ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior...

8
CONSISTS OF THE DEMOLITION OF EXISTING 1,440SF OFFICE BUILDING AND CONSTRUCTION OF NEW ONE STORY WOOD FRAMED OFFICE BUILDING OF APPROXIMATELY 4,900SF PROPERTY DESCRIPTION ASSESSOR MAP: 1S2 12DB TAX LOT: 900 LEGAL: JOHNSON ESTATE ADDITION, LOTS 131 AND 132 SITE SIZE: 5.02 ACRES ZONING LAND USE DISTRICT: R15 CONSTRUCTION TYPE TYPE VB BUILDING AREA BASE ALLOWABLE AREA: 9,000 sf ALLOWABLE AREA WITH MODIFICATIONS: 42,750 sf PROPOSED GROSS AREA: 4,845 sf CHAPEL: 845 sf OFFICES: 4,000 sf BUILDING HEIGHT ALLOWABLE STORIES: 2-STORY PROPOSED STORIES: 1-STORY BUILDING HEIGHT: 15 FEET TO MID-ROOF OCCUPANCY MIXED OCCUPANY: B: OFFICES AND STORAGE A-3: CHAPEL OCCUPANT LOAD OFFICES: 3,138/100 = 32 STORAGE: 862/300 = 3 CHAPEL: 845/15 = 57 (2 MEANS OF EGRESS REQUIRED) TOTAL OCCUPANT LOAD: 92 General Notes G0.0 COVER SHEET G1.2 EXISTING SITE PLAN G1.3 PRELIMINARY UTILITY PLAN Architectural A1.0 SITE PLAN A2.1 MAIN FLOOR PLAN A2.2 ROOF PLAN A3.0 EXTERIOR ELEVATIONS / SECTIONS A6.0 REFLECTED CEILING PLAN NUMBER OF FIXTURES REQUIRED OCCUPANCY WCs LAVATORIES B 1 PER 25 1 PER 40 A-3 1 PER 125M1 PER 200 1 PER 65F NUMBER OF FIXTURE PROVIDED UNISEX TOILETS FOR THE FOLLOWING: OCCUPANCY WCs LAVATORIES B 3 3 A-3 1 1 TOTALS: 4 4 CLIMATE ZONE ZONE 4C, WASHINGTON COUNTY SPECIFIC INSULATION REQUIRMENTS ATTIC INSULATION: R-38 BATT INSULATION WALLS, WOOD FRAMED: R-21 BATT INSULATION FENESTRATION FIXED, OPERABLE, & DOORS WITH >50% GLAZING: U-0.35 STOREFRONT: U-0.45 ENTRANCE DOORS: U-0.80 ALL OTHER: U0.46 AIR LEAKAGE VESTIBULES: REQUIRED TO SEPARATE CONDITIONED SPACE FROM THE EXTERIOR. EXCEPTION: DOORS THAT OPEN DIRECTLY FROM A SPACE LESS THAN 3,000 SF. DATE FILE PATH: 6/30/2017 10:42:55 AM M:\17055.EAS\REVIT\17055_WRK_EAS.rvt ST. ELIZABETH ANN SETON CATHOLIC CHURCH PARISH OFFICE REPLACEMENT 3145 SW 192nd Avenue Beaverton, Oregon 97006 VICINITY MAP PROJECT SUMMARY Owner: St. Elizabeth Ann Seton 3145 SW 192nd Ave Beaverton, OR 97006 Tel: (503) 649 - 9044 BUILDING SUMMARY DRAWING INDEX DESIGN DEVELOPMENT 06/30/2017 PLUMBING SYSTEMS ENERGY CODE SUMMARY Architect: Soderstrom Architects, LTD 1200 NW Naito Parkway, Suite 410 Portland, Oregon 97209 Tel: (503) 228 - 5617

Transcript of ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior...

Page 1: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

CONSISTS OF THE DEMOLITION OF EXISTING 1,440SF OFFICE BUILDING AND CONSTRUCTION OF NEW ONE STORY WOOD FRAMED OFFICE BUILDING OF APPROXIMATELY 4,900SF

PROPERTY DESCRIPTION

ASSESSOR MAP: 1S2 12DBTAX LOT: 900LEGAL: JOHNSON ESTATE ADDITION, LOTS 131 AND 132SITE SIZE: 5.02 ACRES

ZONING

LAND USE DISTRICT: R15

CONSTRUCTION TYPE

TYPE VB

BUILDING AREA

BASE ALLOWABLE AREA: 9,000 sfALLOWABLE AREA WITH MODIFICATIONS: 42,750 sf

PROPOSED GROSS AREA: 4,845 sf CHAPEL: 845 sfOFFICES: 4,000 sf

BUILDING HEIGHT

ALLOWABLE STORIES: 2-STORYPROPOSED STORIES: 1-STORY

BUILDING HEIGHT: 15 FEET TO MID-ROOF

OCCUPANCY

MIXED OCCUPANY:B: OFFICES AND STORAGEA-3: CHAPEL

OCCUPANT LOAD

OFFICES: 3,138/100 = 32STORAGE: 862/300 = 3CHAPEL: 845/15 = 57(2 MEANS OF EGRESS REQUIRED)TOTAL OCCUPANT LOAD: 92

General Notes

G0.0 COVER SHEETG1.2 EXISTING SITE PLANG1.3 PRELIMINARY UTILITY PLAN

Architectural

A1.0 SITE PLANA2.1 MAIN FLOOR PLANA2.2 ROOF PLANA3.0 EXTERIOR ELEVATIONS /

SECTIONSA6.0 REFLECTED CEILING PLAN

NUMBER OF FIXTURES REQUIRED

OCCUPANCY WCs LAVATORIESB 1 PER 25 1 PER 40A-3 1 PER 125M1 PER 200

1 PER 65F

NUMBER OF FIXTURE PROVIDED

UNISEX TOILETS FOR THE FOLLOWING:OCCUPANCY WCs LAVATORIESB 3 3A-3 1 1TOTALS: 4 4

CLIMATE ZONE

ZONE 4C, WASHINGTON COUNTY

SPECIFIC INSULATION REQUIRMENTS

ATTIC INSULATION: R-38 BATT INSULATIONWALLS, WOOD FRAMED: R-21 BATT INSULATION

FENESTRATION

FIXED, OPERABLE, & DOORS WITH >50% GLAZING: U-0.35STOREFRONT: U-0.45ENTRANCE DOORS: U-0.80ALL OTHER: U0.46

AIR LEAKAGE

VESTIBULES: REQUIRED TO SEPARATE CONDITIONED SPACE FROM THE EXTERIOR. EXCEPTION: DOORS THAT OPEN DIRECTLY FROM A SPACE LESS THAN 3,000 SF.

DA

TE

FIL

E P

AT

H:

6/3

0/2

01

7 1

0:4

2:5

5 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

ST. ELIZABETH ANN SETON CATHOLIC CHURCH

PARISH OFFICE REPLACEMENT3145 SW 192nd AvenueBeaverton, Oregon 97006

VICINITY MAP

PROJECT SUMMARYOwner:

St. Elizabeth Ann Seton3145 SW 192nd AveBeaverton, OR 97006Tel: (503) 649-9044

BUILDING SUMMARY

DRAWING INDEX

DESIGN DEVELOPMENT06/30/2017

PLUMBING SYSTEMS

ENERGY CODE SUMMARY

Architect:

Soderstrom Architects, LTD1200 NW Naito Parkway, Suite 410Portland, Oregon 97209Tel: (503) 228-5617

Page 2: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

41

3. 1

8' -

N 8

8d

46

'38"

W

39

3.4

1' -

S 8

2d2

'18"

E

553.20' - N 0d13'33" W

579.43' - N 0d9'32" W

25

19

14

18

49

19

19

19

19

19

17

171

9

19

ADJACENT SANCTUARY

DE

MO

(E

) O

FF

ICE

1200 N

W N

aito

Park

way,

Suite

410

Port

land,

Ore

gon 9

7209

MA

IN 5

03.2

28.5

617

FA

X 5

03.2

73.8

584

ww

w.s

dra

.com

DA

TE

FIL

E P

AT

H:

Drawn:

Job

a r

c h

i t

e c

t u

r e

S O

D E

R S

T R

O M

A

R C

H I T

E C

T S

, L

t d

.

Date

Check:

p l a

n n

i n

g

e x

t e

r i o

r

r e

s t

o r

a t

i o n

i n t

e r

i o r

d

e s

i g

n

6/3

0/2

01

7 1

0:4

2:5

5 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

EXISTING SITE PLAN

G1.2

DD

St. E

lizabeth

Ann S

eto

n C

hu

rch

3145 S

W 1

92nd A

venue

Beavert

on, O

R 9

7006

17055

Author

06/30/17

Checker

3/64" = 1'-0"

EXISTING SITE PLAN1

NORTH

NO. DESCRIPTION DATE

Page 3: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

PHASE 01

(N) PARISH OFFICE

1200 N

W N

aito

Park

way,

Suite

410

Port

land,

Ore

gon 9

7209

MA

IN 5

03.2

28.5

617

FA

X 5

03.2

73.8

584

ww

w.s

dra

.com

DA

TE

FIL

E P

AT

H:

Drawn:

Job

a r

c h

i t

e c

t u

r e

S O

D E

R S

T R

O M

A

R C

H I T

E C

T S

, L

t d

.

Date

Check:

p l a

n n

i n

g

e x

t e

r i o

r

r e

s t

o r

a t

i o n

i n t

e r

i o r

d

e s

i g

n

6/3

0/2

01

7 1

0:4

2:5

6 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

PRELIMINARY UTILITYPLAN

G1.3

DD

St. E

lizabeth

Ann S

eto

n C

hu

rch

3145 S

W 1

92nd A

venue

Beavert

on, O

R 9

7006

17055

Author

06/30/17

Checker

3/64" = 1'-0"

PRELIMINARY UTILITY PLAN1

NORTH

ADDITIONAL PHASES SHOWN FOR FUTURE REFERENCE ONLY AND NOT PART OF OFFICE BUILDING SCOPE

NO. DESCRIPTION DATE

Page 4: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

41

3. 1

8' -

N 8

8d

46

'38"

W

39

3.4

1' -

S 8

2d2

'18"

E

553.20' - N 0d13'33" W

579.43' - N 0d9'32" W

PHASE 01

(N) PARISH OFFICE

1200 N

W N

aito

Park

way,

Suite

410

Port

land,

Ore

gon 9

7209

MA

IN 5

03.2

28.5

617

FA

X 5

03.2

73.8

584

ww

w.s

dra

.com

DA

TE

FIL

E P

AT

H:

Drawn:

Job

a r

c h

i t

e c

t u

r e

S O

D E

R S

T R

O M

A

R C

H I T

E C

T S

, L

t d

.

Date

Check:

p l a

n n

i n

g

e x

t e

r i o

r

r e

s t

o r

a t

i o n

i n t

e r

i o r

d

e s

i g

n

6/3

0/2

01

7 1

0:4

2:4

6 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

ARCHITECTURAL SITEPLAN

A1.0

DD

St. E

lizabeth

Ann S

eto

n C

hu

rch

3145 S

W 1

92nd A

venue

Beavert

on, O

R 9

7006

17055

JB

06/30/17

Checker

3/64" = 1'-0"

SITE PLAN1

NORTH

REVISIONS

NO. DESCRIPTION DATE

Page 5: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

NORTH

4

A3

.0 3

A3

.0

2

A3

.0

1

A3

.0 7

A3.0

6

A3.0

WAITINGL100

RECEPTION102

LOADAREAFACTOR

846 SF

118CHAPEL

15 SF

57

862 SF

SAINT VINCENTDE PAULSTORAGE119

VESTIBULEL101

205 SF

CONFERENCE117

203 SF

CONFERENCE116

276 SF

PASTOR'S OFFICE109

112 SF

DEACON'SOFFICE108

112 SF

RELIGIOUS EDOFFICE107

196 SF

BUSINESSMANAGER106

128 SF

PASTORALASSOCIATE105

65 SF

FILING111

WORKROOM104

COFFEE STATION103

77 SF

STORAGE112

54 SF

MECH121

HALLWAYC110TOILET

T113

TOILETT114

CLOSET115

COAT CLOSETS118

TOILETT118

5

A3.0

8

A3.0

8'-6"

7'-11 7/8"

8'-0"

34 SF

TOILETT109

E.P.

W.H.

A/C

8'-0"

8'-0"

FU

RN

AC

EF

UR

NA

CE

1200 N

W N

aito

Park

way,

Suite

410

Port

land,

Ore

gon 9

7209

MA

IN 5

03.2

28.5

617

FA

X 5

03.2

73.8

584

ww

w.s

dra

.com

DA

TE

FIL

E P

AT

H:

Drawn:

Job

a r

c h

i t

e c

t u

r e

S O

D E

R S

T R

O M

A

R C

H I T

E C

T S

, L

t d

.

Date

Check:

p l a

n n

i n

g

e x

t e

r i o

r

r e

s t

o r

a t

i o n

i n t

e r

i o r

d

e s

i g

n

6/3

0/2

01

7 1

0:4

2:4

8 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

OVERALL PLANS

A2.1

DD

St. E

lizabeth

Ann S

eto

n C

hu

rch

3145 S

W 1

92nd A

venue

Beavert

on, O

R 9

7006

17055

Author

06/30/17

Checker

1/4" = 1'-0"

MAIN FLOOR PLAN1

NO. DESCRIPTION DATE

Page 6: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

4

A3

.0 3

A3

.0

2

A3

.0

1

A3

.0

7

A3.0

6

A3.0

5

A3.0

8

A3.0 NORTH

1200 N

W N

aito

Park

way,

Suite

410

Port

land,

Ore

gon 9

7209

MA

IN 5

03.2

28.5

617

FA

X 5

03.2

73.8

584

ww

w.s

dra

.com

DA

TE

FIL

E P

AT

H:

Drawn:

Job

a r

c h

i t

e c

t u

r e

S O

D E

R S

T R

O M

A

R C

H I T

E C

T S

, L

t d

.

Date

Check:

p l a

n n

i n

g

e x

t e

r i o

r

r e

s t

o r

a t

i o n

i n t

e r

i o r

d

e s

i g

n

6/3

0/2

01

7 1

0:4

2:4

9 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

ROOF PLAN

A2.2

DD

St. E

lizabeth

Ann S

eto

n C

hu

rch

3145 S

W 1

92nd A

venue

Beavert

on, O

R 9

7006

17055

JMB

06/30/17

IRM

1/4" = 1'-0"

ROOF PLAN1

NO. DESCRIPTION DATE

Page 7: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0"

ROOF

5 - TAB ASPHALT SHINGLES OVER 3/4" PWD SHEATHING WITH RIDGE VENT AND SHEET METAL FLASHINGS (TYP).

EXTERIOR WALLS

CULTURED STONE VENEER OVER SELF-ADHERED MEMBRANE WEATHER BARRIER ON GLASS FIBER GYPSUM SHEATHING, 2X6 WOOD STUDS, R-19 INSULATION AND 5/8" INTERIOR GYPSUM BOARD

PRE-FINISHED SHEET METAL GUTTERS AND DOWNSPOUTS

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0"

EXTERIOR WALLS

CULTURED STONE VENEER OVER SELF-ADHERED MEMBRANE WEATHER BARRIER ON GLASS FIBER GYPSUM SHEATHING, 2X6 WOOD STUDS, R-19 INSULATION AND 5/8" INTERIOR GYPSUM BOARD

ROOF

5 - TAB ASPHALT SHINGLES OVER 3/4" PWD SHEATHING WITH RIDGE VENT AND SHEET METAL FLASHINGS (TYP).

EXTERIOR WALLS

FIBER CEMENT BOARD OVER SELF-ADHERED MEMBRANE WEATHER BARRIER ON GLASS FIBER GYPSUM SHEATHING, 2X6 WOOD STUDS, R-19 INSULATION AND 5/8" INTERIOR GYPSUM BOARD

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0"

EXTERIOR WALLS

FIBER CEMENT BOARD OVER SELF-ADHERED MEMBRANE WEATHER BARRIER ON GLASS FIBER GYPSUM SHEATHING, 2X6 WOOD STUDS, R-19 INSULATION AND 5/8" INTERIOR GYPSUM BOARD

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0"

5'-0

1/4

"

15

'-0

1/4

"

5'-0

1/4

"

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0"

PASTOR'S OFFICE109

CONFERENCE116

CONFERENCE117

CHAPEL118

412

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0" SAINT VINCENTDE PAULSTORAGE119

WAITINGL100

HALLWAYC110

RELIGIOUS EDOFFICE107

412

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0"

VESTIBULEL101

WAITINGL100

412

MAIN FLOOR PLAN

8'-0"

FOOTING

3'-6"

B.O. MAIN LEVELCEILING

18'-0"

PASTOR'S OFFICE109

HALLWAYC110

BUSINESSMANAGER106

412

1200 N

W N

aito

Park

way,

Suite

410

Port

land,

Ore

gon 9

7209

MA

IN 5

03.2

28.5

617

FA

X 5

03.2

73.8

584

ww

w.s

dra

.com

DA

TE

FIL

E P

AT

H:

Drawn:

Job

a r

c h

i t

e c

t u

r e

S O

D E

R S

T R

O M

A

R C

H I T

E C

T S

, L

t d

.

Date

Check:

p l a

n n

i n

g

e x

t e

r i o

r

r e

s t

o r

a t

i o n

i n t

e r

i o r

d

e s

i g

n

6/3

0/2

01

7 1

0:4

2:5

2 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

EXTERIOR ELEVATIONS /SECTIONS

A3.0

DD

St. E

lizabeth

Ann S

eto

n C

hu

rch

3145 S

W 1

92nd A

venue

Beavert

on, O

R 9

7006

17055

JMB

06/30/17

IRM

1/8" = 1'-0"

SOUTH ELEVATION1

1/8" = 1'-0"

NORTH ELEVATION2

1/8" = 1'-0"

EAST ELEVATION3

1/8" = 1'-0"

WEST ELEVATION4

1/8" = 1'-0"

LONGITUDINAL SECTION 26

1/8" = 1'-0"

LONGITUDINAL SECTION 15

1/8" = 1'-0"

CROSS SECTION 17

1/8" = 1'-0"

CROSS SECTION 28

NO. DESCRIPTION DATE

Page 8: ST. ELIZABETH ANN SETON CATHOLIC CHURCH€¦ · a2.1 main floor plan a2.2 roof plan a3.0 exterior elevations / sections a6.0 reflected ceiling plan number of fixtures required occupancy

1200 N

W N

aito

Park

way,

Suite

410

Port

land,

Ore

gon 9

7209

MA

IN 5

03.2

28.5

617

FA

X 5

03.2

73.8

584

ww

w.s

dra

.com

DA

TE

FIL

E P

AT

H:

Drawn:

Job

a r

c h

i t

e c

t u

r e

S O

D E

R S

T R

O M

A

R C

H I T

E C

T S

, L

t d

.

Date

Check:

p l a

n n

i n

g

e x

t e

r i o

r

r e

s t

o r

a t

i o n

i n t

e r

i o r

d

e s

i g

n

6/3

0/2

01

7 1

0:4

2:5

5 A

M

M:\

17

05

5.E

AS

\RE

VIT

\17

05

5_

WR

K_

EA

S.r

vt

PERSPECTIVES

A12.0

DD

St. E

lizabeth

Ann S

eto

n C

hu

rch

3145 S

W 1

92nd A

venue

Beavert

on, O

R 9

7006

17055

Author

06/30/17

Checker

ENTRANCE PERSPECTIVE1

BALCONY PERSPECTIVE2

NO. DESCRIPTION DATE