South Devon Link Road Scheme Plan (July 2010)

1
EDGINSWELL LANE A3022 RIVIERA WAY A380 HAMELIN WAY EDGINSWELL PARK EDGINSWELL JUNCTION KERSWELL GARDENS A380 TORQUAY ROAD WORKS TO BE BUILT AT A LATER DATE London to Penzance Railway Line Replacement for Elmcroft as part of other works by DCC Ex et e rt o Torquay Railw ay Br a nc h Line Exeter to Torquay Railway Branch Line A382 TORQUAY ROAD SHALDON ROAD C91 ST MARYCHURCH ROAD ASH WAY RIDGEWAY ROAD ALLER BRAKE ROAD OAK TREE DRIVE ST LUKES RO AD PARK ROAD ALLER N e w B u s L a y b y PENN INN FLYOVER BUCKLAND OAKLAND ROAD BRAKE QUEENSWAY BUCKLAND ROAD PI N E R O AD W O O D ROAD ADDISON WALK L I ME T R E E AVENUE SI L VERW O O D ALLER JUNCTION RAILWAY BRIDGE B OUNDA R Y CL OS E COLE'S LANE CARSWELLS SCHOOL ROAD BRO OK ORCHA R D CHURCH END ROAD E x e t e r t o T o r q u a y R a i l w a y B r a n c h L i n e OLD N EWT O N RO AD F O R E D O W N L A N E Exeter to Torquay Railway Branch Line M E A D O W CLOSE P RI M R O S E WAY YANNON LANE MADDACOMBE ROAD OVERBRIDGE C161MADDOCOMBE LANE CHURCHW AY LANE GREENHILL ROAD YON STREET C340 HUXNOR R OAD EDGINSWELL LANE YON STREET OVERBRIDGE EDGINSWELL LANE EDGINSWELL LANE A3022 RIVIERA WAY A380 HAMELIN WAY DACCABRIDGE ROAD A380 N EW T ON ROA D A380 TORQUAY ROAD A380 TOR QUAY ROAD EDGINSWELL PARK EDGINSWELL JUNCTION KERSWELL GARDENS New play park A380 TORQUAY ROAD MANOR DRIVE E x i s t i n g B u s L a y b y Replacement play equipment 4.5m wide carriageway B OUNDA R Y C L OS E COLE'S LANE CARSWELLS E x e t e r t o T o r q u a y R a i l w a y B r a n c h L i n e OLD N EWT O N RO AD M E A D O W CLOSE PR I M RO S E WAY A380 TORQ WORKS TO BE BUILT AT A LATER DATE CARRIAGEWAY 3700 CARRIAGEWAY 3700 CENTRAL RESERVE 2400min HARD SHOULDER 2300 HARD SHOULDER 2300 VERGE 1500min VERGE 1500min CARRIAGEWAY 3700 CARRIAGEWAY 3700 CENTRAL RESERVE 2400min VERGE 1500min VERGE 1500min PREVIOUS CROSS SECTION AT PENN INN FLYOVER LINEAR DRAINAGE SYSTEM CONCRETE BARRIER CURRENT SCHEME INCLUDES NARROWER CROSS SECTION AT PENN INN FLYOVER LINEAR DRAINAGE SYSTEM NOT TO SCALE CONCRETE BARRIER CARRIAGEWAY 7300 CARRIAGEWAY 7300 CENTRAL RESERVE 2500min VERGE 2500min HARD STRIP 1000 VERGE 2500min HARD STRIP 1000 HARD STRIP 1000 HARD STRIP 1000 CARRIAGEWAY 7300 CARRIAGEWAY 7300 CENTRAL RESERVE 4500min VERGE 3500min VERGE 3500min CUTTING SLOPE TOPSOIL DRAIN DRAIN DRAIN EMBANKMENT SLOPE TOPSOIL 2.5% 2.5% CARRIAGEWAY CONSTRUCTION PREVIOUS CARRIAGEWAY CROSS SECTION ALLER - EDGINSWELL CUTTING SLOPE TOPSOIL DRAIN DRAIN DRAIN EMBANKMENT SLOPE TOPSOIL 2.5% 2.5% CARRIAGEWAY CONSTRUCTION CURRENT SCHEME OMITS HARD STRIPS ALLER - EDGINSWELL NOT TO SCALE Carriageway/ Cutting Embankment Footway SCALE - 1:3750 KEY:- Badger fencing (E3.1/3.2) Otter fencing (E3.1/3.2) Otter tunnel (E3.1/3.2) Badger tunnel (E3.1/3.2) Fishway - Pool and traverse within twin box culverts (E3.1/3.2) Extent of proposed wetlands habitat (retained as grazed pasture) (E3.1/3.2) Existing trees and hedgerows New tree and shrub planting on highway land (as coded) Seeded areas within highway boundary (as coded) Rock cutting (LE1.4) New hedgerow (LE4.4) Tree preservation orders Exchange common land Listed Building (P3.1) Permissive path / Diverted footpath / Public right of way (P4.4) Off site planting Cycleway ALLER JUNCTION EDGINSWELL AND KERSWELL GARDENS Hedge Translocation receptor site The Forum, Barnfield Road, Exeter, Devon, EX1 1QR Tel: 44-(01392) 229700 Fax: 44-(01392) 229701 0 100 200 300 400 500m

Transcript of South Devon Link Road Scheme Plan (July 2010)

Page 1: South Devon Link Road Scheme Plan (July 2010)

EDGINSWELLLANE

A3022RIVIERAWAY

A380

HAMELINWAY

EDGINSWELL PARK

EDGINSWELL

JUNCTION

KERSWELL

GARDENS

A380TORQUAYROAD

WORKS TO BE BUILT AT A LATER DATE

LondontoPenzance

RailwayLine

GOURDERSLANE

Replacement for Elmcroft as

part of other works by DCC

Exeter to T

orquay Rai

lwayBranc

h Line

Exeter to

TorquayRailwayBranch Line

A382TORQUAYROAD

SHALDONROAD

C91STMARYCHURCHROAD

ASHWAY

RIDGEWAYROAD

ALLERBRAKE

ROAD

OAKTREEDRIVE

STLUK

ESROA

D

PARK

ROAD

ALLER

New Bus

Layby

PENN INN

FLYOVER

BUCKLAND

OAKLANDROAD

BRAKE

QUEENSWAY

BUCKLAN

D

ROAD

PINEROADWOOD

ROAD

ADDISON

WALK

LIME TREE

AVENUE

SILVERWOOD

ALLER

JUNCTION

RAILWAY

BRIDGE

BOUNDARY CLOSE

COLE'S LANE

CARSWELLS

SCHOOL

ROAD

BROOK

ORCHAR

D

CHURCH

END R

OADExeter to Torquay Railway Branch Line

OLD NEWTO

N ROAD

FOREDOWN LANE

ExetertoTorquayRailwayBranchLine

MEADOW

CLOSE

PRIMROSEWAY

YANNONLANE

MADDACOMBE

ROAD

OVERBRIDGE

C161MADDOCOMBELANE

CHURCHWAY LANE

GREENHILLROAD

YON STREET

C340 HUXNOR ROAD

EDGIN

SWELL LANE

YON STREET

OVERBRIDGE

EDGINSWELLLANE

EDGINSWELLLANE

A3022RIVIERAWAY

A380

HAMELINWAY

DACCABRIDGEROAD

A380NEWT

ON ROAD

A380TORQUAYROAD

A380 TO

RQUAY R

OAD

EDGINSWELL PARK

EDGINSWELL

JUNCTION

KERSWELL

GARDENS

New play park

A380TORQUAYROAD

MANOR D

RIVE

Existing

Bus Layby

Replacement

play equipment

4.5m wide

carriageway

BOUNDARY CLOSE

COLE'S LANE

CARSWELLS

Exeter to Torquay Railway Branch Line

OLD NEWTO

N ROAD

MEADOW

CLOSE

PRIMROSE WAY

A380TORQUA

WORKS TO BE BUILT AT A LATER DATE

CARRIAGEWAY

3700

CARRIAGEWAY

3700

CENTRAL

RESERVE

2400min

HARD

SHOULDER

2300

HARD

SHOULDER

2300

VERGE

1500min

VERGE

1500min

CARRIAGEWAY

3700

CARRIAGEWAY

3700

CENTRAL

RESERVE

2400min

VERGE

1500min

VERGE

1500min

PREVIOUS CROSS SECTION

AT PENN INN FLYOVER

LINEAR DRAINAGE

SYSTEM

CONCRETE

BARRIER

CURRENT SCHEME

INCLUDES NARROWER

CROSS SECTION AT PENN INN FLYOVER

LINEAR DRAINAGE

SYSTEM

NOT TO SCALE

CONCRETE

BARRIER

CARRIAGEWAY 7300 CARRIAGEWAY 7300

CENTRAL

RESERVE

2500min

VERGE

2500min

HARD

STRIP

1000

VERGE

2500min

HARD

STRIP

1000

HARD

STRIP

1000

HARD

STRIP

1000

CARRIAGEWAY 7300 CARRIAGEWAY 7300

CENTRAL

RESERVE

4500min

VERGE

3500min

VERGE

3500min

CUTTING

SLOPE

TOPSOIL

DRAINDRAINDRAIN

EMBANKMENT

SLOPE

TOPSOIL2.5% 2.5%

CARRIAGEWAY CONSTRUCTION

PREVIOUS CARRIAGEWAY

CROSS SECTION

ALLER - EDGINSWELL

CUTTING

SLOPE

TOPSOIL

DRAINDRAINDRAIN

EMBANKMENT

SLOPE

TOPSOIL2.5% 2.5%

CARRIAGEWAY CONSTRUCTION

CURRENT SCHEME

OMITS HARD STRIPS

ALLER - EDGINSWELL

NOT TO SCALE

Carriageway/

Cutting

Embankment

Footway

SCALE - 1:3750

KEY:-

Badger fencing (E3.1/3.2)

Otter fencing (E3.1/3.2)

Otter tunnel (E3.1/3.2)

Badger tunnel (E3.1/3.2)

Fishway - Pool and traverse

within twin box culverts (E3.1/3.2)

Extent of proposed wetlands habitat

(retained as grazed pasture) (E3.1/3.2)

Existing trees and hedgerowsNew tree and shrub planting

on highway land (as coded)

Seeded areas within highway

boundary (as coded)

Rock cutting (LE1.4)

New hedgerow (LE4.4)

Tree preservation orders

Exchange common land

Listed Building (P3.1)Permissive path / Diverted footpath /

Public right of way (P4.4)

Off site planting

Cycleway

ALLER JUNCTION

EDGINSWELL AND KERSWELL GARDENS

Hedge Translocation

receptor site

The Forum, Barnfield Road, Exeter, Devon, EX1 1QR

Tel: 44-(01392) 229700 Fax: 44-(01392) 229701

0 100 200 300 400 500m