2
100 Climate Solutions Project Campaign ~ 2016 Renewable Energies REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Main stakeholders Social and environmental impact Location and population Project Type : Introducing pay-as-you-go solar to rural Benin; Reduction in poaching of elephants in the Pendjari National Park; At scale, delivering electricity to approxi- mately 7,000 people Solar power plant The project aims to electrify rural localities with mini central photovoltaic solar energy, resulting in the implementation of a low voltage network. ANADER (Benin’s rural electrification authority) 10’000’000 € ANADER (electrification authority); SBBE (State utility company); Integrated Solar Gdadagba, Djidja Commune, Zou Department, Benin 84,590 inh. Solar

Transcript of Solar power plant - R20 Regions of Climate Action

Page 1: Solar power plant - R20 Regions of Climate Action

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Renewable Energies

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Social and environmental impact

Location and population

Project Type :

Introducing pay-as-you-go solar to rural Benin; Reduction in poaching of elephants in the Pendjari National Park; At scale, delivering electricity to approxi-mately 7,000 people

Solar power plant

The project aims to electrify rural localities with mini central photovoltaic solar energy, resulting in the implementation of a low voltage network.

ANADER (Benin’s rural electrification authority)

10’000’000 €

ANADER (electrification authority); SBBE (State utility company); Integrated Solar

Gdadagba, Djidja Commune, Zou Department, Benin84,590 inh.

Solar

Page 2: Solar power plant - R20 Regions of Climate Action

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Energy resource data

Expected type of contract :

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

Feasibility study :

STAGE 3 : Feasibility Studies

STAGE 4 : Permitting / Financing / Contracts

Building permits signed :

Land concession signed :

Environmental impact study :

Grid Connection :

Power Purchase Agreement

Off-Taker :

Tenor : Price of electricity :

Identified sources of fundings

Comments

Engineering, Procurement and Construction Contractor :

Operation and Maintenance Contractor :

STAGE 5 : Engineering / Construction / Commercial Operation

Project maturity ( IFC / World Bank Categories )

STAGE 1 : Concept Development, Site identification

Site identified :

Site access :

Expected installed capacity :

Adequate road Rail access Port facilities

Technology :

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permit t ing / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

No

EHCSP solar modules

Yes done by ANADER

Yes

Under Negociation

Under Negociation

We are training ANADER engineers to act as our O & M partner

Under Negociation

Under Negociation

N/A

Direct consumer

20 years convention Under Negociation

IST has an MoU with French investment group GreenWish Partners and the United Bank of Africa (UBA) and a letter of Interest from EX IM Bank

5 MW

Laboratory set up within the Smart Infrastructure Collaboration Centre at Carnegie Mellon University since 2014.

5 years Build, Own, Operate and Transfer (BOOT)

Yes