Space Reallocation Update

18
Space Reallocation Space Reallocation Update Update October, 2007 October, 2007

description

Space Reallocation Update. October, 2007. Summary. “Almost” on time Definitely under budget Thanks to all for their patience and good humour Lots of “small things” yet to do. Ferrier Building. Everyone has moved in Still need signs Some final details still to complete - PowerPoint PPT Presentation

Transcript of Space Reallocation Update

Page 1: Space Reallocation Update

Space Reallocation UpdateSpace Reallocation Update

October, 2007October, 2007

Page 2: Space Reallocation Update

SummarySummary

““Almost” on timeAlmost” on time Definitely under budgetDefinitely under budget Thanks to all for their patience and Thanks to all for their patience and

good humourgood humour Lots of “small things” yet to doLots of “small things” yet to do

Page 3: Space Reallocation Update

Ferrier BuildingFerrier Building

Everyone has moved inEveryone has moved in Still need signsStill need signs Some final details still to completeSome final details still to complete Access to Ferrier opposite James Access to Ferrier opposite James

Building (to 1Building (to 1stst floor), from Dr. floor), from Dr. Penfield (to 3Penfield (to 3rdrd floor), and from 3 floor), and from 3rdrd floor of Arts (to 3floor of Arts (to 3rdrd floor) floor)

Page 4: Space Reallocation Update

Arts Computer Lab in MayArts Computer Lab in May

Page 5: Space Reallocation Update

Arts Computer Lab in Arts Computer Lab in SeptemberSeptember

Page 6: Space Reallocation Update

The Art Computer Lab Help The Art Computer Lab Help DeskDesk

Page 7: Space Reallocation Update

Department of History Department of History Workspace (May)Workspace (May)

Page 8: Space Reallocation Update

Department of History Department of History Workspace in SeptemberWorkspace in September

Page 9: Space Reallocation Update

The Beaverbrook Conference The Beaverbrook Conference RoomRoom

Page 10: Space Reallocation Update

The Arts Lounge The Arts Lounge (Ferrier 2(Ferrier 2ndnd floor) floor)

Page 11: Space Reallocation Update

The CourtyardThe Courtyard

Construction should start very soonConstruction should start very soon Noisy work to be done ONLY early in Noisy work to be done ONLY early in

the morningthe morning

Page 12: Space Reallocation Update

Courtyard looking eastCourtyard looking east

Page 13: Space Reallocation Update

Courtyard looking westCourtyard looking west

Page 14: Space Reallocation Update

Down the SlopeDown the Slope

Page 15: Space Reallocation Update

Arts West: DLLFArts West: DLLF

Page 16: Space Reallocation Update

““Ready to Roll”Ready to Roll”The Computer Classroom: The Computer Classroom:

Leacock 212Leacock 212 New lighting is operationalNew lighting is operational Computers are now installedComputers are now installed Most software is installedMost software is installed The pedagogical options are The pedagogical options are

unparalleledunparalleled To learn more and to be given a To learn more and to be given a

demonstration of our state-of-the-art demonstration of our state-of-the-art classroom, contact Mary MacKinnonclassroom, contact Mary MacKinnon

Page 17: Space Reallocation Update

Leacock 212: The Computer Leacock 212: The Computer ClassroomClassroom

(prior to the installation of the computers)(prior to the installation of the computers)

Page 18: Space Reallocation Update

What’s Next ?What’s Next ?

How can we best integrate numerous projects How can we best integrate numerous projects in Peterson Hall? (washrooms, CFI projects, in Peterson Hall? (washrooms, CFI projects, general repairs to offices, ventilation, and general repairs to offices, ventilation, and more)more)

How can we make the best use of our new How can we make the best use of our new assets? (especially the computer classroom assets? (especially the computer classroom and breakout rooms in Leacock)and breakout rooms in Leacock)

Installation of the computers at the Stand-up Installation of the computers at the Stand-up computer stations in the Leacock corridor computer stations in the Leacock corridor

Installation of the printers in Leacock by SnaxInstallation of the printers in Leacock by Snax