Page 1 of 1 SUBMITTAL REVIEW COMMENTS PROJECT: 3 rd & Constitution PS-Misc. facility upgrade-Phase 4 BC PN: SUBMITTAL NUMBER: 017500-001A SPECIFICATION SECTION: 01 75 00 DESCRIPTION: Operational Demonstration Plan Resubmittal MANUFACTURER: REVIEWER: Mike Hess DATE: 05/08/2017 BC COMMENTS: 1. Amend Operations Demonstration Plan to include the following information in the section noted: a. Test Activities: i. Indicate at what frequency and concentration the H2S dosing and at what frequency the sampling of pressure differential and H2S concentration at the OCUs will be taken. 2. The requested variance to reduce the duration of testing to one day is granted. 3. The following items are to be provided prior to commissioning the referenced equipment: a. Provide a description of startup procedure for the system per Specification 01 75 00 Section 1.05.A.2. b. Provide the description of the Operator Training as required in 01 75 00 1.05.A.2, or note that this information is to be provided under a separate submittal. SUBMITTAL REVIEW REVIEW IS FOR GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS. NO RESPONSIBILITY IS ASSUMED FOR CORRECTNESS OF DIMENSIONS OR DETAILS. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DEVIATIONS FROM CONTRACT REQUIREMENTS NOT SPECIFICALLY INDICATED ON THIS SUBMITTAL. NO EXCEPTIONS TAKEN MAKE CORRECTIONS NOTED. DO NOT RESUBMIT MAKE CORRECTIONS NOTED AND RESUBMIT REJECTED. RESUBMIT IN ACCORDANCE WITH CONTRACT DOCUMENTS BY: Mike Hess DATE: 05/08/2017 BROWN AND CALDWELL

Transcript of SUBMITTAL REVIEW COMMENTS - DCWater.com · 2020. 5. 15. · submittal. submittal review review is...

  • Page 1 of 1

    SUBMITTAL REVIEW COMMENTS

    PROJECT: 3rd & Constitution PS-Misc. facility upgrade-Phase 4 BC PN:

    SUBMITTAL NUMBER: 017500-001A SPECIFICATION SECTION: 01 75 00

    DESCRIPTION: Operational Demonstration Plan

    Resubmittal MANUFACTURER:

    REVIEWER: Mike Hess DATE: 05/08/2017

    BC COMMENTS:

    1. Amend Operations Demonstration Plan to include the following information in the

    section noted:

    a. Test Activities:

    i. Indicate at what frequency and concentration the H2S dosing and at what

    frequency the sampling of pressure differential and H2S concentration at

    the OCUs will be taken.

    2. The requested variance to reduce the duration of testing to one day is granted.

    3. The following items are to be provided prior to commissioning the referenced

    equipment:

    a. Provide a description of startup procedure for the system per Specification 01 75

    00 Section 1.05.A.2.

    b. Provide the description of the Operator Training as required in 01 75 00

    1.05.A.2, or note that this information is to be provided under a separate

    submittal.

    SUBMITTAL REVIEW

    REVIEW IS FOR GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS. NO RESPONSIBILITY IS ASSUMED FOR

    CORRECTNESS OF DIMENSIONS OR DETAILS. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR

    DEVIATIONS FROM CONTRACT REQUIREMENTS NOT SPECIFICALLY INDICATED ON THIS SUBMITTAL.

    NO EXCEPTIONS TAKEN MAKE CORRECTIONS NOTED. DO NOT RESUBMIT

    MAKE CORRECTIONS NOTED AND RESUBMIT REJECTED. RESUBMIT IN ACCORDANCE WITH

    CONTRACT DOCUMENTS

    BY: Mike Hess DATE: 05/08/2017

    BROWN AND CALDWELL

  • P a g e 1 | Ulliman Schutte Construction, LLC. Task Order #010 3rd and Constitution MFU Phase 4, Blue Plains

    3RD AND CONSTITUTION

    PERFORMANCE TEST PLAN SPECIFICATION SECTION 01 75 00 – Operational Demonstration

    SPECIFICATION SECTION 01 91 00 – Equipment and System Commissioning

    SPECIFICATION SECTION 44 60 11 – Activated Carbon Odor Control System

    SPECIFICATION SECTION 44 60 12 – Hydrogen Sulfide Monitoring Systems

    ULLIMAN SCHUTTE CONSTRUCTION, LLC

    May 1, 2017

    MISCELLANEOUS FACILITIES UPGRADE - PHASE 4

    BLUE PLAINS

    CONTRACT NO. 140230

  • P a g e 2 | Ulliman Schutte Construction, LLC. Task Order #010 3rd and Constitution MFU Phase 4, Blue Plains

    1. Test Plan Overview 1.1 Overview

    This plan details the sequence in which the Activated Carbon Odor Control System and Hydrogen Sulfide Monitoring System (ACOCS and HSMS) Performance Plan for the 3rd and Constitution Ave – Pump Station Modification as referenced in Contract Specification 44 60 11 and 44 60 12, will be completed. The Operational Demonstration is planned to take one day.

    1.2 Purpose

    This Plan provides a step-by-step guide for the completion of the ACOCS AND HSMS Performance Plan as required by Contract Specification Section 01 75 00, 01 91 00, 44 60 11 and 44 60 12. This Plan will include testing sign-off/check-out sheets in order to fulfill Contract Specifications.

    1.3 Plan Outline

    This Plan consist of procedures for the ACOCS AND HSMS Performance Testing. The ACOCS AND HSMS Performance Plan will confirm the performance of the Carbon Vessels and the Hydrogen Sulfide Monitoring System. The equipment at the ACOCS AND HSMS include the following:

    • An axial fiberglass reinforced plastic (FRP) fan (Supply Fan S-1) • A grease filter/mist eliminator • A centrifugal FRP fan • Two (2) Carbon Odor Control Vessels (OCU-1 and OCU-2) • Hydrogen Sulfide Monitoring System

    Please see the attached drawings for the location of the components along with the sample locations and location of where the hydrogen sulfide gas will be introduced.

    The Performance Test is conducted to ensure the ACOCS AND HSMS System is meeting the design standards per the Contract Documents. Prior to the Performance Test, Ulliman Schutte Construction (USC) has completed the following:

    • Media Installation • All System Components Start-Up

  • P a g e 3 | Ulliman Schutte Construction, LLC. Task Order #010 3rd and Constitution MFU Phase 4, Blue Plains

    2. Design Parameters 2.1 Design Requirements for the Carbon Odor Control Vessels

    INLET

    CONTAMINANT INLET

    CONCENTRATION OUTLET

    Hydrogen Sulfide 1-10 ppm 0.1 ppm

    Hydrogen Sulfide >10 ppm 1% of inlet

    Methyl Mercaptan 100-500 ppb 10% of inlet

    Dimethyl Sulfide 100-500 ppb 10% of inlet

    Dimethyl Disulfide 100-500 ppb 10% of inlet

    Dilutions-to-Threshold

    1,000-10,000 D/T 100 D/T

    Max Air Flow Rate H2S Loading

    950 Avg.: 5 ppm

    950 Peak: 50 ppm

  • Thomas.hoelscherCallout

    Thomas.hoelscherCalloutHydrogen sulfide levels will be measured at the test ports marked

    Thomas.hoelscherCalloutTest ports

    Thomas.hoelscherCalloutTest ports

    Thomas.hoelscherCalloutBottled hydrogen sulfide gas will be introduced into the system here.

  • Thomas.hoelscherCalloutHydrogen sulfide measurements will be taken from each sample port. This will be the air after it is treated

    Thomas.hoelscherCalloutHydrogen sulfide measurements will be taken from this sample port. This will be the air before it is treated

    Thomas.hoelscherText BoxNote: Sampling will be the same for each vessel

  • P a g e 6 | Ulliman Schutte Construction, LLC. Task Order #010 3rd and Constitution MFU Phase 4, Blue Plains

    3. Test Activities 3.1 Air Flow Rate for the centrifugal FRP fan

    Airflow rate shall be recorded using a handheld anemometer prior to the start of the test

    3.2 One (1) Liter Air Samples and Differential Pressure Readings at Vessels

    Using a StCroix Sensory Vacuum Pump, take one (1) liter air samples at each vessel inlet and outlet.

    Vessel Air Sample Results Differential Pressure

    Results

    OCU-1 Inlet

    OCU-1 Outlet

    OCU-2 Inlet

    OCU-2 Outlet

    3.3 Air Samples will be sent to StCroix Sensory for analysis

    3.5 Air Samples will be sent to ALS Environmental for analysis.

    3.6 Air Flow Rate (after the air samples are taken )

    Record Air Flow Rate using a handheld anemometer after the air samples are taken.

    3.7 Hydrogen Sulfide Monitoring System

    Print out the graph of the OdaLog results. See the following page for an example of the graph.

  • P a g e 8 | Ulliman Schutte Construction, LLC. Task Order #010 3rd and Constitution MFU Phase 4, Blue Plains

    3rd and Constitution Ave. – Pump Station Modification Contract No. 140230

    Miscellaneous Facilities Upgrade – Phase 4 Task Order #010

    Test Location

    Vessels Tested

    Manufacturer

    Checkout Items Yes No Comments Performance Test Completed:

    Vessel OCU-1 Vessel OCU-2 Hydrogen Sulfide Monitoring System

    3rd and Constitution Ave. Washington DC

    OCU-1 and OCU-2

    ECS Environmental Solutions

  • P a g e 9 | Ulliman Schutte Construction, LLC. Task Order #010 3rd and Constitution MFU Phase 4, Blue Plains

    All Item Confirmed by the following parties: USC Representative: Print Name: ________________________________________________ Signature: ________________________________________________ Date: ________________________________________________ Manufacturer: Print Name: ________________________________________________ Signature: ________________________________________________ Date: ________________________________________________ Owner Representative: Print Name: ________________________________________________ Signature: ________________________________________________ Date: ________________________________________________