Solar Power at KEVICC - Jan 2012

5
King Edward VI Community College Our Solar Power

Transcript of Solar Power at KEVICC - Jan 2012

Page 1: Solar Power at KEVICC - Jan 2012

King Edward VI Community College

Our Solar Power

Page 2: Solar Power at KEVICC - Jan 2012

• System Power: 18.36 kWp

• Annual Production: 15,790 kWh

• CO2 Avoided: 11.1 Tonnes per year

Our Photo-Voltaic System

King Edward VI Community College

Page 3: Solar Power at KEVICC - Jan 2012

• 8 Days with Above Expected Yield

• 4 Days with More Than Double Expected

Yield

• January Yield so far: 442.1 kWh

Performance at 18 January 2012

King Edward VI Community College

Page 4: Solar Power at KEVICC - Jan 2012

• 7 Months with Above Expected Yield

• 2 Months with Close to Expected Yield

• 3 months were not fully monitored

Annual Performance - 2011

King Edward VI Community College

Page 5: Solar Power at KEVICC - Jan 2012

• System Cost: £64,000

• Grants Provided: £60,000

• Our Costs: £4,000

• Our Feed-In Tariff Income: £6,100 so far

Financing Our Photo-Voltaic System

King Edward VI Community College