Status of ESMAP Portfolio of Projects As of June 30, 2002 Energy Sector Manacgement Assistaince Programme ME~~~~~~~~~~~~~~~~ o vrA A A~~~~~~~~~~A August 2002 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... ·...

Page 1: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Status of ESMAP Portfolio of Projects

As of June 30, 2002

Energy

Sector

Manacgement

Assistaince

Programme

ME~~~~~~~~~~~~~~~~ o vrA

A A~~~~~~~~~~A

August 2002

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

JOINT UNDP / WORLD BANKENERGY SECTOR MANAGEMENT ASSISTANCE PROGRAMME (ESMAP)

PURPOSE

The Joint UNDP/World Bank Energy Sector Management Assistance Programme(ESMAP) is a special global technical assistance partnership sponsored by the UNDP,the World Bank and bi-lateral official donors. Established with the support of UNDP andbilateral official donors in 1983, ESMAP is managed by the World Bank. ESMAP'smission is to promote the role of energy in poverty reduction and economic growth in anenvironmentally responsible manner. Its work applies to low-income, emerging, andtransition economies and contributes to the achievement of internationally agreeddevelopment goals. ESMAP interventions are knowledge products including free technicalassistance, specific studies, advisory services, pilot projects, knowledge generation anddissemination, trainings, workshops and seminars, conferences and roundtables, andpublications. ESMAP work is focused on three priority areas: access to modern energy forthe poorest, the development of sustainable energy markets, and the promotion ofenvironmentally sustainable energy practices.

GOVERNANCE AND OPERATIONS

ESMAP is governed by a Consultative Group (the ESMAP CG) composed ofrepresentatives of the UNDP and World Bank, other donors, and development expertsfrom regions which benefit from ESMAP's assistance. The ESMAP CG is chaired by aWorld Bank Vice President, and advised by a Technical Advisory Group (TAG) ofindependent energy experts that reviews the Programme's strategic agenda, its workplan, and its achievements. ESMAP relies on a cadre of engineers, energy planners, andeconomists from the World Bank, and from the energy and development community atlarge, to conduct its activities under the guidance of the Manager of ESMAP.

FUNDING

ESMAP is a knowledge partnership supported by the World Bank, the UNDP and officialdonors from Belgium, Canada, Denmark, Finland, France, Germany, the Netherlands,Norway, Sweden, Switzerland, and the United Kingdom. ESMAP has also enjoyed thesupport of private donors as well as in-kind support from a number of partners in theenergy and development community.

FURTHER INFORMATION

For further information, a copy of the ESMAP Annual Report, or copies of project reports,etc., please visit the ESMAP website: www.esmap.orp. ESMAP can be reached by email atesmapaworldbank.ora or by mail at:

ESMAPc/o Energy and Water

The World Bank1818 H Street, NW

Washington, DC 20433U.S.A.

Page 3: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Table of Contents

ForewordAcronyms and Abbreviations iiiESMAP Portfolio at a Glance (June 30, 2002) vii

Region / Country Project Title Task Manager Page

Africa Region Clean Air Initiative in Sub-Saharan African Chantal Reliquet Page 1Cities

Africa Region Development of a Regional Power Market in Said R. Mikhail Page 3West Africa

Africa Region Power Trade in Nile Basin Phase 2 Mangesh Hoskote Page 5

Africa-Global;AFR Energy and Poverty Reduction Workshop Laurent Durix Page 7

East Asia and Cambodia - Renewable Energy Action Plan Enrique 0. Crousillat Page 9Pacific--Cambodia

East Asia and Designing a Poverty-focused, Dominique M. Lallement Page 11Pacific-Cambodia Gender-sensitive Monitoring and Evaluation

Plan for a World Bank Renewable RuralElectrification Project

East Asia and Capacity building for national and provincial Charles A. Husband Page 13Pacific--China socially and environmentally sustainable

management of coal resources in China

East Asia and China: Policy Advice on Implementation of Masaki Takahashi Page 16Pacific-China Clean Coal Technology projects. Phase II

East Asia and Sulfur Emission Mitigation Policies Todd M. Johnson Page 18Pacific--China

East Asia and Pacific Regional Electricity Market: Mekong Basin Jean-Pierre Charpentier Page 20Region Power Pool Phase II

East Asia and Philippines - Village power fund and incubator Selina Wai Sheung Page 22Paciflc--Philippines for renewable energy enterprises Shum

East Asia and Motorcycle Fleet Upgrade to Reduce Air Jitendra J. Shah Page 24Pacific-Thailand Pollution in Bangkok

East Asia and Power Pool Study Ranjit J. Lamech Page 26Pacific--Thailand

East Asia and Vietnam - Policy dialogue seminar and new Paulo De Sa Page 28Pacific-Vietnam mining code

Europe and Central Azerbaijan - Natural Gas Sector Restructuring Alan F. Townsend Page 30Asia--Azerbaijan and Regulatory Reform

Europe and Central Energy efficiency in urban water utilities in Ede Jorge ljjasz-Vasquez Page 32Asia-Central Asia Central Asia

Europe and Central Asia Multilateral Energy Sector Assistance to the Bjorn Hamso Page 34Region EU Accession Countries

Europe and Central Lithuania - Heating supply to small cities/towns Gary Stuggins Page 38Asia--Lithuania

Europe and Central Key Aspects of Energy-EnvironmentVGHG James Sayle Moose Page 41Asia-Macedonia Strategy

Europe and Central Energy Efficiency (Reconnaissance) Varadarajan Atur Page 43Asia-Romania

Europe and Central Turkey: Energy and Environment Review James Sayle Moose Page 45Asia-Turkey (Phase l1l)

Global Advancing Modem Biomass Energy Willem M. Floor Page 47Opportunities & Challenges

Global Assessing the impacts of energy sector reform Robert W. Bacon Page 50on the poor

Page 4: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Table of Contents

Region / Country Project Title Task Manager Page

Global Best Practices for Grid Electrification - Phase Douglas French Barnes Page 522

Global Global Village Energy Partnership (GVEP) Dominique M. Lallement Page 54

Global Rapid Assessment for Meeting Immediate James Richard Davis Page 56Needs for Water and Energy Services

Latin America and Training Program for Key Group Eleodoro 0. Mayorga Page 59Caribbean--Bolivia Representatives From Indigenous People Alba

Regional Organizations/Rural EnergyDevelopment, Phase 2

Latin America and Good Practice Case Study in Integrating Juan D. Quintero Page 65Caribbean-Bolivia;Brazil Environment into Gas and Oil Pipeline

Projects: Experiences Based on theBolivia-Brazil Gas Pipeline

Latin America and Brazil - Rural Electrification Strategy Jayme Porto Carreiro Page 67Caribbean--Brazil

Latin America and Energy Efficiency in Medium and Small Water Amarquaye Armar Page 70Caribbean-Brazil Supply UUilibies

Latin Amenca and Ecuador - Indigenous people's training Eleodoro 0. Mayorga Page 72Caribbean-Ecuador program on oil development projects Alba

Latin America and Health impacts of traditional fuel use Kulsum Ahmed Page 74Caribbean-Guatemala

Latin America and Technical Assistance to Proposed Expansion Clemencia Torres Page 76Caribbean-Honduras of Solar-Net Village Program

Latin America and Central America Gender in Sustainable Energy Maria C. Correia Page 79Caribbean Region

Latin America and Evaluation of Bank Experience with Integrated Dana Rysankova Page 81Caribbean Region Rural Electrification Projects - Seed Funding

Latin America and LCR - Low income energy assistance Quentin T. Wodon Page 83Caribbean Region

Latin America and Refining Industry in LCR - Sector Reform and Eleodoro 0. Mayorga Page 85Caribbean Region Fuel Quality Improvement Alba

Latin America and Regional Interconnecton b/w Southern Jean-Pierre Charpentier Page 87Caribbean Region American Electricity Markets Phases I & II

Latin America and Regulatory issues of off-grid energy service Clemencia Torres Page 89Caribbean Region delivery as part of national rural electrification

strategies

Latin America and Rural Electrification & Power Reform in Douglas French Barnes Page 91Caribbean Region Central America

Latin America and Energy Sector Reform - Phase 1 Jonathan D. Halpem Page 93Caribbean-Mexico

Latin America and Mexico - TA for long-term program for Oscar Avalle Page 95Caribbean-Mexico renewable energy development

Latin America and Nicaragua - Pilot commercializabon of Clemencia Torres Page 97Caribbean-Nicaragua improved cookstoves

Latin America and Policy & Strategy for the Promotion of Clemencia Torres Page 99Caribbean-Nicaragua Renewable Energy Resources in Nicaragua

Middle East and North Global Efficiency in Sidi Bemoussi Industrial & Rene G. Mendonca Page 101Africa-Morocco Peri-Urban Area

Page 5: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Table of Contents

Region / Country Project Title Task Manager Page

South Asia--Bangladesh Towards Formulating a Rural Energy Strategy Douglas French Barnes Page 103

South Asia--India Access of the Poor to Cleaner Household Kseniya Lvovsky Page 105Fuels in India

South Asia--India Household Energy & Womens Lives: The Douglas French Barnes Page 107Case of India

South Asia-India Household Energy, Air Pollution and Health Kseniya Lvovsky Page 109

South Asia-India India - Environmental Policies for the State Mudassar Imran Page 111Power Sector - Rapid Assessment forKarnataka & Uttar Pradesh

South Asia Region South Asia Urban Air Quality Management Masami Kojima Page 113Strategy

Page 6: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,
Page 7: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

n CXJA A 1D3Joint UNDP/World BankEnergy Sector Management Assistance Programme

Foreword

This report presents the status of ongoing ESMAP projects for the six-monthperiod ending June 30, 2002. Its primary audience is the community of ESMAPdonors and partners.

It is important to note that commitment and disbursement information forall projects is based on a new World Bank-wide financial reporting tool.Since this tool is currently being harmonized with ESMAP financial informationrecords, commitment and disbursement figures for some projects may not reflectactual changes in project budget status over the reporting period. Budgetinformation for projects whose allocations are kept in donor country currenciesmay also experience discrepancies due to foreign exchange fluctuations.

While we have given close scrutiny to the data presented in this report, we wouldappreciate it if readers of this document can point out any discrepancies theymay be able to identify. ESMAP intends to remove any such discrepanciesbefore the end of the current reporting period.

The content of this volume is available for online dissemination to ESMAP donorsthrough the ESMAP web site. Detailed instructions on how to access thisinformation online have been distributed to donors via e-mail. Any furtherinformation about this volume and its contents may be obtained by sending an e-mail message to: esmap©worldbank.org.

ESMAPWashington, D.C.August 2002

Page 8: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,
Page 9: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Abbreviations and Acronyms

The list below provides definitions of ESMAP-specific and general terms. Each projectmay have more project-specific abbreviations and acronyms which are not identified here.

AAA Analytical Advisory Services

ACR Activity Completion Report

AFR Africa Region

AFFREI Africa Rural and Renewable Energy Initiative

AIB Activity Initiation Brief. An AIB was prepared for all ESMAPactivities launched before 1998. It has been replaced by theProject Document which provides detailed information about theproject's background, objectives, schedule of activities andcosts. The Project Document describes the agreed-upon workprogram from which project implementation will be monitored.

ASTAE Asia Alternative Energy Program

BBLs Brown-Bag Lunches

CAS Country Assistance Strategy

CDD Community Driven Development

CDM Claim Development Mechanism

CD-ROM Compact Disk-Read Only Memory

CG Consultative Group

CIDA Canadian International Development Agency

Core Funds or financial contributions to ESMAP which are unrestrictedor untied to procurement or disbursement in specific countries

COP-7 Seventh Conference of the Parties

CSD9 Commission on Sustainable Development, Ninth Session

DFIs Direct Foreign Investors

DFID Department for International Development (UK)

DRIFs Demand-Driven Rural Investment Funds

EAP East Asia & Pacific Region

ECA Europe & Central Asia Region

EDR Energy Development Report

iii

Page 10: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

EE Energy Efficiency

EER Energy-Environment Review

EIA Environmental Impact Assessment

ESCOs Energy Service Companies

ESMAP Energy Sector Management Assistance Programme

EU European Union

GEF Global Environment Facility

GENES Gender & Energy Network

GHG Greenhouse Gas

GLB Global

HIV/AIDS Human Immunoficiency Virus/Acquired ImmunodeficiencySyndrome

IBRD International Bank for Reconstruction and Development

ICR Implementation Completion Report

IDA International Development Association

IAP Indoor Air Pollution

ICT Information and Telecommunications Technologies

IEA International Energy Agency

IEPF Institut de 1'energie et de 1'evironnement de la francophonie

IFC International Finance Corporation

IFC-PDS IFC Project Data Sheets

IMF International Monetary Fund

IPCC Inter-governmental Panel on Climate Change

IRD Integrated Rural Development

LCR or LAC Latin America & Caribbean Region

LPG Liquefied Petroleum Gas

LSMS Living Standard Measurement Survey

LULUCF Land Use, Land-Used Change, and Forestry Programme

iv

Page 11: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

M&E Monitoring & Evaluation

MDGs Millennium Development Goals

MNA or MENA Middle East & North Africa Region

NGO Non-governmental Organization

OECD Organisation for Economic and Co-operation and Development

OED Operations Evaluation Department

PCF Prototype Carbon Fund

PCDs Project Concept Documents

PIF Project Implementation Form

PPI Public Provision of Infrastructure

PPIAF Public-Private Infrastructure Advisory Facility

PRSPs Poverty Reduction Strategy Papers

PV Photovoltaic

RIl Rural Infrastructure Initiative

RPTS Regional Program on the Traditional Energy Sector

SAR South Asia Region

SIF Social Investment Fund

SMEs Small and Medium Enterprises

TOR Terms of Reference

TA Technical Assistance

TAG Technical Advisory Group

TFs Trust Funds

TMs Task Managers

UN United Nations

UNDP United Nations Development Programme

USAID United States

VPP Village Power Partnership

WCD World Commission on Dams

v

Page 12: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

WHO World Health Organization

WBG The World Bank Group

Other ESMAP terms

White Cover Refers to the first draft version of a report on an ESMAP project.

Yellow Cover Refers to the second draft version of a report on an ESMAPproject.

Green Cover Refers to a draft final version of a report on an ESMAP project.

Final Cover or Report The final report on an ESMAP project which becomes a publicdocument.

vi

Page 13: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ESMAP Portfolio at a Glanceas of June 30, 2002

Breakdown by Thematic Area Number of Projects(as a % USS Value) by Thematic Area

Soctar Relorm sector Reform Effniergcy

_~~2 1% 18 5% Efficiency 111

Rural & Per,-.,be. 2

30 7% s -;

Eney Efficiency . -. nvironment_ _ / -7.9% -- ; -1;t -~7.9%27 8%

R,,iral & Pm,luran / 27e

Renewabes lr

mine one ade OTher 93%~~~~~~~R 0- Tad

6% Renewa-les T Interntonal Trade13 3% 5 6%

Breakdown by Geographic Area Number of Projects(as a % US$ Value) East Aua and by Geographic Area

Aftlue Pacific South ASIa AM s1 %155 Middle at n J f 74% East Asia and

Sboth Asla Easterm Europe Neast Afeca PacificMiddle6East 9X and Central Asia 19% 18 5%

MNddeEast and69 Fi \

r4%ca .7%

Globalft 2%

Eastern Eur pe

Latin Amerca nd and Central

352% 148%

Latin Amerl,a endCan1bbean Global

506% 11 1%

Breakdown by Strategic Area Number of Projects(as a % US$ Value) by Strategic Area

Other Other3.1% 74

Market37 %

7 Aucess Acc/ / ~~~~~~ U17~f72%/

M.rloet 222%62 3%

- _!Eno-ronMent17.4%

Ennir33r e3r33 3%

Page 14: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,
Page 15: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I -E -c Z AA n Africa Region 1P070684

Project Title: Clean Air Initiative in Sub-Saharan African Cities

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Belgium

Task Manager: Chantal Reliquet

Project Development Objective Key Indicator

Reduction of air pollution, especially lead, generated Adoption of Action Plans.by motorized transport in Sub-Saharan Africa particularlyin Cotonou, Benin. Preparation of legislation on fuels and vehicles.

Adoption and enforcement of legislation on lead-freegasoline.

Expected Outputs Key Indicators1. Cotonou, Benin Effectiveness of national seminar (number and* Increased awareness of the dangers of urban air representativeness of participants, seminar quality).pollution; stakeholder endorsement of policies tomitigate vehicle pollution.* Baseline and updated data on vehicle emissions Availability of data and conclusions of case study.and in-depth analysis of air quality and pollution effectson local health and productivity.* Identification of cost-effective measures and outline Proposed measures:of action plan. - fuel-targeted

- vehicle-targeted2. Lead Phase-Out - traffic management.

Consensus on lead phase-out policy at countrylevel. Policy guidelines.

Change in regulation regarding leaded and National action plan.unleaded gasoline.

Progressive adoption of unleaded gasoline. * Legislation (phasing, tax incentives, enforcementBest practice cases for dissemination. and control).

Implementation Progress

Component Activities

Capacity Building;Case Studies and National seminars;Creation of a regional network ofexpertise;Dissemination;lmplementation of action plans: Dakar, Ouagadougou, Abidjan, Cotonou,Lagos;lmplementation of action plans: Douala, Harare, Nairobi;Phasing out of leaded gasoline;Program Coordinationand Management;Purchase of monitoring equipment.;Regional seminars;Research and development;Setup of nationaland regional databases

Approval Date: 3/24/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 05/18/2002 12/31/2002

Project Closing (all financial transactions executed): 06/15/2002 03/31/2003

1

Page 16: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I -r N 1\ ^ AAD Africa Region*11 V ILt 'LI ~~~~~~~~~~~~~~P070684,

Summary of Current Project Status, Issues and Actions:

07/11/2002: The January 1 - June 30, 2002 period was marked by the progress made by the sub-regional groups onthe phase-out of leaded gasoline. Among these, the West Africa group (with key refinery centers in Cote d'lvoire,Ghana, and Senegal): the West Central Africa group (with key refinery centers in Cameroon, DRC, and Gabon); andthe East Africa group (with one key refinery center in Kenya) were the most active.

(1) West Africa: a sub-regional workshop, organized by the Clean Air Initiative, IPIECA, Africaclean, and DakarUrban Transport Agency, was held in Dakar, Senegal; March 26-27, 2002. Eighty participants from Burkina Faso,Cote d'lvoire, Ghana, Mauritania, and Senegal participated in the workshop. The discussion focused on the progressmade in the phase-out of leaded gas in the sub-region, highlighting in particular the experience of Ghana, where thephase-out is scheduled to be completed by January 1, 2003. Phase-out should be completed by 2005 in the othercountries.

One of the strongest recommendations of the workshop was to place the issue of lead phase-out, and, more broadly,the issue of urban air pollution on the agenda of the Energy group recently launched by NEPAD.Another development was the scaling-up of "Africaclean", the network of air pollution experts sponsored through theInitiative.

(2) West Central Africa: a sub-regional regional workshop, organized by the Clean Air Initiative and Africaclean andhosted by Benin's Ministry of Environment, was held in Cotonou, Benin; April 11-12, 2002. About 110 participantsfrom Nigeria, Benin, and Niger (sub-regional group countries) as well as Ivory Coast and Senegal (as observers)attended the workshop.

The main output of the workshop was the adoption of a sub-regional action plan to phase out of leaded gasoline byend 2004 at the latest. The Action Plan benefited from the recent adoption of the national action plans of Nigeria(November 2001) and Benin (both sponsored through the Initiative). The sub-regional action plan stipulates areduction of the level of lead in gasoline to 0.15 g/l in 2002 and 0 bye end 2004. There was a strong consensus toadopt a uniform RON grade (93), in order to reduce distribution costs. Additional awareness campaigns, involvingNGOs, will be launched in the coming months.The sub-regional action plan is attached.

(3) East Africa: a sub-regional working group, organized by UNEP, IPIECA, USEPA, and the Clean Air Initiative washeld in Nairobi, Kenya; June 5-7, 2002. It was attended by over 90 participants from the sub-region. The participantsagreed on a sub-regional action plan (attached) on the lead phase-out. A review, organized by UNEP, will take placeduring the second half of 2003 or early 2004, in connection with the meeting of African ministers of Environment(AMCEN).

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $210,000 $210,000 $6,471 $0 $82,987 $127,013

World Bank (BB) $1,243,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Fund $0 $0 $0 $0 $0 $0

Total $t 1,453,000 $210,000 $6,471 $0 $82,987 $127,013

2

Page 17: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Africa RegionIC NA A DLjivii %1 ~~~~~~~~~~~~~~~~~~~~~P068875

Project Title: Development of a Regional Power Market in West Africa

Business Line: Market Development - Regional Markets

Origin of Funds: France

Task Manager: Said R. Mikhail

Project Development Objective Key Indicator

To pave the way for the development of a regional power Publication of issues report highlighting the potentialmarket and more precisely to review, analyze and bottlenecks and stressing the key issues to bepropose options for solving key issues in the political, investigated for the successful implementation of aorganizational, legal, structural, technical, financial and regional power market.commercial domains

Expected Outputs Key Indicators- Project mandated in due time - Successful completion of each project steps within- A political agreement between the various countries budget and time constraints.

for embarking on the development of a regional power - Joint agreement between members of the core groupmarket of countries- A comprehensive issues report including: technical, - Issue report accepted by the World Bank peercommercial, institutional and legal issues and reviewers and the participating countriesrecommendations - Agreed composition of the Steering and Working-Set-up of an operational Working Group and a Group of regional expertsSteering Group of decision makers able to stimulatefurther development and implementation of theforeseen market

Implementation Progress

Component Activities

Launching of a workshop with the assistance of consultants to designate a Task Force and draft TOR ;Organization of aRegional workshop;Preparation of proceedings of recommendations and recommended modus operandi for theimplementation of a regional power ;Publish and disseminate workshop findings.

Approval Date: 12/15/1998

Expected Dates for: Original Revised

Project Completion (all project activities completed): 10/01/2000 06/30/2002

Project Closing (all financial transactions executed): 12/01/2000 08/31/2002

3

Page 18: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

0 ~~~~~~~~~~~~~~~~~~~~~~~~~~~P068875

Summary of Current Project Status, Issues and Actions:

06/11/2002: During this period, activities were merged with those of the Africa Region of the World Bank and focusedon the preparation of a draft PCD for an investment program aimed at supporting some key missing interconnectionlines, the implementation of an Information Coordination Center in the region and the development of possibleregulatory procedures in the region. The key event has been the meeting held with all ECOWAS members andseveral donors in Accra (Ghana) from 2 to 5 April 2002. The purpose of the meeting was to coordinate with differentdonors and to get agreement on the scope of the forthcoming World Bank investment program scheduled to bepresented to the Board by end 2003. In addition to physical investments several additional technical assistanceprograms were identified and requested including assistance to investigate the possibility for taking advantage ofadditional transmission lines to enhance rural and peri-urban electrification. A proposal in this domain has beenprepared and submitted to ESMAP management for evaluation.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $94,244 $94,244 $0 -$3,766 $94,244 $0

World Bank (BB) $0 $5,435 $0 $0 $5,435 $0

Non-ESMAP Trust Funds $0 $20,000 $0 $0 $20,000 $0

Total $94,244 $119,679 $0 -$3,766 $119,679 $0

4

Page 19: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

K N A A D Africa Region

P070940

Project Title: Power Trade in Nile Basin Phase 2

Business Line: Market Development - Regional Markets

Origin of Funds: Core

Task Manager: Mangesh Hoskote

Project Development Objective Key Indicator

Advance a coordinated approach to the promotion of A Nile Basin Power Forum, with an agreed strategicregional electricity markets in Nile Basin countries. framework, creates an environment conducive to power

trade through continued dialogue, review and analysis ofcommon issues of interest, and information exchange

Expected Outputs Key Indicators1. High-level policy consensus to promote the 1. Mandate and guidelines to launch a power forum aredevelopment of regional electricity markets in the Nile agreed at policy level.Basin is established.

2. Agreed proposal for a Nile Basin Power Forum is2. The establishment of a regional power forum is developed and funding is secured for long-termlaunched. implementation.

3. XX Investment opportunities at sub-regional level areidentified and pursued within NBI Subsidiary Action

3. Investment opportunities at the sub-regional level Programs.(Subsidiary Action Programs are Identified)

Implementation ProgressComponent Activities

Engage in discussions with bilateral donors to secure long-term support for the Power Forum.;Hire consultants asnecessary to support the process.;Host Policy & Strategy Workshops for senior level power officials.;Host series oftechnical meetings with power sector technical representatives to formulate scope & function of Power For;ldentifypriority projects and develop project outlines for SAPs.;Plan Policy & Strategy Workshop with power sector technicalrepresentative;Review investment options identified in Scoping Study with representatives from sub-regional subsidiaryaction programs ;Submit Power Forum proposal to power officials for endorsement.

Approval Date: 12/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 10/01/2000 09/30/2002

Project Closing (all financial transactions executed): 01/01/2001 12/31/2002

Summary of Current Project Status, Issues and Actions:

07/26/2002: Next activity is preparation of report on Role of Power Trade on Regional Economic Development;(b)conducting a "visioning exercise" for the regional power trade program; and (c) organization of the First Meeting ofthe Nile Basin Energy Ministers.

5

Page 20: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $504,000 $504,000 $26,401 $24,058 $357,136 $146,864

World Bank (BB) $30,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $534,000 $504,000 $26,401 $24,058 $357,136 $146,864

6

Page 21: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

>ESN4JQ A AD Africa--Globai;AFR2-1 ~ IL 'LI s1 \ t .. _ ~~~~~~~~~~~~~~~~~~~~~~~~P077595

Project Title: Energy and Poverty Reduction Workshop

Business Line: Cross-Cutting - Knowledge Dissemination

Origin of Funds: Netherlands

Task Manager: Laurent Durix

Project Development Objective Key IndicatorTo ensure that the fundamental and beneficial effects of Substantive inclusion of energy in the Poverty Reductionmodern energy development are shared and understood Strategy Papers

Expected Outputs Key IndicatorsWorkshop proceedings and participants' groupwork Utilization of outputs in the PRSP processes ofoutputs participating countries

Implementation ProgressComponent Activities

Plan and conduct workshop

Approval Date: 2/4/2002

Expected Dates for: Original Revised

Project Completion (all project activities completed): 12/15/2002 No revision

Project Closing (all financial transactions executed): 02/15/2003 No revision

Summary of Current Project Status, Issues and Actions:

07/05/2002: Workshop on Modern Energy Services and Poverty Reduction: a Multi-Sectoral Approach

The concept of the workshop, an information brochure and its agenda have been designed in cooperation withAFTEG, and reviewed and approved by ESMAP and AFTEG Managers. Possible participants and multi-sectoralstakeholders are being contacted by the intermediary Country Offices in order to form country delegations toparticipate in the first Workshop, October 23-25, 2002, in Nairobi.

7

Page 22: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- >e S NvI'\LPAfrica--Global;AFRP077595

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $26,130 $26,130 $13,118 $26,288 $26,288 -$158

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $26,130 $26,130 $13,118 $26,288 $26,288 -$158

8

Page 23: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ES MA PA r East Asia and Pacific--Cambodiajl ;; ~~~~~~~~~~~~~~~~~~~~~~~~~P076113J

Project Title: Cambodia - Renewable Energy Action Plan

Business Line: Energy Poverty - Global Village Energy Partnership

Origin of Funds: Sweden;

Task Manager: Enrique 0. Crousillat

Project Development Objective Key Indicator

Ministry of Industry, Mines and Energy (MIME) and At least 10 projects preparedElectricite du Cambodge (EDC) improve performance inefficient rural renewable electricity supply At least 5 employees with necessary skills in MIME HQ

and EDC

MIME established rural-renewable energy budget line

At least 3 donor supported projects prepared in anefficient way, ready for implementation.

Expected Outputs Key Indicators(A) Renewable Energy Action Plan formulated;(B) A (Al) Identified technical, economic and market potentialstrategy for MIME to coordinate the International for renewable energy technologies for (i) small hydro (ii)Assistance for Renewable Energy Development solar PV and (iii) others; (A2) Identified at least 3formulated;(C) Dissemination Program implemented broader issues that cut across technologies e.g. policy,

planning and institutional;(B1) Draft final action plan anddraft donor coordination paper;(C1) At least 100 keystakeholders informed about the action plan

Implementation Progress

Component Activities

(Al) Renewable Energy Study tours and workshop implemented. ;(A2) Renewable Energy Study teams Formed(focussing on: (i) small hydro (ii) solar PV, and (iii) policy, financial and i;(A3) High level Renewable EnergyDevelopment Steering Committee established (to guide and coordinate work of the teams a;(Bl) High level RenewableEnergy Development Group Established (to guide and coordinate work of the teams and formulated;(Cl) Implementeddissemination Workshop;(C2) Formulated discussion and promotional material;(C3) Build Capacity at MIME to informpeople about the process

Approval Date: 5/11/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 12/31/2002 No revision

Project Closing (all financial transactions executed): 03/31/2003 No revision

9

Page 24: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

-r X E M A P DEast Asia and Pacific--Cambodia--.., ail v lf 'LI

P076113

Summary of Current Project Status, Issues and Actions:

07/24/2002: The REAP local project coordinator (Mr. Curtis Hundley) was contracted as of December 1, 2001.Additional contracts have been issued to: Winrock India for Strategy input, Economic analysis and Web Pagepreparation; Mr. Walpita for mini hydro business advice; Mr. Kunthap for policy advice; Mr Hundley for humanresource analysis; and EDC for facilitation of rural enterpreneurs to deliver renawable energy services.

Reporting of the workshop conducted from January 21-22, 2002 has been completed, and assignments for additionalwork have been issued.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $308,000 $308,000 $123,378 $96,274 $108,082 $199,918

World Bank (BB) $170,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $478,000 $308,000 $123,378 $96,274 $108,082 $199,918

10

Page 25: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

l M ES v N4.I A tp East Asia and Pacific--Cambodia

Project Title: Designing a Poverty-focused, Gender-sensitive Monitoring and Evaluation Plan fora World Bank Renewable Rural Electrification Project

Business Line: Cross-Cutting - Methodologies and M&E (for energy and for multi-sectoral programming)

Origin of Funds: Core

Task Manager: Dominique M. Lallement

Project Development Objective Key Indicator

To generate replicable 'good practices' for incorporating 1. ASTAE and ESMAP gain new methodology topoverty and gender considerations into World Bank incorporate poverty and gender considerations inrenewable rural electrification projects renewable rural electrification projects, which can be

disseminated and replicated by other Bank projects.

2a. C-REP project staff and local consultants applyingnew skills in poverty and gender analysis andparticipatory assessments.

2b. C-REP project staff commit to implementing at least75% of recommendations for M&E plan.

Expected Outputs Key Indicators1. Publishable report documenting the monitoring and Final report submitted to ESMAP, ASTAE/EnPoGen andevaluation (M&E) analytical framework developed for C-REP team;Dissemination seminar heldmeasuring the poverty- and gender-related impacts ofWorld Bank rural electrification projects, using theCambodia Renewable/Rural Electrification Project as acase study;2. Dissemination seminar to present thereport and key findings

Implementation Progress

Component Activities

1. Formulate a draft M&E framework for measuring poverty and gender impacts of Bank-supported rural electrificationproj;2. Adapt M&E framework to the Cambodia Renewable Energy Project context;3. Develop and disseminate finalreport documenting methodologies applied, obstacles faced and lessons learned

Approval Date: 8/3/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 03/30/2002 09/30/2002

Project Closing (all financial transactions executed): 06/30/2002 12/31/2002

Page 26: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

_ E S MAA East Asia and Pacific--Cambodia

P075883

Summary of Current Project Status, Issues and Actions:

09/05/2002: The project has produced a draft report which lays out the qualitative and quantitative methodologiesavailable for monitoring and evaluating the gender- and poverty-impact of development interventions. This reportslays out how the methodologies can be implemented as part of World Bank projects. The report is currently underreview. Due to delays in the preparation of the World Bank project for Cambodia, which was to 'test-drive' some ofthese methodologies, the project plan has been adapted to exclude this test.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $95,000 $25,000 $4,950 $13,752 $20,034 $4,966

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $95,000 $25,000 $4,950 $13,752 $20,034 $4,966

12

Page 27: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

< S 4ICNA A D East Asia and Pacific--China

P0761 111

Project Title: Capacity building for national and provincial socially and environmentallysustainable management of coal resources in China

Business Line: Cross-Cutting - Knowledge Dissemination

Origin of Funds: Netherlands

Task Manager: Charles A. Husband

Project Development Objective Key Indicator

* Capacity building within Federal and Provincial Capacity building within Federal and ProvincialGovernments to improve and enforce a legal and Governments to improve and enforce a legal andregulatory framework promoting the transparent access regulatory framework promoting the transparent accessto coal resources, namely for foreign investors, and to coal resources, namely for foreign investors, andsocially and environmentally sustainable energy socially and environmentally sustainable energypractices. practices.* Assisting the Central/Regional govemment to adjust Assisting the Central/Regional government to adjustthe coal sector's production to the desirable change in the coal sector's production to the desirable change indemand for better quality coals that is of higher calorific demand for better quality coals that is of higher calorificvalue and lower in ash and sulfur, and also to address value and lower in ash and sulfur, and also to addressthe inevitable closure of a large number of small, unsafe the inevitable closure of a large number of small, unsafeand inefficient mining operations in a socially and and inefficient mining operations in a socially andenvironmentally responsible manner environmentally responsible mannerIn the context of four selected coal mining projects, In the context of four selected coal mining projects,create a common understanding among local, provincial create a common understanding among local, provincialand national government agencies, mining and energy and national government agencies, mining and energycompanies, as well as civil society on how key coal companies, as well as civil society on how key coalresources should be developed. resources should be developed.

Expected Outputs Key Indicators

13

Page 28: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

l S~Y4IAD tv,^tEast Asia and Pacific--China

The main deliverables of the project will be: Reports, with specific attention to the variouscomponents listed below

* 1: Sector assessment, including : (i) current One local/regional conference (in country) perinstitutional framework; (ii) production and demand selected investmenttrends; (iii) social and environmental issues; and (iv) . An international conference, held within 2 monthsreform of SOEs. of the last assessment undertaken, conference

* 2: Review and analysis of existing legal and proceedings as well as a final report.institutional arrangements, proposals for improvement.

* 3: Review of current regulatory practice andexperience and proposals for improvement.

* 4: In the context of two public/privately fundedmining projects and based on international bestpractices, preparation of reports for social andenvironmental impacts of projects, framework forprivate sector investment.

5: in the context of two public/privately fundedmining projects, capacity building in local/regionalconsultation process, presenting the results achieved toa wider group of stakeholders, enabling a decisionmaking process.

6: A final report on lessons learned that can beintegrated into an overall summary of guidelines for theassessment of such issues by local/regional andnational governments.

7: International conference/consultation process,disseminating results achieved and lessons learned tofurther interested groups.

Implementation Progress

Component Activities

Task 1: Sector assessment. ;Task 2: Review and analysis of existing legislation, regulation and institutionalarrangements.;Task 3: Review of current regulatory practice and experience.;Task 4: In the context of four privatelyfunded coal mining projects, and based on international best practices, four s;Task 5: One local workshop will beorganized per project involving a wide set of stakeholders to stimulate a local/regio;Task 6: Conference disseminatingthe results achieved and lessons learned.

Approval Date: 7/23/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 09/30/2002 No revision

Project Closing (all financial transactions executed): 12/31/2002 No revision

14

Page 29: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

t ~~~~~~~~~~~~~~~~~~~~~~~~~~~~P076111t

Summary of Current Project Status, Issues and Actions:

06/23/2002: The draft preliminary review of the China coal sector was received in January from the local consultants.A workshop to review the report was held in Beijing on January 25, 2002, and was well attended by representativesfrom the Ministries of State Development and Planning, State Economic and Trade Commission, and Land andResources; Agencies for Environment, as well as Health and Safety; and Bank Staff from EAPEG. The day longmeeting was informative, constructive and well received by all participants. Comments received during the workshopwere incorporated into the final report that was received by the Bank at the end of February.

It became apparent from these discussions that the ESMAP study's natural counterpart was the SDPC whoexpressed interest in supporting further work of international consultants and coordinating specific inputs from SETCand MOLaR. It was also apparent that since the legal and regulatory frame of the sector was a great deal moreadvanced than had been anticipated, the TOR for the main study of program would need to be revised to shift theemphasis toward the institutional structure of the sector and its capacity to administer and properly manage thesector and its progressively more decentralized operations, and promote and attract private investment fromcompetent operators.

Procurement of Japanese consultants under the Japanese Consultant Trust Fund was therefore deferred toaccommodate this change and agree on the TOR with the SDPC. The TOR was revised and discussed with theSDPC during a short mission in June 2002. Comments from the ministry and their suggestions on local inputs andprocess are expected at the end of June.

Expressions of interest have nonetheless been received from a number of qualified Japanese consultants and firms,and the RFP documentation finalized and ready to be reviewed by an Bank evaluation commitee as soon as thecomments from SDPC are received. It is expected that the consultants for the main institutional, legal and regulatorystudy can be selected and moblized by mid August.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan I - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G-=B-E)

ESMAP Trust Funds $350,000 $350,000 $0 $49,964 $85,986 $264,014

World Bank (BB) $80,000 $1,997 $0 $1,997 $1,997 $0

Non-ESMAP Trust Funds $250,000 $0 $0 $0 $0 $0

Total $680,000 $351,997 $0 $51,961 $87,983 $264,014

15

Page 30: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Project Title: China: Policy Advice on Implementation of Clean Coal Technology projects. Phase

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Netherlands

Task Manager: Masaki Takahashi

Project Development Objective Key Indicator

To give policy advice to the government on how to - The government's plan for projects using CCTs usingimplement Clean Coal Technology demonstration and innovative financial mechanismscommercial projects - The government's plan for non-power CCT

demonstration and commercial projects

Expected Outputs Key Indicators1. A report of financing specific CCTs including IGCC 1a. A draft report of financing specific CCT due:financing;2. A report on policy advice on September 2001implementation of Clean Coal Technologies;3. A report lb. A workshop on financing CCT expected in Octoberon policy advise of non-power CCTs deployment 2001

1c. A final report and workshop proceedings due:December 2001 ;2a. A draft report on policy advice onimplementation of CCT due: October 20022b. A workshop is expected in November 20022c. A final report and workshop proceedings due:January 2003;3a. A draft report on policy advise onnon-power CCTs due: March 20023b. A workshop on non-power CCTs in April 20023c. A final report and workshop proceedings due: June2002

Implementation Progress

Component Activities

1. Financing specific CCTs: IGCC, PFBC, CFB and supercritical technologies etc.;Policy advice on non-power CCTsdemonstr;2. Policy Advice on Implementation of CCT projects: selection of consultant;3. Policy Advice onImplementation of CCT projects: Consultant's work;A workshop;Financing specific CCT's including IGCC financing withGEF

Approval Date: 5/18/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/30/2002 03/01/2003

Project Closing (all financial transactions executed): 09/30/2002 06/01/2003

16

Page 31: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

2 .kS.~VLI A East Asia and Pacific--China

P074684

Summary of Current Project Status, Issues and Actions:

07/09/2002:RFP was issued in February to five firms, and four proposals have been received. After an evaluation and selectionprocess, Mitsubishi Research Institute was selected as a contractor. A kick off meeting was held in Beijing in Junewith the Chinese counterpart: State Economic and Planning Commission. The contractor is in the process to form ateam with local and international consultants and will start work in July/August. A workshop is scheduled in March2003.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $50,000 $50,000 $10,200 $14,042 $16,925 $33,075

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Fund $0 $0 $0 $0 $0 $0

Total $50,000 $50,000 $10,200 $14,042 $16,925 $33,075

17

Page 32: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

East Asia and Pacific--ChinaI :d-.Liw]v Lf vi

P068523

Project Title: Sulfur Emission Mitigation Policies

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Sweden

Task Manager: Todd M. Johnson

Project Development Objective Key Indicator

To provide assistance to national and local governments Training of local and national officials.in China for efficient sulfur emission control. Reports and case studies.

Expected Outputs Key Indicators -1. Case studies;2. Dissemination;3. Policy 1. Quality of case studies;2. Number of local anddiscussions;4. Training national staff trained;3. Identification of cost-effective

policies and investment;4. Dissemination and use ofcase studies

Implementation Progress

Component Activities

Dissemination;Case study analysis;Policy discussions;Training

Approval Date: 9/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 12/01/2001 09/30/2002

Project Closing (all financial transactions executed): 03/01/2002 12/31/2002

Summary of Current Project Status, Issues and Actions:

08/07/2002: All activities for the project - training, environmental modeling, intervention analysis -- have beencompleted and the team is currently finishing the final report. The Chinese teams in the two cities completed theirreports in April, but did not provide the translated copies of the report until late June. Consultants are currentlyworking on integrating the two case studies into the final report, along with the financial/economic analysis of thepollution control interventions. The final report is expected to be ready for final copy editing by mid-September, 2002,and final printing by end-September.

18

Page 33: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $100,000 $100,000 $12,502 $0 $89,210 $10,790

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $100,000 $100,000 $12,502 $0 $89,210 $10,790

19

Page 34: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| ~ N A A D East Asia and Pacific Region

\ .. P068663

Project Title: Regional Electricity Market: Mekong Basin Power Pool Phase II

Business Line: Market Development - Regional Markets

Origin of Funds: Core

Task Manager: Jean-Pierre Charpentier

Project Development Objective Key Indicator

This activity is a component of a 3-year program for the Workshop on Coordination of technical issues fordevelopment of a regional electricity market in the sustaining an increasing level of trading activities.Greater Mekong Sub-region for which an Action Plan hasbeen developedImplementation of component (la) of the three yearAction Plan, i.e., Transfer of knowledge and promotion ofcoordination of technical issues.

Expected Outputs Key IndicatorsReport identifying major bottlenecks in communication Issue date: March 2000between dispatch centers and in transmissionavailability for enhancing power trading activities;

Workshop Proceedings including recommendations Issue date: May 2000agreed by the regional Experts Group to overcomeidentified bottlenecks.

Implementation Progress

Component Activities

Workshop;Report on identified technical bottlenecks;Workshop Proceedings

Approval Date: 12/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/01/2000 09/30/2002

Project Closing (all financial transactions executed): 08/01/2000 12/31/2002

20

Page 35: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

{ ~~~~~~~~~~~~~~~~~~~~~~~~~~~P068663

Summary of Current Project Status, Issues and Actions:

06/11/2002: A joint Asian Development Bank (ADB) and ESMAP was organized in Hanoi (Vietnam) from 13 to 19December 2001. The main objective of the ESMAP workshop was to transfer information on "Financing Issues andRole of the Private Sector in the Development of a Regional Power Market" to the GMS Group of Experts.Representatives from private development firms, international banks, legal offices as well as staff from theGuarantee and MIGA programs of the World Bank participated to this transfer of knowledge and to the activedebates. A proceedings has been prepared and circulated electronically (at least to participants with Email, otherreceived a hard copy).

The second objective of the workshop was also to discuss and agree on the final version of the Inter GovernmentalAgreement (IGA) developed for the GMS countries and which is expected to be submitted for approval to the nextGMS Ministers meeting which should take place in Cambodia during September 2002.

The last half day of the workshop was devoted to a large discussion on the next set of activities which could besupported by ADB and ESMAP. GMS participants requested an additional ESMAP support to study different marketoptions and to prepare an institutional and regulatory recommendation report. ADB was requested to continue itssupport for more analysis on the on-going regional master plan.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 2 Disb ursed Remaining

App~roved Allocated Commitments Jn 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $565,000 $508,014 $66,500 $66,553 $302,124 $205,890

World Bank (BB) $45,000 $3,852 $0 $0 $3,852 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $610,000 S S511,866 $66,500 $66,53 _ $305,976 $205,890

21

Page 36: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

IKCC4 S MA P DEast Asia and Pacific--Philippines. .- ,-JLdba v lf xi

P072413

Project Title: Philippines - Village power fund and incubator for renewable energy enterprises

Business Line: Energy Poverty - Global Village Energy Partnership

Origin of Funds: Core; ; Switzerland

Task Manager: Selina Wai Sheung Shum

Project Development Objective Key Indicator

* Achieve sustainable, market-based electrification of No. of communities servedremote, rural communities through No. of private sector groups directly/indirectlycommunity/NGO/government partnerships participating (NGOs, supply companies, etc.)

Total No. of households energized

Expected Outputs Key IndicatorsEstablished a model for sustainable development and Community-based project operationalimplementation of community-based projects and Household energized in cost-effective mannerdemonstrated a flexible delivery mechanism for VPF mechanics/conditions developed andfinancing of such projects using the principle of cost successfully testedrecovery and considering local capacity to pay.

Implementation Progress

Component Activities

1. Village Power Incubator Services (includes capacity building for communities to plan, prepare feasibility studies and

Approval Date: 12/7/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/30/2002 06/30/2003

Project Closing (all financial transactions executed): 09/30/2002 08/31/2003

22

Page 37: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P072413

Summary of Current Project Status, Issues and Actions:

07/01/2002: 1. Draft Feasibility Reports Completed. The draft feasibility reports were completed of two (2) pilotprojects namely: Binosawan Micro-hydro Project located in the island of Rapu Rapu, Province of Albay and BagongBayan Micro-hydro Project located in Roxas, Province of Palawan.

2. Swiss Consultants hired. During the period, INFRAS, a Swiss firm was contracted to provide technical assistanceto the project. The consultants inception visit took place during the 3rd week of February.

3. Operating Guidelines initiated. PEI initiated the conceptualization of the operating guidelines for the project. Afirst draft has been produced through still in very preliminary terms. The guidelines are currently being refined basedon the outcome of the draft feasibility reports and further consultations with the communities. The guidelines willcover, among others, project eligibility and evaluation criteria, financing terms and conditions, design and mechanicsof the Village Power Fund and how the funds will be managed. A complete draft will be submitted to the WB shortly.

4. Continuing Community Consultations conducted. PEI and Sibat conducted another round of communityconsultations to keep the communities updated on the progress of the work.

5. Co-financing for the project sought. PEI submitted the ice-plant component to the Philippine FisheriesDevelopment Authority for its consideration. PEI will also try to continue sourcing of additional funds as necessary toensure that the project can be carried out soon after the completion of the feasibility studies.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $371,500 $371,500 $0 $14,366 $43,008 $328,492

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Fund $0 $0 $0 $0 $0 $0

Total $371,500 $371,500 $0 $14,366 $43,008 $328,492

23

Page 38: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I E;;; S M-\I\A A East Asia and Pacific--Thailandj -:' ''_ k.iEl v f1 WII

. _ ___ .... ~~~~~~~~~~~~~~P069992

Project Title: Motorcycle Fleet Upgrade to Reduce Air Pollution in Bangkok

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Netherlands

Task Manager: Jitendra J. Shah

Project Development Objective Key Indicator

Improved air quality and thereby, public health through Increased sales of four strokes in BMAthe reduction of pollutant emissions

* Reduction of sales of two-stroke vehicles

* Cleaner lube oil produced and used consistently

* Remaining two-strokes operate more efficiently

Expected Outputs Key Indicators* Accelerated reduction/elimination of two-stroke Agreements signed, implementation commencedvehicles.

* Agreement on and implementation of tighter Adapted pricing/taxation structure in placeemissions standards and enforcement. Pilot leasing scheme advertised in place

* Agreement with public and private sector on Voucher scheme advertised and in placeimproved lube oil, and efficient pricing

* Establishment of pilot leasing scheme forfour-stokes.

* Establishment of incentives (voucher/discount)

* Scheme for behavioral switch to public transport

Implementation Progress

Component Activities

1. Design plan to phase out production of polluting two-wheelers by accelerating reform of emissions standards;2.Assist in design of tighter Inspection and Maintenance Standards;3. Examine pollution reduction from lube oil technicalimprovement;4. Examine pricing and taxation ;5. Design a financing mechanism to encourage phase-out of pollutingtwo-stroke fleet;6. Design incentive scheme: discounts/vouchers on public transport to those willing to trade intwo-strokes;7. Public awareness & stakeholder workshops, seminars

Approval Date: 10/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 08/31/2000 09/30/2002

Project Closing (all financial transactions executed): 10/30/2000 12/31/2002

24

Page 39: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

EA S A A P East Asia and Pacific--Thailand

P069992

Summary of Current Project Status, Issues and Actions:

06/18/2002: A draft report from Bangkok has been received and is currently under internal review and update. ThreeMotorcycles shipped to US EPA in Ann Arbor have now been prepared for testing and measuring emission factorsfor two stroke engines during the months of June and July 2002. Results of this testing will be incorporated in thedraft report which is expected to be submitted to ESMAP around September 2002.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Disb ursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $120,000 $120,000 $584 $13,675 $111,195 $8,805

World Bank (BB) $100,000 $16,657 $0 $0 $16,657 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $220,000 $136,657 $584 $13,675 _ $127,82 $8,805

25

Page 40: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- c4Z A A rD East Asia and Pacific--Thailand

P069828

Project Title: Power Pool Study

Business Line: Market Development - Basic Sector Reform

Origin of Funds: Core

Task Manager: Ranjit J. Lamech

Project Development Objective Key IndicatorTo build capacity within NEPO to ensure that the design 1. NEPO begins the implementation of an efficientof the power market and industry structure is capable of power market and industry structure.achieving long-term operational and investment 2. Follow-up requests for additional advisory services forefficiency goals. Phase 2 implementation.

Expected Outputs Key IndicatorsI. The outputs delivered to the client by the Expert I. Completed in November 2000.Review Committe (ERC) and World Bank team include: - inception - August 1999(a). Detailed comments/reports at each major - draft report workshop - September 1999milestone of the consultant design study on the - draft final report workshop- November 1999Thailand Power Pool.(b). Thematic discussion notes and presentations at thekey workshops -- there were two workshops in Thailandwhich were attended by ERC team members.

II. Draft to be prepared by September 2002.II. The final published output will be a comprehensive Peer Review by November 2002.report/manual on designing competitive power markets Target publication date: March 2003.-- this report will be derived from: (a) the finalconsultant reports for the Thailand Power Pool Study;(b) ERC team comments on the consultantrecommendations design aspects; (c) work being doneon the China Power Market Design; and (d) MarketImplementation Manual for the Turkish power market.

Implementation ProgressComponent Activities

Preparation of independent report on the Power Pool study.;. Preparation of discussion notes and presentations toNEPO.

Approval Date: 8/2/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 03/31/2001 02/15/2003

Project Closing (all financial transactions executed): 06/30/2001 05/15/2003

26

Page 41: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

l ; < N A 1 X J ) East Asia and Pacific--Thailand

P069828

Summary of Current Project Status, Issues and Actions:

08/23/2002: After consultation with ESMAP management, the Power Market Manual was dropped due to lowdemand for it. A seasoned sector reform expert, who is familiar with the Thai country context and reform process,has been engaged to develop an Implementation Completion Report (ICR) for this activity. A mission is planned forNovember 2002 and the ICR is due to be finalized by February 2003.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $130,000 $130,000 $0 $0 $21,377 $108,623

World Bank (BB) $0 $39,000 $0 $0 $39,000 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $130,000 $169,000 $0 $0 $60,377 $108,623

27

Page 42: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

1C5 UAApEast Asia and Pacific--Vietnam l tS. t 1l \1 _ ~~~~~~~~~~~~~~~~~~~~P072947

Project Title: Vietnam - Policy dialogue seminar and new mining code

Business Line: Market Development - Basic Sector Reform

Origin of Funds: Core

Task Manager: Paulo De Sa

Project Development Objective Key IndicatorReform of the legal and regulatory framework affecting Number of new joint-venture agreements withcoal mining in Vietnam (new mining code and its foreign investors.regulations) in order to provide transparent access to Improved environmental regulations for miningcoal resources. Strengthen the environmental Environmental mitigation plan for Vinacoal.management systems for coal mining in Vietnam. Reduction in the number of labor accidents at the coal

mines.

Expected Outputs Key IndicatorsPolicy Dialogue Seminar with major stakeholders . Participation of high rank Central Govemment officials

to build consensus on sector reform (September 2000) and members of the National Assembly, ProvincialNew mining law and its regulations (December Authorities and foreign investors.

2000) Conclusions and recommendations of the workshopEnvironmental regulations for mining, including set the agenda and time table for sector reform and

provisions for mine closure, community consultation serve as base for a new policy declaration regardingand social impacts of mining (April 2001). coal mining in Vietnam;

New mining code and its regulations draft with theassistance of international lawyers;

A second workshop in Vietnam, in March 2001,provides a forum for stakeholder consultation regardingthe draft code;Final draft Mining Code circulated for comments beforebeing submitted to Government.

Implementation ProgressComponent Activities

1. Policy Dialogue Seminar to be held in Hanoi in September 2000.;2. Preparation of a new mining Code and itsregulations;3. Preparation of environmental regulations for mining, with emphasis on environmental managementsystems for coal.;4. Technical assistance to the preparation of an action plan to promote FDI in mining in Vietnam.

Approval Date: 10/3/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/29/2001 09/30/2002

Project Closing (all financial transactions executed): 07/31/2001 12/31/2002

28

Page 43: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Summary of Current Project Status, Issues and Actions:

09/05/2002: [No progress reported for January-June 2002 period]

Budget Summaryas of June 30, 2002

isbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $150,000 $150,000 $0 $0 $59,634 $90,366

World Bank (BB) $30,000 $70,175 $0 $0 $70,175 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $180,000 $220,175 $0 $0 $129,809 $90,366

29

Page 44: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

KtE N A A D v lfEurope and Central Asia--Azerbaijan

P076760

Project Title: Azerbaijan - Natural Gas Sector Restructuring and Regulatory Reform

Business Line: Market Development - Impact of Reform on the Poor

Origin of Funds: Netherlands; Core

Task Manager: Alan F. Townsend

Project Development Objective Key Indicator

By the end of the ESMAP work the GOA should have The key indicators are issuance of documents including:made all relevant policy decisions and be actively Primary legislationimplementing its natural gas sector reform strategy, Concession contractsincluding preparation of the all of the documentation to Tariff and pricing codessupport privatization and regulation of natural gas Technical codesoperating entities, and establishment of new regulatory Commercial contractsand operating institutions. Social-environment plans

Refugees gas supply plan.Additional indicators are restructuring of institutions:Ministry of State Property, Ministry of Economy, Azerigazand SOCAR.

Expected Outputs Key Indicators1. Restructuring - decisions by GOA as to market and 1. For Restructuring, a market model that specifiesAzerigaz restructuring, to include provisions for linkages vertical and horizontal commercial relationships,with upstream operators and export/transit projects, including any ownership or trading restrictions; and aand initial implementation steps.;2. Privatization - plan for Azerigaz restructuring to fit the market model.decisions by GOA on the privatization of distribution, Consistency with electricity sector structure is critical, totransmission, gas processing and storage, and initial be achieved through coordination with PPIAFimplementation steps.;3. Regulation - decisions by consultants. This must include specific pricingGOA on institutional approach to regulation including approaches to ensure fuel switching from fuel oillocation, accountability, discretion, and independence (mazut) to natural gas, and address social protectionof regulatory authority, and establishment of regulatory concerns.;2. Privatization - time bound privatizationentities. Training of key staff. plan for production and issuance of tender documents

for letting of concession (or sale) of gas sector entitiesand assets.;3. Regulation - Draft primary legislationand supporting codes and agreements, to cover allnecessary regulatory requirements; plan for regulatorycapacity building.

Implementation Progress

Component Activities

1. Options Phase:- Gas infrastructure assessment- Restructuring options- Institutional Options- Environmental, socia;2. Interim Phase- Draft Documentation- Detailed Tariff Analysis, and social protection plan- Environmental Monitorin;3. Implementation Phase- Implementation support

30

Page 45: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

: CE?Q A AD A 1 Europe and Central Asia--Azerbaijan

P076760

Approval Date: 10/18/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 09/30/2002 No revision

Project Closing (all financial transactions executed): 12/31/2002 No revision

Summary of Current Project Status, Issues and Actions:

06/19/2002: NERA delivered the inception report in April 2002 as scheduled and presented the findings andrecommendations at a workshop in Baku in May. About 25 senior stakeholders from government and industryattended. NERA is now working on the financial model which will be the key input for the final report. GOAstakeholders including key ministries are deliberating on key issues raised by the report. The Bank has an opendialogue with GOA to support this process; additionally GOA is in the midst of hiring transaction advisors forprivatization via concession of a gas distribution entity. The ESMAP work is essential in supporting this process, inparticular in setting out the strategic, policy, and regulatory boundaries within which the transaction can occur. Amission may be considered in July or August to discuss any unresolved issues that may affect timely completion ofthe final report; it is anticipated that a final report will be ready by September.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 Disbursed Remaining

Approved Allocated Commitments Jn 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $230,000 $230,000 $154,000 $76,000 $76,000 $154,000

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $230,000 $230,000 $154,000 $76,000 $76,000 $154,000

31

Page 46: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

E M l_ C4/XA AEurope and Central Asia--Central Asia jP073630

Project Title: Energy efficiency in urban water utilities in Central Asia

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Netherlands

Task Manager: Ede Jorge ljjasz-Vasquez

Project Development Objective Key IndicatorA cost-effective energy efficiency strategy program is A cost-effective energy efficiency strategy program isdefined based on a successful application of defined based on a successful application ofmethodology and incorporated in Bank-or donor-financed methodology and incorporated in Bank-orprojects in the three case study locations as a result of donor-financed projects in the three case study locationsdemonstrated economic benefits as a result of demonstrated economic benefits

Expected Outputs Key Indicators1. Energy efficiency evaluation methodology for water - Number of case studies where results of energyutilities successfully developed and tested in three efficiency evaluation are meaningful, targets achievable,Central Asia countries and economic benefits quantifiable

2. Dissemination materials developed and used by - Number of copies of dissemination materialswater utility managers and other sector professionals in distributed to water utility managers and sectorthe ECA region professionals and number of downloads of materials

from external Web

3. Training seminars successfully delivered via - Number of water utility managers and sectorvideoconferencing and attended by water utility professionals that attended the training sessionsmanagers in various countries of the region

Implementation ProgressComponent Activities

1. Development of energy efficiency evaluation methodology for water utilities in the ECA region and testing in threeca;2. 1. Preparation of: (i) a dissemination note; (ii) an audiovisual presentation in CD format presenting the refinedmet;3. Delivery of two training sessions to be broadcasted via videoconference;4. Supervision

Approval Date: 9/6/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 03/31/2001 06/30/2002

Project Closing (all financial transactions executed): 06/30/2001 09/30/2002

Summary of Current Project Status, Issues and Actions:

06/21/2002: The consultancy contract commenced in February 2002. The consultants completed all field activities,and submitted the draft final report to the Bank, the Government of Uzbekistan, and the water utilities of Bukhara andSamarkand for review and comments, in May 2002. The Bank has reviewed the report accordingly, and commentshave been submitted to the consultants for incorporation in the final report. The consultant is expected to submit thefinal report by June 30, 2002.

32

Page 47: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Budget Summaryas of June 30, 2002

DsbursedOutstand ing Jan I - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $250,000 $250,000 $0 $95,918 $96,077 $153,923

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $250,000 $250,000 $0 $95,918 $96,077 $153,923

33

Page 48: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Project Title: Multilateral Energy Sector Assistance to the EU Accession Countries

Business Line: Cross-Cutting - Knowledge Dissemination

Origin of Funds: Core

Task Manager: Bjorn Hamso

Project Development Objective Key IndicatorTo transfer knowledge and experience concerning the - Number of relevant presentations at the workshops andEU Electricity and Gas Directives to policy-makers and their qualityenergy industry leaders in the candidate countries - Opportunities for workshop participants from accession

countries to present their progress and discuss theirproblems with each other and with experts/consultantsfrom the Bank and the EU

Expected Outputs Key IndicatorsThree joint EC - World Bank energy sector workshops - Holding of each workshop on schedule.for the EU accession countries, over FY02. - Presentations by top EU, Bank and external experts at[Two of these would be on topics under the EU the workshopsElectricity Directive, and one on topics under the Gas - Publication of proceedingsDirective. The proceedings of each workshop will beissued and distributed to participants and ESMAP bythe host organization]

Implementation Progress

Component Activities

Co-hosting of three workshops with the European Commission (DGTREN), for the benefit of delegations from the EUaccessio

Approval Date: 7/23/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/30/2002 No revision

Project Closing (all financial transactions executed): 09/30/2002 No revision

Summary of Current Project Status, Issues and Actions:

09/05/2002: [No progress reported for January-June 2002 period]

34

Page 49: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

a-~-C NA AE , IfEurope and Central Asia Region

P076097

Budget Summaryas of June 30, 2002

DsbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) * (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $100,000 $100,000 $0 $23,819 $24,986 $75,014

World Bank (BB) $400,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $500,000 $100,000 $0 $23,819 $24,986 $75,014

35

Page 50: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| --- S ML v A P D Europe and Central Asia Region

P049639

Project Title: Oil Spills Occurrence Database, Modeling, Remediation and Prevention

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Netherlands

Task Manager: Akin 0. Oduolowu

Project Development Objective Key Indicator

This study was divided into two parts: [Original proposal not in log-frame format ]Phase I - Oil Spill Study, Phase 1Phase 11 - The Caspian Regional Mutual Aid program forOil Spill Prevention and PreparednessThe objectives of Phase I have been defined as follows:

Phase I Objectives:* To study historical oil pipeline spills and clean upcosts in Russia and the Former Soviet Union, FSU.* The study will focus only on oil and producttrunklines and gathering flow lines. Minor pipelinesassociated with oil fields, refineries and storage tanks willbe excluded from the analysis in Phase 1.

Phase 11 Objectives:* to collect and examine information on the capabilitiesof private sector companies and the governments ofCaspian littoral states (Azerbaijan, Iran, Kazakhstan,Russia, and Turkmenistan) to respond to major oil spillsin or around the Caspian sea;* to set up and discuss a prototype mutual aidprogram for the Caspian littoral states to effectivelycombat on- and offshore oil spills.

Expected Outputs Key Indicators(a) Data acquisition and analysis of worldwide Orginal proposal not in log-frame formatexperience in mutual aid planning and regionalcooperation during oil spill emergency;(b) Missions to Caspian states to obtain necessaryinformation on the capacity of the Caspian region;(c) Preparation of prototype mutual aid program;(d) Regional workshop to discuss the program

Implementation ProgressComponent Activities

Original proposal not in log-frame format]

36

Page 51: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| J N Pt A A D Europe and Central Asia Region

P049639

Approval Date: 11/1/1997

Expected Dates for: Original Revised

Project Completion (all project activities completed): 10/01/2000 06/30/2002

Project Closing (all financial transactions executed): 12/01/2000 09/30/2002

Summary of Current Project Status, Issues and Actions:

07/10/2002:It was jointly agreed with ESMAP's management to prepare a report for this activity as an ESMAP technical paper.The report has been submitted to ESMAP for formatting.

Budget Summaryas of June 30, 2002

DsbursedOutstanding Jan i - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $53,000 $53,000 $0 $10,916 $49,246 $3,754

World Bank (BB) $4,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Fund $0 $278,268 $0 $113,000 $278,268 $0

Total $57,000 $331,268 $0 $123,916 $327,514 $3,754

37

Page 52: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I -c AA^^ A D Europe and Central Asia--Lithuania

P073366

Project Title: Lithuania - Heating supply to small cities/towns

Business Line: Energy Poverty - Peri-Urban Initiative

Origin of Funds: Core

Task Manager: Gary Stuggins

Project Development Objective Key Indicator

To identify, test, implement and showcase results of Least-cost option(s) for supplying heat to towns areleast-cost option(s) for supplying heat to small towns with identified.improved access to more affordable heat. Identified method(s) are successfully piloted.

Pilot results are disseminated and full-scaleimplementation in remaining 4-6 Lithuanian towns areinitiated and successfully completed.

Expected Outputs Key IndicatorsPhase 1: Final report including comprehensive Phase 1:information and recommendations on ownershipstrategies and the least-cost methods of delivering heat Draft final report (white cover) that includes a thoroughto towns. technical, institutional and economic analysis of the

issue and specific recommendations for pilot programsThe results will be discussed in public in order to seek will be completed by February 2003.private investors to participate in Phase 11 and 111.

Final report (green cover) will be completed by AprilPhase I: Pilot programs using recommended heat 2003.supply method in 2-4 of the 8 towns included in the Recommendations are endorsed by the Government bystudy. July 2003.

Phase IlI: Full involvement of all 8 towns in Phase II:implementing the least cost solution to heat supplybased -on results of pilot program(s). Investments under the pilot program(s) identified by

December 2003.Raising the funding for Phase 11 July 2004Implementation of Phase 11 2004/2005Results from heating season under pilot program(s)available in May 2006.

Phase III:Full-scale implementation (investment) of project inremaining towns begins summer 2007

Implementation Progress

Component Activities

Phase 1:Gather information on current situation in each of 8 towns.Determine least-cost methods of supplying heat

38

Page 53: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

i-W 4ZX X AID Europe and Central Asia--Lithuania

P073366

Approval Date: 11/14/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 12/15/2002 No revision

Project Closing (all financial transactions executed): 03/15/2003 No revision

Summary of Current Project Status, Issues and Actions:

07/11/2002:A draft report covering the background data of six towns in Lithuania, lessons learned from other projects,benchmarking data from 35 Finnish heating companies of same type and size, and the identified developmentmeasures for each town, was completed in Aug 2001. The towns that have been identified are Moletai (Alantavillage), Ignalina, Kaisiadorys, Salcininkai, Sirvintos and Trakai. This was done while waiting for completion of theproject financing scheme.

Out of the six towns, Sirvintos, Trakai and Ignalina are already receiving foreign assistance in modernizing theirheating systems and, therefore, the three towns were excluded from the study preparation.

In spring 2002 two other towns were taken into consideration. Rietavas was visited and data from both of Rietavasand Raseiniai were collected.

Based on evaluation of various arguments, four towns with specific features were selected for the study.

The procurement of the consultant team consisting of four ToRs was initiated. The ToRs are for:

The lead (economic) consultantThe heating consultantThe high-tech energy consultantThe local (partner) consultant

A review of local consultants was undertaken in the spring of 2002 to identify possible energy economists, heatingexperts and social scientists. The energy economists that were identified were generally committed to other tasks ornot interested in this task. However, one consulting firm has been identified (Lithuania Energy Institute) that has thecompetence, skills and interest in energy economics and social assessment. This firm is recommended for thebackground information, coordination and social assessment.

The consultant team is expected to be in place by September 2002.

The project team has visited the cities, received the filled-in data request forms and prepared the draft studymentioned above.

Due to funding delays, the project had to be restarted after a break a few months ago to conduct reviews of cities,updating statistics and preparing short lists for consulting. The TORs have been reworked to enable the team to takethe next steps.

39

Page 54: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

K: E A A D Europe and Central Asia--Lithuania

P073366

Budget Summaryas of June 30, 2002

DsbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $230,000 $230,000 $0 $4,781 $4,840 $225,160

World Bank (BB) $69,000 $557 $0 $557 $557 $0

Non-ESMAP Trust Funds $230,000 $0 $0 $0 $0 $0

Total $529,000 $230,557 $0 $5,338 $5,397 $225,160

40

Page 55: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

i Z~NAA Europe and Central Asia--Macedonia 1L I VIL I it

P069434

Project Title: Key Aspects of Energy-EnvironmenVGHG Strategy

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Core

Task Manager: James Sayle Moose

Project Development Objective Key Indicator

Support GOM in developing key aspects of an energy Investment program consistent with theand environment strategy to reduce greenhouse gas and energy-environment strategy developed under theother pollutants connected with energy producing project.facilities. Possible investments in geothermal energy and/or

electricity interconnnections.

Expected Outputs Key IndicatorsPaper on ways of enhancing uses of geothermal energy Final Paper by June 30 2000Paper on potential for electricity interconnections Final paper by June 30, 2000Dissemination of study results and public consultations Workshop by April 30, 2000with a wide range of stakeholders.

Implementation Progress

Component Activities

Preparation of paper on electricity lnterconnections;Preparation of paper on geothermal issues;Workshop/ discussionswith Macedonian authorities and stakeholders

Approval Date: 10/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 01/14/2002 06/30/2002

Project Closing (all financial transactions executed): 03/15/2002 12/31/2002

Summary of Current Project Status, Issues and Actions:

08/06/2002: A draft report was prepared in early March 2002. It was then presented to the Macedonian Governmentand the state electric company, ESM, during a Bank Mission to Macedonia in the second half of March. The reportargued that the need to generate electricity in Macedonia by buming fossil fuels could be reduced by exploiting thecountry's low heat geothermal resources as well as its mini-hydropower sites. However, the main environmentalbenefits to Macedonia would come from increasing imports of electricity which would replace power produced fromfossil fuels in Macedonia. These imports would primarily come from Bulgaria and could be quite an importantcomponent of Macedonia's electricity supply. They should also be relatively low cost and their impact on reducingusage of fossil fuels in Macedonia is far larger than the impact of mini-hydropower and geothermal. Currentlytransmission capacity to Bulgaria is very limited but a new line is under construction (at a slow pace).

The report should be finalized and perhaps a more formal presentation made to ESM and the MacedonianGovernment. The objective is to do this in October.

41

Page 56: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Lh; J IA A Europe and Central Asia--Macedonia

P069434

Budget Summaryas of June 30. 2002

DisbursedOutstanding Jan 1 Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $70,000 $70,000 $13,500 $33,274 $41,444 $28,556

World Bank (BB) $10,000 $1,012 $0 $0 $1,012 $0

Non-ESMAP Trust Funds $0 $60,000 $0 $0 $60,000 $0

Total $80,000 $131,012 $13,500 $33,274 $102,456 $28,556

42

Page 57: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

E S M N Europe and Central Asia--Romania

t ~~~~~~~~~~~~~~~~~~~~~~~~~~~P064743

Project Title: Energy Efficiency (Reconnaissance)

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Germany; Core

Task Manager: Varadarajan Atur

Project Development Objective Key Indicator

Improve the competitiveness and environmental Uptake of energy efficiency investments and services.sustainability of the Romanian economy.Contribute to creating a vigorous market in energyefficiency products, services and financingSupport the government in strengthening the public rolein enabling energy efficiency activities; andEncourage private enterprises to invest in providingenergy efficiency services to a variety of consumers.

Expected Outputs Key IndicatorsReview of previous EE activities Review report

Reconnaissance mission with a well-structured and Reconnaissance mission with proposal for ESMAPfocussed ESMAP proposal whose components have projectbeen discussed and agreed upon with the main EEstakeholders in Romania and in the Bank

Implementation Progress

Component Activities

Consultant Report: Review of previous ESMAP activities;ESMAP proposal;Reconnaissance mission

Approval Date: 7/1/1997

Expected Dates for: Original Revised

Project Completion (all project activities completed): 09/01/2000 09/30/2002

Project Closing (all financial transactions executed): 11/01/2000 12/31/2002

Summary of Current Project Status, Issues and Actions:

06/26/2002: The report 'Private-sector participation in market-based energy-efficiency financing schemes - LessonsLearned from Romanian and international experiences" was completed in June 2002 (first draft early June, final draftend of June). It summarizes the results of the only task retained for ESMAP funding after the ESMAP-sponsoredreconnaissance mission of World Bank staff to Romania to analyze the energy efficiency situation in Romania anddetermine appropriate follow-up initiatives. One of the initiatives recommended, the development of an energyyefficiency project development and financial facility resulted in the preparation of a GEF project, expected to beapproved by the World Bank in the second half of 2002.

43

Page 58: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

f -- - ;r n X I N AAD Europe and Central Asia--RomaniaI., I., Lio I I} '

P064743

Budget Summaryas of June 30, 2002

DsbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $101,329 $101,329 $4,730 $3,311 $65,335 $35,993

World Bank (BB) $0 $274 $0 $0 $274 $0

Non-ESMAP Trust Fund $0 $0 $0 $0 $0 $0

Total $101,329 $101,603 $4,730 $3,311 $65,610 $35,993

44

Page 59: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Project Title: Turkey: Energy and Environment Review (Phase l1l)

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Core

Task Manager: James Sayle Moose

Project Development Objective Key Indicator

Support the Turkish Government (GOT) in developing Introduction of policies recommended by the projectand implementing an energy-environment strategy, Investments consistent with the energy-environmentincluding key policy initiatives and prioritization of strategy and priorities developed under the projectinvestment options for the energy sector. GHG mitigation strategy

Growth of key pollutants (TSP, S02, NOx, C02 andsolid wastes) vs. GDP growth

Expected Outputs Key IndicatorsEight task reports and a Synthesis report on Task 1 report due: April, 2001Energy-Environment Strategy Task 2 and 6 reports due: Aug 2001

* Task 3, 4 and 5 reports due: September 2001Workshop proceedings Task 7 report due: October 2001

* Task 8 report due: November 2001* Workshop: Dec. 2001Final report and workshop proceedings due: March2002

Implementation Progress

Component Activities

Task 10: Final report;Task 1: Energy demand forecast;Task 2: Coal production, utilization and environmental controloptions;Task 3: Co-generation potential;Task 4: Transmission and distribution loss reduction;Task 5: Non-power sectoremissions;Task 6: Petroleum Product quality;Task 7: Energy system analysis;Task 8: Environmental institutionalframework;Task 9: Workshop

Approval Date: 5/11/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 05/02/2001 09/30/2002

Project Closing (all financial transactions executed): 06/02/2001 12/31/2002

Summary of Current Project Status, Issues and Actions:

07/09/2002:Final drafts have been completed on all of the special studies. A workshop was held to discuss them in Ankara, onJune 19-20, 2002. The comments of the participants in the workshop will be included and the final reports issued bythe end of September of 2002.

45

Page 60: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

. e S M v A P ^ D Europe and Central Asia--Turkey

P074557

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $80,000 $80,000 $0 $40,027 $67,902 $12,098

World Bank (BB) $23,900 $0 $0 $0 $0 $0

Non-ESMAPTrustFunds 31,100,000 $10,500 $0 $0 $10,500 $0

Total $1,203,900 $90,500 $0 $40,027 $78,402 $12,098

46

Page 61: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

K JZ(ZNAAD ~~~~~~~~~~~~~~~~~~~~Global1I~ iLjiyj., 'L I

P070797

Project Title: Advancing Modern Biomass Energy Opportunities & Challenges

Business Line: Energy Poverty - Global Village Energy Partnership

Origin of Funds: Core

Task Manager: Willem M. Floor

Project Development Objective Key IndicatorTo identify bioenergy promotion strategies for developing Identifying and targeting specific regions, certaincountries to minimize market barriers, mobilize private resource-rich sectorssector forces, foster a conducive policy/regulatory Focusing on commercializing certain market-readyframework, and coordinate with local development technologiesobjectives and site-specific environmental and Leveraging the involvement of specific segments ofsocio-economic opportunities the private sector

* Identifying and stimulating key unsatisfied energymarkets* Providing technical support and access to credit fordevelopers, suppliers, and consumers of bioenergy* Coordinating with other development orenvironment initiatives (e.g. joint forest management)* Mobilizing key rural constituents (e.g., smallholdersinterested in agroforestry or farm forestry)* Taking advantage of existing project instruments(e.g., Clean Development Mechanism)

Building capacity among policy makers, NGOs,private sector actors, and potential end-users.

Expected Outputs Key Indicators

47

Page 62: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ES-- M 1 / ^ X A D Globali_ ' 1aJl t t] t1 ~~~~~~~~~~~~~~~~~~~P070797

[1] to characterize short-term and long-term [i] Draft report on bioenergy potential, technologies,potential through a review of bioenergy resource market barriers (Tasks 1-2)estimates found in recent global (and regional) energyanalyses and their critiques, and to identify promising [ii] Draft report on lessons learned from existingtechnologies that can form the basis for future bioenergy activities and case studies, and environmentalexpansion of bioenergy and socioeconomic impacts (Tasks 3-4)* [2] to review market barriers to bioenergydevelopment and other impediments that are amenable [iii] Draft final report; [iv] Final report; [v] Submission ofto policy action journal publications (shortly after completion of project);* [3] to elaborate lessons learned through a global and [vi] Organization of a workshop to which about 20review of major bioenergy interventions (including Bank representatives of development agencies, senioractivities), with a special focus on the selected case technical experts, and national policy makers will bestudies, based on close collaboration with local experts invited with a view to discuss the activity's output as welland site visits. as to make sure that the results are disseminated. One* [4] to better understand how bioenergy projects can opportunity for further dissemination is to coordinate withgenerate social and environmental benefits (e.g., the United Nations Development Program's Globalincome generation, land restoration) and overcome Program in Sustainable Energy, which is engaged inpotential challenges (land-use conflicts, threats to some efforts to promote bioenergy activities within thebiodiversity) by analyzing past experiences with existing UN Country Offices.land-intensive, industrial-scale activities that haveimportant parallels with modem bioenergy strategies.

[5] to develop effective policies for promotingsustainable bioenergy activities and accelerating thedevelopment or bioenergy markets. Moreover, thisproject will aim to contribute to the replication of aparticular successful bioenergy demonstration bytailoring the recommended policies to the nationalcontext and advocating them among policy makers, theBank, and other intemational institutions active in therelevant area. (A further concerted effort to extend,disseminate, and advocate the resulting policyrecommendations might form the basis of asubsequent project proposal, once the promisingapproaches are identified and initially tested.)

Implementation Progress

Component Activities

Draft final report;Final report;Tasks 5-6

Approval Date: 12/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 02/15/2002 09/30/2002

Project Closing (all financial transactions executed): 05/15/2002 10/31/2002

48

Page 63: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Summary of Current Project Status, Issues and Actions:

09/05/2002: [No progress reported for January-June 2002 period]

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $232,640 $232,640 $160,242 $31,008 $105,648 $126,992

World Bank (BB) $17,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $249,640 $232,640 $160,242 $31,008 _ $105,648 _ $126,992

49

Page 64: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

E SMCC A A Globall - "t - 1 t lf tP ......... ... -.- ~~~~~~~~~~~~073751|

Project Title: Assessing the impacts of energy sector reform on the poor

Business Line: Market Development - Impact of Reform on the Poor

Origin of Funds: Core

Task Manager: Robert W. Bacon

Project Development Objective Key IndicatorIdentification and measurement of impacts of energy The construction and use of a template, for measuringsector reform on poverty in selected countries, the impact of energy sector reform on poverty, which iscorresponding to a reform impact template designed as then applied to countries only now starting the reformpart of the study. process.

Expected Outputs Key Indicators1. Design of a strategy for identifying links between 1. Review of work already carried out, and identificationenergy sector reform and poverty. Selection of of potential sources of information needed. Identificationcountries in which these links are to be quantified. of countries to be studied in detail and as scoping

studies. 6 months.

2. Selection of local consultants to work on detailed 2. Detailed terms of reference for local consultants; dataimpact analysis: collection of data to measure impact of collection, analysis and write up. 13 monthssector reform. Assessment of overall impact of sectorreform on poverty in three selected countries.

3. Terms of reference for scoping studies. Write up of3. Selection of local consultants to work on broad findings in countries selected of the factors identifiedanalysis of possible links from sector reform to poverty, which link sector reform to potential impacts on poverty.Collection of data and field material. Preparation of 6 months simultaneous with item 2 above.write-ups in different countries of factors identified.

4. Production of template based on analysis both of4. Design of overall template to be used in future deep studies and of breadth studies. 3 monthsstudies drawing on the three detailed case studies plus subsequent to completion of 2 and 3 above.the additional scoping surveys.

5. Final write up of report and of policy implications of5. Write up of lessons learned for the design of sector findings for future design of energy sector reformreform in such a way as to benefit its impact on poverty. strategies. 2 months subsequent to 4 above

Implementation Progress

Component Activities

1. Choice of main consultant Detailed project design Identification of potential factors linking poverty to sector refor;2.Selection of subsidiary consultants for deep studies and for scoping studies. Detailed survey work on impacts of sec;3.Write up for production of template for measuring impact of sector reform on poverty;4. Write up of policyrecommendations for how sector reform can be designed so as to maximize its potential impact on po

Approval Date: 1/2/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 09/30/2002 12/31/2002

Project Closing (all financial transactions executed): 12/31/2002 02/28/2003

50

Page 65: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

& R kCA AAD GlobalI LAtbJV Li Iki

P07375 1

Summary of Current Project Status, Issues and Actions:

06/12/2002: Following my visit to the principal consultants (EDRC) in Capetown the whole strategy for the study andthe detailed lines for the survey were discussed in substantial detail to clarify the philosophy, scope and depth of thestudy. Following this, a series of e-mails have clarified outstanding issues, a first complete draft of the survey hasbeen recently submitted and iterations are underway. The survey proposed is extremely detailed and precise and isdesigned to give a full picture of the portfolio choices of fuels and the reasons for these choices, together with thesupply options faced. At the same time EORC has been profiling countries for the administration of the survey, usingboth background information on sector reform (so as to choose interesting experiences in relevant countries). Atpresent, the short list of countries proposed includes: Honduras, Senegal, Botswana, South Africa and Bangladesh.Contacts are also being made with institutes in these countries to ascertain that they have the appropriate surveyskills.

The finalized questionnaire is expected to be delivered by end-July and a final short list will be determined at thattime. Contracts with country survey teams will be drawn up in August and arrangements for EDRC to supervise andstandardize the work will be determined at that time.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated commitnents Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (0=B-E)

ESMAP Trust Funds $430.000 $285,915 $68,000 $25,529 $45,222 $240,693

World Bank (BB) so $0 $0 $0 $0 $0

Non-ESMAP Trust Funds 50 $0 $0 $0 $0

Total $430,000 $285,915 $68,000 $25,529 $45,222 $240.693

51

Page 66: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Project Title: Best Practices for Grid Electrification - Phase 2

Business Line: Energy Poverty - Global Village Energy Partnership

Origin of Funds: Netherlands; Core

Task Manager: Douglas French Barnes

Project Development Objective Key IndicatorThe adoption of best practices by institutions extending Number of new or existing companies adopting bestgrid electricity to rural areas in developing countries. practices recommended in the study and increasing

effectiveness of rural electrification.

Expected Outputs Key IndicatorsMethodology for conducting case studies on success Case studies and final report that address the mainfactors. issues

Main factors leading to success of rural electrification in Completed workshopcountries that have achieved significant levels ofelectrification.

Expanded knowledge based on best practices.

Lessons learned from selected countries.

Implementation ProgressComponent Activities

Complete Case Studies;Complete Case Studies Bangladesh;Complete Case Studies China;Complete Case StudiesMexico;Complete Case Studies Tunisia ;Disseminate Findings at Workshop;lnitiation of Project and PreparatoryWork;Synthesize Findings of Case Studies

Approval Date: 12/1/1997

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/01/2000 12/31/2001

Project Closing (all financial transactions executed): 08/01/2000 03/31/2002

Summary of Current Project Status, Issues and Actions:

07/15/2002: The editor is still working on getting the case studies to the TM. Once it is received by TM, he willproduce the final report. The project should be completed before December 2002.

52

Page 67: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

IESMAD~~~~~~~~~~~~~~~~~~~~Goa4Z;-cN A A D.-. 'v.i I v If I L

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed RemainingApproved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $279,860 $279,860 $0 $40,960 $233,189 $46,671

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $279,860 $279,860 $0 $40,960 $233,189 $46,671

53

Page 68: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| - SJAIAD .-r < /|Global

P074622

Project Title: Global Village Energy Partnership (GVEP)

Business Line: Energy Poverty - Global Village Energy Partnership

Origin of Funds: United Kingdom; Core

Task Manager: Dominique M. Lallement

Project Development Objective Key IndicatorTo establish the Global Village Energy Partnership a. A minimum of 10 founding partners

b. At least 5 developing countries committed to GVEPinitiatives

Expected Outputs Key Indicators1. Outreach and consultation with prospective 1.1 General awareness of GVEPpartners;2. Preparation of business organization 1.2 Commitment and financing

1.3 Consensus-building on partnership particulars;2.1Resource planning, including financial sourcing,secretariat cost, etc.2.2 Management plan

Implementation Progress

Component Activities

1. Outreach and consultation;2. Contract for business plan including: governance structure paper, work plan and activitytimetable, budget, call for

Approval Date: 5/8/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/30/2002 No revision

Project Closing (all financial transactions executed): 09/30/2002 No revision

54

Page 69: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ESM AP GlobalP074622

Summary of Current Project Status, Issues and Actions:

08/12/2002: Since January of this year, major developments have occurred to make the launch of the Partnershippossible. First ESMAP, in collaboration with UNDP, donors, representatives of developing countries and NGOs,organized and participated in a series of meetings to determine how the Partnership will effectively extend modernenergy access to the poor. These meetings included a strategy session in Amsterdam in February, WSSD Prepcomevents in New York and Bali in February, March and May, a UNDP meeting in Brussels in April of 2002, and finallythe ESMAP donors meeting in Copenhagen, also in April. In addition to these meetings, ESMAP, acting as theinterim Technical Secretariat, has convened a wide range of electronic focus groups to solicit input on thePartnership's priorities and implementation strategies. Through these meetings and consultations, ESMAP drafted aStatement of Principles for the Global Village Energy Partnership, which outlines both partner commitments and thePartnership's services for addressing modern energy access. The services, which are currently all underdevelopment, are as follows: Action Plans, Knowledge Management and Transaction, Capacity Development,Financing Facilitation and Results Monitoring. The Partnership, under ESMAP's direction, has also developed apreliminary governance structure and is building a web site and a series of online databases. Finally, ESMAP hasbegun to secure funding to cover the overhead costs incurred in developing the Partnership.

As a result, ESMAP will launch the Global Village Energy Partnership at the World Summit on SustainableDevelopment in Johannesburg on August 31, 2002.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jaun 3- Disbursed Remaining

Approved Allocated Commitments Jn 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $232,065 $232,065 $32,200 $8,785 $24,463 $207,602

World Bank (BB) $0 $26,628 $0 $26,628 $26,628 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $232,065 $2 $35,413 $51,092 $207,602

55

Page 70: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ESMXlQ A DAGloball - ' ' t_l, t} \1 ~~~~~~~~~~~~~~~~~~P077689

Project Title: Rapid Assessment for Meeting Immediate Needs for Water and Energy Services

Business Line: Cross-Cutting - Methodologies and M&E (for energy and for multi-sectoral programming)

Origin of Funds: Core

Task Manager: James Richard Davis

Project Development Objective Key IndicatorThe development objective of this and subsequent A) that the rapid assessment screening methodology isworkshops using the outputs will be to deliver short term, adapted to, and accepted in the individual client countrylow risk development projects, while more at hand;comprehensive and time-consuming options assessment B) - should meet World Bank safeguard requirementsand decision-making for satisfying medium and longer and fiduciary policies; andterm demands for water and energy services is going on. C) use criteria for guiding decision-making in the special

case of 'in the pipeline' projects, as suggested in theWorld Commission on Dams report.Primary performance indicators will relate to the testcase of the project-output stakeholder consultationworkshop module requiring that:1) consensus on screening criteria are reached in thefirst workshop, and that optional projects for meetingimmediate needs subsequently were satisfactorilyscreened;2) that (reasonable) consensus was reached about theoutcome of the screening by the second workshop forproject(s) to be advanced for implementation;3) that media reported on the process leading up to thesecond workshop so that potential public responsescould be considered before screening completion; and4) that finalization of project planning andimplementation was authorized by government.

Expected Outputs Key Indicators

56

Page 71: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

'A CS t4, A 1 Globa

The end-of-project milestones to be achieved through Qualitythe implementation of each component are: The Step 5 peer review workshop will focus on quality ofla) Screening criteria; outputs. Indicators of quality will be that there islb) A set of 10 - 12 preliminary case descriptions as a reasonable consensus between peer reviewers thatbasis for screening; outputs la; lb; 1c; 2; 3; 4a; 4b; 4c; & 4d; meet11c) 4 -5 screened cases for in-depth review. requirements that will promote use of, and facilitate2) Documented review methodology. rapid assessment for investment decision-making in3) Write-ups of in-depth analyzed of cases. client countries. For item 6, a quality indicator is that the4a) Draft Executive guide; materials and modules, when promoted, in the first4b) PPt-presentation; instance lead to a concrete test-case.4c) Source-book of cases;4d) Recommendations. Quantities5) Workshop-proceedings with recommendations A quantitative criterion is that each of the listed outputs6) Guiding materials and WBI training modules ready will be documentedfor test of rapid assessment approach

TimeThe criterion related to time is that the development ofthe rapid assessment guiding materials and workshopmodules will follow the progress of the comprehensiveproject: Component (C) Cl=2mnths; C2=2mnths;C3=6mnths; C4=2mnths; C5=1mnth; C6=1mnth

Implementation ProgressComponent Activities

1) Identification and screening of cases for review ;2) Design of a detailed review methodology;3) Collection andanalysis of data;4) Drafting of Executive guide, ppt-presentation, and source-book of cases and recommendations;5)Peer review workshop;6) Finalization of guiding materials and preparation of training modules (towards test-case in aclient country. The tes

Approval Date: 12/11/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 07/01/2003 No revision

Project Closing (all financial transactions executed): 08/01/2003 No revision

Summary of Current Project Status, Issues and Actions:

07/10/2002:Project commenced in early March 2002 and is proceeding a little ahead of schedule. Two intemational consultantsand a project coordinator were appointed in March and the first assessment of 25 case studies of optionsassessment and stakeholder involvement in dam projects was completed by end April. 13 case studies wereselected for more detailed analysis. The outline of the source-book was drafted and preliminary discussions wereheld with WBI about the training course.

A progress report was completed at the end of stages 1 & 2 in early June 2002. An advisory panel of 5 experts ondam development has been formed and the progress report was submitted to them as well as to ESMAP andBNWPP. The responses from the panel, together with the comments from WaterForum, have now beenconsolidated and the sourcebook outline and selected case studies will be modified in light of these comments.

57

Page 72: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

-CQ A D Global

P077689

Budget Summaryas of June 30, 2002

DsbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $105,000 $105,000 $97,450 $64 $64 $104,936

World Bank (BB) $48,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $316,500 $0 $0 $0 $0 $0

Total $469,500 $105,000 $97,450 $64 $64 $104,936

58

Page 73: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

GlobalAD ~~~~~~~~~~~~~~~~~~~~~~P065311

Project Title: Removing Obstacles to Cross-Border Oil & Gas Pipelines

Business Line: Market Development - Upstream Oil & Gas Devt

Origin of Funds: Core

Task Manager: Robert W. Bacon

Project Development Objective Key Indicator

The objective of this project is to provide a tool which 1.1.The interim key performance indicators will beclient governments will want and be able to use tofacilitate quicker development of urgently required cross a) the publication of guidelines and best practices andborder pipelines by the private sector the demand for it

b) the willingness of Governments involved in crossborder pipeline projects to sponsor a workshop on theguidelines

1.2. The longer term indicator will be the amount ofreduction in the average time to project implementation(after feasibility study indicates project and financialviability) compared to the average time the project wouldhave normally taken

Expected Outputs Key Indicatorsa) A report with 4 case studies representing the main a) Publication of and demand for the report;b) Demandvariety of cross border oil and gas projects, with an for and attendance of the workshopsanalysis of the cross border specific aspects ofeconomic, commercial, institutional, regulatory, legaland environmental issues in developing countries orrestructuring economies and with guidelines to allowand encourage private investment in cross borderpipelines without undue delays;b) Workshops on theresults of the report, one organized in cooperation withthe Energy Charter Treaty for its members andworkshops for other regions, where cross borderprojects are relevant

Implementation ProgressComponent Activities

(a) Selection of 4 case studies, draft structure of guidelines;(b) Award case studies within the WB and to externalconsultants;(c) Complete case studies and analysis;(d) First draft of guideline report;(e). Circulation and reviews,internal and external;(f) Presentation at an International Energy Forum;(g) Final report distributed;(h) Workshopspresentations

Approval Date: 1/15/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 10/01/2000 11/30/2002

Project Closing (all financial transactions executed): 01/01/2001 12/31/2002

59

Page 74: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ICSM1A A Globalt S I v ts vPJ x P065311

Summary of Current Project Status, Issues and Actions:

06/12/2002: A new consultant was identified (Professor Paul Stevens) from the small number of people who have thenecessry expertize and breadth to complete such a report. He read the draft and submitted a suggestion on how hewould aim to complete the work. I met with him in London and agreed a timetable. Due to prior commitments he wasable only to start slowly, collecting material and reflecting on the issues, but it was agreed that he would be able todevote primary attention to the study during this summer. Further documentation has also been suggested by us.Professor Stevens has been in touch with the original author (Ralf Dickel) to discuss how the study might bestrengthened and deepened. At present the completion of a draft at the end of the Summer and a presentation in theBank, together with meetings with possible peer reviewers in early Fall, are scheduled.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- isb rsed Remaining

Approved Allorcated Commitments jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $335,000 $335,000 $24,000 $4,201 $281,124 $53,876

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $335,000 $335,000 $24,000 $4,201 $251,124 $53,876

60

Page 75: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

K lZ NA Av D Latin America and Caribbean--BoliviaI- L~jI VILI 'LIP056928

Project Title: National Biomass Programme

Business Line: Energy Poverty - Rural/Renewable Energy Strategy

Origin of Funds: Netherlands

Task Manager: Philippe J-P. Durand

Project Development Objective Key Indicator

To assist the government in developing a National Government has developed a NBP and has formulatedBiomass Plan (NBP), developing a related policy and is implementing a policy framework and its relatedframework and its regulations regulations and institutions

Expected Outputs Key Indicators[a] Execution of 35 demonstration projects that show [a-1] Execution of 20 biomass projects saving 20 K tonsthe economic and institutional viability of of biomass;comprehensive and sustainable solutions that facilitate [a-2] 15 projects of substitution of biomass by naturalthe rural population's use of modern energy for gas;productive and consumptive purposes, the more [a-3] Implementation of large scale (100,000 families)efficient use of biomass energy, and the rural stove program;implementation of improved management of biomass [a-4] Execution of 5 natural forest managementresources.;[b] Operational government institutions that projects.;[b-1] Establishment of a biomass unit within theare able to formulate policies and regulations, to ministrymonitor their execution, to evaluate and adjust them, if [b-2] Formulation of technical regulation and standards;need be.;[c] Operational private sector support [b-3] development of an energy database.;[c-1] Traininginstitutions that promote investments in biomass centers operational to train rural public sector staff asprojects. well as rural users in forest management;

[c-2] Investment by the private sector in 20 projects foran amount of US$1 million.

Implementation Progress

Component Activities

Investment in 3 clausuras silvopastriles;lnvestment in 3 homos de chancaca;lnvestment in 30 energy efficient brickkilns;lnvestment in energy substitution in 5 rice-mills;lnvestment in natural gas energy provision of 48 industrias de Yeso

Approval Date: 2/11/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 10/01/2001 03/31/2002

Project Closing (all financial transactions executed): 12/01/2001 06/30/2002

Summary of Current Project Status, Issues and Actions:

07/02/2002: Activities were completed satisfactorily on June 21, 2002. A final supervision mission took place fromJune 18-21, 2002. The ESMAP final report is under preparation, based on the activity report written by the ESMAPnational coordinator; a first draft of the ESMAP final report should be ready by August 15, 12002. TF22188 wasclosed on June 30, 2002 and the balance (about US$30,000) will be returned to the Dutch Government.

61

Page 76: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I- ;,N A IC I A D Latin America and Caribbean--Bolivia

P056928

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $2,569,113 $2,569,113 $41,224 $921,298 $2,589,672 -$20,559

World Bank (BB) $0 $1,600 $0 $0 $1,600 $0

Non-ESMAP Trust Funds $0 $46,762 $0 $0 $46,762 $0

Total $2,569,113 $2,617,475 $41,224 $921,298 $2,638,034 -$20,559

62

Page 77: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I A .L\ 4 L Latin America and Caribbean--BoliviaP065663

Project Title: Training Program for Key Group Representatives From Indigenous PeopleRegional Organizations/Rural Energy Development, Phase 2

Business Line: Market Development - Impact of Reform on the Poor

Origin of Funds: Canada; Core

Task Manager: Eleodoro 0. Mayorga Alba

Project Development Objective Key Indicator

. Provide general knowledge and training on hydrocarbon *20 IP representatives undergo training and 5 aresector and rural electrification project, i.e., industry, laws, selected as local trainers for another 20 to be trained.institutions and social environmental regulationsenforcement . Linkage with indigenous peoples (IP) of other countries. Provide linkage with indigenous peoples (IP) of othercountries

Expected Outputs Key Indicators- Enhanced knowledge on hydrocarbon sector and rural - Development of training program.electrification projects - Training sessions delivered- Full understanding of IP representatives role and - In house trainers deliver trainingparticipation in hydrocarbon sector regulations - Participation of indigenous peoples (IP) of otherenforcement and rural electrification projects countries in the process and training- In house capability to deliver similar training- Linkage with indigenous peoples (IP) of othercountries

Implementation Progress

Component Activities

First Phase: Preparation of training program;Second Phase: training activities and dissemination of lessons learned

Approval Date: 3/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 05/01/2000 10/31/2002

Project Closing (all financial transactions executed): 07/01/2000 12/31/2002

63

Page 78: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| S M P Latin America and Caribbean--Bolivia

P065663

Summary of Current Project Status, Issues and Actions:

07/12/2002: There have been delays in the review of the procurement of the equipment for the UTH and in thepreparation of manuals for the socialization program. The clearance from the Steering Committee was obtained earlyJuly 2002. The second specialization workshop will take place in Camiri (July 15 to 18, 2002). This workshop willreview the lessons learned by the UTH in the socialization program and the pending questions to improve theparticipatory monitoring practices.

SaskEnergy (Canada) decided to withdraw from the contract for the small scale gas applications component. A newbidding context has been carried out. R. Garcia and Consultores (Argentina) has been selected for assuming thisproject component. A contract is currently under preparation.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jn1- Disbursed Remaining

Approved Allocated Commitments Jnu 30, 2002 to Date Balance

(A) (B) (C) (D) (E) ( (G=8-E)

ESMAP Trust Funds $857,616 $857,616 $190,000 $116,176 $574,945 $282,670

World Bank (BB) $30,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $887,616 $857,616 190 $116,176 $574,945 $282,670

64

Page 79: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

|- AA n Latin America and Caribbean--Bolivia;Brazil------ *.,L I [} ILI ILI

P078011

Project Title: Good Practice Case Study in Integrating Environment into Gas and Oil PipelineProjects: Experiences Based on the Bolivia-Brazil Gas Pipeline

Business Line: Energy & Environment - Rapid Energy-Envt Reviews

Origin of Funds: Netherlands

Task Manager: Juan D. Quintero

Project Development Objective Key Indicator

Adoption of the documented good practices by other Review of project proposals within Banksimilar projects Tracking of projects in private sector.

Expected Outputs Key Indicators1. Good practice documentation satisfactory to the 1. Case study and lessons learned reviewed, clearedBank produced and published2. Workshop held 2. Workshop held, participation satisfactory

Implementation ProgressComponent Activities

1. * Production of good practice case study illustrating lessons learned in integrating environmental and social issues ;2.Workshop

Approval Date: 12/11/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 01/15/2003 No revision

Project Closing (all financial transactions executed): 03/03/2003 No revision

Summary of Current Project Status, Issues and Actions:

06/18/2002: The TORs have been finalized for the study (see attached). Three CVs of international consultants arecurrently being scored by the selection team, following the guidelines provided in AMS 15.00. The consultant will beselected and the hiring process begun by July 1, 2002.

65

Page 80: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

LZ NI , A} D Latin America and Caribbean--Bolivia;Brazil

L.jiyj.i ii ~~~~~~~~~~~~~~~~~~~~~~P078011

Budget Summaryas of June 30, 2002

DisursedOutstanding JanD 1 Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $117,000 $117,000 $22,000 $0 $0 $117,000

World Bank (BB) $29,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $146,000 $117,000 $22,000 $0 $0 $117,000

66

Page 81: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

M .g,< A A Latin America and Caribbean--Brazil

P074149

Project Title:. Brazil - Rural Electrification Strategy

Business Line: Energy Poverty - Rural/Renewable Energy Strategy

Origin of Funds: Netherlands

Task Manager: Jayme Porto Carreiro

Project Development Objective Key Indicator

Rural Electrification projects, based on effective public - By 2005, rural electrification projects, addressed tointerventions and increased private participation, are meet the needs of rural poor, are implemented inimplemented to provide sustainable energy services to two-thirds of the Brazilian states incorporatingpoor population, using modern and cost-effective sustainable delivery mechanisms and using modern andtechnologies. efficient technologies. In 10 of these states, projects are

implemented with private participation.

Expected Outputs Key IndicatorsA long term Rural Electrification Strategy to Rural Electrification Strategy is completed, incorporatingsubstantially increase access of poor rural population to the inputs of intermediate reports.modern energy services, using efficient technologieswith increased private sector participation.

Performance indicators of intermediate/final reports are:Strategy incorporates the findings of studies presentedin intermediate/final reports on: 1. Quantitative knowledge of current energy uses and1. Characterization of the energy market in selected needs, payment capacity, and potential demand for ruralrural areas of Brazil electric services is acquired/updated2. Diagnosis of current implementation conditions and 2. Lessons learned on implementation of ruralappraisal of past and current programs electrification programs are identified3. Innovative delivery mechanisms for rural 3. Innovative delivery mechanisms are designed andelectrification projects in a restructured energy sector assessed4. Rationale for public intervention 4. Rationale for public intervention is validated and itsParticipative design of RES, action plan, assistance to potential impact is assessedimplement strategy, and dissemination RES and action plan are completed after final

discussion with main stakeholders, required assistanceto implement strategy is identified, and results aredisseminated

Implementation Progress

Component Activities

1. Study of the main characteristics of the energy market in rural areas of selected Brazilian states;2. Diagnosis ofcurrent implementation conditions and appraisal of past and current rural electrification programs;3. Design andevaluation of innovative delivery mechanisms including private participation in the restructured Brazilian;4. Study ofimpact and validation of rationale for public interventions to be included in the rural electrification stra;5. Participativedesign of RES, preparation of action plan, identification of required assistance for implementation, an

67

Page 82: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- E SMv A ~ ^ D Latin America and Caribbean--BrazilP074149

Approval Date: 1/20/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 09/30/2002 No revision

Project Closing (all financial transactions executed): 12/31/2002 No revision

Summary of Current Project Status, Issues and Actions:

07/16/2002: A successful Rural Electrification Stakeholder's Consultation Workshop took place in Brasilia on June18, 2002, to discuss issues and options on rural electrification in Brazil. The specific objectives of the workshop wereto: (1) present and discuss a draft background document on national rural electrification strategy prepared by Bankconsultants; (2) promote the debate among key stakeholders on the issues related to rural electrification in Brazil; (3)identify the participants' views; and (4) involve the participants on the formulation of options for a rural electrificationstrategy.

The workshop was the first stakeholder consultation event for this study, which aims to identify options for acomprehensive, national rural electrification strategy, which would contemplate altemative decentralized solutions(including renewable energy technologies), where those are least cost options. An essential part of this study will beto explore the possible roles of the Government, private sector and other local and national actors. Hence, besidesthe need for substantial information gathering and analytical work, an essential condition for the success of suchstudy is the early participation of local stakeholders. The audience were more than 50 high level participants, such askey government officials involved in rural electrification, private sector investors, university representatives, nationalequipment suppliers and service providers, donor agencies, rural financing institutions, NGOs and representatives ofpotential pilot communities. The Bank's delegation was composed of Dominique Lallement (ESMAP Manager),Jayme Porto Carreiro (Task Manager), Kilian Reiche, Birgit Eitel and Katia Nemes (World Bank Task Team),Osvaldo Soliano and Christophe de Gouvello (consultants).

As an input to this first consultation, a consultant's background report was distributed to the participants. Afterpresentations from Dominique Lallement, Osvaldo Soliano, Christophe de Gouvello, and Marcello Poppe (Ministry ofMines and Energy), on lessons from the international experience with rural electrification and on the specificities ofthe Brazilian context, the participants split up into working groups to debate the issues identified in the backgroundreport. Three sub-groups were formed: (i) stand-alone one-user systems (such as solar home systems), (ii) isolatedvillage mini-grids (diesel and renewable energy systems), and (iii) grid extension. Each group held severalbrainstorming sessions, followed by a final plenary discussion of the conclusions.There was consensus among the participants on the benefits of the participatory approach adopted by ESMAP andon the need to pursue the dialogue on rural electrification strategy with the next government that takes power inJanuary 2003.Next Steps.

The project team will proceed to:

(1) Evaluate and summarize the conclusions reached by the workshop's three working groups.

(2) Based on the background report prepared for the workshop and the conclusions of the workshop, prepare areport on Rural Electrification Strategy Options for Brazil. (Nov. 2002)

(3) Discuss the report with the new Brazilian national administration that takes power in January 2003, and preparean implementation plan (Phase II of the ESMAP project).

68

Page 83: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (13) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $250,000 $250,000 $10,105 $69,235 $74,771 $175,229

World Bank (BB) $50,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $300,000 $250,000 $10,105 $69,235 $74,771 $175,229

69

Page 84: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

z ' I.ES M P v A A Latin America and Caribbean--Brazil jP075196

Project Title: Energy Efficiency in Medium and Small Water Supply Utilities

Business Line: Cross-Cutting - Methodologies and M&E (for energy and for multi-sectoral programming)

Origin of Funds: Netherlands

Task Manager: Amarquaye Armar

Project Development Objective Key Indicator

- Mainstream the use by water supply utilities of - Number of pilot sites (in small and medium size"Monitoring & Targetting [M&T] Implementation Plans" as municipalities) that successfully prepare and executebasis to improve service efficiency in small and medium "M&T Implementation Plans"size municipalities;

- Number of ABCON members and/or ASE-MWEP- Build capacity of ABCON members and/or ASE-MWEP counterparts that are trained and become proficient tocounterparts to develop and apply "M&T Implementation apply "M&T Implementation Plans" for water supplyPlans" for water supply operations; operations.

- Assist PROCEL" to disseminate "M&T Implementation - Use of case studies on "M&T Implementation Plans" forPlans" as a "best practice" tool for Brazil. water supply operations into the PROCEL "Best

Practices Information Program" for Brazil.

Expected Outputs Key Indicators1. Prepare and implement Comprehensive M&T 1. Number of "M&T Implementation Plans" that areImplementation Plans for each of the pilot sites are concluded and satisfactorily implemented by waterprepared and implemented;;2. Comprehensive "Toolkit supply utilities for small and medium sizefor "M&T Implementation Plans"(in Portuguese municipalities.;2. Number of ABCON members and/orlanguage) to be used for training activities are prepared ASE-MWEP counterparts that achieve proficiency in theand published and workshops are successfully application of the "Toolkit for M&T Implementationcompleted.;3. Audiovisual (CD format) for Plans".;3. Number of ABCON members and/ordissemination, as a "global best practice" tool for ASE-MWEP counterparts, and other clients of PROCELimproving energy efficiency, case studies on the that receive and utilize the dissemination materials.application of "M&T Implementation Plans" in small andmedium water supply operations, are available to allinterested parties.

Implementation Progress

Component Activities

1. Prepare, justify and arrange execution of M&T Implementation Plans for pilot sites;;2. Prepare "Toolkit on M&TImplementation Plans"(in Portuguese language) for training of water supply utility personnel;;3. Training Workshops andDissemination based on case studies on execution of WM&T Implementation Plans" through PROCEL

Approval Date: 7/13/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/30/2002 12/31/2002

Project Closing (all financial transactions executed): 09/30/2002 03/31/2003

70

Page 85: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

CC U A Latin America and Caribbean--Brazil_I. hi >_I v IL I 1

,~~~~~~~~~~~~~~~~~~~~~~~~~~~P075196

Summary of Current Project Status, Issues and Actions:

06/25/2002: Component l: Draft M&T Implementation Plans have been completed for the three participating ABCON"Host Water Supply Utilities", namely (i) NOVACON (Sao Paulo State), (ii) Agua do Imperador (Rio de Janeiro State),and (iii) SANEATINS (Tocantins State). In all, M&T Implementation Plans have been completed for ongoing watersupply operations of the 3 private water supply utilities covering 23 decentralized sites within 13 municipalities in theabove three states. In May 2002, the ESMAP Local Consultant met with each of the hosts, to identify a sub-set of 3-4representative sites ( at least one site each for NOVACON, Adl, SANEATINS) to be used for the pilot testingactivities. Specifications have been prepared so as to facilitate the procurement and installation (during July/August2002) of sub-metering devices at the pilot sites. During June 2002, an ESMAP mission (Messrs. Armar and lyer, andthe ESMAP Local Consultant) held discussions in Rio de Janeiro with representatives of the national developmentbank (BNDES) and the national infrastructure bank (CEF) to discuss their participation in a proposed "Roundtable"that is to deliberate on "Financing Options for M&T Implementation Plans". The Roundtable is an initiative of ABCONwhich is being supported by ESMAP (September/October 2002) to focus attention on the performance contractingaspects of implementating M&T Plans within regulatory framework (concessions/operator permits) for PSP in theBrazilian water sector.

Component 2: Preparation of the "Toolkit", including case studies is advanced and is expected to be completed inCD format by the end of December 2002. Powerpoint presentations (in Portuguese language) have been preparedand are being used for orientation of water supply professionals (see Component 3 below).

Component 3: Another ESMAP team member (Carlos Velez) joined the ESMAP Local Consultant at the secondworkshop organised by ASE-MWEP on "Energy Efficiency in the Water Sector in Fortaleza ( April 22-23, 2002).Subsequently on June 12, 2002, the ESMAP Local Consultant and the ESMAP mission (Messrs. Armar and lyer)visited at Joao Pessoa at the invitation of the Brazilian "Water Sector Modernization Program" - SEDU/PR (PMSS) todisseminate M&T principles and applications to participants at a seminar on "Planning, Design and Operation ofWater Supply Networks". During June 2002, the ESMAP mission met also with representatives of theSEBRAE-RJ/GTZ Energy Conservation Program to discuss future avenues to increase collaboration on M&Tdissemination strategy under the ongoing energy efficiency initiative for municipalities in Brazil.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1. Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $160,000 $160,000 $25,500 $83,963 $101,892 $58,108

World Bank (BB) $30,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $190,000 .$160000 $25,500 $83,963 $101,892 $58,108

71

Page 86: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Latin America and Caribbean--EcuadorAD ILII

. LhJIYLI II P072741

Project Title: Ecuador - Indigenous people's training program on oil development projects

Business Line: Market Development - Impact of Reform on the Poor

Origin of Funds: Core

Task Manager: Eleodoro 0. Mayorga Alba

Project Development Objective Key IndicatorDisseminate knowledge on potential benefits and Reduction of socio-cultural related conflicts in sociallyimpacts - thus reducing misinformation in the local fragile oil basis due to a better informed population;populations, and increasing possibilities for: i) reduction in the industry perceived risk in E&P ventures,distributing larger industry benefits on impacted regions, leading to an increase of investment, the discovery ofand ii) introducing independent environmental monitoring new hydrocarbon reserves and increased output; andpractice, involving the local population. better living standards of populations in frontier oil

provinces.

Expected Outputs Key IndicatorsAn improved industry regulatory framework on 50 trained indigenous representatives on hydrocarbonenvironmental and social impact related matters.; an industry legal, economic, environmental and socialincreased participation on indigenous peoples in the impact aspects; sufficient capacity including adaptedformulation of regulations and the design, construction, methodology and reaching materials to pursue theoperation and monitor of petroleum projects. knowledge dissemination effort; and a new regulation for

operations in indigenous lands approved bystakeholders' consensus.

Implementation Progress

Component Activities

Course evaluation and assessment of capacity to pursue dissemination.;Detail preparation of the 2nd course byconsultants;;Preparation and delivering of 2nd course by the selected trained indigenous representatives;and;Preparation of the training program involving indigenous leaders, industry and government staff;

Approval Date: 9/14/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 09/14/2001 03/31/2002

Project Closing (all financial transactions executed): 10/15/2001 06/30/2002

72

Page 87: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P072741

Summary of Current Project Status, Issues and Actions:

07/12/2002: From Sep. 16 to Oct. 7, 2001, the first course of the Program took place in Tena and Quito. It includedthree modules: (i) Legal and Technical Overview of the Oil industry, (ii) ElAs and relations between the oil industryand the indigenous peoples, and (iii) Project Design and Information Technology. It was attended by 28 participantsfrom 9 indigenous nationalities. The only nationality that did not participate was the Achuar. Presentations weremade by experts from industry, government, NGOs, academic and indigenous organizations. The course comprisedvisits to oil installations. The documents distributed included 57 different publications.

In spite of the different initial levels of knowledge, all participants show a great interest for learning and understandingthe complexity of the oil industry and its risks and benefits. Fundacion Natura was congratulated for the quality of thecourse and the achievement of the main objectives. Two specific features shoul be highlighted: (i) the course wasconsidered an important step to proceed with the development by stakeholder's consensus of a Reglamento foroperations in indigenous lands; and (ii) the participants learned about the projects developed by CONFENIAE toparticipate directly in industry investments.

A group of 11 Indigenous Peoples representatives were selected for the next phase that is expected to prepare thisgroup as "trainers" able to transmit in their communities the lessons learned. The selection was made incoordination with CONFENIAE on the basis of the participants evaluations made by Fundacion Natura. This phaseincludes stages in industry facilities and additional courses. Stages took place from December 2001 to February2002 in Peru (Proyecto Aguaytia), and Petroecuador and in the MEM.

The second course took place in Puyo (Feb 20-23, 2002). It was attended by the leaders of CONFENIAE andstudents from the "Universidad de la Amazonia". At this workshop the indigenous that received additional trainingand participated in the pasantias delivered presentations on five topics: ElAs, tripartite relations, oil technologies,collective rights and oil legislation; and presented their own views on the country's oil policy.

The evaluation of the entire program was extremely positive and as a result CONFENIAE is requesting ESMAPresources for a second phase in which it would be able to consolidate knowledge and establish an Oil and NaturalResources Technical Unit. The main report has been prepared for publication and the manuals were prepared bythe trained indigenous participants. These documents have been cleared by the MEM and the consultant team.

Budget Summaryas of June 30, 2002

DsbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $280,000 $280,000 $0 $78,827 $280,021 421

World Bank (BB) $0 $4 $0 $0 $4 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $280,000 $280,004 $0 $78,827 $280,025 -$21

73

Page 88: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

; -Zc ZN XA A D Latin America and Caribbean--Guatemala

P074232

Project Title: Health impacts of traditional fuel use

Business Line: Energy & Environment - Indoor Air Pollution

Origin of Funds: Netherlands

Task Manager: Kulsum Ahmed

Project Development Objective Key Indicator

To facilitate the adoption of efficient strategies and - Policy distortions that impede access to commercialpolicies for mitigating environmental damages from energy reduced or eliminatedhousehold energy, through quantification of related - Programs to promote cleaner fuels and improvedhealth impacts and review of policy options stoves initiated or enhanced

- Awareness increased within government of healthimpacts of pollution from household energy

Expected Outputs Key Indicators- Enhanced dialog with the government on household - Final report with main findings and recommendationsenergy, environment and health - Completed workshops- Improved knowledge of the health damages, their - Estimating levels of exposure and health impacts fromcauses and control interventions at the country level household energy- Lessons from experience and policy - Interim reports on data inventory, exposurerecommendations regarding possible household energy assessment, and lessons from improved stoveand other policies to alleviate health problems of indoor programs and fuel substitutionair pollution

Implementation Progress

Component Activities

1. Initiation workshop with country stakeholders to announce project (Nov 13, 2001);2. Review of the WHO-fundedGuatemala study on indoor air pollution;3. Analysis of the results of the recently-completed HIES and the LSMS withrespect to household energy and health;4. Measurement of indoor and local outdoor pollution exposure levels in asample of households;5. Review of implementation experience of improved stoves;6. Review of inter-fuel substitutionoptions;7. Preparation of report which quantifies health impacts and presents policy options;8. Dissemination of findings(workshop)

Approval Date: 2/14/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 10/01/2002 05/01/2003

Project Closing (all financial transactions executed): 12/31/2002 06/01/2003

Summary of Current Project Status, Issues and Actions:

07/09/2002: The activity continues as scheduled. The analysis of the results of the recently-completed HIES and theLSMS with respect to household energy and health was completed earlier this year. In addition, the reviews ofimplementation experience of improved stoves and inter-fuel substitution options are currently underway, andexpected to be completed by October 2002. A health-benefits analysis has also recently been initiated.

74

Page 89: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ac vE MA P ^ D Latin America and Caribbean--GuatemalaP074232

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remai ning

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $167,000 $167,000 $37,278 -$12,067 $39,955 $127,045

World Bank (BB) $40,000 $43,164 $0 $43,164 $43,164 $0

Non-ESMAP Trust Funds $25,000 $22,055 $0 $18,392 $22,055 $0

Total $232,000 $232,219 $37,278 $49,489 $105,174 $127,045

75

Page 90: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

_~ ES M A D v [)Latin America and Caribbean--Honduras]

P075127

Project Title: Technical Assistance to Proposed Expansion of Solar-Net Village Program

Business Line: Energy Poverty - Energy-Poverty Linkages

Origin of Funds: Netherlands

Task Manager: Clemencia Torres

Project Development Objective Key Indicator

To improve access to telecommunications, - No. of microenterprises created or assistedmicroenterprise development, social services and basic - No. of children in remote areas participating ineducation in remote rural areas through the Solar-Net computer-based learning programsVillage Program - No. of GOH staff and private persons trained in remote

power system design and maintenance

Expected Outputs Key Indicators1. Alternative expansion plan, with new criteria for Positive feedbacks from MST and COHCIT, workshopvillage selection and optimal design of ICT and solar participants, community leaders;;;power supply systems completed;2. Two trainingworkshops and one consultation seminar completed;3.Guidance and instructional materials on systems andservice packages developed;4. Integrated telecenter"partnering" concept demonstrated.

Implementation Progress

Component Activities

1. Consultant Studies: design of Sustainable Expansion Plan for Aldeas Solares Program;technical design of IT and solar;2. Demonstration Component;3. Workshops/seminar;4. Publication, Dissemination

Approval Date: 5/15/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/30/2002 04/30/2003

Project Closing (all financial transactions executed): 09/30/2002 06/30/2003

76

Page 91: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Latin America and Caribbean--HondurasKI NA A DP075127

Summary of Current Project Status, Issues and Actions:

07/01/2002: The Government of Honduras' Council for Science and Technology (COHCIT) requested the Bank'sassistance to its proposed expansion plan for the Aldeas Solares Program which is an initiative designed to providecenters for information and communication technologies (ICT) in remote rural areas for social, educational andmicrobusiness development purposes. The centers will be powered with solar energy systems. The purpose of theESMAP TA is to assist the GoH in testing a less-expensive way for a remote center to obtain internet access (viapacket radio transmission from another telecenter connected to an Internet Service Provider by landline), obtainexperience and data on operations and costs, and to develop criteria for selection of sites that could be benefited bythe installations. These will be done by establishing two remote telecenters partly with ESMAP funds using thismethod and piloting their operation over a 6 month period.

The ESMAP pilots will be carried out in the communities of La Montagna Grande and Las Trojes, both about 8-10kilometers (line-of sight) from the town of Santa Lucia where a telecenter built by the InternationalTelecommunications Union (ITU) is operational and would be the source of the intemet connection by radio. Expertsfrom Winrock Int. and ITU are in the process of preparing the procurement list for the two pilot sites. Hondutel, theSecretary of Education, ITU and COHCIT have agreed to assign the operation of the ICT to the community, mostprobably to the AECO (Asociaciones Educativas Comunitarias), which is a community organization founded withinPROHECO (Proyecto Hondureno de Educacion Comunitaria). The community will pay Hondutel for the internetaccess and Hondutel will be responsible for the maintenance of the packet radio equipment. The local vendor will beresponsible for the maintenance of the computer equipment. ITU, COHCIT, Hondutel and ESMAP will sign anagreement of understanding clarifying the roles of the participating institutions, the model of operation and the timeschedule for implementation.

Given the potential capability of the planned ICTs to provide social and educational services, the ESMAP-project hasdeveloped working linkages with the PROFUTURO project and specifically the JSDF grant which supportsPROFUTURO. Corresponding internet software and CD-ROMs for educational purposes of children in rural areaswill be developed though this grant. Also, the ESMAP project is working together with Telebasica, a television-basedsecondary distance education project, and Educatodos, a radio-based education project to reduce adult illiteracy.Students and teachers will also have free access to the internet for education purposes for certain hours.

The aim of the business development component is to help low-income micro and small businesses raise earningsby increasing their business skills, market access and competitiveness. The main strategy will be to drive growth ofthe local businesses by using ICTs services to expand connections with higher income segments of the national andinternational market by building business management skills. Amitigra, a national NGO working in the area of thepilot sites, will carry out an empirical study to evaluate the possibilities of the ICTs to increase the income of thesecommunities through business developrnent especially in the field of agriculture, flower business and ecotourism.

At least two training courses will be held as part of the ESMAP project: (i) a workshop to train operators of theintegrated centers in IT-based business development and (ii) a workshop to train operators in stand-alone PV powersupply design, installation and maintenance. Depending on the results of the research it will carry out, Amitigra willalso be responsible for the contents of the former workshop, while experts from Winrock Int. will organize the latterone including instructional materials suitable for rural areas. ITU and ESMAP wi

77

Page 92: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

IEC A A X A D Latin America and Caribbean--Honduras

P075127

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $197,000 $187,000 $16,550 $17,301 $38,759 $148,241

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $197,000 $187,000 $16,550 $17,301 $38,759 $148,241

78

Page 93: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- s a 4ZXA A

Project Title: Central America Gender in Sustainable Energy

Business Line: Cross-Cutting - Gender and Energy

Origin of Funds: Core

Task Manager: Maria C. Correia

Project Development Objective Key Indicator

Increased gender equity and efficiency of energy use Increased awareness of energy & gender linkagesand management, to meet the needs of poor women and (through meetings, workshops) among project andmen in Central America. program implementers and energy planners (est >8

meetings).* Increased commitment (planning and resources) toincorporating gender considerations in meetingenergy-related needs (project objectives, personneldedicated to issues).* Gender approach being applied to energy projects inthe region (est 2-4 projects involving women'sparticipation).

Expected Outputs Key IndicatorsIntra- and inter-regional information exchange takes Degree of interest in and commitment of memberplace on gender & energy.;Women and men of GENES organizations to GENES network:members apply gender approaches to their work. No. of GENES organizations requesting receipt of

bulletin, disaggregated by type-- NGO, association,cooperative, gov't agency, academic institution(est >50orgs.).* No. of GENES organizations, including bothCoordinators and others, contributing to quarterlybulletin(est >10 orgs.).* Commitment of Country Coordinators to maintainongoing contact with sub-network members (est > 3Coordinators).No. of meetings held at local/country level (est >5meetings);lnstitutional support for gender anddemand-responsive approaches:

GENES organizations initiating process of internalcapacity-building in gender and energy (est. >10 orgs.).

No. of workshops on gender and/or energy fortechnical and administration staff, field personnel,boards (est.15 workshops).

No. of women and No. of men within GENESorganizations sensitized to gender perspective (est. >50w/50 m).

No. and depth of manuals or guides on internalprocedures for incorporating gender perspective,reviewed and applied in GENES organizations (est 2guides).

No. of internal meetings addressing incorporation ofgender approaches to field projects (est. > 5 meetings).Development of policies that indicate institutionalsupport for gender and demand-responsive participation(est 2 policies).

79

Page 94: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

E-M/~D t \ s^ALatin America and Caribbean Region

P070922

Implementation Progress

Component Activities

Develop policy agenda in 2 key countries; Mobilize constituency to support policy change;;Develop prototype of trainingand field manual; facilitate exchange of gender training materials;;Establish effective vehicles for fluid informationexchange and beyond. Determine most effective means of communication;Facilitate capacity-building of GENESmembers in energy options:;Facilitate capacity-building of GENES members in gender approaches: Identify memberneeds for capacity-building;;Facilitate exchange of gender-sensitive energy training materials; Provide T.A. and supportfor national and regional ;facilitate identification & design of strategic gender-sensitive RE projects.;identify expertise ingender training; assessment and training tools;;ldentify member needs and capacities in energy; Identify expertise ingender options;;ldentify priority community development needs with energy component; Facilitate identification anddesign of strategic, ;Implement strategic pilot projects, initially in Nicaragua and Guatemala; and document pilotprojects.;including and especially ENERGIA; and procure hardware for network management.;Meetings withdecision-makers; presentations to policy-makers, program developers and implementers.;prepare/disseminate bulletinamong GENES members; Identify, translate and disseminate key documents among GENES members;;Promotingpolicy awareness and formulation of agendas for change in two key countries:;Provide T.A. and financial support indevelopment of pilot projects:;Provide T.A. and support for national and Regional workshops and exchanges.;verifyeffectiveness of communications and information dissemination; identify and pursue linkages with affinitynetwork;wokshops, and exchanges.

Approval Date: 3/24/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 07/15/2002 09/30/2002

Project Closing (all financial transactions executed): 07/31/2002 12/31/2002

Summary of Current Project Status, Issues and Actions:

07/15/2002: During the last six months the project progress is as follows: the three bi-national exchanges have beenheld. The second round of exchanges has taken place in conjunction with the second bi-national workshop. TwoGENES bulletins under the improved format have been produced, as well as CD-ROMs with the proceedings fromthe workshops and a 30 minutes video from the first workshop. The deadline for the submission of project pilotsproposals is the end of July and the selected projects are expected to be operating by September.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan I1- Disbursed Remaining

Approved Allocated Commitmtaents n 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $225,000 $225,000 $124,600 $53,076 $82,344 $142,656

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $225,000 $225,000 $124,600 $53,076 $82,34 $142,656

80

Page 95: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I E- .:. 4 v I A AD V Latin America and Caribbean Region

P073536

Project Title: Evaluation of Bank Experience with Integrated Rural Electrification Projects - SeedFunding

Business Line: Energy Poverty - Global Village Energy Partnership

Origin of Funds: Core

Task Manager: Dana Rysankova

Project Development Objective Key Indicator

To improve the design of the World Bank's rural More effective delivery of rural electricity serviceselectrification projects through World Bank lending operations

Expected Outputs Key IndicatorsReport which provides an overview of current Report meets sector manager's approvalmulti-sector, integrated projects in the LCR portfoliowith rural electrification components and helps decidewhether to conduct a more detailed investigation andwhich issues to focus on.

Implementation Progress

Component Activities

Review of project literature; compilation of contact information and issues; interviews;, report writing

Approval Date: 12/19/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 08/31/2002 No revision

Project Closing (all financial transactions executed): 09/30/2002 No revision

81

Page 96: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I z~NA A A D Latin America and Caribbean RegionL.iv IL I IP073536

Summary of Current Project Status, Issues and Actions:

08/06/2002: The purpose of the report has been to gain an overview of current multi-sector, integrated projects inLAC portfolio with rural electrification components. The research included compiling a list of projects, contactinformation and issues regarding the integration of rural electrification and other services, and interviewing therelevant task managers. The report provides an initial theoretical analysis of effects of integration on efficiency,effectiveness and sustainability of rural electrification investment, comparing it with initial findings in the identifiedprojects. The purpose of the review has been to help decide whether to conduct a more detailed investigation andwhich issues to focus on. 25 integrated multi-sector projects have been identified, of which only six includedsignificant energy components. The initial findings from the six analyzed projects suggest that:(i) In principal, integration has the potential to capture economies of scope, although it might reduce the benefits ofeconomies of scale.(ii) Most integrated projects adopted demand-driven approaches and/or combining electricity with other (productive orsocial) uses, increasing effectiveness of interventions(iii) In most cases, the projects did not pay adequate attention to the issue of efficiency and sustainability, partly dueto the lack of attention to electricity-specific issues in the project design, as RE component would typically berelatively small and/or complementary to larger-scale interventions.

A draft report has been completed and is being reviewed by the Task Manager and Sector Manager. The final reportwill be presented by August 2002.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan I - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $15,000 $15,000 $0 $760 $5,276 $9,724

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 _ $0 $0 $0

Total $15,000 $15,000 $0 $760 $5,276 $9,724

82

Page 97: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Latin America and Caribbean Region[4Y'NA ADrP074337

Project Title: LCR - Low income energy assistance

Business Line: Energy Poverty - Energy-Poverty Linkages

Origin of Funds: Netherlands

Task Manager: Quentin T. Wodon

Project Development Objective Key Indicator

To provide a best practice guide on how to implement For ESW: quality of analytical framework, policylow income energy assistance, and to enter in dialogue review, and estimates of benefitswith selected Governments and utilities on the issue For policy dialogue: country-specific progress, and LAC

response rate from utilities/Governments to survey ofprograms; participation in workshop

Expected Outputs Key IndicatorsESW best practice report and workshop + For ESW: quality of analytical framework, policycountry-specific dialogue (e.g., Bolivia, Honduras, review, and estimates of benefitsGuatemala). In-country capacity building through close For policy dialogue: country-specific progress, and LACcollaboration with Governments/utilities. response rate from utilities/Governments to survey of

programs; participation in workshop

Implementation Progress

Component Activities

1. Analysis of value of access for the poor using various methods (hedonic, etc.);2. Criteria for affordability, discussionof altemative subsidies/targeting;3. Inventory of programs, and attitudes towards them through utility survey;4. Write-upand workshop

Approval Date: 3/30/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/30/2002 No revision

Project Closing (all financial transactions executed): 09/30/2002 No revision

83

Page 98: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ES MD A A D Latin America and Caribbean Region

Summary of Current Project Status, Issues and Actions:

08/08/2002: Over the last few months, the priority has been on continuing the analytical work and get parts of it infinal form, with the material translated in Spanish, in order to provide a sound basis for training during the next phaseof the project.

1. WBI Book and translation. As mentioned in the previous Task Manager update, the analytical work for thisESMAP project contributed to a large extent to the publication of a book entitled "Accounting for Poverty inInfrastructure Reform: Learning from Latin America's Experience." The book was published by the World BankInstitute in February 2002. A translation in Spanish was prepared over the last few months and posted in May 2002on the web. We are looking for a publisher for this Spanish version (a translation of a previous version of the book isalso available in French). The book is being used in WBI workshops, and we plan to use it as well in the workshopfor this project, and more generally for training in Latin America.

2. Case studies. Another publication is being finalized. It consists of a review of the gains from access to basicinfrastructure, a summary analysis of how to design pro-poor reforms, and case studies for Bolivia, Guatemala, andpossibly Honduras (the three reference countries for this ESMAP project). This is done in collaboration with thePrivate Sector & Infrastructure (PSI) department for Latin America in the World Bank. Energy is prominent in thebook, but the book also analyzes some other sectors, mainly water, which is useful for comparison purposes. Ananalysis of the Honduras electricity subsidy is also being finalized for inclusion in a PPI publication. As mentioned inthe previous Task Manager's update, we are also expanding case studies for El Salvador, Paraguay, and possiblyother countries, at least in terms of basic diagnostics of the relationship between poverty and energy.

3. SimSIP (Simulations for Social Indicators and Poverty). This is on-going. As mentioned in a previous update,part of the objective of this task is to help countries preparing PRSPs to take poverty issues into account. Tofacilitate the technical work to be done by Government and/or utility staff, we have started to develop an Excel-basedsimulation tool for energy and poverty analysis. The analyst provides basic energy consumption data by decile, andthe simulation tool then provides various diagnostics, including those mentioned above. The simulation tool can alsobe used to assess the impact of access versus affordability policy interventions on social welfare. Some otherSimSIP tools were posted on the web starting in February 2002, but we are still working on the energy module incollaboration with the World Bank's PSI group for Latin America to ensure wider usage of the tool once completed.

4. Apart from finalizing all of the above, one part of the project will consist in preparing a survey of utilities in LatinAmerica, to inquire about their energy assistance programs. Another important component is a workshop to beorganized for policy makers and utilities. We have not implemented this yet.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan I1- Dsbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $150,000 $150,000 $17,010 $23,987 $55,247 $94,753

World Bank (BB) $20,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $170,000 $150,000 $17,010 $23,987 $55,247 $94,753

84

Page 99: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

F C A A A D Latin America and Caribbean Region

P065664

Project Title: Refining Industry in LCR - Sector Reform and Fuel Quality Improvement

Business Line: Market Development - Basic Sector Reform

Origin of Funds: Core; Canada; Netherlands

Task Manager: Eleodoro 0. Mayorga Alba

Project Development Objective Key Indicator

Improve air quality and public health by accelerating the Broad agreement on the cost, financing schemes and aintroduction of cleaner fuels at least cost to society realistic time table for the introduction of clean fuels

Expected Outputs Key Indicators1. The cost of introducing cleaner fuels 1. Cost estimate calculated2. Recommendation for optimal future refining sector 2. LP model output is used to indicate where there

should be refinery modernization and expansion, andwhere there should be closure

3. Recommendation for policy changes that can 3. Policy analysis points to adverse consequences offacilitate the introduction of cleaner fuels state control and recommends policy changes that

would facilitate optimal refinery investment in the future

Implementation Progress

Component Activities

Consultation and dissemination;Refinery analysis;Sector reform analysis

Approval Date: 8/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 07/31/2001 09/30/2002

Project Closing (all financial transactions executed): 09/30/2001 12/31/2002

Summary of Current Project Status, Issues and Actions:

07/12/2002: On March 4-5, 2002, the Steering Committee met in Washington to reviewed the two consultant reportsand approve the agenda for the dissemination workshop. The consultants' report to be discussed in this workshophas been completed. It was not possible to obtain an agreement on the invitation of Trinidad & Tobago, theCommittee has decided to arrange for the workshop in Quito - Ecuador (July 22-23, 2002)

85

Page 100: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Latin America and Caribbean RegionI,CZ~NAA DP065664

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1. Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $509,082 $509,082 $45,000 $130,615 $473,930 $35,152

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Fund $0 $0 $0 $0 $0 $0

Total $509,082 $509,082 $45,000 $130,615 $473,930 $35,152

86

Page 101: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ElM A r Latin America and Caribbean Region

Project Title: Regional Interconnection b/w Southern American Electricity Markets Phases I & 11

Business Line: Market Development - Regional Markets

Origin of Funds: Core

Task Manager: Jean-Pierre Charpentier

Project Development Objective Key Indicator

Provide an opportunity for all decision-makers of the Number of decision-makers attending the two keypower sector of the different countries of South America foreseen meetings of the activity (launching and reviewto better understand the key technical, organizational, workshop)and regulatory issues which may represent constraints to Request for launching a second phase ofthe development of regional electricity trading activities recommendation upon satisfactory completion of theamong member states. present activity aimed at identifying issues.

Expected Outputs Key Indicators1. Two issues reports: one on present technical 1. Issue date: June 2000;2. Organization date: Junebottlenecks and a second on present institutional and 2000regulatory issues;2. A review workshop to discuss thefindings of this first phase of activities and torecommend a second phase aimed at studyingoperational options

Implementation ProgressComponent Activities

Launching workshop;Preparation of report on present institutional and regulatory issues;Preparation of report onpresent technical bottlenecks;Review workshop to discuss findings and, if requested, launching a second phase onpossible options;Selection of key consultants

Approval Date: 8/1/1999

Expected Dates for: Original 'Revised

Project Completion (all project activities completed): 07/01/2000 03/31/2002

Project Closing (all financial transactions executed): 10/01/2000 06/30/2002

Summary of Current Project Status, Issues and Actions:

06/11/2002: The final versions of the reports related to phase I and 11 of the project were published and widelycirculated among CIER's participants. These reports were well received and actively discussed during several CIER'smeetings and a third phase aimed at implementing several recommendations of phase 11 were requested. A requestof project proposal for a Phase IlIl of implementation was developed and proposed for ESMAP funding. This thirdphase would deal with implementation of some of the recommendations identified during the second phase, inparticular the adjustment of different national regulatory systems to facilitate trading activities and the preparation ofdraft proposals for the development of key regional entities also identified during the second phase such as: aCoordinating Commission for Regional Regulation (CRR) , a Coordinating Commission for Regional Operations(CRO) and a Coordinating Commission for Commercial Management of a Regional Market (CCM).

87

Page 102: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Latin America and Caribbean Region[4ZZ NA A DP068335

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $430,377 $430,377 $0 $0 $404,695 $25,682

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $430,377 $430,377 $0 $0 $404,695 $25,682

88

Page 103: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

E S Ml v l] WPLatin America and Caribbean Region

Project Title: Regulatory issues of off-grid energy service delivery as part of national ruralelectrification strategies

Business Line: Energy Poverty - Global Village Energy Partnership

Origin of Funds: Netherlands

Task Manager: Clemencia Torres

Project Development Objective Key Indicator

- Achieve improvement of private sector led off-grid - No. of off-grid projects carried outelectrification in target countries through: - No. of private companies involved in off-grid work- Well-adopted public-private partnerships - No. of off-grid households provided connection- Improved efficiency and sustainability of existing and - No. of off-grid energy service concessions operating infuture off-grid concessions and licenses through a sustainable and efficient wayincreased capacity of regulators and concessionaires

Expected Outputs Key Indicators1. Workshop Proceedings;2. Final report including Positive feedback from workshop participants;Positiverecommendations on regulation of rural off-grid feedback on final report and publication as ESMAPconcessions and draft elements of standard bidding report;;More interest of private sector in future biddingsdocuments;3. Capacity built in target countries(regulators and concessionaires);4. Interest created inprivate sector

Implementation Progress

Component Activities

Task 1: Literature Review ;Task 2: Field Visits;Task 3: Stakeholder interviews;Task 4: Draft Study;Task 5: Seminar;Task 6: Final Report

Approval Date: 7/23/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 08/30/2002 No revision

Project Closing (all financial transactions executed): 11/30/2002 No revision

Summary of Current Project Status, Issues and Actions:

07/10/2002: During missions to Bolivia, Brazil and Nicaragua, interviews have been conducted with local counterparts(regulatory agencies, project execution agencies, Government counterparts, private sector and other stakeholders).Existing material and projects relevant for offgrid regulation have been analyzed for the countries named above andexisting regulatory barriers to an efficient scale-up of offgrid electricity service provision have been identified.

89

Page 104: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

.- C A D Latin America and Caribbean Region

P076081

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed RemainingApproved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $150,000 $150,000 $330 $6,116 $6,180 $143,820

World Bank (BB) $20,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $170,000 $150,000 $330 $6,116 $6,180 $143,820

90

Page 105: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P~-A:QXA A 8 S^,2Latin America and Caribbean Region

P053523

[Project Title: Rural Electrificaition & Power Reform in Central America

Business Line: Market Development - Impact of Reform on the Poor

Origin of Funds: Netherlands; Core

Task Manager: Douglas French Barnes

Project Development Objective Key Indicator

(a) Complete background study on rural electrification [Original proposal not in log-frame format ]options in Central America and Panama.(b) Development of priorities for grid and off gridelectricity projects for rural areas.(c) Assess strategies to develop market for products toserve people without access to grid electricity.(d) Assess feasibility of user's associations and privateentrepreneurs to promote electricity service in ruralcommunities without access to grid electricity.

Expected Outputs Key Indicators(i) Complete background review of countries in the [Original proposal not in log-frame format I

region, including sector policies affecting ruraldistribution.(ii) Develop priorities for grid and offgrd electrificationin consultation with the country governrnents.(iii) Complete a workshop on electrification in one ofthe countries in the region

Implementation Progress

Component Activities

[ Original proposal not in log-frame format ]

Approval Date: 10/1/1997

Expected Dates for: Original Revised

Project Completion (all project activities completed): 07/01/2000 10/31/2002

Project Closing (all financial transactions executed): 08/01/2000 12/31/2002

Summary of Current Project Status, Issues and Actions:

07/15/2002: The consultant has completed the draft. TM will work on the production of the final Women and EnergyStudy report to be delivered by November 2002.

91

Page 106: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

IES M 9_ \ 1kA A 10 Latin America and Caribbean Region

P053523

Budget Summaryas of June 30, 2002

DisbursedOutstnding Jan I1 Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B . (C) (D) (E) (G=B-E)

ESMAP Trust Funds $302,000 $302,000 $0 $50,000 $305,539 -$3,539

World Bank (BB) $0 $1,688 $0 $0 $1,688 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $302,000 $303,688 $0 $50,000 _ $307227 -$3,539

92

Page 107: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Project Title: Energy Sector Reform - Phase I

Business Line: Market Development - Basic Sector Reform

Origin of Funds: Core

Task Manager: Jonathan D. Halpern

Project Development Objective Key Indicator

Provision of better decision making tools to Secretaria de Production of a first draft White Paper on Energy PolicyEnergia. by Secretaria.

Expected Outputs Key Indicators1. First draft of White Paper on policy supplied to 1. First draft for White Paper on policy completed.;2.Secretaria. ;2. Draft report on governance of state Collection of data on oil sector required for analysis ofenterprises supplied to Secretaria.;3. Outline of impacts of alternative tax regimes.;3. Paper onalternative taxation schemes presented.;4. 3 governance of state owned enterprises completed inworkshops with senior staff in Secretaria on issues of first draft.;4. Workshops delivered.;synthesis reportsector reform;Macroeconomic impact of energy sector and in country seminarreform

Implementation Progress

Component Activities

Fuels policy paper;Govemance Paper;lnstitutional strengthening;Macroeconomic Implications of Energy Reform;PolicyWhite paper;Taxation paper and software

Approval Date: 8/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/01/2000 09/30/2002

Project Closing (all financial transactions executed): 09/01/2000 12/30/2002

93

Page 108: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I - s < XA AD Latin America and Caribbean--Mexico

P064933

Summary of Current Project Status, Issues and Actions:

08/29/2002: TM Update 06/02: Mexican authorities met with new Bank staff working on Mexican energy program inApril 02 and agreed on the general scope for work with the CRE: preparing web-based software to permit privateparties contemplating investment in power generation to estimate wheeling charges based on consistently applied setof technical and cost parameters. Such a facility will reduce time/costs associated with submission and approval ofpower generation permits by CRE and will signal the cost implications of altemative plant siting to prospective powergenerators. The proposed web based facility will be particularly beneficial to grid-based renewable energy projectsas they are small and generally do not have extensive financing for project development. CRE submitted to the Bankfairly general TORs for a consulting contract in late June 02 which is currently being revised. When CRE submits fullfinal TORs and budgets, the Bank will advise ESMAP. After this, the Bank will contract and supervise theconsultants.

The Macro Impact of Energy Reform study was delayed due to the unavailability of the expert consultant forcompleting computer simulations and write-up of results. All recalibrations and runs are now completed and write-upof results is also underway. The full draft report will be completed before the end of calendar year 02.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $402,000 $192,199 $0 $0 $143,224 $48,975

World Bank (BB) $150,000 $877 $0 $0 $877 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $552,000 $193,076 $0 $0 $144,101 $48,975

94

Page 109: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

CY ZXN7 A_ Latin America and Caribbean--Mexico

P073535

Project Title: Mexico - TA for long-term program for renewable energy development

Business Line: Energy Poverty - Rural/Renewable Energy Strategy

Origin of Funds: Core

Task Manager: Oscar Avalle

Project Development Objective Key Indicator

Achieve significant contribution of renewable energy - Number of LSGC RET projects firmly identified attechnologies (RETs) in energy supply mix of Mexico program initiation (1-2 yrs after ESMAP project)within the medium term (about 10 years) - Number of policy actions recommended by ESMAP

report enacted by GOM- Number of personnel from various government andprivate agencies and trained in RET projectimplementation

Expected Outputs Key IndicatorsA recommended long-term strategy (about 10 years) to - Publication by ESMAP of Strategy Reportcreate initial markets for large-scale grid-connected - Endorsement by SE iof report's recommendations(LSGC) RETs in Mexico, and sustain these marketscommercially. Strategy includes recommendation forfinancing incremental costs.

Implementation Progress

Component Activities

Task 1: Review- existing institutional and policy framework for RET development; experience with past RET projects;ong;Task 2: Review policy options to create initial markets for LSGC RETs (NOFFO, Portfolio Standards, etc) andselect suita;Task 3: Develop APL-type 10-12 year program for RET development, with well-defined outline of Phase 1and logically argu

Approval Date: 11/14/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 03/31/2002 09/30/2002

Project Closing (all financial transactions executed): 06/30/2002 12/31/2002

Summary of Current Project Status, Issues and Actions:

07/15/2002: To support the development of a renewable energy strategy in Mexico, we agreed with our Mexicancounterparts to request ITAM to prepare a detailed analysis of Mexico's current energy matrix, and based on thatmatrix what instruments could be used effectively to promote a more intensive use of renewable energy sources. Inparticular the report focused on the viability of wind as an effective energy source that could be used in some areasof Mexico. Additionally, ITAM started to develop a proposal on how to use Green Certificates in combination with aGreen Fund as a way to make the use of renewable energy financially and economically viable.

95

Page 110: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

E S MIP A A Latin America and Caribbean--Mexico

P073535

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $100,000 $100,000 $8,798 $18,016 $21,801 $78,199

World Bank (BB) $15,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $115,000 $100,000 $8,798 $18,016 $21,801 $78,199

96

Page 111: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Project Title: Nicaragua - Pilot commercialization of improved cookstoves

Business Line: Energy & Environment - Indoor Air Pollution

Origin of Funds: Netherlands

Task Manager: Clemencia Torres

Project Development Objective Key Indicator

To improve kitchen and household environment, reduce Wood fuel consumption per household reduced by 45%indoor pollution, lower cooking costs by achieving a shiftto cookstoves of higher efficiency and reduced smoke Cooking costs per household reduced by 40%

Expected Outputs Key IndicatorsPhase 1: 1-2 ICS of at least 25% efficiency tested andSuitable ICS (Improved CookStoves) models and chosen for pilotprivate sector collaborators identified; Detailed plan for 2-3 private manufacturers actively engaged infactory conversions, marketing and promotions drawn commercial manufacture.up At least 1000 ICS produced annually and at leastPhase 2: half soldICS factories start production; Promotional campaigncarried out; Sales of initial batch of ICS achieved

Implementation Progress

Component Activities

Phase 1.1 Tests and selection of ICS models;Phase 1.2 Market assessment, stove testing and productiondemonstration, and dissemination strategy completed. ;Phase 2.1 Actual factory conversions and production of initialbatch of ICS;Phase 2.2 Execution of marketing plan and promotional campaign in pilot areas;Phase 2.3 Monitoring andevaluation of cookstoves performance, consumer satisfaction and woodfuel savings

Approval Date: 10/23/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 06/14/2002 10/31/2002

Project Closing (all financial transactions executed): 07/15/2002 12/31/2002

97

Page 112: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

-J c C A AD Latin America and Caribbean--Nicaragua1 IL 'L I

P073293

Summary of Current Project Status, Issues and Actions:

07/01/2002: The purpose of this ESMAP-financed technical assistance activity is to catalyse the commercialization ofimproved household stoves in Nicaragua by improving the understanding of consumer preferences, developing aneffective dissemination strategy, selecting financially viable high-efficiency models which satisfy consumerpreferences, training and supporting private entrepreneurs to manufacture and sell them in a financially sustainablemanner, and supporting development of credit networks for stove purchase. The specific objectives are to improvethe kitchen and household environment, reduce indoor pollution and lower cooking costs. The pilot activity consistsof (a) the conduct of a market assessment survey and indoor air pollution measurements, and (b) the conduct of apilot commercial dissemination activity in selected cities, involving selected private stoves manufacturers assisted inconverting to higher efficiency stoves and in promoting and marketing the products. The commercialization part ofthe project was subcontracted to the NGO Proleha.

The market assessment surveys were carried out in Managua, Leon and Granada where 975 households and 300businesses in periurban and urban areas were interviewed. The first draft of the market survey is already completed.Based on results Prolena has decided to focus the pilot commercial dissemination under the ESMAP project onManagua and Leon.

Anticipating the existence of a commercial market, Prolena has developed and will further improve three new modelsof different sizes with production costs of about 20, 25 and 33 US$, respectively. The selling price will be around 30,35 and 45 US$, respectively. The body of these stoves is made out of a mixture of pumice and cement. Further, allstoves have a chimney which directs smoke and soot outdoors and a plate out of metal.

Further, Proleria and the Center for Entrepreneurship in International Health and Development (CEIHD) at theUniversity of Berkeley in Califomia have carried out indoor air pollution measurements in Ciudadela Tipitapa which isabout 20 miles outside Managua. In 30 households using traditional open fire places 24-hour measurements werecarried out with monitors placed on the person doing the cooking as well as in the room where the cooking is done. Inother 30 households - after one month of using the new stoves donated by Prolena - 24-hour measurements werecarried out. In this context, Proleia has also evaluated the fuelwood savings and the acceptance of the differentmodels. So far, the field tests are very promising. Aside from drastically reducing indoor pollution, tests showhouseholds can save about 50% of fuelwood use, compared to cooking with open fire. The first draft reportsummarizing the results will most probably be ready in July.

Regarding the participation of private sector producers, Prolenia is now evaluating the possibility of training severalmore small and medium enterprises working in the concrete business to build the body of the stove. Prolefia wouldproduce and deliver the metal parts like the chimney and the plate. In addition, Prolenia would control the quality ofthe stoves and could give certificates to producers who meet a certain quality standard. Currently, Prolenia iscollecting data on availability of brick manufactures in Managua, Leon and Chinandega.

There is minimal delay of this project. Out of a total of $175,000 ESMAP funding, over $154,000 have beendisbursed or committed. We expect to finish the project and the white cover early next year (February, March 2003).

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments J 30, 2002 to Date Balance

(A) (B) . (C) _ (D) (E) (G=B-E)

ESMAP Trust Funds $175,000 $175,000 $83,752 $27,821 $75,585 $99,415

World Bank (BB) $25,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $200,000 $175,000 $83,752 $27,821 $75,585 $99,415

98

Page 113: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| -.A *A ID Latin America and Caribbean--Nicaragua

P078519

Project Title: Policy & Strategy for the Promotion of Renewable Energy Resources in Nicaragua

Business Line: Energy Poverty - Rural/Renewable Energy Strategy

Origin of Funds: Netherlands

Task Manager: Clemencia Torres

Project Development Objective Key Indicator

A detailed policy strategy for the development of A detailed policy strategy for the development ofrenewable resources (on-grid and off-grid) under the renewable resources (on-grid and off-grid) under thecurrent sector conditions is adopted. current sector conditions is adopted.

Key stakeholder group and their interests identified. Key stakeholder group and their interests identified.

Conflicts in stakeholder interests addressed and Conflicts in stakeholder interests addressed andresolved. resolved.

Expected Outputs Key Indicators1 Current regulatory and macro-economic situation of 1 Barriers and potential are identifiedRenewable Energies is known

2 Market for the development of renewable energy is 2 Demand and supply have been quantifiedknown

3 Policy and strategy recommendations have been3 Recommendations for Policy Strategy for the madeDevelopment of Renewable Energies have beendeveloped

4 Self-assessments of stakeholders, quality of4 CNE and other stakeholders have increased capacity renewable energy projects implementedto evaluate and implement renewable energy projects

Implementation Progress

Component Activities

1 Situation Analysis1.1 Identify market barriers, strengths and weaknesses (technical, regulatory, fiscal, financial) t;2 Market Study2.1 Proposal for development and structure of potential market for renewable energy2.2 Workshop;3 Policy Strategy Options3.1 Policy Analysis - Energy indicators, and economic policy3.2 Perspectives for the inclusio;4 Capacity4.1 Workshops for CNE4.2 Elaboration of training material4.3 Evaluation models for renewable energy, for gr;5 Seminar for dissemination of resultsFour Outreach Workshops;6 Publications

99

Page 114: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Latin America and Caribbean--Nicaraguaf½fZC.A ADP0785 19

Approval Date: 3/27/2002

Expected Dates for: Original Revised

Project Completion (all project activities completed): 07/30/2004 No revision

Project Closing (all financial transactions executed): 10/30/2004 No revision

Summary of Current Project Status, Issues and Actions:

07/15/2002: Implementation of the newly approved activity started during a March, 2002, mission to Nicaragua duringwhich the scope of work and work plan were discussed with the Comisi6n Nacional de Energia (energy ministry), theInstituto Nacional de Energia (energy regulator) and the private sector. Coordination with the PERZA project(IDA/GEF off-grid electrification project, currently in preparation) and other related projects has started. Wind energyhas been identified as the most immediate promising renewable energy technology for grid connection. A detailedTOR for a wind energy assessment, including an evaluation of the economic value of wind energy/capacity and gridintegration engineering and policy issues, has been finalized in close cooperation with CNE and consultants will beprocured shortly. A review of the existing policies for renewable energy development in Nicaragua, as evaluated in aCNE study produced under IADB/Government of Norway financing, has also commenced. The outcome of thereview will be reflected in TOR to guide the main part of the ESMAP policy recommendation/formulation activities.

Budget Summaryas of June 30, 2002

DsbursedOutstanding Jan I - Disbursed Remaining

Approved Allocated commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $250,000 $250,000 $1,980 $190 $190 $249,810

World Bank (BB) $45,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $295,000 $250,000 $1.980 $190 $190 $249,810

100

Page 115: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Project Title: Global Efficiency in Sidi Bernoussi Industrial & Per!-Urban Area

Business Line: Energy Poverty - Peri-Urban Initiative

Origin of Funds: France

Task Manager: Rene G. Mendonca

Project Development Objective Key IndicatorSidi Bernoussi stake-holders agree upon consistent 75% endorsement rate among industrialtechnical, financial, institutional and commercial stake-holdersarrangements needed to permanently upgrade energy Formal agreement of the representatives of theand water access, efficiency and environmental impact. shanty town community

Loan conventions, technical terms of reference,management contracts, between Sidi Bernoussiend-user community and potential contractors ready fornegotiation

Expected Outputs Key Indicators1. The following documents have been finalized: 1. Timely approval of the documents by the Project

(a) Water, energy efficiency market studies in the Steering Committee;2. Project budget and timing

(b) Water and electricity market study in the consistently executed as forecastperiurban area

(c) Technical prefeasibility studies(d) Assessment of the financial needs and credit

opportunities(e) Description of possible institutional

arrangements(f) Identification of potential service contractors;2.

The project has been successfully managed

Implementation Progress

Component Activities

1, (a) to (f), and 2.: The Steering Committee has been installed and held its first meeting on June 10. It approved the ;1.(a) to (e): Consultant for these tasks has been chosen on May 15, 1999. Since then contracting procedure is in progre

Approval Date: 10/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 09/30/2000 09/01/2002

Project Closing (all financial transactions executed): 06/30/2001 09/01/2002

101

Page 116: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

t5N A A D a S ] l]Middle East and North Africa--Morocco

P065461

Summary of Current Project Status, Issues and Actions:

06/19/2002: The industrial zone of Sidi Bernoussi (Izdihar), one of the largest in Casablanca, consists of about 350industrial enterprises. The first phase of the project has been satisfactorily completed, which consisted mainly inestimating the potential for energy conservation, assessing the main issues of the slum situation and validating theinterest of the industrialists for the approach selected. Part of the savings generated from energy conservation willbe used to relocate the various "bidonvilles", and thus eliminating the slums situation. Consultancy services for thisphase was carryout by the French firm Innovation Energie Developpement (IED).

The second phase, which was awarded to IED (started in September 2000), involves the preparation of feasibilitystudies, including producing the project document(s) required for fund mobilization for the full project. The workwould be implemented through Energy Services Companies (ESCOs), first, on a pilot basis. Additional funds (aboutUS$20,000) was obtained from ADEME for the completion of some of the pilot projects. In this context, it should benoted that 3 industrial clients have been identified as pilot projects and have agreed to contribute financially towardthe feasibility study for energy conservation investments. Also 2 slum areas have been identified and agreed uponas first preference for the housing component of the project. Currently, for one of the two slums, apartments wherethe families would be willing to move have been identified, the dwellers have expressed their interest and willingnessto pay. Negotiations with the dedicated financing agency (CIH) are currently ongoing.

The last mission to close the project took place in February 2002. The results of the project was presented to theSteering Committee during that mission. The project ESMAP final report, which would include follow-up projectrecommendations is being finalized and will be distributed to ESMAP soon for their comments. It is expected to becompleted by July/August 2002.

The challenge now is to expand the pilot phase into a full project, dealing with the whole industrial zone. As afollow-up to this project, a GEF project brief (medium sized project) is being finalized and will be submitted to theGEF secretariat for consideration

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $340,000 $340,000 $31,830 $6,664 $286,327 $53,673

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 . $0 $0 $0 $0 $0

Total $340,000 $340,000 $31,830 $6,664 $286,327 $53,673

102

Page 117: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I] i _S_A_ South Asia--Bangladesh }!-W la I V ILt VI ~~~~~~~~~~~~~~~~~~P072626

Project Title: Towards Formulating a Rural Energy Strategy

Business Line: Energy Poverty - Rural/Renewable Energy Strategy

Origin of Funds: Core; Sweden

Task Manager: Douglas French Barnes

Project Development Objective Key Indicator

Implementation of rural energy strategy. Strategy endorsed by the GOB and supported by Govt.agencies, NGOs, donors.

Expected Outputs Key Indicators1. Rural energy strategy for Bangladesh (report). Availability of the report at BBS, research organizations,

institutions of higher learning by end of project.2. Dissemination program implemented.

Report is complete and of good quality.

Survey and study results complete according toschedule.

Implementation Progress

Component Activities

Assessment of Rural Energy Delivery Mechanisms; Cooking and Lighting Altematives Study;;Compilation of ExistingRural Energy Data;;Final Rural Energy Strategy; and Strategy Dissemination.;Prepare Draft Rural Energy Strategy;Rural Energy Strategy Workshop;;Rural Household Energy Survey; Rural Industry Energy Survey;

Approval Date: 7/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 01/04/2002 03/31/2003

Project Closing (all financial transactions executed): 02/28/2002 06/30/2003

Summary of Current Project Status, Issues and Actions:

07/15/2002: Contracts have been signed to conduct a microenterprise and energy survey, and the survey has beeninitiated. We are still in the last stages of negotiation for the contract on the household energy survey. Because ofproblems with an insurance clause that we are working out with the consultant, the activity has been delayed byseveral months. The project completion date is estimated to be March 2004.

The trust fund will need to be extended in order for us to begin this contract.

103

Page 118: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| i- r C bN AAD South Asia--Bangladesh

P072626

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1 - Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $310,000 $228,542 $61,200 $512 $17,919 $210,623

World Bank (BB) $20,000 $82,277 $0 $25,537 $82,277 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $330,000 $310,819 $61,200 $26,048 $100,196 $210,623

104

Page 119: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

'K S] vECNAAD South Asia--India]I- LhJI Lf viI

P075756

Project Title: Access of the Poor to Cleaner Household Fuels in India

Business Line: Energy & Environment - Indoor Air Pollution

Origin of Funds: Netherlands

Task Manager: Kseniya Lvovsky

Project Development Objective Key Indicator

Improve policy formulation with respect to subsidizing the GOI decision on the timeframe and mechanisms foruse of household petroleum fuels; promote policies that retaining kerosene/LPG subsidies (if any) that reflectharmonize fiscal, social (access/health), and sectoral study recommendationspriorities

Expected Outputs Key Indicators1. Intensified dialog with the petroleum sector on 1. Initiation of the process to reflect study findings inpricing/subsidy issues;2. Evaluation and comparison of policy decisions/documents ;2. Study report ;3. A reviewalternative subsidy schemes (and no subsidy scenario) and acceptance of findings and methodology ,4.presented in a form conductive for policy decisions;3. A Increased awareness of different approaches totested methodology for evaluating household fuel promoting cleaner household fuels and their merits andsubsidies, applicable to other countries;4. shortcomingsDissemination and increasing awareness of studyfindings

Implementation ProgressComponent Activities

1. Data collection;2. Computer model development;3. Analysis and interpretation of results ;4. Policy dialog;5.Preparation of study reports and dissemination briefs ;6. Workshops, dissemination and publication

Approval Date: 5/16/2001

Expected Dates for: Original Revised

Project Completion (all project activities completed): 11/30/2002 01/31/2003

Project Closing (all financial transactions executed): 01/31/2003 03/31/2003

Summary of Current Project Status, Issues and Actions:

06/28/2002: The work of consultants (SERFA) is progressing well; inception and interim reports were deliveredDraft final report is expected in September 2002, followed by Bank review and a stakeholder workshop in India inNovember or December 2002. The final report will be completed in January 2003.

105

Page 120: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

South Asia--India

P075756

Budget Summaryas of June 30, 2002

DisbursedOutstanding Ja 1 Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) _ (B) . (C) (D) (E) (G=B-E)

ESMAP Trust Funds $100,000 $100,000 $32,923 $32,122 $32,186 $67,814

World Bank (BB) $110,000 $0 $0 $0 $0 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $210,000 $100,000 $32,923 $32,122 $32,186 $67,814

106

Page 121: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

I - - h A A D South Asia--IndiaL.~ JI v I I

P070938

Project Title: Household Energy & Women's Lives: The Case of India

Business Line: Cross-Cutting - Gender and Energy

Origin of Funds: Core

Task Manager: Douglas French Barnes

Project Development Objective Key Indicator

* To improve knowledge and raise awareness of the Review literature on women and energy in India;impact of various household energy types on women's Entering village level infrastructure data collectedlives or time use. through the India Rural Energy Survey. This includes* To examine how the village infrastructure affects the details pertaining to electrification, infrastructure andrelationship between household energy use and amenities, educational facilities, populationwomen's lives. characteristics, irrigation sources and groundwater;* To improve knowledge on the institutional and policy Establishing a contribution of various factors thatconstraints with respect to household energy in rural affect women's lives in rural India;India. Conducting analyses on the impact of traditional and* To outline efficient strategies and policies related to other fuels, including electrification, controlling for villagehousehold energy use with a view to imnproving the infrastructure, on women's lives;welfare of women. Assessing the impact of various fuels on women's

welfare and work;Identifying institutional and policy obstacles to the

adoption of alternative energy sources;Formulating policy options related to household

energy use with a view to improving the welfare ofwomen.

Expected Outputs Key IndicatorsReport on Women and Rural Energy in India Completion of Report

Implementation Progress

Component Activities

Analysis and Assessment;Data Entry of Village Infrastructure;Editing and Final Report;lnterviewing Experts and Officialsin India; Literature Review; Preparing Report; Review Report

Approval Date: 12/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 08/31/2000 10/31/2002

Project Closing (all financial transactions executed): 10/31/2000 12/31/2002

107

Page 122: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

[ IC NA A D South Asia--India

P070938

Summary of Current Project Status, Issues and Actions:

07/15/2002: The consultant completed the draft report and the TM is working on the final draft which should becompleted by Sept/Oct 2002.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed RemainingApproved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $50,000 $50,000 $0 $15,379 $49,951 $49

World Bank (BB) $0 $12,667 $0 $10,483 $12,667 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $50,000 $62,667 $0 $25,863 $62,618 $49

108

Page 123: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ES MIA D . o JI VPSouth Asia--IndiaP069390

Project Title: Household Energy, Air Pollution and Health

Business Line: Energy & Environment - Indoor Air Pollution

Origin of Funds: Netherlands

Task Manager: Kseniya Lvovsky

Project Development Objective Key Indicator

To generate knowledge that will facilitate the adoption of Policy distortions that impede access to commercialefficient strategies and policies for mitigating energy reduced/eliminatedenvironmental damage from household energy at the Programs to promote cleaner fuels and improvednational and state levels stoves initiated/enhanced

Public awareness increased

Expected Outputs Key Indicators1. Issues Paper on Rural Access to Petroleum Fuels(for Oil Coordination Committee)2. Case Study of the Deepam Initiative for expandingaccess to LPG connections in AP3. Evaluation of Improved Stove Programs - SelectedCase Studies4. TA to MNES for Intervention-based Exposure (andHealth) Assessment5. Development of Methodology for Estimating IAPExposure Levels6. Public Awareness

Implementation ProgressComponent Activities

Data inventory for India district data;Dissemination workshop;Exposure and damage assessment;Mitigation options andreview ;Synthesis of findings

Approval Date: 10/1/1999

Expected Dates for: Original Revised

Project Completion (all project activities completed): 03/01/2001 09/30/2002

Project Closing (all financial transactions executed): 05/01/2001 11/30/2002

109

Page 124: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

| EitiSirtv i,A ^ D South Asia--India

- '~~~~~~~~~~~~~~~~~~: ~~~~~~~~P069390

Summary of Current Project Status, Issues and Actions:

06/28/2002: The main study is completed. The report has been peer reviewed, finalized, and delivered to governmentcounterparts. The study resulted in specific findings and recommendations of practical relevance for formulating IAPmitigation strategies, particularly in respect to promoting low cost measures such as improved biomass stoves andhousing improvements. Furthermore, through its information dissemination and awareness raising component, thestudy facilitated attention to the detrimental health and development impacts of traditional household energy and theneed for multi-sectoral solutions within and outside India. For the first time, IAP issues have been includedprominently in the new 10th Five Year Plan in India.

Several donor organizations and GOI agencies came forward to co-sponsor the regional workshop to disseminateand discuss the draft final report of the study in Delhi on May9-10, 2002 that brought over 150 participants from 15countries and tumed into a major forum on household energy and IAP issues in the developing world. High level GOIofficials and Bank senior managers participated in the workshop. The workshop endorsed the findings of the studyand developed a set of recommendations, which is included in the final report as an annex.

Next steps. Two more IAP Newsletters are under preparation and will be published in July 2002. The ESMAP reportis expected to be published in August 2002. Separate technical publications will be also produced for three majorstudy components: evaluation of the LPG promotional program in AP (publication in SAR discussion series isapproved), evaluation of best performing improved stove programs in six Indian states, and exposure assessmentand modeling in AP. Per advice of a peer review, a policy brochure summarizing the main findings andrecommendations of the study for policy makers and a broad audience is also planned. As a follow up to the study, apossible project to support the commercialization and emphasis on health outcomes of state-level improvedcookstoves programs is being discussed with the Government of India.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan i - Disbursed Remaining

Approved AJlocated commitments Jun 30, 2002 to Date Balance(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $120,000 $120,000 $3,600 $27,737 $117,564 $2,436

World Bank (BB) $40,000 S5,500 $0 $0 $5,500 $0

Non-ESMAP Trust Funds $o0 0 $0 $0 $0

Total $160,000 $125,500 $3,600 $27,737 $123,063 $2,436

110

Page 125: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

A 4 A ~~~~~~~~~~~~~~~~~South Asia--India| -- - ESMAP ~~~~~~~~~~~~~~~~~~~~~P072936

Project Title: India - Environmental Policies for the State Power Sector - Rapid Assessment forKarnataka & Uttar Pradesh

Business Line: Energy & Environment - Rapid Energy-Envt Reviews

Origin of Funds: Netherlands; Core

Task Manager: Mudassar lmran

Project Development Objective Key Indicator

Progress towards developing an environmental policy for General agreement on the key issues and options.the power sector.

Open discussions with the civil society and otherstake-holders

Expected Outputs Key IndicatorsPower sector related environmental policies and Completed RAs for Karnataka and UP.options are incorporated as components in the statepower restructuring programs in Karnataka and UP.

Dissemination workshops in Karnataka and U. Completed workshops and implementation strategy.

Capacity building in Karnatka and UP Completed capacity building in Kamataka and UP.

Implementation Progress

Component Activities

1. RA for Karnataka;2. RA for UP;3. Participatory workshop in Karnataka ;4. Participatory workshop in UP;5. CapacityBuilding in Karnataka;6. Capacity Building in UP

Approval Date: 10/13/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 12/31/2001 12/31/2002

Project Closing (all financial transactions executed): 03/31/2002 03/31/2003

111

Page 126: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

; AJ s A f wp South Asia--India

P072936

Summary of Current Project Status, Issues and Actions:

07/11/2002: A mission to Karnataka and Uttar Pradesh (UP) took place during the period March 4-9 (combined withother missions to India), to Interalia: to brief the respective Energy Secretaries and other stake-holders about thescope of work; introduce the consultants; and to establish working arrangements at the state level.

The main developments are as follows: because of the unstable political environment in UP following the stateelections, and the uncertainty surrounding the duration of the existing political environment, the UP RapidAssessment (RA), as originally planned -- with the ownership of the State Government -- cannot be undertaken. Inagreement with ESMAP and Bank South Asia management, the team initiated discussions with Rajasthan as analternative to UP. Based on initial discussions with Principal Secretary Energy, Government of Rajasthan, Rajasthanexpressed willingness to participate in the RA. The two case study states are now likely to be Karnataka andRajasthan. Mission travel has been suspended to India because of security concerns. As soon as the travelsuspension is lifted, I plan to take a mission to India and resume the work.

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $222,750 $222,750 $135,923 $28,163 $58,056 $164,694

World Bank (BB) $50,000 $33,746 $0 $20,129 $33,746 $0

Non-ESMAP Trust Funds $0 $0 $0 $0 $0 $0

Total $272,750 $256,496 $135,923 $48,291 $91,802 $164,694

112

Page 127: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

AA A 15 v t1 W PSouth Asia RegionK LhnviI ii ~~~~~~~~~~~~~~~~~~~~~~~P073511

Project Title: South Asia Urban Air Quality Management Strategy

Business Line: Energy & Environment - Local and Global Environment Synergies

Origin of Funds: Netherlands

Task Manager: Masami Kojima

Project Development Objective Key Indicator

Acceptance of an air pollution abatement strategy by Indicatorsmunicipal and/or federal governments which is realistic, 1. Intensified dialogue and agreements with clientcost-effective, and sustainable given the limited financial governments and the donor community on a strategicand human resources available in the region and clearly sequenced approach to urban air quality

improvement, and on the preferred scope and role ofdonor assistance.2. Increased awareness of the social costs andcross-sectoral nature of urban air pollution, as well as itslinks to poverty

Outcomes1. Greater institutional capacity to developcost-effective strategies in the future2. All important sources of pollution addressed, not justtransport

Expected Outputs Key Indicators1. Strategy note prepared 1. Strategy paper written (4 weeks)

2. Issues notes prepared 2. Several issues notes (6 months)

3. Meetings and discussions with donor and 3. Minutes of meetings, back-to-office reports andgovernment officials in India held aide-memoires (4 months)

4. Cost-effectiveness calculations 4. Calculations completed and policy options ranked (4

5. Three workshops in the region months)5. Workshops held

6. Issues notes translated into the vernacular; ESMAPreport published 6. Issues notes in different local languages distributed

Implementation Progress

Component Activities

1. Economic analysis of air pollution measures, and identifying gaps;2. Preparation of several issues notes;3. Holdingconsultation meetings;4. Preparation of a strategy note;5. Holding regional workshops;6. Publications in English andlocal languages

113

Page 128: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

K XZ~~~~~~~~~NAAD ~~~~~~~~South Asia Region

P073511

Approval Date: 10/23/2000

Expected Dates for: Original Revised

Project Completion (all project activities completed): 12/31/2001 11/15/2002

Project Closing (all financial transactions executed): 03/31/2002 12/31/2002

Summary of Current Project Status, Issues and Actions:

06/12/2002: Four more briefing notes have been issued. They are

* South Asia Urban Air Quality Management Briefing Note No. 3: Urban Air Pollution: How Can Urban Bus PolicyReduce Air Pollution?This note looks at a general policy framework that makes the provision of clean bus services financially viable for thesupplier and affordable to the user.

* South Asia Urban Air Quality Management Briefing Note No. 4: Urban Air Pollution: What Do We Know about AirPollution?-India Case StudyThis note summarizes the key findings of the report prepared by Tata Energy Research Institute which reviewed theinformation available since 1990 in India on urban air quality.

* South Asia Urban Air Quality Management Briefing Note No. 5: Urban Air Pollution: Impact of Better TrafficManagementThis note considers the various ways in which traffic management can affect local air pollution, and suggests how itmay be best employed to secure both traffic flor and environmental benefits.

* South Asia Urban Air Quality Management Briefing Note No. 6: Urban Air Pollution: Urban Planning and Air QualityThis note focuses on the potential impact of different spatial structures on air quality, and options for improving airquality through urban planning.

All the notes are intended to shift the focus of debate in South Asia from the current one---often focusing narrowly ontechnical solutions to urban air pollution--to that which takes into account broader cross-sectoral policy issues inurban, transport, industry and energy. To discuss the issues raised in the briefing notes and to get feedback,stakeholder consultation in the form of a workshop was held in Mumbai, India on May 14, 2002. The workshop wasattended by over 50 people from the central and local governments, NGOs, universities and research institutions. Anumber of suggestions were made for future briefing note topics. Of special interest was the experience of MexicoCity in vehicle emissions inspection. Mexico Energy-Environment Review, also funded by ESMAP, did an extensivereview of the Mexican experience and this will be shared in South Asia in this program.

The website for this program [http://www.worldbank.org/sarurbanair] continues to serve as the main disseminationtool. Hard copies of the briefing notes are also distributed throughout the region and some have been reported by themedia.

114

Page 129: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Budget Summaryas of June 30, 2002

DisbursedOutstanding Jan 1- Disbursed Remaining

Approved Allocated Commitments Jun 30, 2002 to Date Balance

(A) (B) (C) (D) (E) (G=B-E)

ESMAP Trust Funds $195,000 $195,000 $50,220 $13,749 $25,199 $169,801

World Bank (BB) $0 $0 $0 $0 $0 $0

Non-ESMAP Trust Fund $0 $0 $0 $0 $0 $0

Total $195,000 $195,000 $50,220 $13,749 $25,199 $169,801

115

Page 130: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,
Page 131: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ESMAP Portfolio as of June 30, 2002By Task Manager's Name

Ahmed, KulsumP074232 Health impacts of traditional fuel use Latin America and Under Implementation

Caribbean--Guatemala

Alba, Eleodoro 0. MayorgaP048500 Petroleum Transportation Corridors Africa Region Publication in Process

1'065663 Training Program for Key Group Representatives From Latin America and Under ImplementationIndigenous People Regional Organizations/Rural Energy Caribbean-BoliviaDevelopment, Phase 2

F'065664 Refining Industry in LCR - Sector Reform and Fuel Latin America and Under ImplementationQuality Improvement Caribbean Region

P072741 Ecuador - Indigenous people's training program on oil Latin America and Under Implementationdevelopment projects Caribbean--Ecuador

Armar, AmarquayeP075196 Energy Efficiency in Medium and Small Water Supply Latin America and Under Implementation

Utilities Caribbean--Brazil

Atur, VaradarajanP064743 Energy Efficiency (Reconnaissance) Europe and Central Under Implementabon

Asia-Romania

Avalle, OscarP073535 Mexico - TA for long-term program for renewable energy Latin America and Under Implementation

development Caribbean-Mexico

Bacon, Robert W.P065311 Removing Obstacles to Cross-Border Oil & Gas Global Publication in Process

Pipelines

P073751 Assessing the impacts of energy sector reform on the Global Under Implementationpoor

Barnes, Douglas FrenchP035324 Rural Energy Study South Asia--India Publication in Process

P053523 Rural Electrification & Power Reform in Central America Latin America and Under ImplementationCaribbean Region

P066021 Best Practices for Grid Electrification - Phase 2 Global Under Implementation

P070938 Household Energy & Women's Lives: The Case of India South Asia--India Under Implementation

P072626 Towards Formulating a Rural Energy Strategy South Asia-Bangladesh Under Implementation

Carreiro, Jayme PortoP074149 Brazil - Rural Electrification Strategy Labn America and Under Implementabon

Caribbean-Brazil

Charpentier, Jean-PierreP044441 Commercialization of a Power Company East Asia and Publication in Process

Pacific-Cambodia

P068335 Regional Interconnection b/w Southem American Latin America and Under ImplementationElectricity Markets Phases I & II Caribbean Region

117

Page 132: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P068663 Regional Electricity Market: Mekong Basin Power Pool East Asia and Pacific Under ImplementationPhase ll Region

Correia, Maria C.P070922 Central America Gender in Sustainable Energy Latin America and Under Implementation

Caribbean Region

Crousillat, Enrique 0.P076113 Cambodia - Renewable Energy Action Plan East Asia and Under Implementation

Pacific--Cambodia

Davis, James RichardP077689 Rapid Assessment for Meeting Immediate Needs for Global Under Implementation

Water and Energy Services

Durand, Philippe J-P.P056928 National Biomass Programme Latin America and Publication in Process

Caribbean--Bolivia

Durix, LaurentP077595 Energy and Poverty Reduction Workshop Africa--Global;AFR Under Implementation

Ekouevi, KoffiP077534 Workshop on Rural Energy and Sustainable Africa--Cote d'lvoire Publication in Process

Development

Floor, Willem M.P070797 Advancing Modern Biomass Energy Opportunities & Global Under Implementabon

Challenges

Guistone, Alfred B.P070054 Environment and Health: Bridging the Gaps (Phase IV) Africa Region Publication in Process

Halpern, Jonathan D.P064933 Energy Sector Reform - Phase 1 Latin Amenca and Under Implementation

Caribbean--Mexico

Hamso, BjornP076097 Multilateral Energy Sector Assistance to the EU Europe and Central Asia Under Implementation

Accession Countries Region

Hoskote, MangeshP044764 Rural Energy Development Africa-Malawi Publication in Process

P052260 Corporatization of Distribubon Concessions through Africa-Ghana Publication in ProcessCapitalization

P070940 Power Trade in Nile Basin Phase 2 Africa Region Under Implementaton

P073936 CDM-assist: A collaborabve program to build CDM Africa Region Publication in Processcapacity in Africa

Husband, Charles A.P076111 Capacity building for national and provincial socially and East Asia and Under Implementation

environmentally sustainable management of coal Pacific-Chinaresources in China

ljjasz-Vasquez, Ede Jorge

118

Page 133: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P073630 Energy efficiency in urban water utilities in Central Asia Europe and Central Under ImplementationAsia--Central Asia

Imran, Mudassar

P057861 Dissemination on Environmental Issues in the Power South Asia--India Publication in ProcessSector

P072936 India - Environmental Policies for the State Power Sector South Asia--India Under Implementation- Rapid Assessment for Karnataka & Uttar Pradesh

Johnson, Todd M.

P068523 Sulfur Emission Mitigation Policies East Asia and Under ImplementationPacific-China

Kojima, Masami

P073511 South Asia Urban Air Quality Management Strategy South Asia Region Under Implementation

Lallement, Dominique M.

P074622 Global Village Energy Partnership (GVEP) Global Under Implementation

P075883 Designing a Poverty-focused, Gender-sensitive East Asia and Under ImplementationMonitoring and Evaluation Plan for a World Bank Pacific-CambodiaRenewable Rural Electrification Project

Lamech, Ranjit J.

P045206 Power Sector Regulation & Electricity Law East Asia and Publication in ProcessPacific-Vietnam

P069828 Power Pool Study East Asia and Under ImplementationPacific-Thailand

Lvovsky, Kseniya

P069390 Household Energy, Air Pollution and Health South Asia--India Under Implementation

P075756 Access of the Poor to Cleaner Household Fuels in India South Asia-India Under Implementation

Masse, Rene

P044275 Decentralized Rural Electrification Africa--Cameroon Publication in Process

McPherson, Charles P.

P069382 Petroleum Sector Review Africa--Nigeria Publication in Process

Mendonca, Rene G.

P065461 Global Efficiency in Sidi Bernoussi Industrial & Middle East and North Under ImplementationPeri-Urban Area Africa--Morocco

Mikhail, Said R.

P068875 Development of a Regional Power Market in West Africa Africa Region Under Implementation

Moose, James SayleP069434 Key Aspects of Energy-EnvironmentUGHG Strategy Europe and Central Under Implementation

Asia-Macedonia

P074557 Turkey: Energy and Environment Review (Phase ll) Europe and Central Under ImplementationAsia-Turkey

Oduolowu, Akin 0.

119

Page 134: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P049639 Oil Spills Occurrence Database, Modeling, Remediation Europe and Central Asia Publication in Processand Prevention Region

Quintero, Juan D.

P078011 Good Practice Case Study in Integrating Environment Latin America and Under Implementationinto Gas and Oil Pipeline Projects: Experiences Based Caribbean-Bolivia;Brazilon the Bolivia-Brazil Gas Pipeline

Reliquet, Chantal

P070684 Clean Air Initative in Sub-Saharan African Cities Africa Region Under Implementation

Rivera, Salvador

P058884 Coal Stove Improvement Program East Asia and Publication in ProcessPacific--Mongolia

Rysankova, Dana

P073536 Evaluation of Bank Experience with Integrated Rural Latin America and Under ImplementationElectrificabion Projects - Seed Funding Caribbean Region

Sa, Paulo De

P072947 Vietnam - Policy dialogue seminar and new mining code East Asia and Under ImplementationPacific--Vietnam

Savary, Pierre

P023711 TA to DOE and TANESCO Africa-Tanzania Publication in Process

P023879 Energy Sector Restructuring Africa-Zambia Publication in Process

P044440 Regional Electricity Demand Management TA - Phase II Africa Region Publication in Process

Shah, Jitendra J.

P069992 Motorcycle Fleet Upgrade to Reduce Air Pollution in East Asia and Under ImplementationBangkok Pacific--Thailand

Shum, Selina Wai Sheung

P072413 Philippines - Village power fund and incubator for East Asia and Under Implementationrenewable energy enterprises Pacific--Philippines

Stuggins, Gary

P073366 Lithuania - Heating supply to small cities/towns Europe and Central Under ImplementationAsia--Lithuania

Svensson, Bent R.

P049075 Gas Flaring Reduction Global Publication in Process

P050391 Institutional Reform & Restructuring of Petrovietnam Gas East Asia and Publicabon in ProcessCompany Pacific-Vietnam

Takahashi, Masaki

P074684 China: Policy Advice on Implementation of Clean Coal East Asia and Under ImplementationTechnology projects. Phase II Pacific--China

Taylor, Robert P.

P073016 Developing Financial Intermediabon Mechanisms for Global Under ImplementationEnergy Efficiency Projects in Brazil, China and India

Torres, Clemencia

120

Page 135: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P073293 Nicaragua - Pilot commercialization of improved Latin America and Under Implementationcookstoves Caribbean--Nicaragua

P075127 Technical Assistance to Proposed Expansion of Latin America and Under ImplementationSolar-Net Village Program Caribbean--Honduras

P076081 Regulatory issues of off-grid energy service delivery as Latin America and Under Implementationpart of national rural electrification strategies Caribbean Region

P078519 Policy & Strategy for the Promotion of Renewable Latin America and Under ImplementationEnergy Resources in Nicaragua Caribbean--Nicaragua

Townsend, Alan F.P076760 Azerbaijan - Natural Gas Sector Restructuring and Europe and Central Under Implementation

Regulatory Reform Asia-Azerbaijan

Travers, Sumter LeeP070678 Heat strategies in low-income transition countries Europe and Central Asia Publication in Process

Region

Wodon, Quentin T.P074337 LCR - Low income energy assistance Latin America and Under Implementation

Caribbean Region

Xie, JianP073145 Developing Regional Clean Air Networks Global Publication in Process

121

Page 136: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ESMAP Portfolio as of June 30, 2002By Project ID

P023711 Pierre Savary TA to DOE and TANESCO AFR/Tanzania Publication in Process

P023879 Pierre Savary Energy Sector Restructuring AFR/Zambia Publication in Process

P035324 Douglas French Rural Energy Study SAR/lndia Publication in ProcessBarnes

P044275 Rene Masse Decentralized Rural Electrificabon AFR/Cameroon Publication in Process

P044440 Pierre Savary Regional Electricity Demand Management TA - AFR/AFR Publication in ProcessPhase II

P044441 Jean-Pierre Commercialization of a Power Company EAP/Cambodia Publication in ProcessCharpentber

P044764 Mangesh Hoskote Rural Energy Development AFR/Malawi Publication in Process

P045206 Ranjit J. Lamech Power Sector Regulation & Electricity Law EAPNietnam Publication in Process

P048500 Eleodoro 0. Mayorga Petroleum Transportation Corridors AFR/AFR Publication in ProcessAlba

P049075 Bent R. Svensson Gas Flaring Reduction GLB/Global Publication in Process

P049639 Akin 0. Oduolowu Oil Spills Occurrence Database, Modeling, ECA/ECA Publicabon in ProcessRemediation and Prevention

P050391 Bent R. Svensson Institubonal Reform & Restructuring of Petrovietnam EAPNietnam Publication in ProcessGas Company

P052260 Mangesh Hoskote Corporatization of Distribution Concessions through AFR/Ghana Publication in ProcessCapitalization

P053523 Douglas French Rural Electrification & Power Reform in Central LCR/LCR Under ImplementationBames America

P056928 Philippe J-P. Durand National Biomass Programme LCR/Bolivia Publication in Process

P057861 Mudassar Imran Dissemination on Environmental Issues in the Power SAR/India Publication in ProcessSector

P058884 Salvador Rivera Coal Stove Improvement Program EAP/Mongolia Publication in Process

P064743 Varadarajan Atur Energy Efficiency (Reconnaissance) ECA/Romania Under Implementation

P064933 Jonathan D. Halpem Energy Sector Reform - Phase 1 LCR/Mexico Under Implementation

P065311 Robert W. Bacon Removing Obstacles to Cross-Border Oil & Gas GLB/Global Publication in ProcessPipelines

P065461 Rene G. Mendonca Global Efficiency in Sidi Bemoussi Industrial & MNA/Morocco Under ImplementationPeri-Urban Area

P065663 Eleodoro 0. Mayorga Training Program for Key Group Representatives LCR/Bolivia Under ImplementationAlba From Indigenous People Regional

Organizations/Rural Energy Development, Phase 2

P065664 Eleodoro 0. Mayorga Refining Industry in LCR - Sector Reform and Fuel LCRILCR Under ImplementationAlba Quality Improvement

P066021 Douglas French Best Practices for Grid Electrification - Phase 2 GLB/Global Under ImplementationBarnes

P068335 Jean-Pierre Regional Interconnecton b/w Southem American LCR/LCR Under ImplementationCharpentier Electricity Markets Phases I & II

P068523 Todd M. Johnson Sulfur Emission Mitigation Policies EAP/China Under Implementation

P068663 Jean-Pierre Regional Electridcty Market: Mekong Basin Power EAP/EAP Under ImplementationCharpentier Pool Phase il

P068875 Said R. Mikhail Development of a Regional Power Market in West AFR/AFR Under ImplementationAfrica

122

Page 137: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P069382 Charles P. Petroleum Sector Review AFR/Nigeria Publication in ProcessMcPherson

P069390 Kseniya Lvovsky Household Energy, Air Pollution and Health SAR/lndia Under Implementation

P069434 James Sayle Moose Key Aspects of Energy-Environment/GHG Strategy ECA/Macedonia Under Implementation

P069828 Ranjit J. Lamech Power Pool Study EAP/Thailand Under Implementation

P069992 Jitendra J. Shah Motorcycle Fleet Upgrade to Reduce Air Pollution in EAP/Thailand Under ImplementationBangkok

P070054 Alfred B. Gulstone Environment and Health: Bridging the Gaps (Phase AFR/AFR Publication in ProcessIV)

P070678 Sumter Lee Travers Heat strategies in low-income transition countries ECA/ECA Publication in Process

P070684 Chantal Reliquet Clean Air Initiative in Sub-Saharan African Cities AFR/AFR Under Implementation

P070797 Willem M. Floor Advancing Modern Biomass Energy Opportunities & GLB/Global Under ImplementationChallenges

P070922 Maria C. Correia Central America Gender in Sustainable Energy LCR/LCR Under Implementation

P070938 Douglas French Household Energy & Women's Lives: The Case of SAR/lndia Under ImplementationBarnes India

P070940 Mangesh Hoskote Power Trade in Nile Basin Phase 2 AFR/AFR Under Implementation

P072413 Selina Wai Sheung Philippines - Village power fund and incubator for EAP/Philippines Under ImplementationShum renewable energy enterprises

1'072626 Douglas French Towards Formulating a Rural Energy Strategy SAR/Bangladesh Under ImplementationBarnes

P072741 Eleodoro 0. Mayorga Ecuador - Indigenous people's training program on oil LCR/Ecuador Under ImplementationAlba development projects

P072936 Mudassar Imran India - Environmental Policies for the State Power SAR/India Under ImplementationSector - Rapid Assessment for Karnataka & UttarPradesh

P072947 Paulo De Sa Vietnam - Policy dialogue seminar and new mining EAPNietnam Under Implementationcode

FP073016 Robert P. Taylor Developing Financial Intermediation Mechanisms for GLB/Global Under ImplementationEnergy Efficiency Projects in Brazil, China and India

P073145 Jian Xie Developing Regional Clean Air Networks GLB/Global Publication in Process

P073293 Clemencia Torres Nicaragua - Pilot commercialization of improved LCR/Nicaragua Under Implementationcookstoves

P073366 Gary Stuggins Lithuania - Heating supply to small cities/towns ECA/Lithuania Under Implementation

P073511 Masami Kojima South Asia Urban Air Quality Management Strategy SAR/SAR Under Implementation

P073535 Oscar Avalle Mexico - TA for long-term program for renewable LCR/Mexico Under Implementationenergy development

P073536 Dana Rysankova Evaluation of Bank Experience with Integrated Rural LCR/LCR Under ImplementationElectrification Projects - Seed Funding

P073630 Ede Jorge Energy efficiency in urban water utilities in Central ECA/Central Asia Under Implementationljjasz-Vasquez Asia

P073751 Robert W. Bacon Assessing the impacts of energy sector reform on the GLB/Global Under Implementationpoor

P073936 Mangesh Hoskote CDM-assist: A collaborative program to build CDM AFR/AFR Publication in Processcapacity in Africa

P074149 Jayme Porto Carreiro Brazil - Rural Electrification Strategy LCR/Brazil Under Implementation

P074232 Kulsum Ahmed Health impacts of traditional fuel use LCR/Guatemala Under Implementation

P074337 Quentin T. Wodon LCR - Low income energy assistance LCR/LCR Under Implementation

P074557 James Sayle Moose Turkey: Energy and Environment Review (Phase 111) ECA/Turkey Under Implementation

123

Page 138: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

P074622 Dominique M. Global Village Energy Partnership (GVEP) GLB/Global Under ImplementationLallement

P074684 Masaki Takahashi China: Policy Advice on Implementation of Clean EAP/China Under ImplementationCoal Technology projects. Phase II

P075127 Clemencia Torres Technical Assistance to Proposed Expansion of LCR/Honduras Under ImplementationSolar-Net Village Program

P075196 Amarquaye Armar Energy Efficiency in Medium and Small Water Supply LCR/Brazil Under ImplementationUtilities

P075756 Kseniya Lvovsky Access of the Poor to Cleaner Household Fuels in SAR/India Under ImplementationIndia

P075883 Dominique M. Designing a Poverty-focused, Gender-sensibve EAP/Cambodia Under ImplementationLallement Monitoring and Evaluation Plan for a World Bank

Renewable Rural Electrification Project

P076081 Clemencia Torres Regulatory issues of off-grid energy service delivery LCR/LCR Under Implementationas part of national rural electrification strategies

P076097 Bjorn Hamso Multilateral Energy Sector Assistance to the EU ECA/ECA Under ImplementationAccession Countries

P076111 Charles A. Husband Capacity building for national and provincial socially EAP/China Under Implementationand environmentally sustainable management of coalresources in China

P076113 Enrique 0. Crousillat Cambodia - Renewable Energy Action Plan EAP/Cambodia Under Implementabon

P076760 Alan F. Townsend Azerbaijan - Natural Gas Sector Restructuring and ECA/Azerbaijan Under ImplementationRegulatory Reform

P077534 Koffi Ekouevi Workshop on Rural Energy and Sustainable AFR/Cote d'lvoire Publication in ProcessDevelopment

P077595 Laurent Durix Energy and Poverty Reduction Workshop AFR/Global;AFR Under Implementation

P077689 James Richard Davis Rapid Assessment for Meeting Immediate Needs for GLB/Global Under ImplementationWater and Energy Services

P078011 Juan D. Quintero Good Practice Case Study in Integrating Environment LCR/Bolivia;Brazil Under Implementationinto Gas and Oil Pipeline Projects: ExperiencesBased on the Bolivia-Brazil Gas Pipeline

P078519 Clemencia Torres Policy & Strategy for the Promotion of Renewable LCR/Nicaragua Under ImplementationEnergy Resources in Nicaragua

124

Page 139: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

ESMAP Values your Feedback

If you have found this report useful, or would like toprovide comments on our reports and services, please

log on to our website at www.esmap.org and leave

your feedback. In this way we can better understandour audience's needs and improve the quality of our

knowledge products. Thank you.

ESMAP Management

Page 140: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,
Page 141: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Joint UNDP/World BankENERGY SECTOR MANAGEMENT ASSISTANCE PROGRAMME (ESMAP)

LIST OF REPORTS ON COMPLETED ACTIVITIES

Region/Country Activity/Report Title Date Number

SUB-SAHARAN AFRICA (AFR)

Africa Regional Anglophone Africa Household Energy Workshop (English) 07/88 085/88Regional Power Seminar on Reducing Electric Power SystemLosses in Africa (English) 08/88 087/88

Institutional Evaluation of EGL (English) 02/89 098/89Biomass Mapping Regional Workshops (English) 05/89 --Francophone Household Energy Workshop (French) 08/89 --Interafrican Electrical Engineering College: Proposals for Short-

and Long-Term Development (English) 03/90 112/90Biomass Assessment and Mapping (English) 03/90 --Symposium on Power Sector Reform and Efficiency Improvement

in Sub-Saharan Africa (English) 06/96 182/96Commercialization of Marginal Gas Fields (English) 12/97 201/97Commercilizing Natural Gas: Lessons from the Seminar inNairobi for Sub-Saharan Africa and Beyond 01/00 225/00

Africa Gas Initiative - Main Report: Volume I 02/01 240/01First World Bank Workshop on the Petroleum Products

Sector in Sub-Saharan Africa 09/01 245/01Ministerial Workshop on Women in Energy 10/01 250/01

Angola Energy Assessment (English and Portuguese) 05/89 4708-ANGPower Rehabilitation and Technical Assistance (English) 10/91 142/91Africa Gas Initiative - Angola: Volume II 02/01 240/01

Benin Energy Assessment (English and French) 06/85 5222-BENBotswana Energy Assessment (English) 09/84 4998-BT

Pump Electrification Prefeasibility Study (English) 01/86 047/86Review of Electricity Service Connection Policy (English) 07/87 071/87Tuli Block Farms Electrification Study (English) 07/87 072/87Household Energy Issues Study (English) 02/88 --Urban Household Energy Strategy Study (English) 05/91 132/91

Burkina Faso Energy Assessment (English and French) 01/86 5730-BURTechnical Assistance Program (English) 03/86 052/86Urban Household Energy Strategy Study (English and French) 06/91 134/91

Burundi Energy Assessment (English) 06/82 3778-BUPetroleum Supply Management (English) 01/84 012/84Status Report (English and French) 02/84 011/84Presentation of Energy Projects for the Fourth Five-Year Plan

(1983-1987) (English and French) .05/85 036/85Improved Charcoal Cookstove Strategy (English and French) 09/85 042/85Peat Utilization Project (English) 11/85 046/85Energy Assessment (English and French) 01/92 9215-BU

Cameroon Africa Gas Initiative - Cameroon: Volume III 02/01 240/01Cape Verde Energy Assessment (English and Portuguese) 08/84 5073-CV

Household Energy Strategy Study (English) 02/90 110/90Central AfricanRepublic Energy Assessement (French) 08/92 9898-CAR

Chad Elements of Strategy for Urban Household EnergyThe Case of N'djamena (French) 12/93 160/94

Page 142: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Region/Country Activity/Report Title Date Number

Comoros Energy Assessment (English and French) 01/88 7104-COMIn Search of Better Ways to Develop Solar Markets:

The Case of Comoros 05/00 230/00Congo Energy Assessment (English) 01/88 6420-COB

Power Development Plan (English and French) 03/90 106/90Africa Gas Initiative - Congo: Volume IV 02/01 240/01

C6te d'Ivoire Energy Assessment (English and French) 04/85 5250-IVCImproved Biomass Utilization (English and French) 04/87 069/87Power System Efficiency Study (English) 12/87 --Power Sector Efficiency Study (French) 02/92 140/91Project of Energy Efficiency in Buildings (English) 09/95 175/95Africa Gas Initiative - C6te d'Ivoire: Volume V 02/01 240/01

Ethiopia Energy Assessment (English) 07/84 4741 -ETPower System Efficiency Study (English) 10/85 045/85Agricultural Residue Briquetting Pilot Project (English) 12/86 062/86Bagasse Study (English) 12/86 063/86Cooking Efficiency Project (English) 12/87 --Energy Assessment (English) 02/96 179/96

Gabon Energy Assessment (English) 07/88 6915-GAAfrica Gas Initiative - Gabon: Volume VI 02/01 240/01

The Gambia Energy Assessment (English) 11/83 4743-GMSolar Water Heating Retrofit Project (English) 02/85 030/85Solar Photovoltaic Applications (English) 03/85 032/85Petroleum Supply Management Assistance (English) 04/85 035/85

Ghana Energy Assessment (English) 11/86 6234-GHEnergy Rationalization in the Industrial Sector (English) 06/88 084/88Sawmill Residues Utilization Study (English) 11/88 074/87Industrial Energy Efficiency (English) 11/92 148/92

Guinea Energy Assessment (English) 11/86 6137-GUIHousehold Energy Strategy (English and French) 01/94 163/94

Guinea-Bissau Energy Assessment (English and Portuguese) 08/84 5083-GUBRecommended Technical Assistance Projects (English &

Portuguese) 04/85 033/85Management Options for the Electric Power and Water Supply

Subsectors (English) 02/90 100/90Power and Water Institutional Restructuring (French) 04/91 118/91

Kenya Energy Assessment (English) 05/82 3800-KEPower System Efficiency Study (English) 03/84 014/84Status Report (English) 05/84 016/84Coal Conversion Action Plan (English) 02/87 --Solar Water Heating Study (English) 02/87 066/87Peri-Urban Woodfuel Development (English) 10/87 076/87Power Master Plan (English) 11/87 --Power Loss Reduction Study (English) 09/96 186/96Implementation Manual: Financing Mechanisms for Solar

Electric Equipment 07/00 231/00Lesotho Energy Assessment (English) 01/84 4676-LSOLiberia Energy Assessment (English) 12/84 5279-LBR

Recommended Technical Assistance Projects (English) 06/85 038/85Power System Efficiency Study (English) 12/87 081/87

Madagascar Energy Assessment (English) 01/87 5700-MAGPower System Efficiency Study (English and French) 12/87 075/87

Page 143: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Region/Country Activity/Report Title Date Number

Madagascar Environmental Impact of Woodfuels (French) 10/95 176/95Malawi Energy Assessment (English) 08/82 3903-MAL

Technical Assistance to Improve the Efficiency of FuelwoodUse in the Tobacco Industry (English) 11/83 009/83

Status Report (English) 01/84 013/84Mali Energy Assessment (English and French) 11/91 8423-MLI

Household Energy Strategy (English and French) 03/92 147/92Islamic Republicof Mauritania Energy Assessment (English and French) 04/85 5224-MAU

Household Energy Strategy Study (English and French) 07/90 123/90Mauritius Energy Assessment (English) 12/81 3510-MAS

Status Report (English) 10/83 008/83Power System Efficiency Audit (English) 05/87 070/87Bagasse Power Potential (English) 10/87 077/87Energy Sector Review (English) 12/94 3643-MAS

Mozambique Energy Assessment (English) 01/87 6128-MOZHousehold Electricity Utilization Study (English) 03/90 113/90Electricity Tariffs Study (English) 06/96 181/96Sample Survey of Low Voltage Electricity Customers 06/97 195/97

Namibia Energy Assessment (English) 03/93 11320-NAMNiger Energy Assessment (French) 05/84 4642-NIR

Status Report (English and French) 02/86 051/86Improved Stoves Project (English and French) 12/87 080/87Household Energy Conservation and Substitution (English

and French) 01/88 082/88Nigeria Energy Assessment (English) 08/83 4440-UNI

Energy Assessment (English) 07/93 11672-UNIRwanda Energy Assessment (English) 06/82 3779-RW

Status Report (English and French) 05/84 017/84Improved Charcoal Cookstove Strategy (English and French) 08/86 059/86Improved Charcoal Production Techniques (English and French) 02/87 065/87Energy Assessment (English and French) 07/91 8017-RWCommercialization of Improved Charcoal Stoves and CarbonizationTechniques Mid-Term Progress Report (English and French) 12/91 141/91

SADC SADC Regional Power Interconnection Study, Vols. I-IV (English) 12/93 -

SADCC SADCC Regional Sector: Regional Capacity-Building Programfor Energy Surveys and Policy Analysis (English) 11/91 -

Sao Tomeand Principe Energy Assessment (English) 10/85 5803-STP

Senegal Energy Assessment (English) 07/83 4182-SEStatus Report (English and French) 10/84 025/84Industrial Energy Conservation Study (English) 05/85 037/85Preparatory Assistance for Donor Meeting (English and French) 04/86 056/86Urban Household Energy Strategy (English) 02/89 096/89Industrial Energy Conservation Program (English) 05/94 165/94

Seychelles Energy Assessment (English) 01/84 4693-SEYElectric Power System Efficiency Study (English) 08/84 021/84

Sierra Leone Energy Assessment (English) 10/87 6597-SLSomalia Energy Assessment (English) 12/85 5796-SORepublic of

South Africa Options for the Structure and Regulation of NaturalGas Industry (English) 05/95 172/95

Page 144: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- 4 -

Region/Country Activity/Report Title Date Number

Sudan Management Assistance to the Ministry of Energy and Mining 05/83 003/83Energy Assessment (English) 07/83 4511-SUPower System Efficiency Study (English) 06/84 018/84Status Report (English) 11/84 026/84Wood Energy/Forestry Feasibility (English) 07/87 073/87

Swaziland Energy Assessment (English) 02/87 6262-SWHousehold Energy Strategy Study 10/97 198/97

Tanzania Energy Assessment (English) 11/84 4969-TAPeri-Urban Woodfuels Feasibility Study (English) 08/88 086/88Tobacco Curing Efficiency Study (English) 05/89 102/89Remote Sensing and Mapping of Woodlands (English) 06/90 --Industrial Energy Efficiency Technical Assistance (English) 08/90 122/90Power Loss Reduction Volume 1: Transmission and Distribution

SystemTechnical Loss Reduction and Network Development(English) 06/98 204A/98

Power Loss Reduction Volume 2: Reduction of Non-TechnicalLosses (English) 06/98 204B/98

Togo Energy Assessment (English) 06/85 5221-TOWood Recovery in the Nangbeto Lake (English and French) 04/86 055/86Power Efficiency Improvement (English and French) 12/87 078/87

Uganda Energy Assessment (English) 07/83 4453-UGStatus Report (English) 08/84 020/84Institutional Review of the Energy Sector (English) 01/85 029/85Energy Efficiency in Tobacco Curing Industry (English) 02/86 049/86Fuelwood/Forestry Feasibility Study (English) 03/86 053/86Power System Efficiency Study (English) 12/88 092/88Energy Efficiency Improvement in the Brick and

Tile Industry (English) 02/89 097/89Tobacco Curing Pilot Project (English) 03/89 UNDP Terminal

ReportEnergy Assessment (English) 12/96 193/96Rural Electrification Strategy Study 09/99 221/99

Zaire Energy Assessment (English) 05/86 5837-ZRZambia Energy Assessment (English) 01/83 4110-ZA

Status Report (English) 08/85 039/85Energy Sector Institutional Review (English) 11/86 060/86Power Subsector Efficiency Study (English) 02/89 093/88Energy Strategy Study (English) 02/89 094/88Urban Household Energy Strategy Study (English) 08/90 121/90

Zimbabwe Energy Assessment (English) 06/82 3765-ZIMPower System Efficiency Study (English) 06/83 005/83Status Report (English) 08/84 019/84Power Sector Management Assistance Project (English) 04/85 034/85Power Sector Management Institution Building (English) 09/89 --

Petroleum Management Assistance (English) 12/89 109/89Charcoal Utilization Prefeasibility Study (English) 06/90 119/90Integrated Energy Strategy Evaluation (English) 01/92 8768-ZIMEnergy Efficiency Technical Assistance Project:

Strategic Framework for a National Energy EfficiencyImprovement Program (English) 04/94 --

Capacity Building for the National Energy EfficiencyImprovement Programme (NEEIP) (English) 12/94

Page 145: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Region/Country Activity/Report Title Date Number

Zimbabwe Rural Electrification Study 03/00 228/00

EAST ASIA AND PACIFIC (EAP)

Asia Regional Pacific Household and Rural Energy Seminar (English) 11/90 --

China County-Level Rural Energy Assessments (English) 05/89 101/89Fuelwood Forestry Preinvestment Study (English) 12/89 105/89Strategic Options for Power Sector Reform in China (English) 07/93 156/93Energy Efficiency and Pollution Control in Township and

Village Enterprises (T'VE) Industry (English) 11/94 168/94Energy for Rural Development in China: An Assessment Based

on a Joint Chinese/ESMAP Study in Six Counties (English) 06/96 183/96Improving the Technical Efficiency of Decentralized Power

Companies 09/99 222/99Fiji Energy Assessment (English) 06/83 4462-FIJIndonesia Energy Assessment (English) 11/81 3543-IND

Status Report (English) 09/84 022/84Power Generation Efficiency Study (English) 02/86 050/86Energy Efficiency in the Brick, Tile and

Lime Industries (English) 04/87 067/87Diesel Generating Plant Efficiency Study (English) 12/88 095/88Urban Household Energy Strategy Study (English) 02/90 107/90Biomass Gasifier Preinvestment Study Vols. I & II (English) 12/90 124/90Prospects for Biomass l'ower Generation with Emphasis onPalm Oil, Sugar, Rubberwood and Plywood Residues (English) 11/94 167/94

Lao PDR Urban Electricity Demand Assessment Study (English) 03/93 154/93Institutional Development for Off-Grid Electrification '06/99 215/99

Malaysia Sabah Power System Ef'ficiency Study (English) 03/87 068/87Gas Utilization Study (English) 09/91 9645-MA

Mongolia Energy Efficiency in the Electricity and DistrictHeating Sectors 10/01 247/01

Improved Space Heating Stoves for Ulaanbaatar 03/02 254/02Myanmar Energy Assessment (English) 06/85 5416-BAPapua New

Guinea Energy Assessment (English) 06/82 3882-PNGStatus Report (English) 07/83 006/83Institutional Review in the Energy Sector (English) 10/84 023/84Power Tariff Study (English) 10/84 024/84

Philippines Commercial Potential for Power Production fromAgricultural Residues (English) 12/93 157/93

Energy Conservation Study (English) 08/94 --Strengthening the Non-Conventional and Rural Energy

Development Program in the Philippines:A Policy Framework and Action Plan 08/01 243/01

Rural Electrification and Development in the Philippines:Measuring the Social and Economic Benefits 05/02 255/02

Solomon Islands Energy Assessment (English) 06/83 4404-SOLEnergy Assessment (English) 01/92 979-SOL

South Pacific Petroleum Transport in the South Pacific (English) 05/86 --'rhailand Energy Assessment (English) 09/85 5793-TH

Rural Energy Issues and Options (English) 09/85 044/85

Page 146: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- 6 -

Region/Country Activity/Report Title Date Number

Thailand Accelerated Dissemination of Improved Stoves andCharcoal Kilns (English) 09/87 079/87

Northeast Region Village Forestry and WoodfuelsPreinvestment Study (English) 02/88 083/88

Impact of Lower Oil Prices (English) 08/88 --Coal Development and Utilization Study (English) 10/89 --

Tonga Energy Assessment (English) 06/85 5498-TONVanuatu Energy Assessment (English) 06/85 5577-VAVietnam Rural and Household Energy-Issues and Options (English) 01/94 161/94

Power Sector Reform and Restructuring in Vietnam: Final Reportto the Steering Committee (English and Vietnamese) 09/95 174/95

Household Energy Technical Assistance: Improved CoalBriquetting and Commercialized Dissemination of HigherEfficiency Biomass and Coal Stoves (English) 01/96 178/96

Petroleum Fiscal Issues and Policies for Fluctuating Oil PricesIn Vietnam 02/01 236/01

An Overnight Success: Vietnam's Switch to Unleaded Gasoline 08/02 257/02Western Samoa Energy Assessment (English) 06/85 5497-WSO

SOUTH ASIA (SAS)

Bangladesh Energy Assessment (English) 10/82 3873-BDPriority Investment Program (English) 05/83 002/83Status Report (English) 04/84 015/84Power System Efficiency Study (English) 02/85 031/85Small Scale Uses of Gas Prefeasibility Study (English) 12/88 --Reducing Emissions from Baby-Taxis in Dhaka 01/02 253/02

India Opportunities for Commercialization of NonconventionalEnergy Systems (English) 11/88 091/88

Maharashtra Bagasse Energy Efficiency Project (English) 07/90 120/90Mini-Hydro Development on Irrigation Dams and

Canal Drops Vols. I, II and III (English) 07/91 139/91WindFarm Pre-Investment Study (English) 12/92 150/92Power Sector Reform Seminar (English) 04/94 166/94Environmental Issues in the Power Sector (English) 06/98 205/98Environmental Issues in the Power Sector: Manual for

Environmental Decision Making (English) 06/99 213/99Household Energy Strategies for Urban India: The Case of

Hyderabad 06/99 214/99Greenhouse Gas Mitigation In the Power Sector: Case

Studies From India 02/01 237/01Energy Strategies for Rural India: Evidence from Six States 08/02 258/02

Nepal Energy Assessment (English) 08/83 4474-NEPStatus Report (English) 01/85 028/84Energy Efficiency & Fuel Substitution in Industries (English) 06/93 158/93

Pakistan Household Energy Assessment (English) 05/88 --Assessment of Photovoltaic Programs, Applications, and

Markets (English) 10/89 103/89National Household Energy Survey and Strategy Formulation

Study: Project Terminal Report (English) 03/94 --Managing the Energy Transition (English) 10/94 --

Page 147: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- 7 -

Region/Country Activity/Report Title Date Number

Pakistan Lighting Efficiency Improvement ProgramPhase 1: Commercial Buildings Five Year Plan (English) 10/94

Clean Fuels 10/01 246/01Sri Lanka Energy Assessment (English) 05/82 3792-CE

Power System Loss Reduction Study (English) 07/83 007/83Status Report (English) 01/84 010/84Industrial Energy Conservation Study (English) 03/86 054/86

EUROPE AND CENTRAL ASIA (ECA)

Bulgaria Natural Gas Policies and Issues (English) 10/96 188/96Central Asia andThe Caucasus Cleaner Transport Fuels in Central Asia and the Caucasus 08/01 242/01Central andEastern Europe Power Sector Reform in Selected Countries 07/97 196/97

Increasing the Efficiency of Heating Systems in Central andEastern Europe and the Former Soviet Union (English andRussian) 08/00 234/00

The Future of Natural Gas in Eastern Europe (English) 08/92 149/92Kazakhstan Natural Gas Investment Study, Volumes 1, 2 & 3 12/97 199/97Kazakhstan &Kyrgyzstan Opportunities for Renewable Energy Development 11/97 16855-KAZ

Poland Energy Sector Restructuring Program Vols. I-V (English) 01/93 153/93Natural Gas Upstream Policy (English and Polish) 08/98 206/98Energy Sector Restructuring Program: Establishing the Energy

Regulation Authority 10/98 208/98Portugal Energy Assessment (English) 04/84 4824-PORomania Natural Gas Development Strategy (English) 12/96 192/96Slovenia Workshop on Private Participation in the Power Sector (English) 02/99 211/99Turkey Energy Assessment (English) 03/83 3877-TU

Energy and the Environment: Issues and Options Paper 04/00 229/00

MIDDLE EAST AND NORTH AFRICA (MNA)

Arab Republicof Egypt Energy Assessment (English) 10/96 189/96

Energy Assessment (English and French) 03/84 4157-MORStatus Report (English and French) 01/86 048/86

Morocco Energy Sector Institutional Development Study (English and French) 07/95 173/95Natural Gas Pricing Study (French) 10/98 209/98Gas Development Plan Phase II (French) 02/99 210/99

Syria Energy Assessment (English) 05/86 5822-SYRElectric Power Efficiency Study (English) 09/88 089/88Energy Efficiency Improvement in the Cement Sector (English) 04/89 099/89Energy Efficiency Improvement in the Fertilizer Sector (English) 06/90 115/90

Tunisia Fuel Substitution (English and French) 03/90 --Power Efficiency Study (English and French) 02/92 136/91Energy Management Strategy in the Residential and

Tertiary Sectors (English) 04/92 146/92Renewable Energy Strategy Study, Volume I (French) 11/96 190A/96

Page 148: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- 8 -

Region/Country Activity/Report Title Date Number

Tunisia Renewable Energy Strategy Study, Volume II (French) 11/96 190B/96Yemen Energy Assessment (English) 12/84 4892-YAR

Energy Investment Priorities (English) 02/87 6376-YARHousehold Energy Strategy Study Phase I (English) 03/91 126/91

LATIN AMERICA AND THE CARIBBEAN (LAC)

LAC Regional Regional Seminar on Electric Power System Loss Reductionin the Caribbean (English) 07/89 --

Elimination of Lead in Gasoline in Latin America andthe Caribbean (English and Spanish) 04/97 194/97

Elimination of Lead in Gasoline in Latin America andthe Caribbean - Status Report (English and Spanish) 12/97 200/97

Harmonization of Fuels Specifications in Latin America andthe Caribbean (English and Spanish) 06/98 203/98

Bolivia Energy Assessment (English) 04/83 4213-BONational Energy Plan (English) 12/87 --La Paz Private Power Technical Assistance (English) 11/90 111/90Prefeasibility Evaluation Rural Electrification and Demand

Assessment (English and Spanish) 04/91 129/91National Energy Plan (Spanish) 08/91 131/91Private Power Generation and Transmission (English) 01/92 137/91Natural Gas Distribution: Economics and Regulation (English) 03/92 125/92Natural Gas Sector Policies and Issues (English and Spanish) 12/93 164/93Household Rural Energy Strategy (English and Spanish) 01/94 162/94Preparation of Capitalization of the Hydrocarbon Sector 12/96 191/96Introducing Competition into the Electricity Supply Industry in

Developing Countries: Lessons from Bolivia 08/00 233/00Final Report on Operational Activities Rural Energy and Energy

Efficiency 08/00 235/00Oil Industry Training for Indigenous People: The Bolivian

Experience (English and Spanish) 09/01 244/01Brazil Energy Efficiency & Conservation: Strategic Partnership for

Energy Efficiency in Brazil (English) 01/95 170/95Hydro and Thermal Power Sector Study 09/97 197/97Rural Electrification with Renewable Energy Systems in the

Northeast: A Preinvestment Study 07/00 232/00Chile Energy Sector Review (English) 08/88 7129-CHColombia Energy Strategy Paper (English) 12/86 --

Power Sector Restructuring (English) 11/94 169/94Energy Efficiency Report for the Cormmercial

and Public Sector (English) 06/96 184/96Costa Rica Energy Assessment (English and Spanish) 01/84 4655-CR

Recommended Technical Assistance Projects (English) 11/84 027/84Forest Residues Utilization Study (English and Spanish) 02/90 108/90

DominicanRepublic Energy Assessment (English) 05/91 8234-DO

Ecuador Energy Assessment (Spanish) 12/85 5865-ECEnergy Strategy Phase I (Spanish) 07/88 --

Energy Strategy (English) 04/91 --

Private Minihydropower Development Study (English) 11/92 --

Page 149: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- 9 -

Region/Country Activity/Report Title Date Number

Ecuador Energy Pricing Subsidies and Interfuel Substitution (English) 08/94 11798-ECEnergy Pricing, Poverty and Social Mitigation (English) 08/94 12831-EC

Guatemala Issues and Options in the Energy Sector (English) 09/93 12160-GUHaiti Energy Assessment (English and French) 06/82 3672-HA

Status Report (English and French) 08/85 041/85Household Energy Strategy (English and French) 12/91 143/91

Honduras Energy Assessment (English) 08/87 6476-HOPetroleum Supply Management (English) 03/91 128/91

Jamaica Energy Assessment (English) 04/85 5466-JMPetroleum Procurement, Refining, and

Distribution Study (English) 11/86 061/86Energy Efficiency Building Code Phase I (English) 03/88 --Energy Efficiency Standards and Labels Phase I (English) 03/88 --

Management Information System Phase I (English) 03/88 --

Charcoal Production Project (English) 09/88 090/88FIDCO Sawmill Residues Utilization Study (English) 09/88 088/88Energy Sector Strategy and Investment Planning Study (English) 07/92 135/92

Mexico Improved Charcoal Production Within Forest Management forthe State of Veracruz (English and Spanish) 08/91 138/91

Energy Efficiency Management Technical Assistance to theComision Nacional para el Ahorro de Energia (CONAE) (English) 04/96 180/96

Energy Environment Review 05/01 241/01Nicaragua Modernizing the Fuelwood Sector in Managua and Le6n 12/01 252/01Panama Power System Efficiency Study (English) 06/83 004/83Paraguay Energy Assessment (English) 10/84 5145-PA

Recommended Technical Assistance Projects (English) 09/85 --

Status Report (English and Spanish) 09/85 043/85Peru Energy Assessment (English) 01/84 4677-PE

Status Report (English) 08/85 040/85Proposal for a Stove Dissemination Program in

the Sierra (English and Spanish) 02/87 064/87Energy Strategy (English and Spanish) 12/90 --Study of Energy Taxation and Liberalizationof the Hydrocarbons Sector (English and Spanish) 120/93 159/93

Reform and Privatization in the HydrocarbonSector (English and Spanish) 07/99 216/99

Rural Electrification 02/01 238/01Saint Lucia Energy Assessment (English) 09/84 5111-SLUSt. Vincent andthe Grenadines Energy Assessment (English) 09/84 5103-STV

Sub Andean Environmental and Social Regulation of Oil and GasOperations in Sensitive Areas of the Sub-Andean Basin(English and Spanish) 07/99 217/99

Trinidad andTobago Energy Assessment (English) 12/85 5930-TR

GLOBAL

Energy End Use Efficiency: Research and Strategy (English) 11/89Women and Energy--A Resource Guide

The International Network: Policies and Experience (English) 04/90

Page 150: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

- 10-

Region/Country Activity/Report Title Date Number

Global Guidelines for Utility Customer Management andMetering (English and Spanish) 07/91 --

Assessment of Personal Computer Models for EnergyPlanning in Developing Countries (English) 10/91 --

Long-Term Gas Contracts Principles and Applications (English) 02/93 152/93Comparative Behavior of Firms Under Public and Private

Ownership (English) 05/93 155/93Development of Regional Electric Power Networks (English) 10/94 --

Roundtable on Energy Efficiency (English) 02/95 171/95Assessing Pollution Abatement Policies with a Case Studyof Ankara (English) 11/95 177/95

A Synopsis of the Third Annual Roundtable on Independent PowerProjects: Rhetoric and Reality (English) 08/96 187/96

Rural Energy and Development Roundtable (English) 05/98 202/98A Synopsis of the Second Roundtable on Energy Efficiency:

Institutional and Financial Delivery Mechanisms (English) 09/98 207/98The Effect of a Shadow Price on Carbon Emission in the

Energy Portfolio of the World Bank: A CarbonBackcasting Exercise (English) 02/99 212/99

Increasing the Efficiency of Gas Distribution Phase 1:Case Studies and Thematic Data Sheets 07/99 218/99

Global Energy Sector Reform in Developing Countries:A Scorecard 07/99 219/99

Global Lighting Services for the Poor Phase II: TextMarketing of Small "Solar" Batteries for RuralElectrification Purposes 08/99 220/99

A Review of the Renewable Energy Activities of the UNDP/World Bank Energy Sector Management AssistanceProgramme 1993 to 1998 11/99 223/99

Energy, Transportation and Environment: Policy Options forEnvironmental Improvement 12/99 224/99

Privatization, Competition and Regulation in the British ElectricityIndustry, With Implications for Developing Countries 02/00 226/00

Reducing the Cost of Grid Extension for Rural Electrification 02/00 227/00Undeveloped Oil and Gas Fields in the Industrializing World 02/01 239/01Best Practice Manual: Promoting Decentralized Electrification

Investment 10/01 248/01Peri-Urban Electricity Consumers-A Forgotten but Important

Group: What Can We Do to Electrify Them? 10/01 249/01Village Power 2000: Empowering People and Transforming

Markets 10/01 251/01Private Financing for Community Infrastructure 05/02 256/02

08/21/02

Page 151: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Joint UNDPIWorld BankENERGY SECTOR MANAGEMENT ASSISTANCE PROGRAMME (ESMAP)

LISI' OF TECHNICAL PAPER SERIES

Region/Country Activity/Report Title Date Number

SUB-SAHARAN AFRICA (AFR)

Kenya Field Performance Evaluation of Amorphous Silicon (a-Si)Photovoltaic Systems in Kenya: Methods and Measurementin Support of a Sustainable Commercial Solar Energy Industry 08/00 005/00

The Kenya Portable Battery Pack Experience: TestMarketing an Alternalive for Low-Income Rural HouseholdElectrification 05/01 012/01

Senegal Regional Conference on the Phase-Out of Leaded Gasoline inSub-Saharan Africa 03/02 022/02

Swaziland Solar Electrification Program 2001-2010: Phase 1: 2001-2002(Solar Energy in the Pilot Area) 12/01 019/01

Tanzania Mini Hydropower Development Case Studies on the Malagarasi,Muhuwesi, and Kikuletwa Rivers Volumes I, II, and III 04/02 024/02

Uganda Report on the Uganda Power Sector Reform and RegulationStrategy Workshop 08/00 004/00

WEST AFRICA (AFR)

LPG Market Development 12/01 017/01

EAST ASIA AND PACIFIC (EAP)

China Assessing Markets for Renewable Energy in Rural Areas ofNorthwestern China 08/00 003/00

Technology Assessment of Clean Coal Technologies for ChinaVolume I-Electric Power Production 05/01 011/01

Technology Assessment of Clean Coal Technologies for ChinaVolume II-Environmental and Energy Efficiency Improvementsfor Non-power Uses of Coal 05/01 011/01

Technology Assessment of Clean Coal Technologies for ChinaVolume III-Environmental Compliance in the Energy Sector:Methodological Approach and Least-Cost Strategies 12/01 0Q11/01

Thailand DSM in Thailand: A Case Study 10/00 008/00Development of a Regional Power Market in the Greater Mekong

Sub-Region (GMS) 12/01 015/01Vietnam Options for Renewable Energy in Vietnam 07/00 001/00

Renewable Energy Action Plan 03/02 021/02

Page 152: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

Region/Country Activity/Report Title Date Number

SOUTH ASIA (SAS)

Bangladesh Workshop on Bangladesh Power Sector Reform 12/01 018/01

LATIN AMERICA AND THE CARIBBEAN (LAC)

Regional Electricity Markets Interconnections - Phase IIdentification of Issues for the Development of RegionalPower Markets in South America 12/01 016/01

Regional Electricity Markets Interconnections - Phase IIProposals to Facilitate Increased Energy Exchanges in SouthAmerica 04/02 016/01

Population, Energy and Environment Program (PEA)Comparative Analysis on the Distribution of Oil Rents(English and Spanish) 02/02 020/02

Estudio Comparativo sobre la Distribuci6n de la Renta PetroleraEstudio de Casos: Bolivia, Colombia, Ecuador y Peru 03/02 023/02

GLOBAL

Impact of Power Sector Reform on the Poor: A Review of Issuesand the Literature 07/00 002/00

Best Practices for Sustainable Development of Micro HydroPower in Developing Countries 08/00 006/00

Mini-Grid Design Manual 09/00 007/00Photovoltaic Applications in Rural Areas of the Developing

World 11/00 009/00Subsidies and Sustainable Rural Energy Services: Can we Create

Incentives Without Distorting Markets? 12/00 010/00Sustainable Woodfuel Supplies from the Dry Tropical

Woodlands 06/01 013/01Key Factors for Private Sector Investment in Power

Distribution 08/01 014/01

4/8/02

Page 153: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,
Page 154: Status of ESMAP Portfolio of Projects As of June 30, 2002documents.worldbank.org/curated/en/... · ESMAP interventions are knowledge products including free technical assistance,

C-K1'A ADr Bank

Street, NW

nton, DC 20433 USA

202.458.2321 Fax.: 1.202.522.3 0 18

e.wwwesmap.org

:[email protected]

X~~~~~~~~~~~~~~~~~

A

- 10it uNI_/word B,n_ _g.

A 1ofl .'PWO~

sak

.....

r.....