SHORING - StepUp Scaffold
Transcript of SHORING - StepUp Scaffold
SHORINGSC AFFOLD PRODUC T C ATALOG
w w w.stepupsc affold.com
MEMPHIS
NEW YORK
HOUSTON
LOS ANGELES
ATLANTA
EDMONTON
LATIN AMERICA
UNITED KINGDOM
EUROPE
2
BA734
SHORING FRAMES
SHORING FRAME ACCESSORIES
POST SHORES
SHORING ANGULAR CROSS BRACES
SF
PS01 PS02 PS03 PS04 PS05
U-HEADSRPSCP
BP-S
SJ1P-SSJ1S-SI
W W
H
SF
H
Part # Description Height WidthOD
TubeTop Hole Space
Top Lock Space
Weight(lbs)
SF3H-2W Shoring Frame - 3’ X 2’ 3’ 2’ 2.375” 1.625” 7” 29.98
SF3H-4W Shoring Frame - 3’ X 4’ 3’ 4’ 2.375” 1.625” 7” 36.82
SF4H-2W Shoring Frame - 4 X 2’ 4’ 2’ 2.375” 1.625” 7” 36.99
SF4H-4W Shoring Frame - 4’ X 4’ 4’ 4’ 2.375” 1.625” 7” 46.01
SF5H-2W Shoring Frame - 5’ X 2’ 5’ 2’ 2.375” 1.625” 7” 47.00
SF5H-4W Shoring Frame - 5’ X 4’ 5’ 4’ 2.375” 1.625” 7” 53.99
SF6H-2W Shoring Frame - 6’ X 2’ 6’ 2’ 2.375” 1.625” 7” 58.00
SF6H-4W Shoring Frame - 6’ X 4’ 6’ 4’ 2.375” 1.625” 7” 67.24
Part # DescriptionWeight
(lbs)
SCP Shoring Coupling Pin 1.00
SRP Shoring Rivet Pin with Hitch Pin 0.51
U-HEAD Shoring ‘U’ Head 12.87
BP-S Shoring Base Plate 7.57
SJ1S-S1 Shoring Hollow Screw Jack 14.00
SJ1P-S Shoring Jack with Base Plate 13.67
Part # Description LengthMin.
HeightMax.
HeightWeight
(lbs)
PS01 Post Shore 3'5" to 6' 3’5”-6’1” 3’6” 6’ 25.35
PS02 Post Shore 5'5" to 10' 5’9”-10’3” 5’7” 10’1” 37.99
PS03 Post Shore 6'5" to 11' 6’6”-11’ 6’6” 11’ 40.81
PS04 Post Shore 8'7" to 13'2” 8’6”-13’ 8’8” 13’2” 46.64
PS05 Post Shore 10'7" to 16’4" 10’6”-15’6” 10’8” 16’5” 54.34
Part # DescriptionWeight
(lbs)
BA734 Angular Cross Brace - 7’X3’X4’ 14.30
BA834 Angular Cross Brace - 8’X3’X4’ 16.55
BA1034 Angular Cross Brace - 10’X3’X4’ 18.92
Allowable Loads (lbs)Part # 4’ 5’ 6’ 7’ 8’ 9’ 10’ 11’ 12’ 13’ 14’ 15’
PS01 6800 6650 6500
PS02 6500 6070 5650 5230 4310
PS03 6070 5650 5230 4310 4310
PS04 5230 4310 4310 3970 3550
PS05 4310 3970 3550 3270 3000
Post Shores (PSX)• All Post Shores -
External Tube 2.38” x 0.09” & Internal Tube 1.91” x 0.126”
SHORING : FRAMES & POST SHORESS
TE
PU
P S
CA
FFO
LD F
RA
ME
& B
RA
CE
CA
TALO
G
www.stepupscaf fo ld.com
3
CLAMP-HBSH
ORIN
G
Part # DescriptionWeight
(lbs)
P-BRACKETS-B Panel Brackets Big For Side Walk Bridge Post 3.73
P-BRACKETS-S Panel Brackets Small For Side Walk Bridge Post 1.33
PANEL BRACKETS
Part # Description
Actual Length
(in)
Effective Length
(in)Weight
(lbs)
SB-GIRT1 1’ Girt for Side Walk Bridge Post 14” 12” 1.72
SB-GIRT2 2’ Girt for Side Walk Bridge Post 26” 24” 3.21
SB-GIRT3 3’ Girt for Side Walk Bridge Post 38” 36” 4.67
SB-GIRT4 4’ Girt for Side Walk Bridge Post 50” 48” 6.14
SB-GIRT5 5’ Girt for Side Walk Bridge Post 62” 60” 7.62
SB-GIRT6 6’ Girt for Side Walk Bridge Post 74” 72” 9.10
SB-GIRT7 7’ Girt for Side Walk Bridge Post 86” 84” 10.56
SB-GIRT8 8’ Girt for Side Walk Bridge Post 98” 96” 12.04
SB-DB 10’4” Diagonal Brace 127” 124” 10.27
SIDEWALK BRIDGE GIRTS & BRACE
SIDEWALK BRIDGE CLAMPSPart # Description Category
Weight (lbs)
CLAMP-HB Head Beam Clamp Side Walk Bridge Post 3.19CLAMP-RSB Right Angle Clamp (Sidewalk Bridge) 3 ½ x 2 Side Walk Bridge Post 5.22CLAMP-SSB Swivel Clamp (Sidewalk Bridge) - 3 ½” X 2” Side Walk Bridge Post 5.68CLAMP-ST-N-2.5 Stud Clamp With Hexagonal Screw - 2 ½” 3.45
CLAMP-ST-N Stud Clamp With Hexagonal Screw - 3 ½” Side Walk Bridge Post 4.34
CLAMP-RSB
CLAMP-SSB CLAMP-ST-N
P-BRACKETS-BP-BRACKETS-S
SB-GIRT-X
SHORING CLAMPSPart # Description Category
Weight (lbs)
CLAMP-S25 Forged Swivel Clamp - 2 ½” X 2” Shoring Frame 4.70CLAMP-R25 Forged Right Angle Clamp - 2 ½” X 2” Shoring Frame 4.11
CLAMP-S25 CLAMP-R25
Part # DescriptionLength
(in)Weight
(lbs)
SBP-HD-8 8’ Side Walk Bridge Leg Heavy Duty (0.216 Thickness) 96” 76.75
SBP-HD-10 10’ Side Walk Bridge Leg Heavy Duty (0.216 Thickness) 120” 91.78
SBP-HD-12 12’ Side Walk Bridge Leg Heavy Duty (0.216 Thickness) 144” 106.99
SBP-HD-14 14’ Side Walk Bridge Leg Heavy Duty (0.216 Thickness) 168” 122.20
SBP-HD-16 16’ Side Walk Bridge Leg Heavy Duty (0.216 Thickness) 192” 137.41
SIDEWALK BRIDGE LEG
SBP-HD-X
*all Clamps meet EN74 Safety Requirements
Part # Description Height WidthOD
TubeTop Hole Space
Top Lock Space
Weight(lbs)
SF3H-2W Shoring Frame - 3’ X 2’ 3’ 2’ 2.375” 1.625” 7” 29.98
SF3H-4W Shoring Frame - 3’ X 4’ 3’ 4’ 2.375” 1.625” 7” 36.82
SF4H-2W Shoring Frame - 4 X 2’ 4’ 2’ 2.375” 1.625” 7” 36.99
SF4H-4W Shoring Frame - 4’ X 4’ 4’ 4’ 2.375” 1.625” 7” 46.01
SF5H-2W Shoring Frame - 5’ X 2’ 5’ 2’ 2.375” 1.625” 7” 47.00
SF5H-4W Shoring Frame - 5’ X 4’ 5’ 4’ 2.375” 1.625” 7” 53.99
SF6H-2W Shoring Frame - 6’ X 2’ 6’ 2’ 2.375” 1.625” 7” 58.00
SF6H-4W Shoring Frame - 6’ X 4’ 6’ 4’ 2.375” 1.625” 7” 67.24
SIDEWALK BRIDGE : POSTS & MORES
TE
PU
P S
CA
FFOLD
FRA
ME &
BR
AC
E CA
TALO
G
©2020 StepUp Scaffold. All rights reserved.
STEPUP ATLANTA4520 Palazzo Way | Douglasville, Georgia 30134phone: 1-770-577-4222tollfree: 1-888-814-STEP | fax:1-770-942-0111
STEPUP HOUSTON10413 Wallisville Road | Houston, Texas 77013phone: 1-713-678-8877tollfree: 1-866-678-8877 | fax:1-713-678-8800
STEPUP LOS ANGELES12224 Philadelphia Street | Whittier, CA 90601phone: 1-562-907-STEP | 1-562-777-1898
STEPUP NEW YORK54-20 50th Street | Maspeth, NY 11378phone: 1-718-456-3218 | fax: 1-718-456-3210
STEPUP LATIN AMERICACra 44 # 18-56 | Medellin, Antioquia | Colombiaphone: +57 310 290 2021 | o�ce: +57 4 204 03 26
STEPUP EDMONTON10520 111th Street NW | Edmonton, Alberta T5G 0B6phone: 1-888-814-STEP
STEPUP UK & EUROPEUnit 7B, Lyon Road | Linwood, Renfrewshire, UK PA3 3BQphone: +44 1505 324 399
STEPUP SCAFFOLDCorp orate Headquar ters
2005 Fletcher Creek DriveMemphis, TN 38133
tollfree: 1-888-STEPUP-1 fax: 1-901-452-8688
w w w.stepupsc affold.com