Public Information/Cultural Resources Committee Workshop August 15, 2012
Florida Department of Transportation
District One
SR 542 from 1st Street to E ofSR 542 from 1 Street to E. of Buckeye Loop Road
Winter Haven, Polk County
FPID# 410666-2-32-01FAP# 2241 006 P
1
FAP# 2241-006-P
![Page 2: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/2.jpg)
AGENDAAGENDA
I. INTRODUCTIONS
II. PROJECT BACKGROUND
III. CURRENT PROJECT ACTIVITIES
IV. QUESTIONS/COMMENTS
2
![Page 3: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/3.jpg)
I. INTRODUCTIONSI. INTRODUCTIONS
A. Lake Elbert Lakefront Property Owners/Local Concerned Citizens
B. Federal Highway Administration (FHWA) Staff
C. Florida Department of State – Division of Historical Resources State Historic Preservation Office (SHPO) Staff
D. City of Winter Haven Staff
E. Florida Department of Transportation (FDOT) Staff ( / )(Bartow/Tallahassee)
F. Project Design Team Representatives 3
![Page 4: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/4.jpg)
DEFINITIONS/ACRONYMSDEFINITIONS/ACRONYMS
Project Development & Environment Study (PD&E)
Section 106 – National Historic Preservation Act
National Register of Historic Places (NRHP)
Cultural Resources Assessment Survey (CRAS)
Historic American Building Survey (HABS)Historic American Building Survey (HABS)
4
![Page 5: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/5.jpg)
DEFINITIONS/ACRONYMS ( t )DEFINITIONS/ACRONYMS (cont.)
Section 4(f) – U.S. Department of Transportation Act ( ) p p
Memorandum of Agreement (MOA)
Environmental Assessment – Finding of No Significant Impact (EA/FONSI)Impact (EA/FONSI)
5
![Page 6: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/6.jpg)
II. PROJECT BACKGROUND
A. Why are we here tonight?y g
B. Public & Agency Coordination during the PD&E Study
C PD&E Documentation/Requirements forC. PD&E Documentation/Requirements for Coordination
6
![Page 7: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/7.jpg)
II B P bli & A C di ti d i thII.B. Public & Agency Coordination during the PD&E Study (April 2005 – July 2009)
1. 4 meetings with City of Winter Haven Development Review Committee (DRC)
2 4 St k h ld Ad i C itt ti2. 4 Stakeholder Advisory Committee meetings3. 3 Cultural Resource Committee (CRC) meetings 4. 1 Public Workshop4. 1 Public Workshop5. 1 Public Hearing6. 3 newsletters7. Project Web site
7
![Page 8: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/8.jpg)
II.C. PD&E Documentation/Requirements for CRCII.C. PD&E Documentation/Requirements for CRC Coordination
1 CRAS completed (April 2006)1. CRAS completed (April 2006)2. SHPO “may affect” letter (May 2006)3. Section 106 Documentation and Determination of
Effects (June 2007)4. SHPO concurrence with project effects (August 2007)5 Public Hearing (March 2008)5. Public Hearing (March 2008) 6. Section 106 MOA (March 2009)7. Section 4(f) Evaluation (July 23, 2009)8. EA/FONSI (July 23, 2009)
8
![Page 9: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/9.jpg)
II.C. PD&E Documentation/Requirements for CRCII.C. PD&E Documentation/Requirements for CRC Coordination
9. Mitigation Measures Outlined in the Section 106 MOA9. Mitigation Measures Outlined in the Section 106 MOA
a. Design and Construction of the Project• Access and connectivity between the South LakeAccess and connectivity between the South Lake
Elbert Historic District and the Lake Elbert waterfrontHi t i di t i t k• Historic district markers
b. Preparation of the South Lake Elbert District NRHP nomination
c. HABS Documentation of 35 South Lake Elbert Drive South
9
![Page 10: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/10.jpg)
II C PD&E Documentation/Requirements for CRCII.C. PD&E Documentation/Requirements for CRC Coordination
PD&E Commitments
10
![Page 11: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/11.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES A. Recent History
1. FDOT sent draft NRHP Nomination to City of Winter Haven (February 2011)
11
![Page 12: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/12.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
A. Recent History
2. Cultural/historical resources fieldwork completed (November/December 2011)( )
3. CRAS update completed (July 2012)
4. FDOT sent CRAS update to FHWA (July 2012), will be forwarded to SHPO (August 2012)( g )
12
![Page 13: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/13.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
A. Recent History
5. Preparation of the HABS of 35 S. Lake Elbert Drive is currently underwayy y
13
![Page 14: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/14.jpg)
III. CURRENT PROJECT ACTIVITIES
B. Current Proposed DesignB. Current Proposed Design
1. Roadway (Approved PD&E vs Current Design)
2. Landscaping Concept
3. Summary of Changes
14
![Page 15: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/15.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
1. Approved PD&E Roadway Alignment (west half)
15
![Page 16: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/16.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
1. Current Proposed Roadway Alignment (west half)
16
![Page 17: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/17.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
1. Approved PD&E Roadway Alignment (east half)
17
![Page 18: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/18.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
1. Current Proposed Roadway Alignment (east half)
18
![Page 19: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/19.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
1. Approved PD&E Roadway Sections
19
![Page 20: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/20.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
1. Current Proposed Design Roadway Section
20
![Page 21: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/21.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
2. Landscaping Concept (west half)
21
![Page 22: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/22.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
2. Landscaping Concept (east half)
22
![Page 23: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/23.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
2. Landscaping Concept
23
![Page 24: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/24.jpg)
III. CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
2. Landscaping Concept (visual rendering)
24
![Page 25: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/25.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
2. Landscaping Concept (amenities)
25
![Page 26: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/26.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
2. Landscaping Concept (plant palate)
26
![Page 27: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/27.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
2. Landscaping Concept (plant palate)
27
![Page 28: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/28.jpg)
III. CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
3. Summary of Changes within the Historic District
a. Remove wall and pathway railing• more open, flowing design
i i l k• preserve existing lake access • enhance views from previous PD&E concept• anticipated project cost savingsanticipated project cost savings
b. Enhanced pedestrian amenities and landscaping
28
![Page 29: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/29.jpg)
III. CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
3. Summary of Changes within the Historic District
c. Added two 4-foot bike lanes • slightly wider footprint (total of 4 feet)
i ffi l id h d i ( 1 f h i• minor traffic lane width reduction (-1 foot each in EB & WB direction)
• reduced multi-use path width to 8-foot asphaltreduced multi use path width to 8 foot asphalt sidewalk (-4 feet)
29
![Page 30: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/30.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
C. Next Steps
1. City of Winter Haven
Will h t l t ti ith ff t da. Will have at least one more meeting with affected property owners regarding NHRP designation (Summer/Fall 2012)( )
b. Present NHRP designation to the City Commission d b it t SHPO (Wi t 2012/S i 2013)and submit to SHPO (Winter 2012/Spring 2013)
30
![Page 31: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/31.jpg)
III CURRENT PROJECT ACTIVITIESIII. CURRENT PROJECT ACTIVITIES
C. Next Steps
2. FDOT
a Will review comments received and incorporatea. Will review comments received and incorporate where feasible into continued development of design plans
b. Future CRC meeting and Public Hearing as needed (dates TBD)needed (dates TBD)
31
![Page 32: SR 542 CRC 1 Presentation › images › CRCslides.pdf · Microsoft PowerPoint - SR 542 CRC 1 Presentation.pptx Author: 20239 Created Date: 8/14/2012 8:56:50 AM ...](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f149310060dd743a07c4f3a/html5/thumbnails/32.jpg)
IV. QUESTIONS/COMMENTS?
O t iti f bli i tOpportunities for public input• Oral comments• Comment sheets (drop-box or mail-in)Co e t s eets (d op bo o a )• E-mail/phone