Solar Powering Your Community - ICMA

193
Solar Powering Your Community Addressing Soft Costs and Barriers

Transcript of Solar Powering Your Community - ICMA

Page 1: Solar Powering Your Community - ICMA

Solar Powering Your Community

Addressing Soft Costs and Barriers

Page 2: Solar Powering Your Community - ICMA

Meister Consultants Group

[email protected]

(617) 209 -1986

Chad LaurentMeister Consultants Group

[email protected]

(617) 209 -1990

Jayson Uppal

Page 3: Solar Powering Your Community - ICMA

The SunShot Solar Outreach Partnership (SolarOPs) is a U.S.

Department of Energy (DOE) program designed to increase the use

and integration of solar energy in communities across the US.

About the SunShot Solar Outreach Partnership

Page 4: Solar Powering Your Community - ICMA

Increase installed capacity of solar electricity in

U.S. communities

Streamline and standardize permitting and

interconnection processes

Improve planning and zoning codes/regulations

for solar electric technologies

Increase access to solar financing options

About the SunShot Solar Outreach Partnership

Page 5: Solar Powering Your Community - ICMA

5

Technical

Resources

One to One

Assistance

Peer

Exchange

Regional

Workshops

About the SunShot Solar Outreach Partnership

Page 6: Solar Powering Your Community - ICMA

A comprehensive resource to

assist local governments and

stakeholders in building local

solar markets.

www.energy.gov

Resource Solar Powering Your Community Guide

Technical Resources

Page 7: Solar Powering Your Community - ICMA

A guidebook for Michigan

communities outlining 10

steps to becoming Solar

Ready

www.michigan.gov

Resource Becoming a Solar-Ready Community

Technical Resources

Page 8: Solar Powering Your Community - ICMA

Case Studies

Fact Sheets

How-To Guides

Model Ordinances

Technical Reports

Sample Government Docs

Technical Resources

Resource SunShot Solar Resource Center

www4.eere.energy.gov/solar/sunshot/resource_center

Page 9: Solar Powering Your Community - ICMA

Our experts can help you implement the

best practices we discuss today - apply for

complementary technical assistance

One to One Assistance

Technical Support

www.solaroutreach.org

Solar Outreach Partnership

Page 10: Solar Powering Your Community - ICMA

Poll

Who’s in the room?

Page 11: Solar Powering Your Community - ICMA

Poll

What is your experience with

solar?

Page 12: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 13: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 14: Solar Powering Your Community - ICMA

Solar Technologies

14

Solar Hot Water Concentrated Solar PowerSolar Photovoltaic (PV)

Page 15: Solar Powering Your Community - ICMA

Solar Technologies

15

Solar Hot Water Concentrated Solar PowerSolar Photovoltaic (PV)

Page 16: Solar Powering Your Community - ICMA

Some Basic Terminology

Panel / Module

Cell

Page 17: Solar Powering Your Community - ICMA

Some Basic Terminology

Array

Page 18: Solar Powering Your Community - ICMA

e-e-

Some Basic Terminology

Capacity / Power

kilowatt (kW)

Production

Kilowatt-hour (kWh)

e-

Page 19: Solar Powering Your Community - ICMA

Some Basic Terminology

Residence

5 kW

Office

50 – 500 kW

Factory

1 MW+

Utility

2 MW+

Page 20: Solar Powering Your Community - ICMA

Michigan Solar Market

Source: IREC: US Solar Market Trends

0

5

10

15

20

2007 2008 2009 2010 2011 2012

Megaw

att

s

Cumulative Installed PV Capacity in Michigan

Page 21: Solar Powering Your Community - ICMA

US Solar Market

0

500

1,000

1,500

2,000

2,500

3,000

Cal

iforn

ia

Ari

zona

New

Jers

ey

Neva

da

Colo

rado

Nort

h C

arolin

a

Mas

sach

use

tts

New

Mexic

o

Haw

aii

New

York

Pennsy

lvan

ia

Texas

Flo

rida

Mar

ylan

d

Ohio

Ore

gon

Dela

war

e

Tenness

ee

Illin

ois

Connect

icut

Verm

ont

Georg

ia

Wis

consi

n

Mic

hig

an

Was

hin

gton

Mis

souri

Louis

iana

Dis

tric

t of C

olu

mbia

Min

neso

ta

Vir

ginia

Uta

h

New

Ham

psh

ire

Kentu

cky

South

Car

olin

a

India

na

Mai

ne

Monta

na

Rhode Isl

and

West

Vir

ginia

Ark

ansa

s

Iow

a

Ala

ska

Idah

o

Mis

siss

ippi

Wyo

min

g

Kan

sas

Nebra

ska

Okla

hom

a

Nort

h D

akota

Ala

bam

a

South

Dak

ota

Megaw

att

s

Installed Capacity (MW) 2012

0.25% of US

Capacity

Page 22: Solar Powering Your Community - ICMA

Michigan Solar Market

Michigan US

2watts per person

23watts per person

Page 23: Solar Powering Your Community - ICMA

World Solar Market

Source: REN 21

Top 5 Countries Solar Operating Capacity (2012)

Germany

Italy

USA

China

Japan

Rest of World

Germany

32 %

USA

7.2%

Page 24: Solar Powering Your Community - ICMA

Installed Capacity per Capita

Source: REN 21, World Bank

0

50

100

150

200

250

300

350

400

450

Watt

s p

er

Cap

ita

400 Watts

Per Person

23 Watts Per

Person

Page 25: Solar Powering Your Community - ICMA

US Solar Resource

Source: National Renewable Energy Laboratory 25

Page 26: Solar Powering Your Community - ICMA

Explore benefits

and

Overcome barriers

Page 27: Solar Powering Your Community - ICMA

Activity: Identifying Benefits

Right Now During Session After Break

Write answer on card Compile results Group discussion

What is the greatest benefit solar can bring to

your community? [Blue Card]

Page 28: Solar Powering Your Community - ICMA

Activity: Addressing Barriers

Right Now During Session After Break

Write answer on card Compile results Group discussion

What is the greatest barrier to solar adoption in

your community? [Green Card]

Page 29: Solar Powering Your Community - ICMA

Regional Workshop Surveys

Q: What is the greatest barrier to solar adoption in your community?

Page 30: Solar Powering Your Community - ICMA

Activity: Addressing Barriers

0 50 100 150 200 250 300 350

High Upfront Cost & Low ROI

Lack of Information & Education

Unfriendly Policy Environment & Lack of Incentives

Local Zoning & Permitting

Utility Support

Aesthetics & Historic Preservation

Lack of Support from HOAs

Reliability Concerns

Environmental Impact

Other

Page 31: Solar Powering Your Community - ICMA

The Cost of Solar PV

31

$0

$2

$4

$6

$8

$10

$12

$14

1998 2012

Co

st p

er

Watt

US Average Installed Cost for Behind-the-Meter PV

Tracking the Sun VI: The Installed Cost of Photovoltaics in the US from 1998-2012 (LBNL)

25% drop in price

2010 - 2012

Page 32: Solar Powering Your Community - ICMA

The Cost of Solar PV

Source: Solar Electric Power Association

Co

st o

f El

ect

rici

ty

Time

Solar Price

Retail Price

Wholesale Price

Stage 1

Today

Page 33: Solar Powering Your Community - ICMA

Subsidies and Support

Source: Management Information Services, Inc. October 2011. 60 Years of Energy Incentives: Analysis of

Federal Expenditures for Energy Development; SEIA, May 1, 2012. Federal Energy Incentives Report. 33

0 50 100 150 200 250 300 350 400

Solar

Nuclear

Coal

Natural Gas

Oil

Value of Subsidies and Support ($ billions)

Subsidies for Conventional and Solar Energy, 1950-2010

$104 Billion

$73 Billion

$17 Billion

$369 Billion

$121 Billion

Page 34: Solar Powering Your Community - ICMA

The Cost of Solar PV

Source: Solar Electric Power Association

Co

st o

f El

ect

rici

ty

Time

Solar Price

Retail Price

Wholesale Price

Stage 1 Stage 2

Today

Page 35: Solar Powering Your Community - ICMA

The Cost of Solar PV

Source: Solar Electric Power Association

Co

st o

f El

ect

rici

ty

Time

Solar Price

Retail Price

Wholesale Price

Stage 1 Stage 2

Today

Page 36: Solar Powering Your Community - ICMA

The Cost of Solar in the US

Source: NREL (http://www.nrel.gov/docs/fy14osti/60412.pdf)

LBNL (http://emp.lbl.gov/sites/all/files/lbnl-6350e.pdf)(http://www1.eere.energy.gov/solar/pdfs/sunshot_webinar_20130226.pdf )

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

US Solar Cost German Solar Cost

$ p

er

Watt

Comparison of US and German Solar Costs

Non-Hardware Cost

Total Installed Cost

Page 37: Solar Powering Your Community - ICMA

The Cost of Solar in the US

Source: NREL (http://www.nrel.gov/docs/fy14osti/60412.pdf)

LBNL (http://emp.lbl.gov/sites/all/files/lbnl-6350e.pdf)(http://www1.eere.energy.gov/solar/pdfs/sunshot_webinar_20130226.pdf )

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

US Solar Cost German Solar Cost

$ p

er

Watt

Comparison of US and German Solar Costs

Non-Hardware Cost

Hardware Cost

Page 38: Solar Powering Your Community - ICMA

The Cost of Solar in the US

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

US Solar Cost German Solar Cost

$ p

er

Watt

Comparison of US and German Solar Costs

Non-Hardware Cost

Hardware Cost

Source: NREL (http://www.nrel.gov/docs/fy14osti/60412.pdf)

LBNL (http://emp.lbl.gov/sites/all/files/lbnl-6350e.pdf)(http://www1.eere.energy.gov/solar/pdfs/sunshot_webinar_20130226.pdf )

Page 39: Solar Powering Your Community - ICMA

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

US Solar Cost German Solar Cost

$ p

er

Watt

Comparison of US and German Solar Costs

Column1

Non-Hardware Cost

Hardware Cost

The Cost of Solar in the US

Profits, Taxes, &

Overhead

Source: NREL (http://www.nrel.gov/docs/fy14osti/60412.pdf)

LBNL (http://emp.lbl.gov/sites/all/files/lbnl-6350e.pdf)(http://www1.eere.energy.gov/solar/pdfs/sunshot_webinar_20130226.pdf )

Page 40: Solar Powering Your Community - ICMA

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

US Solar Cost German Solar Cost

$ p

er

Watt

Comparison of US and German Solar Costs

Column1

Non-Hardware Cost

Hardware Cost

The Cost of Solar in the US

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$ p

er

Wat

t

Other Paperwork

Permitting & Inspection

Financing Costs

Customer Acquisition

Installation Labor

Solar Soft Costs

Source: NREL (http://www.nrel.gov/docs/fy14osti/60412.pdf)

LBNL (http://emp.lbl.gov/sites/all/files/lbnl-6350e.pdf)(http://www1.eere.energy.gov/solar/pdfs/sunshot_webinar_20130226.pdf )

Page 41: Solar Powering Your Community - ICMA

Challenge: Installation Time

Photon Magazine

8 daysfrom inception to completion

Germany

Today

New York City’s

Goal 100 daysfrom inception to completion

Page 42: Solar Powering Your Community - ICMA

0

2

4

6

8

10

12

14

16

18

US Germany

Ho

urs

Average Time to Permit a Solar Installation

Time to Installation

Source: NREL, LBNL

7.2x more man-hours

needed in the US

Page 43: Solar Powering Your Community - ICMA

Permitting Costs

Source: NREL, LBNL

$-

$0.05

$0.10

$0.15

$0.20

$0.25

US Germany

Co

st p

er

Watt

Average Cost of Permitting in the US and Germany

21x the cost for

permitting in the

US

Page 44: Solar Powering Your Community - ICMA

Consistency and Transparency

through

Standardized Processes

Germany’s Success

Page 45: Solar Powering Your Community - ICMA

The Cost of Solar in the US

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

$7.00

2010 2012 2014 2016 2018 2020

$/w

att

Change in Soft Costs and Hardware Costs Over Time

Soft Costs

Hardware Costs

$3.3

2

$3.3

2

$3.2

8

$1.9

0

No change in soft

costs between

2010 and 2012

Page 46: Solar Powering Your Community - ICMA

Enable local governments to replicate

successful solar practices to reduce soft

costs and expand local adoption of solar

energy

Workshop Goal

Page 47: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 48: Solar Powering Your Community - ICMA

Solar Market: Trends

Source: Solar Electric Power Association

Co

st o

f El

ect

rici

ty

Time

Solar Price

Retail Price

Wholesale Price

Stage 1 Stage 2

Today

Page 49: Solar Powering Your Community - ICMA

Solar Market: Trends

Source: Solar Electric Power Association

Co

st o

f El

ect

rici

ty

Time

Solar Price

Retail Price

Wholesale Price

Stage 1 Stage 2

Today

A policy driven market designed to mitigate

costs and increase the value of solar production

Page 50: Solar Powering Your Community - ICMA

FederalInvestment Tax

CreditAccelerated Depreciation

Qualified Energy Conservation

Bond

State & UtilityRenewable Portfolio Standard

Net Metering Interconnection

LocalSolar in the

Zoning CodeSolar in the

Building CodeSolar Permits

A Policy Driven Market

Page 51: Solar Powering Your Community - ICMA

FederalInvestment Tax

CreditAccelerated Depreciation

Qualified Energy Conservation

Bond

State & UtilityRenewable Portfolio Standard

Net Metering Interconnection

LocalSolar in the

Zoning CodeSolar in the

Building CodeSolar Permits

A Policy Driven Market

Page 52: Solar Powering Your Community - ICMA

Renewable Portfolio Standard

Retail Electricity Sales

Any electricity source

Renewable

Energy

Page 53: Solar Powering Your Community - ICMA

Renewable Portfolio Standard

Retail Electricity Sales

Any electricity source

Solar carve-out

Renewable

Energy

Page 54: Solar Powering Your Community - ICMA

$e- $

$e-

REC

Renewable Portfolio Standard

Utility

Fossil Fuel

Renewable Energy

Two revenue streams

Page 55: Solar Powering Your Community - ICMA

29 states,+ Washington DC and 2

territories,have Renewable Portfolio

Standards(8 states and 2 territories have

renewable portfolio goals).

www.dsireusa.org / August 2012.

Renewable Portfolio Standard

Page 56: Solar Powering Your Community - ICMA

RPS Impacts: Solar Deployment

Source: DSIRE Solar (http://dsireusa.org/documents/summarymaps/Solar_DG_RPS_map.pdf ); Solar

Energy Industries Association/ GTM Research Solar Market Insight 2012 Year-in-Review

Ranks State RPS? Solar/DG Provision?

1 California Y N

2 Arizona Y Y

3 New Jersey Y Y

4 Nevada Y Y

5 Colorado Y Y

6 North Carolina Y Y

7 Massachusetts Y Y

8 Pennsylvania Y Y

9 Hawaii Y N

10 New Mexico Y Y

RPS and Solar/DG Status of Top Ten Solar States by Cumulative

Installed Capacity (as of Q4 2012)

Page 57: Solar Powering Your Community - ICMA

Michigan RPS

Source: DSIRE

2015 Retail Electricity Sales

Required

10%*

Any electricity source

Wind

94%

Solar

2%

Other

4%

Page 58: Solar Powering Your Community - ICMA

“Utilizing the surcharge caps in the current RPS as a

maximum allowable cost…it would be possible to

increase the renewable portfolio standard by as

much as 8,721 MW through 2035, equivalent to

approximately a 30% RPS.”

Michigan RPS: Future

From a study commissioned by the Governors office in

November 2013:

Page 59: Solar Powering Your Community - ICMA

FederalInvestment Tax

CreditAccelerated Depreciation

Qualified Energy Conservation

Bond

State & UtilityRenewable Portfolio Standard

Net Metering Interconnection

LocalSolar in the

Zoning CodeSolar in the

Building CodeSolar Permits

A Policy Driven Market

Page 60: Solar Powering Your Community - ICMA

Net metering allows customers to export

power to the grid during times of excess

generation, and receive credits that can be

applied to later electricity usage.

Net Metering

Page 61: Solar Powering Your Community - ICMA

Net Metering: Overview

Customer Utility

Morning

Page 62: Solar Powering Your Community - ICMA

Net Metering: Overview

Customer Utility

Afternoon

Excess Credits

Page 63: Solar Powering Your Community - ICMA

Net Metering: Overview

Customer Utility

Night

Solar covers 100% of the customer’s load, even at night!

Page 64: Solar Powering Your Community - ICMA

Net Metering: Market Share

Source: IREC (http://www.irecusa.org/wp-content/uploads/IRECSolarMarketTrends-2012-web.pdf)

More than 93% of distributed

PV Installations are net-metered

Page 65: Solar Powering Your Community - ICMA

Net Metering

Source: DSIRE (July 2013)

43 states,+ Washington DC and 4 territories,have Net

Metering Policies

Page 66: Solar Powering Your Community - ICMA

Provides a “report card” for

state policy on net metering

and interconnection

http://freeingthegrid.org/

Net Metering: Resources

Resource Freeing the Grid

Page 67: Solar Powering Your Community - ICMA

Net Metering: Michigan

Source: Freeing the Grid

Credit Value

Retail Rate (<20 kW)

Power Rate (>20 kW)

System Capacity Limit

150 kW

Aggregate Limit

0.75% of peak load

Credit Rollover

Indefinite

Page 68: Solar Powering Your Community - ICMA

FederalInvestment Tax

CreditAccelerated Depreciation

Qualified Energy Conservation

Bond

State & UtilityRenewable Portfolio Standard

Net Metering Interconnection

LocalSolar in the

Zoning CodeSolar in the

Building CodeSolar Permits

A Policy Driven Market

Page 69: Solar Powering Your Community - ICMA

Standardized interconnection rules require

utilities to provide a fair and transparent

pathway for customer-generators and other

developers of distributed energy resources to

interconnect with the utility’s grid.

Interconnection

Page 70: Solar Powering Your Community - ICMA

Interconnection: Michigan

Source: Freeing the Grid

Applicable Technologies

All DG renewables

System Capacity Limit

None

Bonus

Insurance waived for

projects < 25 kW

Applicable Utilities

IOUs & Co-Ops

Page 71: Solar Powering Your Community - ICMA

Q & A

Page 72: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 73: Solar Powering Your Community - ICMA

Regulatory Barriers

73

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$ p

er

Wat

t

Other Paperwork

Permitting & Inspection

Financing Costs

Customer Acquisition

Installation Labor

$0.17Per Watt

Page 74: Solar Powering Your Community - ICMA

Planning & Permitting Roadmap

74

$0.00

$0.05

$0.10

$0.15

$0.20

$0.25

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Ad

ded

Co

st P

er

Watt

Current Trajectory Roadmap Target

Page 75: Solar Powering Your Community - ICMA

What is a Solar Ordinance?

A regulatory framework that encourages

responsible solar development while preserving

the public health, safety, welfare, and character of

a community.

Solar Ordinance

Source:

Page 76: Solar Powering Your Community - ICMA

What is a Solar Ordinance?

A regulatory framework that encourages

responsible solar development while preserving

the public health, safety, welfare, and character of

a community.

Solar Ordinance

Source:

Page 77: Solar Powering Your Community - ICMA

18,000+ local jurisdictions

with unique zoning and permitting requirements

Challenge: Inconsistency

Source: http://www.nrel.gov/docs/fy12osti/54689.pdf

Page 78: Solar Powering Your Community - ICMA

Consumer Challenges

Source: Forbes

Page 79: Solar Powering Your Community - ICMA

Compare this to Germany which has

One Unified Process

where applicants complete

A single two page form

to receive all necessary permits

The Opportunity

Page 80: Solar Powering Your Community - ICMA

A solar ordinance helps to ensure

responsible solar development

through a

consistent and transparent process

Benefit of a Solar Ordinance

Page 81: Solar Powering Your Community - ICMA

Balancing Growth and Regulation

How does a local government define

what types of solar installations are right

for their community?

Page 82: Solar Powering Your Community - ICMA

Determine Goals

Integrate Goals into Planning

Process

Develop ordinance

informed by plans

Solar Ordinance: Process

Page 83: Solar Powering Your Community - ICMA

FederalInvestment Tax

CreditAccelerated Depreciation

Qualified Energy Conservation

Bond

State & UtilityRenewable Portfolio Standard

Net Metering Interconnection

LocalZoning &

Building CodeSolar Access Solar Permits

A Policy Driven Market

Page 84: Solar Powering Your Community - ICMA

Update Zoning Code

Source: American Planning Association

Section Topics to Address

Definitions Define technologies & terms

Applicability Primary vs. accessory use

Dimensional Standards• Height

• Size

• Setbacks

• Lot coverage

Design Standards• Signage

• Disconnect

• Screening

• Fencing

Page 85: Solar Powering Your Community - ICMA

Typical Requirements:

Permitted as accessory use

Minimize visibility if feasible

Requirements:

– District height

– Lot coverage

– Setback

Zoning Standards: Small Solar

Page 86: Solar Powering Your Community - ICMA

Typical Requirements:

Allowed for primary use in

limited locations

Requirements:

– Height limits

– Lot coverage

– Setback

– Fencing and Enclosure

Zoning Standards: Large Solar

Page 87: Solar Powering Your Community - ICMA

Typical Requirements:

Prevent permanent loss of

“character defining” features

Possible design requirements

– Ground mounted

– Flat roof with setback

– Panels flush with roof

– Blend color

Zoning Standards: Historic

Source: SolarCentury

Page 88: Solar Powering Your Community - ICMA

Solar Ready Construction:

Preparing a building for solar at the outset can

help make future solar installations easier and

more cost effective.

Update Building Code

Page 89: Solar Powering Your Community - ICMA

Require builders to:

Minimize rooftop equipment

Plan for structure orientation to avoid shading

Install a roof that will support the load of a solar array

Record roof specifications on drawings

Plan for wiring and inverter placement

Update Building Code

Page 90: Solar Powering Your Community - ICMA

$-

$1,000

$2,000

$3,000

$4,000

$5,000

During Construction After Construction

Labor

Equipment

Update Building Code

Source: Solar Ready: An Overview of Implementation Practices [Draft]. NREL, Feb. 18, 2011.

60% Savingswhen a building is

solar ready

Page 91: Solar Powering Your Community - ICMA

Installation Soft Costs

91

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$ p

er

Wat

t

Other Paperwork

Permitting & Inspection

Financing Costs

Customer Acquisition

Installation Labor

$0.55Per watt

Page 92: Solar Powering Your Community - ICMA

Source: NREL (http://www.nrel.gov/docs/fy13osti/59155.pdf) 92

$0.00

$0.10

$0.20

$0.30

$0.40

$0.50

$0.60

$0.70

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Ad

ded

Co

st P

er

Watt

Current Trajectory Roadmap Target

Installation Labor Roadmap

Page 93: Solar Powering Your Community - ICMA

FederalInvestment Tax

CreditAccelerated Depreciation

Qualified Energy Conservation

Bond

State & UtilityRenewable Portfolio Standard

Net Metering Interconnection

LocalZoning &

Building CodeSolar Access Solar Permits

A Policy Driven Market

Page 94: Solar Powering Your Community - ICMA

Solar Access

Source: Google Earth

A landowner does not have any legal right to the free flow

of light and air across the adjoining land of his neighbor.

Fontainebleau Hotel

Eden Roc Hotel

Page 95: Solar Powering Your Community - ICMA

Solar Access Laws:

1. Increase the likelihood that properties will receive

sunlight

2. Protect the rights of property owners to install

solar

3. Reduce the risk that systems will be shaded after

installation

Solar Access

Page 96: Solar Powering Your Community - ICMA

Solar Access

Source: Database of State Incentives for Renewables & Efficiency (www.dsireusa.org)

Solar Easements Provision

Solar Rights Provision

Solar Easements and Solar Rights Provisions

U.S. Virgin Islands

DC

Local option to create solar rights provision

No state solar

access laws

Page 97: Solar Powering Your Community - ICMA

A comprehensive review of

solar access law in the US –

Suggested standards for a

model ordinance

www.solarabcs.org

Solar Access

Resource Solar America Board for Codes & Standards

Page 98: Solar Powering Your Community - ICMA

FederalInvestment Tax

CreditAccelerated Depreciation

Qualified Energy Conservation

Bond

State & UtilityRenewable Portfolio Standard

Net Metering Interconnection

LocalZoning &

Building CodeSolar Access Solar Permits

A Policy Driven Market

• Expedited review

• Fair flat fees

• Transparent process

Page 99: Solar Powering Your Community - ICMA

Expedited Review

99

Expedient StandardNo Permit

Depth of Review

Page 100: Solar Powering Your Community - ICMA

Standard

Expedited Review

10

0

Expedient

Within established

design parameters

Impacts are well

understood

Quick, Easy, Cheap

Outside of established

design parameters

Review necessary to

understand impacts

Flexible

Expedient

Depth of Review

Page 101: Solar Powering Your Community - ICMA

Expedited Permitting:

Simplifies requirements for PV

applications

Facilitates efficient review of

content

Minimize need for detailed

studies and unnecessary delays

Model Permitting Process

Resource Solar America Board for Codes & Standards

Page 102: Solar Powering Your Community - ICMA

Standard

Expedited Review

10

2

Expedient

Within established

design parameters

Impacts are well

understood

Quick, Easy, Cheap

Outside of established

design parameters

Review necessary to

understand impacts

Flexible

1-1. Example Design Criteria:

• Size < 10-15 kW

• Code compliant

• Weight < 5 lb / sqft

• 4 strings or less

Expedient

Depth of Review

Page 103: Solar Powering Your Community - ICMA

Expedited Review

10

3

No Permit

Required

Only interconnection

agreement required

Page 104: Solar Powering Your Community - ICMA

Cost-Based Recovery Fees

Fee = (Est. Staff Time x Rate) + Additional Review

Residential

Flat Fees

Commercial

Fee Calculator

Page 105: Solar Powering Your Community - ICMA

Transparent process

Source: Breckenridge, CO (http://www.townofbreckenridge.com/index.aspx?page=694)

Permit

checklist

Electronic

materials

Page 106: Solar Powering Your Community - ICMA

This Essential Info Packet

provides a number of

articles and guidebooks to

help planners plan for solar

in their communities.

planning.org/research/solar

Model Ordinance Resources

Resource Planning and Zoning for Solar Energy

Page 107: Solar Powering Your Community - ICMA

A guidebook for Michigan

communities outlining 10

steps to becoming Solar

Ready

www.michigan.gov

Resource Becoming a Solar-Ready Community

Model Ordinance Resource

Page 108: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 109: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 110: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 111: Solar Powering Your Community - ICMA

Activity: Identifying Benefits

Right Now During Session After Break

Write answer on card Compile results Group discussion

What is the greatest benefit solar can bring to

your community? [Blue Card]

Page 112: Solar Powering Your Community - ICMA

26%

11%

12%12%

9%

9%

3%3%

3%3%3%3%3%

Results of Benefits Activity

reduce energy cost

environmental

energy independence

sustainability

clean technology

example to the community

community pride

public awareness/education

energy conservation

power public lighting, traffic, etc

public health

jobs/green economy

ease grid infrastructure

Page 113: Solar Powering Your Community - ICMA

Local economy growth

Local jobs

Energy independence

Stabilizes price volatility

Valuable to utilities

Smart investment

Benefits of Solar Energy

11

3

Page 114: Solar Powering Your Community - ICMA

Economic Growth

Source: SEIA/GTM Research – 2009/2010/2011/2012 Year in Review Report

http://www.seia.org/research-resources/us-solar-market-insight 114

$0

$2,000,000,000

$4,000,000,000

$6,000,000,000

$8,000,000,000

$10,000,000,000

$12,000,000,000

$14,000,000,000

2006 2007 2008 2009 2010 2011 2012

Page 115: Solar Powering Your Community - ICMA

Job Creation

Source: SEIA Estimates (2006-2009), The Solar Foundation’s National Solar Jobs Census 2010

(2010), The Solar Foundation’s National Solar Jobs Census 2012 (2011-2012). 11

5

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

2006 2007 2008 2009 2010 2011 2012

Solar Job Growth in the US

SEIA

Estimates

The Solar

Foundation

Page 116: Solar Powering Your Community - ICMA

Job Creation

Sources: Interstate Renewable Energy Council, The Solar Foundation, Meister Consultants Group 11

6

0

10,000

20,000

30,000

40,000

50,000

0 500 1000 1500 2000 2500 3000

Num

ber

of So

lar

Jobs

Cumulative Installed Capacity (MW)

Correlation of Market Size & Jobs in Each State

90%

Correlatio

n

Page 117: Solar Powering Your Community - ICMA

Price Stability

Source: ISO New England, Inc. 11

7

0.00

20.00

40.00

60.00

80.00

100.00

120.00

Mar

-03

Jul-03

Nov-

03

Mar

-04

Jul-04

Nov-

04

Mar

-05

Jul-05

Nov-

05

Mar

-06

Jul-06

Nov-

06

Mar

-07

Jul-07

Nov-

07

Mar

-08

Jul-08

Nov-

08

Mar

-09

Jul-09

Nov-

09

Mar

-10

Jul-10

Nov-

10

Mar

-11

Jul-11

Nov-

11

Mar

-12

Jul-12

Nov-

12

Mar

-13

Jul-13

Nov-

13

$/M

Wh

Date

Boston Area Historic Average Wholesale Electricity Price

.

Page 118: Solar Powering Your Community - ICMA

Solar homes sold

20% fasterand for

17% morethan the equivalent non-solar homes

in surveyed California subdivisions

Smart Investment for Homes

Source: http://www.nrel.gov/docs/fy07osti/38304-01.pdf 11

8

From NREL:

Page 119: Solar Powering Your Community - ICMA

Smart Investment for Business

Source: Solar Energy Industries Association

0 20 40 60 80 100

Walmart

Costco

Kohl's

Apple

Ikea

Macy's

Johnson and Johnson

McGraw Hill

Staples

Campbell's Soup

U.S. Foods

Bed Bath and Beyond

Kaiser Permanente

Volkswagen

Walgreen's

Target

Safeway

FedEx

Intel

L'Oreal

General Motors

Toys 'R' Us

White Rose Foods

Dow Jones and Co

Solar Capacity (MW)

Top 20 Companies by Solar Capacity

445 megawatts

deployed as of

August 2013 –

enough to power

73,400 homes

Page 120: Solar Powering Your Community - ICMA

Smart Investment for Gov’t

Source: Borrego Solar 12

0

Page 121: Solar Powering Your Community - ICMA

Avoided Energy Purchases

Avoided T&D Line Losses

Avoided Capacity Purchases

Avoided T&D Investments

Fossil Fuel Price Impacts

Backup Power

Valuable to Utilities

12

1

Page 122: Solar Powering Your Community - ICMA

Valuable to Utilities

Source: Renewable Energy World

2008

2012

Page 123: Solar Powering Your Community - ICMA

Quantified Value

Source: Clean Power Research http://mseia.net/site/wp-content/uploads/2012/05/MSEIA-Final-

Benefits-of-Solar-Report-2012-11-01.pdf

LevelizedValue of Solar ($/MWh) in PA and NJ

Page 124: Solar Powering Your Community - ICMA

Activity: Addressing Barriers

Right Now During Session After Break

Write answer on card Compile results Group discussion

What is the greatest barrier to solar adoption in

your community? [Green Card]

Page 125: Solar Powering Your Community - ICMA

28%

24%6%

6%6%

6%

6%3%

3%3%3%3%3%

Results of Barriers Activity

Cost

Lack of Knowledge

Slow ROI

Lack of financial Incentives

Competing interests

Tree canopy

Bad press

Politics

Lack of leadership

Policy issues

Permitting

Aesthetics

Lack of solar ready building

Page 126: Solar Powering Your Community - ICMA

Fact: Solar works across the US

Source: National Renewable Energy Laboratory 12

6

Page 127: Solar Powering Your Community - ICMA

Fact: Solar is a ubiquitous resource

Source: Perez & Perez. 2009. A fundamental look at energy reserves for the planet.

0

5,000

10,000

15,000

20,000

25,000

Solar Coal Uranium Petrolium Natural Gas

Tera

wat

t Ye

ars

Resource Availability

Available annually

Page 128: Solar Powering Your Community - ICMA

The Cost of Solar PV

12

8

$0

$2

$4

$6

$8

$10

$12

$14

1998 2012

Co

st p

er

Watt

US Average Installed Cost for Behind-the-Meter PV

Tracking the Sun VI: The Installed Cost of Photovoltaics in the US from 1998-2012 (LBNL)

25% drop in price

2010 - 2012

Page 129: Solar Powering Your Community - ICMA

Fact: Solar is cost competitive

Source: Bloomberg 12

9

2012

Page 130: Solar Powering Your Community - ICMA

Fact: Solar is cost competitive

Source: Bloomberg 13

0

2020

Page 131: Solar Powering Your Community - ICMA

Subsidies and Support

Source: Management Information Services, Inc. October 2011. 60 Years of Energy Incentives: Analysis of

Federal Expenditures for Energy Development; SEIA, May 1, 2012. Federal Energy Incentives Report. 13

1

0 50 100 150 200 250 300 350 400

Solar

Nuclear

Coal

Natural Gas

Oil

Value of Subsidies and Support ($ billions)

Subsidies for Conventional and Solar Energy, 1950-2010

$104

$73

$17

$369

$121

Page 132: Solar Powering Your Community - ICMA

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

US Solar Cost German Solar Cost

$ p

er

Watt

Comparison of US and German Solar Costs

Column1

Non-Hardware Cost

Hardware Cost

The Cost of Solar in the US

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$ p

er

Wat

t

Other Paperwork

Permitting & Inspection

Financing Costs

Customer Acquisition

Installation Labor

Solar Soft Costs

Source: NREL (http://www.nrel.gov/docs/fy14osti/60412.pdf)

LBNL (http://emp.lbl.gov/sites/all/files/lbnl-6350e.pdf)(http://www1.eere.energy.gov/solar/pdfs/sunshot_webinar_20130226.pdf )

Page 133: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 134: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 135: Solar Powering Your Community - ICMA

Discussion:

When considering updating

code and streamlining

permitting, who are the

stakeholders and what role do

they play?

Page 136: Solar Powering Your Community - ICMA

Discussion:

What are barriers that may

impede or prevent the

adoption of a solar ordinance

and streamlined permitting

process?

Page 137: Solar Powering Your Community - ICMA

Discussion:

What are effective strategies

to overcome these barriers?

Page 138: Solar Powering Your Community - ICMA

Solar 101 for Communities

Understanding the Solar Regulatory Landscape

Implementing Local Policies to Enable Solar Adoption

Heather Seyfarth: Becoming a Solar Ready Community

Break

Benefits and Barriers Activity

Prasad Gullapalli: Industry Perspective on Local Policy

Group Discussion: Policy Implementation Strategies

Next Steps for Solar in the Region

Agenda

08:45 – 09:10

09:10 – 09:30

09:30 – 10:00

10:00 – 10:20

10:20 – 10:30

10:30 – 10:50

10:50 – 11:10

11:10 – 12:00

12:00 – 12:30

Page 139: Solar Powering Your Community - ICMA

1. Begin the discussion

2. Adopt a resolution

3. Establish a guiding policy

4. Update code language

5. Create an easy-to-use permitting process

Next Steps: Solar Ready Community

Page 140: Solar Powering Your Community - ICMA

6. Provide easy access to information

7. Establish solar installation targets

8. Train staff

9. Pursue solar business opportunities

10.Go the extra mile

Next Steps: Solar Ready Community

Page 141: Solar Powering Your Community - ICMA

6. Provide easy access to information

7. Establish solar installation targets

8. Train staff

9. Pursue solar business opportunities

10.Go the extra mile

Next Steps: Solar Ready Community

Page 142: Solar Powering Your Community - ICMA

MSTN fills a critical need for

accessible, high quality, market-

valued training in solar system

design, installation, sales and

inspection through train-the-

trainer programs

www.midwestsolartraining.org

Train Staff

Resource Midwest Solar Training Network (MSTN)

Page 143: Solar Powering Your Community - ICMA

6. Provide easy access to information

7. Establish solar installation targets

8. Train staff

9. Pursue solar business opportunities

10.Go the extra mile

Next Steps: Solar Ready Community

Page 144: Solar Powering Your Community - ICMA

Ownership Options for Solar

Direct Ownership

Third-Party Ownership

Page 145: Solar Powering Your Community - ICMA

$$

Direct Ownership

Customer Utility

Page 146: Solar Powering Your Community - ICMA

$ $ $e- $

Third Party Ownership

Customer Developer

e-

Power Purchase Agreement

Incentives

Page 147: Solar Powering Your Community - ICMA

Third Party Ownership

Source: GTM Research/ Solar Energy Industries Association, U.S. Solar Market Insight 2012 Year-in-Review

0

10

20

30

40

50

60

70

80

90

100

Q1 2011 Q2 2011 Q3 2011 Q4 2011 Q1 2012 Q2 2012 Q3 2012 Q4 2012

Thir

d P

arty

Ow

ned R

esi

dential

Mar

ket

Shar

e

Percentage of New Residential Installations Owned by Third Party in

CA, AZ, CO, and MA

California Arizona Colorado Massachusetts

Page 148: Solar Powering Your Community - ICMA

Third Party Ownership

14

8

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$ p

er

Wat

t

Other Paperwork

Permitting & Inspection

Financing Costs

Customer Acquisition

Installation Labor

$0.30Per watt

Page 149: Solar Powering Your Community - ICMA

Finance Cost Targets

Source: NREL (http://www.nrel.gov/docs/fy13osti/59155.pdf) 14

9

0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

12.0%

2012 2013 2014 2015 2016 2017 2018 2019 2020

Avera

ge C

ost

of

Cap

ital (%

-Real)

Current Trajectory Roadmap Target

Page 150: Solar Powering Your Community - ICMA

Ownership Options for Solar

Direct Ownership

Third-Party Ownership

Expand direct ownership

options by engaging local

lenders

Page 151: Solar Powering Your Community - ICMA

Fewer than 5%

of the

6,500 banks in the US

are

actively financing solar PV projects

Engage Local Lenders

Page 152: Solar Powering Your Community - ICMA

A guide for local governments

seeking to engage financial

institutions

www.solaroutreach.org

Solarize: Resources

Resource Local Lending for Solar PV

!

!www.mc-group.com 98 North Washington Street Suite 302

Boston M A 02114

617.934.4847

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

! !

!

LOCAL LENDING FOR SOLAR PV:

A GUIDE FOR LOCAL GOVERNMENTS SEEKING

TO ENGAGE FINANCIAL INSTITUTIONS

November!2013!

Page 153: Solar Powering Your Community - ICMA

6. Provide easy access to information

7. Establish solar installation targets

8. Train staff

9. Pursue solar business opportunities

10. Go the extra mile

Next Steps: Solar Ready Community

Page 154: Solar Powering Your Community - ICMA

Customer Acquisition

Source: National Renewable Energy Laboratory 15

4

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$ p

er

Wat

t

Other Paperwork

Permitting & Inspection

Financing Costs

Customer Acquisition

Installation Labor

$0.48Per watt

Page 155: Solar Powering Your Community - ICMA

Barriers

High upfront cost

Complexity

Customer inertia

Customer Acquisition

Page 156: Solar Powering Your Community - ICMA

The Solarize Program

Group purchasing for residential solar PV

Page 157: Solar Powering Your Community - ICMA

Barriers

High upfront cost

Complexity

Customer inertia

Solutions

Group purchase

Community outreach

Limited-time offer

The Solarize Program

Page 158: Solar Powering Your Community - ICMA

The Solarize Program

Select Installer

Marketing &

WorkshopsEnrollment

Site Assessment

Decision &

Installation

Page 159: Solar Powering Your Community - ICMA

The Solarize Program

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

1 kW - 100 kW 100 kW - 200 kW 200 kW - 300 kW 300 kW +

Harvard Mass Group Purchasing Tiers

Average PV Cost July 2011: $5.75 / watt

30% Cost

Reduction

Page 160: Solar Powering Your Community - ICMA

A household is

more likely to adopt solar

for

each additional installation in their zip code

The Solarize Program

Source: NYU Stern and Yale School of Forestry – Peer Effects in the Diffusion of Solar Panels

Page 161: Solar Powering Your Community - ICMA

A roadmap for project

planners and solar advocates

who want to create their own

successful Solarize campaigns.

www.nrel.gov

Solarize: Resources

Resource The Solarize Guidebook

Page 162: Solar Powering Your Community - ICMA

Activity: Next Steps

What do you pledge to do when you leave

today’s workshop? [Orange Card]

Page 163: Solar Powering Your Community - ICMA

Our experts can help you implement the

best practices we discuss today - apply for

complementary technical assistance

One to One Assistance

Technical Support

www.solaroutreach.org

Solar Outreach Partnership

Page 164: Solar Powering Your Community - ICMA

Meister Consultants Group

[email protected]

(617) 209 -1986

Chad LaurentMeister Consultants Group

[email protected]

(617) 209 -1990

Jayson Uppal

Page 165: Solar Powering Your Community - ICMA

Becoming Solar ReadySolar Powering Your Community Workshop

January 23, 2014

Page 166: Solar Powering Your Community - ICMA

What We Do

Mission

Clean Energy Coalition is a non-profit, non-partisan

organization dedicated to promoting clean energy

technologies as a way to create healthier, energy

independent communities.

How We Accomplish Our Mission

Clean Energy Coalition implements, manages, and

evaluates cost-effective, market transformation projects

and programs in the building and transportation sectors.

Page 167: Solar Powering Your Community - ICMA

Mobility

• Michigan Green Fleets

• Michigan Fuel Forward

• Clean Cities –Ann Arbor, Detroit, West Michigan

• Ann Arbor Bike Share

Structures

• Rebuild Michigan

• BetterBuildings for Michigan

• Commercial Energy Assessments

• Xseed Energy

• Solar Site Assessments

Communities

• a2energy and PACE

• HEAL

• Michigan Renewable Energy Tools

• Advancing Solar in Saginaw Bay Region

• Ann Arbor Climate Action Plan

• Greenhouse Gas Inventories

Our Work

Page 168: Solar Powering Your Community - ICMA

The Project : Michigan Renewable Energy Tools

Page 169: Solar Powering Your Community - ICMA

Project Partners

Page 170: Solar Powering Your Community - ICMA

Project Purpose

Problem

Many townships, cities, and villages are interested,

but lack the information and the encouragement

needed to readily address renewable energy.

However, doing nothing drives up “soft costs” and

perpetuates the status quo regardless of our

changing energy needs…..

Page 171: Solar Powering Your Community - ICMA

Project Purpose

Response

…Help local jurisdictions receive the information they

need to adopt new policies and procedures that will

advance renewable energy.

….Offer a resource for the public and other parties

interested in renewable energy options.

Page 172: Solar Powering Your Community - ICMA

Anticipated Impacts

• Reduced barriers adoption

of renewable energies

• Improved customer and

municipal experience

• Provide a platform for future

expansion in the region and

state

• Reduced “soft costs” -

Lowered installed cost

per watt for renewable

energy in Michigan

communities.

Page 173: Solar Powering Your Community - ICMA

Pilot Communities

Page 174: Solar Powering Your Community - ICMA

Piloting the Tools

Report Explores:

• Best Practices

• What’s Currently

Happening

• Recommendations

Page 175: Solar Powering Your Community - ICMA

Piloting the Tools

• Thomas Township, Williams

Charter Township, City of

Saginaw, City of Midland

• Provide support to four

communities associated with

Advancing Solar project

• Get feedback on draft Tools (fact

sheets, guidebooks, etc.)

• Develop approach for promoting

statewide adoption of Tools –

Solar Ready Community

Page 176: Solar Powering Your Community - ICMA

National, State, and Local Research

Sharing Success:

Emerging Approaches

to Efficient Rooftop

Solar Permitting

Solar Permitting Best

Practices

Expedited Permit

Process for PV

Systems

Solar Electric Permit

Fees in Northern

California

Taking the Red Tape

out of Green PowerSolar Powering Your

Community: A Guide

for Local Governments

Solar Ann Arbor

The Impact of Local

Permitting on the Cost

of Solar Power

Page 177: Solar Powering Your Community - ICMA

What We’ve Learned

• The process for installing solar PV varies widely

between jurisdictions

• Hypothetical 5 kW residential rooftop PV installation:

Required Permits Jurisdiction 1 Jurisdiction 2 Jurisdiction 3 Jurisdiction 4

building building

Permits Required electrical electrical electrical electrical

Permit Fees Jurisdiction 1 Jurisdiction 2 Jurisdiction 3 Jurisdiction 4

Building permit fee N/A $75 $135 N/A

Electrical permit fee $35 $60 $155 $90

Total $35 $135 $290 $90

Inspections Jurisdiction 1 Jurisdiction 2 Jurisdiction 3 Jurisdiction 4

Building inspections N/A 2+ 1 N/A

Electrical inspections 1-2 2+ 1 2

Total 1-2 4+ 2 2

Page 178: Solar Powering Your Community - ICMA

Top Recommendations – Advancing Solar

• Information access

Ample information for those interested in installing

solar

• Permitting process

Common practices, policies across all jurisdictions

Expedited permitting process for “prescriptive” systems

Shortened permitting time, streamlined inspections

• Planning and zoning

Common planning document and zoning ordinance

language

Page 179: Solar Powering Your Community - ICMA

Becoming a

Solar Ready Community

Page 180: Solar Powering Your Community - ICMA

Taking the Lead

Page 181: Solar Powering Your Community - ICMA

What is a Solar Ready Community?

Vision

Being a Solar Ready Community means that we have

chosen to be a leader in Michigan and have

proactively addressed solar in our local policies and

procedures. We are prepared for this emerging

technology and supportive of the solar industry in this

state – Michigan has thousands of jobs in the solar

industry and we want to help this number grow.

Developers, homeowners, and businesses know that

as a Solar Ready Community, they can rely on us to

help them through a successful, cost-effective

installation process.

Page 182: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 1: Begin the Discussion

Introduce concept to key

people

Reach out to neighboring

jurisdictions

Engage utility provider

Identify champions

Develop taskforce

Page 183: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 2: Adopt a Resolution

Support & attract local

companies in the solar industry

How solar brings positive

recognition

Benefits of reducing

dependency on imported

energy sources

Health & environmental

benefits

Supports local goals

Tool: Sample resolution

Page 184: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 3: Establish a Guiding Policy

that Supports Solar

Do you have a planning document

that supports solar

If yes:

Determine strength of policy

Raise awareness of policy

Find out what has been done

If no:

Take opportunity to include

solar during next update

cycle

Tool: Sample planning language

Page 185: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 4: Update Code Language

Abandonment

Agriculture land use

Height

Stormwater

Reflection/Glare

Screening

Setback

Tool: Sample zoning language

Page 186: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 5: Create an Easy-to Use

Permitting Process

Provide checklist

Expedite small systems

Allow for online permitting

Reduce appointment time

Coordinate with neighbors

Showcase successful examples

Consider waiving/reducing fees

Tools: Sample checklists, Solar

Sam Exercise

Page 187: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 6: Provide Easy Access to

Information

Your stated goal as a Solar

Ready Community

A description of approval process

Solar zoning language

Permitting applications

Informational resources

Tool: Outline for print and web

materials

Page 188: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 7: Establish Solar

Installation Targets

Conduct an inventory

Determine realistic

target

Example: Boston

Page 189: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 8: Train Staff

Planning, permitting,

zoning, safety

Work with existing

institutions

Page 190: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 9: Pursue Solar

Business Development

Opportunities

Manufacturers

Installers

Partnerships

Page 191: Solar Powering Your Community - ICMA

Solar Ready Steps

Step 10: Go the Extra Mile

Bulk purchasing programs

Collaborate with

organizations & jurisdictions

Community solar

Education

Lead – install on public

buildings

Tool: Partners in this room

Page 192: Solar Powering Your Community - ICMA

http://www.95405.org/

Your Future

Page 193: Solar Powering Your Community - ICMA

For more information on the Renewable

Energy Tools Program:

visit cec-mi.org/MIrenewable.

Join the Twitter conversation about renewable

energy in Michigan by searching for

#MIrenewable.

Contact Heather Seyfarth, Program Supervisor

at [email protected] or 734-585-5720 ext. 21