HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Site ID : 26BIT018.
Site Name : Wangurer.
Drafted by : Mahardika.
Region : North Sulawesi.
Site Model Outdoor photos Album
No Name Company Sign
1
2
3
4
5
This document is Site Model that have been confirmed by Huawei and Indosat.
Below are PIC of each company.
Site ID : 26BIT018.
Site Name : Wangurer.
Site Type : Protelindo site.
Region : North Sulawesi.
Project Name : Indosat MBS Project.
Site Solution Scenario : New Site
Previous System : -
Current System : G900, U900.
Pre-assembly : in the warehouse.
Supervised by:
Indosat Team:
1. Rae Lawrance as SME.
Huawei Team:
1. Mahardika as DQA.
2. Ian Reynolds as QHSE Manager.
3. Risky as Project Engineer.
4. Wido as QC Engineer.
5. Zulchaidir as CME QC.
6. Cahyo as Material Control.
7. Jenius Boris as Project Engineer.
8. Luther as BSS Expert.
General Information:
All connectors RRU, Filter, Port Antenna have been tightened by Torch Wrench 25Nm.
All hybrid tale and power DC connection in RRU have been checked by QC Huawei.
Site Model Wangurer
Waterproofing done by 3 layers; Insulate tape, rubber then insulate tape.
Waterproofing done by 3 layers; Insulate tape, rubber then insulate tape and finally
fixed by cable tie top and bottom.
Site Model Wangurer
Unpacking materials antenna packet on site.
Unpacking materials antenna packet on site & Lifting
Site Model Wangurer
Anchor bolts have been installed tightly (Front – Right)
Anchor bolts have been installed tightly (Back – Right)
Site Model Wangurer
Anchor bolts have been installed tightly (Front – Left)
Anchor bolts have been installed tightly (Back – Left)
Site Model Wangurer
Distance from back Outdoor service cabinet to end foundation is 10cm minimum
View of route patchcord with label and spiral protected, route to left side
Site Model Wangurer
Grounding wire from left side of outdoor service cabinet connected to outdoor busbar
View of Grounding Resistante value of the site, must below 1 Ω
Site Model Wangurer
Outdoor service cabinet back view.
Over view of IDU, ODF, BBU Main, BBU spare, EMUA and DDF.
Site Model Wangurer
View of ALARM Cable connection from EMUA to DDF with label.
View of ALARM Cable from DDF to EMUA with label.
Site Model Wangurer
View of Route cables of IDU Power DC and Power EMUA.
View of route grounding IDU, BBU, EMUA, ODF Inside Outdoor Service Rack.
Site Model Wangurer
View of connection DC Power cable with label inside DCDU.
View of AC Power cable input from ACPDB, must use Heatshrink and label.
Site Model Wangurer
View of AC Power cable inlet/outlet input from ACPDB.
View of AC Power cable inlet hole from ACPDB, must use anaconda.
Site Model Wangurer
View of AC Power cable route to ACPDB., must be plant with 60cm depth
View of AC Power cable route to ACPDB, must use anaconda and PG36, Holesaw
45mm
Site Model Wangurer
View of connection grounding from Cabinet Busbar, Hybrid cable and to Outdoor busbar.
View of inlet/outlet route to Outdoor Busbar
Site Model Wangurer
View of connection AC Power Cable and label in ACPDB.
View of Hybrid cable with grounding kit
Site Model Wangurer
View of Hybrid cable route and label to Outdoor service cabinet.
View of Hybrid cable spare in the left side coil box
Site Model Wangurer
View of Coax cable from ODU to IDU inside Outdoor service cabinet.
View of Coax cable from ODU to IDU inside Outdoor service cabinet
Site Model Wangurer
View of IP LAN cable from IDU to BBU inside Outdoor service cabinet.
View of LAN Cbale spare coiled in the right coil box.
Site Model Wangurer
View of Coax and Hybrid cable laying in Horizontal tray.
Use Clamp for Hybrid cable, and tied big size for Coax cable
Site Model Wangurer
View of Coax Grounding kit and connect to busbar.
View of Big Cable ties cut using Flash Cutter without sharp angle
Site Model Wangurer
View of Coax cable and Hybrid cable in the vertical tray with clamp and ties every 1m.
View of coax and hybrid grounding kit laying in the middle busbar
Site Model Wangurer
View of Hybrid & Hybrid jumper cable to junction box in the tower bracing using
clamp.
View of Hybrid cable and Hybrid jumper overloop to junction box
Site Model Wangurer
View of grounding connection from RRU, Junction box, Filter in Antenna busbar.
View of Hybrid cable, Hybrid jumper, Grounding laying in the bracing
Site Model Wangurer
View of Grounding kit coax, hybrid cable and antenna busbar to upper tower busbar.
View of coax and grounding ODU cable laying in the arm mounting antenna MW
Site Model Wangurer
Antenna Tripleband Azzimuth rotate with RRU and Filter
Antenna Tripleband Azzimuth rotate with RRU and Filter
Site Model Wangurer
View of Junction box label
View of color label hybrid and hybrid jumper in junction box
Site Model Wangurer
View of RRU Hybrid jumper and grounding cable label
View of Filter grounding cable label
Site Model Wangurer
View of Battery label, bottom Bank 1, Top Bank 2 (1-2-3-4 are Battery Cell)
Each Battery Cell must have the same spacing
Site Model Wangurer
Thank you www.huawei.com
Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new technology, etc. There are a
number of factors that could cause actual results and developments to differ materially from those expressed or
implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.