Special Foundatifgfgon Works Curs Sem2 09

download Special Foundatifgfgon Works Curs Sem2 09

of 121

Transcript of Special Foundatifgfgon Works Curs Sem2 09

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    1/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    2/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    3/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    4/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    5/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    6/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    7/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    8/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    9/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    10/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    11/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    12/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    13/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    14/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    15/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    16/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    17/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    18/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    19/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    20/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    21/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    22/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    23/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    24/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    25/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    26/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    27/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    28/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    29/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    30/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    31/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    32/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    33/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    34/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    35/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    36/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    37/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    38/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    39/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    40/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    41/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    42/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    43/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    44/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    45/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    46/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    47/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    48/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    49/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    50/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    51/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    52/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    53/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    54/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    55/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    56/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    57/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    58/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    59/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    60/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    61/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    62/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    63/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    64/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    65/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    66/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    67/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    68/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    69/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    70/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    71/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    72/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    73/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    74/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    75/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    76/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    77/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    78/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    79/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    80/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    81/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    82/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    83/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    84/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    85/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    86/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    87/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    88/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    89/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    90/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    91/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    92/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    93/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    94/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    95/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    96/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    97/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    98/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    99/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    100/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    101/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    102/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    103/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    104/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    105/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    106/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    107/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    108/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    109/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    110/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    111/121

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    112/121

    112

    drilling ;- grab-, chisel- and bailer borings ;- driving of lances ;- vibrating of casing or drill pipes.

    In unstable ground full borehole penetration may require:- the use of drilling muds, grouts or foams ;- temporary casing ;

    - direct insertion of sleeve pipes ;- progressive stabilisation as the borehole advances.

    Grout placement

    The method of grout placement will be determined by the ground condition, the works requirementand the type of grout used. The basic approaches are the following

    a) injection in unsupported boreholes in stable ground ;

    b) injection via sleeve pipes previously placed in a temporarily cased borehole, in unstable ground ;

    c) injection through the drill string in unstable ground, generally considered as a pre-grouting phase and to be followed by approaches a) or b) ;

    d) compaction grouting is usually performed through a casing retrieved during upstage grouting.

    Soil grouting can be achieved with casing, grout sheath, pierced casing, and sleeve pipes.

    Sleeve pipes which are permanently seaied into the ground by use of a support mix (sleeve grout)allow a repeated use of the injection points.

    Large openings (voids, cavities, etc.) are generally filled under gravity, either directly, or via atremie pipe extending to the base of the opening.

    Packers are used to isolate a grouting stage. Packers are either passive, mechanical or pneumatic,and have to be long enough to minimise the risk of grout bypass through the medium being grouted.

    Packers shall ensure tight sealing between the grout hole wall and the injection pipe at maximumgrouting pressure.

    Grouting sequences

    Descending or downstage grouting is commonly reserved for the treatment of unstable rock. Ifseveral holes are grouted using downstage grouting, the uppermost stage in all holes is drilled andgrouted before drilling and grouting the next stage in all neighbouring holes.

    Upstage grouting is only used in open holes in stable rock or if the aim is compaction grouting.

    Multistage grouting, using sleeve pipes is generally used in soils and sometimes in unstable rock.

    Combinations of these techniques are possible.

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    113/121

    113

    13. JET GROUTING

    The jet grouting method is covered by the EN 12716.

    Definitions

    jet groutingthe jet grouting process consists of the disaggregation of the soil or weak rock and its mixing with,and partial replacement by, a cementing agent; the disaggregation is achieved by means of a highenergy jet of a fluid which can be the cementing agent itself

    jet grouted elementvolume of soil treated through a single borehole. The most common elements are:- jet grouted column : a cylindrical jet grouted element (Fig.1 a) ;- jet grouted panel : a planar jet grouted element (Fig.1 b).

    jet grouted structurean assembly of jet grouted elements which are partially or fully interlocked. The most commonstructures formed are:- jet grouted diaphragm : a wall structure (Fig.2 a) ;- jet grouted slab : a horizontal structure formed by essentially vertical jet grouting (Fig.2 b) ;- jet grouted canopy : a structure formed by horizontal jet grouting - see 3.8 below (Fig.2 c) ;- jet grouted block : a three-dimensional structure.

    single systemthe jet grouting process in which the disaggregation and cementation of soil are achieved by a highenergy jet of a single fluid, usually a cement grout (Fig.3 a)

    double (air) systemthe jet grouting process in which the disaggregation and the cementation of soil are achieved byone high energy fluid (usually a cement grout) assisted by an air jet shroud as a second fluid (Fig.3 b)

    double (water) systemthe jet grouting process in which the disaggregation of the soil is achieved by a high energy water jetand its cementing is simultaneously obtained by a separate grout jet (Fig.3 c)

    triple systemthe jet grouting process in which the disaggregation of the soil is achieved by a high energy water

    jet assisted by an air jet shroud, and its cementing is simultaneously obtained by a separate grout jet(Fig.3 d)

    horizontal jet groutingtreatment performed from a horizontal or sub-horizontal borehole (within 20 from the horizontal

    plane)

    jet grouting rigrotary rig able to automatically regulate the rotation and translation of the jet grouting string and tool

    jet grouting string

    jointed rods, with simple, double or triple inner conduit, which convey the jet grouting fluid(s) to themonitor

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    114/121

    114

    monitorthe tool mounted at the end of the jet grouting string, to enable jetting of the fluids into the ground

    nozzlea specially manufactured device fitted into the monitor and designed to transform the high pressurefluid flow in the string into the high speed jet directed at the soil

    radius of influenceeffective distance of disaggregation of soil by the jet, measured from the axis of the monitor

    spoil returnthe surplus mixture of soil particles and introduced fluids arising from the jet grouting process, andnormally flowing to the ground surface via the annulus of the jetting borehole

    jet grouting parametersthe jet grouting parameters are defined:- pressure of the fluid(s) within the jet grouting string ;- flow rate of the fluid(s) within the jet grouting string ;- grout composition ;- rotation speed of the jet grouting string;- rate of withdrawal or insertion of the jet grouting string.

    prejettingthe method in which the jet grouting of an element is facilitated by a preliminary disaggregation

    phase, with a jet of water and/or other fluids

    Prejetting is also widely known as prewashing or precutting.

    fresh-in-fresh sequencethe sequence of work in which the jet grouted elements are constructed successively without waitingfor the grout to harden in the overlapping elements (Fig.4 a)

    primary-secondary sequencethe sequence of work ,in which the execution of an overlapping element cannot commence beforea specified hardening time or achievement of predetermined strength of the adjacent elements

    previously constructed (Fig.4 b)

    jet grouted materialthe material which constitutes the body of a jet grouted element

    reinforced jet grouting jet grouted columns reinforced by steel or other high strength material

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    115/121

    115

    Figure 1 a) Jet grouted column Figure 1 b) Jet grouted panel

    Figure 1 Examples of jet grouted elements

    Figure 2 a) Jet grouted diaphragms

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    116/121

    116

    Figure 2 b) Jet grouted slab Figure 2 c) Jet grouted canopyFigure 2 Examples of jet grouted structures

    Key1 Monitor

    Figure 3 a) Single system

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    117/121

    117

    Key1 Monitor

    Figure 3 b) Double (air) system

    Key1 Monitor

    Figure 3 c) Double (water) system

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    118/121

    118

    Key1 Monitor

    Figure 3 d) Schemes of jet grouting systems

    Figure 4 a) Fresh in fresh sequence

    Figure 4 b) Primary secondary sequence

    Figure 4 Work sequencesMaterials

    Mixes composed of water and cement are usually adopted.Hydraulic binders other than cement can be used.In water/cement mixes the water/cement ratio by weight should range between 0,5 and 1,5.Water reducing, stabilizing, plasticising, waterproofing or antiwashing admixtures can beadded to the water/cement mix.Other materials, such as bentonite, filler, fly-ash, can also be added to the mix.When bentonite is to be used in the mix, a water/bentonite suspension should be prepared beforeadding cement.

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    119/121

    119

    Examples of applications

    Jet grouting can be applied in either temporary or permanent works for different purposes.For example:

    providing foundations for structures to be erected (Fig.5 a) ;underpinning existing foundations (Fig.5 b) ;creating low permeability barriers ;

    creating retaining or supporting structures ;complementing other geotechnical works ;reinforcing a soil mass.

    Figure 5 a) Foundation for structure to be erected

    Figure 5 b) Underpinning existing foundationFigure 5 Examples of applications

  • 8/12/2019 Special Foundatifgfgon Works Curs Sem2 09

    120/121

    120

    Execution

    The execution of jet grouting works requires knowledge and experience in this type of construction.

    The high pressure employed in the jet grouting process is to generate a high speed jet to disaggregate the soil and isnot intended to be applied to the surrounding soil.

    Jet grouted column execution method

    The phases of execution usually consist of:drilling a borehole of a predetermined length ;- introducing to the end of the borehole a monitor connected to the jet grouting string. This

    is unnecessary in some cases as the string and monitor are used for drilling ;- jet ting of the disaggregating and cementing fluid(s) through the monitor, simultaneously

    withdrawing and rotating the rods, with pre-established withdrawal and rotational speed, pump pressure and flow rate for each fluid.

    Jet grouted panel execution method

    The phases of execution are the same as defined for jet grouted columns, with the exception thatduring jetting the rods are withdrawn and not rotated. Alternatively the rods can be rotated aboutlimited angles. The resulting panel is placed in a plane on the drilling axis, or is formed by two ormore sections on planes intersecting the drilling axis (Fig.1 b).

    Alternative execution methods

    If required by soil conditions, alternative execution methods may be adopted, both for column or panel processes. Among alternatives the most usual is prejetting. An element can also beexecuted in sequential treatment for a given length from the borehole collar is completed andallowed to gain strength. Then, after redrilling the treated soil, the process is repeated at a deeperstage, and so on, until the design length of the treatment is reached.

    Equipment 2 > 2Grout flow rate (I/min) 50 to 450 50 to 450 50 to 200 50 to 200