SmartPlant Engineering & Schematic
Agenda
ObjectivesT d ’ T i Today’s Topic
Presentation/Demonstration Poll Questions/Conclusions Poll Questions/Conclusions Questions & Answers
SmartPlant Engineering & Schematic 2
SmartPlant Enterprise
SmartPlant P&ID EngineeringSmartPlant P&ID Engineering Integrity
SmartPlant Engineering & Schematic
SmartPlant E&S Solving Business Problems Designing the Process
– SP P&IDS f t d Ri k Miti ti Safety Safety and Risk Mitigation
– SP Process Safety Controlling the Process
SP InstrumentationPower
Safety
– SP Instrumentation Powering the Process
– SP Electrical Value add Engineering
Controls Value add Engineering
– SmartSketch– SP Explorer
Validating the Designg g– ETAP– SmartPlant P&ID Engineering Integrity Process
SmartPlant Engineering & Schematic
Motor Operated Control valve
GetSmart Webinars
Increase the utilization of the products/solutions offering– New features– Existing but under utilized– Tips and Tricks– User Experiences– User Experiences
Increase the productivity Learn about integration Complementary solution from our partners to help
complete the work process Opportunity to ask questions to the PPM teamsOpportunity to ask questions to the PPM teams See what the peers think with poll questions And more……….
SmartPlant Engineering & Schematic 5
Objectives
Get more mileage out of SP Engineering & Schematics Solution
Increase productivity, design quality and bottom line Be a Front Runner with innovative solutions Making Smart Decisions
The Presenters Mike Herod, SmartPlant P&ID Product Manager, HuntsvilleMike Herod, SmartPlant P&ID Product Manager, Huntsville Frank Joop, E&S Global Business Development
SmartPlant Engineering & Schematic 6
The Topic
SmartPlant® P&ID Engineering IntegritySmartPlant P&ID Engineering Integrity– Making the Right Decision Early
SmartPlant Engineering & Schematic
7
SmartPlant P&ID Engineering Integrity
Save time during P&ID checking Avoid making costly changes late in a project cycleAvoid making costly changes late in a project cycle Ensure the quality and dependability of data to
downstream disciplines Capture the company’s best practices Check for safety
Engineering Interface that quick/intuitive to build rules Easy to check Easy to check Comes delivered with over 3000 checks
– Derived from ISO 10418/API 14C
SmartPlant Engineering & Schematic
Validation at each project milestone
Check at each project milestone– Time consuming– Consistencyy– Faster releases means faster project execution– Great ROI as if;
1 hour to check a P&ID 500 P&ID on the project 4 releases Is 2000 hours @$60 equals $ 120,000
Leverage the intelligent P&ID capabilities beyond reports, validation and integration
Rev 1 Rev 2 Rev 3 Rev 4
SmartPlant Engineering & Schematic
SmartPlant P&ID
System Editing Rules
SmartPlant Engineering & Schematic
SmartPlant P&ID
System Editing Rules
SmartPlant Engineering & Schematic
SmartPlant P&ID
System Editing Rules Display SetsDisplay Sets
SmartPlant Engineering & Schematic
SmartPlant P&ID
System Editing Rules Display SetsDisplay Sets
SmartPlant Engineering & Schematic
SmartPlant P&ID
System Editing Rules Display SetsDisplay Sets Reports Automation (Llama, Plaice)( )
SmartPlant Engineering & Schematic
SmartPlant P&ID
SmartPlant P&ID contains a wealth of data– Object IdentityObject Identity– Properties Select Lists Text UOMs
– Connectivity (topology)Connectivity (topology)
SmartPlant P&ID Engineering Integrity will use all that data to provide Engineering Information on the state of the design
SmartPlant Engineering & Schematic
SP P&ID Engineering Integrity
SmartPlant Engineering & Schematic
SP P&ID Engineering Integrity
Save time checking the P&IDs– All drain valves, unless noted otherwise, are 3/4”.All drain valves, unless noted otherwise, are 3/4 .
SmartPlant Engineering & Schematic
Save time checking the P&ID
All drain valves, unless noted otherwise, are 3/4”.
The unmarked drain valve is 4”, not 3/4”
SmartPlant Engineering & Schematic
Quality Data to downstream disciplines
All Control Valves must: have an Actuatorhave an Actuator have an Opening Action defined and this must be shown
on the drawing
▪ Globe valve (piping) vs Globe Control Valve (instrument)
SmartPlant Engineering & Schematic
19
Avoid costly changes late in project
Equipment vent/drain valves sized according to volume of vessel
SmartPlant Engineering & Schematic
Avoid costly changes late in project
Equipment vent/drain valves sized according to volume of vesselvolume of vessel
Calculate volume & look-up in chart for Vent & Drain sizes& Drain sizes
SmartPlant Engineering & Schematic
Company/Project Best Practises
Compliance with engineering guidelines/best practices Control valves less than certain size should have blocks & bypass Control valves less than certain size should have blocks & bypass
Drain valves in water service should be freeze protected according to winterization guideline
SmartPlant Engineering & Schematic
Save time checking P&IDs
Topology & Data There should be a pressure indicator on the discharge ofThere should be a pressure indicator on the discharge of
centrifugal pumps - followed by a check valve - a drain valve and an isolation block valve.
SmartPlant Engineering & Schematic
Company Best Practises
Design check
No pipe size over 2” if flow-rate is < 80 GPM
N G t V l i C ti i No Gate Valves in Caustic service
SmartPlant Engineering & Schematic
Safety Checks
If a PSV inlet and outlet have block valves they will be CSO.
– Topology: Look on either side of PRV to determine if there are valves.– Data: If valves are found, the correct property ‘Fail Action’ is checked for CSO
definition– Visual: If CSO definition is found then rule will determine if the correct label is– Visual: If CSO definition is found then rule will determine if the correct label is
attached
SmartPlant Engineering & Schematic
The SmartPlant P&ID Engineering Integrity Rules
SmartPlant Engineering & Schematic
The SmartPlant P&ID Engineering Integrity Rules
SmartPlant Engineering & Schematic
The SmartPlant P&ID Engineering Integrity Results
SmartPlant Engineering & Schematic
The Results - Failed
SmartPlant Engineering & Schematic
Rules in Compliance with ISO 10418/API 14C
SmartPlant Engineering & Schematic
SmartPlant Engineering & Schematic
Poll Question
SmartPlant Engineering & Schematic
32
Question #1
R l d i i i i k t f t t DRule driven engineering is a key part of our strategy. Do youthink that rules can lower cost and increase quality of thedesign/projects or it is too difficult to capture/create the rulesdesign/projects or it is too difficult to capture/create the rulesand have to them cover enough to be beneficial
Yes, the rules can lower projects costs and risks and increase quality Yes, but it is a challenge to create the right and sufficient rules No, as manual checking will always be needed, g y Do not know
SmartPlant Engineering & Schematic
33
Summary
Engineering Interface that quick/intuitive to build rules Easy to checkEasy to check Powerful capabilities
Save time during P&ID checking Avoid making costly changes late in a project cycle Ensure the quality and dependability of data to
downstream disciplines Capture the company’s best practices Capture the company s best practices Check for safety
SmartPlant Engineering & Schematic
Today’s presentation
SmartPlant Engineering & Schematic
Q&AQ&A
SmartPlant Engineering & Schematic
36
Additional Information & Recordingg
The recording of the webinar and additional informationcan be found at:
htt // i t h / / bihttp://www.intergraph.com/ppm/webinars.aspxor
http://www.intergraph.com/go/eshttp://www.intergraph.com/go/es
SmartPlant Engineering & Schematic 37
The Future of
Engineering –
Today
SmartPlant Engineering & Schematic