Strategic Plan

52

description

S&R Report 2010

Transcript of Strategic Plan

Page 1: Strategic Plan
Page 2: Strategic Plan

i

June 2010

Strategic Plan for Trinidad and Tobago’s Ship repair and Shipbuilding industry for the period 2011-12 TRINIDAD AND TOBAGO SHIPBUILDING AND REPAIR CLUSTER

An initiative of the Ministry of Trade and Industry Government of the Republic of Trinidad and Tobago ______________________________________________________________ TABLE OF CONTENTS…………………………………………………...…………...……...… ii – iii

APPENDIX ……………………………………………………………………………………………..iv

LIST OF FIGURES AND TABLES ………………………………………………………………..… v

ACRONYMS AND ABBREVIATIONS…………………………..…………………...…….….. vi - vii

Page 3: Strategic Plan

ii

June 2010

TABLE OF CONTENTS

Page

1.0 Executive Summary…………...………………………………………………..……………1

2.0 Background…………………………………………………………………………..………..2

2.1 Economic Rationale……………………………………………………………..……..3

2.2 Diversification……………………………………………………………………… …..7

2.3 Government’s Macro Economic Objective………..………………………………....8

2.3.1 Use of Energy Revenue Surplus………….…………………………………...8

2.3.2 Attracting Foreign Direct Investment..…………………………………………8

2.3.3 Educating the Labour Force…………………………………………………....8

3.0 International Maritime Developments……………………………………..…….………..9

3.1 Increased Economic Growth Impacting Positively on Shipping…….....…….……9

3.2 Increase in Shipyard Orders………………………………………………………...10

3.3 Ship owners facing Dry dock Shortage…………………………………………….11

3.4 Expansion of the Panama Canal……………………………………………………12

4.0 Local Maritime Developments………………………………….………………………... 13

4.1 Increased Vessel Ownership by the Government…………………..…………… 13

4.2 Construction of New Coastal Developments……………………….…….….…….13

4.3 New Bidding Rounds for Exploration of Ultra-deepwater Blocks.….……………13

4.4 Increased Vessel Ownership by Local Maritime Companies.……..…………… 14

5.0 The Domestic Maritime Environment…………………………………………………... 15

5.1 Key Success factors for the Development of Ship repairs and Shipbuilding….. 16

5.2 Our Fundamental Advantage……………...………………………………………... 16

5.3 Fundamentals for Maintaining Competitive Advantages……...……….………… 16

Page 4: Strategic Plan

iii June 2010

Page

6.0 Upcoming Shipyard Developments – Trinidad and Tobago………….……………..17

6.1 Project Profile – Trinidad Dry Dock Company Limited…………….……………..18

6.1.1 Overview……………………………………………………….………………18

6.1.2 Socio-economic Benefits…………………………………….………………19

6.1.3 Construction Planning……………………………………….……………….20

6.2 Project Profile – T&T Advance Shipyard Park…………………………….……… 21

6.2.1 Overview……………………………………………………….…………….. 21

6.2.2 Short Listed Advance Shipyard Park Locations…...……...………22

6.2.3 Socio-economic Benefits…………………………………….………………23

6.2.4 Typical Shipbuilding Production Workflow to be Utilised…….…………..23

6.2.5 T&T Advance Shipyard Fast Facts…………………………………………24 7.0 Shipbuilding & Repair Development Company Trinidad and Tobago Limited..…25

7.1 Organizational Structure.…………………………………………..…...…………...25

7.1.1 S&R Committees………………………………………….…………………..25

7.2 Programme Expenditure……………………………………………..………………26

7.3 Proposed Budget Allocations………………………………………..………………27

8.0 Conclusion and Recommendation…………………………..………………….……… 28

9.0 List of Stakeholders………………………………………...…………...………………… 29

9.1 Maritime Industry Consultants………………………………………...…………….29

9.2 Shipbuilding and Repair Cluster Leadership..……...…………..……………….…30

9.3 Shipbuilding and Repair Cluster Stakeholders………..…….…………………….31

10.0 Additional Information……………………………………………………..………………34

Page 5: Strategic Plan

iv June 2010

Page

APPENDIX 1: Comparative S&R Developments – Brazil and Qatar………………...…….....35 APPENDIX 2: S&R Enquiries Received to Date (April 2008 – Present)...……………….......42 APPENDIX 3: Shipbuilding and Repair ‘VISION’ Booklet …………………...………………...43

Page 6: Strategic Plan

v

June 2010

LIST OF FIGURES Page

Figure 1 31,000 Voyages in the Vicinity of Trinidad and Tobago……………….….……….3

Figure 2 OSV Undergoing Scheduled Zinc Anode Replacement ………………...………...4

Figure 3 Expansion of the Panama Canal Will Add A Third Lock By 2014……………….12

Figure 4 Types of Vessels Registered in Trinidad and Tobago……………………………15

Figure 5 Trinidad Dry Dock Company to Build Shipyard off Sea Lots area………………19

Figure 6 Trinidad Dry Dock Company to Build Shipyard on Reclaimed Land…………....20

Figure 7 Overhead View of the Dry Docks to be Built off Sea Lots………………………..21

Figure 8 Advance Shipyard Park - Ship Repairs and Shipbuilding………………...……...22

Figure 9 Map of Trinidad Showing Possible Shipyard Park Locations….……...….……...23

Figure 10 Diagram showing Proposed Shipyard Production Workflow…………….……....24

Figure 11 Organizational Chart – Shipbuilding & Repair Development Co. T&T Ltd…..…26

Figure 12 The Atlântico Sul Shipyard Located in Suape, N.E. Brazil………………...……..37

Figure 13 President Luiz Inácio Lula da Silva of the Federative Republic of Brazil Visits

Atlântico Sul Shipyard with Venezuelan President, Hugo Chávez…………….. 38

Figure 14 The Nakilat Facility Designed in accordance with Best International Practice…40

Figure 15 Nakilat Ship Repair Yard with Infrastructure, Dry docks, Quays, Buildings...….41

LIST OF TABLES

Table 1 World Merchant Fleet by Ship Type………………………………………………….5

Table 2 New Orders for Standard Vessels Per Year …………...……………….…………..6

Table 3 International Monetary Fund Forecast 2007 – 2010……………………...……..…9

Table 4 Elsewhere in the World Shipbuilder’s Orderbooks…………….….….…..............10

Table 5 Liner Operators “TOP 10” – At January 1, 2008..……………….………………...11

Table 6 Vessels Delivered / Ordered at Foreign Shipyards on behalf of GORTT…....…14

Table 7 Vessels Delivered / Ordered at Foreign Shipyards for Local Companies……...15

Table 8 Trinidad Shipyard Projects (2010 – 2013)………………….………………………18

Table 9 Programme Expenditure (FY2011-2012) Spreadsheet ……..…………………...27

Table 10 Brazil and Qatar Shipyard Projects (2009)………..………………..………..…….36

Page 7: Strategic Plan

vi June 2010

ACRONYMS AND ABBREVIATIONS

AHTS Anchor Handler Tow Supply

APM Arnold Peter Møller

APL American President Lines Limited

ASCO Aberdeen Service Company

BRS Barry Rogliano Salles

CBM Conventional Buoy Mooring (CBM)

CEC Certificate of Environmental Clearance

CGM Compagnie Générale Maritime

CMA Compagnie Maritime d'Affrètement

CO Company

COSCO China Ocean Shipping (Group) Company

CSCL China Shipping Container Lines Company Limited

CSME Caribbean Single Market Economy

dwt Deadweight Tonnage

EIA Environmental Impact Assessment

EMA Environmental Management Authority

FY Financial Year

GATE Government Assistance for Tuition Expense

GDP Gross Domestic Product

GORTT Government of the Republic of Trinidad and Tobago

Ha Hectare

HC Hydrocruiser Corporation

I&OCL Inland & Offshore Contractors Limited

IFC International Finance Centre

IMF International Monetary Fund

LABIDCO La Brea Industrial Estate

LNG Liquified Natural Gas

M Million

Page 8: Strategic Plan

vii June 2010

MOWT Ministry of Works and Transport

MTI Ministry of Trade and Industry

NEC National Energy Corporation of Trinidad and Tobago

NIDCO National Infrastructure Development Company Limited

NMAG National Museum and Art Gallery

NYK Nippon Yusen Kaisha

OSV Offshore Supply Vessel

PATT Port Authority of Trinidad and Tobago

PSV Platform Supply Vessel

QTY Quantity

RO-RO Roll-on Roll-off

S&R Shipbuilding and Repair

T&T Trinidad and Tobago

TT Trinidad and Tobago

TLA Trinidad Lake Asphalt

TTCG Trinidad and Tobago Coast Guard

TTSR Trinidad and Tobago Shipbuilding and Repair

U/C Under Construction

USD United States Dollar

UTT University of Trinidad and Tobago

VLCC Very Large Crude Carrier

Page 9: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 1 of 43 June 2010

1.0 Executive Summary At the present time, Trinidad and Tobago has minimal capacity for the repair and conversion of ships or the construction of high value commercial vessels. Almost all of Trinidad and Tobago’s needs in these sectors were catered for by foreign shipyards which amounted to TT$3,743 billion for the acquisition of some twenty-eight (28) vessels in the last three years. The loss of business to local industry is significant, and major opportunities to further develop and diversify the country’s industrial base are not being exploited. The SHIPBUILDING AND REPAIR DEVELOPMENT COMPANY OF TRINIDAD AND TOBAGO LIMITED, which is a registered Limited Liability Company based on a Public Private Partnership (PPP) model will have the primary responsibility for the implementation of this Shipbuilding and Repair (S&R) Strategic Plan. This plan as outlined in this document and its ‘VISION’ booklet was formulated by industry stakeholders and consultants. The Government of the Republic of Trinidad and Tobago (GORTT) is expected to provide seed funding and generally facilitate the overall development process. Programme expenditure over the initial development period (FY2011-2012) is calculated to be TT$69,734,000 consisting of the establishment of S&R Headquarters and Training Centre, Operating Expenditures, Marketing and Promotion activities (maritime trade shows and publications), S&R Cluster Development (financial grants / non-financial incentives) and the development of an Advance Shipyard Park for the repair and construction of ships <5,000 dwt. Already, several worldwide enquiries have been received from interested parties (Please refer to page 42 - Appendix 2). With the appropriate financial support from the Government of Trinidad and Tobago and the establishment of dedicated office / shipyard facilities, this will greatly assist in a successful conversion of enquiries received to the actual award of contracts. This will result in new jobs, new types of skilled labour requirements and the development of small and micro industries. This report outlines some of the development plans and benefits to be derived from investing in a vibrant domestic ship repair and shipbuilding sector, which will also help to diversify our energy based economy. A significant investment programme is urgently required for Trinidad and Tobago to keep pace with the rest of the world. Sincerely, T&T Shipbuilding and Repair Cluster. Wilfred de Gannes Deputy Leader

Page 10: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 2 of 43 June 2010

2.0 Background This concept and strategy has come about by way of three main reasons: 1) economic rationale driven by recent local and international maritime developments;

2) the need to aggressively diversify the local economy from the energy sector and

3) government’s macro-economic policy.

Page 11: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 3 of 43 June 2010

2.1 Economic Rationale The ideal marine conditions in the Gulf of Paria make it virtually perfect for the maritime industry to operate a safe vessel anchorage and sheltered base for the establishment of a vibrant ship repair and shipbuilding industry. Trinidad & Tobago’s strategic location in relation to North America – Europe - Africa and the Panama Canal, provides a captive market for ship repairs. Trinidad is home to many world-scale industrial plants that export bulk commodities of various types using a wide range of shipping to transport these cargoes. Commodities include Trinidad Lake Asphalt (TLA), Ammonia, Urea, Methanol, Steel billets, Wire rods, as well as Liquefied Natural Gas (LNG) throughout the western hemisphere and Europe. North-South Trade along the West Atlantic shipping lanes also generates approximately 31,000 voyages per annum of vessels passing within 10 nautical miles of Trinidad & Tobago, or 30 nautical miles from Port-of-Spain (Refer to Figure 1 below).

FIGURE 1: 31,000 VOYAGES IN THE VICINITY OF TRINIDAD AND TOBAGO

Source: Trinidad Dry Dock Company Limited.

Page 12: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 4 of 43 June 2010

The type and deadweight size of vessels identified by the Trinidad and Tobago Shipbuilding and Repair Cluster, as the target market for ship repairs, includes Terminal Tugs, Ferries, Barges, Platform Supply Vessels (PSV’s) and Anchor Handler Tow Supply (AHTS) ships (<5,000 dwt) which also comprise the third largest number of vessels that make up the world merchant fleet. (Refer to Table 1, Page 5) These vessels are also very prevalent in our territorial waters, as they play a significant role in the port, ship lightering, offshore oil and gas exploration, and inter-isle passenger transport. Existing ship repair facilities in Trinidad are fully booked with scheduled dry docking of these vessels. Unsatisfactory waiting periods range from 3 to 6 months for an available shipyard slot.

FIGURE 2: OSV UNDERGOING SCHEDULED ZINC ANODE REPLACEMENT.

Source: Maritime Preservation Limited (Trinidad Shipyard)

Page 13: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 5 of 43 June 2010

TABLE 1: WORLD MERCHANT FLEET BY SHIP TYPE

Page 14: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 6 of 43 June 2010

Shipbuilding is a natural extension to ship repairs and provides the shipyard the opportunity to raise its level of competency and allows a higher margin of profitability. Modern shipbuilding methods also afford easier construction and fast delivery times. Demand for shipbuilding products has exploded in the last few years. In 2007 more than 300 million dwt of new orders (4,900 ships) were placed in shipyards. This compares to 117 dwt million in 2003. The world order book is growing rapidly and has risen in just twelve months from 345 million dwt to more than 526 million dwt. This represents close to 50% of the world fleet (a combined total of 1.1 billion dwt). Annual world shipyard production has now reached about 90 million dwt (2,300 ships) compared to 55 million dwt in 2003. The orderbook is spread out over several years and already some Japanese shipyards are talking about deliveries in 2013 (Refer to Table 2 below).

TABLE 2: NEW ORDERS FOR STANDARD VESSELS PER YEAR (end 2007)

Source: BRS-Alphaliner

Page 15: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 7 of 43 June 2010

2.2 Diversification Trinidad and Tobago has become known for its well-established, energy based economy, and the country derives most of its revenue from this sector. However, the new Government has recognized that energy resources are finite and in order to achieve long-term, sustainable growth and development, the country must aggressively diversify its economy. The maritime industry has been identified by the Ministry of Trade and Industry and the People’s Partnership as “one of the targeted sectors in the Government’s thrust to diversify the economy of Trinidad and Tobago” from the energy sector, much in the same way as other gas and petroleum exporting countries have already done, such as Brazil, Qatar, Oman and Norway.

Page 16: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 8 of 43 June 2010

2.3 Government’s Macro Economic Objective The Government of the Republic of Trinidad and Tobago proposes a development agenda to transform the country and to create new employment opportunities for nationals. The driving force behind these developments is to bring prosperity and a higher quality of life to every individual family and community across the country.

2.3.1. USE OF ENERGY REVENUE SURPLUS

Diversification efforts utilizing the windfall energy revenues in attempt to create a more diversified structure of production with a view of reducing the dependency on the energy sector and developing a viable non-energy sector able to compete in the global marketplace. This development will take some time and efforts must be made to ensure the proper utilization of revenues from the energy sector.

2.3.2. ATTRACTING FOREIGN DIRECT INVESTMENT

Over the past five years Trinidad and Tobago’s Foreign Direct Investment (FDI) has averaged US$600 million (net) per annum. Foreign investment primarily fuels the energy and downstream manufacturing sectors in Trinidad and Tobago with large investors inclusive of Cantrex, Arcelor Mittal.

A recent visit to Trinidad and Tobago by a delegation from International Enterprises (IE) Singapore, a lead agency under the Singapore Ministry of Trade and Industry which spearheads the development of Singapore's external economic wing commented on the need to make Trinidad and Tobago more attractive to foreign investment.

2.3.3. FURTHER EDUCATING THE LABOUR FORCE

The University of Trinidad and Tobago (UTT) Campus for Maritime Studies in Chaguaramas was officially inaugurated in September 2007. Maritime degree courses presently offered include BSc. Nautical Studies and MSc. Maritime Management. Ship Engineer and Deckhand courses are also available.

Maritime courses are also being offered by North West Maritime Limited also located in Chaguaramas which was formed to provide world class, relevant training for the maritime sector. Partnering with Northeast Maritime Institute Inc. (USA) they are able to bring the Commonwealth of Dominica Maritime Administration approved and STCW compliant courses to those who previously were unable to afford the training.

Additional government assistance programmes comprising of the following are being offered to assist those in financial need, ensuring high quality maritime training is available to eligible students. - Government Assistance for Tuition Expense programmes (GATE)

- Higher Education Loan and Scholarship programmes.

Page 17: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 9 of 43 June 2010

3.0 International Maritime Developments

3.1 INCREASED ECONOMIC GROWTH IMPACTING POSITIVELY ON SHIPPING The world economy is projected to grow by 4.2% in 2010, against -0.6% in 2009. Commercial trade volumes have been increasing and according to the IMF. There is no doubt that the world economy is on the mend and the rapid growth of developing countries will continue to contribute to increased demand for marine transport and shipbuilding (Refer to Table 3 below). According to Mr. Joep Gorgels, head of European Transportation at Fortis Bank Nederland stated “We have to find €500 billion needed for ship financing between 2011 and 2012”

TABLE 3: IMF SUMMARY OF WORLD OUTPUT(1) 2007 - 2010 (Annual percentage change)

Year

World

USA

Japan

Euro Area Other

Advanced Economies(2)

2007 5.2 2.1 2.4 2.8 3.9 2008 3.0 0.4 -1.2 0.6 1.2 2009 -0.6 -2.4 -5.2 -4.1 -2.3 2010 4.2 3.1 1.9 1.0 3.0

Source: IMF – World Economic Outlook 2010 (1)

Real GDP. (2)

Other Advanced Economies means advanced economies excluding the United States, Euro Area countries & Japan.

Approximately 7,000 million tonnes of cargo, equal to approximately 80% of the world’s commodities, is transported by sea. Approximately, 90 % of the seaborne transport comprises agricultural products, raw material (i.e. steel, etc.) and energy products such as oil, oil products and coal. Without shipping the import and export of goods on the scale necessary for the modern world would not be possible. Seaborne trade continues to expand, bringing benefits for consumers across the world through competitive freight costs, in today’s world of high energy prices. Thanks to the growing efficiency of shipping as a mode of transport and increased economic liberalization, the prospects for the industry's further growth continue to be strong. At present there are around 71,929(3) ships trading internationally, transporting every kind of cargo. The world fleet is registered in over 150 nations and manned by over a million seafarers of virtually every nationality.

(3) Statistics compiled in 2007 by Equasis

Page 18: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 10 of 43 June 2010

3.2 INCREASE IN SHIPYARD ORDERS Nearly 5,400 ships are on order worldwide, including tankers, container ships, bulk carriers and gas transporters. The hulls on order in the shipyards are equivalent to 28 per cent of the world's current merchant shipping fleet. As mentioned previously, this growth is being driven by a sharp upsurge in world trade, a result of globalization. The explosive increase in worldwide shipyard orders are also significant to several countries relatively new to large-scale shipbuilding namely the Philippines, Taiwan, Vietnam, India and Brazil, as seen in Table 4.

TABLE 4: ELSWHERE IN THE WORLD SHIPBUILDER’S ORDERBOOKS (based on firm orders)

Source: BRS-Alphaliner

Page 19: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 11 of 43 June 2010

3.3 SHIP OWNERS FACING DRY DOCK SHORTAGE Several large shipping corporations are joining forces with new and existing dry dock facilities to head off a potential dry-docking capacity crunch as owners take delivery of mega post-panamax containerships and similar sized cruise ship vessels. Owners face future problems finding available facilities both large enough and in the right geographic location. Carnival Cruise Lines, CMA CGM, Holland America Line, A.P. Møller Maersk Line, Mediterranean Shipping Company (MSC) and Royal Caribbean International are some of the names behind orders for these mega ships (Refer to Table 5 below).

TABLE 5: LINER OPERATORS “TOP 10” – AT JANUARY 1ST 2008

Source: AXS-Alphaliner TOP 100 2008

Page 20: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 12 of 43 June 2010

3.4 EXPANSION OF THE PANAMA CANAL Global development and economic growth lead by countries including China and India are impacting positively on shipping. This has given rise to severe bottlenecking, hence the decision to expand the Panama Canal to accommodate the surge in demand. During 2009, fourteen thousand, seven hundred and twenty one (14,721) Ocean Going Vessels passed through the Panama Canal. This figure would have increased since this period. FIGURE 3: EXPANSION OF THE PANAMA CANAL WILL ADD A THIRD LOCK BY 2014

Source: Panama Canal Authority

The Expansion of the Panama Canal will add a third lock and the shipping lanes will be widened by 2014, one hundred years after the Canal opened to shipping traffic. This expansion is expected to cost approximately US$5.3 Billion. Additionally, Post-Panamax vessels also comprise a growing proportion of the shipping fleet and the Canal’s expansion reflects the need to accommodate these larger size ships.

Page 21: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 13 of 43 June 2010

4.0 Local Maritime Developments 4.1 INCREASED VESSEL OWNERSHIP BY THE GOVERNMENT Acquisition of twenty-eight (28) vessels <1,000 dwt at a shipyard price of TT$3,743 billion. Vessels already delivered / ordered at foreign shipyards on behalf of the Government of Trinidad and Tobago (GORTT) within the last three (3) years include:

TABLE 6: VESSELS DELIVERED / ORDERED AT FOREIGN SHIPYARDS ON BEHALF OF GORTT.

QTY SHIPYARD APPLICATION AGENCY STATUS COST TT

1 DAMEN Terminal Tugs PETROTRIN

NEW BUILT $30 M

1 DAMEN Fast Crew Supplier PETROTRIN NEW BUILT $15 M

2 INCAT Inter-Isle Fast Ferries PATT USED $422 M 3 BAE

SYSTEMS 90 Metre

Offshore Patrol Vessels TTCG U/C $2,100 M

4 HC Coastal Water-Taxis NIDCO USED $252 M

5 2

DAMEN DAMEN

Terminal Tugs NEC NEC

NEW BUILT U/C

$100 M $50 M

6

4

AUSTAL

AUSTAL

30 Metre Offshore Patrol Vessels 41m Coastal Water-Taxis

TTCG

NIDCO

NEW BUILT

U/C

$391 M

$383 M

U/C = UNDER CONSTRUCTION TOTAL TT$3,743M 4.2 CONSTRUCTION OF NEW COASTAL DEVELOPMENTS

Fuelled by the rapid growth of Trinidad’s energy sector, particularly as it relates to gas production, port improvements have already been commenced by the Government and includes: - The dredging of the Port of Port of Spain harbour to 12 metres for Post-Panamax ships. - Construction of 300 metre x 12 metre draught main dock (Alutrint) at Labidco, La Brea. - The expansion and further dredging of Galeota Port to accommodate Handy size vessels. 4.3 NEW BIDDING ROUNDS FOR EXPLORATION OF ULTRA-DEEPWATER BLOCKS

Trinidad and Tobago is expected to receive bids later this year. The purpose of this bid round, which will be the country's third ever, is to bolster diminishing reserves, in particular natural gas. Four blocks will be offered, two off the eastern coast and two off the northern coast. Despite the complete lack of success of the Trinidad Deep Atlantic Area offering, Trinidad and Tobago will make another attempt at attracting interest in the ultra-deepwater blocks.

Page 22: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 14 of 43 June 2010

4.4 INCREASED VESSEL OWNERSHIP BY LOCAL MARITIME COMPANIES

Acquisition of some eight (8) vessels <1,000 dwt at a shipyard price of TT$70 Million. Vessels already delivered / ordered at foreign shipyards by companies registered in Trinidad and Tobago within the last two (2) years, includes the following to be used primarily to support the offshore energy sector.

TABLE 7: VESSELS DELIVERED / ORDERED AT FOREIGN SHIPYARDS FOR LOCAL COMPANIES

QTY SHIPYARD APPLICATION COMPANY STATUS COST TT

1 DAMEN Terminal Tug AR SINGH NEW BUILT $25 M 2 LOREAUVILLE, LA Crew Transport I&OCL USED $2 M 1 SWIFTSHIPS Crew Transport I&OCL USED $1 M 1 BOLLINGER OSV I&OCL USED $18 M

2 OFFSHORE TRAWLERS OSV I&OCL USED $10 M 1 LA FORCE SHIPYARD OSV I&OCL USED $14 M

OSV = OFFSHORE SUPPLY VESSEL TOTAL TT$70M

Page 23: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 15 of 43 June 2010

5.0 The Domestic Maritime Environment The Domestic Maritime Environment comprises vessels owned by locally registered companies, both private and government-owned involved in various commercial maritime related industries. Figure 4 below, indicates that vessels owned and registered in Trinidad and Tobago are primarily < 5,000 DWT and includes Lift Barges, Water Carriers, Passenger Ferries, Terminal Tugs, Barges (Transport and Construction), Offshore Support Vessels and Fishing Vessels. This line-up falls within the target market for ship repairs and new shipbuilding, identified by industry stakeholders and consultants (Refer to Page 4, S&R Vision booklet – Appendix 3). Increasing the local shipyard capacity and capabilities to adequately service these vessels within our country will save the ship owners from having to go abroad for expensive repairs, thereby reducing turnaround time and saving valuable foreign exchange.

FIGURE 4: TYPES OF VESSELS REGISTERED IN TRINIDAD AND TOBAGO.

Source: Maritime Services Division - MOWT.

Page 24: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 16 of 43 June 2010

5.1 KEY SUCCESS FACTORS FOR THE DEVELOPMENT OF SHIP REPAIR AND SHIPBUILDING

- GORTT: goal to diversify the economy and expand the domestic maritime sector.

- GORTT: goal to increase involvement in the local ship ownership sector.

- Willingness of stakeholders / nationals of Trinidad and Tobago to be involved at all levels in the domestic ship repair and shipbuilding Industry, as seen by enormous interest in the Maritime Stakeholders Forum (March 2008) and the annual Maritime Mentorship Youth Programme (2008-2009). - Availability of locally produced, competitively priced ship repair and shipbuilding materials. - Availability of locally trained / certified maritime professionals: UTT Maritime Campus and

Northwest Maritime Limited.

5.2 OUR FUNDAMENTAL ADVANTAGE

- Existing ship repair business.

- Existing links with relevant maritime authorities and regulatory bodies.

- Below active hurricane belt.

- Long history in weld fabrication, including offshore platform construction.

- The Gulf of Paria is one of the world’s largest natural sheltered harbours.

5.3 FUNDAMENTALS FOR MAINTAINING COMPETITIVE ADVANTAGES

- Use of standardized ship designs for the construction of new vessels.

- Use of the latest technologies in ship repair and in the shipbuilding process.

- On-going human resource training and development for all industry stakeholders.

- Continuous marketing efforts.

For further details please refer to Pages 11, S&R ‘VISION’ booklet – Appendix 3.

Page 25: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 17 of 43 June 2010

6.0 Upcoming Shipyard Developments -Trinidad and Tobago

TABLE 8: TRINIDAD SHIPYARD PROJECTS (2009 - 2013) LOCATION OF SHIPYARD TRINIDAD TRINIDAD

NAME OF SHIPYARD Caribbean Dockyard & Eng Maritime Preservation Ltd.

START OF OPERATIONS Q1 2009 2011

PROJECT TYPE Re-activation of Drydock Re-location of Shipyard

TYPE OF SHIPYARD Drydocking / floating repairs Drydocking / floating repairs

SHIPYARD AREA 10 Ha. (25 Acres) 1.2 Ha. (3 Acres)

NO. OF FLOATING DRY DOCK PROPOSED 1 1

NO. OF GRAVING DOCKS PROPOSED - -

SEA SIDE CRADLES / TRAVELIFTS 1 1

SERVICE GUIDE JETTIES / WHARF YES YES

MAX. SIZE OF SHIPS TO BE DRY DOCKED 23,000 dwt 5,000 dwt

MAX. LENGTH OF SHIPS TO BE DRY DOCKED 220 Metres 80 Metres

TYPE OF VESSELS TO BE SERVICED OSV’s, AHTS, RIG TUGS, OSVs, FERRIES

NO. OF PERSONS TO BE EMPLOYED 400 200

ESTIMATED TOTAL PROJECT COST TT$ Data unavailable at present $120,000,000

ESTIMATED ANNUAL TURNOVER TT$ $150,000,000 $72,000,000

Notes

Replacement Floating drydock commissioned in Q1 2009.

Project analysed by GORTT due to collapse of CL Financial.

5,000 dwt Floating drydock design being undertaken.

New re-location site identified and presently being finalized.

LOCATION OF SHIPYARD TRINIDAD TRINIDAD

NAME OF SHIPYARD Trinidad Dry Dock Co. Ltd. T&T Advance Shipyard

START OF SHIPYARD OPERATIONS 2013 2011

PROJECT TYPE New Development New Development

TYPE OF SHIPYARD Drydocking / floating repairs Repairs & Newbuilding

SHIPYARD AREA 58 Ha. (143 Acres) 10+ Ha. (25+ Acres)

NO. OF FLOATING DRY DOCKS PROPOSED - 6

NO. OF GRAVING DOCKS PROPOSED 5 2

SEA SIDE CRADLES / TRAVELIFTS 4 6

SERVICE GUIDE JETTIES / WHARF YES YES

MAX. SIZE OF SHIPS TO BE DRY DOCKED 320,000 dwt 5,000 dwt

MAX. LENGTH OF SHIPS TO BE DRY DOCKED 380 Metres 150 Metres

PRIMARY TYPE OF VESSELS TO BE POST PANAMAX, VLCC’S OSVs, AHTS, FERRIES

NUMBER OF PERSONS TO BE EMPLOYED 5,000 1,000

ESTIMATED TOTAL PROJECT COST TT$ $5,000,000,000 $800,000,000

ESTIMATED ANNUAL TURNOVER TT$ $756,000,000 $430,000,000

Notes Application for project CEC from the EMA being undertaken

Shipyard locations short listed. (Refer Page 23)

Page 26: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 18 of 43 June 2010

6.1 Project Profile – Trinidad Dry Dock Company Limited 6.1.1. OVERVIEW

FIGURE 5: TRINIDAD DRY DOCK TO BUILD SHIPYARD OFF SEA LOTS AREA.

The proposed TT$5 Billion Sullivan Island, to be constructed on 58 Hectares (143 Acres) of reclaimed land, strategically located on the shallow inland bank of the Gulf and will be home to one of the largest graving dock facilities in the world. It is one of the most ambitious projects ever undertaken in the Caribbean Region, outside of the energy sector and will be an engineering feat. Internationally, the project is beginning to attract the attention of the engineering world, and although comparable to mega projects such as the Kansai Island Airport off the coast of Japan, and the Palm Island Reclamation Project in the United Arab Emirates, Sullivan Island will be a built community that is buttressed by industrial, commercial and tourism activity. Sullivan Island will consist of the following ship repair facilities: - 5 Graving Docks for ships 2,000 dwt to 320,000 dwt, and up to 380m in length.

- 4 Sea Side Cradles.

- 5 Service / Guide Jetties for wet berthing of ships.

Page 27: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 19 of 43 June 2010

6.1.2. SOCIO-ECONOMIC BENEFITS The Port of Spain Dry Docks is envisaged to have the capacity to create and provide 3,500 Construction related employment opportunities, during its five (5) year construction phase. More importantly, this project will provide an estimated 5,000 permanent jobs in the Ship Repair Sector, with an associated 7,500 jobs in the associated Services Sector. There will be a meaningful inclusion of the female component of the labour force. Therefore, 12,500 permanent and high paying job opportunities for citizens will be created. The location of the Port of Spain Dry Docks, in close proximity to three disadvantaged Communities, viz., Sea Lots, Beetham Gardens and Laventille, could provide a significant Socio-Economic stimulus, which would contribute significantly to the enhancement of the quality of lives and the lifting of the standard of living in these communities. The attendant reduction in the levels of undesirable criminal activity, as well as general improvement in all of the social indicators in these communities, could be a very real beneficial consequence. The proposed location of Sullivan Island, and its Access Residential Causeway, will lead to the general enhancement of an area that is not now used for any activity, being too shallow to permit shipping and too inaccessible to encourage any other type of commercial or recreational activity.

FIGURE 6: TRINIDAD DRY DOCK TO BUILD SHIPYARD ON RECLAIMED LAND.

Page 28: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 20 of 43 June 2010

6.1.3 CONSTRUCTION PLANNING

FIGURE 7: OVERHEAD OF THE TRINIDAD DRY DOCKS TO BE BUILT OFF SEA LOTS

Fill for the creation of Sullivan Island will come from dredging of the Turning Basin. Equipment for dredging is already in Trinidad and Tobago, and can be supplemented at short notice. Equipment for construction and the Dry Dock Operations will largely be sourced overseas and no constraints are envisaged, particularly given the three to five (5) year lead times for acquisition. Skilled labour for construction (estimated at 3,500 persons), is not envisaged to be a major constraint, given the recently established Caribbean Single Market Economy (CSME), and Trinidad and Tobago’s maturity in the Construction Sector. Skilled labour for Dry Dock Operations will similarly be sourced both locally and overseas. An apprenticeship training scheme whereby nationals from the CSME will be sent overseas for training in Dry Dock Operations is expected to yield at least 33% (2,500 personnel) of the Dry Dock’s total skilled labour requirement (7,500 personnel) within three (3) years of start of construction of the facility. The Trinidad Dry Dock Company has applied to the Environmental Management Authority of Trinidad and Tobago, for a Certificate of Environmental Clearance (CEC), to begin construction of Sullivan Island. For further information refer to ‘TRINIDAD SHIPBUILDER AND REPAIR NEWS’ April 2008 Issue #7 Pages 8 -13.

Page 29: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 21 of 43 June 2010

6.2 Project Profile – T&T Advance Shipyard Park 6.2.1 OVERVIEW The Advance Shipyard Park will be an integral part of Trinidad and Tobago’s expanding, ship repair and shipbuilding industry and will be a phased project undertaking of the Shipbuilding and Repair Development Company Trinidad and Tobago Limited. This marine complex will lead the region in the repair of vessels < 5,000 dwt . The Advance Shipyard Park will also excel in building deep sea multipurpose fishing vessels, terminal tug boats, barges, ferries and offshore supply vessels primarily for the export market, thereby earning valuable foreign currencies. The Advance Shipyard Park will be approximately 10+ Hectares (25 Acres) in area extending from the Common User Facility to the on-site Administration and Employee Residential Facility. The Common User Facility will be developed to accommodate a growing ship repair and shipbuilding industry, and shall be home to six (6) primary ship repair / shipbuilding firms and many other smaller companies servicing vessels in the 24 to 150 Metre range.

FIGURE 8: ADVANCE SHIPYARD PARK - SHIP REPAIRS AND SHIPBUILDING.

Page 30: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 22 of 43 June 2010

6.2.2. SHORT LISTED ADVANCE SHIPYARD PARK LOCATIONS

FIGURE 9: MAP OF TRINIDAD SHOWING POSSIBLE SHIPYARD PARK LOCATIONS

Map Source: Google Earth

Page 31: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 23 of 43 June 2010

6.2.3. SOCIO-ECONOMIC BENEFITS Present demand for ship repairs and shipbuilding products in Trinidad and Tobago is estimated to be worth around TT$1.347 billion per annum. This comprises approximately TT$1.247 billion for vessels (primarily commercial workboats, fast ferries, offshore patrol vessels) and approximately $100 million per annum for repairs and maintenance. The shipyard sector with the implementation of the upcoming two (2) shipyard projects will directly employ over 4,000 people and a further 5,000 indirect jobs in the support sector. The Government of Trinidad and Tobago needs to adequately support and strategically position the Shipbuilding and Repair Development Company Trinidad and Tobago Limited to take advantage of the significant demand for Ship Repairs and fabrication of new vessels and equipment for the regional and international maritime markets. Establishment of the Advance Shipyard Park and support facilities will be a testament to global recognition of Trinidad and Tobago's Ship Repair and Shipbuilding prowess and sheer ability in maritime support, similar to what has already been achieved in offshore platform fabrication at the La Brea Industrial Estate (LABIDCO) operated by the National Energy Corporation (NEC). 6.2.4. TYPICAL SHIPBUILDING PRODUCTION WORKFLOW TO BE UTILISED

1. Steel Storage. 7. Pre-outfitting. 2. Steel Cutting. 8. Grand Block Assembly. 3. Sub Assembly. 9. Dock Facilities. 4. Block Assembly. 10. Outfitting Wharf. 5. Painting Halls. 11. Sea trials. 6. Outfitting Shops.

FIGURE 10: DIAGRAM SHOWING PROPOSED SHIPYARD PRODUCTION WORKFLOW

Page 32: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 24 of 43 June 2010

6.2.5 T&T ADVANCE SHIPYARD PARK FAST FACTS

Home to six (6) primary ship repair / shipbuilding firms. Shipyard location to be approximately 10+ Hectares (25 acres) in area includes the Common User Facility and on-site Administration and Employee Residential Facility. The integrated Advance Shipyard Park will formulate a phased development strategy, in close collaboration with ship repair and shipbuilding stakeholders, for the establishment of facilities for the maintenance and construction of marine vessels. Ship Repair and Shipbuilding Training Centre to be established on-site to assist unskilled, semi-skilled and qualified nationals of Trinidad and Tobago to learn and keep up to date with the latest ship repair and shipbuilding technologies available. On-site practical training programmes will supplement the Distance Learning Programme (DLP) utilizing the latest computer learning technologies. (Refer to Page 18, S&R ‘VISION’ Booklet – Appendix 3). Linkages will be made with several local training institutions including, UTT Maritime Campus, Northwest Maritime, The University of the West Indies, Metal Industries Company. Vessels to be repaired and fabricated include deep sea multipurpose fishing vessels, megayachts, terminal tugs, barges, ferries and offshore supply vessels for local and export markets in the 24 to 150 metre range. (Refer to Pages 4-8, S&R ‘VISION’ booklet – Appendix 3). Development of the integrated Advance Shipyard Park would create a “multiplier effect” with the establishment of a wide range of local spin-off industries. (Refer to Page 12, S&R ‘VISION’ booklet - Appendix 3) Ninety-five (95) per cent of vessels will be built for export markets, thereby earning valuable foreign exchange.

Page 33: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 25 of 43 June 2010

7.0 Shipbuilding & Repair Development Company of T&T Ltd

7.1 ORGANIZATIONAL STRUCTURE

FIGURE 11: ORGANIZATIONAL CHART

FEED = FRONT END ENGINEERING & DESIGN MTI = MINISTRY OF TRADE & INDUSTRY DWT = DEADWEIGHT TONS S&R = SHIPBUILDING & REPAIR GORTT = GOVERNMENT OF THE REPUBLIC OF TRINIDAD AND TOBAGO SRDC = SHIPBUILDING & REPAIR DEVELOPMENT COMPANY OF T&T LTD.

7.1.1. S&R COMMITTEES:

The Board of the Shipbuilding and Repair Development Company will establish Committees that leverage the expertise of industry experts to enhance networking and knowledge sharing activity between S&R Stakeholders. Committee meetings are open to all Stakeholders, and those who take an active, dedicated role to committee work are recognized as industry and committee leaders. Committees to be established, among others, include Communications Committee and Human Resource Committee.

Communications Committee which will be formed to address improving the flow of communications to and from the industry Stakeholders. The committee takes a holistic look at all the methods of sharing information with members with a strong focus on the effective utilization of the Internet and the ‘TRINIDAD AND TOBAGO SHIPBUILDER & REPAIR NEWS’ monthly e-newsletter and our ‘ANCHOR’ print quarterly magazine.

Human Resources Committee which shall address issues of common concern in the areas of personnel administration and human resources management by means of presentations by guest speakers and through the shared experience and input of Committee members.

Page 34: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 26 of 43 June 2010

7.2 Programme Expenditure

The Proposed budget over the initial development period (FY2011-2012) is estimated to be TT$69,734,000. This funding is necessary to achieve organizational goals outlined over this period of development. Refer to pages 25-27 in the S&R ‘VISION’ booklet. Expenditure consist of the establishment of S&R Headquarters and Training Centre, Operating Expenditures, Public Relations and Educational activities (maritime tradeshows, seminars and publications), S&R Cluster Development (financial grants / non-financial incentives) to increase domestic shipyard capacity, including the development of an Advance Shipyard Park for the repair and construction of ships <5,000 dwt. SHIPBUILDING & REPAIR DEVELOPMENT COMPANY TRINIDAD & TOBAGO LTD.

PROGRAMME EXPENDITURE (FY2011-2012)

DESCRIPTION COSTING TT$ 000

SHIPBUILDING & REPAIR DEVELOPMENT COMPANY PERIOD

OF TRINIDAD & TOBAGO LIMITED FY2011-12

OFFICE ACCOMMODATION & TRAINING CENTER CLASS 'A' UNFURNISHED OFFICE RENTAL

$1,152

OFFICE & BUILDING MAINTENANCE $389

OFFICE OUTFITTING $2,754

MOTOR VEHICLES, OFFICE & KICHENETTE EQUIPMENT, IT / H & S $2,882

OPERATING EXPENDITURES UTILITIES, OFFICE CONSUMABLES, WEBSITE

$487

SALARIES & WAGES, NIS CONTRIBUTIONS $3,078

TRAINING & HUMAN RESOURCE DEVELOPMENT $3,600

SHIP BUILDING & SHIP REPAIR MARKETING & PROMOTION T&T SHIPBUILDING & REPAIR - ANNUAL MARITIME EXHIBITION / CONFERENCE

$3,000

PRINT & DISTRIBUTE S&R MAGAZINES, BOOKLETS $1,800

MICRO SHIP BUILDING & SHIP REPAIR CLUSTER DEVELOPMENT PIONEER SHIPYARDS GRANTS

-

SERVICE SUB-SECTOR GRANTS $23,812

BUSINESS FEASIBILITY DEVELOPMENT GRANTS $2,381

BUSINESS DEVELOPMENT GRANTS $1,587

NAVAL ARCHITECT FEES FOR STANDARDIZED SHIP DESIGN & BUILDING PLANS $2,812

ADVANCE SHIPYARD DEVELOPMENT (<5,000 DWT SHIPS) FEED, SHIPYARD LAYOUT CONSULTANCY

$5,000

ACQUISITION OF MAIN SPECIALIZED SHIPYARD EQUIPMENT (2 YEAR LEAD TIME) $15,000

TOTAL $69,734

KEY: DWT = DEADWEIGHT TONS FEED = FRONT END ENGINEERING AND DESIGN FY = FINANCIAL YEAR NIS = NATIONAL INSURANCE BOARD IT = INTERNET TECHNOLOGY H & S = HARDWARE & SOFTWARE

Page 35: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 27 of 43 June 2010

Proposed Budget Allocations The majority of funding is to be directed towards S&R Cluster Development (84%), which consists of S&R Development Grants and Low interest Shipyard Loans required to increase ship repair and shipbuilding capacity within Trinidad and Tobago. Refer to Page 25, S&R ‘VISION’ booklet. The development of an Advance Shipyard Park (11%) for the repair and construction of ships <5,000 dwt. Refer to Page 26 in the S&R ‘VISION’ booklet.

FIGURE 12: PROGRAMME EXPENDITURE (FY2011-2012) PIE CHART

Page 36: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 28 of 43 June 2010

Conclusion and Recommendation The current situation with respect to further development of the Ship Repair and Shipbuilding industry is serious and deserves consideration by the government. First, the domestic Ship Repair industry contributes more than TT$100 million to our economy each year and generates more than 350 direct jobs and provides a “multiplier effect” for other local industries in the supply chain. Marine industries have an Economic Generation Factor of 5:1, fueling local economies by the creation of expanded job opportunities and driving international trade meaning that, for every dollar spent, a further five dollars of economic benefits are created. Therefore a TT$5 billion project like the Trinidad Dry Dock project to be established in 2013 at Sea Lots would add a further TT$25 billion benefit to the Trinidad and Tobago economy. Third, maritime traffic in ports is presently predicted to grow by as much as 12-15% per year for the next decade. And fourth, local shipyards earn as much as 85% of their revenues in direct foreign exchange. Though it has fallen on some challenging times over the past 25 years, Trinidad and Tobago’s maritime industry must be considered a vital strategic asset. The industry with the establishment of new shipyards would employ more than 4,000 highly skilled workers and would create some of the highest paying jobs in the manufacturing industry. These facts are often overlooked because ship repair and shipbuilding activities must, by their very nature, occur in some of the rural communities (e.g., Chaguaramas, La Brea and Point Fortin, with Port of Spain the only notable exception). While their present contribution to the Trinidad and Tobago’s economy is small – either directly or indirectly – shipyards are a major impact on the overall economic situation, domestically and globally. The situation now faced by the government should be looked on as an opportunity – an opportunity “To develop a world-class shipbuilding and repair sector”, an opportunity to diversify the economy from the energy sector. The Trinidad and Tobago Shipbuilding and Ship Repair Maritime Cluster strongly urges the government to consider all aspects of this important sector and trusts that it will adequately support and assist in the implementation of plans, as outlined.

Page 37: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 29 of 43 June 2010

Maritime Industry Consultants

Global Insight

Barry Rogliano Salles (BRS)

Maritime Logistics & Trade Consulting (MLTC)

Page 38: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 30 of 43 June 2010

Leadership of the T&T Shipbuilding and Repair Cluster

Mr. William Huggins - Leader

Mr. Wilfred de Gannes - Deputy Leader

Mr. Yuhanna Yusuf – Rapporteur

Page 39: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 31 of 43 June 2010

Shipbuilding and Repair Cluster Stakeholders

Alstons Shipping Limited Associated Marine Designs Ansa McAl Group of Companies

APDAPDAPDAPDLLLL All Purpose Diesel Limited Batchac Art & Design

ASCO Trinidad Limited Cantrex Limited

Caribbean Propellers Limited Comprehensive Insurance Brokers

Damus Caribbean Limited Engine Tech Company Ltd.

Page 40: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 32 of 43 June 2010

Shipbuilding and Repair Cluster Stakeholders

H2Marine

Heritage Designs & Developments Ltd. H2 Marine Limited

H7 LIMITED

H7 Limited Inter-Isle Construction & Fabrication Company

International Marine IceBerg Packaged Ice Limited . & Industrial Inspection

Image Matters Limited Lloyd’s Register Central & South America Ltd.

Maritime Preservation, Ltd. Marine Communications Limited

Page 41: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 33 of 43 June 2010

Shipbuilding and Repair Cluster Stakeholders

Pressure Concrete Plus Limited Svitzer Marine Trinidad and Tobago Ltd.

A Member of A.P. Moller Maersk Group

Tracmac Engineering Ltd. Trinidad Dry Dock Company Limited

A Member Neal and Massy Group

Trintrac Ltd. Tsunami Marine Limited

The Phi Group Wartsila Caribbean, Inc

Webgold Designs Ltd. William Marine Limited

Page 42: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 34 of 43 June 2010

Additional Information Mr. Wilfred de Gannes, Deputy Leader, T&T Shipbuilding and Repair Cluster, Post Office Box 2853, Chaguaramas, Trinidad and Tobago. Tel: +1(868) 753-6057 Tel: +1(868) 384-SHIP (7447) Fax:+1(868) 662-6326 Website: www.tts-r.com/ E-mail: [email protected]

Page 43: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 35 of 43 June 2010

APPENDIX 1

Comparative S&R Developments – Brazil and Qatar Government continues its thrust to diversify the economy from the energy sector, much in the same way as other gas and petroleum exporting countries have already done - Brazil, Qatar, Oman and Norway which share similar circumstances to Trinidad and Tobago. Two notable shipyard projects, together with some details highlighting their planned approach in establishing these world class undertakings are located in the Federative Republic of Brazil and the State of Qatar.

TABLE 10: BRAZIL AND QATAR SHIPYARD PROJECTS (2009) LOCATION OF SHIPYARD BRAZIL QATAR

NAME OF SHIPYARD Atlantico Sul Nikilat-Keppel O & M

START OF OPERATIONS Q4 2009 Q4 2009 (Phase I & II)

PROJECT TYPE New Development New Development

TYPE OF SHIPYARD Newbuilding Repairs & Newbuilding

SHIPYARD AREA 160 Ha. (400 acres) 42 Ha. (100 acres)

NO. OF FLOATING DRY DOCK PROPOSED - 1

NO. OF GRAVING DOCKS PROPOSED 2 2

SEA SIDE CRADLES / TRAVELIFTS - 4

SERVICE GUIDE JETTIES / WHARF YES YES (3,200 km)

MAX. SIZE OF SHIPS TO BE DRY DOCKED 150,000 dwt 266,000 cbm

MAX. LENGTH OF SHIPS TO BE DRY DOCKED 400m 400m

PRIMARY TYPE OF VESSELS TO BE SUEZMAX, OIL PLATFORMS LNG CARRIERS, VLCCs

NUMBER OF PERSONS TO BE EMPLOYED 30,000 (Directly & Indirectly) Data unavailable at present

ESTIMATED TOTAL PROJECT COST TT$ $1,386,000,000 $2,835,000,000

ESTIMATED ANNUAL TURNOVER TT$ $4,000,000,000 Data unavailable at present

Notes

Samsung Heavy Industries providing technical knowledge

Keppel Offshore & Marine providing technical knowledge

Page 44: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 36 of 43 June 2010

Project Profile – Atlântico Sul Shipyard OVERVIEW Completion of Atlântico Sul Shipyard in 2009 will establish one of the largest shipyards in the southern hemisphere and is located in Suape, in the northeastern Brazilian state of Pernambuco. Brazil is the eighth largest steel producer in the world and the Brazilian coastal shipping sector is protected by laws requiring locally built ships and Brazilian crews. The Atlântico Sul consortium won the right in 2006 to construct 10 suezmaxes at a cost of US$1.21 billion for state-owned oil carrier Transpetro, but the Brazilian presidential elections in October and November delayed the final signing of contracts for the new orders. In January 2007, re-elected President Luiz Inácio Lula da Silva signed two contracts at a grand ceremony held in Suape.

FIGURE 12: THE ATLÂNTICO SUL SHIPYARD LOCATED IN SUAPE, N.E. BRAZIL

Source: Atlântico Sul

Page 45: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 37 of 43 June 2010

One contract was to rubberstamp the contract between Transpetro and Atlântico Sul Shipyard for building the 10 ships; and the other was to confirm the 'soft' loan of US$139.5 million granted by the Brazilian National Development Bank (BNDES) to Atlântico Sul for the construction of the shipyard in Suape, located in the impoverished northeast state of Pernambuco. President Luiz Inácio Lula da Silva has put his full weight behind the project, partly because it will bring wealth to his native northeast and partly because it will create up to 30,000 new direct and indirect jobs. The Brazilian management team at Aker Promar S.A. and Samsung Heavy Industries, the Korean yard and multinational firm, are involved as technical advisers to the Atlântico Sul consortium. About one year after the contracts are signed the first plate will be cut for the first suezmax vessel and delivery of the first vessel will be around 32 to 33 months.

FIGURE 13: PRESIDENT LUIZ INÁCIO LULA DA SILVA OF THE FEDERATIVE REPUBLIC OF

BRAZIL VISITS ATLÂNTICO SUL SHIPYARD WITH VENEZUELA PRESIDENT, HUGO CHÁVEZ

Source: Atlântico Sul

Page 46: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 38 of 43 June 2010

President Luiz Inácio Lula da Silva’s entourage was ”very proud” to sign these contracts as they help establish a major shipyard outside of Rio de Janeiro for the first time, and the President comes from the City of Caranhuns, which is only 180 km inland from Suape. Already the State government of Pernambuco has laid down the access road into the Atlântico Sul shipyard which will occupy some 1,650,000m², and the dry docks will be 400 metres long by 73 metres wide. The Atlântico Sul shipyard will be able to construct two vessels up to suezmax size and one oil platform simultaneously. SAMSUNG HEAVY INDUSTRIES (SHI) TO PARTNER WITH ATLÂNTICO SUL Samsung Heavy Industries (SHI) recently signed a contract with the Brazilian shipyard, Atlântico Sul Shipyard, to buy a stake in the firm. In 2006, SHI began technology support for this Brazilian shipyard, which was under construction at that time, and is now the largest shipyard to be built in the Latin American region. On June 11th 2008, SHI announced that it had signed a contract with Atlântico Sul Shipyard to acquire a stake worth US$12.80 million, which is 10% of the total investment in the shipyard. Recently, an ultra large underwater oil field of 40 billion barrels of oil was discovered in Brazil. Petrobras, the state-owned petroleum firm in Brazil, has announced its plans to place an order for 40 drill ships and semi-submersible drilling rigs worth US$30 billion by 2017. The Brazilian government obliges foreign firms to jointly promote manufacturing with Brazilian shipyards when they participate in a bid, to boost the country’s shipbuilding industry. Construction of the Atlântico Sul Shipyard began in April 2007 at the Suape complex in Eastern Brazil, and the yard has a size of 1,650,000m². Camargo, Queiroz, and PJMR, all from Brazil, invested a total of US$220 million into this shipyard. SHI’s acquisition of a stake will allow Camargo and Queiroz each to hold a 40% stake, while SHI and PJMR will hold 10% stake each. This shipyard will boast a dock that is 400 metres long and 73 metres wide, and upon the completion of construction in September 2009, the shipyard will have a ship production capacity of 160,000 tons making it the largest shipyard within the Latin American region. Thanks in part to SHI’s technology support, the shipyard has already received orders to build ten oil tankers equivalent to the Suezmax type, two VLCCs, and one semi submersible crude oil drilling rig, which total US$1.9 billion all together.

Page 47: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 39 of 43 June 2010

BRAZIL TO FUND SHIPYARD IN VENEZUELA Brazil's development bank BNDES has announced on May 5, 2010 that it will pay for building a US$1 billion shipyard in Venezuela. The deal was discussed by Venezuela President Hugo Chavez and Brazilian President Luiz Inacio Lula da Silva during talks in Brasilia. The yard will be built by an as-yet undetermined Brazilian company, an aide to Lula told the Mercantile Monitor newspaper. The ships built there will be used to service Brazil's huge pre-salt offshore oilfields, said Marco Aurelio Garcia, the aide. The decision to build the yard in Venezuela is aimed at stimulating shipbuiding in other parts of Latin America, Garcia said. "This is very important because it demonstrates that the development of Brazil pulls in the other countries in the region," he added. Garcia stressed that Brazil does not want to be "an industrialised island, surrounded by countries with economic difficulties".

Page 48: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 40 of 43 June 2010

Project Profile – Nakilat / Keppel Offshore & Marine Shipyard OVERVIEW Nakilat / Keppel Offshore & Marine has formulated a phased development strategy, in close collaboration with Qatar Petroleum, for the establishment of facilities for the construction and maintenance of marine and offshore structures. Phase 1: Repair and conversion of very large ships (e.g. Q-Max LNG carriers, VLCC’s);

Phase 2: Repair of medium-sized ships (e.g. 30,000 dwt to 80,000 dwt);

Phase 3: Fabrication of offshore structures (and land-based petrochemical plant);

Phase 4: Construction of high value small ships (up to 120m length);

Phase 5: Repair of small ships (thereby covering the full range of vessels).

The first two phases of Nakilat’s strategy have been approved by the Board of Directors, and a team has been established with responsibility for managing the design, construction and operation of a major new ship repair yard in Ras Laffan.

FIGURE 14: THE NAKILAT FACILITY DESIGNED IN ACCORDANCE WITH BEST INTERNATIONAL PRACTICE.

Source: Nakilat / Keppel Offshore & Marine Shipyard

Page 49: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 41 of 43 June 2010

KEY FEATURES OF THE NAKILAT / KEPPEL OFFSHORE & MARINE SHIPYARD

FIGURE 15: NAKILAT SHIP REPAIR YARD WITH INFRASTRUCTURE, DRY DOCKS, QUAYS, BUILDINGS.

Source: Nakilat / Keppel Offshore & Marine Shipyard Nakilat has formed a Joint Venture (“JV”) with Keppel Offshore & Marine - a global leader ship conversion and repair as well as a specialized shipbuilder - to operate the new yard. The JV will provide all mobile equipment (including the floating dock), and the funds necessary to operate the yard. The JV partners will share the risks and rewards of operating the yard. Engineering of Phases 1 and 2 is well underway. Reclamation of the site commenced several months ago. Construction of the Yard is scheduled to start in the fall of 2007, and would be completed in late 2009.

Page 50: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 42 of 43 June 2010

APPENDIX 2

S&R Enquiries Received to Date (April 2008 - Present) The T&T Shipbuilding and Repair Cluster continue to receive enquiries from around the globe. In the last twenty-six (26) months, these enquiries included shipbuilding, ship conversion and the establishment of new maritime service providers in Port of Spain. Below is sample listing of enquires received to date: With the appropriate financial support from the Government of Trinidad and Tobago and the establishment of dedicated office facilities will result in a successful conversion of enquiries to actual contracts awarded. Name of Company Description of Enquiry Country of Origin Active Communications Ltd. Maritime Related Conferences in Port of Spain United Kingdom Al-Bilad Arabia Co. Ltd. Construction of AHTS Vessels x8 Saudi Arabia Associated Marine Design Construction of 160 foot Mega Yacht France / T&T Bernhard Schulte Dry docking of Liquefied Gas Carrier Germany Catherine Chicate-Moibert Tug and Barge hire for Haiti Earthquake Relief Supplies St. Marten Curtis Mohammed Upgrading a CBM system from 70k DWT to 120k DWT T&T David Tate Export, Inc. Hire of Tug and Barge for Aggregate Transportation U.S.A. Diesel Engine Services, SA MAN Ship Engine Repair & Service Facility Panama Diesel Engine Services, SA Maritime Trade Show Panama Domenico Bruni Environmental Conversion of 220,000 dwt Bulk Carrier Venezuela FT. Sakata Marine Services Dry-docking of 3,930 DWT RO-RO Cargo Ship Nicaragua Garvin Ottley Ship Surveying / Classification Agency U.S.A. Green Ventures Manufacture of Riverine Electrical Generation Turbines U.S.A. Halcrow Group Barge Transport of Compressed Natural Gas United Kingdom Helix Energy Solutions Wet-docking 381’ Marine Construction Barge U.S.A. Irene Hess & Carl Nielsen Marine Management Consultants Denmark Juti Enterprises Limited New build of Offshore Patrol Vessel x2 Bangladesh Naviera Integral S.A. C.V Shipping Agency for Tug Boat Mexico NEC Tender for Design and Build of 50 Ton Bollard Tug x2 T&T NMAG Consultancy on restoration of “Humming Bird II” Yacht T&T Nevis Air & Sea Ports Establishment of Ship Repair Facility in Nevis Nevis NuStar Energy L.P. Fabrication of 8’Ø Mooring Buoy U.S.A. NuStar Energy L.P. Dry-docking and Survey of Offshore Supply Vessel U.S.A. Makemba McGuire Student internship specializing in Ocean Engineering U.S.A. Rolls Royce Maritime Trade Show U.S.A. Taipan Shipping Trinidad Ltd. Acquisition of Tug and Barge for Inter-Isle Transport T&T ThyssenKrupp Establishment of Regional Office and Warehouse Germany Veolia Water Solutions Outfitting of 48,000 dwt Bulk Carrier U.S.A. Wärtsilä Establishment of Service Center Finland Wilton Walton Limited Anode and Corrosion Coating Sales & Service United Kingdom Wong Puy Kong Re-location of Shipyard from Suriname to Trinidad P.R. China

Page 51: Strategic Plan

www.tts-r.com Trinidad and Tobago Shipbuilding & Repair Cluster

. Strategic plan for Trinidad and Tobago’s Ship Repair and Shipbuilding Industry for the period 2011-12

Page 43 of 43 June 2010

APPENDIX 3

Shipbuilding and Repair ‘VISION’ Booklet The T&T Shipbuilding and Repair Cluster published its first print publication in April 2008 for worldwide distribution and to help promote Trinidad and Tobago’s development goals for the domestic maritime industry. To view and/or download S&R VISION Booklet please visit our website at: http://issuu.com/shipbuildingandrepairdocuments/docs/s_r_vision_booklet_2008fix

Page 52: Strategic Plan

©2010 Shipbuilding and Repair Development Company of Trinidad and Tobago Ltd

Production: SRDC Multimedia Services Division Cover and Design: Wilfred de Gannes

Please send orders to: Shipbuilding and Repair Development Company of Trinidad and Tobago Limited,

P.O. Box 2853, Chaguaramas, Trinidad and Tobago, West Indies. Tel.: +1(868) 753-6057 • +1(868) 384-SHIP(7447) • Fax: +1(202) 623-7201

E-mail: [email protected] www.tts-r.com