    Requirements Referenced Standards

    ustainable Sites 14 points

    Construction Activity

    Pollution prevention

    Option 1

    The ESC (Erosion & Sedimentation Control) Plan shall conform to the erosion &

    sedimentation requirements of the 2003 EPA Construction General Permit (CGP) which

    outlines the provisions necessay to comply with phase I & phase II of the NPDES (National

    Polluant Discharge Elimination System) program;

    * Prevent loss of soil during construction

    * Prevent sedimentation of storm sewer or receiving streams

    * Prevent polluting the air with dust & particulate matter.

    1/ Storm Water Management for

    Construction Activities (USEPA-US

    Environmental Protection Agency

    Office of Water)

    -

    Option 2

    The ESC (Erosion & Sedimentation Control) Plan follows local erosion & sedimentation

    control standards & codes, which are more stringent than NPDES program requirements.

    Site Selection Do not develop buildings, hardscape, roads or parking areas on portions of sites that meetany one of the following criteria:

    1/ prime farmland as defined by the US Department of Agriculture in the United States

    Code of Federal Regulations, Title 7, Volume 6, Parts 400 to 699, Section 657.5 (citation

    7CFR657.5).

    2/ previously undeveloped land whose elevation is lower than 5 feet above the

    elevation of the 100-year flood as defined by FEMA (Federal Emergency Management

    Agency)

    3/ land that is specifically identified as habitat for any species on Federal or State

    threatened or endangered lists

    -

    4/ within 100ft of any wetlands as definded by United States Code of Federal Regulations

    40 CFR, Parts 230-233 and Part 22, and isolated wetland or areas of special concern

    identified by state or local rule, OR within setback distance from wetland described in

    state or local regulations, as defined by local or state rule or law, whichever is more

    stringent.

    5/ previously undeveloped land that is within 50ft of a water body, defined as seas,

    lakes, rivers, streams and tributaries which support or could support fish, recreation or

    industrial use, consistent with the terminology of the Clean Water Act.

    6/ land which prior to acquisition for the project was public parkland, unless land of

    equal or greater value as parkland is accepted in trade by the public landowner (Park

    Authority project are exempt)

    -

    Development Density &

    Community

    Connectivity

    1 point Option 1-Development DensityConstruct or renovate building on a previously developed site AND in a community with a

    minimum density of 60.000sqft per acre net

    - Project Development density(sq

    =Gross building square footage

    Density Radius (LF)=3x sqrt

    (sqft/acre))

    Average Property (neighborhoo

    = Total sqft of the propertie

    boundary / Total site area (ac

    Option 2-Community Connectivity

    Construct or renovate building on a previously developed site AND within 1/2 mile of a

    residential neighborhood with an average density of 10 units per acre net AND within 1/2

    mile of at least 10 basic services AND with pedestrian access between the building and

    services.

    - Prepare a site map and draw

    building entrance

    Brownfield

    Redevelopment

    1 point Option 1Develop on a site documented as contaminated by means of an ASTM E1903-97 Phase II

    Environmental Site Assessment or a local Voluntary Cleanup Program

    1/ ASTME 1903-97 Phase II

    Environmental Site Assessment

    2/ EPA Brownfields Definition

    -

    Option 2

    Develop on a site defined as a brownfield by a local, state or federal government agency

    ASTME 1903-97 Phase II

    Environmental Site Assessment

    EPA Brownfields Definition

    -

    S-c4 Alternative

    Transportation

    4 points

    SS-c4.1 Public Transportation

    Access

    1 point Option 1Locate project within 1/2 mile of an existing-or planned and funded-commuter rail, light

    rail or subway station (mass transit)

    - Use an area drawing to indicate

    of the project

    Option 2

    Locate project within 1/4 mile of one or more stops for two or more public or campus bus

    lines usable by building occupants (public transportation)

    - Use an area drawing to indica

    mile of the project

    S-c1 1

    PointDescription

    S-p1 Required

    point 1/ US Department of Agriculture(USDA) definition of Prime

    Agriculture Land as stated in United

    States Code of Federal Regulations

    Title 7, Volume 6, Parts 400 to 699,

    Section 657.5 (citation 7CFR657.5)

    2/ Federal Emergency Management

    Agency (FEMA) 100-Year Flood

    Definition

    3/ Endangered Species Lists

    4/ Definition of Wetlands in the

    United States Code of federal

    Regulations, 40CFR

    S-c2

    S-c3

  • 8/13/2019 Summary Leed Nc

    2/12

    Requirements Referenced Standards

    ustainable Sites 14 points

    PointDescription

    SS-c4.2 Bicycle Storage &

    Changing Rooms

    1 point Option 1 - Non Residential ProjectsFor commercial or institutional buildings, provide secure bicycle racks and/or storage

    (within 200 yards of a building entrance) for 5% or more of all building users (measured at

    peak period), AND provide shower & changing facilities in the building, or within 200 yards

    of a building entrance for 0.5% of Full-Time Equivalent (FTE) occupants.

    - *FTE Occupants=Occupant Hou

    *Secure Bicycle Spaces (non-res

    *Showering Facilities (non-resid

    = FTE Occupants x 0.005

    Option 2 - Residential Projects

    Provide covered storage facil ities for securing bicycles for 15% or more of building

    occupants in lieu of changing/shower facilities

    - Secure Bicycle Spaces (resident

    Option 3 - Mixed Residential & Nonresidential Projects

    Provide covered storage facil ities for securing bicycles for 15% or more of building

    occupants AND provide secure bicycle racks and/or storage for 5% or more of all building

    users AND provide shower & changing facilities for 0.5% of Full-Time Equivalent (FTE)

    occupants

    - Peak building users = FTE occup

    SS-c4.3 Low emitting & Fuel

    efficient vehicles

    1 point Option 1 - Low Emitting / Fuel Efficient Vehiclesprovide low emitting & fuel-efficient vehicles for 3% of FTE occupants AND provide

    preferred parking for these vehicles.

    - Nb of vehicles & preferred park

    = FTE Occupants x 0.003

    Option 2 - Preferred Parking for Low Emitting / Fuel Efficient Vehicles

    provide preferred parking for low emitting & fuel-efficient vehicles for 5% of the total

    vehicle parking capacity of the site.

    Nb of alternative fuel vehicle pa

    = Total nb of parking spaces x 0

    Option 3 - Alternative Refueling Stations

    install alternative-fuel refueling stations for 3% of the total vehicle parking capacity of the

    site

    Nb of alternative fuel vehicle fu

    = Total nb of parking spaces x 0

    SS-c4.4 Parking capacity 1 point Option 1 - Non Residential with New ParkingSize parking capacity to not exceed minimum local zoning requirements AND provide

    preferred parking for carpools or vanpools for 5% of the total provided parking spaces

    1/ Portland, Oregon, Zoning Code:

    Title 33, Chapter 33.266 (Parking &

    Loading)

    1/ Determine the nb of parki

    requirements

    2/ Total the parking spaces prov3/ Determine the nb of space

    appropriate sqft area, closest t

    handicapped spaces, as reserve

    Option 2 - Non Residential with New Parking for Less Than 5% of the FTE Occupancy

    Provide preferred parking for carpools or vanpools, markes as such, for 5% of the total

    provided parking spaces

    2/ Institute of Transportation

    Engineers' Parking Generation, 3rd

    Edition

    1/ Identify the FT & PT building

    2/ Calculate FTE

    3/ Determine if the total nb of

    FTE occupants

    4/ Determine the nb of space

    appropriate sqft area, closest t

    handicapped spaces, as reserve

    Option 3 - Residential with New Parking

    Size parking capacity to not exceed minimum local zoning requirements AND provide

    infrastructure & support programs to facilitate shared vehicle usage such as carpool drop-

    off areas, designated parking for vanpools, or car-share services, ride boards, and shuttle

    services to mass transit.

    Comply with local zoning requir

    Option 4 - Mixed Use (Non-Residential & Residential)

    No new parking is provided

    No Calculations required

    S-c5 Site Development 2 points

    SS-c5.1 Protect or Restore

    Habitat

    1 point Option 1 - Undisturbed Greenfield SitesAll site disturbance is limited to:

    * 40ft beyond the building perimeter

    * 10ft beyond surface walkways, patios, surface parking & utilities less than 12 inches in

    diameter

    * 15ft beyond primary roadway curbs & main utility branch trenches* 25ft beyond constructed areas with permeable surfaces (such as pervious paving areas,

    stormwater detention facilities & playing fields) that required additional staging areas in

    order to limit compaction in the constructed area.

    - -

    Option 2- Previously Developed OR Graded Sites

    Restore or protect a minimum of 50% of the site area (excluding the building footprint)

    with native or adapted vegetation.

    Projects earning SSc2 & using vegetated roof surfaces may apply the vegetated roof

    surface to this calculation (if the plants meet the definition of native/adapted), in which

    case the requirement is 20% of the total site area (including building footprint). This option

    is intended for urban sites with little or no building setback (i.e.zero-lot-line).

  • 8/13/2019 Summary Leed Nc

    3/12

    Requirements Referenced Standards

    ustainable Sites 14 points

    PointDescription

    SS-c5.2 Maximize Open Space 1 point Option 1

    Exceed local open space zoning requirements by 25%

    - Total Open Space Required

    =Open Space Required by Zoning

    Option 2

    No local zoning requirements, provide open space greater than or equal to bui lding

    footprint

    Total Open Space Required = Bu

    Option 3

    A zoning ordinance exists with no open space requirements, provide vegetated open space

    equal to 20% of the project's site area

    Total Open Space Required

    =Total Project Site Area x 0.20

    All Options

    * for projects located in urban areas earning ss-c2, vegetated roof areas can contribute to

    credit compliance.

    * for projects located in urban areas earning ss-c2, hardscape areas can contribute to

    credit compliance.for such projects a minimum of 25% of the open space counted must be

    vegetated.

    * wetlands or naturally designed ponds may count as open space if the side slopegradients average 1:4(vertical:horizontal) or less and are vegetated.

    S-c6 Stormwater

    Management

    2 points

    SS-c6.1 Quantity Control 1 point Option 1 - Existing Imperviousness is Less than or Equal to 50% (Largely UndevelopedSites)

    Implement a stormwater management plan that prevents the post-development peak

    discharge rate & quantity from exceeding the pre-development peak discharge rate and

    quantity for the one-and two-year, 24 hour design storms.

    OR Implement a stormwater management plan that protects receiving stream channels

    from excessive erosion by implementing a stream channel protection strategy & quantity

    control strategies

    - * Pre-development site run-off r

    * Pre-development site run-off q

    *Post-development site run-off

    * Post-development site run-off

    Vr = P x Rv x A / 12'

    where

    Vr=volume of proposed storage

    =amount of runoff captured

    Rv=volumetric runoff coefficient

    I = Percent Imperviousness

    Option 2 - Existing Imperviousness is Greater than 50% (Largely Developed Sites)

    Implement a stormwater management plan that results in a 25% decrease in the volume

    of stormwater runoff from the two-year, 24-hour design storm

    SS-c6.2 Quality Control 1 point Implement a stormwater management plan that reduces impervious cover, promotesinfiltration, and captures & treats the stormwater runoff from 90% of the average annual

    rainfall using acceptable best management practices (BMPs).

    BMPs used to treat runoff must be capable of removing 80% of the average annual post

    development total suspended solids (TSS) load based on existing monitoring reports.

    Guidance Specifying Management

    Measures for Sources of Non-Point

    Pollution in Coastal Waters, January

    1993

    Determine the annual rainfall us

    * Humid Watersheds - 1 inch o

    year)

    * Semi-arid Watersheds - 0.75

    rainfall each year)

    * Arid Watersheds - 0.5 inch

    rainfall each year)

    S-c7 Heat Island Effect 2 points

    SS-c7.1 Non-Roof 1 point Option 1Provide any combination of the following strategies for 50% of the site hardscape:

    * Shade (within 5 years of occupancy)

    * Paving materials with a Solar Reflectance Index (SRI) at least 29

    * Open grid pavement system

    - Q=O+R+S

    Q=Qualifying Area

    O=all hardscape surfaces that

    that are at least 50% pervious

    R=all hardscape features that h

    S=Effective shaded area=arithm

    10am, 12 noon and 3pm on the s

    T=all non-roof hardscape surfac

    Option 2Place a minimum of 50% of parking spaces under cover. Any roof used to shade or cover

    parking must have an SRI of at least 29

    Calculate the total number of paCalculate the number of parking

  • 8/13/2019 Summary Leed Nc

    4/12

    Requirements Referenced Standards

    ustainable Sites 14 points

    PointDescription

    SS-c7.2 Roof 1 point Option 1 - Reflective Roofing MaterialsUse roofing materials having a SRI X for a minimum of 75% of the roof surface.X=78 (Low-Sloped Roof-Slope 2:12)

    X=29 (Steep-Sloped Roof-Slope > 2:12)

    1/ Calculate Total Roof Su2/ Deduct areas with

    appurtenances

    3/ Determine wether X is

    Option 2 - Green Roof

    Install a vegetated roof for at least 50% of the roof area

    Option 3 - Combined Reflective Roof & Green Roof Systems

    Install high albedo & vegetated roof surfaces that, in combination, meet the following

    criteria:

    (Area of SRI Roof/0.75)+(Area of Vegetated Roof/0.5) Total Roof Area

    S-c8 Light Pollution

    Reduction

    1 point For Interior LightingThe angle of maximum candela from each interior luminaire as located in the building shall

    intersect opaque building interior surfaces and not exit out through the windows

    OR All non-emergency interior lighting shall be automatically controlled to turn off during

    non-business hours. Provide manual override capabilities for after hours use.

    ASHRAE/IESNA Standard 90.1-2004,

    Energy Standard for Buildings Except

    Low-Rise Residential-Lighting,

    Section 9 (without amendments)

    Determine the direction

    photometric data publish

    For Exterior Lighting

    Only light areas as required for safety & comfort.

    Do not exceed 80% of the lighting power densities for exterior areas and 50% for building

    facades and landscape features as defined in ASHRAE/IESNA Standard 90.1-2004, Exterior

    Lighting section, without amendments

    Calculate the Lighting Po

    Determine if the Lightin

    for LPD reduction

    All projects shall be classified under one of the following zones, as defined in IESNA RP-33,

    and shall follow all of the requirements for that specific zone:

    LZ1 - Dark (Park& Rural settings)

    Undeveloped areas - Population densities less than 200 people per square mile

    Design exterior lighting so that all site & building mounted luminaires produce a maximum

    initial illuminance value no greater than 0.01 horizontal & vertical footcandles at the site

    boundary & beyond

    Document that 0% of the total initial designed fixture lumens are emitted at an angle of

    90degrees or higher from Nadir (straight down)

    LZ2 - Low (Residential areas)

    Population densities 200-3,000 people per square mile

    Design exterior lighting so that all site & building mounted luminaires produce a maximum

    initial illuminance value no greater than 0.1 horizontal & vertical footcandles at the site

    boundary & no greater than 0.01 horizontal footcandles 10ft beyond the site boundary.

    Document that no more than 2% of the total initial designed fixture lumens are emitted at

    an an le of 90 de rees or hi her from Nadir strai ht downLZ3 - Medium (Commercial/Industrial, High-Density Residential)

    Population densities greater than 3,000 people per square mile

    Design exterior lighting so that all site & building mounted luminaires produce a maximum

    initial illuminance value no greater than 0.2 horizontal & vertical footcandles at the site

    boundary & no greater than 0.01 horizontal footcandles 15ft beyond the site boundary.

    Document that no more than 5% of the total initial designed fixture lumens are emitted atan angle of 90 degrees or higher from Nadir (straight down)

    LZ4 - High (Major City Centers, Entertainment Districts)

    Cities with populations greater than 100,000

    Design exterior lighting so that all site & building mounted luminaires produce a maximum

    initial illuminance value no greater than 0.6 horizontal & vertical footcandles at the site

    boundary & no greater than 0.01 horizontal footcandles 15ft beyond the site boundary.

    Document that no more than 10% of the total initial designed fixture lumens are emitted

    at an angle of 90 degrees or higher from Nadir (straight down)

    1/ AST M Standard E1980-01-Standard

    Practice for Calculating Solar Reflectance

    Index of Horizontal & Low-Sloped Opaque

    surfaces

    2/ ASTM Standard E408-71 (1996)e1-

    Standard Test Methods for Total Normal

    Emittance of Surfaces Using Inspection-

    Meter Techniques.

    3/ ASTM E903-96-Standard Test Method for

    Solar Absorptance, Reflectance, and

    Transmittance of Materials Using Integrating

    Spheres

    4/ ASTM E1918-97-Standard Test Method for

    Measuring Solar Reflectance of Horizontal &

    Low-Sloped Surfaces in the Field

    5/ ASTM C1371-04-Standard Test Method for

    Determination of Emittance of Materials

    Near Room Temperature Using Portable

    Emissometers

    6/ ASTM C1549-04-Standard Test Method for

    Determination of Solar Reflectance Near

  • 8/13/2019 Summary Leed Nc

    5/12

    Requirements Referenced Standards

    Water Efficiency 5 points

    WE-c1 Water Efficient Landscaping 2 pointsWE-c1.1 Reduce by 50% 1 point Option 1

    Reduce potable water consumption for irrigation by 50% from a

    calculated mid-summer baseline case

    *plant species factor

    *irrigation efficiency

    *use of captured rainwater

    *use of recycled wastewater

    *use of water treated & conveyed by a public agency specifically for non-

    potable uses

    Option 2

    The irrigation water used on site is supplied by a non-potable source

    WE-c1.2 No Potable Water Use or No Irrigation 1 point Option 1Use only captured rainwater, recycled wastewater, recycled graywater,

    or water treated and conveyed by a public agency specifically for non-potable uses for irrigation

    Option 2

    Install landscaping that does not require permanent irrigation systems.

    Temporary irrigation systems used for plant establishment are allowed

    only if removed within one year of installation

    1 point Option 1 - Water Savings CalculationReduce potable water use for bui lding sewage conveyance by 50%

    through the use of water-conserving fixtures or non-potable water

    -

    Option 2 - On-Site Wastewater Treatment

    Treat 50% of wastewater on-site to tertiary standards. Treated water

    must be infiltrated or used on-site.

    -

    WE-c3 Water Use Reduction 2 points

    WE-c3.1 20% Reduction 1 pointEmploy strategies that in aggregate use 20% less water than the water

    use baseline calculated for the building (not including irrigation) after

    meeting the Energy Policy Act of 1992 fixture performance requirements.

    WE-c3.2 30% Reduction 1 point Employ strategies that in aggregate use 30% less water than the wateruse baseline calculated for the building (not including irrigation) after

    meeting the Energy Policy Act of 1992 fixture performance requirements.

    WE-c2 Innovative Wastewater Technologies

    -

    Description Point

    -

    KL= ks x kdx kmc

    KL = Landscape coefficient

    = the volume of water l

    ks= Species factor (high, a

    accounts for variation

    (ks=0 for species that d

    kd= Density factor

    accounts for the nb of

    landscape(kd=0.5 for a

    kmc= Microclimate factor

    accounts for environm

    landscape, including te

    (average kmc=1 cd wh

    is unaffected by buildin

    & slopes)

    ETL (in) = ET0x KL

    ETL = project-specific evap

    ET0= reference evapotran

    = measurement of the

    a certain reference p

    KL= Landscape coefficient

    IE = Irrigation Efficiency

    = 0.625 (sprinkler)

    = 0.90 (drip)

    CE = Controller Efficiency

    = percent reduction in w controllers or moistur

    Design Case TWA[gal]=(A

    Design Case TPWA[gal]=T

    Baseline Case TWA[gal]=(

    Percent Reduction of Pota

    Percent Reduction of Tota

    The Energy Policy Act(EPAct) of 1992

    -

    Sewage Volume[gal]

    =UsesxDuration[min or flu

    Daily Sewage Generation

    =(Male OccupantsxMale S

    +(Female OccupantsxFem

    Annual Sewage Generatio

    =Total Sewage Generation

    Rainwater Volume[gal]

    =collection area[sf]xcollec

  • 8/13/2019 Summary Leed Nc

    6/12

    Requirements Referenced Stand

    Energy & Atmosphere 17 points

    EA-p1 Fundamental Commissioning of the Building

    Energy Systems

    Required 1/ Designate an individual as the Commissioning Authority (CxA) to lead, reviewand oversee the completion of the commissioning process activities.

    2/ The Owner shall document the Owner's Project Requirements (OPR)

    The Design Team shall develop the Basis of Design (BOD)

    The CxA shall review these documents for clarity & completeness

    The Owner & Design Team shall be responsible for updates to their respective

    documents

    3/ Develop & Incorporate commissioning requirements into the construction

    documents

    4/ Develop & Implement a commissioning plan

    5/ Verify the Installation & performance of the systems to be commissioned

    6/Complete a summary commissioning report

    -

    EA-p2 Minimum Energy Performance Required Design the building project to comply with both:* the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4 & 10.4) of

    ASHRAE/IESNA Standard 90.1-2004

    * AND the prescriptive requirements (Sections 5.5, 6.5, 7.5 & 9.5) or performance

    requirements (Section 11) of ASHRAE/IESNA Standard 90.1-2004

    ASHRAE/IESNA 90.1-2004

    Standard for Buildings Exc

    Rise Residential

    EA-p3 Option 1-Zero use of CFC-based refrigerants in new base buildings -

    Option 2-Phase out Plan for any Existing CFC-based Equipment

    1-10 points Option 1 - Whole Building Energy SimulationDemonstrate a percentage improvement in the proposed building performance

    rating compared to the baseline building performance rating per ASHRAE/IESNA

    Standard 90.1-2004 by a whole building project simulation using the Building

    Performance Rating Method in Appendix G of the Standard.

    Percentage Improvement=100x1-(Proposed Building Performance/Baseline BuildingPerformance)

    New Buildings Existing Building Renovations Points

    10.5% 3.5% 1

    14% 7% 2

    17.5% 10.5% 3

    21% 14% 4

    24.5% 17.5% 5

    28% 21% 6

    31.5% 24.5% 7

    35% 28% 8

    38.5% 31.5% 9

    42% 35% 10

    ASHRAE/IESNA 90.1-2004

    Standard for Buildings Exc

    Rise Residential, and Infor

    Appendix G-Performance

    Method

    1-4 points Option 2 - Prescriptive Compliance PathComply with the prescriptive measures of the ASHRAE Advanced Energy Design

    Guide for Small Office Buildings 2004. The following restrictions apply:

    * Buildings must be under 20,000sqft

    * Buildings must be office occupancy

    * Project teams must fully comply with all applicable criteria as established in the

    Advanced Energy Design Guide for the climate zone in which the building is

    located.

    ASHRAE Advanced Energy

    Guide for Small Office Bui

    2004

    2-5 points Option 3 - Prescriptive Compliance Path-Advanced Buildings Core PerformanceGuide

    Comply with the prescriptive measures identified in the Advanced Buildings Core

    Performance Guide developed by the New Buildings Institute.

    * Applicable for buildings under 100,000sqft

    * Not applicable for health care, warehouse or laboratory projects* Project teams must fully comply with Sections 1 (Design Process Strategies) & 2

    (Core Performance Requirements), & up to 2 additional points are available for

    projects that implement performance strategies listed in section 3 (Enhanced

    Performance)

    Advanced Buildings Core

    Performance Program

    1 point Option 4 - Prescriptive Compliance Path-Advanced Building Benchmark v1.1Comply with the Basic Criteria & Prescriptive measures of the Advanced Building

    Benchmark V1.1 with the exception of the following sections:

    * 1.7 Monitoring & Trend-Logging

    * 1.11 Indoor Air Quality

    * 1.14 Networked Computer Monitor Control

    Projects registered after June 26, 2007 may not use this option

    Advanced Buildings Bench

    Version 1.1

    Description Point

    EA-c1 Optimize Energy Performance

    Fundamental Refrigerant Management Required

  • 8/13/2019 Summary Leed Nc

    7/12

    Requirements Referenced Standa

    Energy & Atmosphere 17 points

    Description Point

    EA-c2 On-Site Renewable Energy 1-3 points Calculate project performance by expressing the energy produced by therenewable systems as a percentage of the building annual energy cost:

    % Renewable Energy Points

    2.5% 1

    7.5% 2

    12.5% 3

    To determine the building annual energy cost, use:

    option1: the building annual energy cost calculated in EAc1

    option2: DOE-CBECS (Commercial Buildings Energy Consumption Survey) database

    ASHRAE/IESNA 90.1-2004:E

    Standard for Buildings Exce

    rise Residential

    EA-c3 Enhanced Commissioning 1 point 1/ Designate an individual as the Commissioning Authority (CxA) to lead, reviewand oversee the completion of the commissioning process activities.

    This requirement has no deviation for project size

    2/ The CxA shall conduct, at a minimum, one commissioning design review of the

    OPR, BOD & design documents prior to mid-construction documents phase & back-

    check the review comments in the subsequent design submission.

    3/ The CxA shall review contractor submittals applicable to systems being

    commissioned for compliance with the OPR & BOD. This review shall be concurrent

    with A/E reviews & submitted to the design team & the Owner.

    4/ Develop a systems manual that provides future operating staff the information

    needed to understand & optimally operate the commissioned systems.

    5/ Verify that the requirements for training operating personnel & building

    occupants are completed.

    6/ Assure the involvement by the CxA in reviewing building operation within 10

    months after substantial completion with O&M staff & occupants. Include a plan

    for resolution of outstanding commissioning-related issues.

    -

    1 point Option 1Do Not use refrigerants

    -

    Option 2

    Select refrigerants and HVAC&R that minimize or eliminate the emission of

    compounds that contribute to ozone depletion & global warming:

    LCGWP + LCODP x 105 100

    *(LCGWP LCODP x 105)xQunit+ / Qtotal 100

    LCODP = [ODPr x (Lr x Life + Mr) x Rc] / Life

    LCGWP = [GWPr x (Lr x Life + Mr) x Rc] / Life

    LCODP=Lifecycle Ozone Depletion Potential (lb CFC11/Ton-Year)

    LCGWP=Lifecycle Direct Global Warming Potential (lbCO2/Ton-year)GWPr=Global Warming Potential of Refrigerant (0 to 12,000lbCO2/lbr)

    ODPr=Ozone Depletion Potential of Refrigerant (0 to 0.2lb CFC11/lbr)

    Lr=Refrigerant Leakage Rate (0.5% to 2.0%;default of 2% unless otherwise

    demonstrated)

    Mr=End-of-Life Refrigerant Loss (2% to 10%; default of 10% unless otherwise

    demonstrated)

    Rc=Refrigerant charge (0.5 to 5.0 lbs of refrigerant per ton of Gross ARI rated

    cooling capacity)

    Life=Equipment Life (10years; default based on equipment type, unless otherwise

    demonstrated)

    AND Do not install fire suppression systems that contain ozone-depleting

    substances (CFCs, HCFCs or Halons)

    1 point IPMVP Option D - Calibrated Simulation (Savings Estimation Method 2)

    IPMVP Option B - Energy Conservation Measure Isolation

    Green Power 1 point Provide at least 35% of the building's electricity from renewable sources byengaging in at least a two-year renewable energy contract. Renewable sources are

    as defined by the Center for Resource Solutions (CRS) Green-e products

    certification requirements.

    Option 1 - Green Power, based on Design Energy Cost (from EA Credit 1)

    Option 2 - Green Power, based on Actual Electricity Consumption

    Option 3 - Green Power, based on Default Electricty Consumption

    (DOE-Commercial Buildings Energy Consumption Survey CBECS database)

    Center for Resource Solutio

    Green-e Product Certificatio

    Requirements

    EA-c6

    EA-c4 Enhanced Refrigerant Management

    EA-c5 Measurement & Verification International PerformanceMeasurement & Verificatio

    Protocol (IPMVP) Volume II

    Concepts and Options for

    Determining Energy Saving

    Construction, April, 2003.

  • 8/13/2019 Summary Leed Nc

    8/12

    Requirements Referenced Stand

    Materials & Resources 13 points

    MR-p1 Storage & Collection of Recyclables Requi

    red

    Provide collection & storage areas for recyclable materials to serve the entire

    building. The collection area has been sized to meet the projected building

    needs.

    The following materials will be accomodated by the building's recycling

    collection & storage area:

    paper, corrugated cardboard, glass, plastics & metals.

    -

    MR-c1 Building Reuse 3 points

    MR-c1.1 Maintain 75% of Existing Walls, Floors & Roof 1 point Maintain at least 75%(based on surface area) of existing building structure(including structural f loor & roof decking) and envelope (exterior skin &

    framing, excluding window assemblies & non-structural roofing material).

    Hazardous materials that areremediated as a part of the project scope shall be

    excluded from the calculation of the percentage maintained.

    -

    MR-c1.2 Maintain 95% of Existing Walls, Floors & Roof 1 point Maintain at least 95%(based on surface area) of existing building structure(including structural f loor & roof decking) and envelope (exterior skin &

    framing, excluding window assemblies & non-structural roofing material).

    Hazardous materials that areremediated as a part of the project scope shall be

    excluded from the calculation of the percentage maintained.

    -

    MR-c1.3 Maintain 50% of Interior Non-Structural

    Elements

    1 point Use existing interior non-structural elements (interior walls, doors, floorcoverings & ceiling systems) in at least 50% (by area) of the completed building

    (including additions).

    -

    MR-c2 Construction Waste Management 2 points

    MR-c2.1 Divert 50% from Disposal 1 point Recycle and/or salvage at least 50% of non-hazardous construction anddemolition.

    -

    MR-c2.2 Divert 75% from Disposal 1 point Recycle and/or salvage at least 75% of non-hazardous construction anddemolition.

    -

    MR-c3 Materials Reuse 2 points

    MR-c3.1 5% 1 point Use salvaged, refurbished or reused materials such that the sum of thesematerials constitute at least 5% based on cost, of the total value of materials

    on the project.

    -

    MR-c3.2 10% 1 point Use salvaged, refurbished or reused materials such that the sum of thesematerials constitute at least 10% based on cost, of the total value of materials

    on the project.

    -

    MR-c4 Recycled Content 2 points

    MR-c4.1 10%(post-consumer+1/2 pre-consumer) 1 point Use materials with recycled content such that:post-consumer recycled content+1/2 pre-consumer content

    10% of the total value of the materials in the project

    MR-c4.2 20%(post-consumer+1/2 pre-consumer) 1 point Use materials with recycled content such that:post-consumer recycled content+1/2 pre-consumer content

    20% of the total value of the materials in the project

    MR-c5 Regional Materials 2 points

    MR-c5.1 10% Extracted, Processed & Manufactured

    Regionally

    1 point Use building materials or products that have been extracted, harvested orrecovered, as well as manufactured, within 500miles of the project site for a

    minimum of 10% (based on cost) of the total materials value.

    -

    MR-c5.2 20% Extracted, Processed & Manufactured

    Regionally

    1 point Use building materials or products that have been extracted, harvested orrecovered, as well as manufactured, within 500miles of the project site for a

    minimum of 20% (based on cost) of the total materials value.

    -

    MR-c6 Rapidly Renewable Materials 1 point Use rapidly renewable building materials & products (made from plants that -

    International Standard IS

    1999-Environmental La

    Declarations-Self-Declared

    Environmental Claims

    Environmental Labeling)

    Description Point

  • 8/13/2019 Summary Leed Nc

    9/12

    Requirements Referenced

    Indoor Environmental Quality 15 pointsOption 1 -Mechanically Ventilated Buildings = Active Ventilation

    Meet the minimum requirements of ASHRAE 62.1-2004 Sections 4 through 7

    (Ventilation for Acceptable Indoor Air Quality) using the ventilation rate procedure

    or the applicable local code, whichever is more stringent.

    Option 2 - Naturally Ventilated Buildings = Passive Ventilation

    Shall comply with ASHRAE 62.1-2004, paragraph 5.1

    Option 3 - Both Mechanical & Natural Ventilation = Mixed-mode Ventilation

    Shall comply with ASHRAE 62.1-2004, chapter 6

    Option 1 - Non Smoking Building

    Smoking is prohibited within the buillding

    ANDDesignated exterior smoking areas have been located at least 25ft away from

    entries, outdoor air intakes and operable windows.

    Option 2 - Designated Smoking Rooms

    Smoking is prohibited within the buillding except in designated smoking areas

    ANDDesignated exterior smoking areas have been located at least 25ft away from

    entries, outdoor air intakes and operable windows

    AND the project has provided one or more designated smoking rooms. The

    smoking rooms are designed to be directly exhausted to the outdoors with no re-

    circulation of ETS-containing air to the non-smoking area of the building, and

    enclosed with impermeable deck-to-deck partitions and operated at a negative

    pressure compared with the surrounding spaces of at least an average of 5Pa

    (0.02in wg) & with a minimum of 1 Pa (0.004in wg) when the door(s) to the

    smoking room are closed

    ANDThe performance of the smoking room differential air pressures has been

    verified by conductiong 15 minutes of measurement, with a minimum of one

    measurement every 10 seconds, of the differential pressure in the smoking room

    with respect to each adjacent area and in each adjacent vertical chase with the

    doors to the smoking room closed. The testing was conducted with each space

    configured for worst case conditions of transport of air from the smoking rooms to

    adjacent spaces with the smoking rooms'doors closed to the adjacent spaces.

    Option 3 - Residential Compliance

    Smoking is prohibited in all commom areas of the buillding

    AND Designated exterior smoking areas have been located at least 25ft away from

    entries, outdoor air intakes and operable windows.

    ANDindividual residential units have been designed to minimize ETS transfer

    between units by sealing penetrations in walls, ceilings, and floors in the

    residential units, and by sealing vertical chased adjacent to the units. In addition,all doors in the residential units leading to common hallways shall be weather-

    stripped to minimize air leakage into the hallway. If the common hallways are

    pressurized with respect to the residential units then doors in the residential units

    leading to the common hallways need not be weather-stripped provided that the

    positive differential pressure is demonstrated as in Option 2.

    Option 1 - Mechanically Ventilated Spaces

    * for densely occupied spaces(design occupant spaces25people/1000sqft): a

    permanent CO2 monitoring system that provides feedback on ventilation system

    performance to ensure that ventilation systems maintaining design minimum

    ventilation requirements has been installed. The system is configured to generate

    an alarm when the conditions vary by 10% or more from setpoint, via either a

    building automation system alarm to the building operator or via a visual or

    audible alert to the building occupants.

    CO2 monitoring locations shall be between 3ft & 6ft above the floor

    * for each mechanical ventilation system serving non-densely occupied spaces,

    provide a direct outdoor airflow measurement device capable of measuring the

    minimum outdoor airflow rate with an accuracy of 15% of the design minimum

    outdoor air rate, as defined by ASHRAE 62.1-2004

    -

    Option 2 - Naturally Ventilated Spaces

    The project has been designed to comply with the requirements for location and

    size of window openings per ASHRAE Standard 62.1-2004, Section 5.1.

    Monitor CO2 concentrations within all naturally ventilated spaces.CO2 monitoring shall be located within the room between 3 ft & 6 ft above the

    floor.

    Option 1 -Mechanically Ventilated Spaces

    Increase breathing zone outdoor air ventilation rates to all occupied spaces by at

    least 30% above the minimum rates required by ASHRAE 62.1-2004 as determined

    by EQ-p1

    Option 2 - Naturally Ventilated Spaces

    Design natural ventilation systems for occupied spaces to meet the

    recommendations set forth in the Carbon Trust Good Practice Guide 237 [1998].

    EQ-c3 Construction IAQ-Management Plan 2 points

    EQ-p2 Environmental Tobacco Smoke (ETS)Control Required

    EQ-c2 Increased Ventilation 1 point

    EQ-c1 Outdoor Air Delivery Monitoring 1

    Required 1/ ASHRAE StandaVentilation For Ac

    Quality

    2/ ASHRAE Standa

    Ventilation & Acce

    Quality in Low-Ris

    Buildings

    point

    1/ ASHRAE Standa

    Ventilation For Ac

    Quality

    2/ The Carbon Tru

    Guide 237-Natura

    domestic building

    designers;develop

    (1999)

    3/ CIBSE Applicatio

    10:2005, Natural v

    domestic buildings

    1/ ANSI/ASTM-E77Test Method for D

    Leakage Rate By Fa

    2/ Residential Man

    Compliance with C

    Energy Efficiency S

    Rise Residential Bu

    Description Point

    EQ-p1 Minimum IAQ Performance

  • 8/13/2019 Summary Leed Nc

    10/12

    Requirements Referenced

    Indoor Environmental Quality 15 points

    Description Point

    Option 1b - Buildling Flush-out with early Occupancy

    perform a building flush-out by supplying a minimum of 3,500cu.ft of OA per sqft

    of floor area (at minimum rate of 0.3 cfm/sqft of OA or at the design minimum

    outside air rate, whichever is greater) a minimum of three hours prior to

    occupancy, until a total of 14.000 cu.ft/sqft of OA has been delivered to the space

    Option 2 - Indoor Air Quality (IAQ) Testing

    conduct baseline IAQ testing, after construction ends & prior to occupancy, using

    testing protocols consistent with the United States Environmental Protection

    Agency Compendium of Methods for the Determination of Air Polluants in Indoor

    Air & as additionally detailed in this Reference Guide.

    EQ-c4 Low-Emitting Materials 4 points

    EQ-4.1 Adhesives & Sealants 1 point All adhesives and sealants used on the interior of the building shall comply with

    the requirements of the following reference standards:* Adhesives, Sealants and Sealant Primers: South Coast Air Quality Management

    District (SCAQMD) Rule #1168 , where the VOC limits are listed and correspond to

    an effective date of July 1, 2005.

    * Aerosol Adhesives: Green Seal Standard for Commercial Adhesives GS-36

    requirements in effect on October 10, 2000

    1/ South Coast Rule

    3, 2003 AmendmenCoast Air Quality M

    District

    2/ Green Seal Starn

    effective October 19

    EQ-4.2 Paints & Coatings 1 point Paints & coatings used on the interior of the building shall comply with therequirements of the following reference standards:

    * Architectural paints, coating & primers applied to interior walls & ceilings: do not

    exceed the VOC content limits established in GS-11,Paints, First Edition, May

    20,1993.

    Primers must meet the VOC limit for non-flat paint:

    Flats: 50g/l & Non-Flats: 150g/l

    * Anti-Corrosive & anti-rust paints applied to interior ferrous metal substrates: do

    not exceed the VOC content limit of 250g/l established in Green Seal Standard GS-

    03, Anti-corrosive Paints, Second Edition, January 7, 1977.

    * Clear wood finishes, floor coatings, stains, sealers, and shellacs applied to interior

    elements:

    do not exceed the VOC content limits established in SCAQMD Rule 1113,

    Architectural coatings, rules in effect on Januray 1, 2004.

    1/ Green Seal Stand

    2/ Green Seal Stand

    3/ South Coast Air Q

    Management Distric

    1113, Architectural

    EQ-4.3 Carpet Systems 1 point All carpet installed in the building interior shall meet* the testing & product requirements of the Carpet & Rug Institute's Green Label

    Plus Program

    * the requirements of the Carpet & Rug Institute Green Label Program

    All carpet adhesive shall meet the requirement of EQ-c4.1:VOC limit of 50g/l

    Carpet and Rug Inst

    Label Plus Testing P

    EQ-4.4 Composite Wood & Agrifiber 1 point Composite wood & agrifiber products used on the interior of the building shallcontain no added urea-formaldehyde resins.

    Laminating adhesives used to fabricate on-site and shop-applied composite wood

    & agrifiber assemblies shall contain no added urea-formaldehyde resins.

    -

    EQ-c5 Indoor Chemical & Pollutant Source Control 1 point * Employ permanent entryway systems at least six feet long in the primarydirection of travel. Acceptable entryway systems include permanently installed

    grates, grilles, or slotted systems that allow for cleaning underneath. Roll-out mats

    are only acceptable when maintained on a weekly basis by a contracted service

    organization.

    * Where hazardous gases chemicals may be present or used, exhaust each space

    sufficiently to create negative pressure with respect to adjacent spaces with the

    door of the room closed.

    The exhaust rate shall be at least 0.5 cfm/sqft with no air re-circulation.

    The pressure differential with the surrounding spaces shall be at least 5Pa (average

    1 Pa).* In mechanically ventilated buildings, provide regularly occupied areas of the

    building with air filtration media prior to occupancy that provides a MERV of 13 or

    better.

    ANSI/ASHRAE 52.2-

    Testing General Ven

    Cleaning Devices fo

    Efficiency by Particl

    EQ-c6 Controllability of Systems 2 points

    EQ-6.1 Lighting 1 point * Provide individual lighting controls for 90% (minmum) of the building occupantsto enable adjustments to suit individual task needs & preferences.

    * AND provide lighting system controllability for all shared multi-occupant spaces

    to enable lighting adjustement that meets group needs & preferences.

    -

    EQ-6.2 Thermal Comfort 1 point * Provide individual comfort controls for 50% (minmum) of the building occupantsto enable adjustments to suit individual task needs & preferences. Operable

    windows can be used in lieu of comfort controls for occupants of areas that are20ft inside of and 10ft to either side of the operable part of the window

    * AND provide comfort system controls for all shared multi-occupant spaces to

    enable adjustements to suit group needs & preferences.

    1/ ANSI/ASHRAE Sta

    2004: Ventilation fo

    Indoor Air Quality

    2/ ANSI/ASHRAE Sta

    Thermal Environme

    for Human Occupan

    EQ-c7 Thermal Comfort 2 points

    EQ-7.1 Design 1 point Design HVAC systems & building envelope to meet the requirements of ASHRAEStandard 55-2004, Thermal Comfort Conditions for Human Occupancy (section

    6.1.1.)

    ASHRAE Standard 5

    Comfort Conditions

    Occupancy

  • 8/13/2019 Summary Leed Nc

    11/12

    Requirements Referenced

    Indoor Environmental Quality 15 points

    Description Point

    EQ-c8 Daylighting & Views 2 points

    Option 1 - Glazing Factor Calculation

    Achieve a minimum glazing factor of 2% in a minimum 75% of all regularly

    occupied areas.

    -

    Option 2 - Daylight Simulation Model

    Demonstrate, through computer simulation, that a minimum daylight illumintion

    level of 25 footcandles has been achieved in a minimum of 75% of all regularlyoccupied areas. Modeling must demonstrate 25 horizontal footcandles under clear

    sky conditions, at noon, on the equinox, at 30" (desk height, typical work plan

    height) above the floor

    Option 3 - Daylight Measurement

    Demonstrate, through records of indoor light measurements, that a minimum

    daylight illumination of 25 footcandles has been achieved in at least 75% of all

    regularly occupied areas. Measurements must be taken on a 10-foot grid for all

    occupied spaces & must be recorded on building floor plans.

    EQ-8.2 Views for 90% of Spaces 1 point Achieve a direct line of sight to the outdoor environment via vision glazingbetween 2'6" & 7'6" above finish floor for building occupants in 90% of all regularly

    occupied areas.

    Determine the area with direct line of sight by totaling the regularly occupied

    square footage that meets the following criteria:

    * In plan view, the area is within sight lines drawn from perimeter vision glazing.

    * In section view, a direct sight line can be drawn from the area to perimeter vision

    glazing

    -

    pointEQ-8.1 Daylighting 75% of Spaces 1

  • 8/13/2019 Summary Leed Nc

    12/12

    Requirements Referenced Standards

    Innovation & Design Process 4 points

    ID-c1 Innovation in Design 4 points

    ID-1.1 Credit 1 1 point

    ID-1.2 Credit 2 1 point

    ID-1.3 Credit 3 1 point

    ID-1.4 Credit 4 1 point

    ID-c2 LEED Accredited Professional 1 point Al least one (1) principal participant of the project team shall be a LEED AccreditedProfessional (AP)

    - * Provide th

    * Provide th

    * Provide a

    * Provide a c

    Provide design teams and projects the opportunities to be awarded points for

    exceptional performance above the requirements set by the LEED for New

    Construction Green Building Rating System and/or innovative performance in

    Greesn Building categories not specifically addressed by this Rating System.

    Four (4) independant sustainability measures may be applied to ID credits

    Description Point

    -

    There are tw

    * strategies

    rule of thum

    requiremen

    * innovation

    There are th

    1/ the proje

    environmen

    to the final d

    2/ the proce

    portion of a

    category.

    3/ the formu

    other projec