Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö...

40
Peter Wågström President and CEO Ann-Sofie Danielsson Chief Financial Officer 2012-08-16 NCC AB 1 Operatunneln i Oslo, Norway Six-month report January 1 – June 30, 2012

Transcript of Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö...

Page 1: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Peter WågströmPresident and CEO

Ann-Sofie Danielsson Chief Financial Officer

2012-08-16 NCC AB 1

Operatunneln i Oslo, Norway

Six-month report January 1 – June 30, 2012

Page 2: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

First six months in brief

2012-08-16 NCC AB 2

Orders received were high: SEK 27,176 M (30,436)

Net sales: SEK 24,392 M (21,383)

Order backlog grew SEK 2.8 BN

Operating profit: SEK 387 M (265)

Operating margin: 1.6% (1.2)

Inspiria Science Center, Norway

Page 3: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Q2 in brief

2012-08-16 NCC AB 3

Orders received: SEK 15,453 M (18,038)

Higher net sales: SEK 13,733 M (12,851)

Operating profit: SEK 517 M (545)

Order backlog: SEK 49.1 BN

Page 4: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC’s Construction unitsQ2 2012

2012-08-16 NCC AB 4

Market difficult to assess

Strong demand in Norway

Orders received down in Sweden, Finland and Denmark

• Housing in Sweden and Finland

• Major projects in Sweden

No major growth in construction investments anticipated for 2012

Citybanan, StockholmOstensjoveien, Oslo

Page 5: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Higher order backlog – NCC’s Construction unitsSEK BN

0

5

10

15

20

25

30

35

40

45

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Orders received, quarter Order backlog Orders received R12

2009 2010 2011 2012

2012-08-16 NCC AB 5

Page 6: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC’s Construction units– major orders in Q2 2012

Railway tunnel between Larvik and Porsgrunn, Norway SEK 1.2 BN

New E18 highway in Østfolt, Norway SEK 455 M

Reconstruction of Höljes power plant, Sweden SEK 300 M

Offices in Oslo, Norway SEK 255 M

2012-08-16 NCC AB 6

20 %

Total SEK 10.8 BN

Page 7: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Railway tunnel Larvik-Porsgrunn, Norway

2012-08-16 NCC AB 7

Expertise and delivery ability key to the customer

Completed in June 2016

Gardemoens flygplats, Norway

4.8 km double-tracked railway tunnel with corresponding evacuation tunnels

Order valued at SEK 1.2 BN

Page 8: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Growth in Norway

2012-08-16 NCC AB 8

Orders received doubled in the first six months

Acquisition of OKK Entreprenør AS

• Production of housing units and commercial properties, as well as refurbishment

• Annual sales of SEK 1 BN and 350 employees

• Improves NCC’s growth potential and will strengthen our local position in Oslo and the Drammen area

Page 9: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC RoadsQ2 2012

2012-08-16 NCC AB 9

Stable market trend

Costs for growth initiatives linked to the strategy

• Aggregates

• Recovery

• Road services

• Expansion in Norway

Page 10: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC HousingQ2 2012

2012-08-16 NCC AB 10

Stable demand and prices

Healthy housing sales particularly in St. Petersburg

Weaker sales in Finland

Restrictive approach to housing starts for private customers in Sweden and Finland

Increase in housing starts for investors

Page 11: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

2012 2011

379 600

58 43

308 524

42 61

0 0

56 97

384 420

1,227 1,745

442 354

1,669 2,099

2012 2011

137 410

17 18

186 338

42 61

0 0

56 97

115 251

553 1,175

323 200

876 1,375

Apr-Jun

2012-08-16 NCC AB 11

Housing starts

11

Number of housing units

Sweden

Denmark

Finland

Baltic countries

St. Petersburg

Norway

Germany

Total, private customers

Investor market

Total

Jan-Jun

Page 12: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Housing units sold

2012 2011

327 294

42 26

316 471

49 53

235 36

58 69

284 289

1,311 1,238

284 332

1,595 1,570

2012 2011

161 150

27 11

162 218

19 25

191 11

28 54

127 160

715 629

141 200

856 829

2012-08-16 NCC AB 1212

Number of housing units

Sweden

Denmark

Finland

Baltic countries

St. Petersburg

Norway

Germany

Total, private customers

Investor market

Total

Apr-Jun Jan-Jun

Page 13: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Housing portfolio trend

2012-08-16 NCC AB 13

Number

For private customers

For investors

June 30, 2012

Mar 31, 2012

June 30, 2012

Mar 31, 2012

In progress 4,506 4,556 1,065 910

Sales rate, % 48 44 73 89

Completion rate, % 51 46 41 43

Page 14: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Housing units for private customersEstimated completion

NCC AB 14

0

200

400

600

800

1 000

1 200

1 400

1 600

Q3 2012 Q4 2012 Q1 2013 Q2 2013 Q3 2013 Later

Number of housing units

2012-08-16

Page 15: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC HousingHousing units in progress for private customers June 30, 2012 (March 31, 2011)

2012-08-16 NCC AB 15

Sweden 32% (32)

Denmark 2% (2) Finland 24% (25)

Norway 6% (6)

Germany 17% (16) St. Petersburg 17% (16)

Baltic countries 2% (3)

Page 16: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Property DevelopmentQ2 2012

2012-08-16 NCC AB 16

Longer decision-making processes

Stable rents and vacancies

Demand for modern and “green” properties in prime locations

Attractive Nordic market

Strong rental market

Torsplan Stockholm

Page 17: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Project starts Q2

2012-08-16 NCC AB 17

Alberga C

• Office project in Espoo, Finland 5,400 m2

Plaza Halo

• Office project in Vantaa, Finland 5,800 m2

Alberga Business Park, Finland

Page 18: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Alberga C

2012-08-16 NCC AB 18

Alberga Business Park is located in Espoo in the Helsinki area

Office building comprising 5,400 m2

Third phase of five totaling 30,000 m2

(earlier phases sold)

Completed June 2013

GreenBuilding and BREEAM, “Very Good” level

Alberga Business Park, Finland

Page 19: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Property sales

2012-08-16 NCC AB 19

Project Type Price SEK MRecognized in

profit

Alberga B Office 196 Q3 2012

Tornby phase 1 Retail 210 Q4 2012

Tavastehus Centrum Retail 800 Q4 2014

After the end of the quarter

Arendal II Logistics 224 Q4 2012

Tornby, Linköping

Page 20: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Property Development26 ongoing or completed projects(not recognized in profit)

2012-08-16 NCC AB 20

Norway, 2 projects

Leasable area 23,200 m2

Finland, 8 projects

Leasable area 63,300 m2

Denmark, 8 projects

Leasable area 41,800 m2

Sweden, 8 projects

Leasable area 115,400 m2

Page 21: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Ann-Sofie Danielsson Chief Financial Officer

2012-08-16 NCC AB 21

Lysaker Polaris, Norway

Page 22: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Income statement

SEK MApr-Jun

2012Apr-Jun

2011Jul 11-Jun 12

Jan-Dec2011

Net sales 13,733 12,851 55,544 52,535

Gross profit 1,289 1,277 5,062 4,814

Selling and administrative costs -771 -734 -2,900 -2,774

Cost ratio

Other5.6%

-05.7%

25.2%

-225.3%

-23

Operating profit 517 545 2,140 2,017

Financial items -70 -44 -231 -208

Profit afterfinancial items 447 502 1,909 1,808

Tax on profit for the period -106 -133 -516 -496

Tax rate 23.7% 26.5% 27.0% 27.4%

Profit for the period 341 369 1,391 1,312

2012-08-16 NCC AB 22

Page 23: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Construction Sweden

01234567

0100200300400500600700

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

SEK M %Profit Operating margin

2010

0

2 000

4 000

6 000

8 000

10 000

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

SEK M Orders received Net sales

2010 2011

20112012-08-16 NCC AB 23

2012

2012 Tvärbanan, Stockholm

Page 24: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Construction Denmark

0

2

4

6

8

0

20

40

60

80

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

0400800

1 2001 6002 0002 4002 8003 200

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Isbjerget, Aarhus

2012-08-16 NCC AB 24

SEK M %Profit Operating margin

2010

SEK M Orders received Net sales

2010 2011

2011

2012

2012

Page 25: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Construction Finland

2012-08-16 NCC AB 25

-2

0

2

4

6

-20

0

20

40

60

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

0400800

1 2001 6002 0002 4002 8003 200

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Wallinmaa, Konala, Finland

SEK M %Profit/loss Operating margin

SEK M Orders received Net sales

2010 2011 2012

2010 2011 2012

Page 26: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Construction Norway

-4

-2

0

2

4

6

-40

-20

0

20

40

60

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

0400800

1 2001 6002 0002 4002 8003 200

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Stavanger Busines Park, Norway

2012-08-16 NCC AB 26

SEK M %Profit/loss Operating margin

2010

SEK M Orders received Net sales

2010 2011

2011

2012

2012

Page 27: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Roads

-60

-40

-20

0

20

40

60

-600

-400

-200

0

200

400

600

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

0500

1 0001 5002 0002 5003 0003 5004 000

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

2012-08-16 NCC AB 27

SEK M %Profit/loss Operating margin

2010

SEK M Net sales

2010 2011

2011

2012

2012

Page 28: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Housing

-404812162024

-1000

100200300400500600

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

0500

1 0001 5002 0002 5003 0003 5004 000

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

Norra Djurgårdsstaden Stockholm

2012-08-16 NCC AB 28

SEK M %Profit/loss Operating margin

2010

SEK M Net sales

2010 2011

2011

2012

2012

Page 29: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Housing units recognized in profit

29

Number of housing units

Apr-Jun 2012

Apr-Jun2011

Jan-Dec 2011

Sweden 121 234 673

Denmark 29 3 73

Finland 211 183 981

Baltic countries 38 13 108

St. Petersburg 6 0 115

Norway 58 59 104

Germany 116 115 710

Total, private customers

579 607 2,764

Investment market 141 200 735

Total 720 807 3,499

2012-08-16 NCC AB 29

Page 30: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

NCC Property Development

2012-08-16 NCC AB 30

-50

0

50

100

150

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

0

500

1 000

1 500

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2

High-bay storage, Gothenburg’s harbor

SEK M Operating profit/loss

2010

SEK M Net sales

2010 2011

2011

2012

2012

Page 31: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Operating profit per business area

SEK MApr-Jun

2012Apr-Jun

2011Jul 11-Jun 12

Jan-Dec2011

NCC Construction Sweden 133 157 787 777

NCC Construction Denmark 46 40 179 169

NCC Construction Finland 14 -11 23 14

NCC Construction Norway 18 9 1 6

NCC Roads 248 271 384 414

NCC Housing 104 84 703 606

NCC Property Development -4 19 158 28

Other and eliminations -40 -23 -96 4

Operating profit 517 545 2,140 2,017

2012-08-16 NCC AB 31

Page 32: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

SEK BNJun 30,

2012Dec 31,

2011Goodwill 1.6 1.6

Property projects 5.0 4.5

Housing projects 11.7 9.9

Accounts receivable and receivables from property sales 8.1 7.7Other assets 10.7 9.2Total assets 37.1 32.9

Balance sheet

2012-08-16 NCC AB 32

Triangeln, Malmö

SEK BNJun 30,

2012Dec 31,

2011

Development properties 2.4 2.4

Ongoing property projects 2.1 1.6

Completed property projects 0.5 0.5

Total property projects 5.0 4.5

Page 33: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

SEK BNJun 30,

2012Dec 31,

2011Goodwill 1.6 1.6

Property projects 5.0 4.5

Housing projects 11.7 9.9

Accounts receivable and receivables from property sales 8.1 7.7Other assets 10.7 9.2Total assets 37.1 32.9

Balance sheet

2012-08-16 NCC AB 33

SEK BNJun 30,

2012Dec 31,

2011

Development properties 5.2 4.8

Development costs 1.2 0.9

Ongoing housing projects 4.9 3.7

Completed housing units 0.4 0.4

Total housing projects 11.7 9.9

Page 34: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Cash flow

SEK MApr-Jun

2012Apr-Jun

2011Jul 11-Jun 12

Jan-Dec2011

From operating activities 451 272 1,971 1,456

From property projects -374 -22 -1,254 -1,472

From housing projects -777 -580 -2,005 -1,265

Other working capital -1,229 -808 -1,037 -266

Investments -251 -297 -791 -857

Cash flow before financing -2,179 -1,435 -3,117 -2,404

2012-08-16 NCC AB 34

Page 35: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Net indebtedness

Debt/equity ratio, multipleNet indebtedness, SEK M

2009 2010

0,0

0,2

0,4

0,6

0,8

1,0

1,2

1,4

1,6

1,8

0

1 000

2 000

3 000

4 000

5 000

6 000

7 000

8 000

9 000

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q22011

2012-08-16 NCC AB 35

2012

Page 36: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Summary Q2 2012

2012-08-16 NCC AB 36

Page 37: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Summary

Higher sales

Lower profit and margin

Market trend difficult to assess

NCC has a strong market position, with a high order backlog

2012-08-16 NCC AB 37

Station Triangeln, Malmö

Page 38: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Management’s focus

2012-08-16 NCC AB 38

Market development

Project control and risk management

Implementation of strategy for profitable growth

Stadshusbron, Stockholm

Page 39: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects
Page 40: Six-month report January 1 –June 30, 2012 - NCC€¦ · 2012-08-16 NCC AB 32 Triangeln, Malmö SEK BN Jun 30, 2012 Dec 31, 2011 Development properties 2.4 2.4 Ongoing property projects

Contact information

IR Manager Johan Bergman

tel. +46 (0)8-585 523 53, +46 (0)70-354 80 35

[email protected]

Chief Financial Officer Ann-Sofie Danielsson

tel. +46 (0)8-585 517 17, +46 (0)70-674 07 20

[email protected]

2012-08-16 NCC AB 40