ACCOTINK CREEK @ AIRFIELD RUNWAY &
RECHLORINATION PLANT PROJECTS GARRISON FORT
BELVOIR, FAIRFAX, VACONSTRUCTED
Dec 2-5, 2008
![Page 2: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/2.jpg)
LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Built with Virginia DOT Class II stone,
level-crested @ 3 ft above the base-flow water surface elevation & trenched 3 ft into the bed.
One row of live willow poles (3 poles/ft) planted in the LPSTP & another row (3/ft)
laid on top of LPSTP (termed Live Siltation).
![Page 3: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/3.jpg)
STEP-BY STEPS FOR ACCOTINK
CREEK, FT. BELVOIR, VA
Toe-down Enhanced LPSTP
All drawings by Dave Derrick
![Page 4: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/4.jpg)
Typical cross-section for Accotink Creek in the proposed project area
ACCOTINK CREEK, FT. BELVOIR, VA LOOKING UPSTREAM
![Page 5: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/5.jpg)
Dig toe-down section of LPSTP 3 ft below bed of stream
ACCOTINK CREEK, FT. BELVOIR, VA
![Page 6: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/6.jpg)
ACCOTINK CREEK, FT. BELVOIR, VA
Place Longitudinal Peaked Stone Toe Protection
(LPSTP) stone in trench
![Page 7: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/7.jpg)
Looking across @ close up of LPSTP stone.
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION - DERRICK 12-2008
![Page 8: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/8.jpg)
ACCOTINK CREEK, FT. BELVOIR, VA
Place Joint Planting (live willow poles) on top of stone (angled up at least 20 degrees) at the rate of
3 poles per lineal foot.
![Page 9: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/9.jpg)
Looking across @ willow poles on stone. Placing soil on poles.
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION- DERRICK 12-2008
![Page 10: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/10.jpg)
ACCOTINK CREEK, FT. BELVOIR, VA
Place Live Siltation (willow poles) on top of stone at the rate of 3 poles per lineal foot
![Page 11: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/11.jpg)
Looking US. LPSTP with joint plantings & Live Siltation in place
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION- DERRICK 12-2008
![Page 12: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/12.jpg)
ACCOTINK CREEK, FT. BELVOIR, VA
At 35 ft spacing intervals, stone Bendway Weirs will be installed that will move the thalweg away
from the toe of the LPSTP.
![Page 13: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/13.jpg)
LPSTP with Joint Pole Plantings &
Live Siltation with an Erosion Control
Blanket
![Page 14: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/14.jpg)
ACCOTINK CREEK, FT. BELVOIR, VA
Tuck the Erosion Control Blanket (ECB) at base of
slope.
The ECB used here is a 100% coir (Coconut fiber)
Rolanka BioD-Mat 40
Roll ECB out over willows & LPSTP
stone.
![Page 15: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/15.jpg)
Install Living Dikes midway between
mid-project keys, 3 deep-planted Live
Willow Poles per ft.
![Page 16: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/16.jpg)
Hoe starting to dig trench for Living Dike (perpendicular to direction of high flow)
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION- DERRICK 12-2008
![Page 17: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/17.jpg)
Looking downhill @ Living Dike trench with willows installed & partially backfilled.
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION - DERRICK 12-2008
![Page 18: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/18.jpg)
Looking downhill @ Living Dike trench with willows installed & partially backfilled. Leave bank rough. Ready for ECB.
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION- DERRICK 12-2008
![Page 19: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/19.jpg)
ACCOTINK CREEK, FT. BELVOIR, VA
FIL
L
CUT
Slope bank. A balanced cut/fill in some sections, heavily eroded areas required soil backfill. Backfill anchors the ECB.
![Page 20: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/20.jpg)
Looking US @ erosion control blankets with soil covering the bottom end
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION - DERRICK 12-2008
![Page 21: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/21.jpg)
Looking US @ coir blanket & Bendway Weirs in place.
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION - DERRICK 12-2008
![Page 22: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/22.jpg)
ACCOTINK CREEK, FT. BELVOIR, VA
Install rooted stock plants through ECB as appropriate
![Page 23: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/23.jpg)
Looking US @ workers installing rooted plants thru ECB.
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION - DERRICK 12-2008
![Page 24: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/24.jpg)
Looking US @ coir blanket, Living Dikes & rooted plants.
CONSTRUCTION-ACCOTINK CR.-RECHLORINATION - DERRICK 12-2008
![Page 25: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/25.jpg)
CONSTRUCTION COMPLETE-Looking US nine months after completion. Most willows browsed by beaver
CONSTRUCTION COMPLETE-ACCOTINK CR.-DERRICK 9-13-2009
![Page 26: STEP-BY STEPS FOR ACCOTINK CREEK, FT. BELVOIR, VA Toe-down Enhanced LPSTP](https://reader036.fdocuments.net/reader036/viewer/2022081517/56815a05550346895dc751b8/html5/thumbnails/26.jpg)
Man’s best friend, Cleophus Speed Elvis Derrick