through of current state of the selected process area
First, describe the process in words Commonly used name List inputs List outputs Give one sentence description of general activity performed Show “setup time”, “cycle time”, “takt time”
XONITEK Corporation 9
Key Definitions to Understand
Setup Time Duration of time between the output of the last good item from the
previous job to the first good piece of this job Example: Clock starts when last bottle of flavor A water hits the
crate and stops when the first verified good bottle of flavor B hits the next crate
Cycle Time How often a unit of output leaves this process.
Example: if one filled bottle of water appears at the output end of the process every 30 seconds, then cycle time = 30 seconds.
Takt Time How often a unit of output must leave the process to keep up with
customer demand. Example: if there are orders for 240 bottles of water per hour, takt
time = 15 seconds.
XONITEK Corporation 10
Take a Walk
Take the team to observe operation of the process:
Record the steps involved in the process using the Flow Process Form – at a rough level
Note cycle time estimates of each step
Categorize the wastes observed
XONITEK Corporation 11
Document the Findings
When complete, formalize the observation:
Account for any potential variances in the process. Are there typically differences due to:
Operator? Shift? Tools? Travel Distances – methods analysis.
Is there prep work for this process that may change how it operates?
Review the Process Inputs for opportunity.
Are there any factors in downstream processes that may impact the way this area performs?
Goal: A process description of the typical execution of the process backbone or any specific variant process steps that may exist.
XONITEK Corporation 12
Formalize the Map
Finally, verify the observation…
Bring each element of the process description to the team.
Verify its accuracy and realism.
Resolve any discrepancies now.
Do not shortchange this process!
XONITEK Corporation 13
Scope Validation
Verify the details of the Project Scope document:
Is the Mission of the project realistic?
Are the CAN/MUST DO’s and the MUST NOT DO’s reasonable?
Are the goals attainable, in a general sense?
If there are any concerns, stop now and review with project sponsor!
XONITEK Corporation 14
Scope Refinement
Validate that the goals are specific: Each goal should have a quantifiable target.
For example: “Reduce cycle time by 50%” Use the wastes identified in the walk through to perform rough
calculations.
Will the specific goals meet the required ROI of the Project Plan?
Consider reviewing the revised goals with the project sponsor to ensure continued support.
XONITEK Corporation 15
Visiting the Site
The Team has Decided to Go Forward…
Prepare for the team’s visit: Select an operator whose activities will be “typical”. Ensure entire team is available, without interruption, for length of
observation. Assign roles (examples next slide) to each team member
based on the pre meeting discussions.
Goal: Record solid data from a typical performance of the process.
XONITEK Corporation 16
Role Assignments… Assign roles based on talents:
Process observation coordinator
Machine observer
Stopwatch operator
Distance measurer
Photographer
Layout/Travel observer
Documentation coordinator
XONITEK Corporation 17
Role Descriptions
Process Observation Coordinator
Primary goal: Record the steps in the process, along with data from other observers (Flow Process Map)
Note when each step in the process starts. Note a short description of the step from the perspective of
the operator (“waits for data display”, “inspects diameter of cut”).
When a step ends, obtain and record time and distance measurements.
Note where machine observations belong in the flow.
Presented by XONITEK Corporation 18
Flow Process Map
This chart allows you to map the activities in a process very specifically.
Draw connecting lines or “X” out the activity of each step.
Tally the number of each symbol and time at each step to overview the process.
Distance and time should be common units of measure… a good choice is feet and minutes.
XONITEK Corporation 19
Role Descriptions
Machine Observer
Primary goal: Record the steps in machine operations Similar to process observation role. Observe and record when machine begins distinct steps in
its processing. Obtain and record time measurements as each step begins. Make notes of the magnitude and nature of significant
movements within machine at each step. Use same stopwatch as process observer!
XONITEK Corporation 20
Role Descriptions
Stopwatch Operator
Primary goal: Provide time measurements as prompted by observation coordinator/machine observer
In preparation, learn the function of all controls on stopwatch. Start stopwatch at beginning of first step and leave running. Listen carefully to observation coordinator and machine
observer calls of “next step”. Provide time on stopwatch at that moment.
XONITEK Corporation 21
Role Descriptions
Distance Measurer
Primary goal: Measure the physical distances walked/moved by operator
Use a distance wheel and walk the same paths the operator walks, without interfering.
Note the nature of any smaller motions in each process step (“three wrist turns”, “one waist twist”).
Provide measurements to observation coordinator when prompted.
XONITEK Corporation 22
Role Descriptions
Photographer
Primary goal: Create a visual record of the process and the Kaizen blitz event
In advance of the event, take pictures of all areas, machines, and equipment involved in the process.
During the event, take pictures of the operator at each step as the process unfolds.
Use angles/locations that provide useful identification/illustration of the steps in the process.
Note any safety hazards observed, along with time they were observed.
Photograph all inventory areas. Take a few pictures of the Kaizen team during the event. After the event, take pictures of the final layout/process operation.
XONITEK Corporation 23
Role Descriptions
Layout/Travel Observer
Primary goals: Illustrate the work area layout; document travel and transport of the process.
In preparation for the event, draw work area layouts for all areas involved in this process.
If possible, fit everything on one sheet. During the event, use “spaghetti diagram” techniques to draw
movements on the layouts. Consider using fresh layout copies for every 10-15 activities. Take measurements of inventory found within the work area.
XONITEK Corporation 24
Role Descriptions
Documentation Coordinator
Primary goal: Collect and assemble the documentation related to the process.
Assemble all input and output documentation to the process. Note when in the process each is received/created. After event, collect copies of any documents the operator
used for guidance before/during operation. Create detailed lists of equipment and tools in the work area. Describe all inspection points in the process.
XONITEK Corporation 25
Role Descriptions
You can add or modify these roles as appropriate
Additional roles should be discussed and added as necessary Likewise with the elimination of roles
XONITEK Corporation 26
Waste Analysis
Collect the observational paperwork created during the event.
For each step observed, categorize as a particular waste or value add.
Sum the durations in each category.
Make other calculations (see next slide).
Re-evaluate the goals of the event (discussed in later slides).
XONITEK Corporation 27
Waste Analysis
Additional information to compute from observations Sum the distances traveled.
Sum the categories of motion observed.
Sum the safety hazards observed.
Calculate the space utilization in the work areas of the process.
Obtain (or estimate) scrap and rework rates for the process.
Validate inventory measurements taken.
XONITEK Corporation 28
Waste Analysis
Build a (semi-)formal Value Stream Map (VSM)
Re-evaluate the goals of the event
Are they achievable, based on the wastes observed?
If not, discuss with project sponsor.
Make any updates necessary and agreed upon by the team and the sponsor.
Move on to making improvement recommendations.
I
Daily
Coils 5 days supply
SteelSupplier
500 ft coilsCustomer
Stamping
1
Weld 1
2
Assem. 1
1
Shipping
1
C/O = 60 min
C/T = 1 min.
Util. = 85 %
Scrap 1 %
460 min. avail.
EPE = 2weeks
C/O = 10 min
C/T = 3 min.
Util. = 77 %
417 min. avail.EPE = 2weeks
Scrap 3 %
C/O = 30 min
C/T = 5 min.
Util. = 93 %
Scrap 3 %
EPE = 2weeks
450 min. avail.
C/O = 0 min
C/T = 8 min.
Util. = 88 %
Scrap 0 %
460 min. avail.EPE = Day
I
4600L2400R
I
1100L600R
I
1200L 640R
ProductionControlWeekly Fax
6-week forecast
90/60/30 dayForecast
Daily Order150sets/day
1 minute 3 minute 5 minute 8 minute VA = 17 min.
NVA = 35.7 days10.3 days 8.2 days 12.1 days
XONITEK Corporation 30
Improvement Development
Identify the bottleneck in the process How can we improve the bottleneck? Which points will then be the next one or two bottlenecks? How can those be improved?
Which Lean tools are best to tackle the bottleneck’s waste? Is it a setup issue? (QCO) Search/motion? (5S) Inventory? (Kanban)
Based on the proposed changes, build a Future State Value Stream Map now
XONITEK Corporation 31
Plan the Changes
Discuss each phase of the change and what resources are required and when…
Mechanical – moving or modifying equipment, connecting machines.
Electrical – redistribution of power, conduits.
Tooling – retool, procurement of tools, creation of new tools, spares.
Additional Training – is the operator qualified to work in an expanded cell structure, revised machine parameters may necessitate additional instructions.
Specialized Resources – outside contractors for specialized needs.
XONITEK Corporation 32
Develop a Timeline
Start with a schedule of activities by sequence…
Review and optimize the activities to be most productive.
Put timing around “groups” of actions to maintain flexibility.
Confer with all impacted departments to minimize disruptions and possibly enable them to modify some operational plans to sustain customer service.
Review all plans with the Kaizen team involved to assure no misses…
XONITEK Corporation 33
Announce the Changes
Formally announce to the impacted area.
Post in public places to inform employees with action dates.
Electronic postings to support personnel may be appropriate as well…
You can never have TOO much communication.
XONITEK Corporation 34
Make the Changes
Get it done.
Don’t be afraid to step back into previous steps in the Kaizen as new information is available.
Adjust. Repeatedly, if necessary. It’s ok.
XONITEK Corporation 35
Create the “Leave Behind”
Use “Leave Behind Template”
Quantify the benefits measured “Cycle Time Reduced 50% from 1:30:50 to 0:45:25” “Set-up Time Reduced 80% from 100 seconds to 20 seconds” Etc.
List each improvement action implemented
Use this form as a template to measure continued use of the improvements implemented
XONITEK Corporation 36
Create the “Leave Behind”
Clearly document hard benefits attained
Calculate time savings attained on an annual basis
Multiply by the appropriate labor rate to get a dollar amount
Remember: It’s only a hard benefit if there is something productive for freed labor to do!
If there is machine time saved, use the appropriate charge rate to calculate the annual benefit, but only if the extra time can be productively used immediately!
Remember: Hard benefits are realized by the time the event is finished; soft benefits require some additional action to accomplish!
XONITEK Corporation 37
Create the “Leave Behind”
Document other hard benefits
Calculate annual dollar value cost of space freed, but only if it can immediately be productively used for something else or sold / unleased!
If there is an immediate sales gain due to orders that can now be fulfilled from extra capacity, that revenue is also a hard benefit
If there is an immediate reduction in inventory, the annual carry cost can be counted as a hard benefit
If there is a reduction in material used, including reduction in scrap, the annual cost of material saved can be counted as a hard benefit
The liquidation value of any equipment sold during the event can be counted as a hard benefit
XONITEK Corporation 38
Example: Hard Benefits Chart
Category Amount Reduced
Improvement
$ %
Labor Savings due to Cycle Time Reduction
01:30:00 $25,000 30%
Floor Space reassigned to Production Line X
2500 sqft $40,000 50%
Surplus Hardware sold to Customer Q
5 wrenches
$500 --
Etc.
…
XONITEK Corporation 39
Create the “Leave Behind”
Create an action plan for “soft” benefits identified List each action that must be taken to convert all identified soft
benefits to hard benefits Assign a resource to each Identify a due date for reporting back to the team
Action Payback Assigned To Due Date
Implement on water production line B $50,000 Tim Comfort 31-Mar-2011
Cross-train operators on prod. line Q $30,000 Ed Giles 31-Jan-2011
Sell extra clamp set $5,000 Amit Pujara 31-Dec-2010
XONITEK Corporation 40
Create the “Leave Behind”
List ideas for additional improvement opportunities
Use the additional improvement ideas generated during the event that were not chosen
List no more than three
Consider those rejected on basis of time/resource constraints, but not those with low payback
Assign each to a particular resource, with a due date!
XONITEK Corporation 41
Closing Events
Make sure the team is publicly recognized!
Make sure all outstanding improvement implementation is completed.
Make sure there is a plan to convert the soft benefits !!!
Schedule periodic (monthly?) reviews to ensure changes are still utilized every time process operates.
Schedule follow-up kaizen events (twice a year?) to repeat the cycle!
XONITEK Corporation 42
Update Standard Work Procedures
Using the appropriate company format update the new work procedures that are validated by the Kaizen Team. Update the standard work document for the process Train all affected employees in the new procedures
Expect that you will need a few cycles to observe before this finalization can be done.
Always involve the front line employees…
*** Questions and Discussion ***
Kaizen
5-S
Quick Changeover
AKA: Single Minute / Moment Exchange of Dies (SMED)
XONITEK Corporation 46
The Effect of QCO
Set Up 60 min. Produce Parts 120 pcs.
Elapsed Time 3 hrs or 180 minutes
Elapsed Time 3 hrs or 180 minutes
• Change Over of 1 hour is 30 sec/pc
• SKU lot size produced to absorb SU costs = 1 SKU
• Change Over is reduced to 10 minutes and kept at 30 sec/pc
• SKU can be changed to 20 pc lots = 6 SKU’s in same time frame
XONITEK Corporation 47
Something to consider…
In an 8 hour shift:
Old scenario – 2 SKU’s and part of a third. Downstream processes waiting Inventory increased.
New Scenario – 16 SKU’s produced More downstream processes supported Less, if anything, put into inventory.
XONITEK Corporation 48
External vs. Internal
External Activities Happen outside of the physical machine Do NOT require the machine to be stopped to be performed
Finding tools Finding dyes Retrieving anything needed to start the production run Locating employees to help with set up Moving inventory out of the way
Internal Activities Actions that require the machine to be stopped
Inserting a dye into the machine Locking it in place
XONITEK Corporation 49
Internal and External… External Activities:
Tools – Hand tools or machine tools necessary to perform the next job. Fixtures – Jigs, templates or dies used to make a specific SKU. Parts – Materials necessary to produce the job, usually from a
stockroom. Material Handling – Hoists, booms or other devices used to move the
previous job or the current job. Completed Jobs – Parts from orders done that are now moved to the
next operation. Instructions – Includes setup check lists and job work parameters.
Internal Activities: Changeover - Placement of tools into the machine or workstation done
while the machine is NOT running.
XONITEK Corporation 50
The Process
A. Observe and record the process as it currently existsB. Pull all External activities to the beginningC. Convert Internal activities into External activitiesD. Conduct activities in parallel
XONITEK Corporation 51
The Observation Techniques
Based on the actual duration of the changeover: < 2 hours… first hand observations with a
stopwatch. First hand observations are best done with one person timing
key activities and the other making any required notes...
> 2 hours use a video camera with a visible timer to record and later review the activities.
XONITEK Corporation 52
Pareto the Activities
Resolve “isolated” incidences Don’t waste time on incidences that rarely occur… establish the operator’s
responsibility to avoid or minimize… Authority not to do… Notification of Line Leadership for resolution…
Identify true waste factors – Non Value Add Standardization of the hardware… the length is waste… only the last quarter
turn tightens the bolt… Quick Clamps to replace manual tie downs… Suspended Tools, pneumatic or electric to improve cycle time. Pre Condition the dies…
Establish Go Forward Momentum… Define Lean tools to facilitate the QCO.
XONITEK Corporation 53
Examples of Quick Change Hold Downs...Quick Turn Clamps replacing screws…
XONITEK Corporation 54
Put Change Over into Perspective…
Question…
How can a pit crew change tires, fill the vehicle with fuel, and inform the driver in less than 30 seconds?
What changes in your business could be facilitated by such a dramatic improvement?
*** Questions and Discussion ***
Quick Change Over
Assorted Topics in Lean
Standard Work
Every process should have a standard procedure with expected durations
Without Standard Work, improvement implementation will not “stick”
Development of Standard Work is the most important (and most often overlooked) element of 5S
Presented by XONITEK Consulting Group Int’l 57
Poka Yoke
“Mistake Proofing”
Reduce the incidence of defects by ensuring a process MUST be completed correctly, by design
Warning poke yoke – an alert that something is about to go wrong Control poke yoke – it is physically impossible to make a mistake
Presented by XONITEK Consulting Group Int’l 58
Poka Yoke
Contact Method A physical attribute prevents the defect
“Keyed” cabling, polarized plugs, uniquely shaped slots
Fixed-value Method An alert to the operator that a number of movements have not been made
Motion-step Method An alert that a particular sequence has not been followed
Presented by XONITEK Consulting Group Int’l 59
Visual Management
As much as possible, integrate visual workplace tools in process improvement activities
An observer should be able to determine, at a glance, what the current state of the process environment is
Examples: Red/Yellow/Green status lights 5S style floor outlines Work scheduling board