Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w....
Transcript of Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w....
43
2
1
1
2 1
1
97 8
1
7 1 1
MEADOW DRIVE
3
4
3
8
7
3
112
EXISTING SITE CONTEXT
MAP 1
SCALE 1:5000
BROWN AND ASSOCIATESprepared by:
OCTOBER 2003
PLANNING GROUP SPY HILL AGGREGATE OPERATIONS
SECTION 33-25-2-W5M, AND SECTION 28-25-2-W5MSITE BOUNDARY
(2.5 m INTERVAL)
EXISTING CONTOUR
FENCE
LEGENDNOTESCITY LIMITS
EXISTING ROADWAY
RUSS GERRISH CONSULTING
EXISTING EASEMENT or R/W
EXISTING TREES
43
2
1
1
2 1
1
97 8
1
7 1 1
MEADOW DRIVE
3
4
3
8
7
3
112
PHASE 3
PHASE 2
PHASE 5
PHASE 6
IN A NATURAL STATEAREA TO BE RETAINED
3 - 4 m PLANTED BERM
3 - 4 m PLANTED BERM TO BE 2 - 3 m PLANTED BERM
2 - 3 m PLANTED BERM
PHASE 4
CONSTRUCTED IN THE FIRST
PHASE OF OPERATIONS
CONSTRUCTED IN THE FIRST
PHASE OF OPERATIONS
3 - 4 m PLANTED BERM
CONSTRUCTED IN THE FIRST
PHASE OF OPERATIONS
PLANT AREAS ANDOVERBURDEN STORAGE
TO DRAIN TOWARD PIT AREA
STRIP50,000 M2
INITIALLY
AND
STOCKPILES
CONCRETE
PLANT
AND
STOCKPILES
2 - 3 m PLANTED BERM
PHASE 1
DRIVEWAY
TO BE ESTABLISHED INITIALLY
ENTRY AND PLANT AREA
AT TOP OF GRAVEL
SCALING AND TRUCK
MARSHALLINGAREA
OVERBURDEN
STORAGE
CONSTRUCTED IN THE FIRST
PHASE OF OPERATIONS
AREA
2 - 3 m PLANTED BERM
(FROM THE TOP OF
THE RAVINE SOUTH TOBE CONSTRUCTED INTHE FIRST PHASE OF
OPERATIONS)
PHASE 1A
PHASE 1B
TOPSOIL AND A PORTION OF OVERBURDENFROM THE INITIAL OPERATING AREAS TOBE USED IN CONSTRUCTION OF BERMS
CHAIN LINK FENCE
TO ENCLOSE THE
PHASE 1 AND AND 2 SITE
EXTRACTION PHASING
MAP 2
SCALE 1:5000
SPY HILL AGGREGATE OPERATIONS
SECTION 33-25-2-W5M, AND
SECTION 28-25-2-W5MSITE BOUNDARY
(2.5 m INTERVAL)
EXISTING CONTOUR
EXISTING FENCE
LIMIT OF EXCAVATION
LEGENDNOTESCITY LIMITS
2.0 m LOCAL PATHWAY
(PHASING BOUNDARY)
PLANTED BERM
- EXCAVATION TO PROCEED FROM PHASE 1 TO PHASE 6
- ALL BERMS AROUND THE PERIMITER OF THE PROPERTY
TO BE CONSTRUCTED DURING PHASE 1
AREA TO BE LEFT INA NATURAL STATE
DISTURBED DURING SURFACE OPERATIONS WILL BE RE-ESTABLISHED
- ALBERTA LEGAL SURVEY CONTROL STATIONS AND MARKERS
TO THE SATISFACTION OF THE CITY LAND SURVEYOR
- THE INITIAL PHASES OF STAGE 1 ARE SHOWN WITHIN
THE SHADED AREA
RUSS GERRISH CONSULTING
PLANNING GROUP
OCTOBER 2003
prepared by: BROWN AND ASSOCIATES
3 - 4 m PLANTED BERM
3 - 4 m PLANTED BERM TO BE
CONSTRUCTED IN THE FIRST
PHASE OF OPERATIONS
CONSTRUCTED IN THE FIRST
PHASE OF OPERATIONS
PLANT AREAS ANDOVERBURDEN STORAGE
TO DRAIN TOWARD PIT AREA
STRIP50,000 M2
INITIALLY
AND
STOCKPILES
CONCRETE
PLANT
AND
STOCKPILES
2 - 3 m PLANTED BERM
PHASE 1
DRIVEWAY
TO BE ESTABLISHED INITIALLYENTRY AND PLANT AREA
AT THE TOP OF GRAVEL
SCALING
AND TRUCKMARSHALLING
AREA
OVERBURDEN
STORAGECONSTRUCTED IN THEFIRST PHASE OF OPERATIONS
SILT FENCING TO BE
INSTALLED PRIOR TOTHE CONSTRUCTION
OF BERMS
INSTALL AND MAINTAIN
SILT FENCING UNTILGRASS IS ESTABLISHED
ON THE BERM
OVERLAND FLOW IN THE PITWILL BE DIRECTED TO THE
NORTH EAST CORNER
TOPSOIL, SUBSOILS, AND OVERBURDENSTOCKPILES IN THE OVERBURDEN STORAGEAREA TO BE SEPARATED TO PREVENT MIXING
INSTALL SILT FENCING 2.0 m FROM THETOE OF BERM AND MAINTAIN UNTIL
GRASS IS ESTABLISHED ON THE BERM
SECTION A-A
31
9.0 m2.0 m 2.0 m 9.0 m 6.10 m
CWNGR.O.W.
DITCH
85th STREET
13
SILT FENCE2275 JK
SILT FENCE
A A
AREA
PHASE 2
3 - 4 m PLANTED BERM
CONSTRUCTED IN THE FIRST
PHASE OF OPERATIONS
CONSTRUCT A 1 m DEEP DITCH ALONG 1/4 SECTION LINE TO
MAINTAIN A 20 m UNDISTURBED
BUFFER AREA BETWEEN THE TOP
OF SLOPE OF DRAINAGE COURSEAND TOP OF PIT EXCAVATION
CONSTRUCT A SWALE TO FACILITATE
THE OVERLAND FLOW FROM POND
INSTALL SILT FENCING 2.0 m FROM THETOE OF THE BERM AND MAINTAIN UNTILGRASS IS ESTABLISHED ON THE BERM
INTERCEPT OVERLAND FLOW FROM THE S 1/2 OF SECTION 28
CULV
ERT
PHASE 1A
PHASE 1B
CULVERT
EROSION AND
MAP 3
SCALE 1:4000
BROWN AND ASSOCIATES
prepared by:
OCTOBER 2003
PLANNING GROUP
SPY HILL AGGREGATE OPERATIONS
SECTION 33-25-2-W5M, AND SECTION 28-25-2-W5M
OVERLAND SWALE
(2.5 m INTERVAL)
EXISTING CONTOUR
LIMIT OF EXCAVATION
LEGENDNOTESSILT FENCE
(PHASING BOUNDARY)
PLANTED BERM
- ALL BERMS SHOWN TO BE CONSTRUCTED DURING PHASE 1
AREA TO BE LEFT INA NATURAL STATE
- THE INITIAL PHASES OF STAGE 1 ARE SHOWN WITHIN
THE SHADED AREA
D.A. Watt CONSULTING
GROUP LTD.
SEDIMENTATION CONTROLPHASE 1 AND 2
DIRECTION OF OVERLAND FLOW
1
1
2 1
1
97 8
1
7 1 1
MEADOW DRIVE
3
4
3
8
7
3
9510953 R/W9813429
9510953 R/W
9511197 U
R/W
2275J K
R/ W
82
10
31
08
21
03
10
2275JK
UR
/W2275JK
UR
/W
NW27-25
8510366
3 - 4 m PLANTED BERM
3 - 4 m PLANTED BERM
82
10
31
0
3 - 4 m PLANTED BERM
3:1 BACKSLOPES
3:1
BA
CK
SLO
PE
S
3:1
BA
CK
SLO
PE
S
3:1
BA
CK
SLO
PE
S
3:1
BA
CK
SLO
PE
S3:1
BA
CK
SLO
PE
S
PENDING FUTURE URBAN DEVELOPMENT
AREA TO BE RESEEDED PENDING
FUTURE URBAN DEVELOPMENT
AREA TO BE RESEEDED WITH HERBACEOUS SEED
SUCH AS SLENDER AND AWNED WHEATGRASS
PENDING FUTURE URBAN DEVELOPMENT
AREA TO BE RESEEDED WITH HERBACEOUS SEED
SUCH AS SLENDER AND AWNED WHEATGRASS
3:1 BACKSLOPES
TYPICAL MARSH /
MEADOW FEATURES
3:1 BACKSLOPES
NATURAL AREA RECLAMATION,
MAP 4
SPY HILL AGGREGATE OPERATIONS
SECTION 33-25-2-W5M, AND SECTION 28-25-2-W5M
SITE BOUNDARY
(1.0 m INSIDE EXCAVATION BOUNDARY
RECLAIMED CONTOUR ELEVATION
LEGEND
AND PLANTING PLAN
A 60 TO 100 m LANDSCAPED SETBACK
WITH LOCAL ASPEN AND SHRUBS WITHINNATURALLY CONTOURED AND PLANTEDTYPICAL 3 TO 4 m BERM
SECTION A-A'SCALE 1:1000
SETBACK AREAPOSSIBLE FUTURE RECREATIONAL USES MAY
SCALE 1:1000
SECTION C-C'
RELOCATED WILLOW CUTTINGS
WITH FORB AND ASPEN ROOT CLUMPS
SEED MIX WITH NATIVE SPECIES
REVEGETATED NORTH FACING BACKSLOPES101st STREET INTERFACE AND BUFFER
TOP DRESS WITH COMBINATION OF NEW AND DIRECTLYPLACED LOCAL STRIPPINGS. TO INCLUDE WILLOWCUTTINGS WITH FORB AND ASPEN ROOT CLUMPS.
AND NEEDLEGRASSSUCH AS ROUGH FESCUE, WHEATGRASS,SEED MIX - GRASS MIX WITH NATIVE SPECIES
PROPOSED PLANT MATERIAL
RECLAIMED NORTH BACKSLOPESUNDISTURBED NATURAL AREA
SCALE 1:5000
AREA OF SURFACE DISTURBANCE ONLY
SEE DETAILS - SECTION D-D'
CONSTRUCTED WETLAND
TEMPORARY AND PERMANENT BERMING,
MINIMAL STRIPPING AND GRADING TO SEPARATETOPSOIL'S, AND ESTHETIC ENHANCEMENTS
UNDISTURBED NATURAL AREA
SCALE 1:1000
SECTION B-B'
INCLUDE PEDESTRIAN AND CYCLE PATHWAYS
CONSTRUCTED WETLAND AND DRAINAGE SYSTEM
SECTION D-D'SCALE 1:250
2 X VERTICAL EXAGGERATION
5.0 m
PLATEAU
POSSIBLEFUTURE
PATHWAY
4.0 m
10:1 SLOPE
5.0 m
10:1 SLOPE
5.0 m
MARSH AREA
RELOCATED WILLOW CUTTINGS
WITH FORB AND ASPEN ROOT CLUMPS
9.0 m
10:1 SLOPE
±28 m TYPICAL
SEED MIX WITH
NATIVE SPECIES
DIRECTION OF OVERLAND FLOW
UNDISTURBED NATURAL AREA
SEE DETAILS - SECTION C - C'
RUSS GERRISH CONSULTING
PLANNING GROUP
OCTOBER, 2003
prepared by: BROWN AND ASSOCIATES
WET MEADOW FRINGE
MARSH
AND DRAINAGE SYSTEM
FINAL GRADING,
2.0 m LOCAL PATHWAY
9 TO 12 m BERM NATURALLYCONTOURED AND PLANTED
WITH LOCAL ASPEN AND SHRUBS
220 m FROM PROPERTY LINE
LIMIT OF MINING APPROXIMATELY
2 m LOCAL PATHWAYPROPERTY LINE
1270
1260
1250
1240
1230
1220
1280
CROSS SECTION N-N'
1270
1260
1250
1240
1230
1220
1280
SECTION S - S
SECTION N - N
SE
CT
ION
W -
W
SE
CT
ION
E -
E
N 1/2 SEC 33
S 1/2 SEC 33
N 1/2 SEC 28
S 1/2 SEC 28
144th Avenue N.W.
85th
Str
eet N
.W.
101st S
treet N
.W.
LIMITS OF EXCAVATION
TOP
HILL
LIMITS OF EXCAVATION
1270
1260
1250
1240
1230
1220
1280
CROSS SECTION S-S'
1270
1260
1250
1240
1230
1220
1280
1300
1290
1280
1270
1260
1250
1240
1230
CROSS SECTION E-E'
1220
1280
1270
1260
1250
1240
1230
1220
1300
1290
1280
1270
1260
1250
1240
1230
CROSS SECTION W-W'
1220
1300
1290
1280
1270
1260
1250
1240
1230
1220
CR
OS
S S
EC
TIO
NS
MA
P 5
SP
Y H
ILL A
GG
RE
GA
TE
OP
ER
AT
ION
S
SE
CT
ION
33
-25
-2-W
5M
, AN
D
SE
CT
ION
28-2
5-2
-W5M
NO
TE
S
KEY MAPNOT TO SCALE
RU
SS
GE
RR
ISH
CO
NS
ULT
ING
PL
AN
NIN
G G
RO
UP
OC
TO
BE
R 2
00
3
pre
pare
d b
y:
BR
OW
N A
ND
AS
SO
CIA
TE
S
DU
E T
O T
HE
SC
ALE
OF
TH
E D
RA
WIN
GS
TH
E
DE
PT
H O
F T
OP
SO
IL H
AS
NO
T B
EE
N D
ET
AIL
ED
TH
E A
VE
RA
GE
TO
PS
OIL
DE
PT
H IS
0.3
m (1
ft)
CONSTRUCTION OF A PERMANENT BERM ALONG THE WEST
SIDE OF THE PROPERTY ADJACENT TO 101st STREET
ESTABLISH THE SITE ACCESS, SCALING AREA, AND
COMMENCE PHASE 1 INITIAL STRIPPING AND EXTRACTION
ONGOING EXTRACTION WITHIN PHASE 2
RELOCATION OF CONCRETE AND ASPHALT PLANT SITES
EXTENSION OF WORKING DRIVEWAY TO CURRENT PHASE
RECLAMATION OF COMPLETED PHASE 1 AREAS AT A
LEVEL APPROXIMATELY 20 METRES BELOW EXISTING
GRADE. TOPSOIL FROM PHASE 2 WILL BE PLACED IN
PHASE 1 RECLAMATION AREAS AND RESEEDED.
ONGOING EXTRACTION TO PROGRESS FROM PHASE 3 TO 5
EXISTING POWER LINE TO BE LOWERED TO THE BASE OF
RECLAMATION OF COMPLETED AREAS AT A LEVEL
APPROXIMATELY 20 METRES BELOW EXISTING GRADE.
DIRECT AND SEQUENTIAL PLACEMENT OF TOPSOIL AND
CONCRETE AND ASPHALT PLANT SITES. CONSTRUCT AN
UPGRADED DRIVEWAY INTERSECTION ON 85th STREET
ACTIVITIES. TOPSOIL, SUBSOILS, AND A PORTION OF THE
OVERBURDEN TO BE USED IN BERM CONSTRUCTION.
TO ACCOMMODATE A SEPARATE TRUCK TURNING LANE.
TO THE BASE OF PHASE 1A APPROXIMATELY 20 METRES
BELOW THE EXISTING GRADE OF THE PROPERTY
THE RECLAIMED AREA
CONSTRUCTION OF A STORMWATER RETENTION POND
WITHIN PHASE 3 TO PREVENT SILTATION OF OFF-SITE
DRAINAGE COURSES
EXISTING ON-SITE DRAINAGE CHANNEL WILL BE
RE-ESTABLISHED AT THE BASE OF THE RECLAIMED AREA
ONGOING EXTRACTION WITHIN PHASE 6
CONSTRUCT NORTH AND NORTHEAST BERMS PRIOR
RECLAMATION OF COMPLETED AREAS AT A LEVEL
APPROXIMATELY 20 METRES BELOW EXISTING GRADE.
TO COMMENCING PHASE 6 EXTRACTION
LOWERED POWER LINE R/W
NO GRAVEL EXTRACTION ACTIVITIES
VEGETATIONTO REMAIN
GRAZING AND OTHERINTERIM USES
FUTURE EXPANSION AREA
SCALE AREA
PLANT AREA
PHASE 1 BERMING
DRIVEWAY
PHASE 1B
INITIAL EXTRACTIONAREA ±90 Acres
NO GRAVEL EXTRACTION ACTIVITIES
VEGETATIONTO REMAIN
PHASE 1
DRIVEWAY
RECLAMATIONIN PROGRESS
PLANTED BERM
CONSTRUCTION OF A2 -3 m MEANDERING
PHASE 1 BERMING
PLANT AREA
±85 Acres
±85 Acres
GRAZING AND OTHERINTERIM USES
FUTURE EXPANSION AREA
NO GRAVEL EXTRACTION ACTIVITIES
STORMWATERRETENTION POND
PHASE 1
DRIVEWAY
RECLAMATION
COMPLETE
PLANT AREA
GRAZING AND OTHERINTERIM USES
FUTURE EXPANSION AREA
PHASE 2
RECLAMATION
IN PROGRESS
±72 Acres±85 Acres
±100 Acres±78 Acres
CONSTRUCTION OF A PERMANENTMEANDERING 3-4 m PLANTED BERMWITHIN A 60 TO 100 m SETBACKADJACENT TO 101st STREET
NO GRAVEL EXTRACTION ACTIVITIES
PHASE 1
DRIVEWAY
RECLAMATION
COMPLETE
PLANT AREA
PHASE 2
RECLAMATION
COMPLETE
PHASE 3
RECLAMATIONCOMPLETE
PHASE 4
RECLAMATIONCOMPLETE
PHASE 5
RECLAMATIONIN PROGRESS
STORMWATERRETENTION POND
VEGETATIONTO REMAIN
PLANTED BERM
CONSTRUCTION OF A2 -3 m MEANDERING
PHASE 6 BERMING
±91 Acres ±91 Acres ±91 Acres
85th STREETENTRY
LIMITS OF FUTUREEXCAVATION
SCALE AREA SCALE AREA SCALE AREA
RECLAMATION PLAN
SECTION 28-25-2-W5M
SECTION 33-25-2-W5M, AND
SPY HILL AGGREGATE OPERATIONS
MAP 6OPERATIONS AND
NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY, AND SHOULD NOT BE SCALED
TO BE STOCKPILED IN PHASE 1B AREA AND THEN USED FOR
REMAINING OVERBURDEN AND SOME TOPSOIL AND SUBSOIL
DIRECT AND SEQUENTIAL RECLAMATION AND BACKFILLING
OVERBURDEN IN RECLAMATION AREAS
CONTINUE DIRECT AND SEQUENTIAL PLACEMENT OF
TOPSOIL AND OVERBURDEN IN RECLAMATION OF
PREVIOUS EXTRACTION AREA.