Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 -...

6
Summary of Department Projects Lincoln City Libraries 0549 - Replace Bookmobile (4) - 090700000549 - 2010/2011 FINAL 0602 - Gere Branch Library - New HVAC (4) - 101400000602 - 2010/2011 FINAL Description: Lincoln City Libraries' Bookmobile provides individualized library services to a diverse population throughout LIncoln and Lancaster County. The bookmobile focuses service delivery to four main areas: County towns and County cities; Youth with emphasis on children at risk (includes preschools and daycares); Seniors; Areas in Lincoln not close to existing libraries. The current bookmobile has been in service since 1993. A replacement vehicle must be a minumum of 30' long, be handicap accessible, and have the capacity for a minimum of 3,000 volumes, and contain public computer stations, and include green features such a solar panels, hybrid generator, and must meet 2010 EPA Emission Standards. Replacement vehicle is estimated to be needed by 2012. Industry representative reports that after order, manufacturing time is nine months. Funding a replacement vehicle is therefore needed in 2010-2011. (SUST CAT 3) "Green" options for specialty vehicles are becoming more abundant. Alternative fuels, lower engine emissions, hybrid power systems, solar panels, LED lighting, and recycled or renewable construction materials are all currently available for integration into bookmobiles. Green options, while contributing to a better environment for all, increase the initial cost of the vehicle. Description: The existing HVAC system is inefficient and past end of life. A geothermal system that would add to the initital cost of this project is possible if additional sustainability funding is available. (SUST CAT 3) Generally Conforms with Plan In Conformance With Plan Comp Plan Conformance: Comp Plan Conformance: Anticipated Date In Service: Anticipated Date In Service: A B Rating: Rating: Continued New Status: Status: $0.0 $0.0 Prior Appropriations Prior Appropriations $250.0 $85.0 Six Year Total Six Year Total $0.0 $0.0 Costs Beyond Costs Beyond $0.0 $0.0 Project Total Project Total Estimated Cost by Activity Estimated Cost by Activity 2015/2016 2015/2016 2014/2015 2014/2015 2013/2014 2013/2014 2012/2013 2012/2013 2011/2012 2011/2012 2010/2011 2010/2011 Equipment Equipment X X Appropriations Appropriations 2015/2016 2015/2016 2014/2015 2014/2015 2013/2014 2013/2014 2012/2013 2012/2013 2011/2012 2011/2012 2010/2011 2010/2011 Keno Funds Other Financing Keno Funds $150.0 $100.0 $85.0 (None) (None) Group: Group: (None) (None) Program: Program: * Amounts are in thousands of dollars 43

Transcript of Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 -...

Page 1: Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 - Replace Headquarters Libary (4) - 071400000371 - 2010/2011 FINAL Description: The Bennett

Summary of Department Projects

Lincoln City Libraries

0549 - Replace Bookmobile (4) - 090700000549 - 2010/2011 FINAL

0602 - Gere Branch Library - New HVAC (4) - 101400000602 - 2010/2011 FINAL

Description: Lincoln City Libraries' Bookmobile provides individualized library services to a diverse population throughout LIncoln and LancasterCounty. The bookmobile focuses service delivery to four main areas: County towns and County cities; Youth with emphasis on children at risk (includespreschools and daycares); Seniors; Areas in Lincoln not close to existing libraries.

The current bookmobile has been in service since 1993. A replacement vehicle must be a minumum of 30' long, be handicap accessible, and have the capacity fora minimum of 3,000 volumes, and contain public computer stations, and include green features such a solar panels, hybrid generator, and must meet 2010 EPAEmission Standards. Replacement vehicle is estimated to be needed by 2012. Industry representative reports that after order, manufacturing time is ninemonths. Funding a replacement vehicle is therefore needed in 2010-2011.

(SUST CAT 3) "Green" options for specialty vehicles are becoming more abundant. Alternative fuels, lower engine emissions, hybrid power systems, solar panels,LED lighting, and recycled or renewable construction materials are all currently available for integration into bookmobiles. Green options, while contributingto a better environment for all, increase the initial cost of the vehicle.

Description: The existing HVAC system is inefficient and past end of life. A geothermal system that would add to the initital cost of this project ispossible if additional sustainability funding is available.(SUST CAT 3)

Generally Conforms with Plan

In Conformance With Plan

Comp Plan Conformance:

Comp Plan Conformance:

Anticipated Date In Service:

Anticipated Date In Service:

A

B

Rating:

Rating:

Continued

New

Status:

Status:

$0.0

$0.0

Prior Appropriations

Prior Appropriations

$250.0

$85.0

Six Year Total

Six Year Total

$0.0

$0.0

Costs Beyond

Costs Beyond

$0.0

$0.0

Project Total

Project Total

Estimated Cost by Activity

Estimated Cost by Activity

2015/2016

2015/2016

2014/2015

2014/2015

2013/2014

2013/2014

2012/2013

2012/2013

2011/2012

2011/2012

2010/2011

2010/2011

Equipment

Equipment

X

X

Appropriations

Appropriations

2015/2016

2015/2016

2014/2015

2014/2015

2013/2014

2013/2014

2012/2013

2012/2013

2011/2012

2011/2012

2010/2011

2010/2011

Keno Funds

Other Financing

Keno Funds

$150.0

$100.0

$85.0

(None)

(None)

Group:

Group:

(None)

(None)

Program:

Program:

* Amounts are in thousands of dollars

43

Page 2: Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 - Replace Headquarters Libary (4) - 071400000371 - 2010/2011 FINAL Description: The Bennett

Summary of Department Projects

Lincoln City Libraries

0604 - Anderson Branch Library - New HVAC (4) - 101400000604 - 2010/2011 FINAL

0370 - Bethany Branch Library - Roof Replacement (4) - 071400000370 - 2010/2011 FINAL

Description: The existing HVAC system is inefficient and past end of life.(SUST CAT 3)

Description: The existing roof is a fully adhered EPDM membrane system, installed in 1989 carrying a 15-year watertight warranty. Based on pastexperience and current condition of the roof, it is recommended that this roof be replaced in 2012-2013.(SUST CAT 3)

In Conformance With Plan

In Conformance With Plan

Comp Plan Conformance:

Comp Plan Conformance:

Anticipated Date In Service:

Anticipated Date In Service:

B

B

Rating:

Rating:

New

Continued

Status:

Status:

$0.0

$0.0

Prior Appropriations

Prior Appropriations

$85.0

$30.9

Six Year Total

Six Year Total

$0.0

$0.0

Costs Beyond

Costs Beyond

$0.0

$0.0

Project Total

Project Total

Estimated Cost by Activity

Estimated Cost by Activity

2015/2016

2015/2016

2014/2015

2014/2015

2013/2014

2013/2014

2012/2013

2012/2013

2011/2012

2011/2012

2010/2011

2010/2011

Equipment

Construction

X

X

Appropriations

Appropriations

2015/2016

2015/2016

2014/2015

2014/2015

2013/2014

2013/2014

2012/2013

2012/2013

2011/2012

2011/2012

2010/2011

2010/2011

General Revenues

General Revenues

$85.0

$30.9

(None)

(None)

Group:

Group:

(None)

(None)

Program:

Program:

* Amounts are in thousands of dollars

44

Page 3: Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 - Replace Headquarters Libary (4) - 071400000371 - 2010/2011 FINAL Description: The Bennett

Summary of Department Projects

Lincoln City Libraries

0371 - Replace Headquarters Libary (4) - 071400000371 - 2010/2011 FINAL

Description: The Bennett Martin Public Library has served the City of Lincoln well for almost 50 years. It is a cultural anchor in downtown Lincoln andserves the needs of a diverse group of library users. Over the past several years, the role and services provided by public libraries have evolvedconsiderably and the current 64,000 square foot building no longer serves a quality community such as Lincoln. During the 2003 Bennett Martin Public LibrarySpace Needs & Facility Study, the community provided information through focus groups and one-on-one interviews which results in the need for a facility with154,489 square feet located in accordance with the 2005 Downtown Master Plan Land Use Framework. (SUST CAT 3)

Generally Conforms with PlanComp Plan Conformance: Anticipated Date In Service:

BRating: ContinuedStatus:

$0.0

Prior Appropriations

$47,482.4

Six Year Total

$0.0

Costs Beyond

$0.0

Project Total

Estimated Cost by Activity 2015/20162014/20152013/20142012/20132011/20122010/2011Final Plans

Construction

Equipment

Other

X

X

X

X

Appropriations 2015/20162014/20152013/20142012/20132011/20122010/2011G.O. Bonds

Other Financing

$23,741.2

$23,741.2

(None)Group: (None)Program:

* Amounts are in thousands of dollars

45

Page 4: Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 - Replace Headquarters Libary (4) - 071400000371 - 2010/2011 FINAL Description: The Bennett

0604

0602

0370

0371

A ST A ST

S 84T

H ST

S 8

4TH

ST S 2

7TH

ST

S 27T

H ST

S 56T

H ST

S 5

6TH

ST

S 70T

H ST

S 7

0TH

ST

N 27

TH S

T N

27TH

ST

VINE ST VINE ST

SOUTH ST SOUTH ST

N 84

TH S

T N

84TH

ST

S 48T

H ST

S 4

8TH

ST

N 70

TH S

T N

70TH

ST

OLD CHENEY RD OLD CHENEY RD

YANKEE HILL RD YANKEE HILL RD

ADAMS ST ADAMS ST

HOLDREGE ST HOLDREGE ST

PINE LAKE RD PINE LAKE RD

NW 48

TH ST

NW

48TH

ST

P ST P ST

SUPERIOR ST SUPERIOR ST

S 13T

H ST

S 1

3TH

ST

S 9TH

ST

S 9TH

ST

N 14

TH S

T N

14TH

ST

W A ST W A ST

N 56

TH S

T N

56TH

ST

RANDOLPH ST RANDOLPH ST

S 14T

H ST

S 1

4TH

ST

RR OO SS AA PP AA RR KK SS WW AA YY O ST O ST

S 33R

D ST

S 3

3RD

ST

SS 44 00

TT HH SS

TT

SALT CREEK RDWY

SALT CREEK RDWY

W VAN DORN ST W VAN DORN ST

PIONEERS BLVD PIONEERS BLVD

W OLD CHENEY RD W OLD CHENEY RD

A ST A ST

S 40T

H ST

S 4

0TH

ST

80

180

80

80

77

6

34

77

2

79

55-K

55-C

55-X

55-W

WaverlyWaverly Lincoln CIP2010 - 2016Lincoln City Libraries

Project Locations

Last 4 digits of project numberXXXX

2 0 21

MilesConsult the detailed project descriptions

and funding summary for further information.File: M:\plan\2010 CIP\GIS\Mapping\Library.mxd

Lincoln's Future Service LimitShown as Black Outline

Site Specific Projects

0549

Projects with Citywide Benefit

46

Page 5: Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 - Replace Headquarters Libary (4) - 071400000371 - 2010/2011 FINAL Description: The Bennett

Lincoln City Libraries

$335.0 $85.0Department Total: $30.9 $0.0 $47,482.4 $0.0 $47,933.3

2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016

$250.0

$85.0

$0.0

$0.0

$0.0

$0.0

$0.0

$85.0

$0.0

$0.0

$0.0

$0.0

$0.0

$30.9

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$47,482.4

$0.0

$0.0

$0.0

$0.0

$0.0

$250.0

$85.0

$85.0

$30.9

$47,482.4

Funding Summary - By Project* Amounts are in thousands of dollars

$0.0

$0.0

$235.0

$100.0

$0.0

$85.0

$0.0

$0.0

$0.0

$30.9

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$23,741.2

$0.0

$0.0

$23,741.2

$0.0

$0.0

$0.0

$0.0

$23,741.2

$115.9

$235.0

$23,841.2

G.O. Bonds

General Revenues

Keno Funds

Other Financing

2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016

$335.0 $85.0 $30.9 $0.0 $47,482.4 $0.0 $47,933.3

Fund Source

* Amounts are in thousands of dollars

Funding Sources

Project Title0549

0602

0604

0370

0371

Replace Bookmobile (4)

Gere Branch Library - New HVAC (4)

Anderson Branch Library - New HVAC(4)Bethany Branch Library - RoofReplacement (4)Replace Headquarters Libary (4)

47

Page 6: Summary of Department Projects...Summary of Department Projects Lincoln City Libraries 0371 - Replace Headquarters Libary (4) - 071400000371 - 2010/2011 FINAL Description: The Bennett

This page left blank intentionally.

48