SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs...

43
SOP: Subcontracts Processing and

Transcript of SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs...

Page 1: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

SOP: Subcontracts Processing and

Page 2: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...
Page 3: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Table of Contents:

1. Navigating your to-do list

2. Pulling your detailed report

3. Verifying accounts and sub-awards

Page 4: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Applicable cases

The Subcontract processing is a data entry process to document the work that University of Colorado Boulder subs out to other Research Institutions as part of the overall work done on a research grant/ contract. This process assumes that we have a grant/ contract that includes a subcontract line item in its budget (Read the “Proposal creation SOP” on how to include a subcontract in a proposal budget and read the “Award processing SOP” on how to add award line for a subcontract) and that the post award has created the subcontract award increment as part of the award processing step. The steps described in this SOP take place during the subcontract review by a subcontract officer.

Data Needed to Complete this Process

Process Steps

1. Log into Cognos. https://rptqa.dev.cu.edu

!

Page 5: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

2. Click on eRA

!

3. Click on CU Boulder

!

4. Click on Live Reports

!

Page 6: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

5. Click on Boulder Workflow Data

!

6. Click on eRA_LIVE_Stage (once we go live you will click on eRA_LIVE Then click ok in the lower left corner

!

Page 7: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

This will pull up all open actions that are tasked to you.

This list is generated from InfoEd. The way the system works is that if there is a sub on an award and there is some kind of action happening on the award it will automatically be routed to subs. So you have to look at this list and determine if the action that occurred on the main award affects the sub and if so, in what way. If you determine that no action is necessary on the award, you will task complete it in Awards Tracking Work Flow in InfoEd. If it is a sub action, you will take the proposal number, look it up in InfoEd, open the short form for the sub that is affected and log the action on the individual sub’s short form. Once you have it logged and a status then you can task complete it in Awards Tracking Work Flow to remove it from your main task list. You will now keep track of it on your detailed status report which pulls its information from the short forms in InfoEd.

!

7. Under Functional Role, Click on Subcontract Review then under Subcontract Officer, choose your name and then click Finish.

!

Page 8: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Now you need to pull your detail report

The detail report is just that, it is a report that pulls information from the short forms in InfoEd. So not only can you tell that you have a task on a sub to complete but you can tell the status of that action. This is the main list you will be keeping up to date with the latest status of all the actions on your plate.

1. Click on eRA

!

2. Click on CU Boulder

!

3. Click on Proposal and Award Tracking

!

Page 9: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

This will pull up the status list of all subs in process on your task list

5. Click on eRA Staging and click ok

4. Click on Subcontract Status Report

!

6. Click on your name and click Finish

!

!

Page 10: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Anything on your original task list that is not on your detailed status report you will have to log the task from your task list onto the individual sub’s short form.

!

1. Now log into Boulder eRA, go to https://erastaging.dev.cu.edu

PRODUCTION SITE: https://era.cu.edu

!

Page 11: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

4. Use your mouse to hover over the folder

!

2. Click on My Proposals, then Search for

!

3. Enter the Proposal number from your cognos task list and hit Locate

!

Page 12: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

5. Click on edit, this will open up the PT record

!

6. Click on Awards

!

Page 13: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

9. Look at the Type of Mod

!

7. Click on the mod you are working on

!

8. Click on Detail

!

Page 14: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

The type is the type of action that occurred on the award. The different types are as follows:

Initial will be used for new awards. For a PT record there will only be one Initial designation. Funding & Extension will be used when the award increment is increasing the authorized funded amount, AND increasing the authorized period of performance. Funding will be used when the award increment is increasing the authorized funded amount.

Extension will be used when the award increment is increasing the authorized period of performance.

POP Reduction will be used when the award increment is decreasing the authorized period of performance

Deobligation will be used when the award increment is decreasing the authorized funded amount.

Carryforward will be used when the sponsor is authorizing funding from one period to move into another.

Page 15: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Supplement will be used for awards that are being funded by a supplemental proposal. (See proposal documentation for additional information).

Key Personnel Change will be used for award increments where the sponsor has approved a change in key personnel i.e. change in PI/ Co-PD/PI.

Admin will be used for all administrative actions and any other sponsor initiated action not previously defined. Examples are a change in contact personnel, change in reporting or a change in estimated funding.

Internal: Correction will be used for correcting errorsInternal: Transfer will be used for moving funds from one account to anotherInternal: PI/CO-I Change will be used for PI / CO-I changes on awardsInternal: Change Org Number will be used to change the organization number Internal: Change Department will be used to change the department that a PI is inInternal: Other will be used for any other internal mod changesConverted will be used for the initial start of using InfoEd. It symbolizes the move from Filemaker to InfoEd. So when we go live all existing projects will have this type identified.

Then in the attachments folder you will find the PSC Peoplesoft compare report. This will tell you what has changed on the award with this new increment. This will only work for mods not new awards. If you see a change that doesn’t make sense to you go to the attachments folder and pull the budget and statement of work to match up the numbers. The comment box on the Award Page by Project number will be used by the Grant and Contract Officers to explain administrative changes.

First, we need to verify that funds are in the sub account.

Page 16: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

1. Click on Financials, then click on the account you want to see

!

This pulls up that account summary in FT. In this screen we can see what the main account is in the Right hand corner it states Parent Account XXXXXX and under

Available funds we can see the total amount of funds in that account. For this example, there is $15,120 in the account. $12,000 will go to the sub and the remaining funds are

CU’s IDC

Page 17: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

2. Click on Setups, then Attributes to see the funding and the IDC rate.

!

!

3. Look at the bottom half of the screen to see the available funds and IDC rate.

!

Page 18: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

4. If there are multiple increments on a project then you will need to look under transactions, then operating budget.

!

Page 19: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Now we need to look at the Attachments to see what paperwork we need in order to process the sub.

This can be confusing because there are TWO attachment folders. We want the SECOND folder, see the red arrow.

!

5. Now that you have verified the funding, you can begin to work on the sub. Get out of the current screen you are in and back to the PT record screen. You do this by clicking Done.

!

Page 20: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Under the Attachments there are 5 folders, Proposal, Award, Sub Documents, Reports, Closeout.

You will need to create sub folders under the Sub Documents folder. So once you click on the Attachments Folder you will see a table with all the Attachments.

1. Click on Folder Maintnance

!

2. Click on Add Folder

!

3. Under Folder Name Enter the Name of the Sub, under Folder Parent, select Sub Documents, under Folder Sequence enter the number in which you want to see this folder under Sub Documents. Click Save and then Click Close.

!

Now under the Attachments, click on Sub Documents and you will see the new folder you created. Put the documents for that sub into that folder.

Page 21: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

On the left side of the screen under Attachments you will see the five folders and then all the attachments that are not in the folders. Click on the attached document that you want to move into the sub folder.

!

Then what you will do is change the folder under the folder dropdown to the sub folder that you just created.

!

Click Save. Then the document will be moved into that folder.

!

Once you have looked at all of the sub documents and moved them into the sub folder you are then able to determine what paperwork is missing.

Page 22: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

At this point you will determine what is missing and send an email to the Department Admin. and PI requesting that information. Now you need to log the sub and begin documenting the short form.

Paperwork required for New Sub:

Statement of Work Budget Budget Justification Sole Source Justification Subcommitment Form Sub Review Form Human or Animal Subjects Approved Protocol( if applicable) SPO Requisition in Filemaker Indirect Cost Rate Agreement

For Modifications:

Marked Up PO Budget (if applicable) Statement of Work (if applicable) Sub Review Form (if new budget)

Page 23: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

On the PT record you will see a folder named SubContracts. Click on that folder

!

Page 24: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

When you do, the screen will look like this, depending on the number of subcontracts, there should be one short form for each sub. Find the Subcontract that needs to be Processed and Click the “Short Form” Button right above it on the right.

!

Page 25: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Enter/Update The Overall Subcontract Information:

Boxes:

1. Subaward Institution number, this number is assigned by InfoEd. We won’t be changing this number.

2. Start date of the sub. The sub doesn’t have to have the same period of performance as the main; it will be within the main’s period of performance though.

3. End date of the sub. A sub can have the same period of performance as the main award but it doesn’t have to, it could be a shorter period as long as the start and end dates are within the main award’s period of performance. To help with closeout of awards within 90 days, the subcontract team will begin to end a subs 30 to 60 days before the end date of the main award with the PI’s permission.

The short Form opens (As show below):

!

Page 26: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

4. Contract Number is the main award number.

5. The Subcontract type is a drop down menu to indicate whether the sub being drafted is a:

CRADA

Letter of Understanding

Subaward Agreement

Subcontract-Cooperative Agreement

Subcontract-Cost-Reimbursable

Subcontract-Cost Reimbursable –Advance Pay

Subcontract- Cost Plus Fixed Fee

Subcontract- Fixed Price

Subcontract- Time and Materials

Task Order

6. Final invoice is a yes or no drop-down to indicate if a final invoice will be required for closeout.

7. Audit yes or no dropdown to indicate here if the subcontractor is subject to the Uniform Guidance audit, formerly the A-133 audit.

8. The Performance Period Box: Ignore the “date received”, “date sent”, “date paid”. Account number is where the project number of the sub is entered. PO Number is the PO

Page 27: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

number issued by CU Marketplace. Those are the two boxes that must be filled out.

9. The Subawardee box is where the legal name of the subcontractor and their address is entered.

10.The PI box is place to enter the subcontractors PI. The technical contact Box 14 and the PI box 10 are the same and only need to be entered in box 10. Box 14 will be left blank.

!

You can either select the PI from an existing list by clicking on Select or you can enter a new PI by clicking on the Edit button.

11.The Title box is where the award title of the main award will be entered from the PT summary screen. If it doesn’t match, correct it to match the main award Project title.

12.The associated dept. is the place for the sub’s PI’s dept. This box will not be used or updated.

13.The main contact box, box 13 and the administrative contact box, box 15 are the same and only need to be entered in box 13. This is the name and contact information of the person that is authorized to negotiate the subcontract that would be entered. This person would be the subcontract officer’s counterpart at the subcontractor.

Page 28: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

!

To change this contact information click on select.

!

You can either select a contact from the drop down list or you can add a new contact by clicking on Add New.

14.Same as PI box and will remain empty.

15.Same as Main contact box and will remain empty.

!

Page 29: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Once you have updated the top part of the short form go down the page

The first thing you encounter as you page down is the Agreement Summary- IGNORE THIS we will not use it.

!

Then you will see Status History with an Expand box- IGNORE THIS we will not use it.

!

Next you will see the Perfomance Sites with an Expand box. We won’t use this but our RSA will for FFATA.

Next is a comments box.

In this area you will write what paperwork is needed or any notes about this particular sub that we will need to know.

Next you will see Budget with an Expand box, IGNORE THIS, we will not use it.

Page 30: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

Next you will see Upload Documents, IGNORE THIS, we will not use it.

Next is the Department Contact Box

This is where you will enter who in the Department that you are working with on the Sub.

Now you will see the rest of the short form are User Defined Fields. We did this so that we could gather more information about our subs and be able to run reports off of them.

First is the Subcontract Officer, choose yourself.

Next you will see the following:

Page 31: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

1. Animal Subject is used when the Sub PI is conducting a project that involves Animals. Each year of a project a protocol must be approved and present.

!

2. Conflict of Interest is used to document whether CU’s PI has a Conflict of Interest and if so, what is the nature of the COI and is there a management plan in place. This will be checked using the DEPA database.

!

Page 32: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

4. Compliance is used to notate whether or not the sub has Equipment or if the sub is fabricating equipment.

!

5. FFATA Report Required? This is to notate whether the Sub is subject to the Federal Funding Accountability and Transparency Act.

!

3. Cost Share is used when the Subcontractor is expected to commit cost share to the project. If there is Cost Share it is important that we know either the amount of money promised or the percentage of the project funds that have been promised and also what is the cost share type that has been committed. There are six options or types. They include:

3rd Party In-kind

AY Cost Sharing

Equipment Cost Sharing

Forfeited indirect cost

GRA Cost Sharing

Other

!

Page 33: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

7. Human Subjects is where the PI at the Sub is conducting research with Human Subjects. They are required to have an approved protocol every year of the project.

!

8. Reports is the area where we keep track of reports that the sub has submitted. These include A-133 audit reports, Progress Reports, and Technical Reports

!

6. FFATA Reports Details, this is the area where the Research Services Assistant will keep track of the FFATA reports that are submitted to fsrs.gov. There should be a report for every modification to the sub.

!

!

Page 34: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

10. Travel, this area is designated to show whether the sub is going to be traveling, if there will be foreign travel and whether they need approval for that either CU’s or the Sponsor’s.

!

9. Small Business Qualification, this area captures two different pieces of information. The first is whether or not the sub is classified as a small business and what type of small business they are. The second piece of information is whether or not the sub is required to submit a small business subcontracting plan. A sub that is classified as a small business is not required to submit a small business subcontracting plan. The small business subcontracting plan is required under a federal contract where the total funding exceeds $650,000. The plan outlines how the subcontractor will try to buy and sub to small businesses.

!

Page 35: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

11. Other is the area where the miscellaneous information is collected. The DUNS number of the sub, What the Sub’s Entity type is, If it is a Federal Contract what is the DPAS rating, and what the purpose of the funding from the federal government is.

The Sub Entity types are:

Associations and Foundations

Federal

Industry

International

State and Local Government

University

!

Page 36: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

For each section that is applicable to the sub, you will select the add button and enter the information.

Next you will see the Subcontract Status History:

!

This is where you will hit the add button and add each step of your status for each new and modification action on the sub

!

!

Page 37: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

This is very similar to the first page of the subs database in filemaker,here we track all mods (funds and nce’s and administrative mods)

Now you will complete for new subs the checklist, risk analysis, and cost/price analysis and attach them in the attachments folder under the sub and mod that you created. For mods, you will might need to do a cost price if there is a new budget. Make sure you attach all of the paperwork in the attachments folder under the sub you are working on.

Now you will run SAM, draft the subcontract in the zdrive, working files, and send it out to the subcontractor. You will update the status history in the short form.

Once you have negotiated it and gotten it back and signed you will complete marketplace on the sub and then update the short form status history that Action complete.

Work Flow

Under that you will see the Total Anticipated section. This is the Total amount the sub should be for , the total estimated cost.

!

Next is the Total Authorized Area, This is where we keep track of every modification to the sub.

!

Page 38: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

1. Click on Awards

2. Click on the Blue Award File

3. Click on the Blue Award Increments Folder

!

!

!

Page 39: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

4. Click on the Mod you are working on

!

5. Click on the middle of the page, Award Increment Status History

!

Page 40: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

6. In the drop down box clickSub Review Complete.

The Closeout Checklist.

.Click on Attachments

!

7. Click on Add Components

!

Page 41: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

9. Then click on the Blue Add Button

!

10. Now open the CloseOut Checklist

!

8. Click on the open box by Closeout_CheckList

!

Page 42: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...

11. Look for the Subcontracts area of the form

!

12. Click on the Required Check Box, this will open up more area for the subs.

!

13. Here is where you will enter the Sub Project number and the PO Number for each sub on the award.

!

Page 43: SOP: Subcontracts Processing and can be confusing because there are TWO attachment folders ... needs to be Processed and Click the “Short Form” Button ... SOP BP SubContracts ...