4
Universiti Teknologi MARA Kedah Faculty of Computer & Mathematical Sciences Department of Science Computer <Project Name> Final Report Date of Submission: <date> SEMESTER DEC 2016 – APRIL 2017 GROUP: KCS1104A Name 1, student number 1 Name 2, student number 2 Name 3, student number 3 <PLEASE USE WHITE COLOUR FOR THIS COVER PAGE> <REMOVE THIS TAG BEFORE PRINT>

Transcript of Software Development Plan - Siti Nurbaya Ismail Web view ·...

Page 1: Software Development Plan - Siti Nurbaya Ismail Web view · 2015-06-062015-06-06 · Final Report. ITS332 Information System Development. CONFIDENTIAL. T5- CS1104A 2016/2017. Page

Universiti Teknologi MARA KedahFaculty of Computer & Mathematical Sciences

Department of Science Computer

<Project Name>Final Report

Date of Submission: <date>

SEMESTER DEC 2016 – APRIL 2017

GROUP: KCS1104A

Name 1, student number 1

Name 2, student number 2

Name 3, student number 3

<PLEASE USE WHITE COLOUR FOR THIS COVER PAGE><REMOVE THIS TAG BEFORE PRINT>

Page 2: Software Development Plan - Siti Nurbaya Ismail Web view · 2015-06-062015-06-06 · Final Report. ITS332 Information System Development. CONFIDENTIAL. T5- CS1104A 2016/2017. Page

<Project Name>Final Report ITS332 Information System Development

Table of Contents

1.0 INTRODUCTION 1.1 Introduction of the project 1.2 Project Organizational Structure1.3 Roles and Responsibilities

2.0 ORGANIZATION 2.1 History of Organization2.2 Organizational Chart

3.0 SYSTEM PLANNING 3.1 Current System Description 3.2 Current System Problem3.3 Project Schedule

4.0 SYSTEM ANALYSIS AND DESIGN 4.1 System Process 4.2 System Objective4.3 Project Scope 4.4 Fact Finding Techniques

4.4.1 Questionnaires/Sampling/Interview/Document Review4.4.2 Business Case/Rules4.4.3 Summary of findings

4.5 Process Modelling 4.5.1 Functional Hierarchy / Decomposition Diagram 4.5.2 Context Diagram4.5.3 Data Flow Diagram Level 04.5.4 Data Dictionary

4.6 Data Modeling4.6.1 Entity Relationship Diagram

4.7 System Spesification4.7.1 Module/Function4.7.2 Purpose of Module/Function

4.8 System Interface4.8.1 Input Interface4.8.2 Output Interface4.8.3 Process Interface

CONFIDENTIAL T5- CS1104A 2016/2017 Page 2 of 4

Page 3: Software Development Plan - Siti Nurbaya Ismail Web view · 2015-06-062015-06-06 · Final Report. ITS332 Information System Development. CONFIDENTIAL. T5- CS1104A 2016/2017. Page

<Project Name>Final Report ITS332 Information System Development

5.0 SYSTEM IMPLEMENTATION

5.1 Test summary

5.1.1 Unit Testing

5.1.2 Integration Testing 5.1.3 System testing

5.2 Feature Tested5.2.1 xxx5.2.2 xxx...

6.0 RESULT AND DISCUSSION 6.1 Result 6.2 System strengths 6.3 System weaknesses

7.0 CONCLUSION AND RECOMMENDATION 7.1 Conclusion 7.2 Recommendation for future works

8.0 APPENDIX (Gant Chart) (Screen interface) (Highlighted Source Code)

CONFIDENTIAL T5- CS1104A 2016/2017 Page 3 of 4

Page 4: Software Development Plan - Siti Nurbaya Ismail Web view · 2015-06-062015-06-06 · Final Report. ITS332 Information System Development. CONFIDENTIAL. T5- CS1104A 2016/2017. Page

<Project Name>Final Report ITS332 Information System Development

Final Report

CONFIDENTIAL T5- CS1104A 2016/2017 Page 4 of 4