SUBJECT: PETITIONER: RECOMMENDATION OF PETITIONER:...
Transcript of SUBJECT: PETITIONER: RECOMMENDATION OF PETITIONER:...
-
DocuSign Envelope ID: DDC1B5CF-38F8-4E75-BFn--04ASE3C1391C
SUBJECT:
CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT
AGENDA ITEM
ANNUAL MAJNTENANCE WORK PROGRAM 2019-2020
PETITIONER: CITY OF HENDERSON
RECOMMENDATION OF PETITIONER: IT IS RECOMMENDED THAT THE CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT APPROVE TlllS FIRST SUPPLEMENT AL INTERLOCAL CONTRACT FOR THE MAINTENANCE OF REGIONAL FLOOD CONTROL FACILITIES FOR FY 2019-2020 (FOR POSSIBLE ACTION)
FISCAL IMP ACT:
BACKGROUND:
Current $2,250,700
Proposed $3,850,700
Fiscal Impact $1 ,600,000
On June 13, 2019 the Clark County Regional Flood Control District entered into an interlocal contract with the City of Henderson to maintain Regional Flood Control Facilities within the City of Henderson. This First Supplemental Interlocal Contract will provide additional funding for the City of Henderson' s FY 2019-2020 Annual Maintenance Work Program.
The additional funding is being requested to complete work on recently advertised projects and miscellaneous maintenance work activities for the remainder of the fiscal year that exceed the remaining FY20 maintenance work program budget. The first bid included the headwall and culvert repairs for the Sandwedge Channel at Windmill Road (PTSWOO 19) and the repair of the energy dissipator bottom slab for the Pittman Railroad West Channel (PTRWOOOO) at the confluence with the Pittman Wash (PTWA0105). The second bid included the erosion repair to the Northeast C-1 Detention Basin (C1HV0140) and the spillway concrete repair and improvements to limit public access for the East C-1 Detention Basin (C1DC0303). The repairs to the PTRWOOOO and ClHV0140 were not identified in time to include in the budget for FY20 and the bid amounts for PTSWOO 19 and C 1HVO140 exceeded the estimated budget amounts resulting in the need to request additional funding.
Respectfully submitted, TAC AGENDA RFCDAGENDA ITEM # llb ITEM # 08 Date: 04/30 /20 20 Date: 04/09/2020
CACAGENDA ITEM # llb
Director of Public Works Date: 04/30/2020
AJ:mvp
-
Staff Discussion:
Regional Flood Control District AGENDA ITEM DEVELOPMENT
Date: 04/20/2020
FISCAL YEAR 2019-2020 MAINTENANCE WORK PROGRAM - CITY OF HENDERSON FIRST SUPPLEMENT AL INTERLOCAL CONTRACT
The City of Henderson has submitted a request to approve a first supplemental interlocal contract for the FY 2019-20 Maintenance r ork Program to increase funding in the amount of$1,600,000.
On June 13, 2019, the Regional Flood Control District entered into an interlocal contract with the City of Henderson to maintain Re~ional Flood Control Facilities within the City of Henderson.
I The additional funding is being requested to complete work on recently advertised projects and miscellaneous maintenance work activities for the remainder of the fiscal year. The first bid included the headwall and culvert repairs for the Sandwedge Channel at Windmill Road and the repair of the energy dissipator bottom slab for fue Pittman Railroad West Channel at the confluence with the Pittman Wash. The second bid included the erosion repair to the Northeast C-1 Detention Basin and the spillway concrete repair and improvements to limit public access for the East C-1 Detention Basin. The repairs to PTRWOOOO and C1HV0140 were not identified in time to include in the budget for FY 20 and the bid amounts for PTSW0019 andClHV0140 exceeded the estimate budget amounts resulting the need to increase funding
District funding will be as rollows: Current Funding Increase/Decrease Proposed Funding
I FY 2019-20 MWP City of Henderson $2,250, 700 $1 ,600,000 $3 ,850, 700
The District Attorney has ieviewed the contract.
Staff Recommendation:
Approve.
Discussion by Technical ~dvisory Committee: AGENDA # 11 b Date: 04/3 0/2020
Recommendation:
Discussion by Citizens Advisory Committee: AGENDA #1 lb Date: 04/30/2020
Recommendation:
043020 COH MWP 19-20-ilc I-aid
-
FIRST SUPPLEMENTAL INTERLOCAL CONTRACT ANNUAL MAINTENANCE WORK PROGRAM
I This FIRST SUPPLEMENTAL INTERLOCAL CONTRACT, made and entered into this
day of , ~20, by and between the CITY OF HENDERSON, a political subdivision of the State of Nevada, herei !after referred to as "CITY", and the CLARK COUNTY REGIONAL FLOOD
CONTROL DISTRICT, h reinafter referred to as "DISTRICT".
WITNESS ETH:
WHEREAS, purs ant to Chapter 543 of the Nevada Revised Statutes, the DISTRICT may
approve and fund projects o maintain flood control improvements; and
WHEREAS, purs ant to NRS 277.180 any one or more public agencies may contract with one or
more other public agencies to perform any governmental service, activity or undertaking which any of the
public agencies is authoriz d by law to perform; and
WHEREAS, the ITY desires to maintain flood control improvements within the CITY in
accordance with the maint nance program set forth herein, and hereinafter referred to as "Project" ; and
WHEREAS, an Inr rlocal Contract was approved between the CITY and the DISTRICT on June
13, 2019 to provide mainte ance funding; and
WHEREAS, the f cilities upon which maintenance will be performed are facilities described in
the DISTRICT'S Master Pjan.
NOW, THEREFORE, in consideration of the covenant , conditions, agreements, and promises
I of the parties hereto, the DISTRICT authorizes the Project as it is mutually understood and agreed as
follows:
SECTION Il - P OJECT COSTS, paragraph 1 shall be revised to read as follows:
The DISTRICT ag ees to make payment for Project costs within the limits specified below:
1. The Project cost shall not exceed $3,850,700.
The amounts aJloc ted to each individual facility within the Project must be specified in
Supplement l Amended B dget. Any changes to said allocated amounts must be approved by the
FY 19-20 HN MWP IC Supp I April 9, 2020
Page 1 of3
http://www.leg.state.nv.us/NRS/NRS-543.htmlhttp://www.leg.state.nv.us/NRS/NRS-277.html
-
DISTRICT'S Chief Engineer in accordance with Section 4.24 of the DISTRICT Operations and
Maintenance Manual.
A written request ust be made to the DISTRICT and a Supplemental Interlocal Contract
approved to increase the a ount noted above prior to payment of any additional funds.
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
The remainder of the original Interlocal Contract dated June 13, 2019 shall remain unchanged.
FY 19-20 HN MWP IC Supp I April 9, 2020
Page 2 of 3
-
IN WITNESS WHEREOF, this First Supplemental Interlocal Contract is hereby executed
as of the date first set foJ h above.
Date of District Action:
ATTEST:
DEANNA HUGHES, Secretary to the Board
Approved as to Form:
BY:~~~~~~~~~~~~~~CHRISTOPHER FIGG~S Chief Deputy District Attorney
REGIONAL FLOOD CONTROL DISTRICT
LAWRENCE L. BROWN ill, Chair
********************~********************************************************* Date of Council Action:
ATTEST:
Sabrina Mercadante, MMC, City Clerk
Approved as to Funding:
Jim Mcintosh Chief Financial Officer
CITY OF HENDERSON
Richard A. Derrick, City Manager/CEO
Approved as to Form:
Nichola G. Va kov, City Attorney
Approved as to Content:
Edward McGuire Director of Public Work
FY 19-20 H MWP IC Supp I April 9, 2020
Page 3 of 3
-
CITY OF HENDERSON MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
MWP Facility Master Plan Facility ID Number Facility Description
C1CH 0000-0452, C1CT 0000-0075, C1DC 0000-0303, C1E1 0000-0065, C1EQ 0000-0297, C1FK 0000-0073, C1H1 0000-0003, C1 H2 0000-0001 , C1HV0000-0300, C1 IT 0273, C1 LM HN65 C1 NORTH 0000-0130, C1RT 0001 -0044, LLMW 0000, LLMW 0129, LLMW 0203 - - -C1BH 0000-0214, C1CH 0455-0674, C1CH 0711 , C1CH 0742
HN66 C1SOUTH 1138, C1GW 0000-0081, C1U1 0000-0062, C1US 0000-0078 PTBR 0067-0175, PTGB 0058-0249, PTVW 0000-0187 HN67 PITTMAN CENTRAL NE
PTHR 0000-0210, PTIS 0000-0258, PTPD 0010-0063, PTRR HN68 PITTMAN CENTRAL SE
0000-0135, PTWH 0000-0116
DCWA 0646-0670, PTDC 0026-0237, PTPE 0000-0166, PTRW 0000-0170, PTSW 0000-0129, PTWA 0000-0476, HN69 PITTMAN CENTRAL NW WWDC 0000-0109
PTDW 0000-0088, PTFD 0000-0111 , PTLM 0000-0078, PTMR 0000-0399, PTRE 0000-0267, PTST 0000-0170, PTW HN70 PITTMAN CENTRAL SW 0000-0005
PTAD 0000-0070, PTAN 0000-0280, PTAT 0000-0007, PTCR 0000-0036, PTDY 0000, PTEA 0493-0773, PTOG 0000-0016, PTPN 0000-0039, PTRD 0000-0055, PTSA 0000-0091, PTSE HN71 PITTMAN ANTHEM INSPIRADA 0000-0346, PTSN 0000-0063, PTSS 0000-0012, PTWS 0000-0063
PTAP 0000-0191 , PTEA 0000-0244, PTEA 0437-0439, PTGV 0000-0073, PTHD 0000-0020, PTPW 0000-0309, PTSH 0011 - HN72 PITTMAN SEVEN HILLS 0084 DCLA 0035, DCN1 0000, PTBE 0140, PTN2 0000-0251 , PTN3 0000, PTN5 0000, PTN6 0000, PTN7 0001 , PTN8 0000
HN73 PITTMAN WEST HENDERSON 0039, PTN9 0000-0027, PTNO 0139-0195, PTSO 0104-0153, PTW A 0815-0983
Albert J. Jankowiak
EXHIBIT "A" Project Manager
Cost
1,948,660.67-
93,267.79
145,300.00
632,500.00
731 ,633.13
80,151 .13
114,890.00
81,797.28
22,500.00
SUBTOTAL $3,850, 700.00
12/31/19
Date
-
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
MWP Facility#: ..;.HN6.;;.;.;;.;:;.5 ________________ _ Entity: CITY OF HENDERSON
Facility Name: C1 NORTH Date Prepared : ..:31:..:4;.:f2::;020=-------
MP Facility ID:
Force AccounU Contract
1
C1CH ()()()()..()452, C1CT 0000-0075, C1DC ~303. C1E1 0000-0065, C1EQ ~297, C1FK 0000-0073, C1H1 0000-0003, C1H2 OOQO.()()Q1, C1HV 0000-0300, C11T 0273, C1LM 0000-0130, C1RT 0001-0044, LLMW 0000, LLMW 0129, LLMW 0203
Actlvfty
Inspect Channel•
lnapect Lev-.io.t.mlon end Debrie Bmlna
Bl Species Survey end Removal
men1c1 .... u
Approved Work Amended Work Total Percent Plan Amount($) Plan Amount ($)- Expenditures ($) Complete
0%
55%
81%
«!Q% 0%
100% 100%
0%1
26%'
100%'
66%
0% 0%
100%,
60%
Scheduled Completion
Date
Jun-202
,artment ol Air Oualltv Issue. 'ork completed during prior fls
Act 3 - Select a consultant to start lhe Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 - C1 Channel remove vegetation and r-stabish flowline in natural portion of C1 Channel downstream of Tuscany subdivision. Ad 15, Act 21 , Act 25, Act 50 - East C -1 Detention Basin (Cl DC 0302 and C1DC 0303); response to Nevada Division of Waler Resources-Dam Safety Englnee~s Office requirement of Immediate action. Act 25 - Drake Channel Confluence. Other expenditures this facilltv were for reaular maln1enance actlvllles. Work to be completecfdurlng current fiscal year:
Act 3 - Consultant to start lhe Asset Management Program for Regional Flood Control Facilltles. Act 25, Act 60, Ad 85 - East C -1 Detenllon Basin (C1DC 0302 and C1DC 0303) and Northeast C1 Detention Basin (C1HV 0140); remow sediment and debris from detention basin and repair erosion on embankments. Other budgeted funding to be exoended on this facmv for reoular maintenance activities.
ConsultanV Contractor: Project Manager. Albert J. Jankowiak (702) 267-3024
-
MWP Facili ty#: HN66
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
Entity: CITY OF HENDERSON
Facility Name: C1 SOUTH Date Prepared: "'31"""412-'-'0"'"2"'"0 ------ -C1 BH 0000-0214, C1CH 045S-0674, C1CH 0711 , C1CH 0742-1138, C1GW 0000-0081 , C1U1 0000-
MP Faci lity ID:
Force AccounV Contract
0062, C1US 0000-0078
Activi ty
3 Facility Assessment and Inventory
5 Inspect Channels 6 Inspect Lev-.ioetentlon end Debri1 Basins 8 Species Survey and Removal
1 Clemi end Reshape Chennels/Lev-
15 Repair Lined Channel 2 Erosion Control end Repelr
21 Provide/Maintain Dust Control
2 Clemi Detentlon/Debri1 Basins
35 Fence Repair
Vegetation Control - Chemical
45IVegetetlon Control - Mechanical
Maintain Access Road
55~Clean & Inspect Inlet/Outlet Structures 60 Repair Inlet/Outlet Structures
6 Clean Storm Sewer Lines
Storm Sewer Repair
3Clean/Flush Culverts & Bridges MlsceHeneoua Work Activities 8 Engineering Homeless Encem1>ment Claanu
Delays or Problem Areas:
'ork completed during prior fiscal year:
Approved Work Amended Work Total Plan Amount($) Plan Amount ($) Expend itures ($)
$2,443.63
$2,477.2
$264.9
$0.00
$0.00
$0.00
$0.00
$2,627.6
$17,651 .3J $0.00
·-$500.0 $0.00
TOTALS
Percent Complete
0%'
70%'
50%
3%
0%
0%
0%
0%1
19%1
0%
0%
0%
100%
93% 59%
Scheduled Completion
Date
Jun-202
,ct 3 - Select a consultant to start the Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 - C1 Channel remove vegetation and re-establish owllne In natural portion of C 1 Channel downstream of Tuscany subdivision. Act 15, Act 21 , Act 25, Act 50 - East C -1 Detention Basin (C1DC 0302 and C1 DC 0303);
response to Nevada Division of Water Resources-Dam Safety Enginee~s Office requirement of immediate action. Act 25 - Drake Channel Connuence. Other expenditures or th is facility were for reaular maintenance activities.
Work to be completed during current fiscal year:
Act 3 - Consultant to start the Asset Management Program for Regional Flood Control Faclllties. Other budgeted funding to be expended on this facillty for regular maintenance activities.
Consultanv Contractor: Project Manager: Alben J. Jankowiak (702) 267-3024
-
MWP Facility#:
Facility Name:
MP Facility ID:
HN67
PITTMAN CENTRAL NE
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
PTBR 0067-0175, PTG8 0058-0249, PTVW 0000-0187
Entity: CITY OF HENDERSON
Date Prepared: _,31'""4/20~"'20""-------
Force Account/ Contract
Activity Approved Work Amended Work Total Percent Plan Amount ($) Plan Amount ($) Expenditures ($) Complete
Scheduled Completion
Date
3 Facility AHM1ment end Inventory 5 Inspect Channels 6 lnspec1 Lev-/Detentlon and Debris Beslns
8 Species Survey and Removal
10 Cleen end ReehepeChennels/Lev-
15 Repai!. LI ned Channel 20 Erosion Control and Repair
21 Provide/Maintain Oust Control
Cleen Detention/Debris Beslns
35 Fence Repair
40 Vegetation Control • Chemical 45 Vegetation Control. Mechanical
SO Mal ntaln Accea1 Roed 55 Cleen & Inspect Inlet/Outlet Structures
60 Repair lnlet/Oudet Struc1uree 65 Clean Storm Sewer Lines
70 Storm Sew• Repair 75 Cleen/Flush Culver1s & Bridges 80 Ml1celleneou1 Work Activities
85 Engln-lng Homelee1 Encmnoment Cleenu
Delays or Problem Areas :
ork completed during prior f iscel yeer:
., ,,00 ~ $2,000.0
,500.
s2.ooo.ooj
$50,000.
$17,000.01
mu1 $18,207.3 $1 ,1 27.67
TOTALS
$2,000.
$30,500.0
$9,000.01
$1 ,000.
$2,
$221.41
$18,207.3
$1 ,127.67
$698 . 3~ $1,083.8
$3,301 .3
$0.00
$0.00
$763.96
$5,826.1
$80.4
$221.41
$2,856.16
$1 ,127.67
39%
54%
11%
0%
0%
38%
12%1
0%
100%
16%
100%
0%
98% 100%
Jun-202
,Act 3 . Select a consultant to start the Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 • C1 Channel remove vegetation and re-establish ;flowline in natural portion of C1 Channel downstream of Tuscany subdivision. Ad 15, Act 21 , Act 25, Act SO · East C • 1 Detention Basin (C1 DC 0302 and C1 DC 0303); response to Nevada Division of Water Resources-Dam Safety Englnee!'s Office requirement of immediate action. Act 25 • Drake Channel Confluence. Other expenditures o th is facility were for reaula r maintenance activities.
'ork to be completed during current f iscal year:
Budoeted fundlna to be exoended on this facililv for reaular maintenance adivitles.
Consultant/ Contractor: Project Manager: Albert J. Jankowiak (702) 267-3024
-
MWP Facili ty#:
Faci lity Name:
MP Facility 10:
HN68 PITTMAN CENTRAL SE
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
PlliR 0000-0210, PTIS 0000-0258, PTPO 001().0063, PTRR 0000-0135, P1WH 0000-0116
Approved Work Amended Work
Entity: CITY OF HENDERSON
Date Prepared: ""3/'-4/2020=""'--------
Total Percent Scheduled Force
AccounV Contract
Activity Plan Amount ($) Plan Amou nt ($) Expenditures ($)
Completion Complete
Date
Facility "81ea1ment end Inventory Inspect Chennals
ln1pact Leveea/Oetentlon end Oebrl1 B111ln1
~Species Survey end Removal
1 Oemt end Reshape Olannellllev-1 Repair Lined Channel
ErOllon Control end Repair
21 1Provlde/Melntaln Oust Control
2slaemt Oetentlon/Oebrl1 B111ln1 Fence Repair
Vegetetlon Control • Chemlcal
~Vegetation Control • Machanlcal Mmlntaln Accea1 Road
55 a_, & Inspect Inlet/Outlet Structures Repair Inlet/Outlet Structures
6~Cl_, Storm Sewer Lines 7 Storm Sewer Repair 7 ClBM11Fluah Culver11 & Bridges
MllC8llaneou1 Work Activities
85IEngln_.lng
Home!•• Encampment CIBMIU
IOelays or Problem Areas:
$3,600.44
$1,000.
$20,500.
$459,000.
$266.3
$14,000.
$43,365.
$3,600.44
$1 ,000.
$20,500.0
$459,000.
$266.3
$14,000.0
$43,365.0
$3,600.44
$193.
$1,707.
$0.00
$266.3
$0.00
$6,051.9
$4 ,066.4
100%
19%
8%
0%
100%!
0%
43%
9%
99%
65%
29%
Jun-202
15, Act 85 • 1-515 Channel (PTIS 0029-0166); re-establish the channel and repair the reno mattresses along lhe 1-515 near Horizon and Horizon Ridge. Budgeted funding o be exoended on this tacllltv for reoular maintenance activities.
ConsultanV Contractor: Project Manager: Albert J. Jankowiak (702) 267-3024
-
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
MWP Facili ty#: _HN6_9 _______________ _
Facility Name: PITTMAN CENTRAL lffl
OONA 0646-0670, PTOC 0026-0237, PTPE 0000-0166, PTRW 0000-0170, PTSW 0000-0129, MP Faci lity ID: PTWA 0000-0476, WWDC 0000-0109
Entity: CITY OF HENDERSON Date Prepared: .. 'Jl ... 4/20=•20-... _____ _
Force Account/ Contract
Activi ty Approved Work Amended Work Total Percent
Complete
Scheduled Completion
Date
3,Facillty Aaaessm.,t and Inventory 5 Inspect Channels
Inspect Lev-/Oetentlon and Debris B•lns
~Species Survey and Removal
1 a .... and Reshape Channela/l.ev-15 Repair Lined Channel
Erosion Control and Repair 21 IProvlde/Malntaln Dust Control
Cl_.. Detention/Debris Basins
35IFence Repair
Vegetation Control - Chemlcal
45IVeoetatlon Control · Mechanical
751Clean/F1uah Culverts & Bridges
Miscellaneous Work Actlvltlee
maitClemiu
IDeieys or Problem Areas :
'ork completed during prior fiscal year:
TOTALSI
Plan Amount($) Plan Amount ($) Expenditures ($)
$1 ,200.
$608.7
$28,800.
$9,000.
$3,160.
$1 ,948.
$250,000.
$1 ,254.
$376.2
$57,500.
$103.3
"·'00~ $1 ,948. $7,757.2
$2,463.
$183,339.6
~.001
50%
100%
68%
0%
100%
100%
47%
100%
99%
0%
100%
100%
57%
100%
Jun-202
ct 3 ·Select e consultant to start the Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 . C1 Channel remove vegetation and r&-eStabtish lowllne In natural portion of C1 Channel downstream of Tuscany subdivision. Ad 15, Act 21 , Act 25, Act 50 ·East C -1 Detention Basin (C1 QC 0302 end C1 QC 0303);
response to Nevada Division of Water Resources-Dam Safety Engineer's Office requirement of Immediate action. Act 25 • Drake Channel Confluence. Other expenditures his facllkv were for reoular maintenance activities.
'ork to be completed during current fiscal year:
ConsultanV Contractor: Project Manager: Albert J. Jankowiak (702) 267-3024
-
MWP Facility#:
Facility Name:
MP Faclllty ID:
HN70 PITIMAN CENTRAL SW
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
Prow 0000-0088. PTFO 0000-0111 , PTLM 0000-0078, PTMR 0000-0399, PmE 0000-0267. PTST 0000-0170, PTW 0000-0005
Entity: CITY OF HENDERSON Date Prepared: _31.._4..-12-..0.-20.._ _____ _
Force Account/ Contract
Activity Approved Work Amended Work Total Percent
Scheduled Completion
Date
3 Facility Assessment and Inventory
5 Inspect Channels
6 Inspect Levees/Oelentlon and Debris Basins
8 Species Survey and Removal
1 Clean and Reshape Channels/Levees 15 Repair Lined Channel
20 Erosion Control and Repair 21 Provide/Maintain Dust Control
25 Clean Detention/Debris Basins 35 Fence Repair
40 Vegetllllon Control - Chemical
45 Vegetation Control - Mechanical
50 Maintain Access Roed 55 Clean & Inspect Inlet/Outlet Structures 60 Repai r lnlet/Oudet Structur111
65 Clean Storm S-er Lines
70 Storm Sewer Repair 75 Clean/Flush Culverts & Bridges
80 Ml1cellaneou1 Work Actlvlt1111
85 Engineering 90 Homel111s Encanomant Claanu
1Delays or Problem Areas:
'ork completed during prior f iscal year.
TOTALS
Plan Amount($) Plan Amount($) Expenditures ($) Complete
$2,500.001 $2,500.00, $842.11
$0.00
$0.00
$0.00
$495.
$3,882.2
34%
0%
0%
0% 5%!
15%
0% 100%1
97%
Jun-202
Act 3 - Select a consultant to start the Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 - C1 Channel remove vegetation and re-estabfish Oowllne In natural portion of C1 Channel downstream of Tuscany subdivision. Ad 15, Act 21 , AC1 25, Act 50 - East C -1 Detention Basin (C1DC 0302 and C1DC 0303): response to Nevada Division of Water Resources-Dam Safety Englnee(s Office requirement of immediate aelion. Act 25 - Drake Channel Confluence. Other expend~ures o lthls facility were for reoular maintenance activities.
'ork to be completed during current fiscal year:
ConsultanV Contractor: Project Manager: Albert J. Jankowiak (702) 267-3024
-
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
MWP Facility#: ..:.H"-N7"-""-1-----------------Facllity Name: PITTMAN ANTHEM INSPIRAOA
MP Facl llly 10:
PTAD 0000-0070, PTAN 0000-0280, PTAT 0000-0007, PTCR 0000.0036, PTDY 0000, PTEA 0493-0773, PTOG 0000-0016, PTPN 0000-0039, PTRO 0000-0055, PTSA 0000-0091 , PTSE 0000-0346, PTSN 0000-0063, PTSS 0000-001 2, PlWS 0000-0063
Entity: CITY OF HENDERSON
Date Prepared: _,3/"'"4""'20=2"-0-------
Force Account/ Contract
Activi ty Approved Work Amended Work Total Percent
Scheduled Completion
Date
3 Facility Assessment end Inventory 5 Inspect Channels
6 Inspect Lev-.ioetentlon and Debris Basins
8 Species Survey and Removal
10 aean and Reshape Chennela/Lev-15 Repair Lined Channel
Erosion Control and Repair
21 Provide/Maintain Oust Control
2 Oean Delantlon/Oebrl1 Basins 35 Fence Repair
40 Vegetetlon Control - Chemical 45 Vegetation Control - Machanlcal
50 Mal ntllin Accaaa Roed 55 Clean & Inspect Inlet/Outlet Structures
60 Repllir Inlet/Outlet Structures
65 Clean Storm Sewer Lines 70 Storm Sewer Repair 75 Clean/Flush Culverts & Bridges 80 Mlacellaneoua Work Activities
85 Engineering Homelea1 Encamoment Cl&Mlu
Delays or Problem Areas :
ork completed during prior f iscal year:
TOTALS
Plan Amount($) Plan Amount($) Expend itures ($) Complete
$5,000.01
$5,000.
$19,971 .
$9,000.
$5,000.
$15,000.
$1 4,000.
$28,950.
$500.
$1 ,000.
$500.001
$1 ,500.001
$478.34
$7,ooo.ool
$5,000.00
$5,000.
$19,971 .6
$9,000.00I
$5,000.001
$28,950.0
$500.
$1 ,000.00!
$500.001
$1 ,500.00I
$1 ,468.34
58,000.00
$2 ,317 . 9~ 46% $2,532.6 51%
$734.:1 4%'
$0.00 0%
$0.~ 0% $0.00 0%
$5,798.1 41%
$0 .~ 0%
$0.00
$0.00 0%
$0.00 0%
$0.00 0%
100%
90%
3 - Select a consullant to start the Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 - C1 Channel remove vegetation and re-establish flowllne In natura l portion of C1 Channel downstream of Tuscany subdivision. Ad. 15, Act 21 , Act 25, Act 50 - East C -1 Detention Basin (C1DC 0302 and C1 DC 0303): response to Nevada Division of Water Resources-Dam Safety Englnee~s Offtee requirement of Immediate action. Act 25 - Drake Channel Confluence. Other expend~ures o, :th is facil~v were for reoular maintenance activities.
'ork to be completed during current f iscal year:
Budaeted fundlna lo be exoended on this facility for reaular maintenance ad.ivities.
ConsullanV Contractor. Project Manager: Albert J. Jankowiak (702) 267-3024
-
MWP Facility#:
Facility Name:
MP Facili ty ID:
HH72
PITTMAN SEVEN HILLS
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
PTAP 0000-0191 , PTEA 0000-024'1, PTEA 0437-o439, PTGV 0000-0073, PTHD 0000-0020, PTPW 0000-0309, PTSH 001 1-00&4
Entity : CITY OF HENDERSON
Date Prepared: -=3/-4/20="'20"-------
Force Account/ Contract
Activi ty Approved Work Amended Work Total Percent
Scheduled Completion
Date Plan Amount($) Plan Amount($) Expend itures ($) Complete
3r1cUlty Aaaaament and Inventory 5 Inspect Channels
5'roo~ "~~ $1 ,665 .4~ 67%
Inspect Lev-'Oelentlon and Debris Basins ~-,
$6,000. $6,000. $3,981 .6 66% -~Species Survey and Removal ---.-- ·-
1 a.en and Reshape Chennela/lev- - -·-- -- - $20,500. $10,000.0 $797. 1~ 8%1 1 Repair Lined Channel 519,000. $10.000.0 50.00 0% - --
Erosion Control and Repair
21IProvlde/Malntllin Dust Control
-1= 510,000.3 $10,000.0~ $822.741 8% .
0%: Oeen Detention/Debris Basins $10,000. $10,000.0 $0.00
Fence Repair $14,000. $14,000.0 $703.14 5%
Vegetation Control - Chemlcel
Vegetation Control - Machanlclli $22,855.201 $10.000.0~ S0.001 0% -Maintain Acceaa Road
-.. _____ ~
O aen & Inspect Inlet/Outlet Structuras --- - -- .. $2 ,015.7~ $2 ,015.7~ $2 ,015 .7~ 100% Repair lnlel/Oudet Structuraa $129.0 $129.0 $129.0 100%1
aaen Storm Sewer lines
Storm Sew• Repair Clean/Flush Culverts & Bridges I $1 .000.00I $1 ,000.00I 50.00I 0% Miscellaneous Work Actlvltlee
85IEnglneerlng $6,152.48 100% .... -....._-- ... Homeleea Encan ment Claenu
TOTAL $16,267.51 Jun-202
Delays or Problem Areas:
'ork completed during prior f iscal year:
ct 3 - Select a consultant to start the Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 - C1 Channel remove vegetation and re-estab&sh line In natural portion of C1 Channel downstream of Tuscany subdivision. Ad 15, Act 21 , Act 25, Act 50 - East C -1 Detention Basin (C10C 0302 and C10C 0303);
response to Nevada Division of Water Resources-Dam Safety Enginee~s Office requirement of Immediate action. Act 25 - Drake Channel Confluence. Other expenditures 0 1 his facllltv were for reaular maintenance activities.
'ork to be completed during current fiscal year:
ConsultanV Contractor. Project Manager: Albert J. Jankowiak (702) 267-3024
-
REGIONAL FLOOD CONTROL DISTRICT MAINTENANCE WORK PROGRAM
FY20 SUPPLEMENT 1 AMENDED BUDGET
MWP Feclllty#: HN73 Entity: CITY OF HENDERSON Facility Name: PITTMAN WEST HENDERSON Date Prepared: ..::31:..4:::/2020=::.....------
MP Feclllty ID: OCLA 0035, DCN1 0000, PTBE 0140, PTN2 0000-0251 , PTN3 0000, PTN5 0000, PTN6 0000, PTN7 0001 , PTN8 0000-0039, PTN9 0000-0027, PTNO 0139-0195, PTSO 0104-0153, PTWA 0815-0983
Force AccounV Contract
Activi ty
31Fec:lllty Aaaeeem.,t end lnv.,tory
5 Inspect Channels lnepec:t Lev-.ioet.,tlon and Debrie Bmlne
8 Species Survey end Removal
10 a ... mnc:t Reehepe Ch.,nele/Lev-15 Repair Lined Channal
20 Eroelon Control end Repair
21 Provide/Maintain Dust Control
Cl_, DetentlonlOebrle Basins
35IFence Repair
Vegetllllon Control - Chemical
~Vegetation Control - Mechanical Mel nt81n Acceae Road
55 Clean & Inspect lnleVOutlet Structures 60 Repair lnlel/Oudet Structur• 65 Clean Storm Sewer Linea
Storm S.Wer Rep81r
75,Clean/Flush Culverts & Bridges 60 Mlacelleneoue Work Actlvlll• 85 Engln-lng
Homeless Encsnom91t Cleenu
'Delays or Problem Araas :
'ork completed during prior f iscal year:
TOTALSI
Approved Work Amended Work Total Plan Amount($) Plan Amount ($) Expenditures ($)
$227.
$0.
$0.00
S0.00
$0.00
S0.00
$0.00
$4,996.8
$5,224.44
Percent Complete
46%
0%
0%:
0%
0%
0%
0%
100%
Scheduled Com pl et Ion
Dale
Jun-202
3 - Select a consultant to start the Asset Management Program for Regional Flood Control Facilities. Act 40, Act 45 - C1 Channel remove vegetation end re-estebrtsh line In natural portion of C 1 Chan net downstream of Tuscany subdivision. Ad 15, Act 21 , Act 25, Act 50 - East C -1 Detention Basin (C1 DC 0302 end C1 DC 0303);
!response to Nevada Olvlsion of Weter Resources-Oam Safety Engineer's Offoce requirement of immediate action. Act 25 - Drake Channel Confluence. Other expend~ures o' his facllltv were for reoula r maintenance activities.
'ork to be completed during current fiscal year:
Consullanv Contractor: Project Manager: Albert J. Jankowiak (702) 267-3024
-
/ I
-~ ( Lp
I
~ ""'
\-'-.
. '
-t .-- ! ·--
--- -- , •
I .,
··---
~"~ ~~
i
,-
.C'
,.- --- ---·-I I
r' 1 I .. - .... _ ,_ -· - . J.
,_
r--··-
1
I I - -- -- ... ·-
:::.-
i -·· -·· ~ r· ..
I I ·,~_.t
,.-i .i
---· -·... .. -- ... -
HN67
--· ·~
..... -;::--·-=-.-;Z.-L ·
IJ J
- ·--"':.. ·--·---~
)-
... _
- -·
Note: PTGB0047 - PTGB0054 are maintained by Desert Canyon HOA
DEPARTM ENT OF PUBLIC WORKS,
PARKS AND RECREATION
CIT")'
~ * ·~ ~ E ~·O ~b~M-
City of Henderson
Clark County Regional Flood Control District
Maintenance Work Program 201912020
r' .t""t.j 1 ~ I • f-
~ !:: r
,....._ ' ' .~~ t !
... ;.v·- y' .._ "':' ,,.·. · ; r ~
Legend Regional Facilities
-- • C· 1 CHANNEL
c::J Detention Basins HN NUMBERS
HN65
HN66
HN67
HN68
HN69
HN70
HN71
HN72
HN73
Henderson Street Center Lines
City Limits
N
.
• W E . . s This "'•P 11 0"91• d u • f lft•ral Nfuettce
11i'1de oftty. Nd her W• ffWlty of accuracy 11 Intended nor •howtd any H HIUmed.
AUTHOR I DATE.
RLW 41412011
P \l)l'QfKtllpublic:_ wotks\9ngiinunng\201MFC_Naw_HEN_num_AIJWewH11nNumbers_ 2011 mat 414/2011 7 57 47 AM lu:I