SOUTH VALLEY DEVELOPMENT
Dai Hong BoEllis Sarah TaylorFan Yuan Yuan
Lee Yuen ChangLint Eva Margaret
![Page 2: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/2.jpg)
Introduction
South Valley Development Project initiated by Egypt’s president in 1997Developed in Toshka, East Oweinat, and the New Governorate OasesDesigned to ease population in the Nile Valley and to increase Egypt’s economy and change approx. 740,000 acres of desert into habitable land allowing 6 million people to live there by 2017Also creating 10,000 + job opportunities
![Page 3: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/3.jpg)
Map of Area
![Page 4: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/4.jpg)
TECHNICAL DATA
SHEIKH ZAYED CANAL2 MAIN CANALS, 4 BRANCHES310KM LONG
540,000 ACRESLIVING CAPACITY FOR
+/- 3 MILLION PEOPLE
![Page 5: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/5.jpg)
2 MAIN PROJECTS
TOSHKA PROJECT540,000 acres, southern Egypt
OWEINAT PROJECTUnderground Water Irrigation Project,200,000 acres, southwestern Egypt
EXISTING LAND AT TOSHKA PROJECTEXISTING LAND AT EAST OWEINAT
PROJECT
![Page 6: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/6.jpg)
Toshka
Sheikh Zayed Canal connected to Lake NasserWater pumped through canal into the desertLarge pumping station installed on the western shore of Lake Nasser
![Page 7: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/7.jpg)
SHEIKH ZAYED CANAL
30 METERS WIDE AT BOTTOM54 METERS WIDE AT SURFACE 6 METERS DEEP
THE SECTION PLANE OF THE CANAL
A PART OF FINISHED CANAL
![Page 8: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/8.jpg)
MUBARAK PUMPING STATION
BIGGEST PUMPING STATION24 PUMPS360 CUBIC METERS DISCHARGE PER SECONDELECTRICITY SUPPLIED BY ASWAN HIGH DAM
![Page 9: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/9.jpg)
Pumping Station
![Page 10: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/10.jpg)
DESIGN
Said to be one of the largest pumping stations in the world The specs of this pump have made it one of the 5 finalists for an Outstanding Civil Engineering Award presented by the American Society of Civil Engineers
OVERVIEW OF MUBARAK PUMP STATION CONSTRUCTION PROJECT
![Page 11: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/11.jpg)
PUMP DESIGN
MAIN PUMP
SYNCHRONUS MOTOR
Model Vertical shaft, centrifugal pump
Pump bore 2,400 -1, 800 (mm)Discharge volume
16.7 m3/s
Speed 210 – 300 min-1
Drive motor 12,000-kW synchronous motor
Number of units
24
![Page 12: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/12.jpg)
MONITORING SYSTEM CONFIGURATION
PUMP OPERATIONAUTOMATIC PUMP ORIENTATIONINLET AND OUTLET WATER LEVELFAILURE NOTIFICATIONENERGY MANAGEMENT
![Page 13: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/13.jpg)
MAIN FACILITIES OF PUMP
AUTO WORKSHOPWATER PURIFICATION PLANTEMERGENCEY DIESEL GENERATORDISCHARGE BASINADMIN BLDG
• POWER RECEPTION BLDG• PUMP STATION• INTAKE CANAL• MEMORIAL BLDG• ELECTRICAL WORKSHOP• MECHANICAL WORKSHOP• WASTE-WATER TREATMENT FACILITY
![Page 14: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/14.jpg)
Mubarak Pumping StationAlternative of piles around the base of pumping station:
Concrete PileHigh Cost with high maintenance feeUsed by most of the pumping stations in North Afrika.
Steel Mini-PileLower cost and maintenance feeAble to absorb the compression of stationTemperature range from 0 ° C to 55 ° C
![Page 15: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/15.jpg)
East Oweinat Project
Cultivate about 250, 000 arcesBy using Nubia Sandstone aquifer system,
underground water pumping from southern of Western Desert of Egypt.
![Page 16: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/16.jpg)
East Oweinat Project
According to Chemical analysis, the underground water is:
From thermal characteristics.
Contains low salt content.
Thus, it is suitable for irrigation purpose.
![Page 17: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/17.jpg)
East Oweinat ProjectAlternative:
Do nothing – leave a huge piece of sandy and dry land.Slowly develop by it own government – time
consuming and slow efficiency.Develop with international companies – huge project,
efficient and increase country turn overrate in short period.Problem
Dewatering the shallow aquifer in some areas (e.g. Kharga Oasis), and lowering of the water level to uneconomic lifting depths.
![Page 18: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/18.jpg)
SOURCE OF INVESTMENT
0
10
20
30
40
50
60
70
80
% FIN AN CED BY
GOVERN M EN T
COM PAN IES ORIN D IVID UALS
TOTAL $90 BILLION MORE THAN 20% WILL COME FROM GOVERNMENTLESS THAN 80% WILL COME FROM COMPANIES OF SEA AND ABROAD
![Page 19: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/19.jpg)
VARIOUS COSTS
INVESTMENT TO TOSHKA REGION – $1.6 BILLION PROJECTA PUMPING STATION ESTIMATED AT $436 MILLIONINSTALLATION COST OF EAST OWEINAT - $422 MILLIONSHEIKH CANAL - $1.6 BILLIONINFASTRUCTURE - $550 MILLION
![Page 20: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/20.jpg)
PROBLEMS OF IMPLEMENTING
FOR THE LONG BUILDING PERIOD, THE INVESTING COMPANIES REQUIRED POWERFUL ABILITIESIN TERMS OF THE DETAILED BUDGETING AND PLOT, ANNUAL COST ASSESSMENT IS NECESSARYTAX OF INVESTORS WILL BE FREE. WIN-WIN SITUATION
![Page 21: SOUTH VALLEY DEVELOPMENThome.eng.iastate.edu/~tge/ce203/group 6ppt.pdfEast Oweinat Project Alternative: zDo nothing – leave a huge piece of sandy and dry land. zSlowly develop by](https://reader034.fdocuments.net/reader034/viewer/2022050200/5f53a70478636920ae078602/html5/thumbnails/21.jpg)
SUMMARY
2 MAIN PROJECTSTOSHKA– MUBARAK PUMPING STATION AND SHEIKH ZAYED CANALEAST OWEINAT PROJECT-SOLEY ABUNDANT UNDERGROUND WATER
OBJECTIVES FOR BOTH – TO DEVELOP AGRICULTURR-FOR-EXPORT, JOB OPPORTUNITIES,DIVERT INVESTMENT POOLS OUTSIDE OF OLD VALLEY TO NEW REGIONSMAIN PROJECTS