Accotink Creek Watershed Project Wakefield Park North

11
A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Accotink Creek Watershed Project Wakefield Park North Contract No. CN14125121 Project No. SD-000031-126 Braddock District 11/30/2016

Transcript of Accotink Creek Watershed Project Wakefield Park North

Page 1: Accotink Creek Watershed Project  Wakefield Park North

A Fairfax County, VA, publication

Department of Public Works and Environmental Services

Working for You!

Accotink Creek Watershed ProjectWakefield Park NorthContract No. CN14125121 Project No. SD-000031-126Braddock District

11/30/2016

Page 2: Accotink Creek Watershed Project  Wakefield Park North

Accotink Creek Watershed ProjectsWakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Page 3: Accotink Creek Watershed Project  Wakefield Park North

Project Details

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

The Wakefield Park North Stream Restoration project was substantially completed within budget and ahead of schedule on October 6, 2016. The project restored approximately 900 linear feet of an unnamed tributary to Accotink Creek using natural channel design techniques.

Project Overview:

• Establish new and stable channel geometry and plan form• Reconnect the channel with its floodplain by raising the stream bed • Place reinforced bed mix material to stabilize the stream bed and banks• Repair a deteriorating outfall and replace a failing Cross County Trail and utility access culvert crossing• Reduce erosion using in-stream grade control structures including: imbricated stone toe protection, plunge and

step pools, log and rock sills, and several cross vanes• Create overbank wetland areas and install surface and buried woody debris to support habitat improvement• The project reduces total phosphorus by 154 pounds per year; reduces total nitrogen by 505 pounds per year;

and removes 27 tons of sediment per year from this tributary leading to Accotink Creek

Project Team:

• Stormwater Planning Division – Dave Anglin, Ken Trinh• Utilities Design and Construction Division (UDCD) – Yudhie Brownson, Tammy Michelli• Project Inspector, UDCD – Jeff Bartlett• Fairfax County Park Authority – Michael Cadwallader, Andy Galusha, Tom McFarland, Mark Plourde, Justin

Roberson, Samantha Wangsgard • Wetland Studies and Solutions, Inc., Design Consultant – J.T. Kelly, Jason Beeler, John Connelly• Meadville Land Services (Contractor) – Steve Johnston

Accotink Creek Watershed Project: Wakefield Park North

Page 4: Accotink Creek Watershed Project  Wakefield Park North

Accotink Creek Watershed Projects: Wakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Annandale, VA, Tax Map No. 70-2, 70-4Braddock District

Project Area

495 Capital Beltway

Accotink Creek

Page 5: Accotink Creek Watershed Project  Wakefield Park North

Accotink Creek Watershed Projects: Wakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Construction of Step Pools Near Outfall

Page 6: Accotink Creek Watershed Project  Wakefield Park North

Accotink Creek Watershed Projects: Wakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Removal of Old Culvert

Page 7: Accotink Creek Watershed Project  Wakefield Park North

Accotink Creek Watershed Projects: Wakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Construction of Trail Pipe Crossing

Page 8: Accotink Creek Watershed Project  Wakefield Park North

Accotink Creek Watershed Projects: Wakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Reinforcing the Streambed

Page 9: Accotink Creek Watershed Project  Wakefield Park North

Before After

Accotink Creek Watershed ProjectsWakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Page 10: Accotink Creek Watershed Project  Wakefield Park North

Before After

Accotink Creek Watershed ProjectsWakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Page 11: Accotink Creek Watershed Project  Wakefield Park North

Additional Information

For additional Information, please call

www.fairfaxcounty.gov/dpwes

Accotink Creek Watershed Projects: Wakefield Park North

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Irene Haske, Public Information Officer703-324-5821, TTY 711