Status of Preparations for the Unit 2 Primary Containment Vessel Internal Investigation
December 27, 2018
Tokyo Electric Power Company Holdings, Inc.
1
1 Results of PCV internal investigation implemented in January, 2018
Image source and rendering: International Research Institute for Nuclear Decommissioning (IRID)
During the PCV internal investigation implemented in January 2018, the investigation unit was lowered from the area above the missing grating to examine the bottom of the pedestal. It was found that the existing structures show no major deformity or damage and that pebble and clay-like deposits cover the entire bottom of the pedestal.
When viewing the area left of center of the pedestal from the location where the camera was lowered, fallen objects, such as parts of a fuel assembly (top tie plate), could be seen in the vicinity and the height of deposits in this area was higher than that in the surrounding area. Therefore, it is possible that the area directly above this location marks one of the paths by which fuel debris fell.
Piece of fallen grating①(Seen during January 2017 investigation)
CRDreplacer elevator
Puddle
Puddle
Side of cable tray Worker access opening
Resting place of fallen pipe-like object
Resting position of fallen spring-like objects
Resting place of fallen rod-like object
Area where deposits are relatively high (Directly below fallen platform grating ①)
Resting position of fallen top tie plate(Near pedestal inner wall)Camera direction
Telescopic investigation device
Investigation unit
Pedestal
2
2 Overview of the PCV Internal Investigation to be implemented
Scope of the PCV internal investigation to be implemented this time
RPV
Containment vessel penetration pipe to be used (X-6 penetration)
Primary Containment Vessel(PCV)
Control Rod Drive (CRD) replacement rail
Pedestal opening
Pedestal
Platform
Control Rod Drive mechanism (CRD) housing
Scope of this investigation
Worker access opening
Approx. 7.2m
Subfloor
Point where investigation unit will be lowered
Since the nature (hardness, frailty, etc.) of the deposits observed at the bottom of the Unit 2 pedestal is unknown, it is important to ascertain in advance whether or not these deposits can be removed by grasping them.
During this investigation the investigation unit will be lowered from the same location it was lowered to the bottom of the pedestal during the January 2018 investigation to touch the deposits at the bottom of the pedestal and observe its behavior.
Image source and rendering: International Research Institute for Nuclear Decommissioning (IRID)
3
3 Investigation method(1/2)
Concept diagram of Unit 2 PCV internal investigation using the guide pipe
Platform
Isolation valve Pedestal
Control Rod Drive
PCV penetration pipe
(X-6 penetration)
Extendable concentriccylinders with differentdiameters (extendable pipe)
Tip bend control unit Guide pipe
(Φ110mm)
PCV
Cable
Alternative shield
Investigation unit to be used this time
Investigation unit used in January, 2018
Modified
Cable drum
After the investigation device reaches the area above the missing grating, the investigation unit will be lowered to touch deposits under the platform and observe its behavior. Photographs, videos and dose data will be taken before touching the deposits and saved as information used to examine the accident.
The investigation unit used in January, 2018 will be modified so that a finger-like mechanism can be actuated to subject the deposits to mechanical force and observe the behavior of the deposits.
As with prior PCV internal investigations, the concentration of radioactive substances in dust will be monitored during the investigation using dust monitors to confirm that gasses from inside the PCV are not leaking out and impacting the external environment.
Image source and rendering: International Research Institute for Nuclear Decommissioning (IRID)
4
3 Investigation method(2/2)
As with the PCV internal investigation conducted in January~February, 2017, a boundary will be formed as shown below by sealing the sliding part of the guide pipe with double O-rings and pressurizing the pipe with nitrogen to prevent gas inside PCV from leaking outside and affecting the surrounding environment during the investigation. A similar boundary will be formed for the sliding part of the cable as well.
Platform
Isolation valve Pedestal
Control Rod Drive
Tip bend control unit Guide pipe
(Φ110mm)
PCV
Cable drum
Sliding part of guide pipe is sealed with O-rings
Isolation valve (open)
Boundary
Pressured nitrogen
Inside of PCV
Pre
ssure
d
nitro
gen
Overview of sealing the cable sliding part
Sliding part of cable is sealed with O-rings
Cable
Investigation unit
Shield
Clamp
Alternative shield
Alternative shield
PCV penetration pipe
(X-6 penetration)
Extendable concentriccylinders with differentdiameters (extendable pipe)
Investigation unit to be used this time
5
4 Modification of the investigation unit
The cameras and lights on the end of the investigation unit have been modified, and the unit has been equipped with a finger-like mechanism.
After the finger mechanism is allowed to come in contact with the deposits, the fingers will be actuated to subject the deposits to mechanical force and observe the behavior of the deposits.
Investigation unit used in January, 2018
Modified
Appearance of the investigation unit
CameraLight
Dosimeter, Temperature gauge
Skirt to prevent foreign material intrusion/snagging
Camera
Light Light
Finger
Skirt to prevent foreign material intrusion/snagging Dosimeter,
Temperature gauge
Direction alteredby spinning
Opens/closes after coming in contact with deposits
※The scope of the area that can be accessed is shown in the video shot in January, 2018 and may be changed depending upon actual conditions. 6
Bottom of pedestal
垂直断面図
Extendable pipe
CRD housing
Fallen grating
CRD rail
Investigation location
CRD replacement mechanism
Platform
5 PCV internal investigation location
Pedestal center
Planned investigation location※
Investigation location (taken in January, 2018)
7
Work item
2019
January February March
Preparation
PCV internal investigation
PCV internal investigation
6 Planned schedule
Training
Investigation device brought in and installed
Training will begin in January, 2019. After that the investigation device will be brought onsite and installed.
The PCV internal investigation will be conducted from the middle to the end of February, 2019. The investigation is scheduled to take one day, and the date will be determined based on work progress at the site.
8
CRD rail
Area A
Area B
Area A:Inaccessible because the extendable pipe touches the pedestal wall
Area B:Inaccessible due to the shape of the opening left by the fallen grating
Part A
Part B
Pedestal center
Scope of access at the bottom of the pedestal during this investigation
(reflected in the video shot in January, 2018)
Result of investigation in area B (taken in January, 2017)
Pedestal center
Investigation location
Reference: Results from deliberating the scope of access
Area B
Positional relationship of CRD rail and fallen grating