6
4 3 2 1 1 2 1 1 9 7 8 1 7 1 1 MEADOW DRIVE 3 4 3 8 7 3 112 EXISTING SITE CONTEXT MAP 1 SCALE 1:5000 BROWN AND ASSOCIATES prepared by: OCTOBER 2003 PLANNING GROUP SPY HILL AGGREGATE OPERATIONS SECTION 33-25-2-W5M, AND SECTION 28-25-2-W5M SITE BOUNDARY (2.5 m INTERVAL) EXISTING CONTOUR FENCE LEGEND NOTES CITY LIMITS EXISTING ROADWAY RUSS GERRISH CONSULTING EXISTING EASEMENT or R/W EXISTING TREES

Transcript of Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w....

Page 1: Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w. ditch 85th street 1 3 silt fence 2275 jk silt fence aa area phase 2 3 - 4 m planted

43

2

1

1

2 1

1

97 8

1

7 1 1

MEADOW DRIVE

3

4

3

8

7

3

112

EXISTING SITE CONTEXT

MAP 1

SCALE 1:5000

BROWN AND ASSOCIATESprepared by:

OCTOBER 2003

PLANNING GROUP SPY HILL AGGREGATE OPERATIONS

SECTION 33-25-2-W5M, AND SECTION 28-25-2-W5MSITE BOUNDARY

(2.5 m INTERVAL)

EXISTING CONTOUR

FENCE

LEGENDNOTESCITY LIMITS

EXISTING ROADWAY

RUSS GERRISH CONSULTING

EXISTING EASEMENT or R/W

EXISTING TREES

Page 2: Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w. ditch 85th street 1 3 silt fence 2275 jk silt fence aa area phase 2 3 - 4 m planted

43

2

1

1

2 1

1

97 8

1

7 1 1

MEADOW DRIVE

3

4

3

8

7

3

112

PHASE 3

PHASE 2

PHASE 5

PHASE 6

IN A NATURAL STATEAREA TO BE RETAINED

3 - 4 m PLANTED BERM

3 - 4 m PLANTED BERM TO BE 2 - 3 m PLANTED BERM

2 - 3 m PLANTED BERM

PHASE 4

CONSTRUCTED IN THE FIRST

PHASE OF OPERATIONS

CONSTRUCTED IN THE FIRST

PHASE OF OPERATIONS

3 - 4 m PLANTED BERM

CONSTRUCTED IN THE FIRST

PHASE OF OPERATIONS

PLANT AREAS ANDOVERBURDEN STORAGE

TO DRAIN TOWARD PIT AREA

STRIP50,000 M2

INITIALLY

AND

STOCKPILES

CONCRETE

PLANT

AND

STOCKPILES

2 - 3 m PLANTED BERM

PHASE 1

DRIVEWAY

TO BE ESTABLISHED INITIALLY

ENTRY AND PLANT AREA

AT TOP OF GRAVEL

SCALING AND TRUCK

MARSHALLINGAREA

OVERBURDEN

STORAGE

CONSTRUCTED IN THE FIRST

PHASE OF OPERATIONS

AREA

2 - 3 m PLANTED BERM

(FROM THE TOP OF

THE RAVINE SOUTH TOBE CONSTRUCTED INTHE FIRST PHASE OF

OPERATIONS)

PHASE 1A

PHASE 1B

TOPSOIL AND A PORTION OF OVERBURDENFROM THE INITIAL OPERATING AREAS TOBE USED IN CONSTRUCTION OF BERMS

CHAIN LINK FENCE

TO ENCLOSE THE

PHASE 1 AND AND 2 SITE

EXTRACTION PHASING

MAP 2

SCALE 1:5000

SPY HILL AGGREGATE OPERATIONS

SECTION 33-25-2-W5M, AND

SECTION 28-25-2-W5MSITE BOUNDARY

(2.5 m INTERVAL)

EXISTING CONTOUR

EXISTING FENCE

LIMIT OF EXCAVATION

LEGENDNOTESCITY LIMITS

2.0 m LOCAL PATHWAY

(PHASING BOUNDARY)

PLANTED BERM

- EXCAVATION TO PROCEED FROM PHASE 1 TO PHASE 6

- ALL BERMS AROUND THE PERIMITER OF THE PROPERTY

TO BE CONSTRUCTED DURING PHASE 1

AREA TO BE LEFT INA NATURAL STATE

DISTURBED DURING SURFACE OPERATIONS WILL BE RE-ESTABLISHED

- ALBERTA LEGAL SURVEY CONTROL STATIONS AND MARKERS

TO THE SATISFACTION OF THE CITY LAND SURVEYOR

- THE INITIAL PHASES OF STAGE 1 ARE SHOWN WITHIN

THE SHADED AREA

RUSS GERRISH CONSULTING

PLANNING GROUP

OCTOBER 2003

prepared by: BROWN AND ASSOCIATES

Page 3: Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w. ditch 85th street 1 3 silt fence 2275 jk silt fence aa area phase 2 3 - 4 m planted

3 - 4 m PLANTED BERM

3 - 4 m PLANTED BERM TO BE

CONSTRUCTED IN THE FIRST

PHASE OF OPERATIONS

CONSTRUCTED IN THE FIRST

PHASE OF OPERATIONS

PLANT AREAS ANDOVERBURDEN STORAGE

TO DRAIN TOWARD PIT AREA

STRIP50,000 M2

INITIALLY

AND

STOCKPILES

CONCRETE

PLANT

AND

STOCKPILES

2 - 3 m PLANTED BERM

PHASE 1

DRIVEWAY

TO BE ESTABLISHED INITIALLYENTRY AND PLANT AREA

AT THE TOP OF GRAVEL

SCALING

AND TRUCKMARSHALLING

AREA

OVERBURDEN

STORAGECONSTRUCTED IN THEFIRST PHASE OF OPERATIONS

SILT FENCING TO BE

INSTALLED PRIOR TOTHE CONSTRUCTION

OF BERMS

INSTALL AND MAINTAIN

SILT FENCING UNTILGRASS IS ESTABLISHED

ON THE BERM

OVERLAND FLOW IN THE PITWILL BE DIRECTED TO THE

NORTH EAST CORNER

TOPSOIL, SUBSOILS, AND OVERBURDENSTOCKPILES IN THE OVERBURDEN STORAGEAREA TO BE SEPARATED TO PREVENT MIXING

INSTALL SILT FENCING 2.0 m FROM THETOE OF BERM AND MAINTAIN UNTIL

GRASS IS ESTABLISHED ON THE BERM

SECTION A-A

31

9.0 m2.0 m 2.0 m 9.0 m 6.10 m

CWNGR.O.W.

DITCH

85th STREET

13

SILT FENCE2275 JK

SILT FENCE

A A

AREA

PHASE 2

3 - 4 m PLANTED BERM

CONSTRUCTED IN THE FIRST

PHASE OF OPERATIONS

CONSTRUCT A 1 m DEEP DITCH ALONG 1/4 SECTION LINE TO

MAINTAIN A 20 m UNDISTURBED

BUFFER AREA BETWEEN THE TOP

OF SLOPE OF DRAINAGE COURSEAND TOP OF PIT EXCAVATION

CONSTRUCT A SWALE TO FACILITATE

THE OVERLAND FLOW FROM POND

INSTALL SILT FENCING 2.0 m FROM THETOE OF THE BERM AND MAINTAIN UNTILGRASS IS ESTABLISHED ON THE BERM

INTERCEPT OVERLAND FLOW FROM THE S 1/2 OF SECTION 28

CULV

ERT

PHASE 1A

PHASE 1B

CULVERT

EROSION AND

MAP 3

SCALE 1:4000

BROWN AND ASSOCIATES

prepared by:

OCTOBER 2003

PLANNING GROUP

SPY HILL AGGREGATE OPERATIONS

SECTION 33-25-2-W5M, AND SECTION 28-25-2-W5M

OVERLAND SWALE

(2.5 m INTERVAL)

EXISTING CONTOUR

LIMIT OF EXCAVATION

LEGENDNOTESSILT FENCE

(PHASING BOUNDARY)

PLANTED BERM

- ALL BERMS SHOWN TO BE CONSTRUCTED DURING PHASE 1

AREA TO BE LEFT INA NATURAL STATE

- THE INITIAL PHASES OF STAGE 1 ARE SHOWN WITHIN

THE SHADED AREA

D.A. Watt CONSULTING

GROUP LTD.

SEDIMENTATION CONTROLPHASE 1 AND 2

DIRECTION OF OVERLAND FLOW

Page 4: Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w. ditch 85th street 1 3 silt fence 2275 jk silt fence aa area phase 2 3 - 4 m planted

1

1

2 1

1

97 8

1

7 1 1

MEADOW DRIVE

3

4

3

8

7

3

9510953 R/W9813429

9510953 R/W

9511197 U

R/W

2275J K

R/ W

82

10

31

08

21

03

10

2275JK

UR

/W2275JK

UR

/W

NW27-25

8510366

3 - 4 m PLANTED BERM

3 - 4 m PLANTED BERM

82

10

31

0

3 - 4 m PLANTED BERM

3:1 BACKSLOPES

3:1

BA

CK

SLO

PE

S

3:1

BA

CK

SLO

PE

S

3:1

BA

CK

SLO

PE

S

3:1

BA

CK

SLO

PE

S3:1

BA

CK

SLO

PE

S

PENDING FUTURE URBAN DEVELOPMENT

AREA TO BE RESEEDED PENDING

FUTURE URBAN DEVELOPMENT

AREA TO BE RESEEDED WITH HERBACEOUS SEED

SUCH AS SLENDER AND AWNED WHEATGRASS

PENDING FUTURE URBAN DEVELOPMENT

AREA TO BE RESEEDED WITH HERBACEOUS SEED

SUCH AS SLENDER AND AWNED WHEATGRASS

3:1 BACKSLOPES

TYPICAL MARSH /

MEADOW FEATURES

3:1 BACKSLOPES

NATURAL AREA RECLAMATION,

MAP 4

SPY HILL AGGREGATE OPERATIONS

SECTION 33-25-2-W5M, AND SECTION 28-25-2-W5M

SITE BOUNDARY

(1.0 m INSIDE EXCAVATION BOUNDARY

RECLAIMED CONTOUR ELEVATION

LEGEND

AND PLANTING PLAN

A 60 TO 100 m LANDSCAPED SETBACK

WITH LOCAL ASPEN AND SHRUBS WITHINNATURALLY CONTOURED AND PLANTEDTYPICAL 3 TO 4 m BERM

SECTION A-A'SCALE 1:1000

SETBACK AREAPOSSIBLE FUTURE RECREATIONAL USES MAY

SCALE 1:1000

SECTION C-C'

RELOCATED WILLOW CUTTINGS

WITH FORB AND ASPEN ROOT CLUMPS

SEED MIX WITH NATIVE SPECIES

REVEGETATED NORTH FACING BACKSLOPES101st STREET INTERFACE AND BUFFER

TOP DRESS WITH COMBINATION OF NEW AND DIRECTLYPLACED LOCAL STRIPPINGS. TO INCLUDE WILLOWCUTTINGS WITH FORB AND ASPEN ROOT CLUMPS.

AND NEEDLEGRASSSUCH AS ROUGH FESCUE, WHEATGRASS,SEED MIX - GRASS MIX WITH NATIVE SPECIES

PROPOSED PLANT MATERIAL

RECLAIMED NORTH BACKSLOPESUNDISTURBED NATURAL AREA

SCALE 1:5000

AREA OF SURFACE DISTURBANCE ONLY

SEE DETAILS - SECTION D-D'

CONSTRUCTED WETLAND

TEMPORARY AND PERMANENT BERMING,

MINIMAL STRIPPING AND GRADING TO SEPARATETOPSOIL'S, AND ESTHETIC ENHANCEMENTS

UNDISTURBED NATURAL AREA

SCALE 1:1000

SECTION B-B'

INCLUDE PEDESTRIAN AND CYCLE PATHWAYS

CONSTRUCTED WETLAND AND DRAINAGE SYSTEM

SECTION D-D'SCALE 1:250

2 X VERTICAL EXAGGERATION

5.0 m

PLATEAU

POSSIBLEFUTURE

PATHWAY

4.0 m

10:1 SLOPE

5.0 m

10:1 SLOPE

5.0 m

MARSH AREA

RELOCATED WILLOW CUTTINGS

WITH FORB AND ASPEN ROOT CLUMPS

9.0 m

10:1 SLOPE

±28 m TYPICAL

SEED MIX WITH

NATIVE SPECIES

DIRECTION OF OVERLAND FLOW

UNDISTURBED NATURAL AREA

SEE DETAILS - SECTION C - C'

RUSS GERRISH CONSULTING

PLANNING GROUP

OCTOBER, 2003

prepared by: BROWN AND ASSOCIATES

WET MEADOW FRINGE

MARSH

AND DRAINAGE SYSTEM

FINAL GRADING,

2.0 m LOCAL PATHWAY

9 TO 12 m BERM NATURALLYCONTOURED AND PLANTED

WITH LOCAL ASPEN AND SHRUBS

220 m FROM PROPERTY LINE

LIMIT OF MINING APPROXIMATELY

2 m LOCAL PATHWAYPROPERTY LINE

Page 5: Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w. ditch 85th street 1 3 silt fence 2275 jk silt fence aa area phase 2 3 - 4 m planted

1270

1260

1250

1240

1230

1220

1280

CROSS SECTION N-N'

1270

1260

1250

1240

1230

1220

1280

SECTION S - S

SECTION N - N

SE

CT

ION

W -

W

SE

CT

ION

E -

E

N 1/2 SEC 33

S 1/2 SEC 33

N 1/2 SEC 28

S 1/2 SEC 28

144th Avenue N.W.

85th

Str

eet N

.W.

101st S

treet N

.W.

LIMITS OF EXCAVATION

TOP

HILL

LIMITS OF EXCAVATION

1270

1260

1250

1240

1230

1220

1280

CROSS SECTION S-S'

1270

1260

1250

1240

1230

1220

1280

1300

1290

1280

1270

1260

1250

1240

1230

CROSS SECTION E-E'

1220

1280

1270

1260

1250

1240

1230

1220

1300

1290

1280

1270

1260

1250

1240

1230

CROSS SECTION W-W'

1220

1300

1290

1280

1270

1260

1250

1240

1230

1220

CR

OS

S S

EC

TIO

NS

MA

P 5

SP

Y H

ILL A

GG

RE

GA

TE

OP

ER

AT

ION

S

SE

CT

ION

33

-25

-2-W

5M

, AN

D

SE

CT

ION

28-2

5-2

-W5M

NO

TE

S

KEY MAPNOT TO SCALE

RU

SS

GE

RR

ISH

CO

NS

ULT

ING

PL

AN

NIN

G G

RO

UP

OC

TO

BE

R 2

00

3

pre

pare

d b

y:

BR

OW

N A

ND

AS

SO

CIA

TE

S

DU

E T

O T

HE

SC

ALE

OF

TH

E D

RA

WIN

GS

TH

E

DE

PT

H O

F T

OP

SO

IL H

AS

NO

T B

EE

N D

ET

AIL

ED

TH

E A

VE

RA

GE

TO

PS

OIL

DE

PT

H IS

0.3

m (1

ft)

Page 6: Spy Hill Open House 3 Maps 1 to 6 - alberta.ca€¦ · 1 2.0 m 2.0 m 9.0 m 6.10 m9.0 m cwng r.o.w. ditch 85th street 1 3 silt fence 2275 jk silt fence aa area phase 2 3 - 4 m planted

CONSTRUCTION OF A PERMANENT BERM ALONG THE WEST

SIDE OF THE PROPERTY ADJACENT TO 101st STREET

ESTABLISH THE SITE ACCESS, SCALING AREA, AND

COMMENCE PHASE 1 INITIAL STRIPPING AND EXTRACTION

ONGOING EXTRACTION WITHIN PHASE 2

RELOCATION OF CONCRETE AND ASPHALT PLANT SITES

EXTENSION OF WORKING DRIVEWAY TO CURRENT PHASE

RECLAMATION OF COMPLETED PHASE 1 AREAS AT A

LEVEL APPROXIMATELY 20 METRES BELOW EXISTING

GRADE. TOPSOIL FROM PHASE 2 WILL BE PLACED IN

PHASE 1 RECLAMATION AREAS AND RESEEDED.

ONGOING EXTRACTION TO PROGRESS FROM PHASE 3 TO 5

EXISTING POWER LINE TO BE LOWERED TO THE BASE OF

RECLAMATION OF COMPLETED AREAS AT A LEVEL

APPROXIMATELY 20 METRES BELOW EXISTING GRADE.

DIRECT AND SEQUENTIAL PLACEMENT OF TOPSOIL AND

CONCRETE AND ASPHALT PLANT SITES. CONSTRUCT AN

UPGRADED DRIVEWAY INTERSECTION ON 85th STREET

ACTIVITIES. TOPSOIL, SUBSOILS, AND A PORTION OF THE

OVERBURDEN TO BE USED IN BERM CONSTRUCTION.

TO ACCOMMODATE A SEPARATE TRUCK TURNING LANE.

TO THE BASE OF PHASE 1A APPROXIMATELY 20 METRES

BELOW THE EXISTING GRADE OF THE PROPERTY

THE RECLAIMED AREA

CONSTRUCTION OF A STORMWATER RETENTION POND

WITHIN PHASE 3 TO PREVENT SILTATION OF OFF-SITE

DRAINAGE COURSES

EXISTING ON-SITE DRAINAGE CHANNEL WILL BE

RE-ESTABLISHED AT THE BASE OF THE RECLAIMED AREA

ONGOING EXTRACTION WITHIN PHASE 6

CONSTRUCT NORTH AND NORTHEAST BERMS PRIOR

RECLAMATION OF COMPLETED AREAS AT A LEVEL

APPROXIMATELY 20 METRES BELOW EXISTING GRADE.

TO COMMENCING PHASE 6 EXTRACTION

LOWERED POWER LINE R/W

NO GRAVEL EXTRACTION ACTIVITIES

VEGETATIONTO REMAIN

GRAZING AND OTHERINTERIM USES

FUTURE EXPANSION AREA

SCALE AREA

PLANT AREA

PHASE 1 BERMING

DRIVEWAY

PHASE 1B

INITIAL EXTRACTIONAREA ±90 Acres

NO GRAVEL EXTRACTION ACTIVITIES

VEGETATIONTO REMAIN

PHASE 1

DRIVEWAY

RECLAMATIONIN PROGRESS

PLANTED BERM

CONSTRUCTION OF A2 -3 m MEANDERING

PHASE 1 BERMING

PLANT AREA

±85 Acres

±85 Acres

GRAZING AND OTHERINTERIM USES

FUTURE EXPANSION AREA

NO GRAVEL EXTRACTION ACTIVITIES

STORMWATERRETENTION POND

PHASE 1

DRIVEWAY

RECLAMATION

COMPLETE

PLANT AREA

GRAZING AND OTHERINTERIM USES

FUTURE EXPANSION AREA

PHASE 2

RECLAMATION

IN PROGRESS

±72 Acres±85 Acres

±100 Acres±78 Acres

CONSTRUCTION OF A PERMANENTMEANDERING 3-4 m PLANTED BERMWITHIN A 60 TO 100 m SETBACKADJACENT TO 101st STREET

NO GRAVEL EXTRACTION ACTIVITIES

PHASE 1

DRIVEWAY

RECLAMATION

COMPLETE

PLANT AREA

PHASE 2

RECLAMATION

COMPLETE

PHASE 3

RECLAMATIONCOMPLETE

PHASE 4

RECLAMATIONCOMPLETE

PHASE 5

RECLAMATIONIN PROGRESS

STORMWATERRETENTION POND

VEGETATIONTO REMAIN

PLANTED BERM

CONSTRUCTION OF A2 -3 m MEANDERING

PHASE 6 BERMING

±91 Acres ±91 Acres ±91 Acres

85th STREETENTRY

LIMITS OF FUTUREEXCAVATION

SCALE AREA SCALE AREA SCALE AREA

RECLAMATION PLAN

SECTION 28-25-2-W5M

SECTION 33-25-2-W5M, AND

SPY HILL AGGREGATE OPERATIONS

MAP 6OPERATIONS AND

NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY, AND SHOULD NOT BE SCALED

TO BE STOCKPILED IN PHASE 1B AREA AND THEN USED FOR

REMAINING OVERBURDEN AND SOME TOPSOIL AND SUBSOIL

DIRECT AND SEQUENTIAL RECLAMATION AND BACKFILLING

OVERBURDEN IN RECLAMATION AREAS

CONTINUE DIRECT AND SEQUENTIAL PLACEMENT OF

TOPSOIL AND OVERBURDEN IN RECLAMATION OF

PREVIOUS EXTRACTION AREA.