Sf6 -Bkr Check List

download Sf6 -Bkr Check List

of 31

Transcript of Sf6 -Bkr Check List

  • 8/20/2019 Sf6 -Bkr Check List

    1/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Che! L"#$ %&' S BREAKERSerial Number:-

    R-Phase

    Y-Phase

    B-Phase

    Location: 400kv Switch Yard Bay Name:-

    !ency: "rom#ton $reaves Ltd% Packa!e&400'( Switch Yard

    Teh*"+ #-e"%"+$"&* &% $he 'e+!e' (T/-e 100SM10A)

    Rated (olta!e: 4)0'( Normal rated current :)000m#s

    *a+% Breakin! "a#acity: 40k rms "losin! and tri# "oils (olta!e: ))0 ( dc%

    Rated ,nsulatin! Level: 4). '(

    Rated *akin! "a#acity:00' Rated Short time current ratin!: 40k /or sec

    INDE

    Sl.No Description

    1 List o/ 1rawin! and documents

    2 List o/ testin! 23ui#ments and 5P re3uired

    3 Physical checks and $eneral ,ns#ections

    4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    Signatures with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#1

    7ni3ue Re/erence:*ake-:"rom#ton $reaves Ltd%

    Rated #ressure o/ S68: 9'S" #eratin!ir Pressure: .%.'S"

    Rated Power 6re3uency ;ithstand (olta!e:8

  • 8/20/2019 Sf6 -Bkr Check List

    2/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS1-List of Drawing and Documents

    Sl.No. 1escri#tion Drawing No

    1.1 'ey sin!le line dia!ram 1$31

    1.2 400'( Switchyard earthin! system layout 14$5221

    1.3400'( Switchyard #rotection 5 meterin! SL1

    1$3112

    1.4 1$3151

    1.5 S'433

    1.6 "ontrol cable Schedule-400'( Switchyard 656#$#S#S#)S#21.* 5* manual  A+aila,le

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments

  • 8/20/2019 Sf6 -Bkr Check List

    3/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears3.1

    3.2 "heck all the /oundation bolt and ti!ht%

    3.3

    3.4

    3.5

    3.6

    3.* "heck dew #oints o/ S68%

    3.'

    Signatures with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#3

    "heck that erection work is com#lete as #er relevant drawin!s %

    "heck /or #ro#er ali!nment o/ structures@su##ort insulators@corona rin!s etc%

    1ensity monitor and #ressure !au!e are #laced #ro#erly below su##ort insulators

    "heck that desiccant ba!s are removed/rom inside the interru#ter chamber be/ore installin!%

    "heck that len!th o/ o#eratin! rod isadAusted as #er su##liers manual

    2nsure that vacuum #ullin! and S68 !as/illin! at s#eci/ied #ressure as #er the #rocedure !iven in su##lier manual%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    4/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    3. "heck the !as #r% 9'!/ at NP

    3.1

    3.11

    3.12

    3.13

    3.14

    3.15

    Signatures with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#4

    "heck the "olour o/ lumina : luminais Blackish i/ *oist and ;hite i/ Cealthy%

    "heck /or any leaka!e o/ S68 !as /rom Aoints usin! leak detector or soa# solution

    "heck !as #ressure daily /or /ewweeks>s#ecially at hi!hest and lowesttem#% o/ the day? to ensure that the #ressure is not reachin! e+tremelimits>/allin! below alarm value< over #ressuri=ed?%

    "heck the earthin! o/ su##ort structure@ breaker /rame and ** bo+es is done #ro#erly%

    "heck the cable have been terminated in** bo+es o/ breakers as #er the cableschedule and e3ui#ment wirin! dia!ram%

    "heck #ro#er !landin! o/ cable andensure #lu!!in! o/ un used cable entrieso/ ** bo+es@sealin! and lockin! o/** bo+es a!ainst water entry %

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    5/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    3.16

    3.1*

    3.1'

    3.1

    3.2 "heck the oil level in the com#ressor 3.21 "heck the air #r%.%. k!/ at NP

    3.22

    3.23

    3.24

    3.25

    3.26

    3.2*

    3.2'

    3.2

    3.3 "heck the o#eration o/ s#ace heater 3.31 "heck the door sealin! o/ the local #anel

    3.32

    Signatures with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#5

    "heck ratin! o/ /uses as #er scheme 5healthiness%

    "heck availability o/ "s#rin! char!in!mechanism checks?%

    "heck the ti!htness o/ all terminalsinside the ** bo+%

    "heck the o#eratin! bar is in disen!a!ed #osition%

    "heck the lock #ins o/ the o#eratin!mechanism are to be in removed

    "heck the dimension o/ wi#in! maincontact>4-DEFmm?

    "heck the dimension o/ stroke o/o#eratin! mechanism>4-D40G@40-mm?

    "heck the dimension o/ over travelmechanism >llowable rann!e in mm)-D 8 F ?

    "heck the air leaka!e% >he #ressureshould not dro# by 0H in )4 hours?%

    "heck the control cable ti!htness 5termination%

    "heck all the cable !lands in entry #oint5 i/ any !a# will /ound@ /ill the !a# by #utty%

    )he the olour aint o7 eah ,r 7orhase iniation

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    6/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    !-List of "acory Test & its #emarks

    Sl.No. 1escri#tion es No /earsMECHANICAL OPERATION TESTS

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.*

    4.' ADDITIONAL TESTS

    4.

    4.1

    4.11 S86 gas Lea "est

    4.13 HIGH VOLTAGE WITHSTAND TESTS

    4.14 Li+e Parts to 9roun().:. )lose

    4.15 :etween terinals().:. Oen

    4.16

    4.1' P;AS$# /()ontat /esistane

    4.1 P;AS$# ()ontat /esistane

    4.2 P;AS$# :()ontat /esistane

    4.22 )losing "ie(s o7 :illir )iruit to 9roun

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    7/81

    Page No. #6

  • 8/20/2019 Sf6 -Bkr Check List

    8/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    $-List of %ite Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    5.1

    5.2

    5.3

    5.4

    5.5

    5.6

    Signatures with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#*

    "heck the ,R value between incomin! 5out!oin! terminals% >,R .00*I by.'( me!!er?

    "heck the ,R value between lowerterminal /lan!e 5 !round% >,R .00*I by .'( me!!er?

    ;ith breaker "LS21 5 2RCS;,"C as well as ,SLR P2Ncondition check ,R value in R-Phase@ Y-Phase 5 B-Phase

    "heck the ,R value between controlcircuit 5 !round% >,R 00*I by .00(

    me!!er?"heck the "losin! coil%>Resistance-)8I5 currentdrawn D)%?

    "heck the tri##in! coil "-@ 5 "-)%>Resistance-J0I 5 current drawn D)%J?

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    9/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.*

    5.'

    5.

    5.1

    5.11

    5.12

    5.13

    5.14

    5.15

    5.16

    5.1*

    5.1'

    Signatures with DateLAPPL(O&M

    L!"L L&"

    Page No.#'

    "heck the tanK value o/ #orcelaininsulator 

    "heck the ca#acitance 5 tanK o/ each!radin!ca#acitor>ca#acitanceD000#/F4H each@tanKD0%009?

    "heck #hase to #hasedistance>1istanceD9000 mm a##ro+%?

    heck the air pressure switch as perscheme

    "heck the "om#ressor- N at airPr%4%.F0% k!/ 

    "heck the "om#ressor- 66 at air

    Pr%.%)F0% k!/ "heck the low Pr% alarm N at airPr%%.F0% k!/ 

    "heck the low Pr% alarm 66 at airPr%4%.F0% k!/ 

    "heck the low Pr% cut out N at airPr%4%0F0% k!/ 

    "heck the low Pr% cut out 66 at airPr%%0F0% k!/ 

    "heck the uto recluse lock N at airPr%4%4F0% k!/ 

    "heck the uto recluse lock 66 at airPr%%EF0% k!/ 

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    10/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.1

    5.2

    5.21

    5.22

    5.23

    5.24

    5.25

    5.26

    5.2*

    5.2'

    5.2

    5.3

    Signatures with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#

    "heck the Sa/ety valve o#en at air Pr%9%0to J%0 '!/ 

    "heck the "om#ressor -) N at airPr%4%F0% k!/ 

    "heck the "om#ressor -) 66 at airPr%.%)F0% k!/ 

    "heck #ower o#eration o/ the breaker atno load

    "heck the contact resistance o/ the breaker contacts>00micro-ohm ma+%?%

    "heck the store ener!y system test-)o#eration with com#ressor o//%

    "heck the closin! time o/ the breaker>Less than .0ms?

    "heck the o#enin! time o/ the breaker>Less than )0ms?

    "heck the #ole discre#ancy within the #ole>)%.ms?%

    "heck the #ole discre#ancy between the #oles>%ms?%

    "heck the o#eratin! se3uence o/ the breaker>0-0%sec-"-min-"%

    "heck the air and !as and lockouto#eration%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    11/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears5.31 "heck the anti #um#in! o#eration%

    5.32

    5.33

    5.34

    5.35

    5.36

    5.3*

    '-List of defects and omissions

    Sl.No. 1escri#tion es No /ears

    6.1

    6.2

    6.3

    6.4

    6.5

    6.6

    6.*

    6.'

    Signatures with Date

    LAPPL(O&M

    L!"L L&"

    "heck the manual tri##in!

  • 8/20/2019 Sf6 -Bkr Check List

    12/81

    Page No.#1

  • 8/20/2019 Sf6 -Bkr Check List

    13/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Serial Number:-

    R-Phase

    Y-Phase

    B-Phase

    Location: 400kv Switch Yard Bay Name:-

    !ency: LSL Packa!e&400'( Switch Yard

    Teh*"+ #-e"%"+$"&* &% $he I#&+$&' 

    Rated (olta!e: 4)0'( Normal rated current :)000 m#s

    INDE

    Sl.No Description

    1 List o/ 1rawin! and documents

    2 List o/ testin! 23ui#ments and 5P re3uired

    3Physical checks and $eneral ,ns#ections4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS1-List of Drawing and Documents

    Che! L"#$ %&' PANTOGRAPH ISOLATOR WITH EARTHSWITCH

    7ni3ue Re/erence:*ake-: 2LPR ,nternational Ltd%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    14/81

    Sl.No. 1escri#tion Drawing No1.1 'ey sin!le line dia!ram 6or ,nstallation Locations 1$31

    1.2  A+aila,le

    1.3 1$3151

    1.4"ontrol cable Schedule-400'( Switchyard

    656#$#S#S#)S#2

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments

  • 8/20/2019 Sf6 -Bkr Check List

    15/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears

    3.1

    3.2 "heck the /oundation bolt and ti!htness%

    3.3

    3.4

    3.5

    3.6

    3.*

    3.'

    3.

    3.1

    3.11

    3.12

    3.13

    Siganature with Date

    "heck that 2rection work is com#lete as #errelevant drawin!s and erection com#letioncerti/icate is available

    "heck /or #ro#er ali!nment o/ structures@ su##ortinsulators@earth switch etc%

    2nsure /or #ro#er movement o/ 2arth Blade into thecontact carrier 

    "heck that #ro#er !askets are !iven /or bo+es o/mechanism and centrali=in! cubicle

    "heck that isolator base and earth switch is #lacedon structure as #er the drawin!

    "heck /or makin! on su##ort insulators@ o#eratin!rods @ earth switch and check these matches withmakin! on base /rame%

    check /or lubrication o/ all #ivot #oints o/ 2arthSwitches%

    "heck that len!th o/ o#eratin! rod is adAusted as #ersu##liers manual

      Be/ore comin! to o#eration whether the insulatorsare cleaned by a##lyin! "arbon etra "hloride >labmade? chemical%

    check the bearin!s@Ce+acon bolts@s#rin! lockwashers@Nut @Minc washers are lubricated with$ra#hite oil or !el%

    he necessary check is carried out to observe thevarious switchin! maneuvers visually% "heck all the

     #arameters like remote

  • 8/20/2019 Sf6 -Bkr Check List

    16/81

    LAPPL(O&M

    L!"L L&"

    Page No.#3

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    17/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Sl.No. 1escri#tion es No /ears

    3.16

    3.1*

    3.1'

    3.1"heck the control cable ti!htness 5 termination%

    3.2

    3.21 "heck the o#eration o/ s#ace heater 

    3.22 "heck the door sealin! o/ the local #anel

    3.23

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#5

    "heck ratin! o/ #eratin! *otors /uses as #erscheme 5 healthiness%

    "heck availability o/ "

  • 8/20/2019 Sf6 -Bkr Check List

    18/81

     

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    !-List of "acory Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.*4.'

    4.

    4.1

    LANCO AMARKANTAK POWER PVT. LTD.PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    $-List of %ite Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    5.1

    5.2

    5.3 "heck the tanK value o/ each #orcelain insulator 

    5.4

    5.5 )he wg resistane o7 ain & earth swith otor 

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#6

    "heck the ,R value between incomin! 5 out!oin!terminals% >,R .00*I by .'( me!!er? ,N #encondition

    "heck the ,R value between lower terminal /lan!e5 !round% >,R .00*I by .'( me!!er?

    "heck the *ain 5 2arth switch motors ,R value by .00( me!!er 

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    19/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.6

    5.*

    5.'

    5.

    5.1

    5.11 "heck the o#eration interlock as #er scheme%Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#*

    Page No.#'

    LANCO AMARKANTAK POWER PVT. LTD.PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    '-List of defects and omissions

    Sl.No. 1escri#tion es No /ears

    6.1

    6.2

    6.3

    6.4

    6.5

    6.6

    "heck the ca#acitance 5 tanK o/ each !radin!ca#acitor>ca#acitanceD000#/F4H each@tanKD0%009?

    "heck the uto reclose lock N at air Pr%4%4F0%k!/ 

    "heck #ower o#eration o/ the ,solator 5 2arthswitch at no load

    "heck the contact resistance o/ the ,solatorcontacts%

    "heck the Local@ Remote and uto recloseo#eration%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    20/81

    6.*

    6.'

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    21/81

  • 8/20/2019 Sf6 -Bkr Check List

    22/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Che! L"#$ %&' HCB ISOLATOR WITH EARTH SWITCHSerial Number:-

    R-Phase

    Y-Phase

    B-Phase

    Location: 400kv Switch Yard Bay Name:-

    *ake:LSL Packa!e&400'( Switch YardTeh*"+ #-e"%"+$"&* &% $he HCB I#&+$&' 

    Rated (olta!e: 4)0'( Normal rated current :)000 m#s

    INDE

    Sl.No Description

    1List o/ 1rawin! and documents2 List o/ testin! 23ui#ments and 5P re3uired

    3 Physical checks and $eneral ,ns#ections

    4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#1

    7ni3ue Re/erence:*ake-: 2LPR ,nternational Ltd%

    LAPPL(

    $%M

  • 8/20/2019 Sf6 -Bkr Check List

    23/81

     

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS1-List of Drawing and Documents

    Sl.No. 1escri#tion Drawing No1.1 'ey sin!le line dia!ram 6or ,nstallation Locations 1$31

    1.2 A+aila,le

    1.3"ontrol cable Schedule-400'( Switchyard

    656#$#S#S#)S#2

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments

  • 8/20/2019 Sf6 -Bkr Check List

    24/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears

    3.1

    3.2 "heck the /oundation bolt and ti!htness%

    3.3

    3.4

    3.5

    3.6

    3.*

    3.'

    3.

    3.1

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    "heck that erection work is com#lete as #er relevant drawin!s and erectioncom#letion certi/icate is available

    "heck /or #ro#er ali!nment o/ structures@su##ort insulators@earth switch etc%

    2nsure /or #ro#er movement o/ 2arthBlade into the contact carrier 

    "heck that #ro#er !askets are !iven /or bo+es o/ mechanism and centrali=in!cubicle

    "heck that isolator base and earth switchis #laced on structure as #er the drawin!

    "heck /or makin! on su##ort insulators@o#eratin! rods @ earth switch and match

    with makin! on base /rame%

    check /or lubrication o/ all #ivot #oints o/2arth Switches%

    "heck that len!th o/ o#eratin! rod isadAusted as #er su##liers manual

      Be/ore comin! to o#eration whether theinsulators are cleaned by a##lyin!"arbon etra "hloride >lab made?chemical%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    25/81

    Page No.#3

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    3.11

    3.12

    3.13

    3.14

    3.15

    3.16

    3.1*

    Siganature with Date

    LAPPL(O&M

    check the bearin!s@Ce+acon bolts@s#rin!lock washers@Nut @Minc washers arelubricated with $ra#hite oil or !el%

    he necessary check is carried out toobserve the various switchin! maneuversvisually% "heck all the #arameters like

    remote

  • 8/20/2019 Sf6 -Bkr Check List

    26/81

    L!"L L&"

    Page No.#4

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    3.1'

    3.1

    3.2

    3.21

    3.22 "heck the o#eration o/ s#ace heater 3.23 "heck the door sealin! o/ the local #anel

    3.24

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#5

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    "heck the dimension o/ wi#in! maincontact

    "heck the dimension o/ over travelmechanism >llowable rann!e in mm 8F ?

    "heck the control cable ti!htness 5termination%

    "heck all the cable !lands in entry #oint5 i/ any !a# will /ound@ /ill the !a# by #utty%

    "heck #hase to #hasedistance>1istanceD9000 mm a##ro+%?

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    27/81

    2 x 300MW UNITS

    4-List o/ 6acory est 5 its Remarks

    Sl.No. 1escri#tion es No /ears

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.*

    4.'

    4.

    4.1

    LANCO AMARKANTAK POWER PVT. LTD.PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    .-List o/ Site est 5 its Remarks

    Sl.No. 1escri#tion es No /ears

    5.1

    5.2

    5.3

    5.4

    5.5

    Siganature with Date

    "heck the ,R value between incomin! 5out!oin! terminals% >,R .00*I by.'( me!!er?

    "heck the ,R value between lowerterminal /lan!e 5 !round% >,R .00*I by .'( me!!er?

    "heck the tanK value o/ each #orcelaininsulator 

    "heck the *ain 5 2arth switch motors,R valve and resistance values by .00(

    me!!er 

    "heck the ca#acitance 5 tanK o/ each!radin!ca#acitor>ca#acitanceD000#/F4H each@tanKD0%009?

  • 8/20/2019 Sf6 -Bkr Check List

    28/81

    LAPPL(O&M

    L!"L L&"

    Page No.#*

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.6

    5.*

    5.'

    5.

    5.1

    Siganature with DateLAPPL(O&M

    L!"L L&"

    Page No.#'

    8-List o/ de/ects and omissions

    Sl.No. 1escri#tion es No /ears

    6.1

    6.2

    6.3

    LAPPL($%M

    "heck the uto recluse lock N at air

    Pr%4%4F0% k!/ 

    "heck #ower o#eration o/ the ,solator 52arth switch at no load

    "heck the contact resistance o/ the,solator contacts%

    "heck the Local@ Remote and utoreclose o#eration%

    "heck the o#eration interlock as #erscheme%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    29/81

    6.4

    6.5

    6.6

    6.*

    6.'

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    30/81

  • 8/20/2019 Sf6 -Bkr Check List

    31/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Che! L"#$ %&' C4''e*$ T'+*#%&'5e' 

    Serial Number:-

    y#e

    R-Phase

    Y-Phase

    B-Phase

    Location: 400kv Switch Yard Bay Name:-

    !ency: LSL Packa!e&400'( Switch Yard

    Teh*"+ #-e"%"+$"&* &% $he C4''e*$ T'+*#%&'5e' 

    Rated Primary "urrent: )000 ,%L% :

     No% / "ores: ( :

    Ratio: ('>(? *in%:

    "lass: ,e+c% >ma+%? at ('ma?

    ,S6 /)" Ohs

    INDE

    Sl.No Description

    1 List o/ 1rawin! and documents2 List o/ testin! 23ui#ments and 5P re3uired

    3 Physical checks and $eneral ,ns#ections

    4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    Signature with Date

    LAPPL($%M LAPPL(O&M

    L!"L L&"

    Page No.#1

    LANCO AMARKANTAK POWER PVT. LTD.

    7ni3ue Re/erence:*ake-: "rom#ton $reves Ltd%

  • 8/20/2019 Sf6 -Bkr Check List

    32/81

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS1-List of Drawing and Documents

    Sl.No. 1escri#tion Drawing No1.1 'ey sin!le line dia!ram 1$31

    1.2400'( Switchyard earthin! system layout 14$5221

    1.3400'( Switchyard #rotection 5 meterin! SL1

    1$3112

    1.4 1$3151

    1.6 "ontrol cable Schedule-400'( Switchyard 656#$#S#S#)S#21.* 5* manual  A+aila,le

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments

  • 8/20/2019 Sf6 -Bkr Check List

    33/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears

    3.1

    3.2 "heck the /oundation bolt and ti!htness%

    3.3 "heck /or " Base 2arthin! is /irmly done3.4 "heck /or cleanliness o/ Porcain insulator3.5 he Bellow should be clearly (isible

    3.6

    3.*

    3.'

    3.

    3.1

    Signature with Date

    LAPPL($%M LAPPL(O&M

    L!"L L&"

    Page No.#3

    "heck that 2rection work is com#lete as #er relevant drawin!s and erectioncom#letion certi/icate is available

    O"O lead should be connected to 2arth

    inside terminal bo+

    "heck i!htness o/ " secondaryconnections

    Secondary ;indin! connections which isnot in use should be short ckted%

    he ( burden value o/ the connectedinstrumentation does not e+ceed the valuess#eci/ied on the s#eci/ication #late o/ the"

    Polarities o/ Primary and Secondaryconnections are as #er the schematics on

    Ratin! Plates

  • 8/20/2019 Sf6 -Bkr Check List

    34/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    3.11

    3.12

    3.13 Secondary bo+ is ti!htly closed

    Signature with Date

    LAPPL($%M LAPPL(O&M

    L!"L L&"

    Page No.#4

    1esired ratio is correctly selected as #er theschematics on the Ratin! #late

    Bellow Position o/ the " is at middle o/the *inimum and ma+imum #ositionsmarked on the Cood

  • 8/20/2019 Sf6 -Bkr Check List

    35/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Sl.No. 1escri#tion es No /ears

    3.1'

    3.1

    3.2

    3.21

    3.22

    3.23

    3.24

    3.25

    3.26

    3.2*

    3.2'"heck the o#eration o/ s#ace heater 3.2 "heck the door sealin! o/ the local #anel

    3.3

    Signature with Date

    LAPPL($%M LAPPL(O&M

    L!"L L&"

    Page No.#5

    "heck ratin! o/ /uses as #er scheme 5healthiness%

    "heck availability o/ "llowable rann!e in mm 8

    "heck the control cable ti!htness 5termination%

    "heck all the cable !lands in entry #oint 5i/ any !a# will /ound@ /ill the !a# by #utty%

    "heck #hase to #hasedistance>1istanceD9000 mm a##ro+%?

  • 8/20/2019 Sf6 -Bkr Check List

    36/81

     

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    !-List of "acory Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    4.1

    4.2

    4.3

    4.4

    C&5-"$e E''&'(6) TEST

    4.5

    4.6 /esistane @ *5 eg.)(ohs

    4.* =oltage Alie(+olts# 62 =olts

    $>itation )urrent(A

    4.5 )oosite $rror(

    4.6 KNEE POINT VOLTAGE TEST(V)

    4.*

    4.'

    4. itation )urrent(A

    INSTRUMENT SECURIT7 ACTOR

    =oltage De+eloe at 5 A

    TESTS CONIRMING TO IEC 00118(899)

    =eri7iation o7 terinal aring anPolarit test

    O+er =oltage !nterturn test 7or OneMinute

    P&:e' 'e;4e*/ H"

  • 8/20/2019 Sf6 -Bkr Check List

    37/81

    !S8

    SPECIAL TESTING

    A--"e= V&$+UENC7 HIGHVOLTAGE WITHSTAND TEST ORONE MINUTE

    Priar "o Seonar8rae "o $arth=oltage Alie(

  • 8/20/2019 Sf6 -Bkr Check List

    38/81

    LAPPL($%M LAPPL(O&M

    L!"L L&"

    Page No.#6

  • 8/20/2019 Sf6 -Bkr Check List

    39/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    '-List of defects and omissions

    Sl.No. 1escri#tion es No /ears5.315.325.335.345.355.365.3*5.3'

    Page No.#

  • 8/20/2019 Sf6 -Bkr Check List

    40/81

  • 8/20/2019 Sf6 -Bkr Check List

    41/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    CHECK LIST OR CAPACITOR VOLTAGE TRANSORMER

    Serial Number:-

    R-Phase

    Y-Phase

    B-Phase

    Location: 400kv Switch Yard Bay Name:-

    !ency: Siemens Ltd% Packa!e&400'( Switch Yard

    Teh*"+ #-e"%"+$"&* &% $he I#&+$&' 

    Rated < Ci!hest System (olta!e : ( burden :

     No% o/ "ores : ccuracy "lass :

    rans/ormation Ratio :

    23uivalent "a#acitance "ou#lin! :

    INDE

    Sl.No Description

    1 List o/ 1rawin! and documents

    2 List o/ testin! 23ui#ments and 5P re3uired

    3 Physical checks and $eneral ,ns#ections

    4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS1-List of Drawing and Documents

    7ni3ue Re/erence:*ake-: 2LPR ,nternational Ltd%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    42/81

    Sl.No. 1escri#tion Drawing No1.1 'ey sin!le line dia!ram 1$31

    1.2400'( Switchyard earthin! system layout 14$5221

    1.3400'( Switchyard #rotection 5 meterin! SL1

    1$3112

    1.4 1$3151

    1.6 "ontrol cable Schedule-400'( Switchyard 656#$#S#S#)S#21.* 5* manual  A+aila,le

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments4. ( 1immerstat? 12.3 .'( me!!er >*otorised? 12.4 *illiohm meter  12.5 1ischar!e Rod 1

    2.6 S#anner Set 12.* Screw driver set 1

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page.No#2

    Block Lo!ic 1ia% 6or interlockin! 6 ) ?

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    43/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears

    3.1

    3.2 "heck the /oundation bolt and ti!htness%

    3.3 "heck /or #ro#er ali!nment o/ structures%

    3.4

    3.5 "heck /or corrctness o/ ratio as name #late

    3.6

    3.* "heck /or /irmness o/ all connections%

    3.'

    3.

    3.1 "heck /or oil leaka!es i/ any%

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#3

    "heck that 2rection work is com#lete as #errelevant drawin!s and erection com#letioncerti/icate is available

    "heck /or #ro#er 2arthin! o/ 2*7 ank% NC6and N

    Strictly check that secondary ckt% ,s not shorted%

    $o /or visual checkin! o/ (aristor /or bul!in!or burnin!%

    "heck that 2*7 is com#letely /illed with oiland check colour o/ oil%

    LAPPL(

    $%M

  • 8/20/2019 Sf6 -Bkr Check List

    44/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    3.11

    3.12

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#4

    "heck /or cleanlyness and door !asket sealin!so/ terminal bo+%

    "heck /or dust accumulation on Porcelain,nsulators%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    45/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Sl.No. 1escri#tion es No /ears3.1' "heck all metal #arts /or corrosion%3.1 "heck /or tank tem#erature%3.2 "heck /or "a#acitor healthyness%

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#5

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    46/81

     

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    !-List of "acory Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.*4.'

    4.

    4.1

    $-List of %ite Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    5.1

    5.2 Primary o 2arth5.3 Primary o Secondary>,ndividual "ore?

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#6

    # )*L+,% . $ /) (0T0#%,D(,,# *% "0LL0%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    47/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.3

    5.45.15.115.125.135.145.155.16

    Siganature with DateLAPPL(O&M

    L!"L L&"

    Page No.#*

    "heck the ca#acitance 5 tanK o/ each !radin!ca#acitor>ca#acitanceD000#/F4H each@tanKD0%009?

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    48/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.1*

    5.1'5.15.25.21

    5.22

    5.23

    5.24

    5.25

    5.26

    5.2*

    5.2'

    5.25.3

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#'

    "heck the uto recluse lock N at airPr%4%4F0% k!/ 

    "heck #ower o#eration o/ the ,solator 5 2arthswitch at no load

    "heck the contact resistance o/ the ,solatorcontacts%

    "heck the closin! time o/ the breaker>Less than.0ms?

    "heck the o#enin! time o/ the breaker>Lessthan )0ms?

    "heck the #ole discre#ancy within the #ole>)%.ms?%

    "heck the #ole discre#ancy between the #oles>%ms?%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    49/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.315.32 "heck the manual tri##in!

  • 8/20/2019 Sf6 -Bkr Check List

    50/81

  • 8/20/2019 Sf6 -Bkr Check List

    51/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Che! L"#$ %&' PANTOGRAPH ISOLATOR ? EARTH SWITCH

    Serial Number:-

    R-Phase

    Y-Phase

    B-Phase

    Location: 400kv Switch Yard Bay Name:-

    !ency: Siemens Ltd% Packa!e&400'( Switch Yard

    Teh*"+ #-e"%"+$"&* &% $he I#&+$&' 

    Rated (olta!e: 4)0'( Normal rated current :)000 m#s

    *a+% Breakin! "a#acity: 40k rms

    Rated ,nsulatin! Level: 4). '(

    Peak withstand current:00' Rated Short time current ratin!: 40k /or sec

    INDE

    Sl.No Description

    1 List o/ 1rawin! and documents

    2 List o/ testin! 23ui#ments and 5P re3uired

    3Physical checks and $eneral ,ns#ections4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS1-List of Drawing and Documents

    7ni3ue Re/erence:*ake-: 2LPR ,nternational Ltd%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    52/81

    Sl.No. 1escri#tion Drawing No1.1 'ey sin!le line dia!ram 1$31

    1.2400'( Switchyard earthin! system layout 14$5221

    1.3400'( Switchyard #rotection 5 meterin! SL1

    1$3112

    1.4 1$3151

    1.5 S'433

    1.6 "ontrol cable Schedule-400'( Switchyard 656#$#S#S#)S#21.* 5* manual  A+aila,le

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments

  • 8/20/2019 Sf6 -Bkr Check List

    53/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears

    3.1

    3.2 "heck the /oundation bolt and ti!htness%

    3.3

    3.4

    3.5

    3.6

    3.*

    3.'

    3.

    3.1

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#3

    "heck that 2rection work is com#lete as #errelevant drawin!s and erection com#letioncerti/icate is available

    "heck /or #ro#er ali!nment o/ structures@su##ort insulators@earth switch etc%

    2nsure /or #ro#er movement o/ 2arth Bladeinto the contact carrier 

    "heck that #ro#er !askets are !iven /or bo+eso/ mechanism and centrali=in! cubicle

    "heck that isolator base and earth switch is #laced on structure as #er the drawin!

    "heck /or makin! on su##ort insulators@o#eratin! rods @ earth switch and match withmakin! on base /rame%

    check /or lubrication o/ all #ivot #oints o/ 2arthSwitches%

    "heck that len!th o/ o#eratin! rod is adAustedas #er su##liers manual

    "heck /or earth switches@ all contact #oints arelubricated with #etrolium Aelly

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    54/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    3.11

    3.12

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#4

    "heck the earthin! o/ su##ort structure@ breaker/rame and ** bo+es is done #ro#erly%

    "heck the cable have been terminated in ** bo+es o/ breakers as #er the cable schedule ande3ui#ment wirin! dia!ram% "heck #ro#er!landin! o/ cable and ensure #lu!!in! o/ unused cable entries o/ ** bo+es@sealin! andlockin! o/ ** bo+es a!ainst water

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    55/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Sl.No. 1escri#tion es No /ears

    3.1'

    3.1

    3.2

    3.21

    3.22

    3.23"heck the dimension o/ wi#in! main contact

    3.24

    3.25

    3.26

    3.2*

    3.2'"heck the o#eration o/ s#ace heater 3.2 "heck the door sealin! o/ the local #anel

    3.3

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#5

    "heck ratin! o/ /uses as #er scheme 5healthiness%

    "heck availability o/ "1istanceD9000mm a##ro+%?

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    56/81

     

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    !-List of "acory Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.*4.'

    4.

    4.1

    $-List of %ite Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    5.1

    5.2

    5.3

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#6

    "heck the ,R value between incomin! 5out!oin! terminals% >,R .00*I by .'(me!!er?

    "heck the ,R value between lower terminal

    /lan!e 5 !round% >,R .00*I by .'(me!!er?

    "heck the tanK value o/ each #orcelain insulator 

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    57/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.3

    5.45.5 heck the air pressure switch as per scheme

    5.15.115.125.135.145.15

    5.16 Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#*

    "heck the ca#acitance 5 tanK o/ each !radin!ca#acitor>ca#acitanceD000#/F4H each@tanKD0%009?

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    58/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.1*

    5.1'5.15.25.21

    5.22

    5.23

    5.24

    5.25

    5.26

    5.2*

    5.2'

    5.25.3

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#'

    "heck the uto recluse lock N at airPr%4%4F0% k!/ 

    "heck #ower o#eration o/ the ,solator 5 2arthswitch at no load

    "heck the contact resistance o/ the ,solatorcontacts%

    "heck the closin! time o/ the breaker>Less than.0ms?

    "heck the o#enin! time o/ the breaker>Lessthan )0ms?

    "heck the #ole discre#ancy within the #ole>)%.ms?%

    "heck the #ole discre#ancy between the #oles>%ms?%

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    59/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    5.315.32 "heck the manual tri##in!

  • 8/20/2019 Sf6 -Bkr Check List

    60/81

  • 8/20/2019 Sf6 -Bkr Check List

    61/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    CHECK LIST OR LT SWITCH GEARSSerial Number:-

    Teh*"+ #-e"%"+$"&* &% L$ S:"$h Ge+'#

    INDE

    Sl.No Description

    1 List o/ 1rawin! and documents

    2 List o/ testin! 23ui#ments and 5P re3uired

    3 Physical checks and $eneral ,ns#ections

    4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS1-List of Drawing and Documents

    Sl.No. 1escri#tion Drawing No1.1 'ey sin!le line dia!ram

    1.25* manual

     A+aila,le

    1.3

    1.4

    1.5

    1.6

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    62/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments1immer? 1

    2.5 "urrent ,nAection 'it 1

    2.6 1ischar!e Rod 1

    2.* S#anner Set 1

    2.' Screw driver set 12. Plier  1

    2.1 orch 1

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page.No#2

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    63/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears

    3.1

    3.2 "heck the /oundation bolt and ti!htness%

    3.3

    3.4

    3.5

    "heck the ratin!s o/ all 6uses

    3.6

    3.*

    3.'

    3. visible ins#ection o/ all

  • 8/20/2019 Sf6 -Bkr Check List

    64/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#4

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears

    Siganature with DateLAPPL(O&M

    L!"L L&"

     

    LAPPL($%M

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    65/81

    Page No.#5

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    !-List of "acory Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.*

    4.'

    4.

    4.1

    Sl.No. 1escri#tion es No /ears

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#6

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    66/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    $ List 0f %ite Tests & it4s #emarks

    Sl.No. 1escri#tion es /ears

    5.1

    5.2 ,R (alue / "ontrol "kt%5.3 ,R (alue / S#ace Ceaters5.4 2arthin! "kt% "ontinuety "heck 5.5 T T,%T55.6 Polarity est5.* Ratio est5.' ;indin! Resistance est5. )T T,%T5

    5.1 Ratio est5.11 "ontrol rans/ormer estin!5.12 "ontact Resistance est 6or Bus-Bars

    5.13 IR V+4e O% D"#$'"4$"&* T'+*#%&'5e' 5.14 Priar5.15

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#*

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    Sl.No. 1escri#tion es No /ears5.1*5.1'5.15.25.215.225.235.245.255.265.2*

    5.2'5.25.3

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#'

    IR V+4e &% B4#B+'# :"$h B@C Ce=/ # $arth G # $arth G: # $arth G

    LAPPL($%M

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    67/81

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITSSl.No. 1escri#tion es No /ears5.315.32

    5.335.345.355.365.3*5.3'

    '-List of defects and omissions

    Sl.No. 1escri#tion es No /ears

    6.1

    6.2

    6.3

    6.4

    6.5

    6.6

    6.*

    6.'

    Siganature with Date

    LAPPL(O&M

    L!"L L&"

    Page No.#

    LAPPL($%M

  • 8/20/2019 Sf6 -Bkr Check List

    68/81

    Page 6' o7 '1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    CHECK LIST OR DCDB220V

    (ake 6 ontrol & %witchgear

    Teh*"+ #-e"%"+$"&* &% L$ S:"$h Ge+'#

    6ault Level : . ' 6or Sec%

    (olta!e : ))0 ( 1"

    us-Bar "urrent Ratin! : 00

    us-Bar Si=e : >.0)? < >G(e and -(e?

    INDE

    Sl.No Description

    1 List o/ 1rawin! and documents

    2 List o/ testin! 23ui#ments and 5P re3uired

    3 Physical checks and $eneral ,ns#ections

    4 List o/ 6acory est 5 its Remarks

    5 List o/ Site est 5 its Remarks

    6 List o/ de/ects and omissions

    S"

  • 8/20/2019 Sf6 -Bkr Check List

    69/81

    Page 6 o7 '1

    Page No.#1

  • 8/20/2019 Sf6 -Bkr Check List

    70/81

    Page * o7 '1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    1-List of Drawing and Documents

    Sl.No. 1escri#tion Drawing No1.1 'ey sin!le line dia!ram LAN)O%I225%16

    1.2$eneral rran!ement 1rawin!s LAN)O%I225%26

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)2 x 300MW UNITS

    2-List of testing equipment and T&P

    Sl.No. estin! e3ui#ments1"? 12.6 "urrent ,nAection 'it 12.* 1ischar!e Rod 12.' S#anner Set 12. Screw driver set 1

    2.1 Plier  1

    S"

  • 8/20/2019 Sf6 -Bkr Check List

    71/81

    Page *1 o7 '1

    Page No.#2

  • 8/20/2019 Sf6 -Bkr Check List

    72/81

    Page *2 o7 '1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    3-Physical checks and general nspections

    Sl.No. 1escri#tion es No /ears

    3.1

    3.2 "heck the /oundation bolt and ti!htness%

    3.3

    3.4

    3.5

    3.6

    3.*

    3.'

    es

    "heck that 2rection work is com#letedas #er relevant drawin!s and erectioncom#letion certi/icate is available

    "heck that all the doors lockin!mechanisms and alli!nments are #ro#er 

    "heck /or #ro#er ali!nment o/ structures@

    su##ort insulators@earth switch etc%

    "heck the #ro#er ti!htness o/ 6ish Plates between the B7S sections%

    "heck the colour codin! Positive and Ne!etive Bus-Bars%

    "heck that #ro#er !askets are !iven /ordoor /or sealin!

    "heck /or the ti!htness o/ all Bus-Barsconnections@su##ort insulators@6eederrollies su##ort @6use Colders 5

     bases@ll Power "onnections%

  • 8/20/2019 Sf6 -Bkr Check List

    73/81

    Page *3 o7 '1

    3.

    4.

    4.1

    4.2

    4.3

    4.4

    4.5

    4.6

    4.*

    4.'

    4.

    Page No. #3

    "heck the Lockin! System o/ *""Bs/or ,solation Pur#ose%

    "heck that backelite sheets insulation areto be #rovided at incomin! 5 out!oin!/eeders%

    "heck the ratin!s and S#eci/ications o/all *""BQs@,solators and Switches arecorrect and matchin! with the 1rawin!s%

    "heck the ratin!s 5 healthiness o/ all

    6uses as #er 1rawin!s

    "heck /or N

  • 8/20/2019 Sf6 -Bkr Check List

    74/81

    Page *4 o7 '1

    5. ,ns#ections o/ "ables $lands

    5.1

    5.2

    5.3

    5.4

    5.5 "heck /or both ends earthin!s o/ #anel%

    S"

  • 8/20/2019 Sf6 -Bkr Check List

    75/81

    Page *5 o7 '1

    Page No.#4

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)2 x 300MW UNITS

    !-List of "acory Test & its #emarks

    Sl.No. 1escri#tion es No /ears

    4.1 IR VALUES O DC POWER CIRCUIT WITH 00 V MEGGER

    4.2 P#N J K2 M.Ohs

    4.3 P#$ J K2 M.Ohs

    4.4 N#$ J K2 M.Ohs

    4.5

    4.6 P; # N J K2 M.Ohs

    4.* P; # $ J K2 M.Ohs

    4.' N # $ J K2 M.Ohs

    4.

    4.1 P#N J ithstoo4.11 P#$ J ithstoo4.12 N#$ J ithstoo

    4.13

    4.14 P; # $ J ithstoo4.15 P; # N J ithstoo4.16 N # $ J ithstoo

    Siganature with Date

    J

    J

    J

    IR VALUES O AC SPACE HEATERCIRCUIT WITH 00 V MEGGER

    J

    J

    J

    HIGH VOLTAGE TEST D.C. POWERCIRCUIT AT 2.KV OR 8 M"*4$e

    J

    A.C. S-+e He+$e' C!$ +$ 8. KV %&' 85"*4$e

    APPL($%M

    LAPPL(O&M

  • 8/20/2019 Sf6 -Bkr Check List

    76/81

    Page *6 o7 '1

    L!"L L&"

    Page No.#5

  • 8/20/2019 Sf6 -Bkr Check List

    77/81

    Page ** o7 '1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    $ List 0f %ite Tests & it4s #emarks

    Sl.No. 1escri#tion /ears

    5.1

    Positi+e # Negeti+ePositi+e # $arth

    Negeti+e # $arth5.2 # )alue 0f %pace 7eaters5.3 Ph # N G5.4 Ph # $ G5.5  N - 2 D5.6 2arthin! "kt% "ontinuety "heck 

    5.*"ontact Resistance est 6or Bus-Bars

    Positive Bus-bar  Ne!etive Bus-Bar 

    5.' Re+/ Te#$"*< (DCI 2@9)

    5.

    5.12

    5.13

    Siganature with Date

    L!"L L&"

    es

    Ce=

    )heing o7 $ % 8 $leent Pi u &Dro o77

    )heing o7 F % = /ela ($leentPi F & Dro o77

    )heing o7 O % = /ela ($leentPi F & Dro o77

    APPL($%M

    LAPPL(O&M

  • 8/20/2019 Sf6 -Bkr Check List

    78/81

    Page *' o7 '1

    Page N.#6

  • 8/20/2019 Sf6 -Bkr Check List

    79/81

    Page * o7 '1

    LANCO AMARKANTAK POWER PVT. LTD.

    PATHADI,KORBA,(CG)

    2 x 300MW UNITS

    '-List of defects and omissions

    Sl.No. 1escri#tion No /ears

    6.1

    6.2

    6.3

    6.4

    6.5

    6.6

    6.*

    6.'

    Siganature with Date

    L!"L L&"

    Page No.#*

    es

    APPL($%M

    LAPPL(O&M

  • 8/20/2019 Sf6 -Bkr Check List

    80/81

    Page ' o7 '1

  • 8/20/2019 Sf6 -Bkr Check List

    81/81