LESSON
3LECTURE
MAJOR TURBINE OVERHAULINGPROCEDURE
SUB - OBJECTIVE
At the end of the lesson the T!"nee #"ll $e !$le to de%onst!te !n &ndest!nd theM!'o O(eh!&l"n) Po*ed&e+
,+ PRE-CONDITIONS .ACTION B/ OPERATION SECTION0
The following tests are to be carried out by Operation Section and the results to besent to MMS.
Check and record vibration and temperatures of all bearings.
Carry out over speed oil trip test for turbine.
Carry out lub. Oil trip test.
Carry out thrust bearing wear test.
Carry out throttle valve stem freedom test.
Check the function of extraction non return valves trip in sequence of turbine trip.
erform characteristic test of hydraulic controller of throttle valves.
erform characteristics test of hydraulic controller of governing valves.
Carry out simulation test of extraction non return valves with de!aerator and highpressure heaters at high level.
Carry out extraction non return valves leak test by opening drain line after nonreturn valves with de!aerator actual high level.
Carry out air leak test of generator.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /
-
8/11/2019 steam turbine3
2/133
INSTRUMENT DISCONNECTION
"rrange with *MS to disconnect and remove the field instruments on the turbine andgenerator as listed below and when required.
/. Thermocouples0. overnor and Throttle $alves limit switches.-. 1ront gauge panel.2. land steam temperature controller.3. "ll vibration pick ups.4. Speed pick ups.5. Turbine rotor position pickup.6. #ifferential expansion pickup.7. &ccentricity pick up./8. Thermocouples and (T#s of turbine and generator bearings.//. Turning ear +imit Switches.
ELECTRICAL DISCONNECTION
"rrange with &MS to disconnect the electrical connections as and when required.
/. Turning gear motor connection0. &xciter brushes.-. (otor grounding device.
DISASSEMBL/
(emove the cladding.
(equest the scaffolding Section to erect the scaffolding as per requirement.
(emove the sheet metal lagging and their thermal insulation from the turbine
casing9 valve bodies and steam piping as required.
#isconnect and remove the throttle valves and servo motors.
#isconnect and remove the governor valves and servo motors.
THROTTLE VALVES
/. :ith reference to the diagrams 1ig. -!/9 -!09 -!- ; -!29 disassemble thethrottle valve.
0. Clean and inspect all the parts paying special attention to sticking on thestem9 excessive clearance of bushings9 wear of plugs and scored seats.
-. Check clearance between stem9 bushings9 inner and outer valve plug.2. "rrange with *M# to overhaul and ad
-
8/11/2019 steam turbine3
3/133
1")+ 3-,+ Thottle V!l(e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& -
-
8/11/2019 steam turbine3
4/133
1")+ 3-2+ Thottle V!l(e+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 2 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
5/133
1")+ 3-3+ Thottle V!l(e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 3
-
8/11/2019 steam turbine3
6/133
1")+ 3-+ Thottle V!l(e+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 4 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
7/133
THROTTLE PARTS LIST+
/. Operation lever connecting link pin0. Operation lever connecting link =in pairs>-. ,olt2. Spherical washer =male and female>3. Connecting link4. ,ushing5. in6. %ut7. Spacer /8. Stud//. Connecting bushing/0. Connecting pin/-. 1ulcrum link/2. Spring seat =upper>/3. 1ulcrum pin/4. 1ulcrum bushing/5. Servo motor support and spring housing/6. Compression spring =inner>/7. Compression spring08. Compression spring =outer>0/. Spring seat =lower>00. Spring guide0-. &xtension nut02. Spherical washers =male and female>03. &xtension nut04. Spherical washers =male and female>05. $alve bonnet06. Stud07. Stud-8. in
-/. $alve stem bushing-0. $alve stem bushing--. Spring seat guide-2. $alve stem-3. uide bushing-4. $alve =main>-5. $alve bushing-6. $alve ring-7. Compression spring28. Spring seat shims2/. Spring seat20. $alve stem end
2-. ilot valve22. ilot valve nut23. $alve seat24. (etaining screw25. asket26. (etaining Screw27. ,ushing38. in3/. Spacer30. +ink
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 5
-
8/11/2019 steam turbine3
8/133
3-. Spherical bearing32. %ut33. :asher special ,olt special34. Switch box35. Switch support bracket36. in37. %ut
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 6 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
9/133
GOVERNING VALVES
/. :ith reference to the diagram -!39 -!4 ; -!59 disassemble the governingvalves.
0. (emove all deposits from stem and plug.-. erform contact check of the seat and disc.2. Check the pilot valve freeness.3. "rrange for #ye enetrant Test of the disc and seats.4. (epair or replace any parts if necessary.5. (eassemble the governing valves.
1")+ 3-4+ Go(en"n) V!l(e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 7
-
8/11/2019 steam turbine3
10/133
1")+ 3-5+ Go(en"n) V!l(e
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /8 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
11/133
GOVERNING VALVE 6 PARTS LIST
/. $alve0. in-. $alve nut2. Stop Screw3. Socket head screw4. %ut5. Spring seat6. Support7. %ut/8. Servo motor link//. Servo motor link pin/0. Spring/-. Spring support/2. Spring support pin/3. Operating lever /4. (etainer/5. +ock nut/6. Operating lever stop bar/7. Support rod08. %ut0/. (etaining screw00. Connecting link pin =upper>0-. Operating lever connecting link02. Connecting link pin =lower>03. Support bracket04. Set screw05. $alve stem bushing06. :asher =female>07. :asher =male>%ut-8. %ut
-/. Stud-0. $alve stem--. +oad spring support-2. $alve bonnet-3. uide bushing-4. in-5. in-6. Cross head pin-7. Cross head28. +oading spring2/. +oading spring20. %ut
2-. Stud22. +oading spring seat =lower>23. +oading spring seat =upper>24. "d
-
8/11/2019 steam turbine3
12/133
1")+ 3-7+ Coss-se*t"on t&$"ne thottle !n )o(eno (!l(es+ Al-8ho$! Pl!nt+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /0 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
13/133
1")+ 3-7!."0+ Le(e O9e!ted B!-L"ft V!l(e Ge!+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /-
-
8/11/2019 steam turbine3
14/133
1")+ 3-7!.""0+ D"e*t o9e!ted B! L"ft V!l(e Ge!+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /2 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
15/133
1")+ 3-7$."0+ T:9"*!l C!% O9e!ted Contol V!l(e .A;"!l Se*t"on0
1")+3-7$.""0+ T:9"*!l M<"9le Contol V!l(e A!n)e%ent+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /3
-
8/11/2019 steam turbine3
16/133
(emove bearing %o. 0 pedestal cover after disconnecting in!board and out boardseals.
(emove the coupling guard.
Measure and record the coupling run out readings and record in the alignmentcheck value sheet.
Measure and record the coupling bolt length.
:ith reference to the diagram -!6 ?(igid Coupling@9 disassemble the turbine andgenerator coupling.
/. Mark all the bolts and holes0. (emove the bolts.-. 'sing .
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /4 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
17/133
1")+ 3-
-
8/11/2019 steam turbine3
18/133
)old the rotor in ?A@ position.
:ith reference to diagram -!7 (otor ?A@ Setting &nd Mic (eading9 measure andrecord the rotor position as described belowB
/. Open the micrometer hole in the end cover by rotating the cover plate.0. *nsert he micrometer spindle.-. )old the sleeve firmly against the boss on the end cover.2. Screw the thimble inwards until it
-
8/11/2019 steam turbine3
19/133
1")+ 3-,+ Re*od of 1"n)e P"e*e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /7
-
8/11/2019 steam turbine3
20/133
:ith reference to the diagram -!// ; -!/09 remove the upper half casing of themain oil pump.
1")+ 3-,,+ M!"n O"l P&%9 !nd Go(eno I%9elle+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 08 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
21/133
1")+ 3-,2+ M!"n o"l P&%9 !nd Go(eno I%9elle+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 0/
-
8/11/2019 steam turbine3
22/133
Measure and record the seal ring clearance of the main oil pump.
Measure and record the governor impeller sleeve clearance.
(emove the upper halves of outer glands on generator and governor ends.
'nbolt9 ack the uppercasing up to bolt dowel height and then remove the uppercasing of the turbine.
NOTE@
D&"n) &n$olt"n) "f !n: $olt "s st&* do not t: to o9en "t #"th e;*ess fo*e+M!e $o"n) on the n&t #"th o&t d!%!)"n) the the!d of the $olt !nd thene%o(e the $olt+
,lank off all openings and connections to the turbine casing and pedestals.
JOURNAL BEARINGS No+ , !nd 2+
Check the %ip and ,earing Clearance before removing the bearing cover.
Check and record the radial clearance on %o. / and %o. 0 bearings.
(emove the upper halves of %o. / and %o. 0
-
8/11/2019 steam turbine3
23/133
1")+ 3-,3+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 0-
-
8/11/2019 steam turbine3
24/133
1")+ 3-,+ T:9"*!l s9he"*!ll:-se!ted t&$"ne $e!"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 02 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
25/133
1")+ 3-,4+ Jo&n!l Be!"n)+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 03
-
8/11/2019 steam turbine3
26/133
1")+ 3-,4.!0."0+ T:9"*!l Jo&n!l $e!"n) &sed "n H")h-Pess&e T&$"ne+
1")+ 3-,4.!0.""0+ Be!"n) P"n*h A*t"on+
1")+ 3-,4.!0."""0+ Be!"n) L"ne !nd Se!t+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 04 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
27/133
1")+ 3-,4.$0."0+ T"lt"n) P!d Be!"n) S*he%!t"*+
1")+ 3-,4.$0.""0+ Blo* !nd P!d Asse%$l:+
1")+ 3-,4.$0."""0+ T"lt"n) P!d Be!"n)+
1")+ 3-,4.$0."(0+ Be!"n) D"!%ete !nd P"n*h+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 05
-
8/11/2019 steam turbine3
28/133
THRUST BEARING
1loat the rotor to the governor and generator end positions9 measure and record thethrust float clearance.
:hile disassembling the thrust bearing with reference to the diagrams 1ig. -!/4 D -!/79 observe the position markings.
(emove the upper half of the thrust bearing and main oil pump.
Check and record the thrust bearing and MO oil seal clearances.
(emove thrust pads and cages.
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 06 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
29/133
CLEANING INSPECTION AND MAINTENANCE
Clean and inspect all the parts.
*nspect the babbitt surface of the pads.
Check wear of the shoe pivot. &nsure flatness to be not more than 3 mm.
Check leveling plates condition.
olish the thrust collar if required.
Check run!out of collar.
"rrange for a compulsory die penetration check of the babbitt linings bonding..
"rrange for the inspection of the thermocouples by *MS.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 07
-
8/11/2019 steam turbine3
30/133
1")+ 3-,5+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& -8 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
31/133
1")+ 3-,5.!0."0+ T"lt"n) P!d Th&st Be!"n) .P!t"!l V"e#0
1")+ 3-,5.!0.""0+ Th&st Be!"n) Const&*t"on+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& -/
-
8/11/2019 steam turbine3
32/133
1")+ 3-,5.$0."0+ Do&$le R&nne th&st Be!"n) S"n)le R&nne th&st Be!"n)T!9eed L!nd Th&st Be!"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& -0 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
33/133
1")+ 3-,5.*0."0+ T!9eed L!nd Th&st Be!"n) Det!"l1&nd!%ent!ls Th&stBe!"n)+ Se*t"on of ! t"lt"n) P!d Be!"n) T:9"*!l T"lt"n) P!d Const&*t"on
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& --
-
8/11/2019 steam turbine3
34/133
1")+ 3-,7+ T"lt"n) P!d th&st Be!"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& -2 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
35/133
1")+ 3-,
-
8/11/2019 steam turbine3
36/133
1")+ 3-,=+ M!"n T&$"ne Th&st Be!"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& -4 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
37/133
1")+ 3-2+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& -5
-
8/11/2019 steam turbine3
38/133
THRUST BEARING CLEARANCE+
"ssemble the thrust bearing as per S*. :ith reference to the diagram Thrust,earing clearance 1ig. -!0/. Measure the clearances marked "9 ,9 and C. (ecordthe measured values on the thrust ,earing Clearance.
Check and record the oil seal rings axial and radial clearances.
Compare the as found value with the design value and ad
-
8/11/2019 steam turbine3
39/133
1")+ 3-22+ Cle!!n*e Che* De("*e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& -7
-
8/11/2019 steam turbine3
40/133
OIL SEAL RINGS
:ith reference to the diagrams 1ig. -!0- ; -!029 disassemble the upper and lowerhalves of the seal rings at the generator end and bearings / and 0.
Clean and inspect all parts.
Check for wear of the seal ring.
(eplace the gasket.
(epair or replace any parts if required.
"d
-
8/11/2019 steam turbine3
41/133
1")+ 3-2+ O"l Se!l R"n)+ .Be!"n)s , !nd 20+
GOVERNOR IMPELLER SEELVE
Check governor impeller sleeve clearance.
*f clearance is more than the design limit =8.83 to 8./3 mm>9 the following actionshould be taken.
(emove the stud shaft.
olish the coupling at the place of rubbing of vibration pickup if required.
(eplace or refurbish the governor impeller sleeve if necessary.
1ix back the stud shaft and align it.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 2/
-
8/11/2019 steam turbine3
42/133
MAIN OIL PUMP
:ith reference to the diagrams 1ig. -!03 ; -!04 ?Main Oil ump and overnorimpeller ? disassemble the main oil pump.
Clean and inspect all the parts.
*nspect the impeller for corrosion and excessive clearance.
Checking wearing ring clearance and replac2e if necessary.
(epair or replace any parts if required.
"ssemble the pump.
ut back pedestal covers and maintain oil defector seal clearance at in and at outboard.
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 20 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
43/133
1")+ 3-24+ M!"n O"l 9&%9 !nd Go(eno I%9elle+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 2-
-
8/11/2019 steam turbine3
44/133
1")+ 3-25+ M!"n O"l 9&%9 !nd Go(eno I%9elle+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 22 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
45/133
MAIN TURBINE GENERATOR BEARING
O11ICE NOTICE
Shot C&ts B:-P!sses J&%9es C&t o&ts et*+ !e NOT to $e *!"ed o&t#"tho&t 9"o !99o(!l fo% :o& D"("s"on M!n!)e+
Obtain T:.
%OT&B
"ttempt the enerator ,earings one after the other.
DISASSEMBL/
"rrange with *MS for removal of vibration ick!ups.
#isassemble the outside oil deflectors.
"rrange with &MS for checking of ,earing *.(. values.
(emove the bearing cover.
Check %ipE Clearance and (ecord.
:ith reference to the diagrams 1ig. -!05 ; -!06 respectively9 remove 'pper half ofthe bearing rings and the bearings.
Check the bearing clearance and record.
osition the rotor lifting device and lift the rotor by about 8.08 mm.
"rrange with *MS to remove (T#.
(oll out lower half of the bearing.
(emove lower half of the bearing and bearing ring9 making them rotating around theshaft neck.
CLEANING AND INSPECTION
:ith reference tot he diagrams clean all parts of bearings and housings.
Check for wear of the oil seal rings.
*f oil seal rings are partially damaged9 restore the sealing edges. Otherwise replacethe seal rings.
Check oil drain passages of oil seal rings for obstruction.
Check for any marks on babbitt surfaces and corrosion.
"rrange with T; * Section to check bonding of ,abbitt lining.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 23
-
8/11/2019 steam turbine3
46/133
*nspect the
-
8/11/2019 steam turbine3
47/133
ASSEMBL/
NOTE@
Befoe e!sse%$l"n) ens&e *le!nl"ness of !ll 9!ts of the $e!"n) ho&s"n)s!nd o"l 9"9"n)+
1or assembling follow the reverse sequence to the disassembly procedure. :hileassembling the bearing9 apply stop oil =ST treatment> to the
-
8/11/2019 steam turbine3
48/133
1")+ 3-27+ Be!"n) !nd H:do)en Se!l Bo; "n) s"de+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 26 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
49/133
1")+ 3-2
-
8/11/2019 steam turbine3
50/133
T!$le 3-,+ Re*od of Ins9e*t"on .C5 Gene!to Be!"n)s+0
ROTOR .See 1")+ 3-2=0
Carry out rotor aluminum grit blasting. Shaft
-
8/11/2019 steam turbine3
51/133
"rrange for liquid enetration *nspection9 'ltrasonic Testing and Magnetic articlesinspection of the bladings and rotor.
(eport and repair any defects found.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 3/
-
8/11/2019 steam turbine3
52/133
1")+ 3-2=+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 30 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
53/133
1")+ 3-3+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 3-
-
8/11/2019 steam turbine3
54/133
1")+ 3-3,+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 32 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
55/133
1")+ 3-32+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 33
-
8/11/2019 steam turbine3
56/133
1")+ 3-33+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 34 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
57/133
1")+ 3-33.!0."0+ T:9"*!l+Roto heel Det!"ls+
1")+ 3-33.!0.""0+ Ro&)h M!*h"n"n) Roto D&"n) M!n&f!*t&"n)+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 35
-
8/11/2019 steam turbine3
58/133
1")+ 3-33.$0."0+ T&$"ne Roto D&"n) M!n&f!*t&e+
1")+ 3-33.$0.""0+ 1!*e-M!*h"n"n) Sho&d B!nds on Do&$le-1lo# Roto+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 36 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
59/133
1")+ 3-33.*0 O99osed-flo# Roto Asse%$l: "n Lo#e-H!lf C!s"n)s+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 37
-
8/11/2019 steam turbine3
60/133
1")+ 3-33 .d0."0+ Asse%$l"n) B&*ets on R"% T&$"ne Roto "n Lo#e-H!lf shellSho#"n) B&*et heels !nd St!t"on!: P!ts+
1")+ 3-33 .d0."""0+ 1"tt"n) Sho&d B!nds O(e B&*et Tenons+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 48 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
61/133
1")+ 3-33 .e0."0+ B&*et Lo*"n) P"e*e !nd P"ns+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 4/
-
8/11/2019 steam turbine3
62/133
1")+ 3-33 .e0.""0+ P!t"!ll: Asse%$led heel Sho#"n) Ad%"ss"on Slot+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 40 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
63/133
1")+ 3-33 .e0."""0+ heel "th $&*ets Inst!lled !nd Lo*"n) P"e*e "n Pl!*e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 4-
-
8/11/2019 steam turbine3
64/133
1")+ 3-33 .e0."(0+ Co%9leted heel Asse%$l: Sho#"n) Sho&d B!nds+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 42 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
65/133
BLADE RINGS
Carry out blade ring aluminum grit blasting.
*nspect the seal strips.
(epair or replace if necessary.
GLAND SEALS
:ith reference to the diagrams -!-49 -!-5 ; -!-69 disassemble the inner and outerglands of the governor and generator ends.
Clean and inspect all the parts.
Check the seal rings for excessive wear.
(epair or replace any parts if necessary.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 43
-
8/11/2019 steam turbine3
66/133
1")+ 3-3+ T:9"*!l HP t&$"ne )l!nd+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 44 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
67/133
1")+ 3-34+ C:l"nde L!:o&t Inne C!s"n)+
/. '*#& ,+"#&
0. #(*++ )O+& 1O( O*%T "SS&M,+G ,O+T.
-. +"T)&!T'(% C*(C'M1&(&%T*"+ (OO$&.
2. 1"C& O1 MO'%T*% +' 1O( "#'STM&%T S)*MS.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 45
-
8/11/2019 steam turbine3
68/133
1")+ 3-35+ Inne Gl!nd .Go(eno End0
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 46 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
69/133
1")+ 3-37+ Inne Gl!nd .Gene!to End0
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 47
-
8/11/2019 steam turbine3
70/133
1")+ 3-3
-
8/11/2019 steam turbine3
71/133
1")+ 3-3=+ B!l!n*e P"ston+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 5/
-
8/11/2019 steam turbine3
72/133
CASINGS
Carry out oil stoning for upper and lower casing faces and blading ring seating.
Clean the casing using a petroleum base solvent..
*nspect the upper and lower casing.
Carry out dye enetrant test for upper casing.
"rrange for liquid enetration Test for Stationary blades and bolting.
"rrange for liquid enetration Test9 and Magnetic article *nspection for noHHleblock and welding.
(eport any abnormalities found and repair or replace any parts if required.
CASING BOLTS
*nspect and clean the casing bolts and dowel area.
(epair or replace any bolts if required.
TURNING GEAR .SEE 1IG+ 3- 3-, 3-20
Carry out S* for the overhaul9 Maintenance and Calibration of the turning gear"ssembly.
Carry out for the Overhaul9 Maintenance and Calibration of the Turning ear Motor.
O11ICE NOTICE
Shot C&ts B:-9!sses J&%9es *&t o&ts et*+ !e NOT to $e *!"ed o&t#"tho&t 9"o !99o(!l fo% :o& D"("s"on M!n!)e+
PREPARATION
Obtain T:.
Make sure that all relevant valves are properly close and tagged.
Make sure that engaging lever is already disengaged.
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 50 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
73/133
DISMANTLING PROCEDURES
"rrange with &M# to disconnect the related electrical connections.
"rrange with *M# to disconnect the instruments and its connections.
(emove bolts holding hand wheel cover and adopter.
(emove hand wheel cover.
(emove base bolts of the unit the from housing.
,y using Crane9 Chain blocks9 slings9 shackle and eye bolts9 lift unit from its positionand place in a safer area.
Take out the engaging lever guard and remove rubber below.
osition the Crane with connections above the motor and fix slings.
(emove motor anchor bolts and pull out the motor.
"rrange with &M# to overhaul or service the motor.
Check the condition of coupling9 rubber insert and hand wheel below. (eplace ifnecessary.
+oosen align screw on the lower half and remove coupling.
(emove thrust bearing cover with packing.
Check thrust bearing and guide bearing. (eplace with new one if required.
(emove pin from the main pinion shaft.
Check gears and replace the bush if required.
ull out reduction gear. (emove spacer ring and shaft.
Take out stop ring of the worm gear. (emove worm gear and pinion shaft.
(emove retaining screw holding the slash pi6nion shaft and pull out the shaft9leaving slash pinion gear in the position.
*nspect all bushing9 shaft and contact surface for the respective gear for any
damage and excessive wear. (eplace the part as necessary.
Clean all parts thoroughly.
Check condition of fulcrum9 neumatic unit below and springs. (epair or replace asnecessary.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 5-
-
8/11/2019 steam turbine3
74/133
LIST O1 PARTS
/. :orm ear 0. :orm gear pinion-. uide bearing assembly2. :orm3. Thrust bearing assembly4. Coupling assembly5. Turning gear place6. Turning gear housing7. Stud/8. %ut//. )and operating mechanism/0. &lectric motor /-. Socket head screw/2. ,ellows/3. Clash pinion gear /4. Clash pinion shaft/5. (eduction gear/6. Main pinion/7. &ngaging lever 08. Shift lever handle0/. %ame plate00. Cover support0-. Spring02. +ever cover 03. Trigger pin04. Trigger 05. ,ushing06. Spacer ring07. Aey-8. Snap ring
-/. Spacer ring-0. ,ushing--. (etaining screw-2. ,ushing-3. Spacer ring-4. ,ushing-5. Spacer ring-6. late assembly-7. ,ushing28. ,ushing2/. ,ushing20. Aey
2-. Stop ring22. Spacer ring23. Spacer ring24. neumatic cylinder25. +imit switch25a +imit Switch25b +imit switch26 in27 Clevis38 Tubing support3/ Tubing assembly
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 52 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
75/133
1")+ 3-+ M!"n T&$"ne T&n"n) Ge!+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 53
-
8/11/2019 steam turbine3
76/133
1")+ 3-,+ M!"n T&$"ne T&n"n) Ge!
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 54 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
77/133
1")+ 3-2+ M!"n T&$"ne T&n"n) Ge!
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 55
-
8/11/2019 steam turbine3
78/133
RIGID COUPLING .SEE 1IG+ 3-30
Clean and inspect the coupling faces.
Scrap off any bruises or burrs. #o not file the coupling surfaces.
Clean and inspect all bolt holes and spot facings.
1")+ 3-3+ R")"d Co&9l"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 56 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
79/133
Go(eno T!nsfo%e o S9eed Ch!n)e
Carry out S* for the Overhaul9 Maintenance and calibration of the overnorTransformer or Speed Changer.
Lo!d L"%"t V!l(e
Carry out S* for the Overhaul9 Maintenance and Calibration of the +oad +imit $alve.
&xhaust ressure (egulator
Carry out S* for the Overhaul9 Maintenance and Calibration of the &xhaustressure (egulator.
Multiple Orifice and Check valve
Carry out S* for the Overhaul9 Maintenance and Calibration of the Multiple Orificeand Check $alve.
Orifice and Oil (elief $alve
Carry out S* for the Overhaul9 Maintenance and Calibration of Orifice and the Oil(elief $alve
Throttle $alve Controller
Carry out S* for the Overhaul9 Maintenance and Calibration of the Throttle $alveController.
overning $alves
Carry out S* for the Overhaul9 Maintenance and Calibration of the overning
$alves.
Over Speed Trip Mechanism
Carry out S* for the Overhaul9 Maintenance and Calibration of the Over Speed TripMechanism.
&xtraction %on (eturn $alves9 Servo motors9 oil Operated "ir ilot $alves.
Main oil Tank9 "uxiliary Oil ump9 turning ear Oil ump9 &mergency Oil ump9 OilCoolers and Oil purifier9 Oil 1ilters =) ; +>.
Carry out the followingB
OIL COOLERS
"rrange to carry out S* of the main tube oil coolers I minor overhaul9 inspectionand maintenance.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 57
-
8/11/2019 steam turbine3
80/133
1ILTERS
"rrange to carry out S* Main Turbine Oil tank for cleaning of all oil filters.
NOTE@
1o !ll the !$o(e *o%9onents these #"ll $e *o(eed on the >*ontol o"ls:ste%? %od&le+
Turn the upper casing up side down.
(emove upper half blade rings after
-
8/11/2019 steam turbine3
81/133
'sing the special lifting beam and slings install the rotor.
:ith reference to the diagram below and using a 1eeler auge9 Measure andrecord the value of ?A@ on the (otor ?A@ Clearance (ecord.
1")+ 3-+ Roto >8? Sett"n)+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 6/
-
8/11/2019 steam turbine3
82/133
NOLE BLOC8 SETTING .1IG+ 3-40
:ith reference to the diagram below and using a 1eeler auge9 Measure andrecord the value of ?'@ on the %oHHle block Setting ) impulse ,lading Clearance(ecord.
:ith the rotor set in the ?A@ position9 install the rotor position pick up coil9 thrustbearing trip device and differential expansion pick up.
1or reference during Minor Overhaul9 with reference to diagram ?(ecord of 1ingeriece@ measure and record the finger gap to rotor which is mounted on J / pedestaland also distance between coupling to casing at J 0 pedestal
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 60 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
83/133
1")+ 3-4+ HP I%9&lse Bl!d"n)+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 6-
-
8/11/2019 steam turbine3
84/133
RADIAL CLEARANCE SO1 ROTOR AND CASING SEAL STRIPS .1IG+ 3-50
:ith reference to the diagram below9 measure the clearances marked ?"@9 ?,@9 ?C@and ?#@ by +ead :ire *mpression method. (ecord the measured values on the(otor ; Casing Seal strips (adial Clearance (ecord.
Compare the as found value with the design value and ad
-
8/11/2019 steam turbine3
85/133
1")+ 3-7+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 63
-
8/11/2019 steam turbine3
86/133
1")+ 3-
-
8/11/2019 steam turbine3
87/133
A;"!l Cle!!n*es fo C:l"nde Bl!des .3-=0
1")+ 3-=+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 65
-
8/11/2019 steam turbine3
88/133
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 66 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
89/133
1")+ 3-4+ A;"!l 1lo#+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 67
-
8/11/2019 steam turbine3
90/133
1")+ 3-4,+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 78 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
91/133
LIST O1 PARTS .1IG+ 3-4 0
/. Turbine (otor 0. (otating ,lade-. (otating ,lade Shroud Strip2. ,lade (ing3. Stationary ,lade +ocking iece4. Seal Strip5. Stationary ,lade6. Stationary ,lade Shroud Strip7. (otating ,lade Caulking Segment
LIST O1 PARTS .1IG+3-4,+0
/. Turbine (otor 0. (otating ,lade-. (otating ,lade Shroud Strip2. ,lade (ing3. Stationary ,lade +ocking iece4. Seal Strip5. Stationary ,lade6. (otating ,lade (etaining in.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 7/
-
8/11/2019 steam turbine3
92/133
1")+ 3-42+ Be!"n) No+ ,+ Cle!!n*e+
Compare the as found value with the design value and ad
-
8/11/2019 steam turbine3
93/133
No+ , Pedest!l Se!l Cle!!n*e .1")+ 3-420
:ith reference to the diagram below9 measure the clearances marked ?"@ and ?,@.(ecord the measured values on the %o./ edestal Seal Clearances (ecord.
Compare the as found value with the design value and ad
-
8/11/2019 steam turbine3
94/133
1")+ 3-43+ Be!"n) No+ 2+ Cle!!n*e+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 72 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
95/133
NO+ 2 BEARING OIL DE1LECTOR SEAL CLEARANCE .1IG+ 3-430
:ith reference tot he diagram below9 measure the clearances marked ?"@ and ?,@.(ecord the measured values on the %o.0 ,earing Oil #eflector Seal Clearances(ecord.
Compare the as found value with the design value and ad
-
8/11/2019 steam turbine3
96/133
1")+ 3-4+ No+2+ Pedest!l Se!l Cle!!n*e .Co&9l"n) G&!d0+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& 74 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
97/133
1")+ 3-44+ Th&st Be!"n) Cle!!n*e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 75
-
8/11/2019 steam turbine3
98/133
MOVEMENT O1 TURBIEN .COLD END TRAVEL0
Set the rotor to ?A@ position
Move the rotor to the limit of the governor end.
Measure and record the movement.
The design value is -.- mm
"d
-
8/11/2019 steam turbine3
99/133
H+P+ BALANCE PISTON RING CLEARANCE .1IG+ 3-450
1")+ 3-45+ H+P+ B!l!n*e P"ston R"n)+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& 77
-
8/11/2019 steam turbine3
100/133
H+P+ IMPULSE BLADE RING .1IG+ 3-470
1")+ 3-47+ H+P+ I%9&lse Bl!de R"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /88 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
101/133
-
8/11/2019 steam turbine3
102/133
ROTOR CLEARANCE AFIAL L+P+ GLAND CASE TO EFHAUST HOOT.1IG+ 3-4=0
1")+ 3-4=+ Roto Cle!!n*e 6 A;"!l L+P+ Gl!nd C!se to E;h!&st Hood+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /80 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
103/133
MAIN OIL PUMP GOVERNOR IMPELLER AND OIL SEAL CLEARANCES.1")+ 3-50
1")+ 3-5+ M!"n o"l 9&%9 )o(eno "%9elle !nd o"l se!l *le!!n*es+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /8-
-
8/11/2019 steam turbine3
104/133
H+P+ BALANCE PISTON SEAL RINGS CLERANCE .1IG+ 3-5,0
:ith reference to the diagram below9 measure the clearances marked "9, and C.(ecord the measured values on the ,alancing iston (ing9 Seal (ing Clearances(ecord.
1")+ 3-5,+ H+P+ B!l!n*e P"ston Se!l R"n)s Cle!!n*e+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /82 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
105/133
H+P+ AND L+P+ GLAND CLEARANCE
:ith reference to the diagram below9 measure the clearances marked "9 , and C.(ecord the measured values on the + and ) land Clearance (ecord.
1")+ 3-52+ LP HP Gl!nd Cle!!n*e+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /83
-
8/11/2019 steam turbine3
106/133
CASING LEVELING BE1ORE AND A1TER SHIMMING THE ANCHOR BOLTS1")+ 3-53+
:ith reference to the diagram below9 level the lower casing to ad
-
8/11/2019 steam turbine3
107/133
"ssemble the thrust bearing and Main Oil ump as final.
(eassemble upper casing of the main oil pump and governor pedestal cover.
*nstall upper half of the gland seals and upper blade rings.
"ssemble the upper casing with sealing compound.
Check for Hero touch of upper and lower casings.
Bolt 9os"t"ons !nd *!s"n) $olts t")hten"n)
Bolt Pos"t"ons
,olt ositions and bolt dimensions are shown on 1igs. 6!-459 -!46 ; -!47.
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /85
-
8/11/2019 steam turbine3
108/133
1")+ 3-5+ C:l"nde L!:o&t O&te C!s"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /86 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
109/133
1")+ 3-5.!0."0+ T:9"*!l Inte-st!)e D"!9h!)%+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /87
-
8/11/2019 steam turbine3
110/133
1")+ 3-5.!0.""0+ T&$"ne Shell Sho#"n) Se(e!l D"!9h!)% H!l(es "n Pl!*e+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& //8 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
111/133
1")+ 3-5.$0."0+ Coss-Se*t"on of T:9"*!l Inte-st!)e P!*"n) A!n)e%ent+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& ///
-
8/11/2019 steam turbine3
112/133
1")+ 3-5.$0.""0+ T:9"*!l P!*"n) C!s"n) Det!"ls .U99e H!lf Re%o(ed0+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& //0 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
113/133
1")+ 3-5.*0."0+ Close U9 ("e# of Inst!lled P!*"n)s R"n)s+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& //-
-
8/11/2019 steam turbine3
114/133
1")+ 3-5.*0.""0+ T:9"*!l Se)%ented Sh!ft P!*"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& //2 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
115/133
1")+ 3-54+ Bolt D"%ens"ons+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& //3
-
8/11/2019 steam turbine3
116/133
1")+ 3-55+ Bolts Pos"t"on D!#"n)+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& //4 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
117/133
1")+ 3-57.!0.I230Thottle V!l(e Bonnet Bolt Pos"t"on 2+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& //5
-
8/11/2019 steam turbine3
118/133
CASING BOLT TIGHTENING
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& //6 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
119/133
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& //7
-
8/11/2019 steam turbine3
120/133
1")+ 3-5
-
8/11/2019 steam turbine3
121/133
Bolts U9 To < %% D"!%ete
Tighten with torque wrench to the required torque as indicated in the table below.
TORUE TABLE
THREAD DIAMETER.MM0
PITCH.MM0
TORUE.8)%0
/2 0.8 4.0
/4 0.8 /0.208 0.3 08.5
00 0.3 --.2
05 -.8 38.6-8 -.3 5-.5
-- -.3 /8-.4-4 -.8 /2/.8
-7 -.8 /44.820 -.8 006.8
23 -.8 -/8.826 -.8 2/2.8
"fter tightening9 measure the elongation of the bolt.
The required elongation is ?8.88/3 x 1ree +ength@
:ith references to the diagram on page 249 determine the free length =1+> for theprincipal bolting member types.
Check that the measured elongation is with in KL! /8 of the required value andad
-
8/11/2019 steam turbine3
122/133
1")+ 3-5=+ Bolts &9 to 42 %% D"!%ete !nd A$o(e+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /00 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
123/133
1")+ 3-7+ N&t o S*e# T&n Ch!t+
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /0-
-
8/11/2019 steam turbine3
124/133
1")+ 3-7.!0+ Bolt He!te T!$le+
BOLT HEATER BOLT POSITION
DIS+ A,44=33 2RSOA ,3,2
RSOB ,,,2,=RSOC , and tighten them again to get the requiredelongation.
(ecord the lengths and elongation values9 in the coupling bolt tightening recordsheet furnished 1ig. -!52.
Take the turbo enerator Couplings run out at each bolt position after finaltightening of the coupling.
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /06 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
129/133
ASSEMBL/ PROCEDURES 1OR TURNING GEAR
"ssemble all parts in the reverse order of dismantling.
"pply silicon liquid sealant to the housing
Carryout oil flushing S* till the oil samples are in satisfactory status.
Tuning and ad
-
8/11/2019 steam turbine3
130/133
-
8/11/2019 steam turbine3
131/133
SIMULATION TEST O1 THROTTLE VALVE
1")+ 3-74++ SIMULATION TEST O1 THROTTLE VALVE
"#$"%C CO'(S& M&C)"%*C"+ M"*%T&%"%C&ST&"M T'(,*%& O$&()"'+ +&SSO% - "& /-/
-
8/11/2019 steam turbine3
132/133
1")+ 3-75 S"%&l!t"on Test of Go(eno V!l(es ,23 B: O9e!t"n) Lo!d L"%"te+
M&C)"%*C"+ M"*%T&%"%C& "#$"%C CO'(S&+&SSO% - "& /-0 ST&"M T'(,*%& O$&()"'+
-
8/11/2019 steam turbine3
133/133