Status of QIF – June 2012 Agenda

28
Status of QIF Development June 12, 2012 Hilton Head Island Dimensional Metrology Standards Consortium (DMSC) Dimensional Measurement Standards Consortium (DMSC) 1

description

Status of QIF Development June 12, 2012 Hilton Head Island Dimensional Metrology Standards Consortium (DMSC). Status of QIF – June 2012 Agenda. One view of the big picture Summary of May 2011 meeting QIF Library QMResults , QMPlans Data Models and XML Schema files Outreach Documentation - PowerPoint PPT Presentation

Transcript of Status of QIF – June 2012 Agenda

Page 1: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 1

Status of QIF DevelopmentJune 12, 2012Hilton Head Island

Dimensional Metrology Standards Consortium (DMSC)

Page 2: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 2

Status of QIF – June 2012Agenda

• One view of the big picture• Summary of May 2011 meeting• QIF Library• QMResults, QMPlans Data Models and XML

Schema files• Outreach• Documentation• Pilot Projects• Brief introductions of attendees

Page 3: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 3

QIF DesignQIF Requirements- Activity model

- Text descriptions- Lists and tables- Use Case Tables

ScenariosFunctional requirementsActors (e.g. commercial solutions)QIF data flow, non-QIF data flowSpecifications and User Documents

Data Model- elements- attributes- relationships

QMResults.xsd

Data Dictionary- elements, semantics, relationships

XML Schema & annotations

QMPlans .xsd

QIF LibraryFeatureTypes.xsd

PrimitiveTypes.xsdCharacteristicTypes.xsd

…….

QMStatistics.xsd

Page 4: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 4

QIF Activity Model

Page 5: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 5

Requirements - Use Case Tables

USE CASE NAME IMPORT MEASUREMENT RESULTSActors CMMs from 3 different vendors

1 SPC package Description

Pre Condition CMMs have written results using QMR

Post Condition

Begins When

Scenario (main)

Scenario (sub flow)

Alternative Flows

Remarks Yields interoperability

Page 6: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 6

Requirements

Specifications and Standards• ASME/ANSI Y14.5 (1994)• ASME/ANSI Y14.5 (2009)• DMIS 5.2• AS 9102a (a user request!)

Use Case DocumentsScenarios

Page 7: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 7

DMSC Organization

Page 8: Status of QIF – June 2012 Agenda

8

QIF Design Meeting 2011Name Company Tues Wed Thur

Admire, Ray Lockheed Martin X X XBaldwin, Jon MetroSage X XBrown, Robert Mitutoyo America X X XCheetham, Andrew Renishaw X X XDugenske, Andrew Georgia Tech X Hayes, Eric Nikon Metrology X X XHeagy, Rex Wilcox X X XHoffman, Matt Metrology Integrators X X Hoffman, Scott Metrology Integrators X X XHorst, John NIST X X XKarras, Lutz Carl Zeiss IMT X X XKramer, Tom NIST X X XMaggiano, Larry Mitutoyo America X X XMorihara, Rich Boeing X Nye, Wayne Pratt & Whitney X X XRippey, Bill - chairman, secretary NIST X X X

Sobel, Will System Insights, MTConnect X X X

Stone, Bob Origin X X XVenkatesh, Sid Boeing X Warndorf, Paul AMT X X XZhao, Fiona NIST X X X

Attendees (21 attendees)

Page 9: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 9

Summary of May 2011 Meeting(“reading of the minutes”) (10 pages)

• Overall Recommendations/Strategy– Marketing and Outreach are essential, to management as well as technical audiences– Support agile development, freely publicly available specifications and XML schema

files. Extensibility is important. – Design guideline: QIF is data models, not process – don’t constrain system

architecture– Traceability requirements: this scenario needs more precision.– Pursue pilot projects for validation, outreach– Requirement: Provide links to manufacturing processes (traceability)– Requirement: FAI AS 9102a– Introduced Use Case Tool and several tables– Business case is important, technically and for traction– Priority: QMPlanning, QMResults, QMStatistics, QMExecution, Measurement

Resource Information. – DMSC should support conformance testing of solutions

Page 10: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 10

Some QIF Strategy Issues

• So far we have had a small working group (but motivated, energetic, and good looking)

• How can we harness existing resources to make progress, and make sure QIF thrives?

• How can we increase our resources?• Will pilot projects accelerate testing, interest,

proliferation? What should their priority be?

Page 11: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 11

Summary of May 2011 Meeting• QCDirectives

– recommendation: the QCDirectives WG is the liaison to AP 242 committee and all other CAD and quality related standards groups.

– concerned with influencing/assessing upstream data flow– NIST and PDES "What do metrology system customers

and suppliers need in AP 242 ed 2 for interoperable Design to Inspection Planning information?

– recommendation: we should Interact/monitor with special interest group Tolmod

Page 12: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 12

Summary of May 2011 Meeting

• QMPlans– Specify what to inspect, not how, but….– Allow for specifying specific resources in Plans– Should MResourceI and QMRules be part of

QMP?– Rules: Lot sampling plan vs. point sampling plan– Optional ordering of steps

Page 13: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 13

Summary of May 2011 meeting

• QM Statistics– Includes QMD space

Page 14: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 14

Summary of May 2011 Meeting

• QMExecution– QMExecution language would be a replacement

for DMIS input, not output– Is XML a good match for format?– Is human readable important? (“so 80s”)– Do not start on QME immediately. When QMP

and QMR take off, then that would be the time to hit QME development hard. Pursuing QME now, would be costly.

Page 15: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 15

Summary of May 2011 Meeting

• QMResults– Pursue liaison with MTConnect, including

measurement results, and potential for CMM utilization (OEE).

– Requirement: traceability to inspection and manufacturing processes

– Liaison/harmonization with ANSI Y14.45?

Page 16: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 16

Summary of May 2011 Meeting

• Start new QM Resources WG– possible rename of the specification is QMAssets.– Will MRI describe CMMs, stylii length, ball

diameters, probe wrists, caliper max length?–

Page 17: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 17

Summary of May 2011 Meeting• Start new QMRules WG (lower priority)

– are measurement rules defined in the QMPlanning realm? Have we adequately defined "measurement rules"?

– Functional requirements: QIF must specify measurement rules used for e.g., cast surfaces, sheet metal, machined surfaces, printed wiring boards.

– Scope: e.g., number of sample points, lot sampling policies

– Specify DME resources in priority order – Note: there is an ISO standard for measurement rules.

Page 18: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 18

Walk Through of Current Data Models• QIF Library• QMResults• QMPlans• QMResources

Page 19: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 19

Take it away Tom Kramer!

Page 20: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 20

Status of QIF Documentation

• Conference papers (2)• QIF Usage and Design Guidelines document • Sample data files• Rough draft of AS9102a FAI mapping

guidance for use of QIF (QMResults WG)• In-schema annotations - a coming attraction• Data Dictionary – a coming attraction• Next steps?

Page 21: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 21

Status of Outreach• Informational marketing and technical credibility

– Pilot Projects and Data Examples– IMTS 2012 or other trade show Demo– Audience: Users and Solution vendors

• Standards Liaison– DMIS harmonization– ANSI Y14.5– MTConnect – International Aerospace Quality Group (IAQG) – Model Based Engineering

• International Aerospace Quality Group (IAQG)– Digitization of FAI AS 9102a, adaptation to MBE

Page 22: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 22

QIF Pilot Projects

• Lockheed Martin stamped part, inspection by multiple DMEs

• MTConnect liaison• IMTS 2012 Demo

Page 23: Status of QIF – June 2012 Agenda

Inspection Plan in AS

9102 format(DISCUS)

Lockheed NIST QMP.xml

CAD + GD&T

NISTSoftware

DMIS

Project Stage 1 Benefits: provides example XML file, validates QMP schema.

Project Stage 1

QMS Pilot Project (NIST-LMC)

Page 24: Status of QIF – June 2012 Agenda

Measurement requirements (CAD + GD&T)

CMMProgram CMM A Results

NIST QMR.xml

CMMProgram CMM B Results

QMS Pilot Project (NIST-LMC)

Continued fromPhase 1

Project Stage 2

Project Stage 3

RSI(DISCUS)

QMR.xml

Lockheed CMMs

Page 25: Status of QIF – June 2012 Agenda

QIF + MTConnectMTConnect uses standard interfaces for

quality dataQIF data models will be validated

Technology suppliers and users benefit! → savings in time, resources, $$

Page 26: Status of QIF – June 2012 Agenda

CADmodel

PC-DMIS Planner

IMTS Interoperability Demo

Planning product W

PlanQMplan format

MeasurLink

Measuring product X

ResultsQMresults format

Reporting product Y

Reporting product Z

Bill, I think the compelling story must be “interoperability”. I think the concern has to be that it must look different than two years ago, e.g. more participation. I think this is much more important than showing connections to other standards. How QIF melds with other standards can be discussion items during the presentation and/or part of the information on the booth signs, but doesn’t need to be part of the live demo. The attached is something that I sent to Bob after Tuesday’s meeting. I feel that the next step, before the June meeting, is to determine who vendors W, X, Y and Z are. Note this drawing has eight data flow paths --- interoperability! Joe

Page 27: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 27

Brief Self Introductions

• Name• Company• Position• Your Goals, mission for this meeting

Page 28: Status of QIF – June 2012 Agenda

Dimensional Measurement Standards Consortium (DMSC) 28

End Status of QIF