Some case study examples

3
Copyright: Scatec Solar ASA www.scatecsolar.com • [email protected] DISCLAIMER: Statements in this presentation may contain forward looking statements and/or assessments. These statements are based on current expectations and data available that involve risks and uncertainties, which may cause actual results to differ from those reported herein. predictable driving results change makers working together Case study examples Scatec Solar ASA

Transcript of Some case study examples

Page 1: Some case study examples

Copyright: Scatec Solar ASA www.scatecsolar.com • [email protected]

page 1

DISCLAIMER: Statements in this presentation may contain forward looking statements and/or assessments. These statements are based on current expectations and data available that involve risks and uncertainties,

which may cause actual results to differ from those reported herein.

predictable driving results

change makers working together

Case study examples Scatec Solar ASA

Page 2: Some case study examples

Copyright: Scatec Solar ASA www.scatecsolar.com • [email protected]

page 2

DISCLAIMER: Statements in this presentation may contain forward looking statements and/or assessments. These statements are based on current expectations and data available that involve risks and uncertainties,

which may cause actual results to differ from those reported herein.

Scatec Solar in South Africa – Successful deployment of the integrated approach

Scatec Solar co-developed, bid for, financed, executed and currently own & operates 190 MW of prime assets in South Africa

Phase I - Kalkbult 75 MW • Financial Close reached in Nov 2012 as the first project in an ambitious

new renewable regime in the country • Constructed and connected after 9 months – 3 months before schedule in a

greenfield setting & built with unskilled local laborers (zero accidents) • The project was the first Utility-Scale PV Plant in Africa

Phase II – Linde & Dreunberg 115 MW • Effectively commercializing single-axis tracker technology in the market • The two projects were executed in parallel, on time and on budget • The combined portfolio effectively makes Scatec Solar one of the largest

Solar IPPs on the continent

Phase IV – 3 Upington Solar Projects 258 MW • Awarded in April 2015, construction start planned early 2017

2

Page 3: Some case study examples

Copyright: Scatec Solar ASA www.scatecsolar.com • [email protected]

page 3

DISCLAIMER: Statements in this presentation may contain forward looking statements and/or assessments. These statements are based on current expectations and data available that involve risks and uncertainties,

which may cause actual results to differ from those reported herein.

Speed of Execution - Case studies

8.5 MW Rwanda project PPA signed (by External Developer): Jul 2013 Scatec Solar Engagement: Oct 2013 Financial Close Reached: Feb 2014 Commercial Operation Date: Jul 2014 60 MW Honduras project PPA signed (by External Developer): Jun 2014 Scatec Solar Engagement: Oct 2014 Financial Close Reached: Dec 2014 Scheduled Commercial Operation Date: 2H 2015 43 MW Jordan projects PPA’s signed Mar 2014 Scheduled Financial Close (first project) Feb 2015 Scheduled Commercial Operation Date: Q1 2016