Small Urban & Single Family Construction Site BMPs Perimeter Controls Tracking Controls Building...
-
Upload
osvaldo-old -
Category
Documents
-
view
216 -
download
0
Transcript of Small Urban & Single Family Construction Site BMPs Perimeter Controls Tracking Controls Building...
Small Urban & Single Family Construction Site BMPs
Perimeter ControlsTracking ControlsBuilding Materials
StorageLiquid StorageDirt & GradingWashout AreasEquipmentConcrete TrucksCurb Inlet
ProtectionSpill Control
PERIMETER CONTROLS
•Improper placement•Avoid running over with equipment•Maintenance
• Silt Fence
• Gravel Bags
• Straw Wattles
TRACKING CONTROLS
•At all entrances/exits•Gravel 1” to 3” angular material•Clean up any material tracked off site
• Tracking Plate & Coarse Gravel
• Keep Equipment Out
BUILDING MATERIALS STORAGE
•All materials covered or stored in containers•Stored onsite and within the perimeter•Adequately covered to prevent wind erosion•Containers fit within a couple of parallel parking spaces
• Urban Sites: Shipping Containers
DIRT & GRADING
•Stockpiled dirt and gravel must be stored onsite and covered•Maintain dust control throughout construction•Maintain additional tarps onsite during the rainy season
WASHOUT AREAS
•Wet construction materials should be handled in water tight washout s •Liquids include paint, stucco, concrete•Use plastic device to collect and contain liquids (water tight)•Inspect washout areas daily•Pump out or allow to evaporate
• Onsite materials
• Kiddie Pool
• Proprietary Products
EQUIPMENT
•Store equipment with perimeter controls •Place drip pans under earth moving equipment when not using •Cover all dumpsters when not using •Trash cans available with lids•All portable toilets must have drip pans•Urban sites create offsite areas or use perimeters around equipment stored on street
CONCRETE TRUCKS/PUMPERS
•Must be surrounded by perimeter controls•Tarps should be placed under pumpers during operation•Residual areas must be cleaned up •Use washout areas for clean up
Inlet Protection
Gravel Bags/ Filter Fabric
Spill ControlHave a spill control protocol
Minor spill kit Absorbent materials Wet/dry vacumm Easy to read instructions
Major spills Preferred contractor phone number
Staff training (basic) on protocol
Single Family Residence Examples
Single Family Residence Examples
Single Family Residence Examples
Single Family Residence Examples
Single Family Residence Examples
Single Family Residence Examples
Single Family Residence Examples
Single Family Residence Examples
Single Family Residence Examples
Single Family Lots
Individual Lot Erosion Control Plan
Single Family Residence Construction BMPs
Best Management Practices (BMPs) References