Summer Co-opAssignment PresentationJeremy Smithes
Marion Metal Center
Area: Manufacturing EngineeringMay 13th – August 2nd
Supervisor: Dave Hall
Mentor: Bryon Winters
2
Background• Education:
• Purdue University• Electrical Engineering Technology• Graduation Date: May 2017
• Work Experience:• Marion Metal Center (May 13th – August 2nd)
• Co-op Student
3
Project 1 IntroductionProblem:
-Navigation between software interlocks was time consuming.Project Description:
-Created a cross reference database.
4
Project 1 ResponsibilitiesAfter
From Robot LD1 ADC Complete DH+(N430:1/2)
Before
Robot LD1ADC Complete DH+
Time Efficiency
5
Project 1 Accomplishments
Adapter-Scanner Ladder Logic
Proximity Sensor Photo-eyeRelays, contactor & safety relay
Peer-to-peer
6
Project 2 IntroductionProblem:
-Electrical schematics on ER and JR line needed revisions and updating.
Project Description: -Examined control panels and recorded revisions.-Corrected and revamped prints.
7
Project 2 ResponsibilitiesER Destacker Revision New & Improved Prints
8
Project 2 Responsibilities Pt.2
ER LINE JR LINE
9
Project 2 AccomplishmentsAutoCAD
Variable Frequency Drive
Transformer
PLC
10
Lessons Learned• Important acronym that helps me learn best: D.A.R.
• Decrypt • Absorb • Retain
• Be proactive.
• Ask questions.
Future Plans –
11
12
Acknowledgements• Dave Hall, Controls Engineer• Bryon Winters, Controls Engineer• Don Natoli, Director of Engineering• Toya Jackson, Manufacturing Engineering Superintendent • Brad Eller, Manufacturing Engineer Group Leader• Steve Donato, Plant Manager• Sue Baber, Supervisor Salaried Personnel• Nikki Minor, Personnel Director• Danielle Kaminski, Safety Representative
13
Q & A
Thank You!
Any Questions?