shamal B B - OFFICE WORK BROTURE-new update-33

of 10 /10
The second project is consist of three complex building (5 storeis,9 stories and one tower 12 stories) Sulaimaniyah 3000 Project زيارىرى ئةنداذكا اوي د يزاين و ر بو وسينطةى شةمال ن

Embed Size (px)

Transcript of shamal B B - OFFICE WORK BROTURE-new update-33

  1. 1. The second project is consist of three complex building (5 storeis,9 stories and one tower 12 stories) Sulaimaniyah 3000 Project
  2. 2. 22 Sulaimaniyah 3000 Project During Construction
  3. 3. 33 The Project consists of 6 concrete & one steel complex building structure Sarchinar Tourism Project Sarchinar Tourism Project
  4. 4. 44 Sarchinar Tourism Project During Construction-City Cenama
  5. 5. 55 Sarchinar Tourism Project During Construction
  6. 6. 66 Sarchinar Tourism Project During Construction
  7. 7. 77 Design of Kunjreen Dam
  8. 8. 88 -Design all components of Garmian Industrial City-Kalar -Engineering Survey of 3500 Donums -Making GIS works for all networks details
  9. 9. 99 Kalar Court Building
  10. 10. 1010 -Detail Design for Qaladze Master Plan (all networks) -Engineering Survey of 6500 Donums -Making GIS work for all details of the city