Statewide Longitudinal Data System RFP Process

29
Office of Superintendent of Public Instruction Olympia, Washington Statewide Longitudinal Data System RFP Process

Transcript of Statewide Longitudinal Data System RFP Process

Page 1: Statewide Longitudinal Data System RFP Process

Office of Superintendent of Public Instruction

Olympia, Washington

Statewide Longitudinal Data System RFP Process

Page 2: Statewide Longitudinal Data System RFP Process

Washington State Profile66,544 sq. miles Land area (2000)

6,287,759 Population (2005)

Under 5 yrs old 6.3%

Under 18 yrs old 23.6%

1,013,189 Students (K12)

58,011 Classroom Teachers (K12)

17.4 Students per Teacher

7 Student Information Systems

40 School Districts w/o a SIS

Page 3: Statewide Longitudinal Data System RFP Process

Brief History

3

2002 – OSPI began creating the Core Student Record System (CSRS)

2003 - created the State Student Identifier (SSID)

CSRS V2 enhanced the SSID system by collecting student data element information

School districts push a monthly data file

Page 4: Statewide Longitudinal Data System RFP Process

Goals of RFPSelect the best partner the state could grow with

Create buy-in from vendors, school districts and ESD’s

Reduce the data collection efforts of the school districts

Collect more dataStudent to teacherStudent to courseTeacher to courseStudent to program

Page 5: Statewide Longitudinal Data System RFP Process

RFP ProcessCreated a data advisory committee

School Districts, Educational Service Districts, and multiple vendorsDiscuss Challenges with current systemData to be collected and why

Communicate statewideLeveraged educational video conference system

Page 6: Statewide Longitudinal Data System RFP Process

RFP ProcessRFP review committee

One SIS Vendor, Two District CIO, One ESD CIO, Agency Developers, agency CIOReport back to advisory committee

Helped develop the RFPReviewed the RFPSelected the final candidate

Page 7: Statewide Longitudinal Data System RFP Process

RFP ProcessScored each RFP based on:

Technical/Design ImplementationCostsProject PlanningExperience of companyExperience of implementation teamFiscal Health

Page 8: Statewide Longitudinal Data System RFP Process

RFP ProcessFace to Face Interviews with Management and Team

Selected final 4 based on scores for interviewsSelected final two for additional interviews

Selection completed Contract Negotiations SOW

Page 9: Statewide Longitudinal Data System RFP Process

RFP Lessons LearnedNeeded more detail about current state systems

Expect to be challenged by vendors once selection process is complete

Thoroughly address security in RFP

Be extremely careful Competition is fierce – RFP and SOW must be strong

Be detailed but be careful - Don’t want to get locked in because of minor changes

Add-on or out of scope will be costlyCOTS solutions – high long term licensing costs

Page 10: Statewide Longitudinal Data System RFP Process

[email protected]

Statewide Longitudinal Data System RFP Process

Page 11: Statewide Longitudinal Data System RFP Process

Center for Educational Performance and Information

Margaret Merlyn Ropp, Ph.D.

NCES MIS ConferenceMarch 2007

Page 12: Statewide Longitudinal Data System RFP Process

Responding to Needs – Next Generation Systems• Vision – Collect once, store once, use

many times –– Good stewardship of data and resources

at the state and local levels• Student Data System – why rewrite?

– Funding (FTE) vs. Accountability –where is a student at a point and time and who is responsible?

– Lack of Alignment with federal reporting deadlines and longitudinal

– Current process resulted in “collect many times, store many times and use once!”

Page 13: Statewide Longitudinal Data System RFP Process

Responding to Needs – Next Generation Systems• School Code Master (Educational Entity

Master)• Student data system could not be rewritten without

changing the underlying structure of entity relationships

• “Schools” are more than buildings at which you report a broken window– Consortia– Charter schools– “Virtual schools”– Early Childhood providers outside of the K-12

constellation– Accountability – who is responsible for providing

instruction?

Page 14: Statewide Longitudinal Data System RFP Process

Procuring Two System Rewrites – The Challenges

• Needed new ideas + migration from existing systems– Multiple existing student data systems that need to use one

Unique Identification Code (UIC) – e.g., assessment, special education, career and technical education, adult education

• A vendor generating a statement of work for an RFP or requirements is prohibited from winning another contract for system design and implementation.

• Needed a blend of transactions and snapshots to determine how frequently to update specific subsets of data elements and a create manageable workflow

Page 15: Statewide Longitudinal Data System RFP Process

What we requested…

• RFP included multiple components –vendors could bid on one or more options– Detailed requirements gathering– Student Data System– Education Entity Master– Optional student transcript functionality

Page 16: Statewide Longitudinal Data System RFP Process

What we got...

Vendors developed partnerships to bid on all the components

• Commercial Off-The-Shelf (COTS) solutions• Warehousing solutions based on ETL

processing• Customizing some existing resources• Build-from-scratch 100% customization.

Page 17: Statewide Longitudinal Data System RFP Process

What we learned…

• Managing a fixed-price deliverable bid– Added 2,000 extra hours for unknown

requirements– Vendors asked many questions to clarify

the scope – we had 90% of the high-level requirements completed

Page 18: Statewide Longitudinal Data System RFP Process

Procurement Tips• DO

– Include cross-agency/program stakeholders on the JEC - locals as advisors

– Create a template for cost breakdown –hours by role, estimates for state infrastructure requirements

– Make sure IT is ready to go – vendors may propose cutting-edge when government values stability and older software versions

– Ask trusted colleagues to review the statement of work

Page 19: Statewide Longitudinal Data System RFP Process

Contact Meg at CEPI

• Telephone: 517-241-2374• E-mail: [email protected]

Page 20: Statewide Longitudinal Data System RFP Process

Lessons LearnedOhio’s Request for Proposals (RFP):

Education Management Information System Redesign for Longitudinal Data

Beth JuilleratChief Information Officer

Page 21: Statewide Longitudinal Data System RFP Process

Background•1990

The Education Management Information System (EMIS) was developed for ODE to collect aggregate student data from LEAs.

•1998 A change in state law enabled the collection of unidentifiable student level data via the use of a unique data verification code.

•2003 No Child Left Behind introduced new requirements for disaggregation of data and calculating adequate yearly progress.

ODE began collecting student data with a unique identification number.

Page 22: Statewide Longitudinal Data System RFP Process

System Inefficiencies

• Collection and storage of duplicate demographic data across various student data files

• Continued data storage in flat file formats that limit efficientaccess, management and use of the data for longitudinal analysisand linkages between student and staff data

• Continued restrictions of the collection of data to a weekly batch mode rather than utilizing new technologies and standards to support real time data submissions

Page 23: Statewide Longitudinal Data System RFP Process

RFP Objectives

• Improve the Education Management Information System reporting from the 26 regional sites to the Ohio Department of Education using School Interoperability Framework standards and infrastructure.

• Allow school district data to be shared more efficiently and effectively with the Ohio Department of Education using School Interoperability Framework standards and infrastructure.

Page 24: Statewide Longitudinal Data System RFP Process

RFP Objectives

• Design, develop and implement a relational database structure for efficient data validation, maintenance, and retrieval of data.

• Enable the Ohio Department of Education to more efficiently and effectively manage longitudinal student data for operational purposes and decision making.

Page 25: Statewide Longitudinal Data System RFP Process

Lessons Learned

Request for Information (RFI)

• Provides an open forum for feedback and questions from potential vendors.

• Brings to light areas in which there was lack of clarity in the scope or goals of the project.

Page 26: Statewide Longitudinal Data System RFP Process

Lessons Learned

Clear and Concise Business Objectives

• Clearly state the business problem to be solved and the objectives of the project

• Articulate the limitations or inefficiencies of the existing system

Page 27: Statewide Longitudinal Data System RFP Process

Lessons Learned

RFP Writer Qualifications

• Must have a good understanding of the business objectives for the project and the scope of the initiative.

• Must be familiar with the state procurement process and structure.

Page 28: Statewide Longitudinal Data System RFP Process

Lessons Learned

Involvement and Communication

• Initiate and require frequent discussions with procurement administrators

• Solicit assistance and feedback from education and technology stakeholders

•Leverage available expertise such as SIFA

Page 29: Statewide Longitudinal Data System RFP Process

Lessons Learned

TIME……TIME ……TIME ….NEVER ENOUGH!

•It always takes more time than you plan!

•Build in EXTRA, EXTRA time for multiple iterations and reviews, including legal!