Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the...

355
This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or confidential. If you have received this in error, please notify us immediately. ® RWDI name and logo are registered trademarks in Canada and the United States of America Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com Tel: 519.823.1311 Fax: 519.823.1316 RWDI AIR Inc. 650 Woodlawn Road West Guelph, Ontario, Canada N1K 1B8 Conestogo Wind Farm Report Acoustic Audit Report Emission Audit Report RWDI #1301142 January 7, 2015 SUBMITTED TO: Jason Seelmann [email protected] NextEra Energy Canada, LP Conestogo Wind, LP 390 Bay Street Suite 1720 Toronto, ON M5H 2Y2 SUBMITTED BY: Greg Conley, M.Eng., P.Eng. Senior Project Manager / Principal [email protected] Aaron Haniff, B.A.Sc., P.Eng. Senior Engineer [email protected]

Transcript of Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the...

Page 1: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or confidential. If you have received this in error, please notify us immediately.

® RWDI name and logo are registered trademarks in Canada and the United States of America

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Tel: 519.823.1311 Fax: 519.823.1316 RWDI AIR Inc. 650 Woodlawn Road West Guelph, Ontario, Canada N1K 1B8

Conestogo Wind Farm

Report

Acoustic Audit Report – Emission Audit Report RWDI #1301142 January 7, 2015

SUBMITTED TO:

Jason Seelmann [email protected]

NextEra Energy Canada, LP

Conestogo Wind, LP 390 Bay Street

Suite 1720 Toronto, ON M5H 2Y2

SUBMITTED BY:

Greg Conley, M.Eng., P.Eng. Senior Project Manager / Principal

[email protected]

Aaron Haniff, B.A.Sc., P.Eng. Senior Engineer

[email protected]

Page 2: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015

EXECUTIVE SUMMARY

RWDI AIR Inc. was retained to conduct an emission acoustic audit of the Conestogo Wind Energy Centre

located in Mapleton Township, Ontario. The purpose of this audit is to capture long-term acoustic

measurements of the sound level produced by the operation of the wind turbines for comparison with the

applicable Ministry of the Environment and Climate Change (MOECC) sound level limits. Two audit

reports (i.e., spring and fall audit programs) have previously been submitted to meet the reporting

requirements for the Renewable Energy Approval (REA) for the facility. The required minimum number of

filtered data points was not achieved during the previous two programs; the program was therefore

extended.

The project was developed by NextEra Energy Canada, LP. The facility is owned by Conestogo Wind,

LP, a wholly owned subsidiary of NextEra Energy Canada, LP. The wind farm consists of nine (9)

Siemens AG 2.3 MW wind turbines, one (1) Siemens AG 2.22 MW wind turbine, and one (1) transformer

substation. The total nameplate capacity of the wind farm is 22.92 MW.

Unattended measurements were conducted at three representative points of reception to assess sound

immissions from the wind turbine site. The continuation of the sampling program beyond the end of the

two required audit periods was requested by the MOECC due to the lack of filtered data points in each

integer wind speed bin for both the turbine operational and parked scenarios. The MOECC requested the

monitoring be extended until the requisite number of data points were achieved over all field programs

combined, or the end of October 2014, whichever occurred first. The extended monitoring program

began in the spring of 2014. It was not required at Receptor B, as the number of filtered points for each

wind speed “bin” was met after combining the previous two audits in 2013.

This report summarizes the data collected over all three monitoring programs (i.e., spring 2013, fall 2013,

spring through fall 2014). A summary of the monitoring periods is provided in section 5.2 of this report.

The facility is required to meet the sound level limits identified in the REA. The minimum number of

filtered measurement intervals for each “bin” was obtained at all locations for both the turbine operational

and parked conditions, with the exception of Receptor A (7m/s only). Based on the available data, the

results indicate the facility is in compliance with the sound level limits identified in the REA.

Page 3: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................................................... 1

2. FACILITY DESCRIPTION .................................................................................................................... 1

3. INSTRUMENTATION ........................................................................................................................... 2

3.1 Acoustic Instrumentation ............................................................................................................... 2

3.2 Non-Acoustic Instrumentation ....................................................................................................... 2

3.3 Calibration ..................................................................................................................................... 2

4. MEASUREMENT PROCEDURE .......................................................................................................... 3

4.1 Noise Measurement Location ....................................................................................................... 3

4.2 Wind Measurement Location ........................................................................................................ 3

4.3 Acoustic Measurements ................................................................................................................ 3

4.3.1 Turbines Operational ......................................................................................................... 3

4.3.2 Turbines Parked ................................................................................................................ 4

4.4 Non-Acoustic Measurements ........................................................................................................ 4

4.5 Number of Measurement Intervals ................................................................................................ 4

4.5.1 Turbines Operational ......................................................................................................... 4

4.5.2 Turbines Parked ................................................................................................................ 4

5. ACOUSTIC AUDIT PROCEDURE ....................................................................................................... 5

5.1 Points of Reception ....................................................................................................................... 5

5.2 Time of Measurements ................................................................................................................. 5

6. DATA PROCESSING ........................................................................................................................... 6

6.1 Data Reduction and Filtering ......................................................................................................... 6

6.2 Effects of Insects and Fauna ......................................................................................................... 6

6.3 Data Analysis ................................................................................................................................ 6

6.4 Determination of Turbine Sound Level ......................................................................................... 6

6.5 Tonal Assessment ......................................................................................................................... 7

7. ASSESSMENT OF COMPLIANCE ...................................................................................................... 7

Tables

Table 1: Valid Total Sound Data for Point of Reception A

Table 2: Valid Total Sound Data for Point of Reception C

Table 3: Valid Ambient Sound Data for Point of Reception A

Table 4: Valid Ambient Sound Data for Point of Reception C

Table 5: Summary of Sound Levels for Point of Reception A

Table 6: Summary of Sound Levels for Point of Reception C

Table 7: Summary of Sound Levels for All Monitoring Locations

Page 4: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015

Figures

Figure 1: Conestogo Wind Farm - Noise Monitor Locations

Figure 2: Valid LEQ Data (2014 Audit) for Point of Reception A

Figure 3: Valid LEQ Data (2014 Audit) for Point of Reception C

Figure 4: Wind Rose Plot for Point of Reception A

Figure 5: Wind Rose Plot for Point of Reception C

Appendices

Appendix A: Zoning Information

Appendix B: Renewable Energy Approval

Appendix C: Equipment List

Appendix D: Signed Statement

Appendix E: Conditions during the Measurements

Appendix F: Spring 2013 Audit Report

Appendix G: Fall 2013 Audit Report

Page 5: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015 Page 1

1. INTRODUCTION

Conestogo Wind, LP retained RWDI AIR Inc. (RWDI) to conduct an emission acoustic audit of the

Conestogo Wind Energy Centre (Conestogo) located in Mapleton Township, Ontario. The purpose of the

audit is to capture long-term acoustic measurements of the sound level produced by the operation of the

wind turbines for comparison with the applicable Ministry of the Environment and Climate Change

(MOECC) sound level limits. This immission audit is intended to meet the requirements of Part D of the

MOE publication “Compliance Protocol for Wind Turbine Noise” (Protocol).

The wind turbines and ancillary equipment are located on privately owned farmland through a legal

agreement between the landowner and Conestogo. The zoning within the project area and surrounding

areas is agricultural. The acoustic environment surrounding the project area is rural and is influenced

primarily by road traffic, farming activities and sounds of nature. Zoning information is included in

Appendix A.

The facility’s Renewable Energy Approval (REA) number 3558-8KTHJP dated December 8, 2011 and an

amendment dated July 15, 2013 are provided in Appendix B. Condition 14 of the REA requires

Conestogo to complete a spring and a fall emission acoustic audit test. Unattended measurements were

conducted at three (3) representative points of reception to assess sound immissions from the wind

turbine site. The points of reception were selected based historical weather data for the area and the

modelling results provided in the “Conestogo Wind Farm Noise Assessment" (Noise Report), dated

December 2010 and prepared by GENIVAR Consultants LP.

Monitoring was completed in the spring and the fall of 2013. The results of these two audits were

previously submitted to the MOECC as part of the requirements of the REA. The continuation of the

sampling program beyond the end of the two required audit periods was requested by the MOECC due to

the lack of filtered data points in each integer wind speed bin for both the turbine operational and parked

scenarios. The MOECC requested the monitoring be extended until the requisite number of data points

were achieved over all field programs combined, or the end of October 2014, whichever occurred first.

The extended monitoring program began in the spring of 2014. It was not required at Receptor B, as the

number of filtered points for each wind speed “bin” was met after combining the previous two audits in

2013.

This report summarizes the combined data collected during all three monitoring programs (spring 2013,

fall 2013, and spring through fall of 2014).

A detailed discussion of the audit procedures and data analysis is provided in the subsequent sections.

2. FACILITY DESCRIPTION

The project was developed by NextEra Energy Canada, LP. The facility is owned by Conestogo Wind,

LP, a wholly owned subsidiary of NextEra Energy Canada, LP. For the purposes of the audit, the project

site is generally bounded by Side Road 16 to the west, Wellington Road 12 to the east, 14th Line to the

south, and 16th Line to the north, in Mapleton Township, County of Wellington.

Page 6: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015 Page 2

The Conestogo wind farm consists of nine (9) Siemens AG 2.3 MW wind turbines, one (1) Siemens AG

2.22 MW wind turbine, and one (1) transformer substation. The total nameplate capacity of the wind farm

is 22.92 MW. All turbines have a hub height of 80 m above local grade.

3. INSTRUMENTATION

Details on the instrumentation used during the year 2014 (current) monitoring program are summarized in

the sections below. For information regarding the instrumentation used in previous monitoring programs

please refer to Appendices F and G. There were minor differences in instrumentation during the various

field programs, but all equipment met or exceeded MOECC requirements.

3.1 Acoustic Instrumentation

The measurements were conducted using Brüel & Kjær 2250 and 2270 Type 1 precision integrating

sound level meters. A list of the acoustic equipment including serial numbers is provided in Appendix C.

The 2250 and 2270 sound level meters are capable of recording both sound level and audio

simultaneously.

All sound monitoring locations were calibrated both before and after each measurement campaign using

either a Larson-Davis CAL200 or CAL250 precision acoustic calibrator. The calibrator's accuracy is equal

to or better than +/- 0.3 dB and is Class 1 according to IEC 60942 within the temperature range of this

measurement program.

In addition to the 90mm diameter primary wind screen that is commonly used for long term monitoring

campaigns, a secondary 500mm diameter wind screen was deployed at each location that meets the

specification as indicated in IEC 61400-11. Each sound monitoring site met the requirements set out in

the Protocol.

3.2 Non-Acoustic Instrumentation

The weather station consisted of a Campbell Scientific weather console using a CR200 data logging

system, a R.M. Young 05103-10 wind anemometer, along with instrumentation for temperature and

relative humidity measurements. The meteorological station met the system requirements as required in

the Protocol.

3.3 Calibration

All acoustic equipment has calibration records that are traceable to an accredited acoustic laboratory and

are within the valid calibration recertification time. All other equipment is within calibration range and

recertification time.

Page 7: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015 Page 3

4. MEASUREMENT PROCEDURE

4.1 Noise Measurement Location

The microphones were located at a height of approximately 4.5 metres above ground representing a

second storey point of reception at a residence. This is consistent with dwellings located at the points of

reception in this study and the modelled receptor heights identified in the Noise Report.

The microphones were located as close to the dwelling as practically possible or in an acoustically-

equivalent location in accordance with the Protocol as appropriate. More specifically, the microphones

were located more than 5 m away from any large reflecting surface and away from trees or foliage that

could affect the measurements. The monitoring positions were also positioned such that any intervening

obstacles or terrain did not shield them from line of sight to the wind turbines.

4.2 Wind Measurement Location

The Protocol requires the wind measurement location be in close proximity to the sound measurement

location. An anemometer was mounted to the same tower as the microphone at each of the sound

measurement locations. A sensor for measuring temperature, relative humidity and precipitation was

located at only one of the monitoring locations. The weather measurement location was not shielded by

nearby buildings or obstructions. Wind speed and direction measurements were obtained at a height of

approximately 10 m above local grade. All monitoring locations were configured to record data in

one-minute intervals.

4.3 Acoustic Measurements

4.3.1 Turbines Operational

All monitoring locations logged one-minute statistical sound level data. The key statistical data used in

the analysis is the A-weighted one-minute energy equivalent sound level (LEQ,1min in dBA). Audio

recordings were also logged for both sound identification and tonality assessment purposes. Small

interruptions in the data set occurred during daytime hours while checks and maintenance was conducted

by RWDI personnel. All monitoring stations were time synchronized with each other and their

meteorological station.

Appendix D includes a statement signed by an authorized representative of the Conestogo wind farm

confirming that all wind turbines were operating as normal for the duration of time periods for the valid

measured data. Acoustic measurements completed during the current monitoring program for turbine

operational conditions are summarized in the Table sections. For additional information on acoustic

measurements conducted during previous programs please refer to Appendices F and G.

Page 8: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015 Page 4

4.3.2 Turbines Parked

Meter configurations were not changed between the turbine operational and turbine parked conditions.

Turbines were parked on several different occasions during all monitoring programs to establish ambient

sound levels. During the parked conditions all turbines were stopped so the measured sound levels at

the point of reception and monitoring locations were representative of ambient background levels. The

shutdown conditions occurred during the normal audit period between the hours of 22:00 and 05:00 the

next day. Ambient measurements were completed during the same audit period between the hours of

22:00 and 05:00 the next day. Acoustic measurements conducted during the current monitoring program

for parked conditions are summarized in the Table Section. For details on acoustic measurements

completed during the previous programs please refer Appendices F and G.

4.4 Non-Acoustic Measurements

The meteorological station was configured to continuously log the appropriate statistical parameters and

outputted one-minute averaged data or instantaneous data where applicable. The station was configured

to log the following data on one-minute intervals:

average wind speed (m/s);

maximum wind speed (m/s);

minimum wind speed (m/s); and

average wind direction (azimuth degrees).

Average temperature (degrees Celsius), average relative humidity (percentage) and precipitation data

was collected at one monitoring location and is considered representative of the area conditions.

4.5 Number of Measurement Intervals

4.5.1 Turbines Operational

The Protocol requires that no less than 120 one-minute intervals are required to be measured for each

integer wind speed for the data set to be considered large enough to conduct the analysis and to be able

to assess compliance. Wind speed measurements are rounded to the nearest integer prior to “binning”.

4.5.2 Turbines Parked

The Protocol states that no less than 60 one-minute intervals are required to be measured for each

integer wind speed for the data set to be considered large enough to determine the ambient sound level.

Wind speed measurements are rounded to the nearest integer prior to “binning”.

Page 9: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015 Page 5

5. ACOUSTIC AUDIT PROCEDURE

5.1 Points of Reception

As required under the REA, monitoring occurred at three different points of reception that represent the

location of the greatest predicted impact and that are located in the direction of the prevailing winds. The

selected points of receptions represented the worst-case non-participating receptors. When sound level

meters could not be located at the worst-case non-participating receptors (i.e., property owner refusal),

sound level meters were located in an acoustically-equivalent location.

Selected points of reception are discussed below, for further detail on the receptor location and selection

rational please refer to the reports found in Appendices F and G.

Point of Reception A was placed at participating receptor P6 (labeled as 6 in Figure 1 of the Noise

Report); this location is considered to be acoustically equivalent to non-participating receptor 65. Point of

Reception B was placed at participating receptor P1 (labeled 1 in Figure 1 of the Noise Report); this

location is considered acoustically equivalent to the vacant lot receptor 114 and non-participating

receptor 92. Point of Reception C was placed at participating P3 (labeled 3 in Figure 1 of the Noise

Report) and is considered acoustically equivalent to non-participating receptor 21.

5.2 Time of Measurements

The REA requires emission acoustic audit measurements be completed on two separate occasions within

a period of twelve months of the commencement of operation and during the lowest anticipated annual

ambient sound levels (i.e., spring and fall). On request of the MOECC, the monitoring programs were

extended beyond the REA requirements to gather additional data and attempt to fulfill the required

number of data points under the Protocol. The table below summarizes the monitoring program time

periods:

Receptor Location Monitoring Period

Receptor A

April 23, 2013 to August 2, 2013

September 1, 2013 to November 25, 2013

March 19, 2014 to October 31, 2014

Receptor B April 24, 2013 to August 2, 2013

September 1, 2013 to December 13, 2013

Receptor C

April 24, 2013 to August 2, 2013

September 1, 2013 to November 25, 2013

March 12, 2014 to June 18, 2014

Page 10: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015 Page 6

6. DATA PROCESSING

6.1 Data Reduction and Filtering

The measurement data was filtered in accordance with the requirements of the Protocol. Filters including

wind direction and individual events were applied to the measurement data as required by the REA and

suggested in the Protocol, respectively. The following filters were applied to the measured data and only

the data that satisfied all four conditions were used in the subsequent analysis:

1. Measurements between 22:00 and 05:00 the following day;

2. Rainfall did not occur within one hour of the measurement interval;

3. The maximum and minimum wind speed during the interval did not differ from the average by more

than 2 m/s; and

4. Removal of extraneous high level events (example: wind over microphone, traffic pass-bys, human

activities, etc.).

Conditions during the measurement period are presented in Appendix E.

6.2 Effects of Insects and Fauna

The audio recordings were reviewed for sounds from insects and fauna. Sounds of insects were audible

throughout the monitoring programs. Data containing sounds of insects were subsequently removed from

the study.

6.3 Data Analysis

Following the guidance of the Protocol, the “binning method” is used to analyse one-minute sound level

data. All sound level data that correlates to wind speeds between 4 to 7 m/s is grouped into integer wind

speed bins. Data within each bin is +/- 0.5 m/s of the specified integer wind speed. Data within these

bins are subsequently filtered and used for further analysis as detailed in Section 6.4.

6.4 Determination of Turbine Sound Level

As described in the Protocol, the measured data obtained for both the total sound (turbines operational)

and ambient sound (turbines parked) are first reduced and filtered as described in Section 6.1. The

binned data are then averaged. The resulting sound levels generated by the turbines only are the

logarithmic subtraction of the average measured total sound minus the average measured ambient sound

at each wind speed.

The resulting valid data for the current program (i.e., 2014) is plotted in Figures 2 and 3 for points of

reception A and C, respectively. Each graph is a plot of valid sound level data versus wind speed

measured at the respective weather station. Each plot shows the measured total sound, the measured

ambient sound, and the resulting average turbine-only sound levels. Valid data for each point of

Page 11: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Emission Testing Acoustic Audit Report Project #1301142 January 7, 2015 Page 7

reception can be found in Tables 1 and 2 for total sound, Tables 3 and 4 for ambient sound, and Tables 5

and 6 for the resulting turbine only sound levels. Table 7 summarizes the data collected during all

monitoring programs and shows the average turbine-only sound at each location.

6.5 Tonal Assessment

An assessment of tonality should be completed as per Protocol, if it is found to be present. Based on

onsite observations during the visits to the site for maintenance of the equipment, no tones were detected

at each point of reception. Audio recordings were reviewed throughout the monitoring periods and no

tones were detected. In addition, tonality and tonal audibility were provided by Siemens Canada. The

data presented showed that the turbines have a negative tonal audibility which is below the positive value

of 3 used for the criteria as per Part D, Section D3.8.3 of the Protocol. As a result, the turbines are not

anticipated to have a tonal component associated with their operations.

7. ASSESSMENT OF COMPLIANCE

The facility is required to meet the sound level limits identified in the REA. For an audit scenario, the

Protocol requires a minimum of 120 operational and 60 ambient one-minute intervals between 4 to 7 m/s

integer wind speeds inclusively. The applicable sound level limits and resultant turbine-only sound levels

at each point of reception are summarized in Table 7 for each audit program and the combined data set.

A facility is deemed to be in compliance if the resulting turbine sound levels do not exceed the sound level

limit at each integer wind speed.

The required data intervals were achieved at all monitoring locations with the exception of the 7 m/s bin at

Receptor A. For this location 61% of the required operational condition data was collected at 7 m/s and

87% of the required parked condition data was collected at 7 m/s. Based on direction from the MOECC

the monitoring program was to be continued till all the required data points were collected or until the end

October 2014. Since the required data was not collected by the end of October, the monitoring program

was ended. Based on the available data, the results indicate the facility is in compliance with the sound

level limits identified in the REA.

Page 12: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Employee Job Title

TABLES

Page 13: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 1 - Valid Total Sound Data for Point of Reception A

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

19/03/2014 22:00 5.0 43.96

19/03/2014 22:01 4.9 43.38

19/03/2014 22:02 4.7 48.37

19/03/2014 22:03 5.0 44.83

19/03/2014 22:04 5.2 40.25

19/03/2014 22:05 5.0 42.87

19/03/2014 22:06 5.3 38.99

19/03/2014 22:07 4.7 39.21

19/03/2014 22:08 5.1 39.51

19/03/2014 22:10 5.7 41.68

19/03/2014 22:11 4.9 43.6

19/03/2014 22:13 6.9 45.05

19/03/2014 22:15 5.4 42.25

19/03/2014 22:17 5.4 38.94

19/03/2014 22:18 4.9 38.48

19/03/2014 22:19 5.2 38.59

19/03/2014 22:23 5.4 40.14

19/03/2014 22:24 6.9 39.28

19/03/2014 22:25 6.1 39.59

19/03/2014 22:26 4.8 42.62

19/03/2014 22:28 6.8 41.29

19/03/2014 22:29 6.9 46.39

19/03/2014 22:33 7.1 41.38

19/03/2014 22:34 7.0 43.43

19/03/2014 22:36 7.2 40.45

19/03/2014 22:37 6.1 45.37

19/03/2014 22:39 7.0 48.4

19/03/2014 22:40 6.6 40.8

19/03/2014 22:43 6.3 40.14

19/03/2014 22:49 7.3 44.2

19/03/2014 22:50 7.4 43.42

19/03/2014 22:51 7.1 46.86

19/03/2014 22:53 7.3 41.41

19/03/2014 22:54 7.4 43.13

19/03/2014 22:55 7.5 47.95

19/03/2014 22:57 7.0 44.6

19/03/2014 22:58 6.2 43.97

19/03/2014 23:02 7.0 47.8

19/03/2014 23:06 6.7 48.27

19/03/2014 23:07 6.9 46.66

19/03/2014 23:11 6.1 49.25

Day and Time of

Measurement

11/12/2014 1/34

Page 14: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

19/03/2014 23:13 7.1 46.05

19/03/2014 23:14 7.4 45.96

19/03/2014 23:15 7.1 46.43

19/03/2014 23:16 6.8 49.12

19/03/2014 23:17 6.7 50.92

19/03/2014 23:19 7.3 49.22

19/03/2014 23:20 7.1 53.09

19/03/2014 23:21 6.6 49.75

19/03/2014 23:22 7.3 47.5

19/03/2014 23:24 7.3 51.75

19/03/2014 23:31 6.8 50.79

19/03/2014 23:32 5.7 54.44

19/03/2014 23:33 6.7 50.77

19/03/2014 23:35 7.0 52.2

19/03/2014 23:36 6.2 51.83

19/03/2014 23:37 5.7 52.11

19/03/2014 23:38 6.4 52.46

19/03/2014 23:39 7.1 49.39

19/03/2014 23:40 6.5 47.51

19/03/2014 23:41 6.1 48.33

19/03/2014 23:43 5.4 49.65

19/03/2014 23:44 4.8 53.33

19/03/2014 23:45 5.5 54.14

19/03/2014 23:46 4.5 53.5

19/03/2014 23:47 5.2 53.35

19/03/2014 23:48 5.1 53.74

20/03/2014 0:01 6.5 53.69

20/03/2014 0:02 6.6 51.38

20/03/2014 3:26 6.1 53.55

20/03/2014 3:27 5.8 51.62

20/03/2014 4:02 7.4 53.13

20/03/2014 4:04 7.0 52.95

20/03/2014 4:19 6.1 50.7

20/03/2014 4:21 7.4 50.46

20/03/2014 4:22 7.1 49.35

20/03/2014 4:24 6.7 47.68

20/03/2014 4:25 6.2 51.08

20/03/2014 4:28 7.0 53.42

20/03/2014 4:30 7.2 49.44

20/03/2014 4:31 6.4 48.89

20/03/2014 4:34 6.6 48.62

20/03/2014 4:35 6.7 50.97

20/03/2014 4:36 6.9 49.97

20/03/2014 4:39 6.8 51.53

11/12/2014 2/34

Page 15: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

20/03/2014 4:40 6.1 53.48

20/03/2014 4:41 6.7 52.58

20/03/2014 4:42 6.2 54.21

20/03/2014 4:57 6.4 53.89

20/03/2014 4:58 6.5 54.22

22/03/2014 4:57 3.6 28

22/03/2014 4:58 4.0 25.85

22/03/2014 4:59 3.5 23.09

26/03/2014 1:12 3.8 42.83

26/03/2014 1:18 3.6 39.84

26/03/2014 2:36 3.7 39.54

26/03/2014 3:25 3.7 38.5

26/03/2014 3:26 4.0 39.21

26/03/2014 3:30 3.5 38.54

26/03/2014 3:31 3.7 38.83

26/03/2014 3:32 3.7 38.67

26/03/2014 3:56 3.9 37.95

26/03/2014 4:06 3.6 37.46

26/03/2014 4:20 3.6 36.96

26/03/2014 4:21 3.5 37.88

26/03/2014 4:42 3.6 38.19

04/04/2014 22:01 7.0 51.17

04/04/2014 22:04 7.2 53.01

04/04/2014 22:06 6.2 52.5

04/04/2014 23:38 5.7 53.28

04/04/2014 23:42 5.8 52.36

09/04/2014 22:00 3.9 42.05

09/04/2014 22:01 4.1 47.67

09/04/2014 22:02 3.8 45.12

09/04/2014 22:03 4.4 45.29

09/04/2014 22:04 4.0 44.01

09/04/2014 22:05 4.2 43.02

09/04/2014 22:06 4.7 40.59

09/04/2014 22:07 3.8 43.59

09/04/2014 22:09 4.0 43.07

09/04/2014 22:10 4.0 41.3

09/04/2014 22:13 4.0 43.05

09/04/2014 22:16 3.9 43.8

09/04/2014 22:17 3.6 41.11

09/04/2014 22:18 4.1 44.01

09/04/2014 22:20 4.0 41.15

09/04/2014 22:22 4.3 41.27

09/04/2014 22:23 3.8 40.93

09/04/2014 22:24 4.0 42.71

11/12/2014 3/34

Page 16: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/04/2014 22:26 3.5 42.37

09/04/2014 22:28 3.7 46.74

09/04/2014 22:29 3.7 43.65

09/04/2014 22:30 3.9 43.38

09/04/2014 22:35 3.7 41.6

09/04/2014 22:36 3.7 41.55

09/04/2014 22:37 3.8 41.47

09/04/2014 22:40 4.2 45.59

09/04/2014 22:41 3.5 42.54

09/04/2014 22:43 3.6 45.92

09/04/2014 22:44 3.6 43.27

09/04/2014 22:45 4.2 42.43

09/04/2014 22:46 3.7 43.9

09/04/2014 22:47 3.6 42.55

09/04/2014 22:48 3.8 43.12

09/04/2014 22:49 3.8 42.47

09/04/2014 22:50 3.7 42.19

09/04/2014 22:52 4.1 47.25

09/04/2014 22:53 3.9 43.73

09/04/2014 22:54 3.9 41.91

09/04/2014 22:56 3.8 41.83

09/04/2014 22:58 3.7 42.19

09/04/2014 23:00 4.3 45.59

09/04/2014 23:01 4.1 41.94

09/04/2014 23:02 3.9 43.3

09/04/2014 23:03 3.9 44.07

09/04/2014 23:04 4.4 46.85

09/04/2014 23:05 4.2 42.06

09/04/2014 23:06 4.4 42.33

09/04/2014 23:07 4.1 45.88

09/04/2014 23:08 4.6 44.08

09/04/2014 23:09 3.9 42.45

09/04/2014 23:10 4.0 41.76

09/04/2014 23:11 3.9 41.63

09/04/2014 23:12 4.6 42.48

09/04/2014 23:13 3.7 44.62

09/04/2014 23:14 4.4 43.43

09/04/2014 23:15 4.6 48.11

09/04/2014 23:16 4.5 42.34

09/04/2014 23:17 3.7 41.94

09/04/2014 23:18 4.1 42.46

09/04/2014 23:19 4.1 42.17

09/04/2014 23:20 4.1 47.41

09/04/2014 23:21 4.4 43.6

11/12/2014 4/34

Page 17: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/04/2014 23:22 3.6 42.26

09/04/2014 23:24 3.5 42.46

09/04/2014 23:25 4.6 41.84

09/04/2014 23:26 4.2 41.98

09/04/2014 23:27 4.8 46.55

09/04/2014 23:28 4.1 49.1

09/04/2014 23:29 3.6 43.84

09/04/2014 23:30 4.3 41.65

09/04/2014 23:31 3.8 41.63

09/04/2014 23:32 4.3 41.89

09/04/2014 23:33 4.3 41.54

09/04/2014 23:34 4.5 41.35

09/04/2014 23:35 4.5 41.14

09/04/2014 23:36 3.5 41.38

09/04/2014 23:37 3.6 42.49

09/04/2014 23:39 3.5 41.92

09/04/2014 23:40 4.0 41.65

09/04/2014 23:41 4.5 42.49

09/04/2014 23:42 4.5 42.03

09/04/2014 23:43 4.0 41.78

09/04/2014 23:45 3.9 42.15

09/04/2014 23:46 4.7 42.23

09/04/2014 23:47 3.7 41.83

09/04/2014 23:51 4.3 42.63

09/04/2014 23:52 4.0 41.55

09/04/2014 23:53 4.5 42.24

09/04/2014 23:54 3.6 49.95

09/04/2014 23:55 3.9 41.81

09/04/2014 23:56 4.5 42.82

09/04/2014 23:57 4.0 41.93

09/04/2014 23:58 4.0 41.94

10/04/2014 0:00 3.9 41.48

10/04/2014 0:01 3.6 41.78

10/04/2014 0:03 4.3 41.77

10/04/2014 0:04 3.9 42.45

10/04/2014 0:05 4.2 41.59

10/04/2014 0:06 3.8 41.57

10/04/2014 0:08 4.3 42.74

10/04/2014 0:09 4.1 42.19

10/04/2014 0:10 3.8 42.31

10/04/2014 0:12 4.3 43.9

10/04/2014 0:15 3.5 42.16

10/04/2014 0:16 3.7 42.09

10/04/2014 0:17 3.7 42.54

11/12/2014 5/34

Page 18: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 0:18 3.7 41.61

10/04/2014 0:19 3.5 41.61

10/04/2014 0:20 3.5 41.6

10/04/2014 0:22 4.2 41.75

10/04/2014 0:23 3.9 45.19

10/04/2014 0:27 3.9 42.06

10/04/2014 0:28 3.6 42.39

10/04/2014 0:29 4.2 42.46

10/04/2014 0:31 4.0 42.37

10/04/2014 0:34 3.9 42.1

10/04/2014 0:35 3.7 41.85

10/04/2014 0:36 3.9 41.73

10/04/2014 0:37 3.7 42.69

10/04/2014 0:38 3.5 42.72

10/04/2014 0:39 3.8 42.1

10/04/2014 0:40 4.2 41.62

10/04/2014 0:41 4.0 44.24

10/04/2014 0:43 3.6 42.85

10/04/2014 0:44 4.0 43.8

10/04/2014 0:45 3.6 42.53

10/04/2014 0:46 3.8 42.41

10/04/2014 0:47 4.3 43.05

10/04/2014 0:48 4.1 42.56

10/04/2014 0:50 3.9 41.78

10/04/2014 0:51 4.0 42.22

10/04/2014 0:52 4.0 42.89

10/04/2014 0:53 4.1 43.23

10/04/2014 0:54 4.1 42.48

10/04/2014 0:55 4.6 42.07

10/04/2014 0:56 4.3 41.55

10/04/2014 0:57 4.2 41.36

10/04/2014 0:58 4.1 41.72

10/04/2014 0:59 4.3 41.57

10/04/2014 1:00 3.7 41.95

10/04/2014 1:02 4.0 43.56

10/04/2014 1:03 3.8 43.63

10/04/2014 1:04 4.0 42.82

10/04/2014 1:06 4.2 41.93

10/04/2014 1:07 3.9 41.77

10/04/2014 1:08 3.8 41.75

10/04/2014 1:09 4.0 41.28

10/04/2014 1:10 4.2 41.06

10/04/2014 1:11 4.1 41.21

10/04/2014 1:12 4.0 41.53

11/12/2014 6/34

Page 19: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 1:13 4.3 41.45

10/04/2014 1:14 3.6 41.6

10/04/2014 1:15 4.0 41.81

10/04/2014 1:16 3.6 41.63

10/04/2014 1:17 4.2 41.13

10/04/2014 1:18 4.0 43.89

10/04/2014 1:19 4.0 41.44

10/04/2014 1:20 4.2 41.86

10/04/2014 1:21 3.9 41.47

10/04/2014 1:22 4.1 41.51

10/04/2014 1:24 4.0 41.61

10/04/2014 1:30 3.9 41.62

10/04/2014 1:31 4.0 41.88

10/04/2014 1:32 3.8 41.7

10/04/2014 1:34 4.6 41.65

10/04/2014 1:35 4.4 41.46

10/04/2014 1:37 4.0 41.77

10/04/2014 1:40 3.9 45.19

10/04/2014 1:41 3.5 43.15

10/04/2014 1:42 4.2 42.87

10/04/2014 1:43 4.3 42.17

10/04/2014 1:44 4.6 42.13

10/04/2014 1:45 4.2 41.93

10/04/2014 1:46 4.0 42.17

10/04/2014 1:47 4.3 42.01

10/04/2014 1:48 4.7 42.06

10/04/2014 1:49 4.6 42.18

10/04/2014 1:50 4.5 42.23

10/04/2014 1:51 4.3 42.96

10/04/2014 1:52 4.4 42.11

10/04/2014 1:53 4.5 42.11

10/04/2014 1:54 4.9 42.65

10/04/2014 1:56 4.0 42.12

10/04/2014 1:58 4.8 43.93

10/04/2014 1:59 3.8 41.59

10/04/2014 2:00 4.3 42.87

10/04/2014 2:01 4.2 42.34

10/04/2014 2:02 4.0 42.74

10/04/2014 2:03 4.8 41.91

10/04/2014 2:04 4.4 41.89

10/04/2014 2:05 3.6 42.5

10/04/2014 2:06 5.1 42.01

10/04/2014 2:07 4.2 42.7

10/04/2014 2:08 4.8 42.64

11/12/2014 7/34

Page 20: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 2:09 4.9 42.52

10/04/2014 2:10 5.0 41.92

10/04/2014 2:11 4.6 42.06

10/04/2014 2:12 4.3 42.06

10/04/2014 2:13 3.9 42.3

10/04/2014 2:14 3.8 42.36

10/04/2014 2:15 4.4 41.78

10/04/2014 2:16 4.2 42.55

10/04/2014 2:18 4.1 43.72

10/04/2014 2:19 4.4 42.08

10/04/2014 2:20 3.5 42.61

10/04/2014 2:21 3.8 42

10/04/2014 2:23 3.9 44.57

10/04/2014 2:24 3.7 42

10/04/2014 2:25 3.9 41.71

10/04/2014 2:26 3.8 42.52

10/04/2014 2:29 3.8 42.85

10/04/2014 2:30 3.7 43.02

10/04/2014 2:32 3.6 42.04

10/04/2014 2:33 4.1 42.02

10/04/2014 2:34 4.1 42.59

10/04/2014 2:39 3.8 42.87

10/04/2014 2:40 3.7 42.89

10/04/2014 2:41 3.5 42.55

10/04/2014 2:42 3.9 43

10/04/2014 2:43 4.8 42.63

10/04/2014 2:44 4.4 44.04

10/04/2014 2:46 3.6 42.94

10/04/2014 2:47 4.2 42.9

10/04/2014 2:48 4.3 42.87

10/04/2014 2:49 3.8 43.31

10/04/2014 2:51 3.8 49.76

10/04/2014 2:52 3.9 42

10/04/2014 2:53 4.6 42.73

10/04/2014 2:54 4.5 43.56

10/04/2014 2:56 3.7 43.16

10/04/2014 2:57 4.3 42.09

10/04/2014 2:58 3.8 42.58

10/04/2014 3:02 3.6 44.79

10/04/2014 3:03 4.2 43.48

10/04/2014 3:04 4.6 43.43

10/04/2014 3:05 4.0 43.84

10/04/2014 3:06 4.3 43.66

10/04/2014 3:07 3.8 42.43

11/12/2014 8/34

Page 21: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 3:08 4.1 43.03

10/04/2014 3:09 4.1 42.3

10/04/2014 3:10 4.0 43.47

10/04/2014 3:11 4.1 42.9

10/04/2014 3:12 3.8 43.14

10/04/2014 3:13 3.6 42.52

10/04/2014 3:14 4.4 43.29

10/04/2014 3:15 3.8 42.96

10/04/2014 3:16 4.0 42.78

10/04/2014 3:17 3.9 42.39

10/04/2014 3:22 3.8 41.9

10/04/2014 3:24 3.7 42.13

10/04/2014 3:28 3.6 42.08

10/04/2014 3:31 4.4 42.18

10/04/2014 3:32 4.4 42.23

10/04/2014 3:33 4.5 42.64

10/04/2014 3:34 4.4 42.2

10/04/2014 3:35 4.4 42.48

10/04/2014 3:37 4.1 41.81

10/04/2014 3:39 4.1 43.95

10/04/2014 3:40 4.5 43.51

10/04/2014 3:41 4.1 44.69

10/04/2014 3:42 3.9 42.78

10/04/2014 3:43 4.0 42.73

10/04/2014 3:45 3.6 42.65

10/04/2014 3:46 4.3 41.9

10/04/2014 3:47 4.1 42.43

10/04/2014 3:48 3.7 42.21

10/04/2014 3:49 4.7 47

10/04/2014 3:51 4.5 43.09

10/04/2014 3:52 4.8 44.79

10/04/2014 3:53 4.4 42.51

10/04/2014 3:55 4.1 42.16

10/04/2014 3:56 4.5 41.56

10/04/2014 3:58 4.4 41.64

10/04/2014 3:59 4.2 42.44

10/04/2014 4:00 3.9 42.61

10/04/2014 4:01 4.1 42.43

10/04/2014 4:02 4.4 42.73

10/04/2014 4:03 4.2 42.35

10/04/2014 4:04 3.9 42.61

10/04/2014 4:06 3.8 43.63

10/04/2014 4:08 3.9 49.26

10/04/2014 4:09 4.2 41.82

11/12/2014 9/34

Page 22: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 4:12 3.9 46.24

10/04/2014 4:13 4.0 42.52

10/04/2014 4:14 4.0 42.4

10/04/2014 4:17 3.5 49.94

10/04/2014 4:22 4.0 50.32

10/04/2014 4:23 3.7 43.03

10/04/2014 4:24 4.2 42.7

10/04/2014 4:25 3.6 42.21

10/04/2014 4:28 3.6 43.73

10/04/2014 4:29 3.5 44.97

10/04/2014 4:40 3.8 42.74

11/04/2014 22:00 3.8 41.42

14/04/2014 2:09 3.7 41.98

14/04/2014 3:06 3.9 41.77

14/04/2014 3:35 4.1 41.42

14/04/2014 3:41 4.0 41.46

14/04/2014 3:43 4.4 41.74

14/04/2014 3:45 4.1 41.26

14/04/2014 3:47 4.6 41.75

14/04/2014 3:55 4.2 41.84

14/04/2014 3:57 4.3 42.4

14/04/2014 4:19 4.5 42.28

14/04/2014 4:21 4.3 41.71

14/04/2014 4:22 4.0 41.85

14/04/2014 4:24 4.3 48.95

14/04/2014 4:26 4.0 42.76

14/04/2014 4:30 4.7 41.69

14/04/2014 4:32 4.5 43.12

14/04/2014 4:33 3.8 43.43

14/04/2014 4:34 3.8 42.44

14/04/2014 4:35 4.2 42.04

14/04/2014 4:36 4.9 42.04

14/04/2014 4:39 4.6 43.28

14/04/2014 4:40 4.2 43.61

14/04/2014 4:41 4.0 42.57

14/04/2014 4:43 5.2 43.66

14/04/2014 4:44 5.4 42.38

14/04/2014 4:46 4.1 46.79

14/04/2014 4:47 4.3 42.69

14/04/2014 4:48 4.4 43.47

14/04/2014 4:49 5.4 52.82

14/04/2014 4:50 4.8 42.39

14/04/2014 4:52 4.7 43.34

14/04/2014 4:53 4.8 42.36

11/12/2014 10/34

Page 23: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/04/2014 4:57 4.6 48.2

14/04/2014 4:58 4.0 42.96

14/04/2014 4:59 4.4 42.53

22/04/2014 3:07 3.6 37.97

22/04/2014 3:12 3.6 39.31

22/04/2014 3:15 3.5 38.7

22/04/2014 3:16 4.2 37.98

22/04/2014 3:18 3.8 38.88

22/04/2014 3:19 3.7 38.48

22/04/2014 3:20 4.4 38.26

22/04/2014 3:21 4.1 38.42

22/04/2014 3:22 3.8 40.52

22/04/2014 3:23 4.5 38.17

22/04/2014 3:24 4.4 38.69

22/04/2014 3:25 3.5 38.1

22/04/2014 3:26 3.6 37.89

22/04/2014 3:27 3.9 37.64

22/04/2014 3:32 3.7 39.59

22/04/2014 3:33 4.0 39.3

22/04/2014 3:35 3.6 39.54

22/04/2014 3:45 3.9 42.33

22/04/2014 3:47 4.1 41.98

22/04/2014 3:48 3.8 41.64

22/04/2014 3:49 3.7 41.97

22/04/2014 3:50 3.6 42.2

22/04/2014 3:51 4.1 41.87

22/04/2014 3:52 4.1 41.61

22/04/2014 3:53 4.2 41.94

22/04/2014 3:54 3.9 41.77

22/04/2014 3:55 4.7 41.73

22/04/2014 3:56 4.2 42.36

22/04/2014 3:57 3.8 42.56

22/04/2014 3:58 3.8 41.67

22/04/2014 3:59 3.7 42.14

22/04/2014 4:00 3.5 42.67

22/04/2014 4:01 3.8 44.78

22/04/2014 4:03 3.5 42.03

22/04/2014 4:04 3.6 45.87

01/05/2014 23:52 3.7 41.42

02/05/2014 0:45 3.7 35.51

02/05/2014 0:48 3.6 44.27

02/05/2014 0:52 5.3 37.52

02/05/2014 0:53 5.7 38.61

02/05/2014 0:54 5.0 37.77

11/12/2014 11/34

Page 24: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/05/2014 0:55 5.1 37.85

02/05/2014 0:56 4.3 39

02/05/2014 0:57 4.0 36.97

02/05/2014 0:58 4.0 45.92

02/05/2014 0:59 5.3 40.76

02/05/2014 1:00 4.2 35

02/05/2014 1:02 3.8 35.91

02/05/2014 1:03 3.5 34.44

02/05/2014 1:04 5.1 34.49

02/05/2014 1:06 4.3 34.31

02/05/2014 1:14 4.1 34.7

02/05/2014 1:16 5.0 35.01

02/05/2014 1:17 5.1 34.81

02/05/2014 1:18 4.8 34.69

02/05/2014 1:19 4.9 34.16

02/05/2014 1:25 4.0 34.33

02/05/2014 1:29 4.0 35.29

02/05/2014 1:30 5.6 48.27

02/05/2014 1:31 4.4 36.87

02/05/2014 1:32 5.4 35.74

02/05/2014 1:37 4.2 36.82

02/05/2014 1:38 3.7 37.92

02/05/2014 1:39 4.0 38.61

02/05/2014 1:52 4.0 43.56

02/05/2014 1:53 5.0 42.53

02/05/2014 1:54 4.1 43.9

02/05/2014 1:56 3.8 41.52

02/05/2014 1:59 5.0 44.77

02/05/2014 2:02 5.7 43.84

02/05/2014 2:04 5.3 42.98

02/05/2014 2:05 5.4 45.25

02/05/2014 2:06 4.7 44.39

02/05/2014 2:07 5.1 51.59

02/05/2014 2:08 5.3 49.6

02/05/2014 2:09 5.5 43.88

02/05/2014 2:10 5.5 44.73

02/05/2014 2:11 4.8 46.05

02/05/2014 2:12 5.7 46.52

02/05/2014 2:13 6.1 45.66

02/05/2014 2:14 5.8 45.35

02/05/2014 2:15 5.8 46.18

02/05/2014 2:16 5.7 46

02/05/2014 2:17 4.9 44.54

02/05/2014 2:18 4.9 43.56

11/12/2014 12/34

Page 25: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/05/2014 2:19 5.0 43.51

02/05/2014 2:20 4.4 42.59

02/05/2014 2:21 4.8 45.26

02/05/2014 2:22 5.0 45.2

02/05/2014 2:23 4.8 45.32

02/05/2014 2:24 4.7 44.9

02/05/2014 2:25 4.9 47.52

02/05/2014 2:26 4.3 44.35

02/05/2014 2:27 5.4 45.65

02/05/2014 2:28 5.4 46.99

02/05/2014 2:29 4.5 44.99

02/05/2014 2:30 4.3 45.15

02/05/2014 2:31 4.0 43.43

02/05/2014 2:32 4.9 42.35

02/05/2014 2:34 4.3 41.97

02/05/2014 2:35 4.3 40.23

02/05/2014 2:36 3.9 39.1

02/05/2014 2:37 4.4 40.06

02/05/2014 2:38 3.9 38.86

02/05/2014 2:39 3.9 40.4

02/05/2014 2:40 4.3 39.57

02/05/2014 2:41 3.7 39.56

02/05/2014 2:42 4.4 39.04

02/05/2014 2:43 4.1 40.07

02/05/2014 2:44 4.1 41.03

02/05/2014 2:45 4.3 44.04

02/05/2014 2:46 4.3 43.63

02/05/2014 2:48 4.5 44.55

02/05/2014 2:49 4.8 43.13

02/05/2014 2:50 3.8 41.79

02/05/2014 2:54 3.6 46.3

02/05/2014 2:55 4.3 46.57

02/05/2014 2:56 4.2 45.51

02/05/2014 2:57 4.2 46.69

02/05/2014 2:58 3.8 47.65

02/05/2014 3:00 3.6 46.86

02/05/2014 3:03 3.5 45.98

02/05/2014 3:05 4.0 46.6

02/05/2014 3:07 3.9 46.67

02/05/2014 3:08 4.0 47.81

02/05/2014 3:09 4.3 47.29

02/05/2014 3:11 4.1 45.78

02/05/2014 3:12 3.7 44

02/05/2014 3:13 3.6 44.44

11/12/2014 13/34

Page 26: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/05/2014 3:14 4.5 44.64

02/05/2014 3:17 4.6 44.7

02/05/2014 3:19 4.0 43.44

02/05/2014 3:20 3.9 43.28

02/05/2014 3:21 5.1 43.32

02/05/2014 3:22 4.7 45.77

02/05/2014 3:23 4.5 44.98

02/05/2014 3:24 4.2 42.97

02/05/2014 3:25 4.2 41.76

02/05/2014 3:26 5.1 41.3

02/05/2014 3:27 4.2 43.24

02/05/2014 3:28 4.4 43.82

02/05/2014 3:29 4.7 41.4

02/05/2014 3:30 4.5 41.8

02/05/2014 3:31 3.6 42.26

02/05/2014 3:32 4.0 40.97

02/05/2014 3:33 4.2 40.82

02/05/2014 3:34 3.9 40.18

02/05/2014 3:35 4.4 40.51

02/05/2014 3:36 3.9 40.63

02/05/2014 3:37 4.3 41.25

02/05/2014 3:38 3.5 40.21

02/05/2014 3:39 4.1 40.18

02/05/2014 3:40 4.8 43.02

02/05/2014 3:41 4.8 41.29

02/05/2014 3:42 4.1 40.32

02/05/2014 3:43 3.7 51.22

02/05/2014 3:44 4.2 40.75

02/05/2014 3:45 3.8 39.79

02/05/2014 3:46 4.7 42.19

02/05/2014 3:47 4.2 38.45

02/05/2014 3:48 4.0 39.21

02/05/2014 3:49 3.9 40.24

02/05/2014 3:50 3.9 41.16

02/05/2014 3:51 3.7 39.78

02/05/2014 3:52 3.8 39.2

02/05/2014 3:53 4.5 38.35

02/05/2014 3:54 4.6 37.86

02/05/2014 3:55 4.5 38.95

02/05/2014 3:56 4.2 39.35

02/05/2014 3:57 4.1 39.41

02/05/2014 3:58 4.2 39.59

02/05/2014 3:59 4.4 39.85

02/05/2014 4:01 4.7 41.52

11/12/2014 14/34

Page 27: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/05/2014 4:02 4.5 44.61

02/05/2014 4:03 4.0 40.37

02/05/2014 4:06 3.8 39.14

02/05/2014 4:07 3.8 39.02

02/05/2014 4:08 3.8 39.34

02/05/2014 4:09 4.2 40.61

02/05/2014 4:10 4.3 39.07

02/05/2014 4:11 4.4 40.97

02/05/2014 4:12 4.3 41.14

02/05/2014 4:13 3.7 41.55

02/05/2014 4:14 3.7 44.05

02/05/2014 4:16 3.8 43.36

02/05/2014 4:17 3.6 42.67

02/05/2014 4:18 3.6 40.6

02/05/2014 4:20 3.8 40.24

02/05/2014 4:21 3.6 41.95

02/05/2014 4:24 4.0 41.42

02/05/2014 4:26 3.8 47.87

02/05/2014 4:27 3.7 39.71

02/05/2014 4:28 4.6 40.4

02/05/2014 4:29 4.3 39.18

02/05/2014 4:31 3.8 39.61

02/05/2014 4:33 3.9 38.82

02/05/2014 4:34 4.8 44.62

02/05/2014 4:35 5.0 48.03

02/05/2014 4:36 4.4 42.89

02/05/2014 4:37 3.7 40.31

02/05/2014 4:40 4.1 40.39

02/05/2014 4:41 3.7 41.57

02/05/2014 4:42 3.9 41.83

02/05/2014 4:43 3.6 39.51

02/05/2014 4:44 4.0 46.31

02/05/2014 4:46 3.6 39.87

02/05/2014 4:47 4.5 41.36

02/05/2014 4:48 4.2 47

02/05/2014 4:53 4.0 40.23

02/05/2014 4:54 3.6 41.45

02/05/2014 4:55 4.0 40.36

02/05/2014 4:58 4.6 39.53

02/05/2014 4:59 3.7 38.31

03/05/2014 4:53 5.6 41.81

03/05/2014 4:55 4.4 39.95

03/05/2014 4:58 4.5 38.97

04/05/2014 23:57 3.8 32.22

11/12/2014 15/34

Page 28: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/05/2014 2:05 4.1 49.06

10/05/2014 2:10 4.1 46.52

10/05/2014 2:11 3.8 44.73

10/05/2014 2:13 4.5 40.13

10/05/2014 2:14 4.4 40.11

10/05/2014 2:15 3.7 48.76

10/05/2014 2:16 4.9 38.59

10/05/2014 2:17 3.9 38.18

10/05/2014 2:18 4.4 35.65

10/05/2014 2:19 3.8 35.71

10/05/2014 2:20 4.3 34.03

10/05/2014 2:22 5.2 37.77

10/05/2014 2:23 4.8 46.69

10/05/2014 2:24 4.6 44.84

10/05/2014 2:25 4.5 40.97

10/05/2014 2:27 3.5 38.76

10/05/2014 2:28 4.2 45.22

10/05/2014 2:30 4.7 40.64

10/05/2014 2:31 3.5 44.5

10/05/2014 2:33 4.0 41.83

10/05/2014 2:34 3.9 40.29

10/05/2014 2:35 4.1 44.68

10/05/2014 2:36 4.1 40.11

10/05/2014 2:37 3.9 40.64

10/05/2014 2:38 3.9 39.9

10/05/2014 2:40 3.8 39.88

10/05/2014 2:42 3.7 38.92

10/05/2014 2:44 3.8 40.27

10/05/2014 2:45 4.0 45.38

10/05/2014 2:46 4.5 42.29

10/05/2014 2:47 4.1 38.7

10/05/2014 2:48 3.8 42.62

10/05/2014 2:49 3.6 37.09

10/05/2014 2:51 3.9 41.99

10/05/2014 2:52 3.7 38.34

10/05/2014 2:54 3.6 43.15

10/05/2014 3:00 3.5 34.2

10/05/2014 3:01 3.6 34

10/05/2014 3:02 3.9 33.49

10/05/2014 3:04 3.7 35.95

10/05/2014 3:05 4.3 36.77

10/05/2014 3:07 3.8 38.08

10/05/2014 3:08 3.9 36.2

10/05/2014 3:09 4.0 35.24

11/12/2014 16/34

Page 29: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/05/2014 3:10 4.2 39.98

10/05/2014 3:11 3.8 38.33

10/05/2014 3:12 3.9 40.1

10/05/2014 3:13 3.6 35.62

10/05/2014 3:14 3.7 37.97

10/05/2014 3:15 4.1 40.51

10/05/2014 3:18 3.8 39.34

10/05/2014 3:24 3.6 38.55

10/05/2014 3:27 3.8 36.57

10/05/2014 3:28 3.7 36.09

10/05/2014 3:30 3.9 36.15

10/05/2014 3:31 3.9 36.41

10/05/2014 3:33 3.7 35.21

13/05/2014 22:48 3.6 45.57

13/05/2014 22:53 3.6 40.56

13/05/2014 22:54 3.8 39.85

13/05/2014 22:55 3.9 39.65

13/05/2014 22:56 3.8 43.14

13/05/2014 22:57 3.9 40.91

13/05/2014 22:58 3.8 40.59

13/05/2014 22:59 3.5 51.13

13/05/2014 23:03 3.7 41.72

13/05/2014 23:04 3.8 43.83

13/05/2014 23:05 3.6 46.95

13/05/2014 23:06 4.0 43.53

13/05/2014 23:07 4.6 40.36

13/05/2014 23:09 4.2 50.61

13/05/2014 23:11 3.5 40.71

13/05/2014 23:14 3.6 40.33

13/05/2014 23:26 4.2 40.48

13/05/2014 23:29 3.6 41.06

13/05/2014 23:30 4.2 41.41

13/05/2014 23:31 3.6 47.37

13/05/2014 23:35 3.5 45.36

13/05/2014 23:44 3.6 43.13

13/05/2014 23:47 4.0 41.51

14/05/2014 0:13 3.6 41

14/05/2014 0:20 4.2 39.46

14/05/2014 0:38 3.7 37.72

14/05/2014 0:41 3.6 38.84

14/05/2014 0:46 3.6 36.77

14/05/2014 0:47 3.6 37.07

14/05/2014 0:50 3.5 35.82

14/05/2014 0:51 3.9 37

11/12/2014 17/34

Page 30: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/05/2014 1:27 3.5 42.01

14/05/2014 1:34 3.8 36.5

14/05/2014 1:57 3.7 33.89

14/05/2014 2:08 3.5 33.73

14/05/2014 2:09 3.8 33.31

14/05/2014 2:25 5.5 35.95

15/05/2014 22:00 3.5 42.25

15/05/2014 22:01 3.5 44.04

15/05/2014 22:02 4.6 45.25

15/05/2014 22:03 4.8 42.77

15/05/2014 22:04 4.0 46.05

15/05/2014 22:05 3.8 45.01

15/05/2014 22:06 3.5 45.36

15/05/2014 22:07 4.5 45.4

15/05/2014 22:08 5.3 42.86

15/05/2014 22:09 4.3 40.99

15/05/2014 22:10 4.5 42.94

15/05/2014 22:11 4.4 41.89

15/05/2014 22:12 4.9 38.08

15/05/2014 22:13 4.1 42.76

15/05/2014 22:14 4.1 44.73

15/05/2014 22:15 4.5 43.22

15/05/2014 22:16 4.2 41.79

15/05/2014 22:17 4.4 43.47

15/05/2014 22:18 5.2 45.01

15/05/2014 22:19 5.1 42.07

15/05/2014 22:20 5.6 42.27

15/05/2014 22:21 6.0 44.12

15/05/2014 22:22 6.5 41.59

15/05/2014 22:23 6.0 43.76

15/05/2014 22:24 5.0 44.61

15/05/2014 22:25 4.9 44.19

15/05/2014 22:26 5.6 40.96

15/05/2014 22:27 5.3 39.42

15/05/2014 22:28 5.1 38.5

15/05/2014 22:29 5.7 40.28

15/05/2014 22:30 5.3 41.81

15/05/2014 22:31 5.4 42.54

15/05/2014 22:32 4.1 41.94

15/05/2014 22:33 4.6 41.65

15/05/2014 22:34 4.3 40.21

15/05/2014 22:35 3.9 39.65

15/05/2014 22:36 4.2 40.31

15/05/2014 22:37 4.0 39.7

11/12/2014 18/34

Page 31: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

15/05/2014 22:38 4.5 44.62

15/05/2014 22:39 4.6 40.07

15/05/2014 22:40 4.6 36.94

15/05/2014 22:41 4.4 35.67

15/05/2014 22:43 4.9 40.82

15/05/2014 22:44 5.8 40.22

15/05/2014 22:45 5.6 41.32

15/05/2014 22:46 5.3 40.36

15/05/2014 22:47 4.8 45.79

15/05/2014 22:48 5.0 36.47

15/05/2014 22:49 5.0 35.92

15/05/2014 22:50 5.9 35.77

15/05/2014 22:51 6.0 40.32

15/05/2014 22:52 5.8 38.48

15/05/2014 22:54 7.0 39.45

15/05/2014 22:55 6.4 41.1

15/05/2014 22:56 6.0 41.37

15/05/2014 22:57 6.4 42.32

15/05/2014 22:58 5.7 41.33

15/05/2014 22:59 6.2 38.93

15/05/2014 23:00 4.3 38.7

15/05/2014 23:01 4.8 39.96

15/05/2014 23:02 5.1 41.1

15/05/2014 23:03 5.8 40.59

15/05/2014 23:04 5.9 36.2

15/05/2014 23:05 5.4 39.25

15/05/2014 23:06 5.5 39.28

15/05/2014 23:07 5.6 40.8

15/05/2014 23:08 5.7 43.28

15/05/2014 23:09 6.1 50.75

15/05/2014 23:10 5.6 40.93

15/05/2014 23:11 6.1 40.16

15/05/2014 23:12 5.7 42.85

15/05/2014 23:13 5.2 42.76

15/05/2014 23:14 5.5 43.61

15/05/2014 23:15 5.1 43.05

15/05/2014 23:16 5.8 46.09

15/05/2014 23:17 5.5 49.33

15/05/2014 23:18 4.9 45.14

15/05/2014 23:19 5.7 42.68

15/05/2014 23:20 5.3 44.1

15/05/2014 23:22 7.3 45.7

15/05/2014 23:23 6.3 43.24

15/05/2014 23:24 6.0 46.52

11/12/2014 19/34

Page 32: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

15/05/2014 23:25 5.7 44.3

15/05/2014 23:26 6.2 43.82

15/05/2014 23:27 5.5 40.67

15/05/2014 23:28 4.9 41.31

15/05/2014 23:29 5.2 42.2

15/05/2014 23:30 4.4 40.79

15/05/2014 23:31 4.6 40.6

15/05/2014 23:32 3.8 40.97

15/05/2014 23:33 4.3 41.41

15/05/2014 23:34 4.6 42.44

15/05/2014 23:35 4.4 44.6

15/05/2014 23:36 3.8 41.88

15/05/2014 23:37 3.7 42.41

15/05/2014 23:38 4.0 44.97

15/05/2014 23:39 4.2 47.27

15/05/2014 23:40 4.3 45.84

15/05/2014 23:41 4.3 41.7

15/05/2014 23:42 4.6 42.31

15/05/2014 23:43 4.5 44.77

15/05/2014 23:44 6.2 42.79

15/05/2014 23:45 5.5 46.93

15/05/2014 23:46 5.6 46.66

15/05/2014 23:47 5.4 44.41

15/05/2014 23:48 4.7 50.39

15/05/2014 23:50 6.4 46.64

15/05/2014 23:51 5.1 48.73

15/05/2014 23:52 4.5 47.32

15/05/2014 23:53 4.8 46.24

15/05/2014 23:54 5.5 46.92

15/05/2014 23:55 5.2 41.81

15/05/2014 23:56 4.9 45.21

15/05/2014 23:57 6.0 47.11

15/05/2014 23:58 6.2 46.98

15/05/2014 23:59 5.6 48.18

16/05/2014 0:00 5.4 45.16

16/05/2014 0:01 5.1 45.57

16/05/2014 0:02 5.3 47.73

16/05/2014 0:03 5.4 47.77

16/05/2014 0:04 5.8 46.53

16/05/2014 0:05 5.6 45.85

16/05/2014 0:06 5.7 48.05

16/05/2014 0:07 5.8 44.99

16/05/2014 0:08 5.8 45.24

16/05/2014 0:09 5.6 44.17

11/12/2014 20/34

Page 33: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/05/2014 0:10 6.5 43.79

16/05/2014 0:11 5.1 44.89

16/05/2014 0:12 5.3 43.76

16/05/2014 0:13 5.7 42.93

16/05/2014 0:14 5.7 46.69

16/05/2014 0:15 5.0 44.81

16/05/2014 0:16 4.6 51.71

16/05/2014 0:17 4.6 49.69

16/05/2014 0:18 5.0 46.53

16/05/2014 0:19 4.7 46.61

16/05/2014 0:20 5.1 45.45

16/05/2014 0:21 5.1 45.72

16/05/2014 0:22 5.7 43.5

16/05/2014 0:23 5.1 40.42

16/05/2014 0:24 4.0 40.63

16/05/2014 0:27 4.4 39.09

16/05/2014 0:28 3.8 40.12

16/05/2014 0:29 4.2 38.71

16/05/2014 0:30 4.5 38.65

16/05/2014 0:31 4.5 39.24

16/05/2014 0:32 3.6 38.27

16/05/2014 0:33 4.0 42.95

16/05/2014 0:34 3.8 47.22

16/05/2014 0:35 3.9 40.13

16/05/2014 0:37 3.6 41.83

16/05/2014 0:38 3.7 44.33

16/05/2014 0:39 4.9 46.44

16/05/2014 0:40 5.5 43.69

16/05/2014 0:41 5.5 46.32

16/05/2014 0:42 4.5 44.32

16/05/2014 0:43 4.2 45.87

16/05/2014 0:44 4.3 44.35

16/05/2014 0:45 5.0 46.54

16/05/2014 0:46 4.4 41.64

16/05/2014 0:47 4.1 40.57

16/05/2014 0:48 4.2 43.74

16/05/2014 0:49 3.9 44.87

16/05/2014 0:50 4.0 43.74

16/05/2014 0:51 3.5 42.91

16/05/2014 0:53 4.1 46.54

16/05/2014 0:54 4.1 43.71

16/05/2014 0:55 4.0 41.99

16/05/2014 0:56 4.5 42.57

16/05/2014 0:57 4.3 49.04

11/12/2014 21/34

Page 34: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/05/2014 0:58 5.2 48.55

16/05/2014 0:59 5.2 45.01

16/05/2014 1:00 4.6 45.15

16/05/2014 1:01 4.6 45.71

16/05/2014 1:02 4.5 44.62

16/05/2014 1:03 4.5 44.06

16/05/2014 1:04 4.2 46.46

16/05/2014 1:05 4.3 45.8

16/05/2014 1:06 3.9 40.41

16/05/2014 1:07 3.9 42.59

16/05/2014 1:08 3.8 44.49

16/05/2014 1:09 3.8 42.67

16/05/2014 1:10 3.9 40.32

16/05/2014 1:11 4.8 38.81

16/05/2014 1:12 4.7 40.88

16/05/2014 1:13 4.9 39.92

16/05/2014 1:14 4.8 41.06

16/05/2014 1:15 4.3 42.67

16/05/2014 1:16 3.6 42.57

16/05/2014 1:17 3.5 42.87

16/05/2014 1:19 3.6 35.75

16/05/2014 1:32 4.0 35.57

16/05/2014 1:33 3.5 37.58

16/05/2014 1:40 3.6 41.58

16/05/2014 1:41 4.0 37.48

16/05/2014 1:42 4.2 36.68

16/05/2014 1:43 4.8 36.96

16/05/2014 1:44 4.5 37.37

16/05/2014 1:45 4.2 37.07

16/05/2014 1:46 4.4 41.15

16/05/2014 1:47 4.7 45.12

16/05/2014 1:48 5.3 37.17

16/05/2014 1:49 5.7 35.95

16/05/2014 1:50 6.6 41.49

16/05/2014 1:51 5.9 41.1

16/05/2014 1:52 5.4 36.4

16/05/2014 1:53 5.5 41.44

16/05/2014 1:54 5.2 40.11

16/05/2014 1:55 4.6 38.03

16/05/2014 1:56 4.8 39.04

16/05/2014 1:57 4.5 38.39

16/05/2014 1:58 3.9 35.79

16/05/2014 1:59 4.8 36.1

16/05/2014 2:00 5.3 37.2

11/12/2014 22/34

Page 35: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/05/2014 2:01 5.1 35.61

16/05/2014 2:02 4.7 35.38

16/05/2014 2:03 3.9 37.23

16/05/2014 2:04 3.8 37.29

16/05/2014 2:05 3.9 36.96

16/05/2014 2:08 3.8 39.99

16/05/2014 2:09 4.0 40.07

16/05/2014 2:11 3.8 35.95

16/05/2014 2:12 4.6 36.53

16/05/2014 2:13 4.7 36.37

16/05/2014 2:14 5.1 46.41

16/05/2014 2:15 4.7 36.93

16/05/2014 2:16 3.8 46.42

16/05/2014 2:17 3.9 33.22

16/05/2014 2:18 4.3 34.28

16/05/2014 2:19 4.1 33.33

16/05/2014 2:20 4.0 32.55

16/05/2014 2:21 3.9 34.01

16/05/2014 2:22 5.5 34.45

16/05/2014 2:23 4.7 34.76

16/05/2014 2:24 3.9 34.56

16/05/2014 2:25 4.6 34.62

16/05/2014 2:26 4.1 38.82

16/05/2014 2:27 4.4 37.41

16/05/2014 2:28 4.4 44.76

16/05/2014 2:29 4.5 36.36

16/05/2014 2:30 4.6 34.96

16/05/2014 2:31 4.6 36.04

16/05/2014 2:32 4.7 35.76

16/05/2014 2:33 4.3 36.49

16/05/2014 2:34 3.9 37.81

16/05/2014 2:35 5.0 39.71

16/05/2014 2:36 4.1 40.95

16/05/2014 2:37 3.9 42.61

16/05/2014 2:38 4.4 42.3

16/05/2014 2:39 4.6 42.38

16/05/2014 2:40 4.1 41.34

16/05/2014 2:41 4.7 41.45

16/05/2014 2:42 4.7 43.56

16/05/2014 2:43 4.3 43.01

16/05/2014 2:44 4.2 46.15

16/05/2014 2:45 4.4 49.52

16/05/2014 2:46 4.4 45.11

16/05/2014 2:47 4.4 43

11/12/2014 23/34

Page 36: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/05/2014 2:48 4.3 45.67

16/05/2014 2:49 3.6 42.56

16/05/2014 2:51 4.5 42.91

16/05/2014 2:52 4.3 40.78

16/05/2014 2:53 4.2 41.26

16/05/2014 2:54 4.0 42.25

16/05/2014 2:55 4.6 42.77

16/05/2014 2:56 4.4 40.69

16/05/2014 2:57 4.0 40.71

16/05/2014 2:58 4.7 36.52

16/05/2014 3:00 4.9 36.91

16/05/2014 3:01 4.3 36.03

16/05/2014 3:02 4.2 34.52

16/05/2014 3:04 3.8 41.91

16/05/2014 3:05 4.2 37.63

16/05/2014 3:06 4.7 37.17

16/05/2014 3:07 4.2 38.6

16/05/2014 3:08 4.2 40.07

16/05/2014 3:09 4.4 41.05

16/05/2014 3:10 4.4 38.08

16/05/2014 3:11 4.1 36.52

16/05/2014 3:12 4.3 37.62

16/05/2014 3:13 4.5 37.59

16/05/2014 3:14 4.4 36.97

16/05/2014 3:15 5.4 41.79

16/05/2014 3:16 5.6 38.87

16/05/2014 3:17 5.5 42.08

16/05/2014 3:18 5.7 38.44

16/05/2014 3:19 6.2 37.03

16/05/2014 3:20 6.3 38.47

16/05/2014 3:21 5.9 37.73

16/05/2014 3:22 5.6 38.93

16/05/2014 3:23 5.8 40.69

16/05/2014 3:24 6.1 39.34

16/05/2014 3:25 5.7 40.17

16/05/2014 3:27 5.0 41.19

16/05/2014 3:28 5.0 37.13

16/05/2014 3:29 4.8 37.03

16/05/2014 3:30 5.2 39.29

16/05/2014 3:31 5.7 36.61

16/05/2014 3:32 5.7 35.91

16/05/2014 3:33 5.0 38.12

16/05/2014 3:34 4.9 38.35

16/05/2014 3:35 5.2 38.25

11/12/2014 24/34

Page 37: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/05/2014 3:36 4.5 41.87

16/05/2014 3:37 4.7 39.83

16/05/2014 3:38 4.2 37.22

16/05/2014 3:39 4.2 37.83

16/05/2014 3:40 5.3 36.97

16/05/2014 3:41 4.2 38.43

16/05/2014 3:42 4.5 37

16/05/2014 3:43 3.9 39.71

16/05/2014 3:44 4.9 36.07

16/05/2014 3:45 5.6 35.54

16/05/2014 3:46 5.4 38.57

16/05/2014 3:47 5.3 37.25

16/05/2014 3:48 5.7 40.87

16/05/2014 3:50 4.9 40.02

16/05/2014 3:51 4.8 36.94

16/05/2014 3:52 5.0 36.9

16/05/2014 3:53 4.1 35.44

16/05/2014 3:55 4.9 37.79

16/05/2014 3:56 3.8 37.88

16/05/2014 3:58 5.3 35.22

16/05/2014 3:59 4.7 36.15

16/05/2014 4:01 3.7 37.37

16/05/2014 4:02 4.4 36.91

16/05/2014 4:04 4.2 46.39

16/05/2014 4:05 5.1 38.38

16/05/2014 4:06 5.8 37.2

16/05/2014 4:07 5.1 37.08

16/05/2014 4:08 6.2 37.02

16/05/2014 4:09 5.6 39.79

16/05/2014 4:10 5.0 44.02

16/05/2014 4:11 4.0 44.66

16/05/2014 4:12 4.2 46.71

16/05/2014 4:13 5.0 46.42

16/05/2014 4:15 4.1 47.48

16/05/2014 4:16 4.5 46.6

16/05/2014 4:17 4.5 45.52

16/05/2014 4:18 4.0 46.31

16/05/2014 4:19 4.8 46.39

16/05/2014 4:20 4.8 45.63

16/05/2014 4:21 5.2 43.4

16/05/2014 4:22 5.1 41.1

16/05/2014 4:23 4.9 47.5

16/05/2014 4:24 5.4 42.75

16/05/2014 4:25 4.7 44.22

11/12/2014 25/34

Page 38: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/05/2014 4:26 5.2 44.47

16/05/2014 4:27 4.3 43.6

16/05/2014 4:28 4.9 41.87

16/05/2014 4:30 5.5 40.85

16/05/2014 4:31 4.7 37.77

16/05/2014 4:32 4.4 38.02

16/05/2014 4:33 4.5 37.35

16/05/2014 4:34 5.4 40.9

16/05/2014 4:35 4.3 40.87

16/05/2014 4:36 5.0 38.34

16/05/2014 4:37 4.0 40.51

16/05/2014 4:38 3.9 39.09

16/05/2014 4:39 4.9 41.64

16/05/2014 4:40 5.1 43.31

16/05/2014 4:41 4.8 42.85

16/05/2014 4:42 4.8 41.71

16/05/2014 4:43 4.1 44.28

16/05/2014 4:44 4.3 42.24

16/05/2014 4:45 3.7 42.08

16/05/2014 4:46 4.0 40.37

16/05/2014 4:47 4.1 40.41

16/05/2014 4:48 4.8 37.82

16/05/2014 4:49 5.3 41.84

16/05/2014 4:50 5.7 41.29

16/05/2014 4:51 5.7 36.31

16/05/2014 4:52 4.8 39.34

16/05/2014 4:53 4.9 41.86

16/05/2014 4:54 5.2 40.28

16/05/2014 4:55 5.0 37.16

16/05/2014 4:56 4.9 37.41

16/05/2014 4:57 5.0 38.99

16/05/2014 4:58 4.9 39.96

16/05/2014 4:59 5.3 38.04

17/05/2014 22:02 3.9 42.35

24/05/2014 0:24 3.5 34.2

24/05/2014 0:56 3.7 37.36

24/05/2014 0:59 3.7 38.16

24/05/2014 1:17 3.9 38

24/05/2014 1:18 3.8 37.9

24/05/2014 1:24 3.9 41.18

24/05/2014 1:25 3.6 38.87

24/05/2014 1:28 3.7 38.31

24/05/2014 1:29 3.9 37.95

24/05/2014 1:30 3.8 37.36

11/12/2014 26/34

Page 39: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

24/05/2014 1:31 4.2 37.4

24/05/2014 1:32 4.2 37.69

24/05/2014 1:33 4.0 37.83

24/05/2014 1:34 4.0 38.18

24/05/2014 1:35 3.9 39.07

24/05/2014 1:36 4.3 37.02

24/05/2014 1:37 4.2 36.98

24/05/2014 1:38 4.2 36.98

24/05/2014 1:39 3.7 36.59

24/05/2014 1:40 3.6 36.99

24/05/2014 1:43 3.5 38.93

24/05/2014 2:07 3.6 34.92

24/05/2014 2:32 3.7 41.21

26/05/2014 3:42 3.5 40.21

26/05/2014 3:53 3.8 41.4

26/05/2014 3:54 3.6 40.87

26/05/2014 3:55 3.8 41.62

26/05/2014 3:56 4.1 41.34

26/05/2014 3:57 4.0 40.68

26/05/2014 3:58 4.0 45.46

26/05/2014 4:02 3.7 41.21

26/05/2014 4:03 3.8 40.79

26/05/2014 4:04 3.9 41.3

26/05/2014 4:05 3.9 40.78

26/05/2014 4:08 3.6 41.2

26/05/2014 4:09 4.0 41.4

26/05/2014 4:11 3.6 43.54

26/05/2014 4:12 4.0 44.06

26/05/2014 4:13 3.8 43.55

26/05/2014 4:15 3.6 41.71

26/05/2014 4:16 3.7 42.26

26/05/2014 4:17 3.7 43.58

26/05/2014 4:21 3.5 41.97

26/05/2014 4:25 3.8 41.92

26/05/2014 4:26 3.7 43.78

26/05/2014 4:27 3.5 42.38

26/05/2014 4:30 3.8 44.01

26/05/2014 4:31 3.8 42.85

26/05/2014 4:36 3.6 42.81

26/05/2014 4:38 3.9 43.11

26/05/2014 23:06 3.5 46.16

02/06/2014 22:05 5.8 53.73

02/06/2014 22:06 5.8 52.38

02/06/2014 22:17 5.1 55.17

11/12/2014 27/34

Page 40: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 22:20 4.9 49.46

02/06/2014 22:22 4.7 53.33

02/06/2014 22:23 4.5 49.82

02/06/2014 22:25 4.1 51.19

02/06/2014 22:28 4.6 51.02

02/06/2014 22:39 4.2 51.04

02/06/2014 22:42 3.7 49.71

02/06/2014 23:29 4.1 46.21

02/06/2014 23:41 3.6 47.18

02/06/2014 23:48 3.5 48.05

02/06/2014 23:49 3.6 47.72

03/06/2014 0:02 3.8 47.65

03/06/2014 0:05 3.8 49.06

03/06/2014 0:08 3.7 48.03

03/06/2014 0:09 3.5 47.52

03/06/2014 0:35 3.5 44.67

04/06/2014 3:08 3.6 32.15

04/06/2014 3:10 4.2 32.4

04/06/2014 3:12 3.5 33.15

04/06/2014 3:13 4.1 36.12

04/06/2014 3:14 4.2 34.49

04/06/2014 3:15 4.2 34.36

04/06/2014 3:16 4.5 35.6

04/06/2014 3:18 6.0 34.7

04/06/2014 3:19 5.7 34.32

04/06/2014 3:20 5.0 38.9

04/06/2014 3:21 4.8 34.61

04/06/2014 3:22 4.8 36.24

04/06/2014 3:23 4.9 34.43

04/06/2014 3:24 4.9 33.42

04/06/2014 3:25 5.0 39.75

04/06/2014 3:26 4.7 35.02

04/06/2014 3:27 5.1 35.13

04/06/2014 3:28 4.1 37.93

04/06/2014 3:29 4.0 44.29

04/06/2014 3:32 3.5 45.28

04/06/2014 3:33 3.9 35.5

04/06/2014 3:34 4.1 36.55

04/06/2014 3:35 3.9 34.59

04/06/2014 3:36 4.0 36.63

04/06/2014 3:37 3.9 36.98

04/06/2014 3:38 3.8 43.12

04/06/2014 3:39 3.6 39.92

04/06/2014 3:40 4.3 36.67

11/12/2014 28/34

Page 41: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/06/2014 3:41 3.7 35.85

04/06/2014 3:42 3.6 36.2

04/06/2014 3:44 4.0 35.93

04/06/2014 3:45 4.1 36.45

04/06/2014 3:46 3.8 36.3

04/06/2014 3:47 3.7 41.82

04/06/2014 3:49 4.0 40.65

04/06/2014 3:51 4.2 39.87

04/06/2014 3:52 3.6 37.7

21/08/2014 2:41 3.6 41.44

31/08/2014 0:26 3.7 49.26

31/08/2014 0:36 3.6 49.72

31/08/2014 0:50 3.8 50.3

31/08/2014 0:52 3.9 49.27

31/08/2014 1:01 4.0 49.25

31/08/2014 1:57 3.8 51

01/09/2014 23:29 3.8 50.73

01/09/2014 23:35 3.5 50.19

02/09/2014 1:07 4.0 49.58

02/09/2014 1:09 3.5 49.24

02/09/2014 1:15 3.7 49.42

02/09/2014 3:20 3.7 47.96

02/09/2014 3:21 3.6 48.52

02/09/2014 3:33 3.5 47.98

02/09/2014 3:35 4.2 47.05

02/09/2014 3:46 3.6 48.12

02/09/2014 3:47 4.2 47.85

02/09/2014 3:56 3.9 48.43

02/09/2014 4:13 3.7 49.31

02/09/2014 4:15 4.3 48.88

02/09/2014 4:17 3.7 48.92

02/09/2014 4:18 4.5 49.51

02/09/2014 4:19 4.2 49.44

02/09/2014 4:29 3.7 50.22

02/09/2014 4:30 3.6 49.41

11/09/2014 1:36 4.9 54.65

08/10/2014 1:24 3.6 38.91

08/10/2014 2:27 3.6 43.19

08/10/2014 2:31 3.6 40.88

08/10/2014 2:33 3.8 42.39

08/10/2014 2:34 4.0 42.38

08/10/2014 2:41 4.0 40.98

08/10/2014 2:43 4.2 39.44

08/10/2014 2:44 4.3 40.72

11/12/2014 29/34

Page 42: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

08/10/2014 2:46 4.3 43.34

08/10/2014 2:47 4.5 50.53

08/10/2014 2:52 3.8 43.37

08/10/2014 2:55 4.6 42.45

08/10/2014 3:07 4.3 41.93

08/10/2014 3:08 4.0 40.92

08/10/2014 3:10 4.1 42.23

08/10/2014 3:11 4.2 41.94

08/10/2014 3:26 3.9 43.59

08/10/2014 3:32 3.5 48.02

08/10/2014 3:41 3.7 44.91

08/10/2014 3:54 3.6 42.93

08/10/2014 4:06 3.8 44.1

08/10/2014 4:15 3.8 43.94

08/10/2014 22:00 4.0 47.3

08/10/2014 22:01 3.7 49.86

08/10/2014 22:02 3.6 48.48

08/10/2014 22:03 3.8 47.29

08/10/2014 22:06 4.1 48.53

08/10/2014 22:07 3.8 47

08/10/2014 22:09 5.2 53.7

08/10/2014 22:10 4.4 50.77

08/10/2014 22:13 5.4 52.7

08/10/2014 22:28 3.8 51.2

08/10/2014 22:33 3.6 48.68

08/10/2014 22:34 3.8 50.44

16/10/2014 22:17 3.5 34.43

16/10/2014 22:23 3.9 34.39

16/10/2014 22:24 3.8 33.95

16/10/2014 22:28 3.9 39.36

16/10/2014 23:22 4.0 42.83

16/10/2014 23:28 3.8 39.82

16/10/2014 23:31 4.0 38.41

16/10/2014 23:52 3.5 40.57

17/10/2014 0:11 3.6 45.55

17/10/2014 0:22 3.8 42.36

17/10/2014 0:25 3.8 40.33

17/10/2014 0:33 3.7 41.08

17/10/2014 0:37 3.6 38.43

17/10/2014 0:53 3.8 40.51

17/10/2014 1:16 3.6 41.02

17/10/2014 2:12 3.9 41.59

17/10/2014 2:15 4.5 39.85

17/10/2014 2:16 3.5 39.73

11/12/2014 30/34

Page 43: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/10/2014 3:10 3.7 41.7

17/10/2014 3:21 4.4 43.36

17/10/2014 3:22 4.5 42.74

17/10/2014 3:23 3.9 41.38

17/10/2014 3:56 3.9 43.17

17/10/2014 4:00 3.5 43.5

17/10/2014 4:04 4.1 43.93

17/10/2014 4:05 3.9 40.65

17/10/2014 4:07 3.5 42.19

17/10/2014 4:08 3.7 40.96

17/10/2014 4:14 3.5 46.38

17/10/2014 4:26 3.6 46.47

17/10/2014 4:30 3.8 42.22

17/10/2014 22:03 4.0 47.93

17/10/2014 22:06 4.6 47.63

17/10/2014 22:07 4.1 45.55

17/10/2014 22:08 3.9 44.93

17/10/2014 22:12 4.9 48.97

17/10/2014 22:14 3.6 51.16

17/10/2014 22:16 3.5 47.09

17/10/2014 22:17 4.8 49.51

17/10/2014 22:22 4.7 50.03

17/10/2014 22:23 5.3 46.42

17/10/2014 22:24 4.4 45.69

17/10/2014 22:25 3.9 46.33

17/10/2014 22:27 4.7 48.28

17/10/2014 22:56 4.0 46.55

17/10/2014 22:58 3.6 45.01

17/10/2014 22:59 3.8 47.17

17/10/2014 23:00 4.0 48.94

17/10/2014 23:01 3.5 47.95

17/10/2014 23:18 4.5 48.12

17/10/2014 23:20 4.3 46.57

17/10/2014 23:28 3.5 46.08

17/10/2014 23:30 4.0 44.53

17/10/2014 23:32 4.8 49.07

17/10/2014 23:33 3.5 47.35

17/10/2014 23:34 4.5 44.93

17/10/2014 23:35 3.8 44.41

17/10/2014 23:36 4.5 46.34

17/10/2014 23:39 4.8 47.91

17/10/2014 23:40 4.1 45.74

17/10/2014 23:41 4.8 46.06

17/10/2014 23:42 4.7 44.51

11/12/2014 31/34

Page 44: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/10/2014 0:09 4.3 47.02

18/10/2014 0:11 3.6 45.18

18/10/2014 0:12 4.2 44.57

18/10/2014 0:13 5.2 45.37

18/10/2014 0:15 4.2 45.63

18/10/2014 0:17 4.2 47.03

18/10/2014 0:28 4.1 50.03

18/10/2014 0:29 4.1 46.94

18/10/2014 1:04 4.1 45.35

18/10/2014 1:06 3.9 43.86

18/10/2014 2:00 3.7 43.12

18/10/2014 2:04 4.4 43.01

18/10/2014 2:06 3.9 44.86

18/10/2014 2:07 3.6 45.85

18/10/2014 2:11 4.7 54.57

18/10/2014 2:12 4.3 51.34

18/10/2014 2:13 3.9 50.74

18/10/2014 2:14 4.2 49.17

18/10/2014 2:15 3.6 49.27

18/10/2014 2:16 3.7 48.42

18/10/2014 2:17 3.7 46.19

18/10/2014 2:18 4.4 46.44

18/10/2014 2:19 3.9 43.64

18/10/2014 2:20 4.5 43.28

18/10/2014 2:21 4.4 43.84

18/10/2014 2:23 3.7 43.89

18/10/2014 2:24 3.8 41.04

18/10/2014 2:29 3.7 40.04

18/10/2014 2:30 3.8 40.96

18/10/2014 2:31 3.6 41.3

18/10/2014 2:33 4.0 40.96

18/10/2014 2:34 4.2 40.87

18/10/2014 2:36 4.2 42.91

18/10/2014 2:37 4.3 40.71

18/10/2014 2:39 3.9 40.36

18/10/2014 2:42 3.8 38.79

18/10/2014 2:46 3.7 36.64

18/10/2014 2:47 3.6 37.16

18/10/2014 3:01 4.4 43.76

18/10/2014 3:02 4.1 41.06

18/10/2014 3:03 6.0 41.27

18/10/2014 3:04 4.0 41.99

18/10/2014 3:05 3.8 40.82

18/10/2014 3:07 3.7 43.13

11/12/2014 32/34

Page 45: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/10/2014 3:10 5.3 42.36

18/10/2014 3:11 4.3 45.2

18/10/2014 3:12 3.8 42.45

18/10/2014 3:13 4.4 47.79

18/10/2014 3:14 4.1 40.82

18/10/2014 3:17 3.8 40.47

18/10/2014 3:18 4.2 41.6

18/10/2014 3:19 4.5 41.13

18/10/2014 3:20 4.8 42.11

18/10/2014 3:25 5.6 42.27

18/10/2014 3:29 4.2 42.01

18/10/2014 3:30 3.7 45.13

18/10/2014 3:32 4.4 41.88

18/10/2014 3:35 4.1 41.45

18/10/2014 3:36 3.9 40.41

18/10/2014 3:37 4.8 41.82

18/10/2014 3:38 4.6 42.94

18/10/2014 3:39 4.3 41.02

18/10/2014 3:41 4.9 41.96

18/10/2014 3:42 4.3 43.82

18/10/2014 3:43 5.1 43.86

18/10/2014 3:45 3.7 42.73

18/10/2014 3:48 4.0 43.48

18/10/2014 3:49 4.5 46.15

18/10/2014 3:51 3.7 45.41

18/10/2014 3:52 3.5 48.39

18/10/2014 3:53 3.7 48.04

18/10/2014 3:54 3.9 44.16

18/10/2014 3:55 3.9 48.22

18/10/2014 4:06 5.4 43.8

18/10/2014 4:08 4.6 45.66

18/10/2014 4:16 5.4 44.34

18/10/2014 4:21 4.5 45.6

18/10/2014 4:23 4.8 47.52

18/10/2014 4:24 4.8 46.52

18/10/2014 4:25 5.4 44.2

18/10/2014 4:26 4.2 46.39

18/10/2014 4:31 4.2 44.78

18/10/2014 4:33 3.9 46.67

18/10/2014 4:37 4.1 43.11

18/10/2014 4:38 4.2 44.1

18/10/2014 4:39 3.6 41.35

18/10/2014 4:42 5.2 42.55

18/10/2014 4:44 3.6 42.46

11/12/2014 33/34

Page 46: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/10/2014 4:45 4.0 44.35

18/10/2014 4:46 4.2 45.1

18/10/2014 4:49 3.7 47.16

18/10/2014 4:50 4.2 49.7

18/10/2014 4:51 4.3 50.66

18/10/2014 4:53 5.3 49.13

18/10/2014 4:55 3.9 47.1

18/10/2014 4:58 4.5 45.75

11/12/2014 34/34

Page 47: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 2 - Valid Total Sound Data for Point of Reception C

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

24/03/2014 22:02 3.5 32.3

24/03/2014 23:06 3.5 32.24

24/03/2014 23:10 3.5 31.49

24/03/2014 23:12 3.6 30.01

24/03/2014 23:13 3.5 31.88

24/03/2014 23:14 3.6 31.74

24/03/2014 23:18 3.6 30.43

24/03/2014 23:19 3.7 30.44

24/03/2014 23:21 3.5 32.93

24/03/2014 23:22 3.6 30.24

24/03/2014 23:32 3.6 32.07

24/03/2014 23:33 3.8 32.84

24/03/2014 23:34 3.7 32.91

24/03/2014 23:36 3.6 31.64

24/03/2014 23:37 3.6 32.22

24/03/2014 23:38 3.6 32.36

24/03/2014 23:40 3.8 33.65

24/03/2014 23:41 3.6 33.31

24/03/2014 23:42 3.6 34.06

24/03/2014 23:43 3.7 34.54

24/03/2014 23:44 3.9 36.67

24/03/2014 23:46 3.7 32.95

24/03/2014 23:56 3.6 32.19

24/03/2014 23:57 3.6 32.47

24/03/2014 23:58 3.8 31.76

24/03/2014 23:59 3.5 32.6

25/03/2014 0:00 3.7 32.69

25/03/2014 0:01 3.6 33.27

25/03/2014 0:02 3.9 33.65

25/03/2014 0:03 4.0 33.84

25/03/2014 0:04 3.9 33.87

25/03/2014 0:05 4.2 33.89

25/03/2014 0:06 4.2 32.09

25/03/2014 0:07 3.9 32.56

25/03/2014 0:10 3.8 32.88

25/03/2014 0:11 3.7 33.02

25/03/2014 0:13 3.7 34.05

25/03/2014 0:14 3.6 33.97

25/03/2014 0:17 3.5 33.96

25/03/2014 0:20 3.8 32.36

25/03/2014 0:21 3.9 33.34

Day and Time of

Measurement

11/12/2014 1/95

Page 48: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

25/03/2014 0:22 3.7 33.77

25/03/2014 0:24 3.9 33.9

25/03/2014 0:25 3.9 34.88

25/03/2014 0:26 3.6 34.76

25/03/2014 0:45 3.5 34.55

25/03/2014 0:46 3.7 35.11

25/03/2014 0:47 3.6 35.08

25/03/2014 1:03 3.6 32.64

25/03/2014 1:04 3.6 33.29

25/03/2014 1:05 3.7 32.85

25/03/2014 1:06 3.9 32.79

25/03/2014 1:07 3.7 34.81

25/03/2014 1:08 3.6 34.19

26/03/2014 23:51 3.8 32.24

26/03/2014 23:52 3.9 32.09

26/03/2014 23:53 3.6 32.66

26/03/2014 23:54 3.9 32.39

26/03/2014 23:55 3.7 33.94

26/03/2014 23:56 4.2 33.12

26/03/2014 23:57 3.7 34.12

26/03/2014 23:58 4.1 35.36

26/03/2014 23:59 4.1 34.41

27/03/2014 0:00 3.9 34.65

27/03/2014 0:01 4.0 34.39

27/03/2014 0:02 3.8 35.95

27/03/2014 0:03 4.1 35.85

27/03/2014 0:04 3.8 34.85

27/03/2014 0:05 3.7 36.22

27/03/2014 0:06 4.5 35.46

27/03/2014 0:07 4.0 34.96

27/03/2014 0:08 4.0 35.52

27/03/2014 0:09 4.1 34.95

27/03/2014 0:10 3.9 35.72

27/03/2014 0:11 4.0 35.08

27/03/2014 0:12 3.8 35.45

27/03/2014 0:13 3.5 35.3

27/03/2014 0:15 3.7 35.52

27/03/2014 0:17 3.6 36.25

27/03/2014 0:18 3.8 35.9

27/03/2014 0:19 4.0 36.14

27/03/2014 0:20 3.9 36.56

27/03/2014 0:21 4.1 36.67

27/03/2014 0:22 4.4 36.11

27/03/2014 0:23 3.9 36.74

11/12/2014 2/95

Page 49: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

27/03/2014 0:24 4.3 37.02

27/03/2014 0:25 4.5 38.27

27/03/2014 0:26 4.7 37.92

27/03/2014 0:27 4.7 37.75

27/03/2014 0:28 4.7 39.18

27/03/2014 0:29 5.0 39.25

27/03/2014 0:30 5.1 39.06

27/03/2014 0:31 5.0 39.43

27/03/2014 0:32 5.1 37.95

27/03/2014 0:33 5.0 38.33

27/03/2014 0:34 4.8 37.58

27/03/2014 0:35 4.6 38.61

27/03/2014 0:36 5.1 38.78

27/03/2014 0:37 5.0 38.79

27/03/2014 0:38 4.8 39.11

27/03/2014 0:39 4.8 39.07

27/03/2014 0:40 5.1 40.64

27/03/2014 0:41 5.5 38.95

27/03/2014 0:42 5.3 38.1

27/03/2014 0:43 4.6 37.05

27/03/2014 0:44 4.2 38.44

27/03/2014 0:45 4.9 37.16

27/03/2014 0:46 4.8 37.37

27/03/2014 0:47 4.4 39.25

27/03/2014 0:48 4.6 38.83

27/03/2014 0:49 4.8 39.05

27/03/2014 0:50 4.9 40.01

27/03/2014 0:51 5.1 37.95

27/03/2014 0:52 4.5 37.8

27/03/2014 0:53 4.5 38.25

27/03/2014 0:54 4.7 38.08

27/03/2014 0:55 4.6 37.99

27/03/2014 0:56 4.5 37.65

27/03/2014 0:57 4.5 37.45

27/03/2014 0:58 4.6 37.72

27/03/2014 0:59 4.4 37.58

27/03/2014 1:00 4.5 38.34

27/03/2014 1:01 4.8 38.4

27/03/2014 1:02 4.6 37.45

27/03/2014 1:03 4.6 37.99

27/03/2014 1:04 4.5 36.79

27/03/2014 1:05 4.3 37.06

27/03/2014 1:06 4.3 36.69

27/03/2014 1:07 4.4 36.41

11/12/2014 3/95

Page 50: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

27/03/2014 1:08 4.3 37.04

27/03/2014 1:09 4.1 36.85

27/03/2014 1:10 4.3 37.01

27/03/2014 1:11 4.2 37.07

27/03/2014 1:12 4.5 36.83

27/03/2014 1:13 4.3 36.5

27/03/2014 1:14 4.3 39.75

27/03/2014 1:15 5.0 37.54

27/03/2014 1:17 4.9 37.66

27/03/2014 1:18 4.9 36.6

27/03/2014 1:19 4.5 36.06

27/03/2014 1:20 4.2 35.19

27/03/2014 1:21 4.3 36.14

27/03/2014 1:22 4.1 36.82

27/03/2014 1:23 4.0 36.48

27/03/2014 1:24 4.2 36.69

27/03/2014 1:25 4.6 37.13

27/03/2014 1:26 4.3 37.15

27/03/2014 1:27 4.5 37.16

27/03/2014 1:28 4.5 36.53

27/03/2014 1:29 4.5 36.77

27/03/2014 1:30 4.5 37.92

27/03/2014 1:31 4.8 38.16

27/03/2014 1:32 4.8 37.76

27/03/2014 1:33 4.7 37.66

27/03/2014 1:34 4.8 37.46

27/03/2014 1:35 4.6 38.14

27/03/2014 1:36 4.8 38.53

27/03/2014 1:37 4.9 39.44

27/03/2014 1:38 5.2 38.17

27/03/2014 1:39 4.8 38.6

27/03/2014 1:40 4.7 38.41

27/03/2014 1:41 5.1 39.54

27/03/2014 1:42 5.1 38.61

27/03/2014 1:43 5.0 39.09

27/03/2014 1:44 5.2 39.49

27/03/2014 1:45 5.0 40.55

27/03/2014 1:46 5.1 39.8

27/03/2014 1:47 5.3 40.37

27/03/2014 1:48 5.6 40.62

27/03/2014 1:49 5.5 42.07

27/03/2014 1:50 5.7 40.78

27/03/2014 1:51 5.5 41.65

27/03/2014 1:52 5.8 42.22

11/12/2014 4/95

Page 51: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

27/03/2014 1:53 5.7 41.32

27/03/2014 1:54 5.7 41.2

27/03/2014 1:55 5.4 40.14

27/03/2014 1:56 5.3 40.99

27/03/2014 1:57 5.5 41.25

27/03/2014 1:58 5.8 42.06

27/03/2014 1:59 5.9 42.48

27/03/2014 2:00 5.9 40.91

27/03/2014 2:01 5.5 41.35

27/03/2014 2:02 5.6 42.01

27/03/2014 2:03 5.7 42.02

27/03/2014 2:04 5.9 41.41

27/03/2014 2:05 5.6 43.37

27/03/2014 2:06 6.1 40.73

27/03/2014 2:07 5.5 41.79

27/03/2014 2:08 5.6 41.4

27/03/2014 2:09 5.7 43.17

27/03/2014 2:10 6.2 43.7

27/03/2014 2:11 5.9 43.55

27/03/2014 2:12 6.0 42.95

27/03/2014 2:13 6.1 43.51

27/03/2014 2:14 6.3 44.06

27/03/2014 2:15 6.3 43.47

27/03/2014 2:16 6.0 43.27

27/03/2014 2:17 6.1 42.17

27/03/2014 2:18 5.8 42.9

27/03/2014 2:19 6.1 43.73

27/03/2014 2:20 6.0 43.16

27/03/2014 2:21 6.0 42.91

27/03/2014 2:22 5.9 42.96

27/03/2014 2:23 5.7 43.52

27/03/2014 2:24 6.1 45.66

27/03/2014 2:25 6.5 44.22

27/03/2014 2:26 6.5 43.28

27/03/2014 2:27 6.0 41.96

27/03/2014 2:28 5.6 43.6

27/03/2014 2:29 6.1 43.92

27/03/2014 2:30 6.1 45.73

27/03/2014 2:31 6.3 44.5

27/03/2014 2:32 6.4 45.59

27/03/2014 2:33 6.1 44.85

27/03/2014 2:34 6.5 46.48

27/03/2014 2:35 6.5 45.52

27/03/2014 2:36 6.6 43.19

11/12/2014 5/95

Page 52: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

27/03/2014 2:37 5.9 42.47

27/03/2014 2:38 5.5 42.56

27/03/2014 2:39 5.5 42.32

27/03/2014 2:40 5.1 43.56

27/03/2014 2:41 5.3 42.08

27/03/2014 2:42 5.4 40.96

27/03/2014 2:43 5.2 40.52

27/03/2014 2:44 5.0 41.41

27/03/2014 2:45 5.3 39.63

27/03/2014 2:46 5.2 40.57

27/03/2014 2:47 5.2 38.7

27/03/2014 2:48 4.3 39.26

27/03/2014 2:49 4.8 39.07

27/03/2014 2:50 4.4 39.9

27/03/2014 2:51 4.8 40.72

27/03/2014 2:52 4.8 40.78

27/03/2014 2:53 5.2 41.71

27/03/2014 2:54 5.5 45.11

27/03/2014 2:55 6.1 43.15

27/03/2014 2:56 6.1 44.36

27/03/2014 2:57 6.0 45.5

27/03/2014 2:58 6.1 46.94

27/03/2014 2:59 6.4 46.31

27/03/2014 3:00 6.5 46.71

27/03/2014 3:01 6.2 47.31

27/03/2014 3:02 6.6 45.78

27/03/2014 3:03 6.0 44.67

27/03/2014 3:04 6.3 43.19

27/03/2014 3:05 5.6 44.05

27/03/2014 3:06 6.0 43.58

27/03/2014 3:07 6.0 43.24

27/03/2014 3:08 5.5 42.92

27/03/2014 3:09 6.1 42.17

27/03/2014 3:10 5.5 41.97

27/03/2014 3:11 5.2 42.38

27/03/2014 3:12 5.7 41.8

27/03/2014 3:13 5.6 42.92

27/03/2014 3:14 5.7 42.92

27/03/2014 3:15 5.6 44.65

27/03/2014 3:16 6.0 42.18

27/03/2014 3:17 5.9 44.73

27/03/2014 3:18 6.1 42.86

27/03/2014 3:19 5.9 43.5

27/03/2014 3:20 5.9 45.21

11/12/2014 6/95

Page 53: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

27/03/2014 3:21 6.3 44.12

27/03/2014 3:22 6.2 43.84

27/03/2014 3:23 6.2 43.32

27/03/2014 3:24 5.9 44.05

27/03/2014 3:25 6.0 42.73

27/03/2014 3:26 5.7 44.03

27/03/2014 3:27 5.9 43.33

27/03/2014 3:28 6.2 43.43

27/03/2014 3:29 6.0 44.21

27/03/2014 3:30 6.1 41.84

27/03/2014 3:31 5.7 41.89

27/03/2014 3:32 5.5 42.48

27/03/2014 3:33 5.6 41.04

27/03/2014 3:34 5.1 42.09

27/03/2014 3:35 5.3 42.2

27/03/2014 3:36 5.5 41.31

27/03/2014 3:37 5.2 42.27

27/03/2014 3:38 5.3 41.32

27/03/2014 3:39 5.6 40.87

27/03/2014 3:40 5.2 40.85

27/03/2014 3:41 4.9 40.24

27/03/2014 3:42 4.8 39.68

27/03/2014 3:43 4.6 40.16

27/03/2014 3:44 4.6 40.43

27/03/2014 3:45 5.0 40.34

27/03/2014 3:46 4.7 41.76

27/03/2014 3:47 5.0 41.03

27/03/2014 3:48 5.0 41.8

27/03/2014 3:49 5.2 43.09

27/03/2014 3:50 5.9 43.88

27/03/2014 3:51 6.0 43.65

27/03/2014 3:52 6.1 45.82

27/03/2014 3:53 6.7 45.4

27/03/2014 3:54 6.4 43.59

27/03/2014 3:55 6.1 44.54

27/03/2014 3:56 6.2 42.88

27/03/2014 3:57 5.7 43.71

27/03/2014 3:58 5.8 42.03

27/03/2014 3:59 5.5 44.66

27/03/2014 4:00 5.6 43.23

27/03/2014 4:01 5.9 43.85

27/03/2014 4:02 5.8 44.57

27/03/2014 4:03 5.9 42.67

27/03/2014 4:04 5.8 42.2

11/12/2014 7/95

Page 54: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

27/03/2014 4:05 5.6 43.4

27/03/2014 4:06 5.6 41.44

27/03/2014 4:07 5.3 42.77

27/03/2014 4:08 5.6 41.35

27/03/2014 4:09 5.5 41.59

27/03/2014 4:10 5.0 42.51

27/03/2014 4:11 5.4 43.53

27/03/2014 4:12 5.8 43.43

27/03/2014 4:13 5.7 44.79

27/03/2014 4:14 6.0 45.28

27/03/2014 4:15 6.2 45.23

27/03/2014 4:16 6.2 45.6

27/03/2014 4:17 6.4 44.2

27/03/2014 4:18 6.2 45.35

27/03/2014 4:19 5.9 44.63

27/03/2014 4:20 6.1 44.36

27/03/2014 4:21 6.1 47.33

27/03/2014 4:22 6.6 47.7

27/03/2014 4:23 6.7 47.11

27/03/2014 4:24 6.8 47.06

27/03/2014 4:25 6.7 48.56

27/03/2014 4:26 6.9 48.64

27/03/2014 4:27 7.1 46.93

27/03/2014 4:28 6.7 47.59

27/03/2014 4:29 6.9 46.61

27/03/2014 4:30 6.5 45.13

27/03/2014 4:31 6.3 46.68

27/03/2014 4:32 6.7 47.14

27/03/2014 4:33 6.4 46.06

27/03/2014 4:34 6.2 46.81

27/03/2014 4:35 6.7 46.75

27/03/2014 4:36 6.6 47.78

27/03/2014 4:37 6.3 46.2

27/03/2014 4:38 6.5 49.57

27/03/2014 4:39 7.1 48.07

27/03/2014 4:40 7.3 49.58

27/03/2014 4:42 6.8 48.63

27/03/2014 4:43 6.8 47.68

27/03/2014 4:44 7.1 47.18

27/03/2014 4:45 6.8 46.87

27/03/2014 4:46 6.4 46.11

27/03/2014 4:47 6.4 46.26

27/03/2014 4:48 6.6 46.33

27/03/2014 4:49 6.2 46.65

11/12/2014 8/95

Page 55: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

27/03/2014 4:50 6.6 45.9

27/03/2014 4:51 6.2 42.6

27/03/2014 4:52 5.6 43.74

27/03/2014 4:53 5.8 44.23

27/03/2014 4:54 5.8 45.31

27/03/2014 4:55 6.0 46.08

27/03/2014 4:56 6.5 46.8

27/03/2014 4:57 6.7 44.78

27/03/2014 4:58 6.2 46.73

27/03/2014 4:59 6.3 45.32

28/03/2014 0:02 7.5 52.82

28/03/2014 2:19 7.4 50.32

28/03/2014 2:39 7.1 49.66

28/03/2014 2:41 7.2 47.1

28/03/2014 2:42 6.1 49.05

28/03/2014 2:44 7.0 50.16

28/03/2014 2:45 7.1 51.42

28/03/2014 2:48 6.8 49.54

28/03/2014 2:49 7.3 49.29

28/03/2014 2:50 7.5 51.05

28/03/2014 2:53 7.3 50.84

28/03/2014 3:00 7.4 48.88

28/03/2014 3:01 7.3 48.9

28/03/2014 3:02 7.4 51

28/03/2014 3:07 7.5 50.9

28/03/2014 3:10 7.2 50.28

28/03/2014 3:14 7.1 47.89

28/03/2014 3:15 6.8 47.94

28/03/2014 3:16 6.9 46.78

28/03/2014 3:17 6.9 47.96

28/03/2014 3:18 7.0 45.73

28/03/2014 3:19 6.4 45.94

28/03/2014 3:20 6.1 46.25

28/03/2014 3:21 6.6 47.93

28/03/2014 3:22 7.2 49.57

28/03/2014 3:23 7.3 46.94

28/03/2014 3:24 6.8 47.6

28/03/2014 3:25 6.6 50.19

28/03/2014 3:26 7.2 50.07

28/03/2014 3:28 7.4 50.39

28/03/2014 3:31 7.0 48.26

28/03/2014 3:34 7.4 47.24

28/03/2014 3:35 7.2 47.41

28/03/2014 3:36 6.7 47.99

11/12/2014 9/95

Page 56: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

28/03/2014 3:37 7.1 47.27

28/03/2014 3:38 6.8 47.35

28/03/2014 3:39 6.3 49.92

28/03/2014 4:00 7.5 51.44

28/03/2014 4:13 7.4 49.15

28/03/2014 4:32 7.3 51.12

28/03/2014 4:36 7.3 51.7

28/03/2014 4:38 7.5 52.34

03/04/2014 22:37 4.9 52.62

03/04/2014 22:39 5.5 50.68

03/04/2014 22:43 5.8 49.48

03/04/2014 22:45 5.7 52.06

03/04/2014 22:55 6.3 52.24

03/04/2014 23:17 6.1 49.87

03/04/2014 23:19 6.8 50.55

03/04/2014 23:22 7.5 53.74

03/04/2014 23:25 6.9 53.08

03/04/2014 23:28 5.5 53.29

03/04/2014 23:34 7.3 53.94

03/04/2014 23:35 7.2 54.33

03/04/2014 23:37 6.5 52.89

03/04/2014 23:55 6.6 50.29

04/04/2014 0:07 6.9 46.81

04/04/2014 0:18 4.7 51.29

04/04/2014 0:24 5.6 50.27

04/04/2014 0:34 5.7 53.23

04/04/2014 0:57 5.8 56.97

04/04/2014 1:02 7.0 53.42

04/04/2014 1:05 6.3 53.61

04/04/2014 1:13 5.4 55.35

04/04/2014 1:17 5.0 55.13

04/04/2014 1:18 7.3 53.54

04/04/2014 1:22 6.1 46.81

04/04/2014 1:23 5.1 53.03

04/04/2014 1:27 6.9 50.64

04/04/2014 1:29 5.6 50.57

04/04/2014 1:49 5.0 50.26

04/04/2014 2:03 6.6 50.96

04/04/2014 2:06 6.6 50.72

04/04/2014 2:09 7.3 51.57

04/04/2014 2:11 7.1 50.43

04/04/2014 2:15 7.0 51.36

04/04/2014 2:17 6.5 51.84

04/04/2014 2:18 7.1 50.73

11/12/2014 10/95

Page 57: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/04/2014 2:44 5.0 54.32

04/04/2014 2:50 4.7 48.89

04/04/2014 2:56 5.8 56.25

04/04/2014 2:58 6.9 49.27

04/04/2014 3:01 7.3 51.9

04/04/2014 3:05 6.8 51.85

04/04/2014 3:10 5.9 44.64

04/04/2014 3:11 4.9 45.04

04/04/2014 3:12 4.6 45.14

04/04/2014 3:14 5.4 51.92

04/04/2014 3:25 6.8 50.11

04/04/2014 3:26 6.3 53.44

04/04/2014 3:31 6.0 59.44

04/04/2014 3:34 6.7 52.68

04/04/2014 3:38 5.7 51.63

04/04/2014 3:39 5.6 53.63

04/04/2014 3:46 5.4 46.76

04/04/2014 3:49 6.0 50.8

04/04/2014 3:50 6.3 50.48

04/04/2014 3:55 4.6 49.48

04/04/2014 3:58 5.2 47.37

04/04/2014 3:59 6.2 46.87

04/04/2014 4:01 4.4 51.06

04/04/2014 4:02 6.3 52.15

04/04/2014 4:03 6.8 53.64

04/04/2014 4:05 7.4 51.31

04/04/2014 4:07 7.1 49.09

04/04/2014 4:26 6.9 54.06

07/04/2014 2:07 3.6 30.16

09/04/2014 22:00 5.0 38.96

09/04/2014 22:01 5.0 39.4

09/04/2014 22:02 5.1 39.92

09/04/2014 22:03 5.5 42.54

09/04/2014 22:04 5.3 40.93

09/04/2014 22:05 5.1 39.38

09/04/2014 22:06 4.7 39.07

09/04/2014 22:07 5.3 38.87

09/04/2014 22:08 5.0 38.61

09/04/2014 22:09 5.0 38.65

09/04/2014 22:10 4.9 38.85

09/04/2014 22:11 5.1 38.74

09/04/2014 22:12 4.7 38.77

09/04/2014 22:13 4.7 39.71

09/04/2014 22:14 4.7 40.2

11/12/2014 11/95

Page 58: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/04/2014 22:15 5.3 39.02

09/04/2014 22:16 5.3 41.77

09/04/2014 22:17 5.2 39.42

09/04/2014 22:18 5.0 39.87

09/04/2014 22:19 5.0 38.92

09/04/2014 22:20 4.8 39.25

09/04/2014 22:21 4.7 40.1

09/04/2014 22:22 5.0 38.97

09/04/2014 22:23 4.7 39.35

09/04/2014 22:24 4.2 41.02

09/04/2014 22:25 4.8 40.03

09/04/2014 22:26 4.4 39.38

09/04/2014 22:27 4.5 40.06

09/04/2014 22:28 5.0 39.91

09/04/2014 22:29 5.0 40.49

09/04/2014 22:30 4.9 40.12

09/04/2014 22:31 4.9 42.55

09/04/2014 22:32 5.7 41.04

09/04/2014 22:33 5.3 40.92

09/04/2014 22:34 5.4 42.02

09/04/2014 22:35 4.7 41.63

09/04/2014 22:36 5.1 40.24

09/04/2014 22:37 5.2 39.82

09/04/2014 22:38 5.0 40.07

09/04/2014 22:39 4.8 39.84

09/04/2014 22:40 4.7 40.31

09/04/2014 22:41 4.3 41.62

09/04/2014 22:42 5.6 41.24

09/04/2014 22:43 5.3 41.26

09/04/2014 22:44 5.5 41.27

09/04/2014 22:45 4.8 41.26

09/04/2014 22:46 5.6 40.97

09/04/2014 22:47 5.2 41.83

09/04/2014 22:48 5.6 40.93

09/04/2014 22:49 5.1 43.15

09/04/2014 22:50 5.4 41.47

09/04/2014 22:51 5.5 44.03

09/04/2014 22:52 5.3 41.15

09/04/2014 22:53 5.7 41.4

09/04/2014 22:54 4.7 43.74

09/04/2014 22:55 6.1 41.53

09/04/2014 22:56 5.7 42.49

09/04/2014 22:57 5.4 42.41

09/04/2014 22:58 5.1 41.23

11/12/2014 12/95

Page 59: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/04/2014 22:59 5.1 42.71

09/04/2014 23:00 5.3 45.59

09/04/2014 23:01 5.4 41.6

09/04/2014 23:02 5.4 41.89

09/04/2014 23:03 5.0 40.88

09/04/2014 23:04 5.0 41.37

09/04/2014 23:05 4.6 41.09

09/04/2014 23:06 5.3 40.5

09/04/2014 23:07 5.0 42.03

09/04/2014 23:08 4.7 41.86

09/04/2014 23:09 5.4 41.02

09/04/2014 23:10 4.9 41.38

09/04/2014 23:11 5.3 41.35

09/04/2014 23:12 5.1 40.32

09/04/2014 23:13 4.5 42.53

09/04/2014 23:14 5.3 40.94

09/04/2014 23:15 5.1 41.18

09/04/2014 23:16 5.1 41.53

09/04/2014 23:17 5.3 40.96

09/04/2014 23:18 5.2 40.76

09/04/2014 23:19 4.8 41.3

09/04/2014 23:20 5.1 40.43

09/04/2014 23:21 4.6 40.51

09/04/2014 23:22 4.5 39.9

09/04/2014 23:23 4.5 42.76

09/04/2014 23:24 4.2 40.77

09/04/2014 23:25 4.4 40.75

09/04/2014 23:26 4.5 40.76

09/04/2014 23:27 4.6 40.93

09/04/2014 23:28 4.7 41.04

09/04/2014 23:29 4.9 41.46

09/04/2014 23:30 5.0 40.88

09/04/2014 23:31 4.8 41.11

09/04/2014 23:32 4.9 42.94

09/04/2014 23:33 5.4 40.99

09/04/2014 23:34 4.5 41.77

09/04/2014 23:35 4.6 41.09

09/04/2014 23:36 5.5 40.95

09/04/2014 23:37 5.0 42.03

09/04/2014 23:38 5.1 41.79

09/04/2014 23:39 4.6 42.04

09/04/2014 23:40 5.2 42.66

09/04/2014 23:41 5.7 41.67

09/04/2014 23:42 5.5 41.41

11/12/2014 13/95

Page 60: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/04/2014 23:43 4.6 42.03

09/04/2014 23:44 5.1 41.85

09/04/2014 23:45 5.2 42.11

09/04/2014 23:46 5.5 43.01

09/04/2014 23:47 5.5 44.15

09/04/2014 23:48 6.0 43.47

09/04/2014 23:49 6.1 42.9

09/04/2014 23:50 5.8 42.52

09/04/2014 23:51 5.4 42.39

09/04/2014 23:52 5.5 42.43

09/04/2014 23:53 5.3 42.66

09/04/2014 23:54 5.5 42.69

09/04/2014 23:55 5.7 42.26

09/04/2014 23:56 5.0 41.63

09/04/2014 23:57 5.1 41.81

09/04/2014 23:58 4.9 41.95

09/04/2014 23:59 5.2 42.93

10/04/2014 0:00 5.5 41.45

10/04/2014 0:01 5.0 41.27

10/04/2014 0:02 5.1 42.28

10/04/2014 0:03 5.1 41.99

10/04/2014 0:04 5.4 41.33

10/04/2014 0:05 4.7 41.04

10/04/2014 0:06 4.2 41.12

10/04/2014 0:07 4.3 40.81

10/04/2014 0:08 4.3 41.18

10/04/2014 0:09 4.8 41.73

10/04/2014 0:10 4.6 41.19

10/04/2014 0:11 4.5 42.26

10/04/2014 0:12 5.4 42.31

10/04/2014 0:13 4.9 42.76

10/04/2014 0:14 5.6 41.52

10/04/2014 0:15 5.2 43.2

10/04/2014 0:16 5.6 42.97

10/04/2014 0:17 5.8 42.31

10/04/2014 0:18 5.6 41.59

10/04/2014 0:19 5.1 42.13

10/04/2014 0:20 5.4 42.66

10/04/2014 0:21 5.4 42.16

10/04/2014 0:22 5.5 42.23

10/04/2014 0:23 5.1 41.87

10/04/2014 0:24 5.8 41.25

10/04/2014 0:25 4.9 41.59

10/04/2014 0:26 5.0 42.29

11/12/2014 14/95

Page 61: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 0:27 5.0 42.55

10/04/2014 0:28 5.5 41.05

10/04/2014 0:29 4.6 41.87

10/04/2014 0:30 4.8 41.87

10/04/2014 0:31 5.6 41.7

10/04/2014 0:32 5.6 41.36

10/04/2014 0:33 5.0 41.69

10/04/2014 0:34 5.0 41.12

10/04/2014 0:35 5.2 41.65

10/04/2014 0:36 5.0 40.59

10/04/2014 0:37 5.0 41.5

10/04/2014 0:38 4.9 41.32

10/04/2014 0:39 4.8 40.73

10/04/2014 0:40 5.0 41.07

10/04/2014 0:41 4.5 40.8

10/04/2014 0:42 4.9 41.27

10/04/2014 0:43 4.7 40.98

10/04/2014 0:44 4.3 41.3

10/04/2014 0:45 5.1 41.52

10/04/2014 0:46 5.4 41.66

10/04/2014 0:47 4.9 41.38

10/04/2014 0:48 5.3 40.72

10/04/2014 0:49 5.0 41.99

10/04/2014 0:50 5.1 40.35

10/04/2014 0:51 4.5 41.14

10/04/2014 0:52 4.8 41.25

10/04/2014 0:53 5.1 40.83

10/04/2014 0:54 4.7 40.85

10/04/2014 0:55 5.0 40.83

10/04/2014 0:56 4.5 41.81

10/04/2014 0:57 5.2 41.11

10/04/2014 0:58 5.3 40.96

10/04/2014 0:59 4.8 41.58

10/04/2014 1:00 5.0 40.35

10/04/2014 1:01 4.8 40.64

10/04/2014 1:02 4.7 40.72

10/04/2014 1:03 4.5 40.39

10/04/2014 1:04 4.1 41.47

10/04/2014 1:05 5.3 40.75

10/04/2014 1:06 5.1 40.73

10/04/2014 1:07 4.6 40.29

10/04/2014 1:08 4.4 40.63

10/04/2014 1:09 4.7 41.01

10/04/2014 1:10 4.7 40.92

11/12/2014 15/95

Page 62: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 1:11 4.7 40.64

10/04/2014 1:12 4.7 40.66

10/04/2014 1:13 4.9 40.72

10/04/2014 1:14 4.7 40.23

10/04/2014 1:15 4.7 40.53

10/04/2014 1:16 4.5 41.32

10/04/2014 1:17 4.8 41.22

10/04/2014 1:18 5.4 40.13

10/04/2014 1:19 4.8 40.29

10/04/2014 1:20 4.5 40.18

10/04/2014 1:21 4.4 40.52

10/04/2014 1:22 4.6 40.36

10/04/2014 1:23 4.8 39.6

10/04/2014 1:24 4.4 41.15

10/04/2014 1:25 4.3 40.44

10/04/2014 1:26 4.4 40.57

10/04/2014 1:27 4.8 40.53

10/04/2014 1:28 4.5 40.34

10/04/2014 1:29 4.6 40.59

10/04/2014 1:30 4.6 40.81

10/04/2014 1:31 4.5 40.51

10/04/2014 1:32 4.5 40.84

10/04/2014 1:33 4.9 40.53

10/04/2014 1:34 4.4 41.13

10/04/2014 1:35 4.6 41.02

10/04/2014 1:36 4.4 40.64

10/04/2014 1:37 4.4 40.7

10/04/2014 1:38 4.3 40.72

10/04/2014 1:39 4.1 40.7

10/04/2014 1:40 4.3 41.4

10/04/2014 1:41 4.8 41.16

10/04/2014 1:42 4.0 41.22

10/04/2014 1:43 4.6 41.16

10/04/2014 1:44 4.5 41.09

10/04/2014 1:45 4.7 40.56

10/04/2014 1:46 4.5 41.22

10/04/2014 1:47 4.8 41.15

10/04/2014 1:48 4.6 40.71

10/04/2014 1:49 4.6 40.87

10/04/2014 1:50 4.4 42.07

10/04/2014 1:51 4.6 41.45

10/04/2014 1:52 4.9 41.42

10/04/2014 1:53 4.6 41.09

10/04/2014 1:54 4.7 41.13

11/12/2014 16/95

Page 63: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 1:55 4.6 41.06

10/04/2014 1:56 4.8 41.71

10/04/2014 1:57 5.1 41.59

10/04/2014 1:58 5.2 41.46

10/04/2014 1:59 5.0 40.84

10/04/2014 2:00 4.8 40.84

10/04/2014 2:01 4.6 40.83

10/04/2014 2:02 4.8 40.69

10/04/2014 2:03 4.2 41.23

10/04/2014 2:04 4.8 40.78

10/04/2014 2:05 4.5 42.34

10/04/2014 2:06 5.3 41.39

10/04/2014 2:07 4.8 41.63

10/04/2014 2:08 5.1 40.86

10/04/2014 2:09 5.0 40.54

10/04/2014 2:10 4.7 40.94

10/04/2014 2:11 4.6 40.96

10/04/2014 2:12 4.9 41.5

10/04/2014 2:13 4.7 42.04

10/04/2014 2:14 5.3 41.18

10/04/2014 2:15 5.3 40.68

10/04/2014 2:16 4.7 41.23

10/04/2014 2:17 4.8 41.54

10/04/2014 2:18 4.9 41.6

10/04/2014 2:19 5.5 42.26

10/04/2014 2:20 5.1 42.07

10/04/2014 2:21 5.4 41.59

10/04/2014 2:22 5.2 41.11

10/04/2014 2:23 4.9 41.1

10/04/2014 2:24 4.9 41.73

10/04/2014 2:25 5.1 41.37

10/04/2014 2:26 5.6 40.97

10/04/2014 2:27 5.1 41.15

10/04/2014 2:28 4.8 41.23

10/04/2014 2:29 5.2 41.32

10/04/2014 2:30 5.1 41.66

10/04/2014 2:31 5.2 41.29

10/04/2014 2:32 5.1 42

10/04/2014 2:33 4.6 41.68

10/04/2014 2:34 5.3 42.45

10/04/2014 2:35 5.3 42.22

10/04/2014 2:36 5.3 41.29

10/04/2014 2:37 5.1 42.02

10/04/2014 2:38 5.3 41.39

11/12/2014 17/95

Page 64: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 2:39 5.2 42.15

10/04/2014 2:40 5.3 40.91

10/04/2014 2:41 5.1 41.92

10/04/2014 2:42 4.7 41.39

10/04/2014 2:43 5.0 41.82

10/04/2014 2:44 5.1 43.33

10/04/2014 2:45 5.4 42.34

10/04/2014 2:46 5.3 41.58

10/04/2014 2:47 5.1 41.77

10/04/2014 2:48 5.0 41.51

10/04/2014 2:49 5.0 41.69

10/04/2014 2:50 4.6 41.82

10/04/2014 2:51 4.8 41.53

10/04/2014 2:52 4.4 41.38

10/04/2014 2:53 4.7 41.82

10/04/2014 2:54 4.7 42.24

10/04/2014 2:55 5.4 41.81

10/04/2014 2:56 5.4 40.79

10/04/2014 2:57 4.8 41.75

10/04/2014 2:58 5.4 40.82

10/04/2014 2:59 5.0 40.63

10/04/2014 3:00 4.7 40.4

10/04/2014 3:01 4.8 41.82

10/04/2014 3:02 5.3 41.3

10/04/2014 3:03 4.9 42.27

10/04/2014 3:04 5.2 41.17

10/04/2014 3:05 5.1 41.04

10/04/2014 3:06 4.7 41.3

10/04/2014 3:07 4.8 41.11

10/04/2014 3:08 4.6 40.88

10/04/2014 3:09 4.7 41.18

10/04/2014 3:10 4.7 41.91

10/04/2014 3:11 5.4 40.94

10/04/2014 3:12 5.0 40.64

10/04/2014 3:13 4.8 40.91

10/04/2014 3:14 4.5 41.07

10/04/2014 3:15 4.8 40.98

10/04/2014 3:16 5.0 41.43

10/04/2014 3:17 4.7 40.52

10/04/2014 3:18 4.7 40.13

10/04/2014 3:19 4.6 40.69

10/04/2014 3:20 4.9 40.33

10/04/2014 3:21 5.1 40.25

10/04/2014 3:22 4.3 40.96

11/12/2014 18/95

Page 65: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 3:23 4.5 40.94

10/04/2014 3:24 4.9 40.57

10/04/2014 3:25 4.4 41.03

10/04/2014 3:26 4.8 39.93

10/04/2014 3:27 4.6 41.26

10/04/2014 3:28 5.3 39.92

10/04/2014 3:29 4.4 40.38

10/04/2014 3:30 5.0 39.76

10/04/2014 3:31 4.2 40.92

10/04/2014 3:32 4.4 40.57

10/04/2014 3:33 5.0 39.93

10/04/2014 3:34 4.4 40.25

10/04/2014 3:35 4.4 40.24

10/04/2014 3:36 4.7 40.58

10/04/2014 3:37 4.7 40.44

10/04/2014 3:38 4.3 40.07

10/04/2014 3:39 4.6 40.39

10/04/2014 3:40 4.6 39.71

10/04/2014 3:41 4.1 40.89

10/04/2014 3:42 4.4 40.63

10/04/2014 3:43 4.5 39.91

10/04/2014 3:44 4.0 40.94

10/04/2014 3:45 4.7 40.41

10/04/2014 3:46 4.9 40.21

10/04/2014 3:47 4.4 41.04

10/04/2014 3:48 4.9 40.39

10/04/2014 3:49 4.7 40.57

10/04/2014 3:50 4.7 40.42

10/04/2014 3:51 4.8 40.72

10/04/2014 3:52 4.9 41.25

10/04/2014 3:53 5.1 41.63

10/04/2014 3:54 5.3 41.81

10/04/2014 3:55 5.7 40.95

10/04/2014 3:56 5.3 40.71

10/04/2014 3:57 5.4 41.14

10/04/2014 3:58 5.3 41.13

10/04/2014 3:59 5.5 40.08

10/04/2014 4:00 5.2 40.6

10/04/2014 4:01 5.0 41.43

10/04/2014 4:02 5.4 42.15

10/04/2014 4:03 5.3 43.35

10/04/2014 4:04 6.0 40.21

10/04/2014 4:05 4.9 40.5

10/04/2014 4:06 4.7 41.03

11/12/2014 19/95

Page 66: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 4:07 5.0 39.84

10/04/2014 4:08 4.9 40.84

10/04/2014 4:09 5.0 40.77

10/04/2014 4:10 4.9 41.15

10/04/2014 4:11 5.2 40.58

10/04/2014 4:12 4.9 41.25

10/04/2014 4:13 5.0 40.6

10/04/2014 4:14 5.0 41.41

10/04/2014 4:15 4.6 39.84

10/04/2014 4:16 4.5 40.49

10/04/2014 4:17 4.7 42.75

10/04/2014 4:18 4.4 40.51

10/04/2014 4:19 5.4 41.83

10/04/2014 4:20 5.5 41.5

10/04/2014 4:21 4.9 41.63

10/04/2014 4:22 5.4 41.08

10/04/2014 4:23 5.4 40.22

10/04/2014 4:24 4.6 40.7

10/04/2014 4:25 4.9 41.4

10/04/2014 4:26 5.4 41.29

10/04/2014 4:27 4.9 41.24

10/04/2014 4:28 5.2 40.9

10/04/2014 4:29 5.0 40.58

10/04/2014 4:30 4.7 42.07

10/04/2014 4:31 5.2 40.32

10/04/2014 4:32 4.8 40.86

10/04/2014 4:33 4.8 40.87

10/04/2014 4:34 4.9 40.67

10/04/2014 4:35 4.8 40.36

10/04/2014 4:36 4.6 41.03

10/04/2014 4:37 4.8 41.81

10/04/2014 4:38 5.3 40.88

10/04/2014 4:39 4.7 40.85

10/04/2014 4:40 5.1 41.38

10/04/2014 4:41 5.0 40.76

10/04/2014 4:42 5.0 40.58

10/04/2014 4:43 4.8 40.87

10/04/2014 4:44 4.6 40.42

10/04/2014 4:45 4.7 40.52

10/04/2014 4:46 4.6 40.75

10/04/2014 4:47 5.0 40.83

10/04/2014 4:48 4.8 41.7

10/04/2014 4:49 5.2 40.63

10/04/2014 4:50 4.9 41.15

11/12/2014 20/95

Page 67: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/04/2014 4:51 5.0 40.66

10/04/2014 4:52 4.7 40.35

10/04/2014 4:53 5.0 40.51

10/04/2014 4:54 4.4 40.77

10/04/2014 4:55 4.8 40.36

10/04/2014 4:56 4.7 40.18

10/04/2014 4:57 4.8 41.52

10/04/2014 4:58 5.1 42.74

10/04/2014 4:59 4.8 41.77

11/04/2014 22:38 7.3 46.14

11/04/2014 22:40 6.3 44.45

11/04/2014 22:41 6.3 48.88

11/04/2014 22:42 6.7 50.68

11/04/2014 22:46 6.8 47.58

11/04/2014 22:47 7.1 46.93

11/04/2014 22:48 7.0 42.75

11/04/2014 22:49 6.4 46.33

11/04/2014 22:50 6.3 44.8

11/04/2014 22:51 7.1 45.59

11/04/2014 22:52 6.0 44.47

11/04/2014 22:53 6.7 43.62

11/04/2014 22:54 6.0 45.17

11/04/2014 22:55 6.4 46.15

11/04/2014 22:56 6.9 46.98

11/04/2014 22:57 6.8 44.51

11/04/2014 22:58 6.6 44.3

11/04/2014 22:59 6.4 44.4

11/04/2014 23:00 6.2 44.45

11/04/2014 23:01 6.5 40.95

11/04/2014 23:02 5.7 40.59

11/04/2014 23:03 5.4 39.92

11/04/2014 23:04 5.0 41.7

11/04/2014 23:05 5.4 41.19

11/04/2014 23:06 5.5 39.38

11/04/2014 23:07 5.1 40.59

11/04/2014 23:08 5.2 42.45

11/04/2014 23:09 5.6 49.12

11/04/2014 23:10 5.5 43.57

11/04/2014 23:11 5.5 39.52

11/04/2014 23:12 5.3 38.95

11/04/2014 23:13 4.6 39.92

11/04/2014 23:14 5.1 40.18

11/04/2014 23:15 5.5 40.36

11/04/2014 23:16 5.3 39.85

11/12/2014 21/95

Page 68: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

11/04/2014 23:17 5.6 41.53

11/04/2014 23:18 5.2 40.09

11/04/2014 23:19 5.5 42.11

11/04/2014 23:20 5.7 41.47

11/04/2014 23:21 5.7 41.54

11/04/2014 23:22 6.1 39.45

11/04/2014 23:23 5.7 38.45

11/04/2014 23:24 5.2 37.92

11/04/2014 23:25 5.0 38.07

11/04/2014 23:26 4.6 38.16

11/04/2014 23:27 5.0 36.96

11/04/2014 23:28 4.6 35.85

11/04/2014 23:29 4.2 37.12

11/04/2014 23:30 3.6 42.96

11/04/2014 23:37 3.9 35.12

11/04/2014 23:38 4.3 34.1

11/04/2014 23:39 4.1 33.39

11/04/2014 23:40 3.9 33.16

11/04/2014 23:41 3.7 32.45

11/04/2014 23:42 3.5 32.53

11/04/2014 23:48 3.5 31.18

11/04/2014 23:55 3.6 31.61

11/04/2014 23:56 3.8 32.42

11/04/2014 23:57 3.5 31.48

13/04/2014 3:59 7.3 51.27

13/04/2014 4:00 7.5 49.56

13/04/2014 4:01 6.1 48.64

13/04/2014 4:02 5.4 49.86

13/04/2014 4:03 5.7 52.92

13/04/2014 4:04 6.3 52.92

13/04/2014 4:05 7.0 48.45

13/04/2014 4:06 6.5 50.41

13/04/2014 4:08 6.0 52.76

13/04/2014 4:10 7.5 53.59

13/04/2014 4:18 5.8 50.51

13/04/2014 4:19 6.1 46.29

13/04/2014 4:21 4.9 47.98

13/04/2014 4:23 5.8 45.76

13/04/2014 4:24 5.4 45.92

13/04/2014 4:25 5.0 44.96

13/04/2014 4:26 4.7 44.52

13/04/2014 4:27 4.7 43.37

13/04/2014 4:28 4.7 43.61

13/04/2014 4:29 4.6 41.88

11/12/2014 22/95

Page 69: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

13/04/2014 4:30 4.3 42

13/04/2014 4:31 4.2 42.14

13/04/2014 4:32 4.7 42.18

13/04/2014 4:33 4.0 44.07

13/04/2014 4:34 5.0 41.01

13/04/2014 4:35 4.0 42.33

13/04/2014 4:36 4.0 43.35

13/04/2014 4:37 4.0 41.48

13/04/2014 4:38 4.8 40.32

13/04/2014 4:39 3.9 42.42

13/04/2014 4:40 4.6 42.05

13/04/2014 4:41 4.1 42.12

13/04/2014 4:42 4.0 43.57

13/04/2014 4:43 3.9 44.51

13/04/2014 4:44 4.7 43.15

13/04/2014 4:45 4.7 43.51

13/04/2014 4:46 4.3 43.19

13/04/2014 4:47 4.0 43.82

13/04/2014 4:48 3.7 45.08

13/04/2014 4:49 4.9 45.34

13/04/2014 4:50 5.2 44.84

13/04/2014 4:51 4.8 46.19

13/04/2014 4:52 5.4 47.88

13/04/2014 4:53 5.1 46.64

13/04/2014 4:54 6.0 43.43

13/04/2014 4:56 5.0 42.86

13/04/2014 4:59 3.8 42.75

13/04/2014 22:46 3.5 32.23

13/04/2014 23:26 3.5 38.93

13/04/2014 23:28 3.9 39.21

13/04/2014 23:31 3.7 38.6

13/04/2014 23:35 3.7 39.03

13/04/2014 23:36 4.0 38.98

13/04/2014 23:37 3.8 38.38

13/04/2014 23:38 3.8 38.22

13/04/2014 23:39 3.7 37.9

13/04/2014 23:42 3.5 37.72

13/04/2014 23:51 3.8 39.53

13/04/2014 23:53 3.8 39.78

13/04/2014 23:54 3.8 40.26

13/04/2014 23:55 3.9 40.39

13/04/2014 23:56 4.8 40.51

13/04/2014 23:57 4.3 40.56

13/04/2014 23:58 4.4 39.95

11/12/2014 23/95

Page 70: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

13/04/2014 23:59 4.9 39.72

14/04/2014 0:00 3.8 39.79

14/04/2014 0:01 3.7 39.81

14/04/2014 0:02 3.7 39.82

14/04/2014 0:03 3.6 39.76

14/04/2014 0:04 4.2 39.56

14/04/2014 0:05 3.9 39.48

14/04/2014 0:06 4.0 39.8

14/04/2014 0:07 3.6 39.68

14/04/2014 0:08 3.9 41.11

14/04/2014 0:09 3.6 41.16

14/04/2014 0:10 5.1 40.78

14/04/2014 0:11 4.7 40.88

14/04/2014 0:12 4.9 40.77

14/04/2014 0:13 4.6 40.91

14/04/2014 0:14 4.8 40.56

14/04/2014 0:15 4.8 40.85

14/04/2014 0:16 4.6 41.36

14/04/2014 0:17 5.2 42.25

14/04/2014 0:18 5.3 40.94

14/04/2014 0:19 4.6 43.22

14/04/2014 0:20 4.4 40.26

14/04/2014 0:21 4.4 41.01

14/04/2014 0:22 4.0 41.1

14/04/2014 0:23 4.5 41.34

14/04/2014 0:24 4.6 41.32

14/04/2014 0:25 4.8 41.07

14/04/2014 0:26 4.5 40.54

14/04/2014 0:27 4.6 41.28

14/04/2014 0:28 4.3 42.22

14/04/2014 0:29 5.2 41.37

14/04/2014 0:30 5.1 42.34

14/04/2014 0:32 4.9 41.48

14/04/2014 0:33 4.9 41.08

14/04/2014 0:34 4.6 43.6

14/04/2014 0:35 5.3 41.88

14/04/2014 0:36 5.2 42.32

14/04/2014 0:37 4.2 43.53

14/04/2014 0:39 5.2 40.99

14/04/2014 0:40 4.5 41.1

14/04/2014 0:41 4.2 41.14

14/04/2014 0:42 4.4 41.47

14/04/2014 0:43 4.8 41.44

14/04/2014 0:44 4.6 41.16

11/12/2014 24/95

Page 71: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/04/2014 0:45 4.6 40.46

14/04/2014 0:46 4.8 41.44

14/04/2014 0:47 4.5 41.29

14/04/2014 0:48 4.3 41.45

14/04/2014 0:49 4.4 41.25

14/04/2014 0:50 4.2 41.14

14/04/2014 0:51 4.2 41.67

14/04/2014 0:52 4.5 42.34

14/04/2014 0:53 4.8 42.23

14/04/2014 0:54 5.1 41.91

14/04/2014 0:55 4.4 42.95

14/04/2014 0:56 5.1 43.14

14/04/2014 0:57 5.5 42.68

14/04/2014 0:58 5.5 42.97

14/04/2014 0:59 5.2 42.81

14/04/2014 1:00 5.8 42.34

14/04/2014 1:01 5.0 43.1

14/04/2014 1:02 5.5 42.58

14/04/2014 1:03 5.4 43.05

14/04/2014 1:04 5.4 42.62

14/04/2014 1:05 5.3 43.35

14/04/2014 1:06 5.3 43.06

14/04/2014 1:07 5.8 43.02

14/04/2014 1:08 5.6 43.17

14/04/2014 1:09 5.5 42.69

14/04/2014 1:10 5.7 42.56

14/04/2014 1:11 5.2 41.94

14/04/2014 1:12 5.3 42.36

14/04/2014 1:13 5.0 42.39

14/04/2014 1:14 5.0 43.01

14/04/2014 1:15 5.2 43.54

14/04/2014 1:16 5.3 48.51

14/04/2014 1:17 6.5 48.6

14/04/2014 1:19 7.1 46.28

14/04/2014 1:20 6.7 46.19

14/04/2014 1:21 6.6 45.94

14/04/2014 1:22 6.4 45.08

14/04/2014 1:23 6.8 45.02

14/04/2014 1:24 6.0 43.95

14/04/2014 1:25 6.1 42.49

14/04/2014 1:26 5.1 45.21

14/04/2014 1:27 4.5 45.31

14/04/2014 1:28 6.2 43.03

14/04/2014 1:29 5.0 44.67

11/12/2014 25/95

Page 72: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/04/2014 1:30 6.0 45.31

14/04/2014 1:31 5.9 44.21

14/04/2014 1:32 5.8 46.11

14/04/2014 1:33 5.9 45.96

14/04/2014 1:34 6.4 48.81

14/04/2014 1:35 7.0 46.68

14/04/2014 1:36 7.2 46.52

14/04/2014 1:37 6.2 47.58

14/04/2014 1:38 6.8 47.72

14/04/2014 1:39 6.7 48.58

14/04/2014 1:40 6.6 47.44

14/04/2014 1:41 7.0 47.43

14/04/2014 1:42 6.8 48.4

14/04/2014 1:43 7.0 47.94

14/04/2014 1:44 7.2 48.16

14/04/2014 1:45 7.1 48.1

14/04/2014 1:46 6.8 50.77

14/04/2014 1:47 7.2 49.07

14/04/2014 1:49 6.9 50.09

14/04/2014 1:51 7.2 49.77

14/04/2014 1:53 7.1 48.26

14/04/2014 1:54 6.9 52.88

14/04/2014 1:57 7.1 52.3

14/04/2014 1:59 7.0 51.43

14/04/2014 2:02 7.2 51.45

14/04/2014 2:04 7.3 49.84

14/04/2014 2:05 7.0 49.85

14/04/2014 2:07 7.4 49.7

14/04/2014 2:09 7.2 47.84

14/04/2014 2:10 6.7 48.28

14/04/2014 2:11 7.0 47.54

14/04/2014 2:12 6.7 48.27

14/04/2014 2:13 6.5 47.6

14/04/2014 2:14 7.2 47.49

14/04/2014 2:15 6.9 45.54

14/04/2014 2:16 6.2 46.6

14/04/2014 2:17 6.2 46.41

14/04/2014 2:18 6.4 45.76

14/04/2014 2:19 6.1 46.35

14/04/2014 2:20 6.3 45.04

14/04/2014 2:21 6.2 46.18

14/04/2014 2:22 6.0 46.44

14/04/2014 2:23 6.6 45.19

14/04/2014 2:24 6.3 45.36

11/12/2014 26/95

Page 73: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/04/2014 2:25 5.9 47.06

14/04/2014 2:26 6.4 46

14/04/2014 2:27 6.2 45.32

14/04/2014 2:28 6.2 45.12

14/04/2014 2:29 5.5 46.28

14/04/2014 2:30 6.4 46.39

14/04/2014 2:31 6.7 46.69

14/04/2014 2:32 6.6 48.76

14/04/2014 2:33 6.6 47.37

14/04/2014 2:34 7.1 50.43

14/04/2014 2:35 6.9 48.33

14/04/2014 2:37 7.3 44.84

14/04/2014 2:38 6.7 45.57

14/04/2014 2:39 6.1 44.61

14/04/2014 2:40 6.2 45.27

14/04/2014 2:41 6.4 44.05

14/04/2014 2:42 5.9 44.17

14/04/2014 2:43 6.0 43.53

14/04/2014 2:44 5.7 43.68

14/04/2014 2:45 5.6 44.45

14/04/2014 2:46 5.8 44.41

14/04/2014 2:47 6.0 45.31

14/04/2014 2:48 6.2 44.55

14/04/2014 2:49 6.1 43.71

14/04/2014 2:50 6.0 45.82

14/04/2014 2:51 6.0 47.34

14/04/2014 2:52 6.9 44.49

14/04/2014 2:53 6.4 44.37

14/04/2014 2:54 5.7 44.11

14/04/2014 2:55 5.9 44.21

14/04/2014 2:56 6.1 43.62

14/04/2014 2:57 6.1 43.78

14/04/2014 2:58 5.3 43.81

14/04/2014 2:59 5.3 43.49

14/04/2014 3:00 5.7 43.81

14/04/2014 3:01 5.4 43.36

14/04/2014 3:02 5.3 43.57

14/04/2014 3:03 5.4 43.52

14/04/2014 3:04 5.5 43.8

14/04/2014 3:05 5.5 42.82

14/04/2014 3:06 5.4 44.33

14/04/2014 3:07 5.3 44.82

14/04/2014 3:08 6.2 43.09

14/04/2014 3:09 5.2 43.07

11/12/2014 27/95

Page 74: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/04/2014 3:10 5.3 42.83

14/04/2014 3:11 5.0 42.26

14/04/2014 3:12 5.2 43.07

14/04/2014 3:13 5.0 43.31

14/04/2014 3:14 5.5 44.24

14/04/2014 3:15 6.0 43.77

14/04/2014 3:16 5.2 43.4

14/04/2014 3:17 5.8 43.51

14/04/2014 3:18 5.4 43.57

14/04/2014 3:19 5.9 42.98

14/04/2014 3:20 4.9 42.97

14/04/2014 3:21 5.1 42.77

14/04/2014 3:22 5.3 43.35

14/04/2014 3:23 5.3 43.13

14/04/2014 3:24 5.5 43.58

14/04/2014 3:25 5.6 43.66

14/04/2014 3:26 5.7 43.61

14/04/2014 3:27 6.1 43.63

14/04/2014 3:28 5.6 43.18

14/04/2014 3:29 5.4 43.57

14/04/2014 3:30 5.6 43.5

14/04/2014 3:31 5.5 43.23

14/04/2014 3:32 5.4 42.78

14/04/2014 3:33 5.1 43.54

14/04/2014 3:34 5.4 42.83

14/04/2014 3:35 5.0 43.03

14/04/2014 3:36 5.2 42.97

14/04/2014 3:37 4.8 42.68

14/04/2014 3:38 4.9 43.3

14/04/2014 3:39 5.3 43

14/04/2014 3:40 5.4 43.95

14/04/2014 3:41 5.6 43.42

14/04/2014 3:42 5.8 43.48

14/04/2014 3:43 5.6 42.63

14/04/2014 3:44 5.3 42.29

14/04/2014 3:45 4.9 42.25

14/04/2014 3:46 4.7 42.65

14/04/2014 3:47 4.8 42.42

14/04/2014 3:48 5.2 42.74

14/04/2014 3:49 5.3 42.04

14/04/2014 3:50 4.8 42.08

14/04/2014 3:51 4.9 42.63

14/04/2014 3:52 4.9 43.27

14/04/2014 3:53 5.3 43.62

11/12/2014 28/95

Page 75: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/04/2014 3:54 5.8 42.64

14/04/2014 3:55 5.5 44.19

14/04/2014 3:56 5.2 44.18

14/04/2014 3:57 6.0 44.75

14/04/2014 3:58 6.1 44.85

14/04/2014 3:59 6.4 43.98

14/04/2014 4:00 5.9 45.41

14/04/2014 4:01 6.0 43.82

14/04/2014 4:02 6.2 44.26

14/04/2014 4:03 5.5 44.35

14/04/2014 4:04 6.2 44.22

14/04/2014 4:05 5.6 44.46

14/04/2014 4:06 5.8 44.96

14/04/2014 4:07 6.1 44.62

14/04/2014 4:08 5.9 45.01

14/04/2014 4:09 6.2 44.59

14/04/2014 4:10 5.8 45.84

14/04/2014 4:11 6.6 45.48

14/04/2014 4:12 5.7 44.95

14/04/2014 4:13 6.2 45.42

14/04/2014 4:14 6.5 45.13

14/04/2014 4:15 6.3 44.54

14/04/2014 4:16 6.0 44.41

14/04/2014 4:17 6.0 45.9

14/04/2014 4:18 6.1 44.48

14/04/2014 4:19 6.8 44.46

14/04/2014 4:20 5.9 44.08

14/04/2014 4:21 5.8 44.71

14/04/2014 4:22 6.0 45.35

14/04/2014 4:23 6.4 44.66

14/04/2014 4:24 6.4 45.46

14/04/2014 4:25 6.5 45.34

14/04/2014 4:26 6.5 44.01

14/04/2014 4:27 6.0 44.04

14/04/2014 4:28 5.7 44.87

14/04/2014 4:29 6.2 45.61

14/04/2014 4:30 6.5 44.84

14/04/2014 4:31 5.9 44.8

14/04/2014 4:32 6.2 44.65

14/04/2014 4:33 6.2 43.88

14/04/2014 4:34 5.8 44.51

14/04/2014 4:35 5.8 43.92

14/04/2014 4:36 6.0 44.71

14/04/2014 4:37 6.0 44.24

11/12/2014 29/95

Page 76: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

14/04/2014 4:38 5.8 44.63

14/04/2014 4:39 6.5 44.79

14/04/2014 4:40 6.2 45.52

14/04/2014 4:41 6.6 43.47

14/04/2014 4:42 5.9 45.44

14/04/2014 4:43 6.3 44.53

14/04/2014 4:44 6.6 45.39

14/04/2014 4:45 6.3 44.04

14/04/2014 4:46 6.1 47.5

14/04/2014 4:47 6.7 45.15

14/04/2014 4:48 6.3 45.83

14/04/2014 4:49 6.7 45.78

14/04/2014 4:50 6.8 45.9

14/04/2014 4:51 6.7 47.69

14/04/2014 4:53 6.6 45.65

14/04/2014 4:54 7.0 46.21

14/04/2014 4:55 7.1 45.18

14/04/2014 4:56 6.6 48.16

14/04/2014 4:57 7.0 45.19

14/04/2014 4:58 7.2 44.49

14/04/2014 4:59 6.5 46.61

16/04/2014 22:16 3.5 33.39

16/04/2014 22:17 3.6 32.25

16/04/2014 22:27 3.6 34.72

16/04/2014 22:33 3.7 34.87

16/04/2014 22:38 3.7 34.5

16/04/2014 22:39 3.7 34.86

16/04/2014 22:40 3.7 35.15

16/04/2014 22:41 4.0 33.66

16/04/2014 22:42 3.9 33.97

16/04/2014 22:44 3.7 34.58

16/04/2014 22:45 3.5 36.87

16/04/2014 22:46 3.7 32.88

16/04/2014 22:47 3.8 34

16/04/2014 22:49 3.6 33.89

16/04/2014 22:50 4.1 35.45

16/04/2014 22:52 4.0 34.63

16/04/2014 22:53 3.6 39.37

16/04/2014 22:54 3.6 38.28

16/04/2014 22:56 4.0 35.74

16/04/2014 22:57 3.9 32.1

16/04/2014 22:58 3.6 31.28

16/04/2014 23:48 3.8 35.35

16/04/2014 23:50 3.5 34.2

11/12/2014 30/95

Page 77: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/04/2014 23:52 3.8 31.94

17/04/2014 1:21 4.0 35.59

17/04/2014 1:23 3.8 36.64

17/04/2014 1:24 3.6 36.79

17/04/2014 1:25 3.7 36.66

17/04/2014 1:27 3.9 36.5

17/04/2014 1:31 3.8 37.62

17/04/2014 1:33 3.7 37.95

17/04/2014 1:54 4.0 38.23

17/04/2014 1:56 4.0 37.97

17/04/2014 1:57 3.9 39.27

17/04/2014 1:58 4.0 39.84

17/04/2014 1:59 3.6 40.62

17/04/2014 2:00 4.0 41.81

17/04/2014 2:01 4.4 41.74

17/04/2014 2:02 4.3 39.69

17/04/2014 2:03 3.8 39.69

17/04/2014 2:04 4.1 40.46

17/04/2014 2:05 4.4 38.87

17/04/2014 2:06 4.1 41.58

17/04/2014 2:10 5.8 41.85

17/04/2014 2:11 4.5 41.58

17/04/2014 2:12 4.2 45.79

17/04/2014 2:14 5.2 45.64

17/04/2014 2:15 5.5 46.67

17/04/2014 2:16 4.7 45.61

17/04/2014 2:17 5.4 44.16

17/04/2014 2:18 5.0 43.62

17/04/2014 2:19 4.9 43.1

17/04/2014 2:20 4.8 44.89

17/04/2014 2:21 4.7 47.13

17/04/2014 2:22 5.4 48.05

17/04/2014 2:24 5.5 45.03

17/04/2014 2:26 5.2 48.91

17/04/2014 2:27 4.8 49.72

17/04/2014 2:29 6.3 46.28

17/04/2014 2:31 5.0 46.22

17/04/2014 2:32 5.3 49.26

17/04/2014 2:33 5.8 48.06

17/04/2014 2:34 6.4 47.88

17/04/2014 2:35 5.4 46.09

17/04/2014 2:36 5.9 47.86

17/04/2014 2:37 5.7 52.13

17/04/2014 2:38 5.3 48.11

11/12/2014 31/95

Page 78: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/04/2014 2:40 5.0 46.03

17/04/2014 2:42 5.4 50.24

17/04/2014 2:43 6.1 49.95

17/04/2014 2:44 6.0 49.15

17/04/2014 2:47 5.7 46.93

17/04/2014 2:48 6.0 46.33

17/04/2014 2:49 5.5 48.22

17/04/2014 2:50 5.4 47.16

17/04/2014 2:51 6.3 45

17/04/2014 2:52 5.6 45.83

17/04/2014 2:53 4.8 51.45

17/04/2014 2:54 6.1 44.9

17/04/2014 2:55 5.4 45.85

17/04/2014 2:56 5.3 48.67

17/04/2014 2:58 6.1 46.06

17/04/2014 2:59 5.0 43.34

17/04/2014 3:00 5.2 45.93

17/04/2014 3:01 4.8 45.08

17/04/2014 3:02 5.3 45.63

17/04/2014 3:03 5.3 43.26

17/04/2014 3:04 5.5 42.77

17/04/2014 3:05 4.1 45.59

17/04/2014 3:06 4.8 47.52

17/04/2014 3:07 5.3 46.34

17/04/2014 3:08 5.9 43.04

17/04/2014 3:09 5.3 43.9

17/04/2014 3:10 4.7 44.41

17/04/2014 3:11 5.2 47.33

17/04/2014 3:12 5.5 46.64

17/04/2014 3:13 5.6 41.34

17/04/2014 3:14 5.0 42.65

17/04/2014 3:15 4.5 45.21

17/04/2014 3:16 5.0 47.43

17/04/2014 3:18 4.8 43.08

17/04/2014 3:19 5.0 42.95

17/04/2014 3:20 4.3 43.65

17/04/2014 3:21 5.1 44.56

17/04/2014 3:23 5.2 42.53

17/04/2014 3:24 4.5 43.61

17/04/2014 3:25 4.5 43.33

17/04/2014 3:26 4.6 47.09

17/04/2014 3:27 4.1 50.56

17/04/2014 3:28 6.7 46.47

17/04/2014 3:29 6.3 43.75

11/12/2014 32/95

Page 79: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/04/2014 3:30 5.0 41.56

17/04/2014 3:31 4.7 43.49

17/04/2014 3:32 4.2 44

17/04/2014 3:33 5.1 44.96

17/04/2014 3:34 5.0 48.71

17/04/2014 3:36 4.9 46.32

17/04/2014 3:37 5.1 44.41

17/04/2014 3:39 4.7 46.65

17/04/2014 3:40 6.2 43.21

17/04/2014 3:41 4.9 42.1

17/04/2014 3:42 4.4 44.53

17/04/2014 3:43 4.7 47.37

17/04/2014 3:44 5.0 50.47

17/04/2014 3:45 6.5 50.28

17/04/2014 3:46 7.0 45.42

17/04/2014 3:47 5.7 45.38

17/04/2014 3:48 5.7 48.09

17/04/2014 3:49 5.3 45.17

17/04/2014 3:50 6.0 47.01

17/04/2014 3:51 6.2 51.38

17/04/2014 3:53 6.4 45.31

17/04/2014 3:56 7.4 50

17/04/2014 3:58 6.2 47.98

17/04/2014 3:59 4.8 44.68

17/04/2014 4:00 6.1 43.8

17/04/2014 4:01 4.4 47.64

17/04/2014 4:02 5.9 47.2

17/04/2014 4:03 5.7 43.12

17/04/2014 4:04 5.5 46.85

17/04/2014 4:05 5.1 46.24

17/04/2014 4:06 5.3 46.44

17/04/2014 4:08 5.0 49.81

17/04/2014 4:09 6.1 47.79

17/04/2014 4:10 6.4 51.02

17/04/2014 4:11 6.1 48.35

17/04/2014 4:12 5.7 50.46

17/04/2014 4:13 5.9 49.47

17/04/2014 4:14 6.7 51.54

17/04/2014 4:15 6.4 50.82

17/04/2014 4:16 7.2 47.46

17/04/2014 4:17 6.2 46.89

17/04/2014 4:18 6.2 50.12

17/04/2014 4:19 6.1 47.86

17/04/2014 4:20 6.0 47.77

11/12/2014 33/95

Page 80: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/04/2014 4:22 5.0 49.12

17/04/2014 4:23 5.5 49.19

17/04/2014 4:25 5.7 52.06

17/04/2014 4:26 7.3 52.85

17/04/2014 4:27 7.0 54.44

17/04/2014 4:29 6.4 49.72

17/04/2014 4:30 6.2 51.08

17/04/2014 4:31 6.3 51.08

17/04/2014 4:32 6.2 50.78

17/04/2014 4:33 6.4 48.51

17/04/2014 4:34 6.7 47.82

17/04/2014 4:35 6.0 50.55

17/04/2014 4:37 6.4 48.84

17/04/2014 4:38 7.3 48.14

17/04/2014 4:39 5.2 52.88

17/04/2014 4:40 5.6 51.84

17/04/2014 4:41 7.4 48.38

17/04/2014 4:42 5.9 54.5

17/04/2014 4:44 7.0 51.26

17/04/2014 4:45 6.0 48.72

17/04/2014 4:46 6.1 47.23

17/04/2014 4:47 6.0 54.65

17/04/2014 4:51 7.0 49.01

17/04/2014 4:52 6.8 50.44

17/04/2014 4:53 5.5 52.11

17/04/2014 4:54 7.3 51.87

17/04/2014 4:55 6.6 47.31

17/04/2014 4:56 5.6 49.05

17/04/2014 4:57 6.2 53.17

17/04/2014 4:59 6.4 47.24

17/04/2014 22:00 4.4 40

17/04/2014 22:01 3.6 42.61

17/04/2014 22:02 3.5 41.87

17/04/2014 22:03 3.7 42.26

17/04/2014 22:04 3.8 42.12

17/04/2014 22:05 4.0 41.9

17/04/2014 22:06 4.4 43.17

17/04/2014 22:07 4.5 42.15

17/04/2014 22:08 5.1 41.02

17/04/2014 22:09 3.7 40.74

17/04/2014 22:11 3.8 42.77

17/04/2014 22:12 3.8 40.66

17/04/2014 22:13 4.6 41.2

17/04/2014 22:14 3.7 40.92

11/12/2014 34/95

Page 81: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/04/2014 22:15 3.9 40.6

17/04/2014 22:16 3.9 41.45

17/04/2014 22:17 3.8 41.05

17/04/2014 22:18 3.7 41.67

17/04/2014 22:19 3.8 40.1

17/04/2014 22:20 3.8 39.95

17/04/2014 22:24 3.8 40.29

17/04/2014 22:27 4.1 40.1

17/04/2014 22:29 3.5 41.91

17/04/2014 22:30 3.9 41.61

17/04/2014 22:31 4.3 41.56

17/04/2014 22:32 3.9 40.76

17/04/2014 22:33 4.3 40.57

17/04/2014 22:35 4.0 39.96

17/04/2014 22:36 3.6 40.67

17/04/2014 22:38 3.6 41.56

17/04/2014 22:39 3.7 41.31

17/04/2014 22:40 4.3 41.42

17/04/2014 22:41 4.0 41.99

17/04/2014 22:42 3.9 41.67

17/04/2014 22:43 3.8 44.87

17/04/2014 22:44 4.0 43.25

17/04/2014 22:45 3.8 41.09

17/04/2014 22:46 4.1 41.41

17/04/2014 22:47 4.2 41.22

17/04/2014 22:50 3.6 41.55

17/04/2014 22:51 4.2 41.11

17/04/2014 22:52 4.0 41.76

17/04/2014 22:53 3.8 41.31

17/04/2014 22:54 4.2 47.23

17/04/2014 22:55 3.5 43.62

17/04/2014 22:56 3.6 45.69

17/04/2014 22:59 3.6 40.8

17/04/2014 23:00 3.5 44.64

17/04/2014 23:01 3.5 39.99

17/04/2014 23:02 3.5 40.77

17/04/2014 23:03 3.6 41.23

17/04/2014 23:04 3.7 40.91

17/04/2014 23:05 3.7 40.46

17/04/2014 23:06 3.9 40.34

17/04/2014 23:09 3.9 40.66

17/04/2014 23:10 3.6 40.98

17/04/2014 23:12 4.3 42.16

17/04/2014 23:13 4.0 41.94

11/12/2014 35/95

Page 82: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/04/2014 23:14 3.8 41.51

17/04/2014 23:15 4.5 41.04

17/04/2014 23:16 4.0 40.38

17/04/2014 23:17 3.8 41.42

17/04/2014 23:18 3.6 41.01

17/04/2014 23:19 4.1 41.35

17/04/2014 23:20 3.9 41.95

17/04/2014 23:21 4.3 41.21

17/04/2014 23:22 4.1 41.51

17/04/2014 23:23 4.0 41.84

17/04/2014 23:24 3.8 40.93

17/04/2014 23:25 4.2 41.7

17/04/2014 23:26 3.8 41.18

17/04/2014 23:27 4.2 41.36

17/04/2014 23:28 4.2 41.47

17/04/2014 23:29 4.2 41.88

17/04/2014 23:30 4.2 41.11

17/04/2014 23:31 3.9 41.08

17/04/2014 23:32 3.8 41.71

17/04/2014 23:33 3.9 41.49

17/04/2014 23:34 3.9 41.01

17/04/2014 23:35 3.9 41.19

17/04/2014 23:36 4.2 41.4

17/04/2014 23:37 4.3 40.9

17/04/2014 23:38 4.1 41.09

17/04/2014 23:39 4.2 41.47

17/04/2014 23:40 4.5 40.77

17/04/2014 23:41 3.9 40.25

17/04/2014 23:42 4.2 40.67

17/04/2014 23:43 4.0 40.98

17/04/2014 23:44 3.6 42.92

17/04/2014 23:45 4.5 42.57

17/04/2014 23:46 4.1 43.56

17/04/2014 23:47 4.9 43.25

17/04/2014 23:48 4.9 43.01

17/04/2014 23:49 4.8 43.09

17/04/2014 23:50 4.6 42.91

17/04/2014 23:51 4.8 42.76

17/04/2014 23:52 4.6 45.15

17/04/2014 23:53 4.8 44.11

17/04/2014 23:54 5.0 44.93

17/04/2014 23:55 4.8 43.33

17/04/2014 23:56 5.0 44.43

17/04/2014 23:57 5.1 44.36

11/12/2014 36/95

Page 83: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/04/2014 23:58 5.5 44.57

17/04/2014 23:59 5.0 43.93

18/04/2014 0:00 5.5 43.96

18/04/2014 0:01 5.4 44.02

18/04/2014 0:02 5.4 45.01

18/04/2014 0:03 4.8 44.23

18/04/2014 0:04 5.7 46.08

18/04/2014 0:05 5.4 44.99

18/04/2014 0:06 5.7 45.85

18/04/2014 0:07 5.7 47.51

18/04/2014 0:08 5.5 48.03

18/04/2014 0:09 6.3 47.29

18/04/2014 0:10 6.3 46.22

18/04/2014 0:11 5.5 46.44

18/04/2014 0:13 5.9 48.76

18/04/2014 0:15 6.0 47.72

18/04/2014 0:16 5.9 48.72

18/04/2014 0:18 6.6 46.56

18/04/2014 0:19 6.0 49.09

18/04/2014 0:20 6.3 48.45

18/04/2014 0:21 6.5 49.42

18/04/2014 0:22 6.6 47.85

18/04/2014 0:23 6.0 48.98

18/04/2014 0:24 6.4 50.71

18/04/2014 0:25 6.5 48.55

18/04/2014 0:26 6.7 47.58

18/04/2014 0:27 6.5 48.03

18/04/2014 0:28 5.4 49.48

18/04/2014 0:29 6.8 51.18

18/04/2014 0:30 7.0 52.35

18/04/2014 0:32 6.8 49.3

18/04/2014 0:33 6.7 51.15

18/04/2014 0:34 7.2 50.22

18/04/2014 0:35 7.0 48.08

18/04/2014 0:36 6.3 50.23

18/04/2014 0:37 6.4 49.29

18/04/2014 0:38 6.8 49.03

18/04/2014 0:39 6.5 50.56

18/04/2014 0:40 7.1 49.17

18/04/2014 0:41 6.8 51.19

18/04/2014 0:42 6.5 50.65

18/04/2014 0:43 7.3 51.84

18/04/2014 0:44 7.4 50.48

18/04/2014 0:45 7.0 51.67

11/12/2014 37/95

Page 84: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/04/2014 0:46 6.4 50.45

18/04/2014 0:47 7.3 51.98

18/04/2014 0:48 7.0 52.45

18/04/2014 0:50 7.3 49.28

18/04/2014 0:51 6.9 47.32

18/04/2014 0:52 6.3 49.18

18/04/2014 0:53 6.6 50.41

18/04/2014 0:54 7.1 48.99

18/04/2014 0:55 5.6 47.05

18/04/2014 0:56 5.9 49.03

18/04/2014 0:57 5.9 48.14

18/04/2014 0:58 6.3 47.26

18/04/2014 0:59 6.2 49.9

18/04/2014 1:01 6.8 47.94

18/04/2014 1:02 5.9 47.44

18/04/2014 1:03 6.0 48.19

18/04/2014 1:04 6.3 50

18/04/2014 1:05 6.4 47.74

18/04/2014 1:06 6.7 48.55

18/04/2014 1:07 6.3 50.87

18/04/2014 1:09 7.4 47.08

18/04/2014 1:10 6.2 48.19

18/04/2014 1:11 6.7 47.36

18/04/2014 1:12 6.6 46.3

18/04/2014 1:13 6.2 46.71

18/04/2014 1:14 6.3 47.36

18/04/2014 1:15 6.1 47.74

18/04/2014 1:16 6.1 47.15

18/04/2014 1:17 6.3 46.3

18/04/2014 1:18 6.9 46.29

18/04/2014 1:19 6.1 46.74

18/04/2014 1:20 6.4 45.72

18/04/2014 1:21 6.4 46.68

18/04/2014 1:22 6.1 46.05

18/04/2014 1:23 5.8 46.4

18/04/2014 1:24 6.1 47.38

18/04/2014 1:25 6.1 46.77

18/04/2014 1:26 5.9 47.73

18/04/2014 1:27 5.8 51.22

18/04/2014 1:28 6.9 49.36

18/04/2014 1:29 7.4 47.42

18/04/2014 1:30 6.2 49.72

18/04/2014 1:31 6.6 50.22

18/04/2014 1:32 7.4 50.29

11/12/2014 38/95

Page 85: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/04/2014 1:33 6.8 48.69

18/04/2014 1:34 7.0 52.01

18/04/2014 1:35 7.1 51.7

18/04/2014 1:37 6.9 51.55

18/04/2014 1:42 7.1 50.26

18/04/2014 1:43 6.6 51.48

18/04/2014 1:44 7.4 49.71

18/04/2014 1:45 7.3 48.06

18/04/2014 1:46 6.9 50.05

18/04/2014 1:47 7.1 48.88

18/04/2014 1:48 7.0 49.91

18/04/2014 1:49 7.1 48.9

18/04/2014 1:50 7.1 48.14

18/04/2014 1:51 6.8 47.75

18/04/2014 1:52 6.8 50.52

18/04/2014 1:53 6.8 49

18/04/2014 1:55 6.3 46.49

18/04/2014 1:56 6.3 45.78

18/04/2014 1:57 6.7 44.16

18/04/2014 1:58 6.3 45.46

18/04/2014 1:59 6.1 44.6

18/04/2014 2:00 6.0 44.32

18/04/2014 2:01 6.0 43.75

18/04/2014 2:02 6.0 43.09

18/04/2014 2:03 5.3 42.53

18/04/2014 2:04 5.5 43.06

18/04/2014 2:05 5.3 44.36

18/04/2014 2:06 5.5 42.83

18/04/2014 2:07 5.5 43.43

18/04/2014 2:08 5.4 42.24

18/04/2014 2:09 5.5 41.49

18/04/2014 2:10 5.2 42.67

18/04/2014 2:11 5.1 44.05

18/04/2014 2:12 5.7 44.65

18/04/2014 2:13 6.0 42.99

18/04/2014 2:14 5.4 42.63

18/04/2014 2:15 5.2 42.23

18/04/2014 2:16 5.1 42.54

18/04/2014 2:17 4.9 43.39

18/04/2014 2:18 5.4 46.36

18/04/2014 2:19 5.7 44.17

18/04/2014 2:20 5.7 44.12

18/04/2014 2:21 5.8 43.39

18/04/2014 2:22 5.5 43.37

11/12/2014 39/95

Page 86: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/04/2014 2:23 5.5 42.13

18/04/2014 2:24 4.9 45.16

18/04/2014 2:25 5.3 42.59

18/04/2014 2:26 5.2 43.12

18/04/2014 2:27 5.3 42.59

18/04/2014 2:28 4.9 43.69

18/04/2014 2:29 5.5 41.46

18/04/2014 2:30 4.6 40.66

18/04/2014 2:31 4.6 40.83

18/04/2014 2:32 4.4 41.32

18/04/2014 2:33 4.7 42.03

18/04/2014 2:34 4.5 42.41

18/04/2014 2:35 5.2 42.11

18/04/2014 2:36 5.1 41.87

18/04/2014 2:37 4.7 41.24

18/04/2014 2:38 4.9 42.12

18/04/2014 2:39 4.8 40.83

18/04/2014 2:40 4.9 41.14

18/04/2014 2:41 4.2 40.83

18/04/2014 2:42 5.0 41.47

18/04/2014 2:43 4.6 41.11

18/04/2014 2:44 4.9 40.83

18/04/2014 2:45 4.4 41.37

18/04/2014 2:46 4.4 41.85

18/04/2014 2:47 4.7 43.26

18/04/2014 2:48 5.7 43.59

18/04/2014 2:49 5.6 43.21

18/04/2014 2:50 5.8 41.78

18/04/2014 2:51 4.9 41.35

18/04/2014 2:52 4.5 42.73

18/04/2014 2:53 5.3 43.32

18/04/2014 2:54 5.6 43.65

18/04/2014 2:55 5.4 44.44

18/04/2014 2:56 5.9 43.71

18/04/2014 2:57 5.9 42.95

18/04/2014 2:58 5.2 42.51

18/04/2014 2:59 5.6 43.14

18/04/2014 3:00 5.5 45.08

18/04/2014 3:01 5.8 44.25

18/04/2014 3:02 6.3 44.36

18/04/2014 3:03 5.7 45.15

18/04/2014 3:04 5.9 44.6

18/04/2014 3:05 6.1 44.09

18/04/2014 3:06 6.2 44.34

11/12/2014 40/95

Page 87: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/04/2014 3:07 6.0 44.08

18/04/2014 3:08 5.9 43.33

18/04/2014 3:09 5.5 44.33

18/04/2014 3:10 5.7 43.28

18/04/2014 3:11 5.7 44.7

18/04/2014 3:12 6.0 45.08

18/04/2014 3:13 6.1 44.54

18/04/2014 3:14 6.3 44.44

18/04/2014 3:15 5.7 44.08

18/04/2014 3:16 6.1 43.77

18/04/2014 3:17 6.1 43.13

18/04/2014 3:18 5.7 44.76

18/04/2014 3:19 5.9 43.27

18/04/2014 3:20 5.6 42.82

18/04/2014 3:21 5.8 43.69

18/04/2014 3:22 5.9 42.92

18/04/2014 3:23 5.7 41.73

18/04/2014 3:24 5.3 41.23

18/04/2014 3:25 4.8 41.3

18/04/2014 3:26 4.7 41.49

18/04/2014 3:27 5.0 41.25

18/04/2014 3:28 5.0 41.98

18/04/2014 3:29 5.1 41.36

18/04/2014 3:30 5.1 40.69

18/04/2014 3:31 4.5 40.61

18/04/2014 3:32 4.6 40.73

18/04/2014 3:33 4.6 40.29

18/04/2014 3:34 4.4 40.62

18/04/2014 3:35 4.2 40.49

18/04/2014 3:36 4.2 40.83

18/04/2014 3:37 4.3 40.91

18/04/2014 3:38 4.5 41.03

18/04/2014 3:39 4.5 40.95

18/04/2014 3:40 4.5 41.34

18/04/2014 3:41 4.6 41.97

18/04/2014 3:42 4.4 41.25

18/04/2014 3:43 4.3 41.39

18/04/2014 3:44 4.5 40.57

18/04/2014 3:45 4.4 40.22

18/04/2014 3:46 4.5 40.5

18/04/2014 3:47 4.3 40.19

18/04/2014 3:48 4.7 40.75

18/04/2014 3:49 4.9 40.48

18/04/2014 3:50 4.7 41.05

11/12/2014 41/95

Page 88: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/04/2014 3:51 4.6 41.21

18/04/2014 3:52 4.9 41.08

18/04/2014 3:53 5.0 40.98

18/04/2014 3:54 4.9 41.05

18/04/2014 3:55 4.8 40.89

18/04/2014 3:56 4.9 41.71

18/04/2014 3:57 5.1 41.12

18/04/2014 3:58 5.2 41.01

18/04/2014 3:59 4.8 40.86

18/04/2014 4:00 5.0 41.02

18/04/2014 4:01 4.4 41.58

18/04/2014 4:02 5.1 41.72

18/04/2014 4:03 4.8 41.24

18/04/2014 4:04 4.9 40.68

18/04/2014 4:05 4.7 41.07

18/04/2014 4:06 4.7 40.74

18/04/2014 4:07 4.9 40.42

18/04/2014 4:08 4.7 40.37

18/04/2014 4:09 4.6 40.73

18/04/2014 4:10 4.4 40.83

18/04/2014 4:11 4.6 40.31

18/04/2014 4:12 4.6 40.77

18/04/2014 4:13 4.7 40.59

18/04/2014 4:14 4.5 40.97

18/04/2014 4:15 4.5 40.45

18/04/2014 4:16 4.8 40.43

18/04/2014 4:17 4.4 40.81

18/04/2014 4:18 4.6 40.83

18/04/2014 4:19 4.6 41.12

18/04/2014 4:20 4.8 41.96

18/04/2014 4:21 4.7 40.51

18/04/2014 4:22 4.8 39.92

18/04/2014 4:23 4.4 40.72

18/04/2014 4:24 4.9 40.87

18/04/2014 4:25 4.5 39.64

18/04/2014 4:26 3.8 40.87

18/04/2014 4:27 4.4 39.92

18/04/2014 4:28 4.7 39.87

18/04/2014 4:29 4.5 39.53

18/04/2014 4:30 4.0 41.29

18/04/2014 4:31 4.7 40.16

18/04/2014 4:32 4.4 41.24

18/04/2014 4:33 4.1 40.51

18/04/2014 4:34 4.7 41.1

11/12/2014 42/95

Page 89: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/04/2014 4:35 4.5 42.36

18/04/2014 4:36 5.3 40.76

18/04/2014 4:37 5.0 40.5

18/04/2014 4:38 5.3 40.48

18/04/2014 4:39 4.9 40.46

18/04/2014 4:40 4.7 43.6

18/04/2014 4:41 5.1 40.36

18/04/2014 4:42 5.0 41.38

18/04/2014 4:43 4.9 39.92

18/04/2014 4:44 4.9 43.31

18/04/2014 4:45 5.0 40.82

18/04/2014 4:46 5.0 42.44

18/04/2014 4:47 5.2 39.82

18/04/2014 4:48 5.2 41.16

18/04/2014 4:49 4.7 40.26

18/04/2014 4:51 4.8 41.36

18/04/2014 4:52 5.3 40.4

18/04/2014 4:53 4.8 41.2

18/04/2014 4:54 5.0 39.71

18/04/2014 4:55 4.6 40.02

18/04/2014 4:56 4.4 42.03

18/04/2014 4:57 5.5 39.23

18/04/2014 4:58 4.7 39.66

18/04/2014 4:59 4.4 39.91

19/04/2014 22:45 3.6 44.41

20/04/2014 0:12 3.6 34.34

20/04/2014 3:37 3.5 38.41

20/04/2014 3:48 3.6 38.89

20/04/2014 3:49 3.5 38.73

20/04/2014 3:50 3.6 38.7

20/04/2014 3:52 3.7 38.44

20/04/2014 3:54 3.6 38.47

20/04/2014 3:56 3.8 38.82

20/04/2014 3:58 3.6 38.43

20/04/2014 4:00 3.6 38.05

20/04/2014 4:06 4.1 39.43

20/04/2014 4:08 3.7 39.49

20/04/2014 4:09 3.8 39.11

20/04/2014 4:10 4.2 39.84

20/04/2014 4:11 3.8 39.43

20/04/2014 4:12 3.8 39.03

20/04/2014 4:13 3.8 39.54

20/04/2014 4:14 3.8 38.52

20/04/2014 4:15 3.6 39.09

11/12/2014 43/95

Page 90: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

20/04/2014 4:19 3.7 39.25

20/04/2014 4:22 4.1 40.85

20/04/2014 4:23 4.1 39.31

20/04/2014 4:24 4.1 39.68

20/04/2014 4:26 3.9 39.75

20/04/2014 4:27 3.8 39.75

20/04/2014 4:28 3.6 39.14

20/04/2014 4:29 3.7 38.56

20/04/2014 4:37 3.5 38.65

20/04/2014 4:38 3.7 38.75

20/04/2014 4:46 3.7 39.46

20/04/2014 4:47 4.2 39.94

20/04/2014 4:48 3.9 38.89

20/04/2014 4:53 4.0 39.3

20/04/2014 4:56 3.9 39.46

20/04/2014 4:58 3.5 39.9

20/04/2014 4:59 4.1 38.88

20/04/2014 22:02 3.5 34.67

20/04/2014 22:03 3.7 33.83

20/04/2014 22:04 4.1 32.78

20/04/2014 22:05 3.5 32.91

20/04/2014 22:07 3.5 33.9

20/04/2014 22:08 3.7 34.87

20/04/2014 22:09 4.5 33.11

20/04/2014 22:10 3.8 40.18

20/04/2014 22:13 3.6 34.74

20/04/2014 22:14 3.6 34.13

20/04/2014 22:18 3.6 41.13

20/04/2014 22:27 3.7 32.32

20/04/2014 22:28 3.7 32.41

20/04/2014 22:30 3.8 32.11

20/04/2014 22:31 3.5 32.06

20/04/2014 22:34 3.7 39.7

20/04/2014 22:36 3.6 32.58

20/04/2014 22:37 3.8 32.33

20/04/2014 22:41 3.6 33.11

20/04/2014 22:44 3.5 33.1

20/04/2014 23:35 3.6 34.86

20/04/2014 23:36 3.6 35.18

20/04/2014 23:37 3.7 35.62

22/04/2014 3:45 3.8 37.27

24/04/2014 22:01 3.9 35.12

24/04/2014 22:02 3.7 33.87

24/04/2014 23:58 3.7 32.76

11/12/2014 44/95

Page 91: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

24/04/2014 23:59 3.6 40.77

25/04/2014 0:02 3.6 35.85

25/04/2014 0:49 3.6 35.04

25/04/2014 0:51 3.8 33.44

25/04/2014 0:52 3.8 33.07

25/04/2014 0:53 3.6 31.74

25/04/2014 1:11 3.6 36.28

25/04/2014 1:12 3.9 35.33

25/04/2014 1:13 3.6 36.6

25/04/2014 1:15 3.7 35.32

25/04/2014 1:19 3.8 35.79

25/04/2014 1:20 3.7 36.14

25/04/2014 1:23 3.8 35.09

25/04/2014 1:25 3.8 34.86

25/04/2014 1:42 3.6 34.22

25/04/2014 1:45 3.5 34.63

25/04/2014 1:53 3.6 35.79

25/04/2014 1:54 3.9 37.04

25/04/2014 1:56 3.5 35.42

25/04/2014 1:58 3.5 35.97

25/04/2014 1:59 3.8 36.47

25/04/2014 2:00 3.5 36.31

25/04/2014 2:01 3.9 35.13

25/04/2014 2:06 3.9 40.85

25/04/2014 2:07 3.5 40.85

25/04/2014 2:08 4.2 37.82

25/04/2014 2:09 4.4 36.21

25/04/2014 2:10 3.7 34.45

25/04/2014 2:11 3.5 34.29

25/04/2014 2:13 3.6 32.93

25/04/2014 2:24 3.6 34.64

25/04/2014 2:25 3.8 34.64

25/04/2014 2:34 4.0 36.4

25/04/2014 2:36 4.1 35.03

25/04/2014 2:37 3.8 34.47

25/04/2014 2:39 3.7 35.43

25/04/2014 2:43 3.6 33.16

25/04/2014 3:06 3.6 36.23

25/04/2014 3:07 4.2 34.19

25/04/2014 3:08 3.8 34.12

25/04/2014 3:13 3.9 37.59

25/04/2014 3:14 4.0 39.45

25/04/2014 3:15 4.3 37.16

25/04/2014 3:16 4.6 39.13

11/12/2014 45/95

Page 92: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

25/04/2014 3:18 4.2 37.55

25/04/2014 3:19 3.6 36.61

25/04/2014 3:33 3.6 40.09

25/04/2014 3:34 3.7 39.36

25/04/2014 3:35 5.0 38.99

25/04/2014 3:36 4.3 39.69

25/04/2014 3:37 3.8 42.91

25/04/2014 3:38 5.0 40.72

25/04/2014 3:39 4.7 41.23

25/04/2014 3:40 4.0 43

25/04/2014 3:41 4.4 41.14

25/04/2014 3:42 5.0 41.27

25/04/2014 3:43 3.8 40.46

25/04/2014 3:44 4.6 40.7

25/04/2014 3:46 4.7 43.86

25/04/2014 3:47 4.6 44.1

25/04/2014 3:48 5.4 47.36

25/04/2014 3:49 5.5 47.58

25/04/2014 3:50 6.4 44.04

25/04/2014 3:51 5.9 41.47

25/04/2014 3:52 4.7 43.46

25/04/2014 3:54 4.5 44.63

25/04/2014 3:56 5.4 45.31

25/04/2014 3:57 4.8 42.55

25/04/2014 3:59 4.8 40.4

25/04/2014 4:00 5.0 41.19

25/04/2014 4:01 4.1 38.77

25/04/2014 4:02 4.3 38.37

25/04/2014 4:03 3.8 39.66

25/04/2014 4:04 3.7 42.8

25/04/2014 4:05 4.7 41.22

25/04/2014 4:06 4.4 43.71

25/04/2014 4:08 5.6 39.88

25/04/2014 4:09 3.9 39.72

25/04/2014 4:10 4.7 42.24

25/04/2014 4:11 4.5 41.82

25/04/2014 4:12 5.0 45.33

25/04/2014 4:14 5.2 40.99

25/04/2014 4:15 5.4 40.12

25/04/2014 4:16 4.1 41.09

25/04/2014 4:17 4.2 39.26

25/04/2014 4:18 4.0 40.18

25/04/2014 4:19 4.5 38.28

25/04/2014 4:20 4.1 39.7

11/12/2014 46/95

Page 93: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

25/04/2014 4:21 3.7 38.05

25/04/2014 4:22 4.1 39.21

25/04/2014 4:23 3.7 41.6

25/04/2014 4:24 4.2 40.12

25/04/2014 4:25 4.9 40.14

25/04/2014 4:26 4.5 41.45

25/04/2014 4:27 4.9 39.49

25/04/2014 4:28 4.4 45.71

25/04/2014 4:30 5.3 41.16

25/04/2014 4:32 4.7 42.67

25/04/2014 4:33 6.0 37.95

25/04/2014 4:34 4.2 37.76

25/04/2014 4:37 3.6 41.55

25/04/2014 4:40 5.1 38.95

25/04/2014 4:41 4.3 42.3

25/04/2014 4:43 4.9 39.12

25/04/2014 4:44 4.5 39.03

25/04/2014 4:45 4.5 37.96

25/04/2014 4:46 4.1 44.29

25/04/2014 4:48 3.9 39.04

25/04/2014 4:49 3.9 41.41

25/04/2014 4:50 3.8 44.65

25/04/2014 4:51 5.1 40.34

25/04/2014 4:52 5.2 42.04

25/04/2014 4:53 4.6 43.84

25/04/2014 4:55 5.3 41.86

25/04/2014 4:56 4.1 40.66

25/04/2014 4:57 4.4 41.71

25/04/2014 4:58 4.8 41.97

25/04/2014 4:59 5.1 40.97

28/04/2014 22:14 6.8 48.91

28/04/2014 22:20 4.6 48.92

28/04/2014 22:22 5.1 47.34

28/04/2014 22:44 4.5 41.3

28/04/2014 23:39 3.8 44.99

28/04/2014 23:41 4.7 45.22

28/04/2014 23:42 4.4 46.94

28/04/2014 23:43 5.3 49.08

28/04/2014 23:45 6.4 46.36

28/04/2014 23:52 4.7 48.01

28/04/2014 23:53 4.6 49.94

28/04/2014 23:56 5.5 50.36

28/04/2014 23:57 5.2 47.91

28/04/2014 23:58 6.7 47.93

11/12/2014 47/95

Page 94: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

29/04/2014 0:02 5.6 45.2

29/04/2014 0:08 5.1 47.16

29/04/2014 0:16 4.7 46.28

29/04/2014 0:18 5.9 47.61

29/04/2014 0:19 6.0 52.46

29/04/2014 0:23 5.8 46.1

29/04/2014 0:24 4.8 45.99

29/04/2014 0:25 5.5 44.16

29/04/2014 0:26 5.4 48.75

29/04/2014 0:27 5.1 49.92

29/04/2014 0:30 4.5 46.72

29/04/2014 0:32 5.5 47.25

29/04/2014 0:33 6.3 51.82

29/04/2014 0:34 5.5 49.34

29/04/2014 0:39 4.0 49.31

29/04/2014 0:45 6.6 52.34

29/04/2014 0:49 6.4 45.96

29/04/2014 0:51 5.3 51.2

29/04/2014 0:53 6.8 49.61

29/04/2014 1:37 5.6 53.05

29/04/2014 2:01 6.5 53.52

29/04/2014 2:07 7.3 49.95

29/04/2014 2:24 6.6 51.28

29/04/2014 2:29 6.0 55.69

29/04/2014 3:05 6.4 57.79

29/04/2014 3:33 6.3 57.13

29/04/2014 4:22 7.3 51.97

29/04/2014 4:32 6.5 49.74

29/04/2014 4:33 6.0 53.03

29/04/2014 4:34 6.4 54.44

29/04/2014 4:53 6.8 51.62

29/04/2014 4:56 6.4 53.89

29/04/2014 4:57 5.9 53.96

29/04/2014 4:59 6.5 49.63

29/04/2014 22:00 6.3 50.9

29/04/2014 22:01 6.3 48.12

29/04/2014 22:02 5.9 49.34

29/04/2014 22:03 6.1 47.61

29/04/2014 22:04 5.9 49.58

29/04/2014 22:05 5.4 52.86

29/04/2014 22:06 6.8 51.55

29/04/2014 22:07 7.1 50.7

29/04/2014 22:10 6.3 49.06

29/04/2014 22:11 6.2 50.58

11/12/2014 48/95

Page 95: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

29/04/2014 22:12 5.7 50.96

29/04/2014 22:13 6.2 49.94

29/04/2014 22:15 6.7 48.31

29/04/2014 22:17 5.5 47.96

29/04/2014 22:18 5.3 47.21

29/04/2014 22:19 5.6 51.63

29/04/2014 22:20 5.7 53.29

29/04/2014 22:22 6.9 50.89

29/04/2014 22:23 6.6 49.87

29/04/2014 22:24 6.6 48.72

29/04/2014 22:25 5.5 50.72

29/04/2014 22:27 6.8 52.7

29/04/2014 22:35 6.9 51.42

29/04/2014 22:36 6.1 54.41

29/04/2014 22:41 6.1 51.74

29/04/2014 22:42 7.4 51.42

29/04/2014 22:43 7.0 48.35

29/04/2014 22:45 5.2 48.75

29/04/2014 22:47 5.9 45.22

29/04/2014 22:49 4.9 44.3

29/04/2014 22:50 4.8 43.34

29/04/2014 22:51 5.2 45.21

29/04/2014 22:52 4.7 48.06

29/04/2014 22:53 4.7 45.82

29/04/2014 22:54 5.9 47.53

29/04/2014 22:55 4.2 47.46

29/04/2014 22:57 5.6 46.85

29/04/2014 23:02 6.4 49.81

29/04/2014 23:03 5.6 50.99

29/04/2014 23:04 6.3 52.15

29/04/2014 23:05 6.2 51.05

29/04/2014 23:06 7.2 51.75

29/04/2014 23:12 6.4 49.44

29/04/2014 23:14 5.7 52.93

30/04/2014 1:07 7.3 53.53

30/04/2014 1:16 6.5 54.34

30/04/2014 1:17 6.7 53.91

30/04/2014 3:11 5.2 45.27

30/04/2014 3:12 5.1 43.9

30/04/2014 22:00 3.6 37.73

30/04/2014 22:04 3.6 32.81

30/04/2014 22:08 4.0 33.02

30/04/2014 22:09 3.5 32.74

30/04/2014 22:15 3.7 31.75

11/12/2014 49/95

Page 96: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

30/04/2014 22:21 3.9 34.63

30/04/2014 22:37 3.8 32.27

30/04/2014 22:40 3.5 37.54

30/04/2014 22:41 4.6 36.95

30/04/2014 22:42 4.3 34.67

30/04/2014 22:43 3.6 33.45

30/04/2014 23:04 3.6 33.8

30/04/2014 23:09 4.0 34.19

30/04/2014 23:10 3.6 34.71

30/04/2014 23:14 3.8 33.69

30/04/2014 23:18 3.5 32.96

30/04/2014 23:22 3.7 35.44

30/04/2014 23:23 3.6 36.58

30/04/2014 23:27 3.6 35.31

30/04/2014 23:36 3.6 39.59

30/04/2014 23:38 4.0 36.68

30/04/2014 23:40 3.6 37.01

30/04/2014 23:41 4.2 38.33

30/04/2014 23:42 3.8 39.14

30/04/2014 23:43 4.7 37.14

30/04/2014 23:44 4.2 37.45

30/04/2014 23:45 3.7 39.01

30/04/2014 23:46 4.0 39.17

30/04/2014 23:47 4.3 37.31

30/04/2014 23:48 4.0 38.24

30/04/2014 23:51 3.6 38.66

30/04/2014 23:57 3.9 41.7

01/05/2014 0:13 3.6 38.9

01/05/2014 0:17 3.8 35.45

01/05/2014 0:18 3.9 34.44

01/05/2014 0:29 3.8 39.83

01/05/2014 0:30 3.7 36.59

01/05/2014 0:31 4.3 36.74

01/05/2014 0:32 3.9 35.86

01/05/2014 0:33 4.2 34.76

01/05/2014 0:37 3.7 42.21

01/05/2014 0:38 4.1 39.5

01/05/2014 0:45 3.7 39.28

01/05/2014 0:46 3.5 37.15

01/05/2014 0:47 3.5 37.46

01/05/2014 0:49 4.3 37.17

01/05/2014 0:50 4.4 35.04

01/05/2014 0:51 4.0 34.28

01/05/2014 0:54 3.9 38.55

11/12/2014 50/95

Page 97: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

01/05/2014 0:55 3.5 37.14

01/05/2014 0:56 4.1 39.47

01/05/2014 0:57 3.7 39.91

01/05/2014 0:58 4.6 40.67

01/05/2014 0:59 4.6 40.24

01/05/2014 1:00 5.1 37.1

01/05/2014 1:01 4.3 37.91

01/05/2014 1:02 3.8 37.44

01/05/2014 1:03 4.1 37.45

01/05/2014 1:04 4.0 36.03

01/05/2014 1:05 4.1 35.74

01/05/2014 1:06 3.7 37.62

01/05/2014 1:07 3.7 38.78

01/05/2014 1:08 4.7 39.83

01/05/2014 1:09 4.3 39.74

01/05/2014 1:10 4.8 40.99

01/05/2014 1:11 4.2 40.59

01/05/2014 1:12 5.4 40.18

01/05/2014 1:13 4.8 39.01

01/05/2014 1:14 4.7 37.86

01/05/2014 1:15 4.4 38.2

01/05/2014 1:16 3.8 38.71

01/05/2014 1:17 4.2 37.76

01/05/2014 1:18 4.3 37.21

01/05/2014 1:19 4.0 37.3

01/05/2014 1:20 3.9 36.48

01/05/2014 1:21 4.0 36.78

01/05/2014 1:22 3.7 35.83

01/05/2014 1:23 3.7 36.56

01/05/2014 1:27 4.3 36.41

01/05/2014 1:28 3.6 37.77

01/05/2014 1:30 4.3 35.58

01/05/2014 1:31 3.7 35.01

01/05/2014 1:35 3.7 35.94

01/05/2014 1:36 3.9 34.84

01/05/2014 1:37 3.7 34.68

01/05/2014 1:38 3.7 34.76

01/05/2014 1:39 3.9 33.38

01/05/2014 1:40 3.8 32.97

01/05/2014 1:41 3.5 33.47

01/05/2014 2:29 3.7 36.41

01/05/2014 2:31 4.1 34.97

01/05/2014 2:32 4.1 34.17

01/05/2014 2:34 3.5 32.15

11/12/2014 51/95

Page 98: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

01/05/2014 3:22 3.8 34.19

01/05/2014 3:23 4.1 34.64

01/05/2014 3:24 3.9 33.88

01/05/2014 3:25 3.7 33.22

01/05/2014 3:26 3.7 32.29

01/05/2014 3:31 3.5 33.24

01/05/2014 3:32 4.0 33.06

01/05/2014 3:33 3.6 33.38

01/05/2014 3:34 3.6 32.46

01/05/2014 3:35 3.5 33.84

01/05/2014 3:39 4.0 33.91

01/05/2014 3:40 4.3 34.45

01/05/2014 3:41 3.8 33.62

01/05/2014 3:42 4.0 34.4

01/05/2014 3:44 3.8 34.61

01/05/2014 3:45 3.9 38.32

01/05/2014 3:46 3.7 34.15

01/05/2014 3:47 4.2 33.79

01/05/2014 3:48 3.9 32.29

01/05/2014 3:49 3.6 33.82

01/05/2014 3:51 3.6 33.4

01/05/2014 3:52 3.8 33.25

01/05/2014 3:53 3.9 32.24

01/05/2014 3:54 3.6 32.68

01/05/2014 3:56 3.6 32.07

01/05/2014 3:59 3.6 30.84

01/05/2014 4:15 3.5 31.95

02/05/2014 22:13 3.7 37.55

02/05/2014 22:15 4.0 36.59

02/05/2014 22:56 3.8 38.06

03/05/2014 0:03 3.6 34.39

03/05/2014 0:10 3.8 36.97

03/05/2014 0:12 4.1 38.11

03/05/2014 0:13 3.9 34.93

03/05/2014 0:14 3.8 36.03

03/05/2014 0:15 4.3 36.92

03/05/2014 0:16 4.3 35.34

03/05/2014 0:17 4.1 34.74

03/05/2014 0:20 4.5 36.05

03/05/2014 0:23 4.2 34.46

03/05/2014 0:24 3.8 35.04

03/05/2014 0:25 4.1 35.58

03/05/2014 0:27 3.7 37.79

03/05/2014 0:28 4.2 34.14

11/12/2014 52/95

Page 99: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

03/05/2014 0:29 3.7 33.68

03/05/2014 0:31 4.5 33.27

03/05/2014 0:32 3.7 36.75

03/05/2014 0:34 4.0 36.06

03/05/2014 0:35 4.9 34.55

03/05/2014 0:36 4.4 33.65

03/05/2014 0:37 4.7 34.23

03/05/2014 0:38 4.0 38.61

03/05/2014 0:39 4.0 34.71

03/05/2014 0:40 4.6 35.12

03/05/2014 0:41 3.9 36.63

03/05/2014 0:42 3.8 36.13

03/05/2014 0:45 3.9 35.58

03/05/2014 0:49 3.8 46.62

03/05/2014 0:50 3.6 41.49

03/05/2014 0:57 3.8 35.27

03/05/2014 0:58 3.8 42.11

03/05/2014 1:00 3.6 34.24

03/05/2014 1:01 3.9 32.69

03/05/2014 1:02 4.0 33.07

03/05/2014 1:03 3.6 33.32

03/05/2014 1:04 3.7 33.73

03/05/2014 1:05 4.0 33.94

03/05/2014 1:07 3.7 34.11

03/05/2014 1:08 3.9 34.56

03/05/2014 1:09 3.7 33.4

03/05/2014 1:10 4.0 34.31

03/05/2014 1:11 4.2 34.31

03/05/2014 1:15 4.1 37.94

03/05/2014 1:22 3.5 38.51

03/05/2014 1:24 3.7 37.19

03/05/2014 1:34 3.6 37.1

03/05/2014 1:39 3.6 36.58

03/05/2014 1:44 3.5 35.97

03/05/2014 1:50 4.2 36.7

03/05/2014 1:51 3.6 37.01

03/05/2014 1:52 3.8 38.64

03/05/2014 1:54 3.9 36.67

03/05/2014 1:58 3.6 37.48

03/05/2014 2:04 3.6 35.71

03/05/2014 2:10 4.2 36.29

03/05/2014 2:11 3.9 34.89

03/05/2014 2:13 3.7 35.89

03/05/2014 2:14 3.7 33.81

11/12/2014 53/95

Page 100: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

03/05/2014 2:16 4.3 34.64

03/05/2014 2:17 3.6 36.8

03/05/2014 2:18 4.7 34.37

03/05/2014 2:20 3.5 33.75

03/05/2014 2:21 3.8 36.32

03/05/2014 2:22 3.8 34.33

03/05/2014 2:23 4.3 33.98

03/05/2014 2:24 3.6 33.55

03/05/2014 2:26 3.8 34.64

03/05/2014 2:47 3.6 35.41

03/05/2014 2:55 3.7 38.24

03/05/2014 2:57 3.6 35.97

03/05/2014 2:58 4.4 37.18

03/05/2014 2:59 4.1 36.31

03/05/2014 3:00 3.8 35.45

03/05/2014 3:03 4.2 36.04

03/05/2014 3:04 3.6 34.88

03/05/2014 3:05 3.5 34.94

03/05/2014 3:06 3.7 35.66

03/05/2014 3:09 3.5 36.9

03/05/2014 3:13 3.7 36.54

03/05/2014 3:14 4.4 35.7

03/05/2014 3:15 3.9 36.39

03/05/2014 3:19 3.9 38.44

03/05/2014 3:23 4.2 37.44

03/05/2014 3:24 4.1 36.97

03/05/2014 3:25 3.6 37.67

03/05/2014 3:28 3.7 37.67

03/05/2014 3:32 3.6 37.7

03/05/2014 3:33 3.6 39.28

03/05/2014 3:34 3.5 38.22

03/05/2014 3:57 3.8 35.59

03/05/2014 3:58 4.3 35.4

03/05/2014 3:59 3.6 35.43

03/05/2014 4:11 3.7 36.51

03/05/2014 4:27 4.0 36.26

03/05/2014 4:29 4.0 34.91

03/05/2014 4:30 4.0 36.65

03/05/2014 4:32 3.8 34.73

03/05/2014 4:33 4.3 35.37

03/05/2014 4:34 3.5 36.45

03/05/2014 4:35 4.0 36.44

03/05/2014 4:38 3.6 37.51

03/05/2014 4:41 3.6 36.39

11/12/2014 54/95

Page 101: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

03/05/2014 4:42 3.7 39.82

03/05/2014 4:43 3.8 36.84

03/05/2014 4:46 3.7 39.48

03/05/2014 4:47 3.6 36.94

03/05/2014 4:50 3.7 36.63

03/05/2014 4:52 3.6 36.38

03/05/2014 4:53 5.6 36.71

03/05/2014 4:54 5.0 38.23

03/05/2014 4:55 4.4 38.68

03/05/2014 4:56 5.0 37.53

03/05/2014 4:57 5.0 38.97

03/05/2014 4:58 4.5 38.28

03/05/2014 4:59 3.8 39.08

07/05/2014 4:12 3.7 37.33

07/05/2014 4:18 3.6 37.35

07/05/2014 4:21 3.6 37.22

07/05/2014 4:24 3.7 37.75

07/05/2014 4:30 3.5 37.53

07/05/2014 22:11 4.4 42.39

07/05/2014 22:17 4.5 41.3

07/05/2014 22:25 4.6 39.59

07/05/2014 22:28 4.3 40.16

07/05/2014 22:32 3.7 42.04

07/05/2014 23:00 3.6 39.56

07/05/2014 23:13 3.9 37.93

07/05/2014 23:15 3.6 40.23

07/05/2014 23:17 4.5 43.15

07/05/2014 23:19 4.5 40.37

07/05/2014 23:20 4.0 39.01

07/05/2014 23:21 3.7 39.6

07/05/2014 23:24 4.9 39.71

07/05/2014 23:26 3.6 40.69

07/05/2014 23:27 3.8 40.15

07/05/2014 23:28 4.2 41.86

07/05/2014 23:34 4.4 40.61

07/05/2014 23:38 4.7 42.03

07/05/2014 23:39 4.2 43.55

07/05/2014 23:44 4.0 38.84

07/05/2014 23:53 4.7 40.3

07/05/2014 23:57 4.0 40.77

07/05/2014 23:58 4.7 42.54

07/05/2014 23:59 4.6 43.13

08/05/2014 0:00 4.9 44.35

08/05/2014 0:01 4.7 45.38

11/12/2014 55/95

Page 102: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

08/05/2014 0:04 5.1 41.32

08/05/2014 0:06 4.1 40.54

08/05/2014 0:08 4.6 41.25

08/05/2014 0:09 4.7 41.74

08/05/2014 0:13 4.7 43.49

08/05/2014 0:14 4.7 42.88

08/05/2014 0:16 4.5 41.07

08/05/2014 0:17 4.5 43.8

08/05/2014 0:18 3.9 40.03

08/05/2014 0:21 3.7 40.9

08/05/2014 0:24 3.9 41.86

08/05/2014 0:30 4.5 39.62

08/05/2014 0:32 3.5 40.4

08/05/2014 0:35 4.1 41.3

08/05/2014 0:36 4.7 41.1

08/05/2014 0:39 5.1 38.87

08/05/2014 0:40 4.9 38.12

08/05/2014 0:41 3.9 38.95

08/05/2014 0:42 3.7 38.84

08/05/2014 0:43 3.8 39.05

08/05/2014 0:44 4.1 39.08

08/05/2014 0:45 4.2 38.92

08/05/2014 0:46 3.8 38.42

08/05/2014 0:47 3.8 39.66

08/05/2014 1:13 5.4 40.9

08/05/2014 1:14 5.1 39.79

08/05/2014 1:15 4.4 39.71

08/05/2014 1:53 4.0 39.05

08/05/2014 1:54 4.2 38.56

08/05/2014 1:55 4.1 38.38

08/05/2014 1:57 3.7 40.25

08/05/2014 1:58 4.2 41.97

08/05/2014 1:59 4.1 42.63

08/05/2014 2:00 4.8 42.1

08/05/2014 2:01 4.5 40.77

08/05/2014 2:02 4.8 42.82

08/05/2014 2:03 4.3 39.55

08/05/2014 2:04 4.8 40.98

08/05/2014 2:05 3.6 41.11

08/05/2014 2:06 4.5 39.8

08/05/2014 2:07 4.4 38.67

08/05/2014 2:08 4.3 38.53

08/05/2014 2:09 3.6 38.52

08/05/2014 2:10 3.6 40.33

11/12/2014 56/95

Page 103: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

08/05/2014 2:12 4.6 41.76

08/05/2014 2:13 3.7 40.5

08/05/2014 2:14 4.7 44.55

08/05/2014 2:15 4.1 44.28

08/05/2014 2:16 5.3 42.79

08/05/2014 2:17 5.0 41.5

08/05/2014 2:18 4.7 43.16

08/05/2014 2:19 4.5 43.6

08/05/2014 2:20 4.9 45.07

08/05/2014 2:21 4.9 42.79

08/05/2014 2:22 5.7 44.98

08/05/2014 2:23 4.4 42.86

08/05/2014 2:24 5.0 42.65

08/05/2014 2:25 4.8 42.72

08/05/2014 2:27 4.7 43.81

08/05/2014 2:28 5.0 42.75

08/05/2014 2:29 5.3 41.08

08/05/2014 2:30 4.6 41.84

08/05/2014 2:31 3.9 41.25

08/05/2014 2:32 4.0 44.09

08/05/2014 2:33 4.5 44.03

08/05/2014 2:34 5.3 46.32

08/05/2014 2:36 5.0 42.47

08/05/2014 2:38 4.7 42.12

08/05/2014 2:39 4.4 42.39

08/05/2014 2:40 4.4 47.06

08/05/2014 2:42 6.0 42.46

08/05/2014 2:43 5.7 40.87

08/05/2014 2:45 4.1 41.78

08/05/2014 2:46 4.7 42.08

08/05/2014 2:47 4.6 42.45

08/05/2014 2:48 4.6 42.55

08/05/2014 2:49 5.1 44.75

08/05/2014 2:50 4.8 44.46

08/05/2014 2:51 5.7 41.88

08/05/2014 2:52 5.1 44.82

08/05/2014 2:53 4.6 42.46

08/05/2014 2:55 4.8 40.81

08/05/2014 2:57 4.0 42.83

08/05/2014 2:58 4.1 41.11

08/05/2014 2:59 4.6 40.95

08/05/2014 3:00 4.6 41.37

08/05/2014 3:01 4.4 39.93

08/05/2014 3:02 4.1 39.88

11/12/2014 57/95

Page 104: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

08/05/2014 3:03 3.7 39.55

08/05/2014 3:04 4.1 38.7

08/05/2014 3:05 4.2 39.61

08/05/2014 3:06 3.8 40.44

08/05/2014 3:07 4.2 40.48

08/05/2014 3:08 4.5 39.87

08/05/2014 3:09 4.4 40.83

08/05/2014 3:11 4.3 40.05

08/05/2014 3:12 4.0 38.6

08/05/2014 3:13 4.2 38.22

08/05/2014 3:16 3.5 40.98

08/05/2014 3:17 3.7 39.15

08/05/2014 3:18 4.5 39.93

08/05/2014 3:19 3.6 39.56

08/05/2014 3:20 3.8 39.38

08/05/2014 3:21 4.0 39.27

08/05/2014 3:22 3.8 39.04

08/05/2014 3:23 3.5 38.47

08/05/2014 3:24 3.6 39.37

08/05/2014 3:26 3.7 40.79

08/05/2014 3:27 4.0 39.53

08/05/2014 3:28 4.6 39.44

08/05/2014 3:29 3.9 40.3

08/05/2014 3:30 3.7 39.36

08/05/2014 3:31 4.2 39.72

08/05/2014 3:32 3.7 41.26

08/05/2014 3:33 4.1 39.76

08/05/2014 3:34 4.1 40.97

08/05/2014 3:35 4.1 41.85

08/05/2014 3:36 4.0 40.5

08/05/2014 3:37 4.7 40.32

08/05/2014 3:38 4.0 39.87

08/05/2014 3:39 3.7 39.91

08/05/2014 3:40 4.0 39.58

08/05/2014 3:41 3.9 39.85

08/05/2014 3:42 3.8 40.08

08/05/2014 3:43 4.0 39.69

08/05/2014 3:44 4.0 40.51

08/05/2014 3:45 4.0 40.96

08/05/2014 3:46 4.3 39.86

08/05/2014 3:47 4.4 39.91

08/05/2014 3:48 3.7 41.19

08/05/2014 3:49 3.9 40.04

08/05/2014 3:50 4.7 40.06

11/12/2014 58/95

Page 105: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

08/05/2014 3:51 3.7 40.29

08/05/2014 3:52 3.9 39.61

08/05/2014 3:53 4.2 40.79

08/05/2014 3:54 4.0 39.28

08/05/2014 3:55 4.2 38.62

08/05/2014 3:58 3.9 38.5

08/05/2014 3:59 3.5 37.36

08/05/2014 4:06 3.8 37.37

08/05/2014 4:22 3.7 38.83

08/05/2014 4:23 4.0 38.34

08/05/2014 4:24 3.9 38.43

08/05/2014 4:25 3.6 38.16

08/05/2014 4:26 3.5 39.06

08/05/2014 4:28 4.2 40.39

08/05/2014 4:29 4.5 40.12

08/05/2014 4:30 4.3 39.44

08/05/2014 4:31 4.3 39.48

08/05/2014 4:41 3.7 41.14

08/05/2014 4:44 5.1 39.14

08/05/2014 4:45 4.0 42.29

08/05/2014 4:46 3.7 38.77

08/05/2014 4:47 3.7 44.36

08/05/2014 4:54 4.5 40.85

08/05/2014 4:56 4.4 39.61

08/05/2014 4:58 4.0 41.73

08/05/2014 22:00 4.1 37.78

08/05/2014 22:04 4.3 44.46

08/05/2014 22:05 4.9 43.94

08/05/2014 22:07 5.1 44.34

08/05/2014 22:10 4.2 39.66

08/05/2014 22:11 3.8 41.64

08/05/2014 22:13 4.4 39.45

08/05/2014 22:14 3.5 42.93

08/05/2014 22:16 4.5 43.57

08/05/2014 22:17 4.5 46.3

08/05/2014 22:18 4.8 43.83

08/05/2014 22:19 5.8 45.09

08/05/2014 22:20 5.4 43.05

08/05/2014 22:21 5.3 42.12

08/05/2014 22:22 4.8 47.4

08/05/2014 22:23 4.6 42.8

08/05/2014 22:24 5.1 39.82

08/05/2014 22:25 4.9 41.17

08/05/2014 22:26 4.2 44.2

11/12/2014 59/95

Page 106: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

08/05/2014 22:27 4.0 43.12

08/05/2014 22:29 4.9 45.51

08/05/2014 22:30 5.7 41.39

08/05/2014 22:31 5.3 40.49

08/05/2014 22:32 4.5 39.18

08/05/2014 22:36 4.8 41.69

08/05/2014 22:37 4.0 44.28

08/05/2014 22:38 4.0 43.85

08/05/2014 22:39 5.1 45.55

08/05/2014 22:40 5.2 41.42

08/05/2014 22:42 4.0 42.98

08/05/2014 22:43 5.5 42.96

08/05/2014 22:44 4.7 42.02

08/05/2014 22:45 4.7 43.44

08/05/2014 22:46 4.4 41.16

08/05/2014 22:47 5.3 40.65

08/05/2014 22:48 4.4 41.66

08/05/2014 22:49 4.0 40.97

08/05/2014 22:50 4.0 43.91

08/05/2014 22:51 3.9 41.35

08/05/2014 22:52 5.1 40.88

08/05/2014 22:53 3.8 42.42

08/05/2014 22:54 4.0 41.31

08/05/2014 22:55 4.1 42.33

08/05/2014 22:56 4.0 43.93

08/05/2014 22:57 4.5 42.89

08/05/2014 22:58 5.1 41.91

08/05/2014 22:59 4.6 40.9

08/05/2014 23:00 4.0 41.93

08/05/2014 23:02 4.2 40.65

08/05/2014 23:05 5.2 45.48

08/05/2014 23:06 5.0 45.97

08/05/2014 23:07 5.0 45.16

08/05/2014 23:08 5.9 42.88

08/05/2014 23:10 4.5 43.58

08/05/2014 23:11 4.4 43.26

08/05/2014 23:13 4.6 42.87

08/05/2014 23:14 4.3 41.89

08/05/2014 23:15 4.6 41.59

08/05/2014 23:16 4.6 43.16

08/05/2014 23:17 4.0 45.94

08/05/2014 23:18 4.2 47.86

08/05/2014 23:20 6.0 45.58

08/05/2014 23:21 5.4 44.68

11/12/2014 60/95

Page 107: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

08/05/2014 23:22 4.7 46.48

08/05/2014 23:23 4.9 47.93

08/05/2014 23:24 5.5 51.13

08/05/2014 23:25 5.5 51.02

08/05/2014 23:27 6.8 52.62

08/05/2014 23:28 6.3 51.4

08/05/2014 23:30 6.7 51.11

08/05/2014 23:31 6.0 49.32

08/05/2014 23:34 5.7 47.7

08/05/2014 23:35 6.2 48.24

08/05/2014 23:36 5.7 46.88

08/05/2014 23:37 5.7 44.83

08/05/2014 23:38 5.6 42.71

08/05/2014 23:39 5.2 43.58

08/05/2014 23:40 4.5 43.06

08/05/2014 23:42 5.0 42.66

08/05/2014 23:43 4.6 44.77

08/05/2014 23:44 4.5 43.87

08/05/2014 23:45 5.3 45.91

08/05/2014 23:46 5.0 43.96

08/05/2014 23:48 4.8 44.72

08/05/2014 23:49 5.3 44.83

08/05/2014 23:50 5.4 43.66

08/05/2014 23:51 5.4 42.21

08/05/2014 23:52 5.2 44.15

08/05/2014 23:53 4.2 43.26

08/05/2014 23:54 5.7 43.38

08/05/2014 23:55 4.5 44.91

08/05/2014 23:56 4.9 42.34

08/05/2014 23:57 5.3 45.85

08/05/2014 23:58 4.6 46.17

08/05/2014 23:59 5.5 45.15

09/05/2014 0:00 5.4 42.8

09/05/2014 0:01 5.4 43.61

09/05/2014 0:02 4.5 43.26

09/05/2014 0:04 4.9 49.6

09/05/2014 0:05 6.0 49.52

09/05/2014 0:08 6.1 45.49

09/05/2014 0:09 5.5 44.76

09/05/2014 0:10 5.5 45.15

09/05/2014 0:11 4.8 43.15

09/05/2014 0:12 5.4 44.39

09/05/2014 0:13 4.3 45.26

09/05/2014 0:14 5.3 45.68

11/12/2014 61/95

Page 108: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 0:16 5.1 46.65

09/05/2014 0:17 5.1 47.22

09/05/2014 0:18 5.5 46.73

09/05/2014 0:19 6.0 46.48

09/05/2014 0:20 5.3 49.37

09/05/2014 0:21 5.4 48.52

09/05/2014 0:22 6.5 49.32

09/05/2014 0:23 6.2 49.74

09/05/2014 0:24 6.3 50.04

09/05/2014 0:25 6.3 48.91

09/05/2014 0:26 6.2 45.53

09/05/2014 0:27 6.1 44.29

09/05/2014 0:28 5.1 46.75

09/05/2014 0:29 4.9 43.34

09/05/2014 0:30 5.9 43.42

09/05/2014 0:31 4.6 41.3

09/05/2014 0:32 5.1 40.32

09/05/2014 0:33 4.3 40.01

09/05/2014 0:36 4.2 40.04

09/05/2014 0:38 3.5 44.37

09/05/2014 0:39 4.2 40.77

09/05/2014 0:40 3.5 43.95

09/05/2014 0:41 3.5 45.85

09/05/2014 0:42 5.1 48.01

09/05/2014 0:43 5.5 45.19

09/05/2014 0:45 5.4 46.31

09/05/2014 0:46 5.9 43.66

09/05/2014 0:47 5.4 42.89

09/05/2014 0:48 4.6 43.87

09/05/2014 0:49 4.3 44.11

09/05/2014 0:50 4.8 44.25

09/05/2014 0:51 5.3 43.67

09/05/2014 0:53 4.9 43.44

09/05/2014 0:54 4.4 44.82

09/05/2014 0:55 4.5 44.76

09/05/2014 0:56 4.9 44.42

09/05/2014 0:57 4.9 43.94

09/05/2014 0:58 5.1 45.83

09/05/2014 0:59 5.0 43.46

09/05/2014 1:00 5.0 43.68

09/05/2014 1:01 4.6 45.76

09/05/2014 1:02 4.6 43.4

09/05/2014 1:03 5.5 44.97

09/05/2014 1:04 4.6 42.24

11/12/2014 62/95

Page 109: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 1:05 4.9 43.32

09/05/2014 1:06 4.3 43.97

09/05/2014 1:08 4.8 44.26

09/05/2014 1:09 4.5 42.32

09/05/2014 1:10 4.5 41.85

09/05/2014 1:11 4.5 42.82

09/05/2014 1:12 4.4 42.58

09/05/2014 1:13 4.6 42.01

09/05/2014 1:14 4.9 42.34

09/05/2014 1:15 4.3 40.35

09/05/2014 1:16 4.4 40.17

09/05/2014 1:17 4.0 40.47

09/05/2014 1:18 4.0 41.59

09/05/2014 1:19 3.7 40.83

09/05/2014 1:20 4.2 41.18

09/05/2014 1:21 4.3 41.7

09/05/2014 1:22 4.0 40.5

09/05/2014 1:23 4.6 42.94

09/05/2014 1:24 4.3 39.98

09/05/2014 1:25 4.9 39.46

09/05/2014 1:26 4.0 40.83

09/05/2014 1:28 4.0 41.46

09/05/2014 1:29 3.6 39.69

09/05/2014 1:30 4.0 39.5

09/05/2014 1:31 3.5 41.41

09/05/2014 1:32 3.6 39.82

09/05/2014 1:33 4.3 39.75

09/05/2014 1:34 3.9 39.32

09/05/2014 1:35 3.9 41.39

09/05/2014 1:36 3.6 39.68

09/05/2014 1:37 3.9 41.26

09/05/2014 1:39 4.4 40.5

09/05/2014 1:40 3.8 46.15

09/05/2014 1:41 3.5 43.88

09/05/2014 1:42 4.2 41.8

09/05/2014 1:44 4.2 39.09

09/05/2014 1:45 4.2 40.97

09/05/2014 1:47 3.9 40.47

09/05/2014 1:48 4.3 41.04

09/05/2014 1:49 4.1 42.31

09/05/2014 1:51 4.2 43.4

09/05/2014 1:52 3.5 39.26

09/05/2014 1:54 3.6 40.97

09/05/2014 1:55 4.0 39.82

11/12/2014 63/95

Page 110: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 1:56 4.3 38.98

09/05/2014 1:57 3.9 38.88

09/05/2014 1:58 3.8 41.26

09/05/2014 1:59 3.9 38.54

09/05/2014 2:00 4.2 40.41

09/05/2014 2:02 4.1 40.18

09/05/2014 2:03 4.4 40.29

09/05/2014 2:04 3.9 42.43

09/05/2014 2:05 4.0 43.02

09/05/2014 2:06 4.7 42.91

09/05/2014 2:07 4.4 44.23

09/05/2014 2:08 4.8 45.24

09/05/2014 2:09 5.1 43.68

09/05/2014 2:10 5.3 43.31

09/05/2014 2:11 4.9 44.1

09/05/2014 2:12 4.7 43.94

09/05/2014 2:13 5.2 45.01

09/05/2014 2:14 5.1 45.07

09/05/2014 2:15 5.3 48.32

09/05/2014 2:16 5.4 47.44

09/05/2014 2:17 5.9 43.69

09/05/2014 2:18 6.1 46.21

09/05/2014 2:19 4.8 46.25

09/05/2014 2:20 5.3 46.01

09/05/2014 2:21 5.4 44.58

09/05/2014 2:23 5.0 44.12

09/05/2014 2:26 5.1 42.36

09/05/2014 2:27 4.9 45.21

09/05/2014 2:28 4.8 42.57

09/05/2014 2:29 5.4 42.85

09/05/2014 2:30 4.7 42.2

09/05/2014 2:31 4.7 41.34

09/05/2014 2:32 4.5 40.78

09/05/2014 2:33 4.0 41.09

09/05/2014 2:34 4.2 43.79

09/05/2014 2:35 4.1 42.3

09/05/2014 2:36 5.3 41.27

09/05/2014 2:37 4.3 42.58

09/05/2014 2:38 4.1 42.59

09/05/2014 2:39 4.5 40.84

09/05/2014 2:40 4.5 41.44

09/05/2014 2:41 4.1 44.06

09/05/2014 2:42 4.3 43.67

09/05/2014 2:43 5.0 41.02

11/12/2014 64/95

Page 111: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 2:44 5.0 40.65

09/05/2014 2:45 4.2 43

09/05/2014 2:46 3.6 42.36

09/05/2014 2:47 4.5 41.83

09/05/2014 2:48 4.6 43.26

09/05/2014 2:49 3.7 41.18

09/05/2014 2:50 5.0 43.6

09/05/2014 2:51 4.2 41.73

09/05/2014 2:52 5.1 42.51

09/05/2014 2:53 4.4 41.93

09/05/2014 2:54 4.4 40.28

09/05/2014 2:55 4.3 41.46

09/05/2014 2:56 3.7 41.46

09/05/2014 2:57 4.1 40.97

09/05/2014 2:58 3.8 43.45

09/05/2014 2:59 4.0 41.72

09/05/2014 3:01 4.8 40.78

09/05/2014 3:02 4.1 39.46

09/05/2014 3:03 4.3 40.4

09/05/2014 3:04 3.8 39

09/05/2014 3:05 3.7 39.71

09/05/2014 3:07 3.8 41.33

09/05/2014 3:09 4.3 40.44

09/05/2014 3:10 3.8 41.29

09/05/2014 3:11 3.9 43.19

09/05/2014 3:12 4.2 42.85

09/05/2014 3:13 4.9 39.87

09/05/2014 3:14 4.8 40.04

09/05/2014 3:15 3.8 39.72

09/05/2014 3:16 3.9 39.18

09/05/2014 3:17 3.6 39.98

09/05/2014 3:19 3.8 40.36

09/05/2014 3:20 4.3 39.52

09/05/2014 3:21 4.1 39.18

09/05/2014 3:23 3.8 40.65

09/05/2014 3:24 4.0 39.48

09/05/2014 3:25 3.8 40.28

09/05/2014 3:26 3.8 43.51

09/05/2014 3:27 3.8 38.41

09/05/2014 3:28 3.5 38.46

09/05/2014 3:35 3.6 38.56

09/05/2014 3:36 3.8 40.3

09/05/2014 3:38 4.1 42.8

09/05/2014 3:39 4.2 42.8

11/12/2014 65/95

Page 112: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 3:40 5.0 42.11

09/05/2014 3:41 4.8 40.94

09/05/2014 3:42 4.8 41.31

09/05/2014 3:43 4.3 43.13

09/05/2014 3:44 4.4 43.86

09/05/2014 3:45 4.8 43.18

09/05/2014 3:46 4.8 43.31

09/05/2014 3:47 4.7 40.64

09/05/2014 3:48 4.8 39.66

09/05/2014 3:49 4.2 40.46

09/05/2014 3:50 4.0 39.84

09/05/2014 3:51 4.5 39.1

09/05/2014 3:52 4.3 39.68

09/05/2014 3:53 3.9 40.07

09/05/2014 3:54 3.9 39.47

09/05/2014 3:55 3.8 40.1

09/05/2014 3:57 4.2 39.35

09/05/2014 3:58 3.8 40.38

09/05/2014 3:59 4.0 38.74

09/05/2014 4:00 4.3 39.53

09/05/2014 4:02 3.8 39.69

09/05/2014 4:03 3.7 39.84

09/05/2014 4:05 3.9 38.93

09/05/2014 4:06 3.6 39.11

09/05/2014 4:09 4.1 38.17

09/05/2014 4:10 3.6 38.83

09/05/2014 4:12 3.6 39.39

09/05/2014 4:13 3.5 39

09/05/2014 4:14 3.8 38.74

09/05/2014 4:15 3.6 39.09

09/05/2014 4:16 3.6 40.01

09/05/2014 4:17 3.7 40.13

09/05/2014 4:18 4.1 40.48

09/05/2014 4:19 3.7 41.67

09/05/2014 4:20 4.2 43.07

09/05/2014 4:21 4.4 41.81

09/05/2014 4:22 5.1 42.73

09/05/2014 4:23 4.6 42.9

09/05/2014 4:24 4.9 41.77

09/05/2014 4:25 4.6 41.89

09/05/2014 4:26 4.8 41.97

09/05/2014 4:27 4.2 40.94

09/05/2014 4:28 4.8 40.79

09/05/2014 4:29 4.3 41.92

11/12/2014 66/95

Page 113: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 4:30 4.0 40.78

09/05/2014 4:31 4.4 41.47

09/05/2014 4:32 3.9 41.01

09/05/2014 4:33 4.4 41.41

09/05/2014 4:34 4.0 41.36

09/05/2014 4:35 4.2 42.65

09/05/2014 4:36 4.3 41.45

09/05/2014 4:37 4.8 41.61

09/05/2014 4:38 3.9 40.5

09/05/2014 4:39 4.3 42.58

09/05/2014 4:40 4.3 42.11

09/05/2014 4:41 4.4 42.23

09/05/2014 4:42 4.3 40.54

09/05/2014 4:43 4.6 41.35

09/05/2014 4:44 4.1 41.41

09/05/2014 4:45 4.4 42.71

09/05/2014 4:46 4.3 40.71

09/05/2014 4:47 4.6 41.25

09/05/2014 4:48 4.1 45.77

09/05/2014 4:49 4.1 40.45

09/05/2014 4:50 3.9 40.98

09/05/2014 4:51 3.7 41.57

09/05/2014 4:52 4.0 42.14

09/05/2014 4:53 4.1 41.41

09/05/2014 4:54 4.6 41.82

09/05/2014 4:55 4.1 42.23

09/05/2014 4:56 4.3 41.42

09/05/2014 4:57 4.5 41.55

09/05/2014 4:58 3.8 41.52

09/05/2014 4:59 4.1 41.69

09/05/2014 22:00 5.1 43.54

09/05/2014 22:01 5.1 43.42

09/05/2014 22:02 5.9 40.18

09/05/2014 22:03 6.1 42.17

09/05/2014 22:04 5.0 41.55

09/05/2014 22:05 6.1 39.36

09/05/2014 22:06 5.4 39.93

09/05/2014 22:07 5.1 41.1

09/05/2014 22:08 5.2 39.51

09/05/2014 22:09 5.5 40.48

09/05/2014 22:10 5.1 38.75

09/05/2014 22:11 5.4 37.33

09/05/2014 22:12 5.2 39.46

09/05/2014 22:13 4.6 37.92

11/12/2014 67/95

Page 114: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 22:14 5.2 40.13

09/05/2014 22:16 5.6 40.12

09/05/2014 22:17 4.9 36.77

09/05/2014 22:18 4.9 39.74

09/05/2014 22:19 4.5 36.5

09/05/2014 22:20 5.3 36.01

09/05/2014 22:21 4.4 36.78

09/05/2014 22:22 4.1 36.45

09/05/2014 22:23 4.5 36.87

09/05/2014 22:24 3.8 37.02

09/05/2014 22:25 4.2 46.94

09/05/2014 22:26 4.3 42.67

09/05/2014 22:27 5.2 38.92

09/05/2014 22:28 4.1 38.57

09/05/2014 22:29 4.4 39.03

09/05/2014 22:30 4.3 38.42

09/05/2014 22:31 4.7 38.63

09/05/2014 22:32 4.9 40.43

09/05/2014 22:33 4.5 37.28

09/05/2014 22:34 5.1 36.83

09/05/2014 22:35 4.2 36.03

09/05/2014 22:36 4.0 38.03

09/05/2014 22:38 4.6 43.13

09/05/2014 22:39 4.1 40.5

09/05/2014 22:40 4.5 40.98

09/05/2014 22:41 4.8 40.04

09/05/2014 22:42 5.4 40.21

09/05/2014 22:43 5.2 45.37

09/05/2014 22:44 5.4 39.13

09/05/2014 22:47 4.9 36.86

09/05/2014 22:48 4.8 38.5

09/05/2014 22:50 4.3 39.48

09/05/2014 22:51 4.9 39.31

09/05/2014 22:53 4.8 39.95

09/05/2014 22:54 4.2 39.41

09/05/2014 22:55 5.0 38.02

09/05/2014 22:56 4.7 39.44

09/05/2014 22:57 4.5 39.37

09/05/2014 22:58 5.3 38.97

09/05/2014 22:59 4.8 39.2

12/05/2014 23:19 3.8 39.73

12/05/2014 23:20 3.9 40.24

12/05/2014 23:21 3.9 37.65

12/05/2014 23:37 3.6 36.89

11/12/2014 68/95

Page 115: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

12/05/2014 23:38 3.5 38.77

13/05/2014 0:38 4.9 40.48

13/05/2014 0:39 5.0 38.49

13/05/2014 0:40 5.0 39.52

13/05/2014 0:41 4.0 39.13

13/05/2014 0:42 4.4 39.29

13/05/2014 0:43 4.6 39.75

13/05/2014 0:44 4.2 43.32

13/05/2014 0:45 4.5 41.28

13/05/2014 0:46 5.9 42.89

13/05/2014 0:47 5.5 42.21

13/05/2014 0:48 5.9 42.6

13/05/2014 0:49 5.6 43.08

13/05/2014 0:50 5.9 42.45

13/05/2014 0:51 5.9 41.59

13/05/2014 0:52 5.8 40.68

13/05/2014 0:53 5.8 40.57

13/05/2014 0:54 5.1 39.4

13/05/2014 0:55 4.8 39.3

13/05/2014 0:56 4.9 40.44

13/05/2014 0:57 4.6 41.81

13/05/2014 0:58 5.2 41.96

13/05/2014 0:59 5.2 41.18

13/05/2014 1:00 5.1 42.27

13/05/2014 1:01 5.4 41.99

13/05/2014 1:02 5.1 41.93

13/05/2014 1:03 5.4 40.09

13/05/2014 1:04 5.6 41.38

13/05/2014 1:05 4.8 40.42

13/05/2014 1:06 5.5 40.38

13/05/2014 1:07 4.6 38.86

13/05/2014 1:08 4.7 41.17

13/05/2014 1:09 4.1 41.41

13/05/2014 1:10 4.7 41.49

13/05/2014 1:11 5.0 39.74

13/05/2014 1:12 4.9 39.53

13/05/2014 1:13 3.8 38.8

13/05/2014 1:14 4.2 40.32

13/05/2014 1:15 4.1 41.99

13/05/2014 1:16 4.7 41.9

13/05/2014 1:17 5.6 41.1

13/05/2014 1:18 4.8 40.74

13/05/2014 1:19 4.9 39.42

13/05/2014 1:20 4.6 41.03

11/12/2014 69/95

Page 116: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

13/05/2014 1:21 3.8 42.53

13/05/2014 1:47 5.1 39.53

13/05/2014 1:48 4.5 41.71

13/05/2014 1:49 4.3 41.99

13/05/2014 1:50 4.8 42.21

13/05/2014 1:51 5.2 41.52

13/05/2014 1:52 5.3 41.08

13/05/2014 1:53 5.0 42.67

13/05/2014 1:54 4.7 42.24

13/05/2014 1:55 5.1 40.73

13/05/2014 1:56 5.0 40.25

13/05/2014 1:57 5.0 39.61

13/05/2014 1:58 4.8 39.45

13/05/2014 1:59 4.8 38.47

13/05/2014 2:00 4.5 39.32

13/05/2014 2:01 4.4 38.76

13/05/2014 2:02 4.1 38.82

13/05/2014 2:03 3.9 39.03

13/05/2014 2:04 4.2 39.84

13/05/2014 2:05 4.1 39.53

13/05/2014 2:06 4.5 39.74

13/05/2014 2:07 4.3 38.62

13/05/2014 2:08 4.6 39.46

13/05/2014 2:09 4.2 39.75

13/05/2014 2:10 4.3 39.59

13/05/2014 2:11 4.2 40.58

13/05/2014 2:12 4.6 40.45

13/05/2014 2:13 4.9 40.71

13/05/2014 2:14 4.6 41.77

13/05/2014 2:15 5.0 41.09

13/05/2014 2:16 5.2 40.64

13/05/2014 2:17 5.0 39.64

13/05/2014 2:18 5.0 39.96

13/05/2014 2:19 4.6 40.98

13/05/2014 2:20 4.8 40.87

13/05/2014 2:21 5.0 40.45

13/05/2014 2:22 5.1 41.18

13/05/2014 2:23 5.0 41.21

13/05/2014 2:24 4.9 40.66

13/05/2014 2:25 5.0 40.66

13/05/2014 2:26 5.0 40.14

13/05/2014 2:27 4.9 39.76

13/05/2014 2:28 4.6 40.44

13/05/2014 2:29 4.3 39.91

11/12/2014 70/95

Page 117: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

13/05/2014 2:30 4.7 39.99

13/05/2014 2:31 4.3 39.19

13/05/2014 2:32 4.5 39.11

13/05/2014 2:33 4.0 39.97

13/05/2014 2:34 4.2 39.17

13/05/2014 2:35 4.5 40.82

13/05/2014 2:36 4.2 41.64

13/05/2014 2:37 4.6 42.81

13/05/2014 2:38 5.4 39.18

13/05/2014 2:39 6.0 39.55

13/05/2014 2:40 4.5 40.23

13/05/2014 2:41 4.8 40.1

13/05/2014 2:42 4.6 42.27

13/05/2014 2:43 4.3 43.1

13/05/2014 2:44 5.6 39.73

13/05/2014 2:45 5.5 40.59

13/05/2014 2:46 4.6 41.73

13/05/2014 2:47 4.9 40.94

13/05/2014 2:48 5.5 39.18

13/05/2014 2:49 5.3 40.16

13/05/2014 2:50 4.4 39.2

13/05/2014 2:51 4.8 40.6

13/05/2014 2:52 4.3 40.15

13/05/2014 2:53 4.7 39.03

13/05/2014 2:54 4.9 39.57

13/05/2014 2:55 4.7 36.41

13/05/2014 2:56 3.9 36.63

13/05/2014 2:57 3.7 37.48

13/05/2014 2:58 3.9 38.14

13/05/2014 2:59 4.3 36.8

13/05/2014 3:00 4.6 41.43

13/05/2014 3:01 4.1 37.2

13/05/2014 3:02 4.6 40.21

13/05/2014 3:03 4.7 37.19

13/05/2014 3:04 3.9 35.58

13/05/2014 3:05 4.0 35.79

13/05/2014 3:06 3.5 35.96

13/05/2014 3:10 4.2 40.64

13/05/2014 3:11 4.4 41.03

13/05/2014 3:12 3.9 36.92

13/05/2014 3:13 4.0 37.74

13/05/2014 3:14 3.6 47.43

13/05/2014 3:18 3.7 47.61

13/05/2014 3:19 4.2 49.78

11/12/2014 71/95

Page 118: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

13/05/2014 3:20 4.2 55.12

13/05/2014 3:21 5.3 56.91

13/05/2014 3:23 6.4 51.25

13/05/2014 3:24 4.9 54.39

13/05/2014 3:25 4.6 52.16

13/05/2014 3:26 4.5 48.9

13/05/2014 3:27 4.1 43.75

13/05/2014 3:28 3.7 39.4

13/05/2014 3:31 3.5 41.55

13/05/2014 3:32 3.5 40.23

13/05/2014 3:33 4.0 42.31

13/05/2014 3:34 4.5 41.61

13/05/2014 3:35 4.5 56.97

13/05/2014 3:36 3.7 40.1

13/05/2014 3:37 4.1 44.53

13/05/2014 3:38 4.6 40.11

13/05/2014 3:39 4.6 38.46

13/05/2014 3:40 4.6 49.29

13/05/2014 3:41 4.3 36.64

13/05/2014 3:42 4.0 52.4

13/05/2014 3:43 3.7 43.2

13/05/2014 3:45 3.7 39.89

13/05/2014 3:46 4.5 39.3

13/05/2014 3:47 4.4 46.49

13/05/2014 3:48 4.1 44.08

13/05/2014 3:49 4.9 41.82

13/05/2014 3:50 5.8 42.04

13/05/2014 4:04 3.6 46.95

13/05/2014 4:11 3.9 44.92

13/05/2014 4:12 4.4 45.84

13/05/2014 4:13 4.2 46.21

13/05/2014 4:14 4.3 46.55

13/05/2014 4:15 4.6 47.01

13/05/2014 4:16 4.6 47.43

13/05/2014 4:17 4.6 46.56

13/05/2014 4:18 4.8 45

13/05/2014 4:19 4.9 47.63

13/05/2014 4:20 4.6 49.83

13/05/2014 4:21 5.0 49.99

13/05/2014 4:22 5.0 50.1

13/05/2014 4:23 4.3 49.76

13/05/2014 4:24 3.7 49.62

13/05/2014 4:25 3.9 48.77

13/05/2014 4:29 4.1 44.86

11/12/2014 72/95

Page 119: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

13/05/2014 4:31 3.8 45.82

13/05/2014 4:37 4.0 46.76

13/05/2014 4:38 5.6 47.63

13/05/2014 4:39 5.0 47.24

13/05/2014 4:40 5.3 48.62

13/05/2014 4:41 5.1 47.72

13/05/2014 4:42 5.7 46.64

13/05/2014 4:43 4.9 46.89

13/05/2014 4:44 5.1 47.28

13/05/2014 4:45 4.1 48.9

13/05/2014 4:46 5.0 45.98

13/05/2014 4:47 5.5 43.86

13/05/2014 4:48 3.9 42.2

13/05/2014 4:49 3.8 41.62

13/05/2014 4:50 3.9 39.55

13/05/2014 4:51 4.1 39.21

13/05/2014 4:52 3.9 39.27

13/05/2014 4:53 4.5 38.99

13/05/2014 4:54 4.5 38.78

13/05/2014 4:55 4.4 39.36

13/05/2014 4:56 4.4 42.36

13/05/2014 4:57 4.9 41.77

13/05/2014 4:58 5.6 40.96

13/05/2014 4:59 5.8 44.18

13/05/2014 22:04 4.1 41.38

13/05/2014 22:05 4.2 41.53

13/05/2014 22:06 4.4 41.52

13/05/2014 22:07 4.6 40.64

13/05/2014 22:08 4.4 41.29

13/05/2014 22:09 4.3 41.64

13/05/2014 22:11 4.2 41.62

13/05/2014 22:12 5.3 41.56

13/05/2014 22:13 4.5 41.1

13/05/2014 22:14 4.5 40.51

13/05/2014 22:15 4.2 41.05

13/05/2014 22:16 4.0 40.95

13/05/2014 22:17 3.8 40.35

13/05/2014 22:18 3.8 40.97

13/05/2014 22:19 3.9 39.81

13/05/2014 22:20 4.2 39.71

13/05/2014 22:21 3.7 39.74

13/05/2014 22:22 3.8 39.27

13/05/2014 22:23 3.5 39.59

13/05/2014 22:27 4.7 40.1

11/12/2014 73/95

Page 120: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

13/05/2014 22:28 4.4 40.48

13/05/2014 22:29 4.0 39.95

13/05/2014 22:30 4.5 40.06

13/05/2014 22:31 4.6 39.39

13/05/2014 22:32 4.7 40.05

13/05/2014 22:33 3.8 41.52

13/05/2014 22:35 4.3 40.61

13/05/2014 22:36 4.5 40.45

13/05/2014 22:37 4.4 40.73

13/05/2014 22:38 3.9 40.81

13/05/2014 22:39 4.5 40.09

13/05/2014 22:40 4.5 39.28

13/05/2014 22:41 4.5 40.21

13/05/2014 22:42 4.6 41.14

13/05/2014 22:43 4.0 37.06

13/05/2014 22:44 4.3 37.29

13/05/2014 22:46 3.5 37.5

13/05/2014 22:48 3.7 37.83

13/05/2014 22:49 4.0 43.61

13/05/2014 22:50 4.1 40.28

13/05/2014 22:52 3.5 38.72

13/05/2014 22:54 3.8 38.07

13/05/2014 22:57 3.5 38.56

13/05/2014 22:59 3.7 38.68

13/05/2014 23:00 3.7 37.62

13/05/2014 23:01 3.5 37.2

13/05/2014 23:02 3.5 37.15

13/05/2014 23:03 3.8 37.25

13/05/2014 23:08 4.1 38.59

13/05/2014 23:09 3.8 37.86

13/05/2014 23:10 4.0 38.02

13/05/2014 23:11 3.7 36.95

13/05/2014 23:17 3.9 38.37

13/05/2014 23:19 4.0 37.23

13/05/2014 23:20 3.6 36.88

15/05/2014 1:19 3.8 38.95

15/05/2014 1:32 3.5 37.28

15/05/2014 1:35 3.8 37.42

15/05/2014 2:55 5.7 42.3

15/05/2014 2:56 4.9 45.83

15/05/2014 2:57 4.5 44.33

15/05/2014 2:58 5.8 40.93

15/05/2014 2:59 5.3 42.68

15/05/2014 3:00 4.6 41.62

11/12/2014 74/95

Page 121: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

15/05/2014 3:01 5.2 41.98

15/05/2014 3:02 4.3 42.65

15/05/2014 3:03 4.3 40.93

15/05/2014 3:04 5.1 38.75

15/05/2014 3:05 5.0 39.54

15/05/2014 3:06 3.8 39.15

15/05/2014 3:07 4.5 37.92

15/05/2014 3:08 4.1 38.81

15/05/2014 3:09 4.1 40.5

15/05/2014 3:10 4.6 40.76

15/05/2014 3:11 5.1 41.87

15/05/2014 3:12 4.9 40.34

15/05/2014 3:13 4.6 38.69

15/05/2014 3:14 4.5 39.88

15/05/2014 3:15 4.4 37.1

15/05/2014 3:16 5.0 35.33

15/05/2014 3:17 4.2 35.35

15/05/2014 3:20 3.7 36.52

15/05/2014 3:22 3.9 36.16

15/05/2014 3:24 4.1 39.6

15/05/2014 3:25 3.7 36.36

15/05/2014 3:26 4.7 34.87

15/05/2014 3:27 3.9 34.51

15/05/2014 3:28 3.6 33.47

15/05/2014 3:29 3.6 34

15/05/2014 4:13 4.1 44.48

15/05/2014 4:14 3.7 41.83

15/05/2014 4:15 3.8 38.98

15/05/2014 4:17 3.9 37.86

15/05/2014 4:19 3.8 35.48

18/05/2014 1:10 3.5 32.78

19/05/2014 0:19 3.5 32.92

19/05/2014 0:21 3.5 32.19

19/05/2014 0:34 3.6 33.94

19/05/2014 0:37 3.7 34.03

19/05/2014 0:39 3.8 32.21

19/05/2014 0:40 3.7 34.1

19/05/2014 0:42 3.7 33.38

19/05/2014 0:57 3.6 36.23

19/05/2014 1:02 3.8 34.31

19/05/2014 1:03 3.7 33.61

19/05/2014 1:04 3.7 33.67

20/05/2014 22:36 4.0 40.18

20/05/2014 22:37 5.0 45.04

11/12/2014 75/95

Page 122: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

20/05/2014 22:38 3.8 42.66

20/05/2014 22:39 4.3 39.44

20/05/2014 22:40 5.6 38.52

20/05/2014 22:41 3.8 38.5

20/05/2014 22:44 4.3 41.32

20/05/2014 22:45 4.1 41.51

20/05/2014 22:46 3.9 38.14

20/05/2014 22:47 4.9 37.58

20/05/2014 22:48 3.8 38.7

20/05/2014 22:52 3.7 40.11

20/05/2014 22:54 3.9 39.02

20/05/2014 22:56 3.9 38.77

20/05/2014 22:57 3.8 39.55

20/05/2014 22:58 4.1 39.66

20/05/2014 22:59 3.9 39.27

20/05/2014 23:00 4.4 41.26

20/05/2014 23:01 3.7 39.66

20/05/2014 23:02 4.7 38.18

20/05/2014 23:03 4.7 38.7

20/05/2014 23:04 3.7 40.46

20/05/2014 23:06 4.5 39.78

20/05/2014 23:07 4.5 40.38

20/05/2014 23:08 4.4 39.52

20/05/2014 23:09 4.4 41.5

20/05/2014 23:10 3.7 41.74

20/05/2014 23:11 4.3 44.94

20/05/2014 23:12 4.9 40.32

20/05/2014 23:13 4.6 40.54

20/05/2014 23:14 4.4 40.42

20/05/2014 23:15 4.7 42.04

20/05/2014 23:16 4.2 40.9

20/05/2014 23:17 4.7 42.81

20/05/2014 23:18 4.1 43.12

20/05/2014 23:19 5.0 43.44

20/05/2014 23:20 5.1 41.09

20/05/2014 23:21 4.2 40.83

20/05/2014 23:22 4.0 42.92

20/05/2014 23:23 4.4 43.71

20/05/2014 23:24 4.0 42.07

20/05/2014 23:25 5.1 43.13

20/05/2014 23:26 4.9 42.45

20/05/2014 23:27 3.9 42.42

20/05/2014 23:28 4.9 41.29

20/05/2014 23:29 4.7 40.06

11/12/2014 76/95

Page 123: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

20/05/2014 23:30 4.5 39.3

20/05/2014 23:31 4.1 41.04

20/05/2014 23:32 4.1 40.13

20/05/2014 23:33 4.2 40.5

20/05/2014 23:34 4.2 42

20/05/2014 23:35 4.2 40.09

20/05/2014 23:36 5.2 39.43

20/05/2014 23:37 4.3 39.87

20/05/2014 23:38 4.1 42.59

20/05/2014 23:39 4.4 41.18

20/05/2014 23:40 5.0 39.64

20/05/2014 23:41 4.8 40.99

20/05/2014 23:42 4.1 40.29

20/05/2014 23:43 4.3 40.25

20/05/2014 23:44 3.8 40.05

20/05/2014 23:45 4.2 42.37

20/05/2014 23:46 3.8 42.48

20/05/2014 23:48 5.0 37.81

20/05/2014 23:49 3.7 38.16

20/05/2014 23:50 3.5 40.07

20/05/2014 23:51 3.8 39.38

20/05/2014 23:53 3.7 38.05

20/05/2014 23:54 4.2 37.92

20/05/2014 23:55 3.6 39

20/05/2014 23:56 3.6 39.06

20/05/2014 23:57 3.7 38.04

20/05/2014 23:58 4.3 39.28

20/05/2014 23:59 4.0 39.48

21/05/2014 0:00 4.3 41.57

21/05/2014 0:01 4.1 39.7

21/05/2014 0:02 4.5 38.13

21/05/2014 0:03 4.4 38.57

21/05/2014 0:04 4.1 38.19

21/05/2014 0:05 3.6 36.83

21/05/2014 0:06 4.1 37.19

21/05/2014 0:07 3.6 35.88

21/05/2014 0:09 3.7 37.73

21/05/2014 0:11 3.5 36.99

21/05/2014 0:13 3.7 37.28

21/05/2014 0:23 3.6 34.78

21/05/2014 0:46 3.5 37.29

21/05/2014 0:48 3.9 36.3

21/05/2014 0:51 3.8 36.83

21/05/2014 0:54 3.9 37.93

11/12/2014 77/95

Page 124: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

21/05/2014 0:55 3.6 38.65

21/05/2014 0:56 4.1 38.38

21/05/2014 0:57 3.8 40.15

21/05/2014 0:58 3.9 39.77

21/05/2014 0:59 4.1 41.01

21/05/2014 1:00 4.1 38.33

21/05/2014 1:02 3.7 38.79

21/05/2014 1:04 4.2 38.57

21/05/2014 1:06 3.8 41.84

21/05/2014 1:07 3.7 36.92

21/05/2014 1:08 3.6 38.47

21/05/2014 1:10 3.6 39.92

21/05/2014 1:11 4.2 37.56

21/05/2014 1:12 4.1 37.55

21/05/2014 1:13 3.7 37.57

21/05/2014 1:16 4.1 36.5

21/05/2014 1:21 3.5 40.16

21/05/2014 1:23 3.5 39.12

21/05/2014 1:24 3.8 38.53

21/05/2014 1:25 4.2 37.64

21/05/2014 1:27 3.6 37.34

21/05/2014 1:29 3.7 37.48

21/05/2014 1:32 3.6 37.15

21/05/2014 1:34 3.6 36.81

21/05/2014 1:35 3.6 37.51

21/05/2014 1:36 3.7 37.49

21/05/2014 1:37 3.8 38

21/05/2014 1:39 3.5 39.65

21/05/2014 1:40 4.5 39.32

21/05/2014 1:41 4.6 41.84

21/05/2014 1:42 4.0 41.58

21/05/2014 1:43 3.9 40.73

21/05/2014 1:44 5.0 40.36

21/05/2014 1:45 4.6 40.24

21/05/2014 1:46 4.1 40.11

21/05/2014 1:47 4.3 39.81

21/05/2014 1:48 4.2 39.73

21/05/2014 1:49 4.3 40.14

21/05/2014 1:50 3.8 39.14

21/05/2014 1:51 4.7 38.98

21/05/2014 1:52 4.2 40.06

21/05/2014 1:53 4.0 40

21/05/2014 1:54 4.4 39.16

21/05/2014 1:55 4.4 38.48

11/12/2014 78/95

Page 125: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

21/05/2014 1:56 3.7 38.83

21/05/2014 1:57 4.0 40.4

21/05/2014 1:58 3.6 41.37

21/05/2014 1:59 4.0 40.41

21/05/2014 2:00 4.9 40.04

21/05/2014 2:01 4.5 38.37

21/05/2014 2:02 3.8 36.86

21/05/2014 2:03 3.8 36.72

21/05/2014 2:05 3.5 36.68

21/05/2014 2:06 3.6 37.04

21/05/2014 2:09 4.0 38.88

21/05/2014 2:11 4.0 37.34

21/05/2014 3:28 3.5 37.73

21/05/2014 3:29 3.9 38

21/05/2014 3:30 3.7 37.75

21/05/2014 3:31 3.7 36.87

21/05/2014 3:33 3.6 35.68

25/05/2014 22:16 3.7 33.68

25/05/2014 22:26 3.5 37.82

25/05/2014 22:38 3.6 41.26

25/05/2014 22:43 3.7 35.59

25/05/2014 22:44 3.8 35.83

25/05/2014 22:45 3.8 36.03

25/05/2014 22:46 4.0 36.86

25/05/2014 22:47 4.1 35.45

25/05/2014 22:48 4.3 35.3

25/05/2014 22:54 3.9 33.07

25/05/2014 23:48 3.9 39.06

26/05/2014 0:09 3.7 38.38

26/05/2014 0:10 3.6 38.15

26/05/2014 0:11 3.6 38.05

26/05/2014 0:12 3.7 37.78

26/05/2014 0:13 3.8 37.96

26/05/2014 0:14 3.6 39.69

26/05/2014 0:15 3.6 38.23

26/05/2014 0:16 3.6 38.36

26/05/2014 0:17 4.0 37.76

26/05/2014 0:18 3.9 38.2

26/05/2014 0:19 3.9 37.95

26/05/2014 0:20 3.8 37.81

26/05/2014 0:21 4.3 38.06

26/05/2014 0:22 4.0 38.04

26/05/2014 0:23 4.3 37.71

26/05/2014 0:24 4.5 38.56

11/12/2014 79/95

Page 126: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

26/05/2014 0:25 4.0 38.53

26/05/2014 0:26 4.4 39.04

26/05/2014 0:27 4.4 39.34

26/05/2014 0:28 4.1 40.58

26/05/2014 0:29 4.1 38.33

26/05/2014 0:30 4.2 38.21

26/05/2014 0:31 4.3 37.94

26/05/2014 0:32 3.6 38.34

26/05/2014 0:33 3.7 38.33

26/05/2014 0:34 3.8 37.43

26/05/2014 0:35 3.9 37.85

26/05/2014 0:37 4.1 37.74

26/05/2014 0:38 3.6 37.48

26/05/2014 0:39 3.8 37.37

26/05/2014 0:40 3.9 38.42

26/05/2014 0:41 3.8 38.17

26/05/2014 0:42 4.2 39.17

26/05/2014 0:43 4.1 39.1

26/05/2014 0:44 4.0 39.49

26/05/2014 0:45 4.4 39.12

26/05/2014 0:46 4.3 38.99

26/05/2014 0:47 3.8 38.57

26/05/2014 0:48 4.1 38.03

26/05/2014 0:49 4.0 38.34

26/05/2014 0:50 4.1 38.2

26/05/2014 0:51 3.8 37.39

26/05/2014 0:52 3.9 37.29

26/05/2014 0:53 3.8 37.66

26/05/2014 0:57 3.9 38.43

26/05/2014 0:58 3.9 38.69

26/05/2014 1:03 3.5 37.26

26/05/2014 1:04 3.8 37.22

26/05/2014 1:05 3.6 37.46

26/05/2014 1:06 3.5 37.65

26/05/2014 1:08 3.9 37.33

26/05/2014 1:09 4.0 37.45

26/05/2014 1:13 3.5 37.78

26/05/2014 1:18 3.5 37.72

28/05/2014 22:00 3.5 41.53

28/05/2014 22:01 4.2 38.36

28/05/2014 22:04 3.9 33.88

28/05/2014 22:16 3.6 34.96

28/05/2014 22:23 3.8 35.06

29/05/2014 22:11 3.8 40.05

11/12/2014 80/95

Page 127: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

29/05/2014 22:12 3.5 40.94

29/05/2014 22:13 4.0 36.81

29/05/2014 22:14 3.6 37.37

29/05/2014 22:17 3.6 36.58

29/05/2014 22:19 3.7 40.71

29/05/2014 22:20 3.5 39.6

31/05/2014 22:00 4.3 41.73

31/05/2014 22:01 4.8 41.6

31/05/2014 22:02 4.9 42.38

31/05/2014 22:03 4.5 40.76

31/05/2014 22:04 4.2 40.53

31/05/2014 22:05 4.2 41.06

31/05/2014 22:06 4.5 40.1

31/05/2014 22:07 4.3 39.68

31/05/2014 22:08 4.2 40.73

31/05/2014 22:09 4.0 40.94

31/05/2014 22:10 3.9 40.05

31/05/2014 22:11 4.7 44.3

31/05/2014 22:12 3.9 43.05

31/05/2014 22:13 4.3 42.52

31/05/2014 22:14 4.4 40.54

31/05/2014 22:15 3.9 40.84

31/05/2014 22:16 4.3 40.53

31/05/2014 22:17 4.2 40.24

31/05/2014 22:18 4.2 41.07

31/05/2014 22:19 3.9 40.6

31/05/2014 22:20 4.3 40

31/05/2014 22:21 4.2 39.94

31/05/2014 22:22 4.0 40.57

31/05/2014 22:23 3.9 40.33

31/05/2014 22:24 4.2 40.66

31/05/2014 22:25 4.3 40.58

31/05/2014 22:26 4.5 40.1

31/05/2014 22:27 4.5 39.79

31/05/2014 22:28 4.2 39.35

31/05/2014 22:29 4.1 39.42

31/05/2014 22:30 4.1 38.83

31/05/2014 22:31 3.8 43.43

31/05/2014 22:32 4.2 40.01

31/05/2014 22:33 3.8 39.55

31/05/2014 22:34 3.5 39.87

31/05/2014 22:36 3.6 41.1

31/05/2014 22:37 4.0 42.37

31/05/2014 22:38 4.1 41.03

11/12/2014 81/95

Page 128: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

31/05/2014 22:39 3.7 41.17

31/05/2014 22:40 4.0 41.35

31/05/2014 22:41 4.2 43.02

31/05/2014 22:42 4.3 40.55

31/05/2014 22:43 4.6 41.21

31/05/2014 22:44 4.3 42.86

31/05/2014 22:45 3.7 40.52

31/05/2014 22:46 4.2 39.91

31/05/2014 22:47 4.0 43.98

31/05/2014 22:48 3.6 40

31/05/2014 22:49 3.8 41.03

31/05/2014 22:50 4.0 40.25

31/05/2014 22:51 4.0 41.69

31/05/2014 22:52 4.2 42.96

31/05/2014 22:53 4.2 46.72

31/05/2014 22:54 4.0 39.85

31/05/2014 22:55 3.8 40.47

31/05/2014 22:57 3.8 40.28

31/05/2014 22:58 3.8 41.19

31/05/2014 23:02 3.8 40.28

31/05/2014 23:03 3.7 40.43

31/05/2014 23:05 3.6 41.99

31/05/2014 23:06 3.8 40.47

31/05/2014 23:09 3.6 39.66

31/05/2014 23:11 3.5 39.92

31/05/2014 23:29 3.5 40.6

31/05/2014 23:31 3.6 40.85

31/05/2014 23:33 3.6 40.61

31/05/2014 23:35 3.7 40.42

31/05/2014 23:36 3.6 40.61

31/05/2014 23:37 3.8 40.03

31/05/2014 23:38 3.8 40.04

31/05/2014 23:39 3.9 41.28

31/05/2014 23:40 3.6 45.57

31/05/2014 23:41 3.5 40.29

31/05/2014 23:42 4.0 41.54

31/05/2014 23:43 4.0 41.56

31/05/2014 23:44 3.9 40.75

31/05/2014 23:45 4.1 40.59

31/05/2014 23:46 4.3 40.86

31/05/2014 23:47 4.4 40.2

31/05/2014 23:48 4.3 40.21

31/05/2014 23:49 4.3 40.62

31/05/2014 23:50 4.3 40.71

11/12/2014 82/95

Page 129: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

31/05/2014 23:51 4.2 42.07

31/05/2014 23:52 4.0 40.36

31/05/2014 23:53 3.9 40.52

31/05/2014 23:54 4.3 40.59

31/05/2014 23:55 4.2 39.86

31/05/2014 23:56 3.9 39.49

31/05/2014 23:58 4.0 39.74

31/05/2014 23:59 3.8 39.32

01/06/2014 0:00 3.7 40.16

01/06/2014 2:23 3.5 49.51

01/06/2014 2:26 3.8 40.54

01/06/2014 2:30 3.6 40.16

01/06/2014 2:39 3.5 40.15

01/06/2014 4:12 3.7 39.94

01/06/2014 4:13 3.9 40.81

01/06/2014 4:14 3.7 40.05

01/06/2014 4:15 3.6 39.9

01/06/2014 4:22 3.5 39.99

01/06/2014 4:31 3.6 39.8

01/06/2014 22:00 4.4 41.59

01/06/2014 22:01 4.4 40.47

01/06/2014 22:02 4.8 41.91

01/06/2014 22:03 5.1 40.5

01/06/2014 22:04 4.8 40.81

01/06/2014 22:05 5.2 40.02

01/06/2014 22:06 5.2 39.78

01/06/2014 22:07 5.0 39.05

01/06/2014 22:08 4.9 38.79

01/06/2014 22:09 4.7 39.8

01/06/2014 22:10 4.2 39.85

01/06/2014 22:11 4.8 39.21

01/06/2014 22:12 4.7 38.73

01/06/2014 22:13 4.6 39.55

01/06/2014 22:14 4.5 41.74

01/06/2014 22:15 4.6 40.62

01/06/2014 22:16 4.6 38.83

01/06/2014 22:17 4.9 38.72

01/06/2014 22:18 4.6 39.21

01/06/2014 22:19 4.1 41.47

01/06/2014 22:20 4.5 40.65

01/06/2014 22:21 4.2 41.5

01/06/2014 22:22 5.1 41.08

01/06/2014 22:23 4.4 42.23

01/06/2014 22:24 5.1 42.13

11/12/2014 83/95

Page 130: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

01/06/2014 22:25 5.0 42.34

01/06/2014 22:26 5.5 41.7

01/06/2014 22:27 4.7 40.82

01/06/2014 22:28 5.4 39.52

01/06/2014 22:29 4.8 40.84

01/06/2014 22:30 4.8 41.59

01/06/2014 22:31 4.8 40

01/06/2014 22:32 4.9 40.11

01/06/2014 22:33 4.4 41.73

01/06/2014 22:34 4.0 42.37

01/06/2014 22:35 4.2 43.93

01/06/2014 22:36 4.8 40.71

01/06/2014 22:37 5.8 43.46

01/06/2014 22:38 5.1 41.36

01/06/2014 22:39 4.1 39.82

01/06/2014 22:40 5.4 40.4

01/06/2014 22:41 4.4 41.69

01/06/2014 22:42 3.8 41.29

01/06/2014 22:43 3.6 43.26

01/06/2014 22:44 4.7 42

01/06/2014 22:45 4.6 42.5

01/06/2014 22:46 5.2 42.27

01/06/2014 22:47 4.3 41.5

01/06/2014 22:48 5.2 42.85

01/06/2014 22:49 4.3 44.6

01/06/2014 22:50 4.9 42.13

01/06/2014 22:51 5.2 42.86

01/06/2014 22:52 5.0 41.5

01/06/2014 22:53 4.8 41.75

01/06/2014 22:54 4.5 41.65

01/06/2014 22:55 4.5 41.71

01/06/2014 22:56 4.3 41.88

01/06/2014 22:57 4.7 43.48

01/06/2014 22:58 4.4 43.4

01/06/2014 23:00 5.0 46.58

01/06/2014 23:01 5.1 43.84

01/06/2014 23:02 5.8 44.23

01/06/2014 23:03 5.4 46.88

01/06/2014 23:04 3.9 43.55

01/06/2014 23:05 5.5 45.02

01/06/2014 23:06 5.1 43.72

01/06/2014 23:08 4.9 43.81

01/06/2014 23:10 5.6 42.8

01/06/2014 23:11 4.5 43.47

11/12/2014 84/95

Page 131: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

01/06/2014 23:12 4.2 44.74

01/06/2014 23:13 4.2 41.95

01/06/2014 23:15 4.2 42.59

01/06/2014 23:16 4.6 42.61

01/06/2014 23:17 4.8 42.32

01/06/2014 23:18 4.3 43.71

01/06/2014 23:19 4.3 44.2

01/06/2014 23:20 4.6 43.17

01/06/2014 23:21 5.4 42.78

01/06/2014 23:23 4.3 42.53

01/06/2014 23:24 4.0 43.75

01/06/2014 23:25 4.3 46.66

01/06/2014 23:26 4.8 44.27

01/06/2014 23:27 4.6 43.62

01/06/2014 23:28 6.1 49.92

01/06/2014 23:29 5.0 43.92

01/06/2014 23:30 4.8 42.93

01/06/2014 23:32 4.7 46.14

01/06/2014 23:33 4.7 44.49

01/06/2014 23:34 5.6 44.6

01/06/2014 23:35 6.2 43.42

01/06/2014 23:36 5.6 42.54

01/06/2014 23:37 5.2 43.09

01/06/2014 23:38 5.3 45.34

01/06/2014 23:39 4.5 43.83

01/06/2014 23:40 5.0 42.83

01/06/2014 23:41 5.8 43.45

01/06/2014 23:42 4.9 43.02

01/06/2014 23:43 5.1 43.42

01/06/2014 23:44 4.9 43.39

01/06/2014 23:45 4.9 42.79

01/06/2014 23:46 5.3 42.39

01/06/2014 23:47 4.9 43.83

01/06/2014 23:48 4.5 42.95

01/06/2014 23:49 4.7 45.53

01/06/2014 23:50 4.7 44.22

01/06/2014 23:51 5.2 42.85

01/06/2014 23:52 6.1 43.72

01/06/2014 23:53 4.7 43.1

01/06/2014 23:54 4.6 44.64

01/06/2014 23:55 4.8 42.78

01/06/2014 23:56 5.2 42.66

01/06/2014 23:57 5.4 42.87

01/06/2014 23:58 4.8 41.94

11/12/2014 85/95

Page 132: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

01/06/2014 23:59 4.8 41.74

02/06/2014 0:00 4.5 42.55

02/06/2014 0:01 4.5 42.25

02/06/2014 0:02 4.0 41.88

02/06/2014 0:03 4.3 41.87

02/06/2014 0:04 4.8 42.56

02/06/2014 0:05 3.9 42.99

02/06/2014 0:06 4.0 42.03

02/06/2014 0:07 4.0 43.37

02/06/2014 0:08 4.2 45.5

02/06/2014 0:09 4.5 44.14

02/06/2014 0:10 5.0 41.78

02/06/2014 0:11 5.0 42.01

02/06/2014 0:12 4.6 41.29

02/06/2014 0:13 3.9 41.68

02/06/2014 0:17 4.4 42.76

02/06/2014 0:18 4.3 42.13

02/06/2014 0:19 3.9 42.96

02/06/2014 0:20 4.3 42.24

02/06/2014 0:21 4.6 42.25

02/06/2014 0:22 4.7 42.11

02/06/2014 0:23 4.5 42.19

02/06/2014 0:24 4.8 43.57

02/06/2014 0:25 4.0 42.19

02/06/2014 0:26 4.6 42.64

02/06/2014 0:27 5.0 42.67

02/06/2014 0:28 4.6 42.37

02/06/2014 0:29 4.6 41.46

02/06/2014 0:30 5.0 41.58

02/06/2014 0:31 4.7 41.54

02/06/2014 0:32 4.1 40.8

02/06/2014 0:33 4.3 41.17

02/06/2014 0:34 4.5 41.02

02/06/2014 0:35 4.2 41.58

02/06/2014 0:36 4.2 41

02/06/2014 0:37 4.5 41.55

02/06/2014 0:38 4.2 41.12

02/06/2014 0:39 4.3 41.06

02/06/2014 0:40 4.5 41.07

02/06/2014 0:41 4.1 41.12

02/06/2014 0:42 4.0 41.29

02/06/2014 0:43 4.3 41.28

02/06/2014 0:44 4.5 41.22

02/06/2014 0:45 4.3 40.85

11/12/2014 86/95

Page 133: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 0:46 4.5 40.79

02/06/2014 0:47 4.0 40.48

02/06/2014 0:48 4.1 41.33

02/06/2014 0:49 3.8 40.73

02/06/2014 0:50 4.0 40.95

02/06/2014 0:51 4.0 40.66

02/06/2014 0:52 4.1 40.47

02/06/2014 0:53 3.9 40.81

02/06/2014 0:54 3.8 41.33

02/06/2014 0:55 4.0 41.42

02/06/2014 0:56 4.3 41.36

02/06/2014 0:57 4.5 41.25

02/06/2014 0:58 4.6 41.43

02/06/2014 0:59 4.5 41.3

02/06/2014 1:00 4.7 42.68

02/06/2014 1:01 4.7 42.68

02/06/2014 1:02 5.2 41.57

02/06/2014 1:03 5.6 41.51

02/06/2014 1:04 5.1 41.91

02/06/2014 1:05 4.6 42.22

02/06/2014 1:06 5.2 43.19

02/06/2014 1:07 5.2 44.12

02/06/2014 1:08 5.5 43.42

02/06/2014 1:09 5.9 43.38

02/06/2014 1:10 6.0 44.24

02/06/2014 1:11 6.0 43.99

02/06/2014 1:12 6.1 43.75

02/06/2014 1:13 6.3 44.24

02/06/2014 1:14 6.1 44.5

02/06/2014 1:15 6.1 43.82

02/06/2014 1:16 6.4 43.64

02/06/2014 1:17 6.5 44.16

02/06/2014 1:18 6.1 44.06

02/06/2014 1:19 6.3 44.33

02/06/2014 1:20 6.4 44.44

02/06/2014 1:21 6.4 45.39

02/06/2014 1:22 6.5 44.07

02/06/2014 1:23 6.8 44.07

02/06/2014 1:24 6.6 43.47

02/06/2014 1:25 6.0 43.96

02/06/2014 1:26 6.0 44.52

02/06/2014 1:27 6.0 44.15

02/06/2014 1:28 6.5 43.39

02/06/2014 1:29 6.1 43.75

11/12/2014 87/95

Page 134: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 1:30 6.5 42.55

02/06/2014 1:31 5.9 42.48

02/06/2014 1:32 5.9 43.39

02/06/2014 1:33 5.7 42.88

02/06/2014 1:34 5.7 43.81

02/06/2014 1:35 5.4 42.96

02/06/2014 1:36 5.7 42.55

02/06/2014 1:37 6.1 43.8

02/06/2014 1:38 5.6 43.71

02/06/2014 1:39 5.6 42.55

02/06/2014 1:40 5.9 42.14

02/06/2014 1:41 5.4 41.87

02/06/2014 1:42 4.9 41.89

02/06/2014 1:43 4.8 42.18

02/06/2014 1:44 4.8 42.36

02/06/2014 1:45 4.8 43.09

02/06/2014 1:46 5.2 43.26

02/06/2014 1:47 5.3 42.53

02/06/2014 1:48 6.1 42.62

02/06/2014 1:49 5.9 43.69

02/06/2014 1:50 5.6 43.49

02/06/2014 1:51 6.0 42.71

02/06/2014 1:52 6.1 42.53

02/06/2014 1:53 5.9 42.2

02/06/2014 1:54 5.6 41.89

02/06/2014 1:55 5.2 42.21

02/06/2014 1:56 4.7 43.07

02/06/2014 1:57 5.0 42.37

02/06/2014 1:58 5.2 42.26

02/06/2014 1:59 5.1 42.31

02/06/2014 2:00 4.9 42.13

02/06/2014 2:01 5.0 42.3

02/06/2014 2:02 4.8 42.51

02/06/2014 2:03 4.9 42.26

02/06/2014 2:04 4.7 42.96

02/06/2014 2:05 4.8 43.23

02/06/2014 2:06 4.3 42.54

02/06/2014 2:07 5.1 42.64

02/06/2014 2:08 4.7 42.82

02/06/2014 2:09 4.5 42.69

02/06/2014 2:10 4.1 42.33

02/06/2014 2:11 4.7 42.91

02/06/2014 2:12 4.4 42.8

02/06/2014 2:13 4.7 42.69

11/12/2014 88/95

Page 135: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 2:14 5.1 42.8

02/06/2014 2:15 5.4 43.49

02/06/2014 2:16 5.2 42.96

02/06/2014 2:17 5.2 42.99

02/06/2014 2:18 5.6 42.58

02/06/2014 2:19 5.4 42.62

02/06/2014 2:20 5.6 43.26

02/06/2014 2:21 5.4 42.59

02/06/2014 2:22 4.7 43.88

02/06/2014 2:23 5.0 43.03

02/06/2014 2:24 5.2 44.21

02/06/2014 2:25 5.5 44.75

02/06/2014 2:26 5.1 45.43

02/06/2014 2:27 6.0 43.33

02/06/2014 2:28 6.6 44.08

02/06/2014 2:29 6.1 45.45

02/06/2014 2:30 5.5 44.61

02/06/2014 2:31 5.8 44.11

02/06/2014 2:32 6.4 43.59

02/06/2014 2:33 5.7 44.86

02/06/2014 2:34 5.3 44.08

02/06/2014 2:35 5.6 45.41

02/06/2014 2:36 5.9 44.72

02/06/2014 2:37 6.0 44

02/06/2014 2:38 6.3 45.33

02/06/2014 2:39 6.3 42.71

02/06/2014 2:40 6.1 43.99

02/06/2014 2:41 5.7 43.31

02/06/2014 2:42 5.5 44.33

02/06/2014 2:43 5.6 42.87

02/06/2014 2:44 5.6 43.71

02/06/2014 2:45 5.6 43.7

02/06/2014 2:46 5.4 43.77

02/06/2014 2:47 5.5 43.83

02/06/2014 2:48 5.4 44.55

02/06/2014 2:49 5.9 43.69

02/06/2014 2:50 5.5 42.6

02/06/2014 2:51 5.9 43.8

02/06/2014 2:52 5.4 44.23

02/06/2014 2:53 5.4 43.76

02/06/2014 2:54 5.1 44.32

02/06/2014 2:55 5.7 42.59

02/06/2014 2:56 5.2 44.88

02/06/2014 2:57 5.7 43.1

11/12/2014 89/95

Page 136: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 2:58 5.6 42.83

02/06/2014 2:59 5.5 42.72

02/06/2014 3:00 5.2 42.74

02/06/2014 3:01 5.2 42.32

02/06/2014 3:02 4.9 42.52

02/06/2014 3:03 5.2 42.06

02/06/2014 3:04 5.0 43.19

02/06/2014 3:05 4.8 43.17

02/06/2014 3:06 4.7 43.05

02/06/2014 3:07 4.7 42.52

02/06/2014 3:08 4.9 42.87

02/06/2014 3:09 5.1 43.09

02/06/2014 3:10 5.4 43.39

02/06/2014 3:11 5.3 42.76

02/06/2014 3:12 5.2 42.91

02/06/2014 3:13 5.2 43.55

02/06/2014 3:14 4.5 43.76

02/06/2014 3:15 5.5 43.5

02/06/2014 3:16 5.3 43.16

02/06/2014 3:17 5.8 43.82

02/06/2014 3:18 5.8 42.97

02/06/2014 3:19 5.6 43.87

02/06/2014 3:20 5.9 44.68

02/06/2014 3:21 5.5 43.93

02/06/2014 3:22 5.7 43.83

02/06/2014 3:23 5.8 42.76

02/06/2014 3:24 5.7 43.38

02/06/2014 3:25 5.3 43.16

02/06/2014 3:26 5.4 43.28

02/06/2014 3:27 5.5 42.56

02/06/2014 3:28 5.3 42.31

02/06/2014 3:29 5.4 41.9

02/06/2014 3:30 5.1 42.14

02/06/2014 3:31 5.4 41.96

02/06/2014 3:32 4.9 42.04

02/06/2014 3:33 4.8 41.99

02/06/2014 3:34 4.9 42.35

02/06/2014 3:35 5.1 42.77

02/06/2014 3:36 5.4 42.26

02/06/2014 3:37 5.4 42.55

02/06/2014 3:38 5.4 41.98

02/06/2014 3:39 5.0 41.82

02/06/2014 3:40 5.4 42.16

02/06/2014 3:41 5.0 42.38

11/12/2014 90/95

Page 137: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 3:42 5.1 43.02

02/06/2014 3:43 5.6 42.28

02/06/2014 3:44 5.6 43.2

02/06/2014 3:45 5.5 43

02/06/2014 3:46 5.6 42.84

02/06/2014 3:47 5.7 42.03

02/06/2014 3:48 5.6 43.11

02/06/2014 3:49 5.3 42.22

02/06/2014 3:50 5.4 42.29

02/06/2014 3:51 5.2 42.36

02/06/2014 3:52 5.3 41.86

02/06/2014 3:53 5.2 41.76

02/06/2014 3:54 5.2 42.14

02/06/2014 3:55 4.9 42.14

02/06/2014 3:56 5.0 41.99

02/06/2014 3:57 4.8 42.18

02/06/2014 3:58 4.9 42.27

02/06/2014 3:59 4.8 42.25

02/06/2014 4:00 4.7 42.36

02/06/2014 4:01 4.4 42.39

02/06/2014 4:02 4.7 42.15

02/06/2014 4:03 4.9 41.96

02/06/2014 4:04 4.6 42.39

02/06/2014 4:05 4.5 42.49

02/06/2014 4:06 4.6 42.66

02/06/2014 4:07 4.6 42.08

02/06/2014 4:08 4.5 42.34

02/06/2014 4:09 4.0 41.83

02/06/2014 4:10 4.0 42.77

02/06/2014 4:11 4.4 41.97

02/06/2014 4:12 3.9 42.24

02/06/2014 4:13 3.9 41.58

02/06/2014 4:14 4.2 42.07

02/06/2014 4:15 4.0 42

02/06/2014 4:16 3.7 42.04

02/06/2014 4:17 4.4 41.32

02/06/2014 4:18 4.6 41.66

02/06/2014 4:19 4.9 41.88

02/06/2014 4:20 4.7 42.43

02/06/2014 4:21 4.4 41.26

02/06/2014 4:22 4.7 41.85

02/06/2014 4:23 4.9 41.76

02/06/2014 4:24 4.4 42.09

02/06/2014 4:25 4.3 42.01

11/12/2014 91/95

Page 138: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 4:26 4.5 43.25

02/06/2014 4:27 4.2 42.35

02/06/2014 4:28 4.1 41.58

02/06/2014 4:29 4.6 42.76

02/06/2014 4:30 4.1 42.04

02/06/2014 4:31 3.9 42.12

02/06/2014 4:32 3.9 41.89

02/06/2014 4:33 4.4 41.76

02/06/2014 4:34 4.1 41.85

02/06/2014 4:35 3.7 42.09

02/06/2014 4:36 3.8 42.22

02/06/2014 4:37 4.1 41.13

02/06/2014 4:38 4.2 41.64

02/06/2014 4:39 4.3 42.04

02/06/2014 4:40 3.9 41.19

02/06/2014 4:41 4.1 42.05

02/06/2014 4:42 4.5 41.5

02/06/2014 4:43 4.2 42.25

02/06/2014 4:44 4.4 41.7

02/06/2014 4:45 4.2 42.6

02/06/2014 4:46 4.4 41.48

02/06/2014 4:47 4.5 43.56

02/06/2014 4:48 4.7 44.13

02/06/2014 4:49 3.9 45.03

02/06/2014 4:50 4.4 45.04

02/06/2014 4:51 4.9 45.59

02/06/2014 4:52 4.3 46.29

02/06/2014 4:53 4.8 47.62

02/06/2014 4:54 4.4 47.64

02/06/2014 4:55 5.0 51.65

02/06/2014 4:56 4.8 50.26

02/06/2014 4:57 4.7 46.95

02/06/2014 4:58 5.3 47.68

02/06/2014 4:59 4.8 46.02

02/06/2014 22:25 7.3 46.28

02/06/2014 22:26 6.6 49.35

02/06/2014 22:27 6.9 45.39

02/06/2014 22:29 7.1 47.89

02/06/2014 22:30 6.5 48.84

02/06/2014 22:35 7.4 51.1

02/06/2014 22:36 7.3 44.86

02/06/2014 22:39 6.6 46.19

02/06/2014 22:41 6.3 50.74

02/06/2014 22:45 6.7 43.56

11/12/2014 92/95

Page 139: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

02/06/2014 22:46 6.6 42.84

02/06/2014 22:47 7.5 42.56

02/06/2014 22:50 5.2 48.4

02/06/2014 22:51 5.9 49.93

02/06/2014 22:55 7.2 48.55

02/06/2014 22:56 6.5 44.95

02/06/2014 23:01 6.5 44.03

02/06/2014 23:04 6.1 48.65

02/06/2014 23:05 6.6 50.78

02/06/2014 23:06 7.0 47.89

02/06/2014 23:12 5.3 43.89

02/06/2014 23:13 5.4 47.54

02/06/2014 23:21 6.4 50.09

02/06/2014 23:43 4.9 43.57

02/06/2014 23:52 5.4 41.56

02/06/2014 23:53 5.8 42.37

03/06/2014 0:01 5.1 46.72

03/06/2014 0:02 5.4 44.48

03/06/2014 0:07 7.1 44.74

03/06/2014 0:09 6.7 45.54

03/06/2014 0:12 6.2 41.26

03/06/2014 0:16 5.1 40.74

03/06/2014 0:18 4.8 42.23

03/06/2014 0:38 4.3 39.96

03/06/2014 0:39 3.7 40.35

03/06/2014 0:51 4.3 37.9

03/06/2014 0:52 4.2 38.3

03/06/2014 0:55 3.7 38.18

03/06/2014 1:13 4.1 37.57

03/06/2014 1:15 4.2 37.7

03/06/2014 1:16 4.5 37.24

03/06/2014 1:18 4.0 37.15

03/06/2014 1:19 4.3 36.98

03/06/2014 1:20 4.4 37.06

03/06/2014 1:32 3.6 36.17

03/06/2014 1:33 3.5 36.48

03/06/2014 1:50 3.5 35.76

03/06/2014 2:00 4.0 35.81

03/06/2014 2:01 4.2 46.49

03/06/2014 2:04 3.6 45.67

03/06/2014 2:05 4.0 35.98

03/06/2014 2:06 3.7 32.41

03/06/2014 2:29 3.6 32.62

03/06/2014 2:30 4.0 33.19

11/12/2014 93/95

Page 140: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

03/06/2014 2:31 4.3 36.04

03/06/2014 2:33 3.8 33.06

03/06/2014 2:34 3.7 32.8

03/06/2014 2:42 4.0 32.41

03/06/2014 3:12 4.1 36.2

03/06/2014 3:14 5.0 35.84

03/06/2014 3:15 4.4 39.75

03/06/2014 3:16 4.5 49.91

03/06/2014 3:17 4.2 54.99

03/06/2014 3:19 4.4 37.01

03/06/2014 3:20 4.3 34.33

03/06/2014 3:21 4.0 33.6

03/06/2014 3:22 3.5 35.77

03/06/2014 3:23 3.5 34.92

03/06/2014 3:25 4.2 36.35

03/06/2014 3:26 4.1 35.62

03/06/2014 3:28 4.4 34.34

03/06/2014 3:29 3.7 38.54

03/06/2014 3:34 3.7 36.19

03/06/2014 3:35 3.9 36.34

03/06/2014 3:36 3.8 34.23

03/06/2014 3:37 4.9 35.28

03/06/2014 3:38 4.3 35.9

03/06/2014 3:40 3.9 37.36

03/06/2014 3:42 4.2 40.93

03/06/2014 3:43 3.7 36.91

03/06/2014 3:46 3.9 34.86

03/06/2014 3:47 3.8 35.19

03/06/2014 3:50 3.6 33.77

17/06/2014 3:07 3.5 31.23

17/06/2014 3:13 3.6 31.61

17/06/2014 3:15 3.7 31.12

17/06/2014 3:16 3.6 30.66

17/06/2014 3:17 3.6 30.76

17/06/2014 3:43 3.5 34.54

17/06/2014 3:58 3.5 37.19

17/06/2014 4:01 3.6 36.76

17/06/2014 4:02 3.8 36.85

17/06/2014 4:03 3.8 36.66

17/06/2014 4:04 3.8 36.87

17/06/2014 4:05 3.7 36.56

17/06/2014 4:06 3.8 36.89

17/06/2014 4:07 3.7 36.71

17/06/2014 4:10 3.5 37.07

11/12/2014 94/95

Page 141: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/06/2014 4:21 3.9 38.22

17/06/2014 4:22 3.8 38.69

17/06/2014 4:23 3.6 37.71

17/06/2014 4:24 3.7 37.31

17/06/2014 4:25 3.9 37.55

17/06/2014 4:26 3.6 38.14

17/06/2014 4:27 3.6 37.8

17/06/2014 4:28 3.7 37.02

17/06/2014 4:29 3.7 37.4

17/06/2014 4:31 3.6 38.3

17/06/2014 4:32 3.6 39.27

17/06/2014 4:33 3.9 38.18

17/06/2014 4:34 4.0 38.01

17/06/2014 4:35 4.1 38.31

17/06/2014 4:36 4.2 37.7

17/06/2014 4:37 4.5 38.24

17/06/2014 4:38 4.4 38.17

17/06/2014 4:39 4.1 38.51

17/06/2014 4:40 4.0 38.57

17/06/2014 4:41 4.0 39.25

17/06/2014 4:42 3.6 39.06

17/06/2014 4:45 3.7 39.53

17/06/2014 4:46 3.5 39.97

17/06/2014 4:48 3.7 55.55

17/06/2014 4:49 3.5 56.95

17/06/2014 4:56 3.7 57.63

17/06/2014 4:59 3.6 58.05

11/12/2014 95/95

Page 142: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 3 - Valid Ambient Sound Data for Point of Reception A

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

20/03/2014 22:00 5.4 36.01

20/03/2014 22:01 4.5 35.62

20/03/2014 22:02 5.0 36.05

20/03/2014 22:03 5.1 34.81

20/03/2014 22:04 4.5 35.5

20/03/2014 22:05 4.3 35.39

20/03/2014 22:07 5.0 33.89

20/03/2014 22:08 4.6 34.1

20/03/2014 22:09 5.1 36.87

20/03/2014 22:10 4.9 39.01

20/03/2014 22:11 4.7 43.79

20/03/2014 22:12 4.8 40.38

20/03/2014 22:13 4.9 36.49

20/03/2014 22:14 4.6 36.03

20/03/2014 22:15 4.1 36.27

20/03/2014 22:16 4.6 40.27

20/03/2014 22:17 4.6 39.19

20/03/2014 22:18 4.8 34.85

20/03/2014 22:19 4.9 41.78

20/03/2014 22:20 4.5 38.04

20/03/2014 22:21 4.8 38.47

20/03/2014 22:22 4.9 38

20/03/2014 22:23 4.9 34.97

20/03/2014 22:24 4.2 36.52

20/03/2014 22:25 4.0 39.25

20/03/2014 22:26 4.9 35.46

20/03/2014 22:27 4.6 34.64

20/03/2014 22:28 3.9 36.93

20/03/2014 22:29 3.8 36.31

20/03/2014 22:30 3.9 39.09

20/03/2014 22:31 4.0 36.79

20/03/2014 22:32 5.5 36.17

20/03/2014 22:34 4.7 35.32

20/03/2014 22:35 4.1 39.9

20/03/2014 22:36 4.9 37.66

20/03/2014 22:37 4.7 35.18

20/03/2014 22:38 4.5 39.39

20/03/2014 22:39 4.9 35

20/03/2014 22:40 5.2 35.13

20/03/2014 22:41 4.7 37.27

20/03/2014 22:42 5.1 35.46

Day and Time of

Measurement

15/12/2014 1/13

Page 143: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

20/03/2014 22:43 5.0 34.97

20/03/2014 22:44 4.6 33.55

20/03/2014 22:45 4.5 33.3

20/03/2014 22:46 4.9 38.95

20/03/2014 22:47 5.3 35.36

20/03/2014 22:48 4.4 38.59

20/03/2014 22:49 4.7 37.59

20/03/2014 22:50 4.8 39.12

20/03/2014 22:51 5.6 38.98

20/03/2014 22:52 5.1 39.8

20/03/2014 22:53 4.8 39.87

20/03/2014 22:54 4.8 44.39

20/03/2014 22:55 5.5 43.81

20/03/2014 22:56 4.4 42.17

20/03/2014 22:57 4.5 40.29

20/03/2014 22:58 4.8 41.6

20/03/2014 22:59 5.3 39.12

20/03/2014 23:00 4.9 37.26

20/03/2014 23:01 5.3 42.83

20/03/2014 23:04 4.8 39.13

20/03/2014 23:05 4.1 39.6

20/03/2014 23:10 4.9 37.64

20/03/2014 23:13 4.8 37.27

20/03/2014 23:14 4.0 44.13

20/03/2014 23:16 5.1 38.51

20/03/2014 23:17 4.7 37.08

20/03/2014 23:18 5.8 41.66

20/03/2014 23:20 3.9 37.47

20/03/2014 23:22 4.1 38.46

20/03/2014 23:23 3.9 42.5

20/03/2014 23:26 3.7 35.72

20/03/2014 23:28 4.3 40.55

20/03/2014 23:29 4.1 37.77

20/03/2014 23:30 4.6 36.79

20/03/2014 23:31 4.5 35.52

20/03/2014 23:32 5.5 38.97

20/03/2014 23:33 4.7 37.37

20/03/2014 23:34 5.4 36.98

20/03/2014 23:35 5.3 38.1

20/03/2014 23:36 4.8 40.09

20/03/2014 23:37 5.6 35.32

20/03/2014 23:38 5.6 39.04

20/03/2014 23:39 5.0 39.22

20/03/2014 23:40 5.7 35.7

15/12/2014 2/13

Page 144: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

20/03/2014 23:41 5.9 39.19

20/03/2014 23:42 5.9 44.94

20/03/2014 23:44 5.9 37.86

20/03/2014 23:45 5.4 37.53

20/03/2014 23:46 5.9 38.38

20/03/2014 23:47 5.1 40.95

20/03/2014 23:48 5.7 40.78

20/03/2014 23:49 5.7 39.7

20/03/2014 23:50 5.8 36.85

20/03/2014 23:51 5.7 39.04

20/03/2014 23:52 4.9 42.58

20/03/2014 23:53 5.4 38.75

20/03/2014 23:54 5.0 40.58

20/03/2014 23:55 4.9 44.27

20/03/2014 23:56 4.5 43.95

20/03/2014 23:57 4.6 44.55

20/03/2014 23:58 4.0 42.39

20/03/2014 23:59 4.9 45.24

21/03/2014 0:00 4.9 42.12

21/03/2014 0:01 4.9 39.44

21/03/2014 0:02 4.5 37.92

21/03/2014 0:03 5.0 38.16

21/03/2014 0:04 4.6 42.03

21/03/2014 0:05 4.3 39.55

21/03/2014 0:06 4.4 39.67

21/03/2014 0:07 3.9 44.27

21/03/2014 0:08 3.9 40.95

21/03/2014 0:09 4.7 41.77

21/03/2014 0:10 4.6 39.21

21/03/2014 0:11 4.4 38.76

21/03/2014 0:12 4.7 45.37

21/03/2014 0:13 4.7 41.87

21/03/2014 0:14 4.5 43.17

21/03/2014 0:15 4.2 44.51

21/03/2014 0:16 4.8 40.48

21/03/2014 0:17 4.7 42.86

21/03/2014 0:18 4.6 39.02

21/03/2014 0:19 4.4 37.63

21/03/2014 0:20 3.8 36.6

21/03/2014 0:21 3.8 35.88

21/03/2014 0:22 4.2 35.12

21/03/2014 0:23 3.9 34.66

21/03/2014 0:24 4.5 37.07

21/03/2014 0:26 4.4 36.01

15/12/2014 3/13

Page 145: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

21/03/2014 0:27 4.9 36.25

21/03/2014 0:28 4.8 41.61

21/03/2014 0:29 4.6 38.75

21/03/2014 0:30 4.6 41.63

21/03/2014 0:31 4.7 40.95

21/03/2014 0:32 3.8 40.49

21/03/2014 0:33 4.9 41.5

21/03/2014 0:34 4.5 41.68

21/03/2014 0:36 4.0 42.7

21/03/2014 0:38 4.0 44.52

21/03/2014 0:39 4.0 48.11

21/03/2014 0:40 3.8 46.15

21/03/2014 0:41 3.9 42.76

21/03/2014 0:44 3.8 41.53

21/03/2014 0:45 3.6 44.26

21/03/2014 0:47 3.6 43.4

21/03/2014 0:50 3.5 38.19

21/03/2014 0:52 4.1 35.31

21/03/2014 0:54 4.1 33.58

21/03/2014 0:55 3.6 35.5

21/03/2014 1:02 4.2 34

21/03/2014 1:03 4.1 33.5

21/03/2014 1:04 4.1 33.97

21/03/2014 1:19 3.7 34.81

21/03/2014 1:31 3.6 41.43

21/03/2014 1:36 3.6 37.07

21/03/2014 1:37 3.8 35.28

21/03/2014 1:38 3.9 35.91

21/03/2014 1:40 4.2 32.79

21/03/2014 1:41 3.8 33.98

21/03/2014 1:42 4.0 32.27

21/03/2014 1:43 3.7 32.3

21/03/2014 1:44 3.7 29.92

21/03/2014 1:57 3.7 32.48

21/03/2014 2:10 3.8 26.86

21/03/2014 2:17 4.2 26.84

21/03/2014 2:19 3.9 27.7

21/03/2014 2:20 4.0 28.45

21/03/2014 2:21 3.8 26.83

21/03/2014 2:22 4.1 28.33

21/03/2014 2:24 3.7 28.35

21/03/2014 2:27 4.1 33.13

21/03/2014 2:28 4.6 31.49

21/03/2014 2:29 4.5 28.28

15/12/2014 4/13

Page 146: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

21/03/2014 2:30 4.0 27.7

21/03/2014 2:31 4.2 28.05

21/03/2014 2:32 3.8 28.78

21/03/2014 2:34 4.1 31.69

21/03/2014 2:35 3.9 32.16

21/03/2014 2:36 4.4 31.67

21/03/2014 2:37 3.6 32.35

21/03/2014 2:38 4.4 30.88

21/03/2014 2:39 4.9 30.6

21/03/2014 2:40 5.0 30.99

21/03/2014 2:41 4.1 31.17

21/03/2014 2:42 4.0 32.29

21/03/2014 2:43 3.7 29.37

21/03/2014 2:48 3.7 33.34

21/03/2014 2:49 4.3 33.26

21/03/2014 2:51 4.1 30.63

21/03/2014 2:52 3.7 31.75

21/03/2014 2:53 3.6 32.36

21/03/2014 2:54 4.0 31.52

21/03/2014 2:55 4.2 30.71

21/03/2014 2:56 4.1 30.19

21/03/2014 2:57 4.3 29.35

21/03/2014 2:58 3.5 30.06

21/03/2014 2:59 4.2 29.42

21/03/2014 3:01 3.6 30.37

21/03/2014 3:02 4.4 28.41

21/03/2014 3:03 3.9 30.08

21/03/2014 3:04 4.1 29.98

21/03/2014 3:06 3.6 31.51

21/03/2014 3:11 3.8 28.89

21/03/2014 3:12 3.8 34.42

21/03/2014 3:13 3.7 35.01

21/03/2014 3:14 4.1 32.27

21/03/2014 3:15 3.8 32.22

21/03/2014 3:25 4.2 35.53

21/03/2014 3:26 4.3 35.92

21/03/2014 3:32 3.7 34.39

21/03/2014 3:33 3.7 34.24

21/03/2014 3:36 3.9 36.35

15/04/2014 22:01 3.7 38.26

15/04/2014 22:02 4.4 35.14

15/04/2014 22:03 3.8 31.39

15/04/2014 22:04 4.3 37.13

15/04/2014 22:05 3.9 33.25

15/12/2014 5/13

Page 147: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

15/04/2014 22:06 3.7 32.83

15/04/2014 22:08 3.9 33.12

15/04/2014 22:09 4.0 34.05

15/04/2014 22:10 3.7 32.65

15/04/2014 22:11 3.9 36.21

15/04/2014 22:12 3.5 39.16

15/04/2014 22:14 5.0 36.06

15/04/2014 22:15 4.4 36.14

15/04/2014 22:16 4.5 35.92

15/04/2014 22:17 4.1 42.2

15/04/2014 22:18 3.6 41.23

15/04/2014 22:19 4.0 39.07

15/04/2014 22:20 4.0 39.23

15/04/2014 22:21 4.4 37.67

15/04/2014 22:22 4.1 34.12

15/04/2014 22:23 3.8 34.31

15/04/2014 22:24 4.7 34.9

15/04/2014 22:25 4.1 36.75

15/04/2014 22:26 4.3 38.02

15/04/2014 22:27 3.6 37.08

15/04/2014 22:30 3.9 39.32

15/04/2014 22:33 3.7 39.58

15/04/2014 22:34 4.0 37.36

15/04/2014 22:35 3.7 32.63

15/04/2014 22:36 3.7 32.73

15/04/2014 22:37 3.5 39.56

15/04/2014 22:38 4.1 33.08

15/04/2014 22:43 3.5 34.3

15/04/2014 23:12 3.7 36.03

15/04/2014 23:22 3.5 34.08

15/04/2014 23:23 3.5 32.81

15/04/2014 23:26 3.6 33.62

22/04/2014 22:13 4.4 39

22/04/2014 22:16 3.7 39.82

22/04/2014 22:24 4.0 40.83

22/04/2014 22:26 3.5 40.82

22/04/2014 23:01 3.5 42.53

22/04/2014 23:46 3.7 40.58

23/04/2014 0:15 3.9 39.07

23/04/2014 0:31 3.6 37.54

23/04/2014 0:41 3.7 41.66

23/04/2014 1:22 3.6 39.9

23/04/2014 1:24 4.0 41.68

23/04/2014 2:05 4.1 37.68

15/12/2014 6/13

Page 148: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/04/2014 2:06 3.8 41.26

23/04/2014 2:26 3.6 38.99

23/04/2014 2:43 3.7 39.32

23/04/2014 2:52 3.8 42.29

23/04/2014 3:10 3.7 40.37

23/04/2014 3:15 3.6 40.91

23/04/2014 3:17 4.5 44.63

23/04/2014 3:28 4.0 38.27

23/04/2014 3:35 3.5 43.76

23/04/2014 3:52 3.6 40.27

23/04/2014 4:21 3.9 42.44

04/05/2014 0:38 6.4 54.3

04/05/2014 1:31 7.5 50.25

04/05/2014 1:38 7.1 49.75

04/05/2014 1:56 3.7 51.13

04/05/2014 1:59 4.5 49.06

04/05/2014 2:00 5.1 50.14

04/05/2014 2:19 4.9 45.78

04/05/2014 2:26 5.0 50.69

04/05/2014 2:27 4.9 48.56

04/05/2014 2:42 4.1 52.47

04/05/2014 2:51 4.9 48.2

04/05/2014 2:52 5.1 47.34

04/05/2014 2:53 5.6 47.04

04/05/2014 2:55 4.0 45.53

04/05/2014 3:00 6.0 49.12

04/05/2014 3:01 5.7 54.13

04/05/2014 3:02 5.1 52.26

04/05/2014 3:06 5.4 50.33

04/05/2014 3:11 5.8 51.31

04/05/2014 3:18 5.7 48.48

04/05/2014 3:19 4.4 48.58

04/05/2014 3:20 3.8 51.4

04/05/2014 3:21 4.9 49.36

04/05/2014 3:22 4.4 47.02

04/05/2014 3:23 4.8 48.8

04/05/2014 3:27 6.1 43.99

04/05/2014 3:28 5.5 45.68

04/05/2014 3:29 5.7 45.75

04/05/2014 3:30 6.6 49.84

04/05/2014 3:32 5.3 46.3

04/05/2014 3:33 5.6 47.49

04/05/2014 3:34 6.2 46.57

04/05/2014 3:35 5.9 45.51

15/12/2014 7/13

Page 149: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/05/2014 3:36 5.4 46.07

04/05/2014 3:37 5.0 44.08

04/05/2014 3:38 5.5 42.01

04/05/2014 3:39 5.2 44.51

04/05/2014 3:41 5.6 43.36

04/05/2014 3:45 5.9 46.24

04/05/2014 3:46 4.9 44.37

04/05/2014 3:47 6.3 45.1

04/05/2014 3:48 5.6 48.1

04/05/2014 3:50 5.4 42.52

04/05/2014 3:51 5.2 43.97

04/05/2014 3:52 5.6 45.21

04/05/2014 3:53 5.7 44.26

04/05/2014 3:54 5.8 49.82

04/05/2014 3:55 6.1 47.07

04/05/2014 3:56 6.2 46.18

04/05/2014 3:57 6.3 46.78

04/05/2014 3:58 5.5 45.16

04/05/2014 3:59 5.3 45.02

04/05/2014 4:00 4.4 48.49

04/05/2014 4:01 4.6 44.11

04/05/2014 4:02 4.6 43.42

04/05/2014 4:03 6.7 42.14

04/05/2014 4:04 5.8 44.88

04/05/2014 4:05 5.8 44.8

04/05/2014 4:06 4.9 47.3

04/05/2014 4:07 5.2 43.64

04/05/2014 4:08 6.6 42.69

04/05/2014 4:09 5.8 42.9

04/05/2014 4:10 4.3 42.86

04/05/2014 4:11 4.8 44.83

04/05/2014 4:12 4.7 44.83

04/05/2014 4:13 5.0 43.82

04/05/2014 4:14 4.3 42.68

04/05/2014 4:15 4.3 39.94

04/05/2014 4:17 4.8 39.74

04/05/2014 4:18 4.9 41.23

04/05/2014 4:19 3.9 43.05

04/05/2014 4:20 5.0 47.12

04/05/2014 4:21 4.0 45.29

04/05/2014 4:22 4.0 44.43

04/05/2014 4:23 4.7 46.6

04/05/2014 4:24 5.1 44.95

04/05/2014 4:26 6.1 47.34

15/12/2014 8/13

Page 150: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/05/2014 4:27 5.4 44.16

04/05/2014 4:28 5.2 45.15

04/05/2014 4:29 4.9 46.76

04/05/2014 4:30 4.3 44.63

04/05/2014 4:31 5.2 44.12

04/05/2014 4:32 4.3 41.62

04/05/2014 4:33 4.2 44.25

04/05/2014 4:34 4.4 41.81

04/05/2014 4:35 4.5 43.36

04/05/2014 4:36 4.7 43.24

04/05/2014 4:37 4.9 42.42

04/05/2014 4:38 4.3 45.02

04/05/2014 4:40 5.0 45.39

04/05/2014 4:41 4.4 39.88

04/05/2014 4:42 4.3 46.16

04/05/2014 4:43 4.9 42.11

04/05/2014 4:44 4.0 41.88

04/05/2014 4:45 3.9 40.82

04/05/2014 4:46 3.6 41.49

04/05/2014 4:47 4.0 42.99

04/05/2014 4:48 4.0 41.82

04/05/2014 4:49 4.5 43.19

04/05/2014 4:50 4.0 45.9

04/05/2014 4:51 4.0 45.97

04/05/2014 4:52 3.7 45.17

04/05/2014 4:53 4.1 42.55

04/05/2014 4:54 4.2 40.53

04/05/2014 4:55 4.2 41.7

04/05/2014 4:56 4.0 39.15

04/05/2014 4:57 4.2 40.23

04/05/2014 4:58 3.9 47.72

04/05/2014 4:59 4.0 43.97

22/05/2014 23:51 3.7 31.82

22/05/2014 23:57 3.6 31.19

23/05/2014 0:40 3.5 36.31

23/05/2014 0:41 4.2 36.92

23/05/2014 0:42 4.0 35.24

23/05/2014 0:43 3.7 34.92

23/05/2014 0:44 4.0 34.69

23/05/2014 0:45 4.0 37.72

23/05/2014 0:46 4.2 35.56

23/05/2014 0:47 3.8 34.02

23/05/2014 0:49 3.9 36.69

23/05/2014 0:50 3.6 35.14

15/12/2014 9/13

Page 151: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/05/2014 1:14 3.5 31.94

23/05/2014 1:15 3.9 32.29

23/05/2014 1:30 4.0 33.61

23/05/2014 1:31 3.7 40.52

23/05/2014 1:32 3.8 29.96

23/05/2014 1:33 3.9 31.79

23/05/2014 1:34 4.6 35.96

23/05/2014 1:35 3.8 42.4

23/05/2014 1:38 3.5 34.2

23/05/2014 1:39 4.7 34.73

23/05/2014 1:41 3.9 35.75

23/05/2014 1:42 4.3 34.84

23/05/2014 1:55 3.6 30.48

23/05/2014 2:15 3.8 35.11

23/05/2014 2:16 4.1 31.82

23/05/2014 2:17 4.9 31.53

23/05/2014 2:19 3.6 35.53

23/05/2014 2:21 3.8 32.45

23/05/2014 2:36 4.6 36.06

23/05/2014 2:37 3.8 38.91

23/05/2014 2:38 4.3 35.67

23/05/2014 2:40 4.4 38.44

23/05/2014 2:42 4.2 34.79

23/05/2014 2:45 3.9 36.56

23/05/2014 2:46 4.0 35.99

23/05/2014 4:42 4.4 35.87

04/06/2014 3:08 3.6 32.15

04/06/2014 3:10 4.2 32.4

04/06/2014 3:12 3.5 33.15

04/06/2014 3:13 4.1 36.12

04/06/2014 3:14 4.2 34.49

04/06/2014 3:15 4.2 34.36

04/06/2014 3:16 4.5 35.6

04/06/2014 3:18 6.0 34.7

04/06/2014 3:19 5.7 34.32

04/06/2014 3:20 5.0 38.9

04/06/2014 3:21 4.8 34.61

04/06/2014 3:22 4.8 36.24

04/06/2014 3:23 4.9 34.43

04/06/2014 3:24 4.9 33.42

04/06/2014 3:25 5.0 39.75

04/06/2014 3:26 4.7 35.02

04/06/2014 3:27 5.1 35.13

04/06/2014 3:28 4.1 37.93

15/12/2014 10/13

Page 152: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/06/2014 3:29 4.0 44.29

04/06/2014 3:32 3.5 45.28

04/06/2014 3:33 3.9 35.5

04/06/2014 3:34 4.1 36.55

04/06/2014 3:35 3.9 34.59

04/06/2014 3:36 4.0 36.63

04/06/2014 3:37 3.9 36.98

04/06/2014 3:38 3.8 43.12

04/06/2014 3:39 3.6 39.92

04/06/2014 3:40 4.3 36.67

04/06/2014 3:41 3.7 35.85

04/06/2014 3:42 3.6 36.2

04/06/2014 3:44 4.0 35.93

04/06/2014 3:45 4.1 36.45

04/06/2014 3:46 3.8 36.3

04/06/2014 3:47 3.7 41.82

04/06/2014 3:49 4.0 40.65

04/06/2014 3:51 4.2 39.87

04/06/2014 3:52 3.6 37.7

04/06/2014 4:12 3.6 51.98

17/06/2014 22:01 4.5 50.99

17/06/2014 22:04 4.1 51.36

17/06/2014 22:06 3.9 50.59

17/06/2014 22:08 5.8 48.91

17/06/2014 22:12 3.8 46.56

17/06/2014 22:16 4.0 42.03

17/06/2014 22:39 6.2 47.88

17/06/2014 22:40 4.9 48.36

17/06/2014 22:42 3.5 49.29

17/06/2014 22:43 3.8 50.65

17/06/2014 22:44 3.7 50.34

17/06/2014 22:46 4.3 47.42

17/06/2014 22:48 3.5 52.16

17/06/2014 22:57 4.0 49.94

17/06/2014 23:02 4.8 51.42

17/06/2014 23:04 4.6 44.2

17/06/2014 23:07 3.7 48.74

17/06/2014 23:08 4.2 48.27

17/06/2014 23:10 3.8 48.39

17/06/2014 23:11 3.6 46.18

17/06/2014 23:12 4.5 43.95

17/06/2014 23:14 3.7 52.31

17/06/2014 23:16 3.7 44.68

18/06/2014 0:26 5.9 43.29

15/12/2014 11/13

Page 153: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/06/2014 0:27 4.6 45.22

18/06/2014 0:28 4.8 42.32

18/06/2014 0:29 6.0 42.19

18/06/2014 0:30 4.5 45

18/06/2014 0:31 4.7 43.94

18/06/2014 0:32 4.7 50.74

18/06/2014 0:33 6.6 45.12

18/06/2014 0:36 5.6 44.35

18/06/2014 0:37 5.0 40.7

18/06/2014 0:38 3.9 42.77

18/06/2014 0:39 4.8 40.11

18/06/2014 0:40 4.3 41.61

18/06/2014 0:44 5.6 46.01

18/06/2014 0:48 4.2 45.68

18/06/2014 0:49 3.7 42.11

18/06/2014 1:08 4.1 45.9

20/09/2014 23:46 3.6 54.04

21/09/2014 0:09 4.0 48.45

21/09/2014 0:14 3.7 50.42

21/09/2014 0:29 4.0 46.04

21/09/2014 0:35 4.0 46.39

21/09/2014 0:41 3.7 47.01

21/09/2014 0:43 3.5 45.93

21/09/2014 0:44 4.1 45.51

21/09/2014 0:46 3.8 46

21/09/2014 0:47 4.0 44.9

21/09/2014 1:01 3.9 49.92

21/09/2014 1:04 3.5 50.64

21/09/2014 1:05 3.7 48.04

21/09/2014 1:10 4.0 46.54

21/09/2014 1:11 4.2 46.57

21/09/2014 1:12 4.1 50.01

21/09/2014 1:13 3.5 49.1

21/09/2014 1:20 4.1 52.14

21/09/2014 1:22 4.3 50.59

21/09/2014 1:24 3.6 50.86

21/09/2014 1:34 3.8 51.11

21/09/2014 1:49 3.6 51.52

21/09/2014 1:55 3.7 48.92

15/12/2014 12/13

Page 154: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

15/12/2014 13/13

Page 155: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 4 - Valid Ambient Sound Data for Point of Reception C

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

15/04/2014 22:00 5.1 43.1

15/04/2014 22:01 5.4 38.75

15/04/2014 22:02 4.9 37.37

15/04/2014 22:03 4.2 40.57

15/04/2014 22:04 4.5 37.39

15/04/2014 22:05 4.4 35.46

15/04/2014 22:06 4.0 43.53

15/04/2014 22:07 3.6 44.66

15/04/2014 22:08 4.2 41.13

15/04/2014 22:09 5.5 41.82

15/04/2014 22:10 5.4 34.53

15/04/2014 22:11 4.3 35.31

15/04/2014 22:12 4.0 41.3

15/04/2014 22:13 4.4 42.26

15/04/2014 22:14 4.8 37.25

15/04/2014 22:15 5.3 37.01

15/04/2014 22:16 4.1 33.74

15/04/2014 22:17 3.7 40.12

15/04/2014 22:18 3.8 36.59

15/04/2014 22:19 4.8 36.08

15/04/2014 22:20 3.9 36.17

15/04/2014 22:21 4.1 33.13

15/04/2014 22:22 3.6 32.93

15/04/2014 22:23 3.8 31.35

15/04/2014 22:24 3.9 34.41

15/04/2014 22:25 3.5 37.33

15/04/2014 22:26 4.3 35.65

15/04/2014 22:27 4.4 34.04

15/04/2014 22:28 4.2 33.2

15/04/2014 22:29 3.9 36.07

15/04/2014 22:30 3.8 31.82

15/04/2014 22:31 3.6 41.03

15/04/2014 22:32 3.8 41.55

15/04/2014 22:33 5.4 36.64

15/04/2014 22:34 4.6 34.96

15/04/2014 22:35 4.3 34

15/04/2014 22:36 3.9 38.75

15/04/2014 22:37 4.2 35.99

15/04/2014 22:38 4.6 34.08

15/04/2014 22:39 4.0 36.26

15/04/2014 22:40 3.8 33.47

15/04/2014 22:41 4.0 34.39

Day and Time of

Measurement

11/12/2014 1/32

Page 156: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

15/04/2014 22:42 3.7 33.81

15/04/2014 22:43 3.7 34.98

15/04/2014 22:44 3.6 38.66

15/04/2014 22:45 4.5 40.18

15/04/2014 22:46 4.1 36.32

15/04/2014 22:47 3.9 35.96

15/04/2014 22:48 3.7 32.14

15/04/2014 22:49 3.9 36.63

15/04/2014 22:50 3.8 36.25

15/04/2014 22:51 4.2 36.53

15/04/2014 22:52 4.5 38.73

15/04/2014 22:53 4.4 35.17

15/04/2014 22:54 4.2 34.22

15/04/2014 22:55 3.9 34.86

15/04/2014 22:56 4.1 40.37

15/04/2014 22:57 3.9 38.84

15/04/2014 22:58 4.7 32.54

15/04/2014 23:00 3.6 34.79

15/04/2014 23:01 3.9 38.51

15/04/2014 23:02 4.4 37.67

15/04/2014 23:03 4.1 39.69

15/04/2014 23:04 4.9 40.81

15/04/2014 23:05 4.0 39.37

15/04/2014 23:06 4.0 35.56

15/04/2014 23:07 4.1 36.41

15/04/2014 23:08 3.7 36.07

15/04/2014 23:09 4.3 41.69

15/04/2014 23:10 4.1 39.97

15/04/2014 23:11 4.4 40.63

15/04/2014 23:12 4.5 37.77

15/04/2014 23:13 4.6 37.27

15/04/2014 23:14 4.6 39.07

15/04/2014 23:15 4.4 34.23

15/04/2014 23:16 4.1 35.26

15/04/2014 23:17 3.9 31.5

15/04/2014 23:19 4.1 31.75

15/04/2014 23:22 3.7 34.23

15/04/2014 23:23 4.0 31

15/04/2014 23:25 3.7 41.89

15/04/2014 23:26 4.2 34.93

15/04/2014 23:27 4.2 36.35

15/04/2014 23:28 3.8 37.68

15/04/2014 23:29 4.5 41.29

15/04/2014 23:30 4.3 40.24

11/12/2014 2/32

Page 157: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

15/04/2014 23:31 5.1 44.41

15/04/2014 23:32 5.0 42.54

15/04/2014 23:33 5.4 43.81

15/04/2014 23:34 5.1 39.6

15/04/2014 23:35 4.9 43.14

15/04/2014 23:36 4.9 43.6

15/04/2014 23:37 5.7 46.34

15/04/2014 23:38 5.5 45.4

15/04/2014 23:39 6.0 43.5

15/04/2014 23:40 5.2 41.62

15/04/2014 23:41 5.0 43.44

15/04/2014 23:42 5.2 44.21

15/04/2014 23:43 5.0 38.78

15/04/2014 23:44 5.1 38.07

15/04/2014 23:45 4.6 34.97

15/04/2014 23:46 4.3 35.23

15/04/2014 23:47 4.2 35.87

15/04/2014 23:48 4.2 38.21

15/04/2014 23:49 4.3 39.94

15/04/2014 23:50 4.9 38.39

15/04/2014 23:51 5.1 46.62

15/04/2014 23:52 5.4 49.77

15/04/2014 23:53 6.3 44.12

15/04/2014 23:54 6.7 40.97

15/04/2014 23:55 4.7 42.37

15/04/2014 23:56 5.1 42.99

15/04/2014 23:57 4.8 40.49

15/04/2014 23:58 4.3 37.82

15/04/2014 23:59 4.5 40.83

16/04/2014 0:00 4.8 39.21

16/04/2014 0:01 4.9 47.49

16/04/2014 0:02 5.4 42.76

16/04/2014 0:03 6.1 42.34

16/04/2014 0:04 5.0 42.14

16/04/2014 0:05 5.2 36.67

16/04/2014 0:06 4.5 40.74

16/04/2014 0:07 4.1 51.01

16/04/2014 0:09 7.0 44.76

16/04/2014 0:10 5.4 44.7

16/04/2014 0:11 5.0 46.86

16/04/2014 0:12 5.5 48.96

16/04/2014 0:13 6.4 46.38

16/04/2014 0:14 6.4 43.98

16/04/2014 0:15 6.1 37.29

11/12/2014 3/32

Page 158: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/04/2014 0:16 4.7 42.15

16/04/2014 0:17 4.8 42.97

16/04/2014 0:18 5.1 44.28

16/04/2014 0:19 5.9 43.44

16/04/2014 0:20 5.5 41.36

16/04/2014 0:21 5.1 37.59

16/04/2014 0:22 4.3 36.94

16/04/2014 0:23 4.1 40.57

16/04/2014 0:24 3.9 38.63

16/04/2014 0:25 5.0 32.91

16/04/2014 0:26 3.9 32.66

16/04/2014 0:28 3.6 36.54

16/04/2014 0:29 4.1 37.65

16/04/2014 0:30 4.6 31.37

16/04/2014 0:31 3.6 32.95

16/04/2014 0:32 3.6 36.72

16/04/2014 0:33 3.8 37.8

16/04/2014 0:34 5.0 30.3

16/04/2014 0:37 3.9 32.74

16/04/2014 0:38 3.5 33.18

16/04/2014 0:39 3.8 32.09

16/04/2014 0:40 3.8 30.29

16/04/2014 0:41 3.7 30.01

16/04/2014 0:42 3.6 29.41

16/04/2014 0:43 3.6 34.35

16/04/2014 0:44 3.7 36.26

16/04/2014 0:45 4.0 32.48

16/04/2014 0:46 4.4 30.64

16/04/2014 0:48 3.6 36.14

16/04/2014 0:49 4.2 31.59

16/04/2014 0:50 3.8 31.48

16/04/2014 0:53 4.1 29.47

16/04/2014 1:19 3.5 33.74

16/04/2014 1:23 4.0 33.8

16/04/2014 1:24 4.0 36.7

16/04/2014 1:25 3.7 32.3

16/04/2014 1:26 4.5 32.01

16/04/2014 1:28 3.8 37.57

16/04/2014 1:29 4.4 33.39

16/04/2014 1:30 3.8 34.65

16/04/2014 1:31 4.1 33.01

16/04/2014 1:32 4.1 30.5

16/04/2014 1:33 3.9 32.5

16/04/2014 1:34 4.0 30.16

11/12/2014 4/32

Page 159: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

16/04/2014 1:40 3.6 30.13

22/04/2014 22:00 5.6 47.04

22/04/2014 22:02 5.1 42.33

22/04/2014 22:03 4.9 44.27

22/04/2014 22:04 5.2 44.82

22/04/2014 22:05 4.5 48.36

22/04/2014 22:06 6.2 46.72

22/04/2014 22:07 6.0 49.1

22/04/2014 22:08 5.7 49.97

22/04/2014 22:10 6.8 47.33

22/04/2014 22:11 5.9 45.16

22/04/2014 22:12 6.4 41.81

22/04/2014 22:13 5.8 43.93

22/04/2014 22:14 5.3 40.52

22/04/2014 22:15 4.8 48.25

22/04/2014 22:16 5.0 49.76

22/04/2014 22:17 6.4 49.4

22/04/2014 22:18 6.5 46.67

22/04/2014 22:20 6.4 43.21

22/04/2014 22:21 5.7 44.74

22/04/2014 22:22 5.1 46.25

22/04/2014 22:23 5.8 47.36

22/04/2014 22:24 6.3 46.85

22/04/2014 22:25 6.7 47.41

22/04/2014 22:26 5.9 46.92

22/04/2014 22:27 6.2 46.97

22/04/2014 22:29 6.5 45.25

22/04/2014 22:30 7.1 42.41

22/04/2014 22:31 5.7 46.13

22/04/2014 22:32 5.0 44.83

22/04/2014 22:33 6.2 47.93

22/04/2014 22:34 5.4 48.18

22/04/2014 22:36 6.0 48.74

22/04/2014 22:37 6.3 51.37

22/04/2014 22:40 5.5 46.03

22/04/2014 22:41 6.6 51.12

22/04/2014 22:42 6.1 50.74

22/04/2014 22:45 6.3 46.52

22/04/2014 22:46 6.7 43.01

22/04/2014 22:47 5.6 46.32

22/04/2014 22:48 5.3 46.6

22/04/2014 22:49 6.0 44.97

22/04/2014 22:50 5.7 45.01

22/04/2014 22:51 5.2 45.69

11/12/2014 5/32

Page 160: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

22/04/2014 22:52 5.4 44.26

22/04/2014 22:53 6.0 46.58

22/04/2014 22:54 5.8 50.16

22/04/2014 22:55 6.8 45.95

22/04/2014 22:56 6.9 46.26

22/04/2014 22:57 5.3 44.18

22/04/2014 22:58 6.2 41.26

22/04/2014 22:59 4.8 41.6

22/04/2014 23:00 5.1 42.51

22/04/2014 23:01 4.9 46.88

22/04/2014 23:02 5.3 43.19

22/04/2014 23:04 5.4 39.28

22/04/2014 23:05 5.4 46.23

22/04/2014 23:06 4.7 48.44

22/04/2014 23:07 6.2 46.7

22/04/2014 23:08 6.5 45.93

22/04/2014 23:10 6.0 43.65

22/04/2014 23:11 6.0 47.37

22/04/2014 23:12 5.5 42.85

22/04/2014 23:14 5.4 45.67

22/04/2014 23:15 5.3 47.26

22/04/2014 23:16 6.3 47.17

22/04/2014 23:17 6.6 41.37

22/04/2014 23:18 5.5 49.43

22/04/2014 23:19 5.0 44.54

22/04/2014 23:20 6.8 41.69

22/04/2014 23:21 5.3 43.12

22/04/2014 23:22 5.2 49.94

22/04/2014 23:24 6.7 45.04

22/04/2014 23:26 5.5 43.34

22/04/2014 23:27 5.6 43.35

22/04/2014 23:28 4.7 46.89

22/04/2014 23:29 5.7 50.58

22/04/2014 23:30 6.7 46.62

22/04/2014 23:31 7.1 46.63

22/04/2014 23:32 5.3 48

22/04/2014 23:33 6.5 45.21

22/04/2014 23:34 5.8 44.92

22/04/2014 23:35 5.7 46.38

22/04/2014 23:36 6.1 45.8

22/04/2014 23:37 6.0 43.25

22/04/2014 23:38 5.7 46.21

22/04/2014 23:39 5.6 47.34

22/04/2014 23:40 5.7 46.48

11/12/2014 6/32

Page 161: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

22/04/2014 23:41 6.4 43.24

22/04/2014 23:42 6.2 41.5

22/04/2014 23:43 4.6 45.62

22/04/2014 23:44 5.3 46.3

22/04/2014 23:45 6.4 47.45

22/04/2014 23:46 5.9 48.55

22/04/2014 23:47 6.6 47.34

22/04/2014 23:48 7.4 41.22

22/04/2014 23:49 5.4 45.4

22/04/2014 23:50 5.2 46.62

22/04/2014 23:52 5.5 44.52

22/04/2014 23:53 5.7 42.21

22/04/2014 23:54 5.2 43.6

22/04/2014 23:55 5.2 50.47

22/04/2014 23:56 6.0 49.85

22/04/2014 23:57 7.1 51.95

23/04/2014 0:00 6.2 50.62

23/04/2014 0:02 7.2 50.16

23/04/2014 0:03 6.5 49.27

23/04/2014 0:04 7.1 45.27

23/04/2014 0:05 6.8 43.69

23/04/2014 0:06 5.5 49.26

23/04/2014 0:07 6.2 48.68

23/04/2014 0:08 6.4 43.73

23/04/2014 0:09 6.2 42.12

23/04/2014 0:10 5.6 47.7

23/04/2014 0:12 7.1 46.07

23/04/2014 0:13 6.8 46.39

23/04/2014 0:14 6.5 51.4

23/04/2014 0:15 5.8 50.8

23/04/2014 0:16 7.1 50.48

23/04/2014 0:17 7.1 48.78

23/04/2014 0:19 6.7 48.36

23/04/2014 0:20 6.7 52.03

23/04/2014 0:21 6.7 50.12

23/04/2014 0:25 7.3 50.35

23/04/2014 0:26 7.3 49.92

23/04/2014 0:28 7.4 46.45

23/04/2014 0:30 5.9 53.65

23/04/2014 0:32 7.4 52.14

23/04/2014 0:36 7.5 45.99

23/04/2014 0:37 6.2 44.2

23/04/2014 0:38 5.4 43.88

23/04/2014 0:39 5.0 41.17

11/12/2014 7/32

Page 162: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/04/2014 0:40 5.1 44.35

23/04/2014 0:41 5.5 39.77

23/04/2014 0:42 4.8 47.24

23/04/2014 0:43 4.5 50.94

23/04/2014 0:44 7.4 48.31

23/04/2014 0:45 6.9 52.82

23/04/2014 0:52 7.3 47.31

23/04/2014 0:53 7.0 47.11

23/04/2014 0:54 6.2 45.59

23/04/2014 0:55 6.0 44.55

23/04/2014 0:56 5.7 49.04

23/04/2014 0:57 5.4 51.98

23/04/2014 1:03 6.3 45.12

23/04/2014 1:04 5.0 47.79

23/04/2014 1:06 5.8 53.51

23/04/2014 1:09 7.2 51.79

23/04/2014 1:10 6.2 53.15

23/04/2014 1:13 6.9 45.32

23/04/2014 1:14 7.1 50.27

23/04/2014 1:15 5.9 52.38

23/04/2014 1:20 7.5 51.86

23/04/2014 1:27 6.3 52.39

23/04/2014 1:28 7.4 50.13

23/04/2014 1:29 6.6 50.62

23/04/2014 1:31 6.4 51.27

23/04/2014 1:34 5.9 47.7

23/04/2014 1:35 6.2 44.28

23/04/2014 1:36 6.4 42.35

23/04/2014 1:37 5.8 44.05

23/04/2014 1:38 4.9 47.31

23/04/2014 1:41 7.0 42.65

23/04/2014 1:42 5.6 43.98

23/04/2014 1:43 4.7 49.83

23/04/2014 1:44 5.9 50.41

23/04/2014 1:45 6.9 47.42

23/04/2014 1:46 6.8 51.43

23/04/2014 1:47 6.4 49.04

23/04/2014 1:52 6.9 51.44

23/04/2014 1:54 6.6 45.4

23/04/2014 1:55 5.4 45.67

23/04/2014 2:07 7.1 51.38

23/04/2014 2:08 6.2 53.08

23/04/2014 2:11 5.5 51.31

23/04/2014 2:12 6.1 52.82

11/12/2014 8/32

Page 163: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/04/2014 2:14 7.2 48.72

23/04/2014 2:19 5.7 49.67

23/04/2014 2:26 7.0 49.26

23/04/2014 2:27 6.3 51.07

23/04/2014 2:30 6.7 43.95

23/04/2014 2:32 5.7 46.99

23/04/2014 2:33 6.3 44.24

23/04/2014 2:35 5.7 49.14

23/04/2014 2:36 6.1 49.22

23/04/2014 2:37 6.7 50.24

23/04/2014 2:38 7.0 42.53

23/04/2014 2:39 6.5 43.45

23/04/2014 2:40 4.8 44.13

23/04/2014 2:41 5.1 52.01

23/04/2014 2:46 6.9 49.75

23/04/2014 2:54 5.7 49

23/04/2014 2:55 6.1 53.03

23/04/2014 2:56 6.6 49.98

23/04/2014 2:57 7.1 46.51

23/04/2014 2:58 6.7 52.78

23/04/2014 3:04 6.4 50.22

23/04/2014 3:05 7.0 50.05

23/04/2014 3:10 7.4 45.05

23/04/2014 3:11 6.4 52.32

23/04/2014 3:15 6.2 49.04

23/04/2014 3:17 6.4 46.41

23/04/2014 3:18 6.5 47.05

23/04/2014 3:21 6.3 52.5

23/04/2014 3:26 7.0 51.92

23/04/2014 3:29 5.4 49.64

23/04/2014 3:32 7.3 50.23

23/04/2014 3:34 6.3 49.67

23/04/2014 3:35 7.5 47.09

23/04/2014 3:37 5.2 52.46

23/04/2014 3:40 5.5 51.02

23/04/2014 3:41 6.4 45.87

23/04/2014 3:43 6.5 53.72

23/04/2014 3:46 5.6 47.22

23/04/2014 3:47 4.7 49.01

23/04/2014 3:48 6.6 45.38

23/04/2014 3:49 7.0 47.81

23/04/2014 3:50 6.2 44.91

23/04/2014 3:51 5.7 41.88

23/04/2014 3:52 5.3 43.45

11/12/2014 9/32

Page 164: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/04/2014 3:53 5.7 44.21

23/04/2014 3:54 5.3 40.86

23/04/2014 3:55 5.8 39.98

23/04/2014 3:56 4.9 41.66

23/04/2014 3:57 4.7 40.61

23/04/2014 3:58 5.2 46.97

23/04/2014 3:59 4.6 45.16

23/04/2014 4:01 5.9 45.97

23/04/2014 4:03 6.1 41.99

23/04/2014 4:04 5.5 46.86

23/04/2014 4:05 5.1 48.31

23/04/2014 4:07 7.5 52.56

23/04/2014 4:09 6.4 46.25

23/04/2014 4:10 5.6 51.98

23/04/2014 4:12 7.1 43.08

23/04/2014 4:13 6.6 46.17

23/04/2014 4:15 5.2 43.02

23/04/2014 4:16 5.4 47.24

23/04/2014 4:17 5.7 47.89

23/04/2014 4:18 6.6 52.83

23/04/2014 4:20 6.2 52.36

23/04/2014 4:24 5.6 44.73

23/04/2014 4:25 5.9 47.83

23/04/2014 4:26 6.1 51.8

23/04/2014 4:27 6.1 51.72

23/04/2014 4:30 6.6 49.04

23/04/2014 4:32 6.2 48.34

23/04/2014 4:34 6.7 46.72

23/04/2014 4:35 7.1 46.11

23/04/2014 4:36 6.0 52.32

23/04/2014 4:37 6.0 48.14

23/04/2014 4:38 7.1 44.03

23/04/2014 4:39 6.4 40.68

23/04/2014 4:40 4.5 43.77

23/04/2014 4:41 5.2 49.84

23/04/2014 4:42 5.6 48.49

23/04/2014 4:43 7.0 45.88

23/04/2014 4:45 6.5 45.8

23/04/2014 4:47 5.5 47.72

23/04/2014 4:48 6.3 49.47

23/04/2014 4:49 7.0 47.12

23/04/2014 4:50 6.7 46.58

23/04/2014 4:56 7.0 52.23

23/04/2014 4:57 6.9 50.42

11/12/2014 10/32

Page 165: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/04/2014 4:58 7.0 47.63

23/04/2014 4:59 7.3 44.39

04/05/2014 0:09 5.9 51.98

04/05/2014 1:31 7.5 51.94

04/05/2014 1:32 5.6 53.47

04/05/2014 1:38 7.1 52.33

04/05/2014 1:56 3.7 51.6

04/05/2014 2:00 5.1 52.23

04/05/2014 2:16 6.4 51.83

04/05/2014 2:27 4.9 51.69

04/05/2014 2:45 6.1 46.91

04/05/2014 2:53 5.6 51.13

04/05/2014 3:01 5.7 52.85

04/05/2014 3:09 5.8 48.73

04/05/2014 3:11 5.8 49.43

04/05/2014 3:12 4.7 47.94

04/05/2014 3:13 5.0 47.8

04/05/2014 3:21 4.9 50.69

04/05/2014 3:22 4.4 48.89

04/05/2014 3:27 6.1 51.68

04/05/2014 3:28 5.5 47.93

04/05/2014 3:29 5.7 51.93

04/05/2014 3:30 6.6 50.53

04/05/2014 3:32 5.3 51.12

04/05/2014 3:33 5.6 51.51

04/05/2014 3:35 5.9 50.77

04/05/2014 3:38 5.5 51.28

04/05/2014 3:39 5.2 46.27

04/05/2014 3:40 5.6 49.57

04/05/2014 3:41 5.6 47.88

04/05/2014 3:45 5.9 47.67

04/05/2014 3:46 4.9 43.66

04/05/2014 3:47 6.3 40.22

04/05/2014 3:48 5.6 45.64

04/05/2014 3:49 5.3 48.93

04/05/2014 3:50 5.4 44.56

04/05/2014 3:51 5.2 42.52

04/05/2014 3:52 5.6 41.17

04/05/2014 3:53 5.7 46.26

04/05/2014 3:54 5.8 49.77

04/05/2014 3:55 6.1 45.79

04/05/2014 3:56 6.2 52.09

04/05/2014 3:57 6.3 47.66

04/05/2014 3:58 5.5 47.14

11/12/2014 11/32

Page 166: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/05/2014 3:59 5.3 41.3

04/05/2014 4:00 4.4 45.71

04/05/2014 4:01 4.6 44.25

04/05/2014 4:02 4.6 43.7

04/05/2014 4:03 6.7 49.49

04/05/2014 4:04 5.8 42.58

04/05/2014 4:05 5.8 39.42

04/05/2014 4:06 4.9 36.98

04/05/2014 4:07 5.2 36.98

04/05/2014 4:08 6.6 37.35

04/05/2014 4:09 5.8 45.04

04/05/2014 4:10 4.3 43.49

04/05/2014 4:11 4.8 44.48

04/05/2014 4:12 4.7 41.85

04/05/2014 4:13 5.0 42.1

04/05/2014 4:14 4.3 47.93

04/05/2014 4:15 4.3 48.84

04/05/2014 4:17 4.8 37.92

04/05/2014 4:18 4.9 41.95

04/05/2014 4:19 3.9 40.33

04/05/2014 4:20 5.0 40.63

04/05/2014 4:21 4.0 43.85

04/05/2014 4:22 4.0 48.53

04/05/2014 4:23 4.7 41.8

04/05/2014 4:24 5.1 42.12

04/05/2014 4:26 6.1 44.56

04/05/2014 4:27 5.4 44.84

04/05/2014 4:28 5.2 47.63

04/05/2014 4:29 4.9 41.41

04/05/2014 4:30 4.3 45.8

04/05/2014 4:31 5.2 41.75

04/05/2014 4:32 4.3 40.09

04/05/2014 4:33 4.2 45.17

04/05/2014 4:34 4.4 42.45

04/05/2014 4:35 4.5 36.57

04/05/2014 4:36 4.7 37.63

04/05/2014 4:37 4.9 42.05

04/05/2014 4:38 4.3 46.05

04/05/2014 4:40 5.0 42.23

04/05/2014 4:41 4.4 46.33

04/05/2014 4:42 4.3 41.87

04/05/2014 4:43 4.9 47.74

04/05/2014 4:44 4.0 39.13

04/05/2014 4:45 3.9 37.93

11/12/2014 12/32

Page 167: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/05/2014 4:46 3.6 37.72

04/05/2014 4:47 4.0 40.96

04/05/2014 4:48 4.0 39.57

04/05/2014 4:49 4.5 43.63

04/05/2014 4:50 4.0 44.54

04/05/2014 4:51 4.0 39.91

04/05/2014 4:52 3.7 42.49

04/05/2014 4:53 4.1 48.14

04/05/2014 4:54 4.2 41.6

04/05/2014 4:55 4.2 36.39

04/05/2014 4:56 4.0 40.72

04/05/2014 4:57 4.2 37.86

04/05/2014 4:58 3.9 36.03

04/05/2014 4:59 4.0 33.78

09/05/2014 22:00 5.1 43.54

09/05/2014 22:01 5.1 43.42

09/05/2014 22:02 5.9 40.18

09/05/2014 22:03 6.1 42.17

09/05/2014 22:04 5.0 41.55

09/05/2014 22:05 6.1 39.36

09/05/2014 22:06 5.4 39.93

09/05/2014 22:07 5.1 41.1

09/05/2014 22:08 5.2 39.51

09/05/2014 22:09 5.5 40.48

09/05/2014 22:10 5.1 38.75

09/05/2014 22:11 5.4 37.33

09/05/2014 22:12 5.2 39.46

09/05/2014 22:13 4.6 37.92

09/05/2014 22:14 5.2 40.13

09/05/2014 22:16 5.6 40.12

09/05/2014 22:17 4.9 36.77

09/05/2014 22:18 4.9 39.74

09/05/2014 22:19 4.5 36.5

09/05/2014 22:20 5.3 36.01

09/05/2014 22:21 4.4 36.78

09/05/2014 22:22 4.1 36.45

09/05/2014 22:23 4.5 36.87

09/05/2014 22:24 3.8 37.02

09/05/2014 22:25 4.2 46.94

09/05/2014 22:26 4.3 42.67

09/05/2014 22:27 5.2 38.92

09/05/2014 22:28 4.1 38.57

09/05/2014 22:29 4.4 39.03

09/05/2014 22:30 4.3 38.42

11/12/2014 13/32

Page 168: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 22:31 4.7 38.63

09/05/2014 22:32 4.9 40.43

09/05/2014 22:33 4.5 37.28

09/05/2014 22:34 5.1 36.83

09/05/2014 22:35 4.2 36.03

09/05/2014 22:36 4.0 38.03

09/05/2014 22:37 3.6 35.93

09/05/2014 22:38 4.6 43.13

09/05/2014 22:39 4.1 40.5

09/05/2014 22:40 4.5 40.98

09/05/2014 22:41 4.8 40.04

09/05/2014 22:42 5.4 40.21

09/05/2014 22:43 5.2 45.37

09/05/2014 22:44 5.4 39.13

09/05/2014 22:46 4.6 40.29

09/05/2014 22:47 4.9 36.86

09/05/2014 22:48 4.8 38.5

09/05/2014 22:50 4.3 39.48

09/05/2014 22:51 4.9 39.31

09/05/2014 22:53 4.8 39.95

09/05/2014 22:54 4.2 39.41

09/05/2014 22:55 5.0 38.02

09/05/2014 22:56 4.7 39.44

09/05/2014 22:57 4.5 39.37

09/05/2014 22:58 5.3 38.97

09/05/2014 22:59 4.8 39.2

09/05/2014 23:00 4.8 39.13

09/05/2014 23:01 5.2 39.46

09/05/2014 23:02 5.2 40.18

09/05/2014 23:03 5.1 41.09

09/05/2014 23:04 4.8 43.65

09/05/2014 23:05 5.4 40.32

09/05/2014 23:07 4.8 41.97

09/05/2014 23:08 4.0 45.84

09/05/2014 23:09 5.5 39.84

09/05/2014 23:11 4.9 39.57

09/05/2014 23:12 4.4 38.35

09/05/2014 23:13 4.7 39.97

09/05/2014 23:14 4.4 41.6

09/05/2014 23:15 4.6 41.16

09/05/2014 23:16 5.4 38.35

09/05/2014 23:17 5.5 39.1

09/05/2014 23:18 4.4 36.82

09/05/2014 23:19 4.2 39.82

11/12/2014 14/32

Page 169: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

09/05/2014 23:20 3.9 39.7

09/05/2014 23:24 3.8 37.58

09/05/2014 23:25 3.7 36.87

09/05/2014 23:26 3.9 40.24

09/05/2014 23:29 5.6 41.04

09/05/2014 23:30 5.2 40.71

09/05/2014 23:32 5.3 38.84

09/05/2014 23:33 5.4 41.01

09/05/2014 23:34 5.0 45.72

09/05/2014 23:35 5.6 43.42

09/05/2014 23:36 5.2 43.53

09/05/2014 23:38 5.5 41.94

09/05/2014 23:39 5.0 37.97

09/05/2014 23:41 3.8 38.72

09/05/2014 23:42 3.7 38.39

09/05/2014 23:43 4.8 39.18

09/05/2014 23:44 4.4 38.54

09/05/2014 23:45 4.8 37.56

09/05/2014 23:46 4.4 40.12

09/05/2014 23:47 3.8 41.19

09/05/2014 23:48 5.3 39.03

09/05/2014 23:51 4.8 38.89

09/05/2014 23:52 3.9 36.08

09/05/2014 23:53 4.1 35.42

09/05/2014 23:54 3.8 38.8

09/05/2014 23:56 4.6 38.98

09/05/2014 23:57 4.7 37

09/05/2014 23:58 4.6 35.97

09/05/2014 23:59 4.2 39.43

10/05/2014 0:00 3.7 39.73

10/05/2014 0:01 4.8 37.97

10/05/2014 0:02 4.8 36.22

10/05/2014 0:03 4.5 38.66

10/05/2014 0:04 3.9 37.25

10/05/2014 0:05 4.5 38.12

10/05/2014 0:06 3.8 36.82

10/05/2014 0:07 3.9 37.48

10/05/2014 0:09 4.2 36.09

10/05/2014 0:10 3.6 37.78

10/05/2014 0:13 4.6 36.95

10/05/2014 0:14 4.3 42.22

10/05/2014 0:17 4.2 41.1

10/05/2014 0:18 4.9 39.06

10/05/2014 0:19 5.0 41.98

11/12/2014 15/32

Page 170: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/05/2014 0:20 4.2 43.49

10/05/2014 0:23 4.3 40.53

10/05/2014 0:24 4.9 41.99

10/05/2014 0:25 5.1 42.19

10/05/2014 0:29 5.8 40.4

10/05/2014 0:32 7.3 40.97

10/05/2014 0:33 5.1 40.83

10/05/2014 0:41 7.0 43.42

10/05/2014 0:42 6.3 42.37

10/05/2014 0:43 6.3 42.69

10/05/2014 0:45 6.2 44.13

10/05/2014 0:48 6.5 44.59

10/05/2014 0:50 6.6 46.65

10/05/2014 0:51 6.8 46.3

10/05/2014 0:53 7.1 45.28

10/05/2014 0:57 6.9 44

10/05/2014 0:58 6.8 46.69

10/05/2014 1:09 6.4 40.26

10/05/2014 1:10 5.9 40.43

10/05/2014 1:11 5.7 37.11

10/05/2014 1:12 5.2 36.53

10/05/2014 1:13 4.1 39.9

10/05/2014 1:14 3.9 37.26

10/05/2014 1:15 5.3 38.55

10/05/2014 1:16 4.5 37.9

10/05/2014 1:17 5.1 36.56

10/05/2014 1:18 4.6 35.77

10/05/2014 1:19 4.7 46.68

10/05/2014 1:20 4.4 41.15

10/05/2014 1:21 4.0 36.62

10/05/2014 1:22 5.1 39.2

10/05/2014 1:23 4.5 35.87

10/05/2014 1:24 3.8 35.34

10/05/2014 1:25 3.8 36.62

10/05/2014 1:28 4.8 38.49

10/05/2014 1:29 4.8 36.53

10/05/2014 1:30 5.4 33.32

10/05/2014 1:31 4.3 34.41

10/05/2014 1:32 3.6 36.15

10/05/2014 1:33 3.9 35.98

10/05/2014 1:34 4.5 36.03

10/05/2014 1:35 4.3 35.1

10/05/2014 1:36 4.2 34.24

10/05/2014 1:37 3.8 35.63

11/12/2014 16/32

Page 171: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/05/2014 1:38 3.9 34.26

10/05/2014 1:39 4.3 33.64

10/05/2014 1:40 4.1 35.19

10/05/2014 1:41 3.8 35.39

10/05/2014 1:43 4.3 34.38

10/05/2014 1:44 3.9 34.08

10/05/2014 1:46 3.9 35.58

10/05/2014 1:47 3.9 38.33

10/05/2014 1:49 5.1 36.4

10/05/2014 1:51 4.5 38.66

10/05/2014 1:52 3.8 36.72

10/05/2014 2:01 5.8 42.03

10/05/2014 2:02 5.3 40.74

10/05/2014 2:03 6.1 43.63

10/05/2014 2:04 5.3 41.05

10/05/2014 2:05 6.9 39.05

10/05/2014 2:06 6.2 40.77

10/05/2014 2:07 5.1 39.36

10/05/2014 2:08 5.9 39.37

10/05/2014 2:09 5.7 42.14

10/05/2014 2:10 5.3 43.66

10/05/2014 2:12 6.8 41.34

10/05/2014 2:13 5.7 36.83

10/05/2014 2:14 5.7 36.57

10/05/2014 2:15 4.9 41.51

10/05/2014 2:16 4.5 43.72

10/05/2014 2:21 6.7 39.49

10/05/2014 2:23 5.7 35.87

10/05/2014 2:27 4.3 33.8

10/05/2014 2:29 4.0 34.73

10/05/2014 2:30 3.9 34.54

10/05/2014 2:31 4.4 36.19

10/05/2014 2:32 4.0 32.93

10/05/2014 2:33 5.0 35.34

10/05/2014 2:34 3.6 34.64

10/05/2014 2:35 4.6 32.68

10/05/2014 2:38 4.7 37.1

10/05/2014 2:39 4.1 36.19

10/05/2014 2:40 5.1 36.86

10/05/2014 2:41 4.1 37.14

10/05/2014 2:42 4.2 36.11

10/05/2014 2:46 4.4 38.32

10/05/2014 2:48 5.4 35.15

10/05/2014 2:49 4.9 37.54

11/12/2014 17/32

Page 172: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/05/2014 2:50 4.0 35.55

10/05/2014 2:51 5.2 38.48

10/05/2014 2:52 4.3 36.53

10/05/2014 2:54 4.1 35.7

10/05/2014 2:55 5.2 36.99

10/05/2014 2:56 4.6 37.72

10/05/2014 2:58 4.7 37

10/05/2014 2:59 4.1 36.95

10/05/2014 3:02 5.8 39.98

10/05/2014 3:04 5.5 40.17

10/05/2014 3:05 5.4 40.73

10/05/2014 3:06 5.9 35.4

10/05/2014 3:07 5.5 36.19

10/05/2014 3:08 3.9 37.93

10/05/2014 3:10 5.2 38.69

10/05/2014 3:11 5.3 35.88

10/05/2014 3:12 5.3 38.8

10/05/2014 3:13 4.4 36.77

10/05/2014 3:14 5.5 36.67

10/05/2014 3:15 4.7 35.72

10/05/2014 3:16 4.6 40.01

10/05/2014 3:17 4.6 42.48

10/05/2014 3:18 5.6 38.65

10/05/2014 3:19 6.7 35.58

10/05/2014 3:21 4.3 37.23

10/05/2014 3:22 5.4 39.15

10/05/2014 3:23 4.9 35.92

10/05/2014 3:24 5.5 37.78

10/05/2014 3:26 5.3 36.5

10/05/2014 3:27 4.4 38.71

10/05/2014 3:28 4.6 35.1

10/05/2014 3:29 5.8 35.05

10/05/2014 3:30 4.5 34.84

10/05/2014 3:31 4.4 35.95

10/05/2014 3:32 4.4 35.46

10/05/2014 3:33 4.8 37.18

10/05/2014 3:34 4.3 40.97

10/05/2014 3:35 5.0 36.17

10/05/2014 3:36 5.5 35.54

10/05/2014 3:37 4.6 36.28

10/05/2014 3:38 4.6 39.02

10/05/2014 3:39 4.5 37.85

10/05/2014 3:40 5.7 37.95

10/05/2014 3:41 4.8 36.29

11/12/2014 18/32

Page 173: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/05/2014 3:42 5.0 35.05

10/05/2014 3:43 4.5 34.93

10/05/2014 3:44 4.1 35.38

10/05/2014 3:46 3.9 35.38

10/05/2014 3:47 3.7 36.06

10/05/2014 3:48 4.3 35.58

10/05/2014 3:49 4.5 34.9

10/05/2014 3:50 4.3 36.33

10/05/2014 3:51 3.9 36.98

10/05/2014 3:52 4.3 34.71

10/05/2014 3:53 4.5 35.96

10/05/2014 3:54 3.8 34.75

10/05/2014 3:55 4.3 33.11

10/05/2014 4:03 3.6 33.32

10/05/2014 4:07 3.7 34.09

10/05/2014 4:08 4.6 34.7

10/05/2014 4:10 3.6 35.26

10/05/2014 4:11 3.8 33.8

10/05/2014 4:12 4.0 35.67

10/05/2014 4:15 3.9 34.22

10/05/2014 4:18 3.8 40.13

10/05/2014 4:19 4.4 40.19

10/05/2014 4:20 4.8 37.47

10/05/2014 4:21 5.0 38.11

10/05/2014 4:22 4.3 35.4

10/05/2014 4:23 4.6 37.81

10/05/2014 4:24 4.0 39.53

10/05/2014 4:25 4.3 37.9

10/05/2014 4:26 4.8 43.71

10/05/2014 4:27 4.5 38.69

10/05/2014 4:28 5.1 37.65

10/05/2014 4:29 4.7 40.03

10/05/2014 4:30 4.2 43.17

10/05/2014 4:31 4.9 39.63

10/05/2014 4:32 5.3 43.65

10/05/2014 4:33 4.5 40.03

10/05/2014 4:34 5.9 43.18

10/05/2014 4:35 4.5 39.66

10/05/2014 4:36 5.3 38.7

10/05/2014 4:37 4.8 38.29

10/05/2014 4:38 4.8 37.28

10/05/2014 4:39 4.5 39.46

10/05/2014 4:41 4.8 35.63

10/05/2014 4:42 3.7 34.88

11/12/2014 19/32

Page 174: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

10/05/2014 4:43 3.5 37.42

10/05/2014 4:44 3.6 38.49

10/05/2014 4:46 4.5 37.43

10/05/2014 4:47 4.1 42

10/05/2014 4:48 4.3 41.93

10/05/2014 4:49 4.9 39.14

10/05/2014 4:50 5.0 41.78

10/05/2014 4:51 4.5 46.55

10/05/2014 4:52 3.9 46.08

10/05/2014 4:53 3.9 43.57

10/05/2014 4:54 3.6 43.59

10/05/2014 4:55 3.8 37.6

10/05/2014 4:56 5.0 39.51

10/05/2014 4:57 3.7 41.55

10/05/2014 4:58 3.7 45.76

10/05/2014 4:59 4.4 41.41

22/05/2014 22:00 4.7 45.07

22/05/2014 22:01 4.3 41.84

22/05/2014 22:02 3.8 37.11

22/05/2014 22:04 3.8 39.69

22/05/2014 22:05 4.5 33.75

22/05/2014 22:06 5.0 34.26

22/05/2014 22:07 3.5 39.94

22/05/2014 22:10 3.7 33.17

22/05/2014 22:15 4.0 46.5

22/05/2014 22:16 4.3 40.07

22/05/2014 22:17 6.0 36.38

22/05/2014 22:18 5.6 37.2

22/05/2014 22:19 4.5 35.31

22/05/2014 22:20 3.7 34.47

22/05/2014 22:21 4.3 36.06

22/05/2014 22:23 3.7 35.74

22/05/2014 22:24 3.6 36.61

22/05/2014 22:28 3.6 37.18

22/05/2014 22:30 3.9 36.38

22/05/2014 22:31 4.0 42.52

22/05/2014 22:33 4.0 36.32

22/05/2014 22:34 3.5 40.72

22/05/2014 22:35 3.7 33.85

22/05/2014 22:36 3.6 33.84

22/05/2014 22:40 3.6 36.85

22/05/2014 22:41 4.3 34.17

22/05/2014 22:42 4.1 35.25

22/05/2014 22:44 3.8 35.03

11/12/2014 20/32

Page 175: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

22/05/2014 22:45 3.5 33.22

22/05/2014 22:46 4.0 34.25

22/05/2014 22:52 3.7 37.18

22/05/2014 22:53 3.9 36.48

22/05/2014 22:54 3.9 37.6

22/05/2014 22:55 4.3 37.03

22/05/2014 23:10 4.0 36.7

22/05/2014 23:11 4.1 35.53

22/05/2014 23:12 4.2 36.22

22/05/2014 23:14 4.0 34.85

22/05/2014 23:16 3.7 36.59

22/05/2014 23:17 4.0 39.81

22/05/2014 23:18 3.5 40.74

22/05/2014 23:19 3.7 36.19

22/05/2014 23:20 3.6 33.79

22/05/2014 23:21 4.2 36.02

22/05/2014 23:22 3.7 35.37

22/05/2014 23:23 3.7 36.12

22/05/2014 23:24 4.3 37.07

22/05/2014 23:25 4.0 37.37

22/05/2014 23:26 4.4 34.88

22/05/2014 23:27 4.1 38.55

22/05/2014 23:28 4.3 39.66

22/05/2014 23:29 3.9 38.84

22/05/2014 23:30 4.9 38.18

22/05/2014 23:31 4.2 38.31

22/05/2014 23:32 4.1 35.73

22/05/2014 23:33 4.9 36.98

22/05/2014 23:34 3.9 39.96

22/05/2014 23:35 4.2 39.57

22/05/2014 23:36 4.4 41.73

22/05/2014 23:37 5.4 37.31

22/05/2014 23:38 4.4 36.44

22/05/2014 23:39 4.9 39.54

22/05/2014 23:41 4.2 44.63

22/05/2014 23:42 4.5 38.86

22/05/2014 23:43 4.0 36.65

22/05/2014 23:44 4.1 35.83

22/05/2014 23:45 4.5 34

22/05/2014 23:49 4.5 37.8

22/05/2014 23:51 4.4 36.38

22/05/2014 23:52 3.6 36.61

22/05/2014 23:53 4.3 36.88

22/05/2014 23:55 3.9 34

11/12/2014 21/32

Page 176: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

22/05/2014 23:56 3.5 37.09

22/05/2014 23:57 3.6 33.4

22/05/2014 23:58 4.1 32.78

22/05/2014 23:59 4.0 32.18

23/05/2014 0:08 4.0 35.72

23/05/2014 0:09 4.1 35.04

23/05/2014 0:10 4.1 35.42

23/05/2014 0:11 4.3 34.62

23/05/2014 0:12 3.9 34.77

23/05/2014 0:13 3.6 36.34

23/05/2014 0:15 4.4 35.56

23/05/2014 0:16 3.5 34.45

23/05/2014 0:17 3.7 34.26

23/05/2014 0:18 4.1 34.89

23/05/2014 0:20 4.2 39.05

23/05/2014 0:21 3.5 37.32

23/05/2014 0:22 4.3 40.57

23/05/2014 0:23 3.9 39.91

23/05/2014 0:24 3.7 40.58

23/05/2014 0:25 3.7 36.11

23/05/2014 0:26 4.4 40.52

23/05/2014 0:27 4.7 38.76

23/05/2014 0:28 4.3 37.05

23/05/2014 0:29 4.8 32.67

23/05/2014 0:30 4.7 33.48

23/05/2014 0:33 3.6 35.25

23/05/2014 0:35 3.6 43.74

23/05/2014 0:39 3.7 36.99

23/05/2014 0:41 3.8 37.79

23/05/2014 0:42 4.1 36.55

23/05/2014 0:44 4.4 36.03

23/05/2014 0:45 3.7 33.78

23/05/2014 0:47 3.9 38.4

23/05/2014 0:48 3.5 37.89

23/05/2014 0:50 3.5 39.62

23/05/2014 0:51 4.6 42.52

23/05/2014 0:52 4.1 36.45

23/05/2014 0:53 4.0 41.99

23/05/2014 0:54 4.0 41.44

23/05/2014 0:55 3.8 37.18

23/05/2014 0:56 4.0 36.92

23/05/2014 0:57 3.9 37.8

23/05/2014 1:04 3.8 32.3

23/05/2014 1:12 3.5 31.7

11/12/2014 22/32

Page 177: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/05/2014 1:18 3.9 32.94

23/05/2014 1:26 3.6 34.92

23/05/2014 1:27 3.7 34.47

23/05/2014 1:40 3.6 33.99

23/05/2014 1:42 3.8 39.09

23/05/2014 1:43 3.6 37.75

23/05/2014 1:44 4.4 37.7

23/05/2014 1:45 4.1 37.59

23/05/2014 1:46 4.6 36.17

23/05/2014 1:47 3.9 36.41

23/05/2014 1:48 4.1 32.59

23/05/2014 1:49 3.9 35.06

23/05/2014 1:50 3.7 34.09

23/05/2014 1:51 3.6 36.19

23/05/2014 1:52 3.6 35.21

23/05/2014 1:58 3.7 32.74

23/05/2014 2:01 3.5 32.06

23/05/2014 2:02 3.5 34.04

23/05/2014 2:04 3.7 37.04

23/05/2014 2:05 3.5 36.05

23/05/2014 2:07 4.2 36.5

23/05/2014 2:08 4.2 39.42

23/05/2014 2:10 4.6 36.15

23/05/2014 2:11 4.6 37.22

23/05/2014 2:12 4.0 38.21

23/05/2014 2:13 3.8 36.3

23/05/2014 2:14 4.8 35.94

23/05/2014 2:15 3.6 37.79

23/05/2014 2:16 4.1 38.6

23/05/2014 2:17 4.2 36.29

23/05/2014 2:18 4.9 34.9

23/05/2014 2:19 4.0 35.58

23/05/2014 2:20 3.6 37.46

23/05/2014 2:21 3.5 38.34

23/05/2014 2:22 4.4 35.96

23/05/2014 2:23 4.2 35.85

23/05/2014 2:24 4.2 36.4

23/05/2014 2:25 3.9 37.41

23/05/2014 2:26 3.8 38.65

23/05/2014 2:28 3.8 36.24

23/05/2014 2:29 4.0 35.98

23/05/2014 2:30 3.8 36.55

23/05/2014 2:31 3.6 37.76

23/05/2014 2:32 4.1 40.77

11/12/2014 23/32

Page 178: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/05/2014 2:33 4.2 36.17

23/05/2014 2:35 4.0 35.65

23/05/2014 2:36 3.6 35.14

23/05/2014 2:37 4.1 38.51

23/05/2014 2:38 3.7 35.66

23/05/2014 2:39 3.7 34.36

23/05/2014 2:40 4.6 34.59

23/05/2014 2:43 3.6 35.73

23/05/2014 2:44 4.1 36.74

23/05/2014 2:45 3.5 37.95

23/05/2014 2:46 4.4 36.6

23/05/2014 2:47 4.6 34.8

23/05/2014 2:48 3.8 36.83

23/05/2014 2:50 4.0 39.53

23/05/2014 2:51 4.1 41.89

23/05/2014 2:52 5.2 35.04

23/05/2014 2:53 5.1 36.26

23/05/2014 2:54 4.0 35.54

23/05/2014 2:55 4.1 36.45

23/05/2014 2:56 4.0 39.49

23/05/2014 2:57 3.6 42.06

23/05/2014 2:58 5.1 45.21

23/05/2014 2:59 4.5 44.8

23/05/2014 3:00 6.1 39.59

23/05/2014 3:01 6.0 43.31

23/05/2014 3:02 5.1 46.33

23/05/2014 3:03 5.1 41.94

23/05/2014 3:04 5.8 44.54

23/05/2014 3:05 5.3 43.67

23/05/2014 3:06 5.6 37.27

23/05/2014 3:07 5.6 39.54

23/05/2014 3:08 4.8 40.28

23/05/2014 3:09 4.5 41.57

23/05/2014 3:10 4.4 42.29

23/05/2014 3:11 4.6 47.24

23/05/2014 3:12 4.9 50.51

23/05/2014 3:13 5.7 45.18

23/05/2014 3:14 6.3 48.52

23/05/2014 3:18 5.6 45.28

23/05/2014 3:19 4.9 41.37

23/05/2014 3:20 5.6 40.4

23/05/2014 3:21 5.6 41.48

23/05/2014 3:22 4.9 45.59

23/05/2014 3:23 4.0 48.75

11/12/2014 24/32

Page 179: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/05/2014 3:24 5.7 41.68

23/05/2014 3:25 6.2 40.88

23/05/2014 3:27 4.5 40.79

23/05/2014 3:28 4.8 38.62

23/05/2014 3:29 5.1 37.61

23/05/2014 3:30 4.8 34.67

23/05/2014 3:31 4.2 34.95

23/05/2014 3:32 3.6 34.25

23/05/2014 3:33 3.8 34.77

23/05/2014 3:36 3.9 40.67

23/05/2014 3:37 5.1 43.96

23/05/2014 3:38 5.1 44.65

23/05/2014 3:39 4.0 46.83

23/05/2014 3:40 5.3 48.11

23/05/2014 3:41 6.2 48.07

23/05/2014 3:43 6.5 43.94

23/05/2014 3:44 5.3 43.02

23/05/2014 3:45 4.1 44.32

23/05/2014 3:47 4.7 40.59

23/05/2014 3:49 4.4 39.92

23/05/2014 3:50 5.1 41.55

23/05/2014 3:51 4.7 41.41

23/05/2014 3:53 5.1 41.38

23/05/2014 3:54 4.8 43.24

23/05/2014 3:55 5.7 39.97

23/05/2014 3:56 5.2 47.97

23/05/2014 3:57 4.3 41.38

23/05/2014 4:00 5.0 43.28

23/05/2014 4:01 5.2 43.03

23/05/2014 4:02 5.5 39.84

23/05/2014 4:03 5.7 42.49

23/05/2014 4:04 4.8 44

23/05/2014 4:07 4.7 40.63

23/05/2014 4:08 5.1 42.71

23/05/2014 4:09 4.7 38.38

23/05/2014 4:10 5.4 37.25

23/05/2014 4:11 5.1 37.64

23/05/2014 4:12 4.1 38.13

23/05/2014 4:13 4.6 39.31

23/05/2014 4:14 4.4 38.35

23/05/2014 4:15 4.9 36.74

23/05/2014 4:16 4.7 40.87

23/05/2014 4:17 4.4 36.14

23/05/2014 4:18 5.2 35.97

11/12/2014 25/32

Page 180: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

23/05/2014 4:19 4.5 34.72

23/05/2014 4:20 4.0 37.22

23/05/2014 4:21 4.0 39.83

23/05/2014 4:22 4.2 38.9

23/05/2014 4:23 4.2 36.44

23/05/2014 4:24 4.9 34.29

23/05/2014 4:25 4.4 34.85

23/05/2014 4:26 3.9 35.63

23/05/2014 4:27 3.6 34.08

23/05/2014 4:28 4.0 37.05

23/05/2014 4:29 3.6 34.38

23/05/2014 4:30 4.4 34.01

23/05/2014 4:31 3.7 33.4

23/05/2014 4:36 4.1 45.94

23/05/2014 4:37 3.7 42.16

23/05/2014 4:39 5.6 43.84

23/05/2014 4:40 4.8 42.41

23/05/2014 4:41 5.4 41.22

23/05/2014 4:42 5.2 42.5

23/05/2014 4:43 5.2 43.78

23/05/2014 4:45 4.3 42.81

23/05/2014 4:46 5.2 37.85

23/05/2014 4:47 5.9 38.36

23/05/2014 4:48 4.6 40.1

23/05/2014 4:49 4.5 37.22

23/05/2014 4:50 4.6 38.12

23/05/2014 4:51 3.9 40.6

23/05/2014 4:52 4.4 38.9

23/05/2014 4:53 4.2 32.08

23/05/2014 4:57 3.8 45.45

23/05/2014 4:59 4.4 46.85

04/06/2014 0:46 3.6 27.8

04/06/2014 0:51 3.6 29.25

04/06/2014 0:53 3.6 27.93

04/06/2014 0:58 3.5 26.42

04/06/2014 1:16 4.0 29.78

04/06/2014 1:18 3.7 32.96

04/06/2014 1:19 4.0 30.42

04/06/2014 1:20 4.3 30.5

04/06/2014 1:21 4.1 29.26

04/06/2014 1:22 4.2 29.41

04/06/2014 1:23 4.0 28.91

04/06/2014 1:24 3.7 28

04/06/2014 1:26 3.6 29.15

11/12/2014 26/32

Page 181: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/06/2014 1:28 3.8 30.25

04/06/2014 1:30 4.0 29.73

04/06/2014 1:31 3.7 29.16

04/06/2014 1:32 4.1 30.03

04/06/2014 1:33 3.6 29.88

04/06/2014 1:34 3.7 31.12

04/06/2014 1:35 3.6 28.23

04/06/2014 1:36 3.8 28.2

04/06/2014 1:37 3.9 28.88

04/06/2014 1:41 3.6 27.33

04/06/2014 1:42 3.7 27.08

04/06/2014 1:46 3.7 27

04/06/2014 1:47 3.5 28.58

04/06/2014 1:56 3.5 28.31

04/06/2014 1:58 3.5 28.08

04/06/2014 2:03 3.6 28.44

04/06/2014 2:06 3.6 33.18

04/06/2014 2:07 3.6 28.98

04/06/2014 2:08 3.5 29.18

04/06/2014 2:09 3.6 28.77

04/06/2014 2:12 3.7 32.35

04/06/2014 2:14 3.6 28.77

04/06/2014 2:16 3.6 30.83

04/06/2014 2:18 3.9 29.72

04/06/2014 2:19 3.8 31.04

04/06/2014 2:20 4.3 29.37

04/06/2014 2:21 3.8 29.2

04/06/2014 2:22 4.2 31.49

04/06/2014 2:23 3.8 29.35

04/06/2014 2:25 4.2 27.54

04/06/2014 2:52 3.8 29.81

04/06/2014 2:53 3.6 28.79

04/06/2014 2:54 3.7 28.66

04/06/2014 2:55 3.7 28.89

04/06/2014 2:58 3.5 28.43

04/06/2014 2:59 3.5 28.71

04/06/2014 3:31 3.5 30.03

04/06/2014 3:35 3.7 29.49

04/06/2014 3:42 3.6 29.03

04/06/2014 3:46 3.8 30.18

04/06/2014 3:47 3.6 28.24

04/06/2014 3:48 4.0 29.5

04/06/2014 3:49 3.8 30.41

04/06/2014 3:53 4.2 30.3

11/12/2014 27/32

Page 182: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

04/06/2014 3:54 3.5 30.86

04/06/2014 3:55 3.5 29.92

04/06/2014 3:56 3.9 30.1

04/06/2014 4:11 4.1 29.6

04/06/2014 4:17 3.7 30.26

04/06/2014 4:54 3.7 50.47

17/06/2014 22:00 7.1 48.08

17/06/2014 22:01 5.8 46.8

17/06/2014 22:02 5.9 48.5

17/06/2014 22:03 6.4 47.38

17/06/2014 22:05 6.4 45.37

17/06/2014 22:07 6.2 47.15

17/06/2014 22:08 4.9 50.5

17/06/2014 22:11 6.3 51.08

17/06/2014 22:13 7.0 52.48

17/06/2014 22:14 7.4 47.9

17/06/2014 22:19 6.3 49.89

17/06/2014 22:20 6.8 42.33

17/06/2014 22:22 7.0 43.4

17/06/2014 22:23 5.1 44.93

17/06/2014 22:24 6.0 41.77

17/06/2014 22:25 5.3 44.23

17/06/2014 22:26 5.6 43.45

17/06/2014 22:27 5.0 46.85

17/06/2014 22:29 5.4 42.42

17/06/2014 22:30 6.5 41.35

17/06/2014 22:31 4.9 46.75

17/06/2014 22:32 5.5 50.46

17/06/2014 22:33 4.4 44.77

17/06/2014 22:34 5.1 47.15

17/06/2014 22:36 5.7 48.67

17/06/2014 22:38 6.4 44.69

17/06/2014 22:40 5.7 45.45

17/06/2014 22:41 5.5 49.37

17/06/2014 22:42 5.3 49.69

17/06/2014 22:43 6.5 48.5

17/06/2014 22:54 6.3 48.75

17/06/2014 22:55 5.2 50.01

17/06/2014 22:57 6.4 53.3

17/06/2014 22:58 7.1 49.1

17/06/2014 23:02 6.0 49.31

17/06/2014 23:03 4.9 44.52

17/06/2014 23:04 4.6 41.43

17/06/2014 23:07 5.0 45.34

11/12/2014 28/32

Page 183: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

17/06/2014 23:08 6.2 45.99

17/06/2014 23:15 4.6 48.03

18/06/2014 0:26 4.6 38.71

18/06/2014 0:27 4.5 34.78

18/06/2014 0:28 4.1 35.58

18/06/2014 0:29 4.9 35.71

18/06/2014 0:30 4.2 39.33

18/06/2014 0:31 4.3 36.43

18/06/2014 0:32 4.5 35.7

18/06/2014 0:33 4.3 35.88

18/06/2014 0:34 4.2 40.66

18/06/2014 0:35 3.8 36.9

18/06/2014 0:37 5.6 39.59

18/06/2014 0:38 4.4 41.01

18/06/2014 0:39 4.5 40.9

18/06/2014 0:40 3.7 36.41

18/06/2014 0:41 3.9 38.67

18/06/2014 0:42 4.7 36.97

18/06/2014 0:43 4.2 40.76

18/06/2014 0:44 4.8 35.77

18/06/2014 0:45 3.6 32.66

18/06/2014 0:49 4.3 38.14

18/06/2014 0:50 3.8 36.29

18/06/2014 0:51 4.3 35.36

18/06/2014 0:52 4.3 33.98

18/06/2014 0:53 3.9 37.37

18/06/2014 0:54 4.0 34.13

18/06/2014 0:56 3.8 36.87

18/06/2014 0:59 3.8 35.6

18/06/2014 1:01 4.3 39.71

18/06/2014 1:03 3.5 33.4

18/06/2014 1:05 3.7 33.51

18/06/2014 1:10 3.9 40.35

18/06/2014 1:11 3.6 41.62

18/06/2014 1:13 3.9 40.49

18/06/2014 1:15 4.4 36.23

18/06/2014 1:16 4.9 40.67

18/06/2014 1:17 3.7 36.74

18/06/2014 1:21 4.0 36.84

18/06/2014 1:22 4.2 37.21

18/06/2014 1:23 3.9 37.75

18/06/2014 1:25 4.3 39.46

18/06/2014 1:26 3.8 41.46

18/06/2014 1:27 4.0 40.03

11/12/2014 29/32

Page 184: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/06/2014 1:28 4.4 38.14

18/06/2014 1:29 4.5 39.41

18/06/2014 1:30 4.9 41.21

18/06/2014 1:31 3.8 45.54

18/06/2014 1:33 4.6 39.51

18/06/2014 1:34 5.5 42.62

18/06/2014 1:36 4.0 35.85

18/06/2014 1:37 5.0 37.99

18/06/2014 1:39 3.9 34.78

18/06/2014 1:40 4.5 35.63

18/06/2014 1:42 3.7 32.28

18/06/2014 1:43 3.8 32.28

18/06/2014 1:50 4.3 36.47

18/06/2014 1:51 4.7 44.23

18/06/2014 1:52 5.1 41.84

18/06/2014 1:53 3.5 41.8

18/06/2014 1:54 5.4 40.97

18/06/2014 1:55 5.5 37.33

18/06/2014 1:56 5.2 40.36

18/06/2014 1:57 5.1 38.46

18/06/2014 1:58 4.3 40.48

18/06/2014 1:59 4.7 42.57

18/06/2014 2:00 4.2 36.85

18/06/2014 2:01 5.3 44.08

18/06/2014 2:02 5.1 35.62

18/06/2014 2:03 3.7 37.41

18/06/2014 2:05 4.0 37.45

18/06/2014 2:06 4.5 34.27

18/06/2014 2:07 4.8 36.99

18/06/2014 2:08 3.8 34.82

18/06/2014 2:10 4.1 35.01

18/06/2014 2:11 3.6 34.41

18/06/2014 2:12 4.7 35.61

18/06/2014 2:13 4.3 32.78

18/06/2014 2:15 4.2 36.09

18/06/2014 2:18 4.7 35.14

18/06/2014 2:19 3.5 33.41

18/06/2014 2:21 4.4 45.13

18/06/2014 2:26 5.3 43.75

18/06/2014 2:27 6.2 48.34

18/06/2014 2:28 6.4 42.96

18/06/2014 2:29 5.1 40.6

18/06/2014 2:30 6.1 44.06

18/06/2014 2:31 5.6 43.87

11/12/2014 30/32

Page 185: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/06/2014 2:32 4.4 42.11

18/06/2014 2:33 5.8 40.77

18/06/2014 2:34 5.9 39.85

18/06/2014 2:35 5.7 37.21

18/06/2014 2:36 4.4 36.98

18/06/2014 2:37 5.5 37.91

18/06/2014 2:38 3.7 37.16

18/06/2014 2:39 4.0 36.22

18/06/2014 2:40 4.4 34.44

18/06/2014 2:41 4.1 33.22

18/06/2014 2:42 4.3 35.27

18/06/2014 2:46 4.2 33.05

18/06/2014 2:47 3.5 31.86

18/06/2014 2:53 3.6 34.18

18/06/2014 2:58 4.4 42.99

18/06/2014 2:59 4.4 40.69

18/06/2014 3:00 4.8 39.95

18/06/2014 3:01 5.7 42.4

18/06/2014 3:02 4.6 42.83

18/06/2014 3:03 4.3 39.9

18/06/2014 3:05 5.4 39.18

18/06/2014 3:06 4.6 41.25

18/06/2014 3:07 4.9 37.57

18/06/2014 3:08 4.3 36.13

18/06/2014 3:09 5.4 36.19

18/06/2014 3:10 4.3 38.29

18/06/2014 3:11 4.1 37.4

18/06/2014 3:13 4.6 34.1

18/06/2014 3:14 4.8 36.1

18/06/2014 3:15 3.7 37.23

18/06/2014 3:16 3.8 33.29

18/06/2014 3:17 4.1 34.12

18/06/2014 3:18 4.9 35.13

18/06/2014 3:19 3.5 35.07

18/06/2014 3:21 4.0 36.25

18/06/2014 3:22 3.9 33.66

18/06/2014 3:23 4.1 36.03

18/06/2014 3:24 4.5 33.09

18/06/2014 3:25 3.5 33.83

18/06/2014 3:26 3.9 35.31

18/06/2014 3:29 4.0 33.07

18/06/2014 3:30 3.9 31.77

18/06/2014 3:34 3.8 37.05

18/06/2014 3:38 4.0 35.42

11/12/2014 31/32

Page 186: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

18/06/2014 3:40 4.4 39.06

18/06/2014 3:41 4.0 34.87

18/06/2014 3:42 3.6 36.21

18/06/2014 3:43 4.8 37.51

18/06/2014 3:44 3.5 36.9

18/06/2014 3:45 3.7 36.76

18/06/2014 3:46 4.5 38.57

18/06/2014 3:47 4.4 37.97

18/06/2014 3:48 4.4 35.83

18/06/2014 3:49 4.4 34.66

18/06/2014 3:50 4.5 37.39

18/06/2014 3:51 4.1 33.66

18/06/2014 3:52 4.0 34.92

18/06/2014 3:53 4.3 32.95

18/06/2014 3:54 3.6 30.82

18/06/2014 3:55 4.4 33.2

18/06/2014 3:56 3.5 33.98

18/06/2014 4:00 3.8 32.67

18/06/2014 4:01 4.4 34.02

18/06/2014 4:02 4.0 30.28

18/06/2014 4:03 3.7 30.58

18/06/2014 4:04 4.0 31.46

18/06/2014 4:09 3.8 34.25

18/06/2014 4:11 4.7 34.77

18/06/2014 4:12 4.0 43.57

18/06/2014 4:13 3.9 36.61

18/06/2014 4:15 3.6 32.9

18/06/2014 4:16 4.1 32.03

18/06/2014 4:20 3.8 31.98

18/06/2014 4:21 3.9 30.65

18/06/2014 4:39 3.6 29.77

11/12/2014 32/32

Page 187: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 5 - Summary of Sound Levels at Point of Reception A

Conestogo Wind Farm, 1301142

Wind

Speed

Average LEQ for Total

Sound Condition

Average LEQ for Ambient

Sound Condition

Turbine Only

Sound Levels at

Meter

REA Sound

Level Limits

Over REA

Limits?

(m/s) (dBA) (dBA) (dBA) (dBA) (Yes/No)

4 43.6 966 43.2 307 33 40 No

5 45.0 327 43.3 158 40 40 No

6 47.2 110 46.3 49 40 40 No

7 49.0 54 47.8 6 43 43 No

Total # of Valid Intervals

for Ambient Sound

Condition

Total # of Valid Intervals

for Total Sound

15/12/2014

Page 188: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 6 - Summary of Sound Levels at Point of Reception C

Conestogo Wind Farm, 1301142

Wind

Speed

Average LEQ for Total

Sound Condition

Average LEQ for Ambient

Sound Condition

Turbine Only

Sound Levels at

Meter

REA Sound

Level Limits

Over REA

Limits?

(m/s) (dBA) (dBA) (dBA) (dBA) (Yes/No)

4 41.0 1759 39.0 643 37 40 No

5 43.3 1465 43.5 409 33 [1]

40 No

6 47.0 663 47.6 235 37 [1]

40 No

7 49.5 273 48.4 106 43 43 No

Notes:

Total # of Valid Intervals

for Ambient Sound

Condition

Total # of Valid Intervals

for Total Sound

-As the ambient conditions is higher than the total sound level condition, the total sound and ambient sound levels are assumed equal and therefore the turbine only sound

levels are estimated to be 10 dB lower than the ambient condition.

12/12/2014

Page 189: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 7 - Summary of Sound Levels at All Monitoring Locations

Conestogo Wind Farm, 1301142

Wind Speed

Average LEQ for

Total Sound

Condition

Average LEQ for

Ambient Sound

Condition

Turbine Only Sound

Levels at Meter

Average LEQ for

Total Sound

Condition

Average LEQ for

Ambient Sound

Condition

Turbine Only Sound

Levels at Meter

Average LEQ for

Total Sound

Condition

Average LEQ for

Ambient Sound

Condition

Turbine Only Sound

Levels at Meter

Average Turbine Only

Sound Level at Meter

REA Sound Level

LimitsOver REA Limits?

(m/s) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (Yes/No)

4 38.9 121 - 0 39 [1]

43.0 467 42.2 201 35 43.6 966 43.2 307 33 1554 508 36 40 NO

5 39.1 35 38.0 3 32 43.6 113 41.1 56 40 45.0 327 43.3 158 40 475 217 39 40 NO

6 39.6 4 40.2 31 30 [2]

46.0 67 45.2 [3]

0 38 47.2 110 46.3 49 40 181 80 38 40 NO

7 - 0 40.7 46 31 [2]

47.6 19 46.8 [3]

0 40 49.0 54 47.8 6 43 73 52 40 43 NO

4 47.5 151 - 0 38 43.8 843 39.5 206 40 [4]

- - - - - 994 206 39 40 NO

5 48.0 90 47.4 3 40 45.8 546 43.7 312 40 [4]

- - - - - 636 315 40 40 NO

6 47.9 16 48.0 27 38 [2]

46.4 335 45.2 238 38 [4]

- - - - - 351 265 38 40 NO

7 48.3 3 48.4 32 38 [2]

48.3 255 46.8 38 41 [4]

- - - - - 258 70 40 43 NO

4 40.0 563 - 0 40 [1]

41.2 607 37.6 505 39 41.0 1759 39.0 643 37 2929 1148 39 40 NO

5 40.1 218 42.3 3 32 [2]

42.9 262 39.9 448 40 43.3 1465 43.5 409 33 [1]

1945 860 37 40 NO

6 42.1 80 45.8 31 36 [2]

43.7 56 41.3 53 40 47.0 663 47.6 235 37 [1]

799 319 38 40 NO

7 42.3 49 46.3 47 36 [2]

46.8 29 46.4 1 37 49.5 273 48.4 106 43 351 154 40 43 NO

Notes: [1] The total sound level condition is at or below the limit, so it could conservatively be assumed to be all turbine only impats

[3] Due to lack of valid ambient data readings for the 6 and 7 m/s bins, average LEQ ambient sound data from point of reception B was used.

[4]Noise propagation was completed to predicted sound levels at the Non-Participation Receptor

B

Cumulative Results

[2] As the ambient condition is higher than the total sound level condition, the total sound and ambient sound levels are assumed equal and therefore the turbine only sound levels are estimated to be 10 dB lower than the ambient condition.

C

Total Number of

Valid Intervals for

Total Sound

Total Number of

Valid Intervals

for Ambient

Sound

Spring 2013 Program Fall 2013 Program

Number of Valid

Intervals for Total

Sound

Number of Valid

Intervals for

Ambient Sound

Condition

Spring 2014 Program

Number of Valid

Intervals for Total

Sound

Number of Valid

Intervals for Total

Sound

Number of Valid

Intervals for

Ambient Sound

Condition

Number of Valid

Intervals for Total

Sound

Receptor Location

A

Page 190: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

FIGURES

Page 191: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

#* #*#*

#*#*#*#* #*

#*

#*

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!!

!

!

!

!!

!

!! !

!!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!!

!!

!

!!

")

")

")

16th Line

14th Line

Wellington Road 7

Side

road 1

5

18th Line

Side

road 3

Side

road 6

Side

road 1

2

15th

Sidero

ad

Charles

St W

6th Si

deroad

12th

Sidero

ad

Regio

nal R

d

C

B

A9

87 65

4

321

10

9 7

6

5

4

32

1

9594

93

92 91

90

96

88

87 8685

83

7574

73

72

71

70

69

68

67

6665

64

6362

616059

58

5756

55

52 51

32

3130

29

27

26

25

2423

22

21

20

19

18

17

16

15

14

13

12

1110

110

116120

119118

117

114

112

111

109

108

107

106

105

101

103

102

8

89

28

531000

531000

532000

532000

533000

533000

534000

534000

535000

535000

536000

536000

537000

537000

4843

800

4843

800

4844

800

4844

800

4845

800

4845

800

4846

800

4846

800

4847

800

4847

800

4848

800

4848

800

4849

800

4849

800

4850

800

4850

800

4851

800

4851

800

4852

800

4852

800

Conestogo Wind Farm - Noise Monitor Locations

Conestoga Noise Assessment, Arthur, Ontario Project #1301142

[True North

Date Revised: Dec. 17, 2013

Approx. Scale:

Figure:Drawn by: NBN

1:42,5001

Map Projection: UTM NAD 83 Zone 17N.

0 500 1,000 1,500 mService Layer Credits: FBS Imagery, 2010.Road Data: Esri v 10.0.

Legend") Monitoring Locations! Offsite Noise Receptor! Onsite Noise Receptor! Vacant Lot Receptor

#* Wind TurbinesRoads

Page 192: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 11, 2014

Conestogo Wind Farm, Mapleton Township, Ontario

ELSDrawn by: Figure:

Project #1301142

Date Revised:

2Valid LEQ Data - Point of Reception A

25

30

35

40

45

50

55

60

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid

LE

Q(d

BA

)

Wind Speed (m/s)

Figure 2 - Valid LEQ Data for 2014 Audit Point of Reception A

Total Sound

Ambient Sound

Turbine Only Sound

Legend

Page 193: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 11, 2014

Conestogo Wind Farm, Mapleton Township, Ontario

ELSDrawn by: Figure:

Project #1301142

Date Revised:

3Valid LEQ Data - Point of Reception C

25

30

35

40

45

50

55

60

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid

LE

Q(d

BA

)

Wind Speed (m/s)

Figure 3 - Valid LEQ Data for 2014 Audit Point of Reception C

Total Sound

Ambient Sound

Turbine Only Sound

Legend

Page 194: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 11, 2014

Conestogo Wind Farm, Mapleton Township, Ontario

ELSDrawn by: Figure:

Project #1301142

Date Revised:

4Wind Rose Plot – Point of Reception A

0%

2%

4%

6%

8%

10%

12%

14%

N

NNE

NE

ENE

E

ESE

SE

SSE

S

SSW

SW

WSW

W

WNW

NW

NNW

Page 195: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 11, 2014

Conestogo Wind Farm, Mapleton Township, Ontario

ELSDrawn by: Figure:

Project #1301142

Date Revised:

5Wind Rose Plot – Point of Reception C

0%

2%

4%

6%

8%

10%

12%

14%

N

NNE

NE

ENE

E

ESE

SE

SSE

S

SSW

SW

WSW

W

WNW

NW

NNW

Page 196: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX A

Page 197: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Township ofMapleton

Parcels - Teranet 2002. County of Wellington 2010.Date: October 18, 2012Date Printed: November 19, 2012NE layer comprised of MNR Wetlands 2009GRCA Wetlands, Steep Slopes & Floodplain 2009F:\LIS\Mapleton Zoning\Mapleton Zoning - E size.mxd

Schedule A-1

WELLINGTON RD 86WELLINGTON RD 86

0 1,250 2,500 3,750 5,000625Meters

1:50,000

M1

EI

IN

INEI

EI

INININ

IN

INEI

OS1OS1

EI EI IN

IN

OS2

OS2

M1

IN

INININ

IN

ININ

IN

OS2

OS2

OS2

OS2

OS2

OS2

OS2

R1A

ININ

OS2EI

EI

IN

M1C2

C2 IN INWELLINGTON RD 86

CONC 3

CONC 4 CONC 5

CONC 6

CONC 8 EIGHTH LINE

WELLINGTON RD 8

CONC 12

WELLINGTON RD 7

CONC 14

CONC 16 SIXTEENTH LINE

FOURTEENTH LINE

WELLINGTON RD 7

TWELFTH LINE

WELLINGTON RD 8

EIGHTH LINE

SIXTH LINE

HOLLEN RD

FOURTH LINE

CONC 3 WELLINGTON RD 45

EIGHTEENTH LINEWELLINGTON RD 109 HIGHWAY 6

JONES BASELINE

WELL

INGT

ON R

D 9

SR 6

WELL

INGT

ON R

D 10

SR 15

WELL

INGT

ON R

D 11

SR 16 SR

17

WELL

INGT

ON R

D 12

SR 18

SR 19

YATT

ON SR

THIRD LINE

BLIND LINE

REID WOODS DR

SR 19SR

18

SR 16

SR 17

SR 15

SR 12

WELL

INGT

ON R

D 10

SR 6

SR 3WE

LLIN

GTON

RD

9WE

LLIN

GTON

RD

9

SR 3

SR 6

WELL

INGT

ON R

D 10

SR 12

SR 15

WELL

INGT

ON R

D 11

SR 16

SR 17

WELL

INGT

ON R

D 12

SR 18

SR 19

SR 21

SR 21

SR 19

SR 19

SR 18

SR 17

Rothsay

Moorefield

Drayton

Glen Allen

Lebanon

WallensteinWallenstein

Yatton

Alma

IN

18 17 16 15 14 13 12 11 109

87

65 2 134

23

31.212

31.2831.50

31.208

31.213

31.213

31.24

31.40

31.17

7

31.20

9

31.202

31.20

31.20

31.18

31.26

31.244

31.3831.15

31.2

31.12

31.197

31.200

31.9

31.35

31.18

131

.170

31.22

3

31.20

7

31.21531.55

31.17

31.23

31.193

31.19

0

31.6

31.5

31.32

31.78

31.118

31.1931.128

31.178

31.185

31.47

31.13

4

31.11

1

31.96

31.131.113

31.9

31.4

31.37

31.52

31.14

31.42

31.52

31.3

31.99

31.11

31.46

31.245

31.43

31.201

31.10

7

31.10

731.117

31.171

31.7

31.10

3

31.39

31.39

31.219

31.123

31.65

31.19

9

31.10

4

31.123

31.93

31.9431.119

31.173

31.199

31.100

31.143

31.83

31.10

1

31.18

3

31.21

1

31.220

31.88

31.85

31.77

31.60

31.11

6

31.81

31.7931.66

31.80

31.18

0

31.249

31.176

31.147

31.132

31.21

0

31.20

6

31.21

7

31.11

0

31.57

31.61 31.13

7

31.14

4 31.84 31.10

8

31.16

8

31.87

31.148

31.125

31.67

31.12

0

31.23

5

31.71

31.109

31.9531.131

31.16

7

31.14

131.175

31.75

31.13

0

31.19

8

31.7531

.97

31.175

31.18

7

31.9831.188

31.16

9

31.14

9

31.17

2

31.17931.69

31.62

31.63

31.18

9

31.18

2

31.150

31.68

31.74

31.91

31.101

31.56

31.12

7

31.12

2 31.102

31.40

31.40

31.127 31.40

31.7031.205

31.14531.145

31.115

31.12

431.216

31.72

31.90

31.22831.142

C1

31.139

31.231

31.23

2

31.234

31.23

3

31.23

7

31.236

31.23

8

31.239

31.2931.30C2

31.54

31.204

31.195

31.2231.36

31.21

31.166

31.14631.226

31.91

31.92

31.143

31.139

31.163

31.40

IN

OS2OS2

OS2

HOLLEN

31.241

22212019181716151413121110987654321

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

IX

VIII

VII

VI

V

IV

III

II

I

AGRICULTURAL UNSERVICED RESIDENTIAL LOW DENSITY RESIDENTIALLOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIALHIGH DENSITY RESIDENTIAL RESIDENTIAL TRANSITIONCENTRAL COMMERCIAL HIGHWAY COMMERCIALNEIGHBOURHOOD COMMERCIAL SHOPPING CENTRE COMMERCIAL AGRICULTURAL COMMERCIAL GENERAL INDUSTRIAL LIGHT INDUSTRIAL RURAL INDUSTRIALEXTRACTIVE INDUSTRIALINSTITUTIONAL OPEN SPACE OPEN SPACE CONESTOGA LAKE FUTURE DEVELOPMENT NATURAL ENVIRONMENT FLOODWAY(f) Flood SPECIAL POLICY AREA EXCEPTION ZONES

AR1AR1BR1CR2R3RTC1C2C3C4ACM1M2RINEIINOS1OS2FDNEFL(f)

XVII

XVI

XV

XIV

XIII

XII

XI

X

XVIII

XVII

XVI

XV

XIV

XIII

XII

XI

X

IX

VIII

VII

VI

V

IV

III

II

I

31.51

ABCD

31.243

31.44

31.246

AC

31.251

31.25

3

31.25

4

31.257

31.258

Con B

Con A

Page 198: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX B

Page 199: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Ministry of the EnvironmentMinistère de l’Environnement

RENEWABLE ENERGY APPROVAL

NUMBER 3558-8KTHJP

Issue Date: December 8, 2011

Conestogo Wind, LP5500 North Service Rd, No. Suite 205Burlington, OntarioL7L 6W6

ProjectLocation:

Conestogo Wind Energy CentreBounded by SR 16, SR 18, 14th Line and Highway 6Mapleton Township, County of WellingtonN0G 1A0

You have applied in accordance with Section 47.4 of the Environmental Protection Act for approval to engage in arenewable energy project in respect ofClass 4 wind facilityconsisting of the following:

- the construction, installation, operation, use and retiring of:

(a) nine (9) wind turbine generators each rated at 2.3 megawatts (MW) generating output capacity and one (1) windturbine generator rated at 2.22 MW generating output capacity with a total name plate capacity of 22.92 MW,designated as source ID Nos.T1 to T10, each with a hub height of 80 above grade, and sited at the locations shownin Schedule A and as indicated in the supporting documentation submitted with the application; and

(b) associated ancillary equipment, systems and technologies including ten (10) 690V/34.5 kV pad mountedtransformers, distribution lines, one (1) transformer substation to connect to the Hydro One distribution system,distribution lines and access roads;

all in accordance with the application for a Renewable Energy Approval dated December 16, 2010 and signed by F. AllenWiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with the application,including amended documentation submitted up to November 30, 2011.

For the purpose of this renewable energy approval, the following definitions apply:

"Acoustic Audit - Emission" means an investigative procedure that is compliant with the IEC Standard 61400-11 andconsisting of measurements and/or acoustic modelling of noise emissions produced by wind turbine generators,assessed to determine compliance with the manufacturer's noise (acoustic) equipment specifications and emissiondata of the wind turbine generators, included in the Noise Report;

1.

"Acoustic Audit - Immission" means an investigative procedure consisting of measurements and/or acousticmodelling of all sources of noise emissions due to the operation of the Equipment, assessed to determine compliancewith the Noise Performance Limits set out in this Approval;

2.

"Acoustic Audit Report - Emission" means a report presenting the results of the Acoustic Audit - Emission;3."Acoustic Audit Report - Immission" means a report presenting the results of the Acoustic Audit - Immission;4."Acoustical Consultant" means a person currently active in the field of environmental acoustics and noise/vibrationcontrol, who is familiar with Ministry noise guidelines and procedures and has a combination of formal universityeducation, training and experience necessary to assess noise emissions from wind facilities;

5.

"Act" means the Environmental Protection Act, R.S.O 1990, c.E.19, as amended;6."Adverse Effect" has the same meaning as in the Act;7."Application" means the application for a Renewable Energy Approval dated December 16, 2010 and signed by F.8.

9.

CONTENT COPY OF ORIGINAL

Page 200: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

6.7.

Allen Wiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with theapplication including amended documentation submitted up to November 30, 2011;

8.

"Approval" means this Renewable Energy Approval issued in accordance with Section 47.4 of the Act, including anyschedules to it;

9.

"A-weighting" means the frequency weighting characteristic as specified in the International ElectrotechnicalCommission (IEC) Standard 61672, and intended to approximate the relative sensitivity of the normal human ear todifferent frequencies (pitches) of sound . It is denoted as “A”;

10.

"A-weighted Sound Pressure Level" means the Sound Pressure Level modified by application of an A-weightingnetwork. It is measured in decibels, A-weighted, and denoted “dBA”;

11.

"Class 1 Area" means an area with an acoustical environment typical of a major population centre, where thebackground sound level is dominated by the activities of people, usually road traffic, often referred to as “urbanhum;

12.

"Class 2 Area" means an area with an acoustical environment that has qualities representative of both Class 1 andClass 3 Areas:

(a) sound levels characteristic of Class 1 during daytime (07:00 to 19:00 or to 23:00 hours);

(b) low evening and night background sound level defined by natural environment andinfrequent human activity starting as early as 19:00 hours (19:00 or 23:00 to 07:00hours);

(c) no clearly audible sound from Stationary Sources other than from those under impactassessment.

13.

"Class 3 Area" means a rural area with an acoustical environment that is dominated by natural sounds having little orno road traffic, such as the following:

(a) a small community with less than 1000 population;

(b) agricultural area;

(c) a rural recreational area such as a cottage or a resort area; or

(d) a wilderness area.

14.

"Company" means Conestogo Wind GP, Inc. (general partner) and Conestogo Wind, LP (limited partner) operatingin partnership as Conestogo Wind, LP, and includes it successors and assignees;

15.

"Compliance Protocol for Wind Turbine Noise" means the Ministry document Compliance Protocol for WindTurbine Noise, Guideline for Acoustic Assessment and Measurement, PIBS 8540e;

16.

"Decibel" means a dimensionless measure of Sound Level or Sound Pressure Level, denoted as dB;17."Director" means a person appointed in writing by the Minister of the Environment pursuant to section 5 of the Actas a Director for the purposes of section 47.5 of the Act;

18.

"District Manager" means the District Manager of the appropriate local district office of the Ministry where theFacility is geographically located;

19.

"Equipment" means the ten (10) wind turbine generators and associated ancillary equipment identified in thisApproval and as further described in the Application, to the extent approved by this Approval;

20.

"Equivalent Sound Level" is the value of the constant sound level which would result in exposure to the same total A-weighted energy as would the specified time-varying sound, if the constant sound level persisted over an equal timeinterval. It is denoted Leq and is measured in dB A-weighting (dBA);

21.

"Facility" means the renewable energy generation facility, including the Equipment, as described in this Approval andas further described in the Application, to the extent approved by this Approval;

22.

"IEC Standard 61400-11" means the International Standard IEC Standard 61400-11, Wind turbine generator systems– Part 11: Acoustic noise measurement techniques, 2006;

23.

"Independent Acoustical Consultant" means an Acoustical Consultant who is not representing the Company and wasnot involved in preparing the Noise Report. The Independent Acoustical Consultant shall not be retained by theAcoustical Consultant involved in the noise impact assessment;

24.

"Ministry" means the Ontario Ministry of the Environment;25."Noise Guidelines for Wind Farms" means the Ministry document entitled, Noise Guidelines for Wind Farms -26.

27.28.

CONTENT COPY OF ORIGINAL

Page 201: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

25.

Interpretation for Applying MOE NPC Publications to Wind Power Generation Facilities, dated October 2008;26.

"Noise Receptor" has the same meaning as in O. Reg. 359/09;27."Noise Report" means the report, included in the Application and entitled "Conestogo Wind Farm Noise Assessment",prepared by GENIVAR Inc., dated July 2011;

28.

"O. Reg. 359/09" means Ontario Regulation 359/09 “Renewable Energy Approvals under Part V.0.1 of the Act”made under the Act;

29.

"Point of Reception" has the same meaning as in the Noise Guidelines for Wind Farms and is subject to the samequalifications described in that document;

30.

"Sound Level" means the A-weighted Sound Pressure Level;31."Sound Level Limit" is the limiting value described in terms of the one hour A-weighted Equivalent Sound Level Leq;32."Sound Pressure" means the instantaneous difference between the actual pressure and the average or barometricpressure at a given location. The unit of measurement is the micro pascal (µPa);

33.

"Sound Pressure Level" means twenty times the logarithm to the base 10 of the ratio of the effective pressure (µPa)of a sound to the reference pressure of 20 µPa;

34.

"UTM" means Universal Transverse Mercator coordinate system.35.

You are hereby notified that this approval is issued to you subject to the terms and conditions outlined below:

TERMS AND CONDITIONS

GENERAL

1. The Company shall construct, install, use, operate, maintain and retire the Facility in accordance with the terms andconditions of this Approval and the Application.

2. Where there is a conflict between a provision of this Approval and any document submitted by the Company, theconditions in this Approval shall take precedence. Where there is a conflict between one or more of the documentssubmitted by the Company, the document bearing the most recent date shall take precedence.

3. The Company shall ensure a copy of this Approval is:

(1) accessible, at all times, by Company staff operating the Facility and;

(2) submitted to the clerk of each local municipality and upper-tier municipality in which the Facility is situated alongwith the Application.

4. If the Company has a website, the Company shall ensure that the Approval and the Application are posted on theCompany's publicly accessible website within five (5) business days of receiving this Approval.

5. The Company shall, at least six (6) months prior to the anticipated retirement date of the entire Facility, or part of theFacility, review its Decommissioning Plan Report to ensure that it is still accurate. If the Company determines that theFacility cannot be decommissioned in accordance with the Decommissioning Plan Report, the Company shall provide theDirector and District Manager a written description of plans for the decommissioning of the Facility.

6. The Facility shall be retired in accordance with the Decommissioning Plan Report and any directions provided by theDirector or District Manager.

7. The Company shall, at least six (6) months prior to the anticipated retirement date of the entire Facility, or part of theFacility, the Company shall contact the Ministry of Agriculture, Food and Rural Affairs plans for the decommissioning ofthe Facility, and follow any directions provided by that ministry in respect of the Company’s plans to restore the projectlocation to its previous agricultural capacity.

EXPIRY OF APPROVAL

8. Construction and installation of the Facility must be completed within two (2) years of the later of:

CONTENT COPY OF ORIGINAL

Page 202: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(1) the date this Approval is issued; or

(2) if there is a hearing or other litigation in respect of the issuance of this Approval, the date that this hearing orlitigation is disposed of, including all appeals.

9. This Approval ceases to apply in respect of any portion of the Facility not constructed or installed before the later of thedates identified in Condition No. 8.

NOISE PERFORMANCE LIMITS

10. The Company shall ensure that:

(1) the Sound Levels from the Equipment, at the Points of Reception identified the Noise Report, comply with theSound Level Limits set in the Noise Guidelines for Wind Farms, as applicable, and specifically as stated in the tablebelow:

Wind Speed (m/s) at 10 m height 4 5 6 7 8 9 10

Wind Turbine Sound Level Limits, dBA 40.0 40.0 40.0 43.0 45.0 49.0 51.0

(2) the Equipment is constructed and installed at either of the following locations:

a) at the locations identified in Schedule A of this Approval; or

b) at a location that does not vary by more than 10 metres from the locations identified in Schedule A ofthis Approval and provided that,

i) the Equipment will comply with Condition No. 10 (1) and

ii) all setback prohibitions established under O.Reg. 359/09 are complied with.

11. The locations identified in Table 7 of the Noise Report as “Point of Reception ID” numbers 102, 103, 105-112, and114-117 are specified as Noise Receptors for the purposes of paragraph 2 of subsection 54 (1.1) of O. Reg. 359/09 andsubclause 35 (1) (a) (ii) of O. Reg. 359/09.

12. If the Company determines that some or all of the Equipment cannot be constructed in accordance with Condition No.10 (2), prior to the construction and installation of the Equipment in question, the Company shall apply to the Director foran amendment to the terms and conditions of the Approval.

13. Within three (3) months of the completion of the construction of the Facility, the Company shall submit to the Directora written confirmation signed by the Vice President, Development, Conestogo Wind, LP that the UTM coordinates of the“as constructed” Equipment comply with the requirements of Condition No. 10 (2).

ACOUSTIC AUDIT - IMMISSION

14. The Company shall carry out an Acoustic Audit - Immission of the sound levels produced by the operation of theEquipment in accordance with the following:

(1) the acoustic audit measurements shall be undertaken in accordance with Part D of the Compliance Protocol forWind Turbine Noise;

(2) the acoustic audit measurements shall be performed by an Independent Acoustical Consultant at three (3)different Points of Reception that have been selected using the following criteria:

(a) the Points of Reception should represent the location of the greatest predicted noise impact, i.e. thehighest predicted sound level; and

CONTENT COPY OF ORIGINAL

Page 203: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(b) the Points of Reception should be located in the direction of prevailing winds from the Facility;

(3) the acoustic audit measurements shall be performed on two (2) separate occasions within a period of twelve (12)months that represent the lowest annual ambient sound levels, preferably:

(a) March and April, and

(b) October and November

15. The Company shall submit to the District Manager and the Director an Acoustic Audit Report-Immision, prepared byan Independent Acoustical Consultant, at the following points in time:

(1) no later than six (6) months after the commencement of the operation of the Facility for the first of the two (2)acoustic audit measurements at the three (3) Points of Reception; and

(2) no later than twelve (12) months after the commencement of the operation of the Facility for the second of thetwo (2) acoustic audit measurements at the three (3) Points of Reception.

ACOUSTIC AUDIT - EMISSION

16. The Company shall carry out an Acoustic Audit - Emission of the acoustic emissions produced by the operation of thewind turbine generators in accordance with the following:

(1) the acoustic emission measurements shall be undertaken in accordance with the IEC Standard 61400-11;

(2) the acoustic emission measurements shall be performed by an Independent Acoustical Consultant; and

(3) the acoustic emission measurements shall be performed on the wind turbine generator rated at 2.22 MWgenerating output capacity, and any one of the other wind turbine generators rated at 2.3 MW generating outputcapacity, used in the Facility.

17. The Company shall submit to the District Manager and the Director an Acoustic Audit Report-Emission, prepared inaccordance with Section 9 of the IEC Standard 61400-11 by an Independent Acoustical Consultant, no later than six (6)months after the commencement of the operation of the Facility.

STORMWATER MANAGEMENT

18. The Company shall employ best management practices for stormwater management and sediment and erosion controlduring construction, installation, use, operation, maintenance and retiring of the Facility, as outlined in the Application.

SEWAGE WORKS OF THE TRANSFORMER SPILL CONTAINMENT FACILITY

19. The Company shall design and construct a transformer spill containment facility which meets the followingrequirements:

(1) the spill containment area serving the transformer shall have a minimum volume equal to the volume oftransformer oil and lubricants plus the volume equivalent to providing a minimum 24-hour duration, 25-year returnstorm capacity for the stormwater drainage area around the transformer under normal operating conditions;

(2) the containment facility shall have an impervious concrete floor and walls sloped toward an outlet, maintaining afreeboard of 0.25 metres terminating approximately 0.30 metres above grade, with an impervious plastic liner orequivalent, and 1.0 metre layer of crushed stoned within;

(3) the containment pad shall drain to an oil control device, such as an oil/water separator, a pump-out sump, an oilabsorbing material in a canister or a blind sump; and

CONTENT COPY OF ORIGINAL

Page 204: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(4) the oil control device shall be equipped with an oil detection system and appropriate sewage appurtenances asnecessary (pumpout manhole, submersible pumps, level controllers, floating oil sensors, etc.) that allows for batchdischarges or direct discharges and for proper implementation of the monitoring program described in Condition No.22.

20. The Company shall:

(1) as a minimum, check the oil detection system on a monthly basis and create a written record of the inspections;

(2) ensure that the effluent is essentially free of floating and settle-able solids and does not contain oil or any othersubstance in amounts sufficient to create a visible film, sheen or foam on the receiving waters;

(3) immediately identify and clean-up all losses of oil from the transformer;

(4) upon identification of oil in the effluent pumpout, take immediate action to prevent the further occurrence ofsuch loss; and

(5) ensure that equipment and material for the containment, clean-up and disposal of oil and materials contaminatedwith oil are kept within easy access and in good repair for immediate use in the event of:

(a) loss of oil from the transformer,(b) a spill within the meaning of Part X of the Act, or(c) the identification of an abnormal amount of oil in the effluent.

21. The Company shall design, construct and operate the sewage works such that the concentration of the effluentparameter named in the table below does not exceed the maximum concentration objective shown for that parameter in theeffluent, and shall comply with the following requirements:

Effluent Parameters Maximum Concentration ObjectiveOil and Grease 15mg/L

(1) notify the District Manager as soon as reasonably possible of any exceedance of the maximum concentrationobjective set out in the table above;

(2) take immediate action to identify the cause of the exceedance; and

(3) take immediate action to prevent further exceedances.

22. Upon commencement of the operation of the Facility, the Company shall establish and carry out the followingmonitoring program for the sewage works:

(1) the Company shall collect and analyse the required set of samples at the sampling points listed in the table belowin accordance with the measurement frequency and sample type specified for the effluent parameter, oil and grease,and create a written record of the monitoring:

EffluentParameters

Measurement Frequencyand Sample Points

Sample Type

Oil and Grease B – Batch, i.e., for each discrete volume in the sump prior topumpout; orQ – Quarterly for direct effluent discharge, i.e., four timesover a year, relatively evenly spaced.

Grab

(2) in the event of an exceedance of the maximum concentration objective set out in the table in Condition No. 21,the Company shall:

(a) increase the frequency of sampling to once per month, for each month that effluent discharge

CONTENT COPY OF ORIGINAL

Page 205: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

occurs, and

(b) provide the District Manager, on a monthly basis, with copies of the written record created for themonitoring until the District Manager provides written direction that monthly sampling and reporting isno longer required; and

(3) if over a period of twenty-four (24) months of effluent monitoring under Condition No. 22(1), there are noexceedances of the maximum concentration set out in the table in Condition No. 21, the Company may reduce themeasurement frequency of effluent monitoring to a frequency as the District Manager may specify in writing,provided that the new specified frequency is never less than annual.

23. The Company shall comply with the following methods and protocols for any sampling, analysis and recordingundertaken in accordance with Condition No. 22:

(1) Ministry of the Environment publication "Protocol for the Sampling and Analysis of Industrial/ MunicipalWastewater", January 1999, as amended from time to time by more recently published editions, and

(2) the publication "Standard Methods for the Examination of Water and Wastewater", 21st edition, 2005, asamended from time to time by more recently published editions.

WATER TAKING ACTIVITIES

24. The Company shall not take more than 50,000 litres of water on any day by any means during the construction,installation, use, operation, maintenance and retiring of the Facility.

BIRD AND BAT MONITORING

25. The Company shall implement its Post Construction Follow-up Plan submitted as part of the Application.

26. If the Company determines that it must deviate from its Post Construction Follow-up Plan, the Company shall contactthe District Manager at the Guelph District Office of the Ministry of Natural Resources and the Director, prior to makingany changes to the methodology in the Post Construction Follow-up Plan, and follow any directions provided.

27. The Company shall contact the District Manager at the Guelph District Office of the Ministry of Natural Resources andthe Director if the mortality thresholds stated in its Post Construction Follow-up Plan are reached for either bird or bats.

TRAFFIC MANAGEMENT PLANNING

28. Within three (3) months of receiving this Approval, the Company shall prepare a Traffic Management Plan and provideit to the Township of Mapleton and the County of Wellington.

29. Within three (3) months of having provided the Traffic Management Plan to the Township of Mapleton and the Countyof Wellington, the Company shall make reasonable efforts to enter into a Development Agreement and a Road UsersAgreement with the Township of Mapleton.

30. If a Development Agreement or a Road Users Agreement has not been signed with the Township of Mapleton withinthree (3) months of having provided the Traffic Management Plan to the Township of Mapleton and the County ofWellington, the Company shall provide a written explanation to the Director as to why this has not occurred.

31. The Company shall distribute a notice to every assessed owner of land within five (5) kilometres of the projectlocation, notifying them of the expected start date of construction, at least ten (10) days prior to the commencement ofany construction or installation activities at the project location.

ARCHAEOLOGICAL RESOURCES

32. The Company shall implement all of the recommendations for further archaeological fieldwork and for the protectionof archaeological sites found in the consultant archaeologist's report included in the Application, and which the Company

CONTENT COPY OF ORIGINAL

Page 206: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

submitted to the Ministry of Tourism and Culture in order to comply with clause 22 (2) (b) of O. Reg. 359/09.

33. Should any previously undocumented archaeological resources be discovered, the Company shall:

(1) cease all alteration of the area in which the resources were discovered immediately;

(2) engage a consultant archaeologist to carry out the archaeological fieldwork necessary to further assess the areaand to either protect and avoid or excavate any sites in the area in accordance with the Ontario Heritage Act, theregulations under that act and the Ministry of Tourism and Culture's Standards and Guidelines for ConsultantArchaeologists; and

(3) notify the Director as soon as reasonably possible.

COMMUNITY LIAISON COMMITTEE

34. Within three (3) months of receiving this Approval, the Company shall make reasonable efforts to establish aCommunity Liaison Committee. The Community Liaison Committee shall be a forum to exchange ideas and shareconcerns with interested residents and members of the public. The Community Liaison Committee shall be established by:

(1) publishing a notice in a newspaper with general circulation in each local municipality in which the project locationis situated; and

(2) posting a notice on the Company’s publicly accessible website, if the Company has a website;to notify members of the public about the proposal for a Community Liaison Committee and invite residents livingwithin a one (1) kilometre radius of the Facility that may have an interest in the Facility to participate on theCommunity Liaison Committee.

35. The Company may invite other members of stakeholders to participate in the Community Liaison Committee, including,but not limited to, local municipalities, local conservation authorities, Aboriginal communities, federal or provincialagencies, and local community groups.

36. The Community Liaison Committee shall consist of at least one Company representative who shall attend all meetings.

37. The purpose of the Community Liaison Committee shall be to:

(1) act as a liaison facilitating two way communications between the Company and members of the public withrespect to issues relating to the construction, installation, use, operation, maintenance and retirement of the Facility;

(2) provide a forum for the Company to provide regular updates on, and to discuss issues or concerns relating to,the construction, installation, use, operation, maintenance and retirement of the Facility with members of the public;and

(3) ensure that any issues or concerns resulting from the construction, installation, use, operation, maintenanceand retirement of the Facility are discussed and communicated to the Company.

38. The Company shall provide administrative support for the Community Liaison Committee including, at a minimum:

(1) providing a meeting space for Community Liaison Committee meetings; and

(2) providing access to resources, such as a photocopier, so that the Community Liaison Committee can:

(a) prepare and distribute meeting notices;

(b) record and distribute minutes of each meeting; and

(c) prepare reports about the Community Liaison Committee’s activities.

CONTENT COPY OF ORIGINAL

Page 207: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

39. The Company shall submit any reports of the Community Liaison Committee to the Director and post it on theCompany’s publicly accessible website, if the Company has a website.

40. The Community Liaison Committee shall meet at a minimum of twice per year or more frequently as determined to beappropriate.

41. All Community Liaison Committee meetings shall be open to the general public.

42. The Community Liaison Committee shall operate for a minimum period of two (2) years from the date of formation. At the end of the two (2) year period, the Company shall determine in consultation with the Director whether theCommunity Liaison Committee should continue operating.

43. If a Community Liaison Committee has not been established within three (3) months of receiving this Approval, theCompany shall provide a written explanation to the Director as to why this has not occurred.

OPERATION AND MAINTENANCE

44. Before construction and installation of the Equipment, including the sewage works of the transformer spill containmentfacility, the Company shall prepare a written manual for use by Company staff outlining the operating procedures and amaintenance program for the Equipment that includes as a minimum the following:

(1) routine operating and maintenance procedures in accordance with good engineering practices and asrecommended by the Equipment suppliers;

(2) inspection programs including frequency of inspection and the methods or tests employed to detect whenmaintenance is necessary;

(3) repair and maintenance programs, including the frequency of repair and maintenance;

(4) emergency procedures;

(5) procedures for any record keeping activities relating to operation and maintenance of the Equipment, includingthe sewage works of the transformer spill containment facility;

(6) all appropriate measures to minimize noise emissions from the Equipment; and

(7) any additional information requested in writing by the District Manager from time to time.

45. The Company shall;

(1) update as required the manual described in Condition No. 44; and

(2) make the manual described in Condition No. 44 available for review by staff of the Ministry upon request.

46. The Company shall ensure that the Facility is operated and maintained in accordance with the Approval and the manualdescribed in Condition No. 44.

RECORD CREATION AND RETENTION

47. The Company shall create written records consisting of the following:

(1) an operations log summarizing the operation and maintenance activities of the Facility;

(2) within the operations log, a summary of routine and Ministry staff inspections of the Facility; and

CONTENT COPY OF ORIGINAL

Page 208: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(3) a record of any complaint alleging an Adverse Effect caused by the construction, installation, use, operation,maintenance or retirement of the Facility.

48. A record described under Condition No. 47 shall include:

(1) a description of the complaint that includes as a minimum the following:

a) the date and time the complaint was made;

b) the name, address and contact information of the person who submitted the complaint;

(2) a description of each incident to which the complaint relates that includes as a minimum the following:

a) the date and time of each incident;

b) the duration of each incident;

c) the wind direction and wind speed at the time of each incident;

d) the ID of the Equipment involved in each incident and its output at the time of each incident;

e) the location of the person who submitted the complaint at the time of each incident; and(3) a description of the measures taken to address the cause of each incident to which the complaint relates and toprevent a similar occurrence in the future.

49. The Company shall retain, for a minimum of five (5) years from the date of their creation, all records described inCondition No. 20, 22 and 47, and make these records available for review by staff of the Ministry upon request.

NOTIFICATION OF COMPLAINTS

50. The Company shall notify the District Manager of each complaint within two (2) business days of the receipt of thecomplaint.

51. The Company shall provide the District Manager with the written records created under Condition No. 47 within eight(8) business days of the receipt of the complaint.

52. If the Company receives a complaint related to groundwater, the Company shall contact the District Manager withinone (1) business day of the receipt of the complaint, to discuss appropriate measures to manage any potential groundwaterissues.

CHANGE OF OWNERSHIP

53. The Company shall notify the Director in writing, and forward a copy of the notification to the District Manager,within thirty (30) days of the occurrence of any of the following changes:

(1) the ownership of the Facility;

(2) the operator of the Facility;

(3) the address of the Company;

(4) the partners, where the Company is or at any time becomes a partnership and a copy of the most recentdeclaration filed under the Business Names Act, R.S.O. 1990, c.B.17, as amended, shall be included in thenotification; and

(5) the name of the corporation where the Company is or at any time becomes a corporation, other than a municipalcorporation, and a copy of the most current information filed under the Corporations Information Act, R.S.O. 1990,c. C.39, as amended, shall be included in the notification.

CONTENT COPY OF ORIGINAL

Page 209: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

NOTIFICATION TO THE MINISTRY

54. The Company shall notify in writing the District Manager and the Director of the following commencement dates:

(1) Construction of the Facility; and,

(2) Operation of the Facility.

SCHEDULE A

Coordinates of the Equipment are listed below in UTM17-NAD83 projection:

The UTM coordinates of the wind turbines are:

Identifier Make and Model UTM CoordinatesEasting X (m)

UTM CoordinatesNorthing Y (m)

Elevation (m) Hub Height (m)

Turbine T1 SWT-2.3-101 532473 4849525 437 80

Turbine T2 SWT-2.3-101 532805 4849467 437 80

Turbine T3 SWT-2.3-101 533042 4849278 438 80

Turbine T4 SWT-2.3-101 533192 4848833 440 80

Turbine T5 SWT-2.3-101 533541 4849083 440 80

Turbine T6 SWT-2.3-101 533584 4848820 442 80

Turbine T7 SWT-2.3-101 532370 4848809 437 80

Turbine T8 SWT-2.3-101 532759 4848778 437 80

Turbine T9 SWT-2.221-101 533684 4847742 451 80

Turbine T10 SWT-2.3-101 533723 4847213 460 80

The manufacturer of the SWT-2.3-101 and SWT-2.221-101 turbines is Siemens.

The transformer substation UTM coordinates are:

UTM X Easting (m) UTM Y Northing (m) Elevation (m)

533085 4849117 437

The reasons for the imposition of these terms and conditions are as follows:

REASONS

1. Condition Nos. 1 and 2 are imposed to ensure that the Facility is constructed, installed, used, operated, maintained andretired in the manner in which it was described for review and upon which Approval was granted. These conditions arealso included to emphasize the precedence of Conditions in the Approval and the practice that the Approval is based on themost current document, if several conflicting documents are submitted for review.

2. Condition Nos. 3 and 4 are included to require the Company to provide information to the public and the localmunicipality.

3. Condition Nos. 5, 6 and 7 are included to ensure that final retirement of the Facility is completed in an aestheticallypleasing manner, in accordance with Ministry standards, and to ensure long-term protection of the health and safety of thepublic and the environment.

CONTENT COPY OF ORIGINAL

Page 210: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

4. Condition Nos. 8 and 9 are intended to limit the time period of the Approval.

5. Condition Nos. 10 and 11 are included to provide the minimum performance requirement considered necessary toprevent an Adverse Effect resulting from the operation of the Equipment and to ensure that the noise emissions from theEquipment will be in compliance with applicable limits set in the Ministry's Noise Guidelines for Wind Farms (2008).

6. Condition Nos. 12 and 13 are included to ensure that the Equipment is constructed, installed, used, operated, maintainedand retired in a way that meets the regulatory setback prohibitions set out in O. Reg, 359/09 under the Act.

7. Condition Nos. 14, 15, 16 and 17 are included to require the Company to gather accurate information so that theenvironmental noise impact and subsequent compliance with the Act, O. Reg. 359/09, the Noise Guidelines for WindFarms and this Approval can be verified.

8. Condition Nos. 18, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32 and 33 are included to ensure that the Facility is constructed,installed, used, operated, maintained and retired in a way that does not result in an Adverse Effect or hazard to the naturalenvironment or any persons.

9. Condition No. 19 is included to ensure that the sewage works of the transformer spill containment facility are designedto have adequate capacity to provide spill control. This condition is also included to enable compliance with this Approval,such that the environment is protected and deterioration, loss, injury or damage to any person, property or the environmentis minimized and/or prevented.

10. Condition No. 20 is included to ensure that the sewage works of the transformer spill containment facility will beoperated and maintained in accordance with the information submitted by the Company, and to adequately manage andclean-up any oil spill from the transformer.

11. Condition No. 21 is included to establish non-enforceable effluent quality objectives which the Company is required tostrive towards on an ongoing basis. These objectives are to be used as a mechanism to trigger corrective action proactivelyand voluntarily before environmental impairment occurs.

12. Condition Nos. 22 and 23 are included to require the Company to demonstrate that the performance of the sewageworks of the transformer spill containment facility is at a level consistent with the design and effluent objectives specifiedin the Approval and is not causing any impairment to the environment.

13. Condition Nos. 34, 35, 36, 37, 38, 39, 40, 41, 42 and 43 are imposed to ensure continued communication between theCompany and the local residents.

14. Condition Nos. 44, 45 and 46 are included to emphasize that the Equipment must be maintained and operated accordingto a procedure that will result in compliance with the Act, O. Reg. 359/09 and this Approval.

15. Condition Nos. 47, 48 and 49 are included to require the Company to keep records and provide information to staff ofthe Ministry so that compliance with the Act, O. Reg. 359/09 and this Approval can be verified.

16. Condition Nos. 50, 51 and 52 are included to ensure that any complaints regarding the construction, installation, use,operation, maintenance or retirement of the Facility are responded to in a timely and efficient manner.

17. Condition No. 53 is included to ensure that the Facility is operated under the corporate name which appears on theapplication form submitted for this Approval and to ensure that the Director is informed of any changes.

18. Condition No. 54 is included to inform the Ministry of major milestone dates for the Facility.

NOTICE REGARDING HEARINGS

In accordance with Section 139 of the Environmental Protection Act, within 15 days after the service of this notice, you

CONTENT COPY OF ORIGINAL

Page 211: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

may by further written notice served upon the Director, the Environmental Review Tribunal and the EnvironmentalCommissioner, require a hearing by the Tribunal.

In accordance with Section 47 of the Environmental Bill of Rights, 1993, the Environmental Commissioner will placenotice of your request for a hearing on the Environmental Registry.

Section 142 of the Environmental Protection Act provides that the notice requiring the hearing shall state:

1. The portions of the renewable energy approval or each term or condition in the renewable energy approval in respect of which the hearing isrequired, and;2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

The signed and dated notice requiring the hearing should also include:

3. The name of the appellant;4. The address of the appellant;5. The renewable energy approval number;6. The date of the renewable energy approval;7. The name of the Director;8. The municipality or municipalities within which the project is to be engaged in;

This notice must be served upon:

The Secretary*Environmental Review Tribunal655 Bay Street, 15th FloorToronto, OntarioM5G 1E5

AND The Environmental Commissioner1075 Bay Street, 6th FloorSuite 605Toronto, OntarioM5S 2B1

AND The DirectorSection 47.5, Environmental Protection ActMinistry of the Environment2 St. Clair Avenue West, Floor 12AToronto, OntarioM4V 1L5

* Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from theTribunal at: Tel: (416) 314-4600, Fax: (416) 314-4506 or www.ert.gov.on.ca

Under Section 142.1 of the Environmental Protection Act, residents of Ontario may require a hearing by theEnvironmental Review Tribunal within 15 days after the day on which notice of this decision is published in theEnvironmental Registry. By accessing the Environmental Registry at www.ebr.gov.on.ca, you can determine when thisperiod ends.

Approval for the above noted renewable energy project is issued to you under Section 47.5 of the EnvironmentalProtection Act subject to the terms and conditions outlined above.

DATED AT TORONTO this 8th day of December, 2011Mansoor Mahmood, P.Eng.DirectorSection 47.5, Environmental Protection Act

SM/c: District Manager, MOE GuelphThomas Bird, NextEra Energy Canada

CONTENT COPY OF ORIGINAL

Page 212: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Ministry of the EnvironmentMinistère de l’Environnement

AMENDMENT TO RENEWABLE ENERGY APPROVAL

NUMBER 3558-8KTHJP

Issue Date: July 15, 2013

Conestogo Wind, LP390 Bay St, Suite 1720Toronto, OntarioM5H 2Y2

Site Location: Conestogo Wind Energy CentreBounded by SR 16, SR 18, 14th Line and Highway 6Mapleton Township, County of WellingtonN0G 1A0

You are hereby notified that I have amended Approval No. 3558-8KTHJP issued on December 8, 2011 for a class four (4)wind facility with a total name plate capacity of 22.92 MW , as follows:

A. The definition of Application on page 2 of the Approval is deleted and replaced with the following:

8. "Application" means the application for a Renewable Energy Approval dated December 16, 2010 and signed by F. AllenWiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with the applicationincluding amended documentation submitted up to November 30, 2011; and the amendment application dated March 18,2013 and signed by F. Allen Wiley, Vice President, Development, Conestogo Wind, LP, and all supporting documentationsubmitted with the Application, including amended documentation submitted up to the date this Approval is issued;

B. The location of the centre of the transformer substation as detailed in Schedule B of the Approval has beenmodified as noted below:

UTM X Easting (m) UTM Y Northing (m) Elevation (m)533,072 4,849,126 440

This Notice shall constitute part of the approval issued under Approval No. 3558-8KTHJP dated December 8, 2011

NOTICE REGARDING HEARINGS

In accordance with Section 139 of the Environmental Protection Act, within 15 days after the service of this notice, youmay by further written notice served upon the Director, the Environmental Review Tribunal and the EnvironmentalCommissioner, require a hearing by the Tribunal.

In accordance with Section 47 of the Environmental Bill of Rights, 1993, the Environmental Commissioner will placenotice of your request for a hearing on the Environmental Registry.

Section 142 of the Environmental Protection Act provides that the notice requiring the hearing shall state:

1. The portions of the renewable energy approval or each term or condition in the renewable energy approval in respect of which the hearing is

CONTENT COPY OF ORIGINAL

Page 213: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

required, and;2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

The signed and dated notice requiring the hearing should also include:

3. The name of the appellant;4. The address of the appellant;5. The renewable energy approval number;6. The date of the renewable energy approval;7. The name of the Director;8. The municipality or municipalities within which the project is to be engaged in;

This notice must be served upon:

The Secretary*Environmental Review Tribunal655 Bay Street, 15th FloorToronto, OntarioM5G 1E5

AND The Environmental Commissioner1075 Bay Street, 6th FloorSuite 605Toronto, OntarioM5S 2B1

AND The DirectorSection 47.5, Environmental Protection ActMinistry of the Environment2 St. Clair Avenue West, Floor 12AToronto, OntarioM4V 1L5

* Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from theTribunal at: Tel: (416) 212-6349, Fax: (416) 314-3717 or www.ert.gov.on.ca

Under Section 142.1 of the Environmental Protection Act, residents of Ontario may require a hearing by theEnvironmental Review Tribunal within 15 days after the day on which notice of this decision is published in theEnvironmental Registry. By accessing the Environmental Registry at www.ebr.gov.on.ca, you can determine when thisperiod ends.

Approval for the above noted renewable energy project is issued to you under Section 47.5 of the EnvironmentalProtection Act subject to the terms and conditions outlined above.DATED AT TORONTO this 15th day of July, 2013

Vic Schroter, P.Eng.DirectorSection 47.5, Environmental Protection Act

DM/c: District Manager, MOE GuelphThomas Bird, NextEra Energy Canada, ULC

CONTENT COPY OF ORIGINAL

Page 214: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX C

Page 215: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2270

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250

Serial No. 3003575

Preamplifier

Make and Type Brüel & Kjær Preamplifier Type ZC-0032

Serial No. 19187

Microphone

Make and Type Brüel & Kjær ½” Sound Microphone Type 4189

Serial No. 2870433

Calibrator

Make and Type Larson-Davis CAL200 precision acoustic calibrator (1000 Hz)

Serial No. Various

Page 216: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2250

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250

Serial No. 3006066

Preamplifier

Make and Type Brüel & Kjær Preamplifier Type ZC-0032

Serial No. 20423

Microphone

Make and Type Brüel & Kjær ½” Sound Microphone Type 4189

Serial No. 2820087

Calibrator

Make and Type Larson-Davis CAL200 precision acoustic calibrator (1000 Hz)

Serial No. Various

Page 217: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2250

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250

Serial No. 3004068

Preamplifier

Make and Type Brüel & Kjær Preamplifier Type ZC-0032

Serial No. 19685

Microphone

Make and Type Brüel & Kjær ½” Sound Microphone Type 4189

Serial No. 2877087

Calibrator

Make and Type Larson-Davis CAL200 precision acoustic calibrator (1000 Hz)

Serial No. Various

Page 218: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX D

Page 219: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or
Page 220: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX E

Page 221: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Conestogo Wind Farm, 1301142

Measurement Duration March 19, 2014 to October 31, 2014

Wind Speed 0 to 16 m/s

Temperature -16 to 22˚C

General Weather Conditions Weather conditions varied significantly over the measurement campaign

Wind Rose Plot Found in Figure 4 and 5

Signed Statement by the Operator Found in Appendix D

Table E1 - Summary of Measurement Conditions

Page 222: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX F Spring 2013 Audit Report

Page 223: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

This document is intended for the sole use of the party to whom it is addressed and may contain information that is

privileged and/or confidential. If you have received this in error, please notify us immediately.

® RWDI name and logo are registered trademarks in Canada and the United States of America

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Tel: 519.823.1311

Fax: 519.823.1316

RWDI AIR Inc.

650 Woodlawn Road West

Guelph, Ontario, Canada

N1K 1B8

Report Conestogo Wind Farm

Acoustic Audit Report - Immission

Spring 2013 Audit Report

RWDI # 1301142

August 8, 2013

SUBMITTED TO

Douglas McIntosh

NextEra Energy Canada

390 Bay Street, Suite 1720

Toronto, ON M5H 2Y2

[email protected]

SUBMITTED BY

Greg Conley, M.Eng., P.Eng.

Senior Project Manager / Principal

[email protected]

Aaron Haniff, B.A.Sc. EIT

Senior Scientist

[email protected]

Page 224: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

EXECUTIVE SUMMARY

Conestogo Wind, LP retained RWDI AIR Inc. to conduct an acoustic audit - immission of the Conestogo

Wind Energy Centre located in Mapleton Township, Ontario. The purpose of this audit is to capture long-

term acoustic measurements of the sound level produced by the operation of the wind turbines for

comparison with the applicable Ministry of the Environment sound level limits. This audit report is the first

of two immission audit reports as required by the Renewable Energy Approval (REA) for the facility.

The project was developed by NextEra Energy Canada, ULC. The facility is owned by Conestogo Wind,

LP, a wholly owned subsidiary of NextEra Energy Canada, ULC. The wind farm consists of nine (9)

Siemens AG 2.3 MW wind turbines, one (1) Siemens AG 2.22 MW wind turbine, and one (1) transformer

substation. The total nameplate capacity of the wind farm is 22.92 MW.

Unattended measurements were conducted at three (3) representative points of reception to assess

sound immissions from the wind turbine site. The spring measurement program began on April 23rd,

2013 and ended on August 2, 2013. The lack of data points in each integer wind speed bin for both the

turbine operational and parked scenarios required the continuation of the sampling program well past the

end of April. Because of unexpected weather conditions, the full data set was not obtained at the three

points of reception for both the turbine operational and parked scenarios.

The facility is required to meet the sound level limits identified in the REA. The minimum number of

measurement intervals was not obtained for both the turbine operational and parked conditions. However,

based on the available data, the facility appears to be in compliance with the sound level limits identified

in the REA.

For the second acoustic audit – immission test for the October – November time period, the following

recommendations are made based on feedback received from the Ministry during this test measurement

program:

• Weather instrumentation will be co-located with the sound level meters (instead of a centrally

located weather station); and

• The equipment will be mobilized by September 1, 2013 in advance of the October – November

time period.

Page 225: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................................................... 1

2. FACILITY DESCRIPTION .................................................................................................................... 1

3. INSTRUMENTATION ........................................................................................................................... 2

3.1 Acoustic Instrumentation ............................................................................................................... 2

3.2 Non-Acoustic Instrumentation ....................................................................................................... 2

3.3 Calibration ..................................................................................................................................... 3

4. MEASUREMENT PROCEDURE .......................................................................................................... 3

4.1 Noise Measurement Location ....................................................................................................... 3

4.2 Wind Measurement Location ........................................................................................................ 3

4.3 Acoustic Measurements ................................................................................................................ 4

4.4 Non-Acoustic Measurements ........................................................................................................ 4

4.5 Number of Measurement Intervals ................................................................................................ 5

5. ACOUSTIC AUDIT PROCEDURE ....................................................................................................... 5

5.1 Points of Reception ....................................................................................................................... 5

5.2 Time of Measurements ................................................................................................................. 6

6. DATA PROCESSING ........................................................................................................................... 6

6.1 Data Reduction and Filtering ......................................................................................................... 6

6.2 Effects of Insects and Fauna ......................................................................................................... 7

6.3 Data Analysis ................................................................................................................................ 7

6.4 Determination of Turbine Sound Level ......................................................................................... 7

6.5 Tonal Assessment ......................................................................................................................... 8

7. ASSESSMENT OF COMPLIANCE ...................................................................................................... 8

8. RECOMMENDATIONS ......................................................................................................................... 8

Page 226: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Tables

Table 1: Valid Total Sound Data for Point of Reception A

Table 2: Valid Total Sound Data for Point of Reception B

Table 3: Valid Total Sound Data for Point of Reception C

Table 4: Valid Ambient Sound Data for Point of Reception A

Table 5: Valid Ambient Sound Data for Point of Reception B

Table 6: Valid Ambient Sound Data for Point of Reception C

Table 7: Summary of Sound Levels at Point of Reception A

Table 8: Summary of Sound Levels at Point of Reception B

Table 9: Summary of Sound Levels at Point of Reception C

Figures

Figure 1: Conestogo Wind Farm - Noise Monitor Locations

Figure 2: Valid LEQ Data at Point of Reception A

Figure 3: Valid LEQ Data at Point of Reception B

Figure 4: Valid LEQ Data at Point of Reception C

Figure 5: Wind Rose Plot

Appendices

Appendix A: Zoning Information

Appendix B: Renewable Energy Approval

Appendix C: Equipment List

Appendix D: Signed Statement

Appendix E: Conditions during the Measurements

Page 227: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 1

1. INTRODUCTION

Conestogo Wind, LP retained RWDI AIR Inc. (RWDI) to conduct an acoustic audit - immission of the

Conestogo Wind Energy Centre (Conestogo) located in Mapleton Township, Ontario. The purpose of this

audit is to capture long-term acoustic measurements of the sound level produced by the operation of the

wind turbines for comparison with the applicable Ministry of the Environment (MOE) sound level limits.

This immission audit is intended to meet the requirements of Part D of the MOE publication “Compliance

Protocol for Wind Turbine Noise” (Protocol).

The wind turbines and ancillary equipment are located on privately owned farmland through a legal

agreement between the landowner and Conestogo. The zoning within the project area and surrounding

areas is agricultural. The acoustic environment surrounding the project area is rural and is influenced

primarily by road traffic, farming activities and sounds of nature. Zoning information is included in

Appendix A.

The facility’s Renewable Energy Approval (REA) number 3558-8KTHJP dated December 8, 2011 and an

amendment dated July 15, 2013 are provided in Appendix B. Condition 14 of the REA requires

Conestogo to complete a spring and a fall acoustic audit – immission test. This is the first of two reports

presenting the results of the spring period immission audit test.

Unattended measurements were conducted at three (3) representative points of reception to assess

sound immissions from the wind turbine site. The points of reception were selected based historical

weather data for the area and the modelling results provided in the “Conestogo Wind Farm Noise

Assessment" (Noise Report), dated December 2010 and prepared by GENIVAR Consultants LP.

A detailed discussion of the audit procedures and data analysis is provided in the subsequent sections.

2. FACILITY DESCRIPTION

The project was developed by NextEra Energy Canada, ULC. The facility is owned by Conestogo Wind,

LP, a wholly owned subsidiary of NextEra Energy Canada, ULC. The Conestogo wind farm became

operational on December 20 of 2012.

For the purposes of this audit, the project site is generally bounded by Side Road 16 to the west,

Wellington Road 12 to the east, 14th Line to the south, and 16th Line to the north, in Mapleton Township,

County of Wellington.

The Conestogo wind farm consists of nine (9) Siemens AG 2.3 MW wind turbines, one (1) Siemens AG

2.22 MW wind turbine, and one (1) transformer substation. The total nameplate capacity of the wind farm

is 22.92 MW. All turbines have a hub height of 80 m above local grade.

Page 228: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 2

3. INSTRUMENTATION

All instrumentation used for the immission testing followed the requirements set out in the Protocol.

3.1 Acoustic Instrumentation

The measurements were conducted using two (2) Brüel & Kjær 2250 and one (1) Larson Davis model

824 Type 1 precision integrating sound level meters. A list of the acoustic equipment including serial

numbers is provided in Appendix C. A Marantz PMD620 professional handheld digital audio recorder

was used in addition to the Larson Davis 824 meter to capture audio recordings. The 2250 sound level

meters are capable of recording both sound level and audio. Each sound monitoring site meets the

following requirements:

• Type 1 sound level meter according to the IEC standard 61672-1 Sound Level Meter, Part 1:

Specifications;

• Class 1 or Class 2 microphone systems;

• The instrumentation having constant frequency response over at the 20 Hz to 20000Hz frequency

range;

• The filters meeting the requirements of IEC 61620 for Class 1 filters; and

• The instrumentation being capable of measuring audio recordings continuously during the

measurement campaign, at sampling rate of at least 8000 Hz.

All three sound monitoring locations were calibrated both before and after the measurement campaign

using either a Larson-Davis CAL200 or CAL250 precision acoustic calibrator. The calibrator's accuracy is

equal to or better than +/- 0.3 dB and is Class 1 according to IEC 60942 within the temperature range of

this measurement program.

In addition to the 90mm diameter primary wind screen that is commonly used for long term monitoring

campaigns, a secondary 500mm diameter wind screen was deployed at each location that meets the

specification as indicated in IEC 61400-11.

3.2 Non-Acoustic Instrumentation

The meteorological station met the system requirements as required in the Protocol. The weather station

consisted of a Campbell Scientific weather console using a CR200 data logging system, a R.M. Young

05103-10 wind anemometer and other auxiliary measurement instrumentation for temperature and

relative humidity. This weather monitoring system meets the requirements of signal processing having a

maximum deviation of +/- 0.2 m/s in the wind speed range from 4 m/s to 12 m/s. The anemometer itself

has accuracy equal to or better than +/- 0.2 m/s at 10 m/s and an output resolution equal to or less than

+/- 0.1 m/s. The anemometer measures wind direction within 5 degrees.

Page 229: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 3

3.3 Calibration

All relevant acoustic equipment has calibration records that are traceable to an accredited acoustic

laboratory and are within the valid calibration recertification time. All other equipment is within calibration

range and recertification time.

4. MEASUREMENT PROCEDURE

4.1 Noise Measurement Location

Microphone Height

The microphones were located at a height of approximately 4.5 metres above ground representing a 2

storey residence. This height is consistent with dwellings located at the points of reception in this study

and the modelled receptor heights identified in the Noise Report.

Microphone Position

The microphones were located as close to the dwelling as practically possible or in an acoustically

equivalent location in accordance with the Protocol as appropriate. More specifically, the microphones

were located more than 5 m away from any large reflecting surface and away from trees or foliage that

could affect the measurements. The monitor positions were also not shielded from the wind turbine noise.

4.2 Wind Measurement Location

The Protocol requires the wind measurement location be in close proximity to the sound measurement

location. For this project study, the weather measurement location was centrally located on the site as

shown in Figure 1. RWDI is of the opinion that this location is preferred (as opposed to co-locating

weather instruments with the sound level meter) and representative of the meteorological conditions at

the points of reception for the following reasons:

• the terrain between the turbines and the points of reception is generally flat and open with

minimal obstructions (e.g., buildings, tree rows or forested areas);

• most important in terms of sound transmission through the atmosphere is not what the

meteorology is at the receptor, rather what the average meteorology is between the source and

the receptor; and

• the distance between the points of reception and the closest group of turbines is approximately 1

km.

From a meteorological perspective the integer wind speed values required for this study are consistent

with a large weather front that generally doesn’t see a lot of variability in wind speed or wind direction at a

given time over this distance. The best estimate of the meteorology affecting the sound pathway between

the wind turbines and the three points of reception is a centrally located weather station.

Regardless of the reasoning above, the 2nd measurement session (fall 2013) will include weather

instruments at each point of reception. This change in approach follows recent discussions with MOE

staff at the Environmental Approvals Branch.

Page 230: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 4

The weather measurement location was not shielded by nearby buildings or obstructions. Weather

measurements were obtained at a height of 10 m.

4.3 Acoustic Measurements

Turbines Operational

All monitoring locations were configured to log one-minute statistical sound level data. The key statistical

data used in the analysis is the A-weighted one-minute energy equivalent sound level (LEQ dBA). Audio

recordings were also logged on a continual basis for both sound identification and tonality assessment

purposes. Small interruptions in the data set occurred during daytime hours while weekly checks and

maintenance was conducted by RWDI personnel. All monitoring stations were time synchronized with

each other and the meteorological station.

Appendix D includes a statement signed by an authorized representative of the Conestogo wind farm

confirming that all wind turbines were operating as normal for the duration of time periods for the valid

measured data.

Turbines Parked

Turbines were parked on two different occasions to establish ambient sound levels as per the guidance

included in the Protocol. Acoustic measurements during parked conditions were obtained on May

23rd/24th and May 24th/25th 2013. During the parked conditions all turbines were parked and the

measured sound levels at the point of reception were representative of ambient background levels. The

shutdown conditions occurred during the normal audit period between the hours of 22:00 and 05:00. The

sound level and meteorological monitoring stations were fully operational and logging the same statistical

data as the turbine operational scenario. Ambient measurements were completed during the same

general measurement period as for the turbines operational scenario.

4.4 Non-Acoustic Measurements

The meteorological station was configured to continuously log the appropriate statistical parameters and

outputted one-minute averaged data or instantaneous data where applicable. The station was configured

to log the following data on one-minute intervals:

• average wind speed (m/s);

• maximum wind speed (m/s);

• minimum wind speed (m/s);

• average wind direction (azimuth degrees);

• average temperature (degrees Celsius); and

• average relative humidity (percentage).

As was mentioned previously, all stations (sound and weather) were time synchronized.

Page 231: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 5

4.5 Number of Measurement Intervals

Turbines Operational

The Protocol requires that no less than 120 one-minute intervals are required to be measured for each

integer wind speed for the data set to be considered large enough to conduct the analysis and to be able

to assess compliance. Wind speed measurements are rounded to the nearest integer prior to “binning”.

Turbines Parked

Ambient sound measurements were completed with all turbines parked. The Protocol states that no less

than 60 one-minute intervals are required to be measured for each integer wind speed for the data set to

be considered large enough to determine the ambient sound level. Wind speed measurements are

rounded to the nearest integer prior to “binning”.

5. ACOUSTIC AUDIT PROCEDURE

5.1 Points of Reception

Condition 14 (2) of the REA requires three (3) different points of reception that represent the location of

the greatest predicted points of impact and that are located in the direction of the prevailing winds.

Additionally, the Protocol states that the points of reception should represent worst-case non-participating

receptors.

Selected points of receptions were identified based on those expected to be most impacted by sounds

from the operation of the wind farm. The most impacted points of reception were determined from the

noise contours provided in the Noise Report. These points of reception were further refined to downwind

locations that would receive a reasonable frequency of prevailing winds for the current season (i.e., west

to south to east winds). This review resulted in points of reception being ideally positioned to the

northwest, north, and east of the wind farm.

Based on the above, receptor number 65, 114 and 21 (as identified in the Noise Report) were selected as

the three worst-case non-participating receptor locations in the direction of the prevailing winds.

For reasons described below the sound level meters could not be located at these non-participating

receptors and have been instead located at alternative locations that are acoustically equivalent and

conservative.

Point of Reception A - participating receptor P6 in the Noise Report (labelled 6 in Figure 1) is in an area

considered acoustically equivalent to non-participating receptor 65. Receptor 65 did not want to

participate in this audit and would not allow access to their property. Further, the residence is surrounded

by a fairly dense woodlot that would introduce contamination of the measurements. The sound level

monitor was positioned as close as possible to receptor 65 on the property of a participating receptor (P6).

Fencing prevented the monitor from being located further to the southeast which would have been

Page 232: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 6

preferred to be more in line with receptor 65. Location A is expected to experience conservative sound

levels (i.e., closer to 40 dBA contour) and allow for less interference from extraneous noise sources (i.e.,

less potential influence from trees), yet has similar setbacks to the same turbines and roadways as

receptor 65.

Point of Reception B - participating receptor P1 in the Noise Report (labelled 1 in Figure 1) is in an area

considered acoustically equivalent to vacant lot receptor 114, and is also indicative for non-participating

receptor 92. This location is considered to be conservative relative to the nearest non-participating

receptors (i.e., closer to 40 dBA contour) and is positioned to reduce interference from noise associated

with farms and businesses that can operate 24 hours a day at P1 and receptor 92 and the nearby road.

Point of Reception C - participating receptor P3 in the Noise Report (labelled 3 in Figure 1) is in an area

considered acoustically equivalent to non-participating receptor 21. Receptor 21 was contacted to

participate in the audit however agreement on acceptable terms to locate on their property could not be

attained. Location C is expected to experience similar sound levels to receptor 21.

Locations of the points of reception and on-site and off-site receptors are identified in Figure 1. The

numeric values of the receptor locations are consistent with the Noise Report.

5.2 Time of Measurements

The REA requires acoustic audit – immission measurements be completed on two (2) separate occasions

within a period of twelve (12) months of the commencement of operation and during the lowest annual

ambient sound levels. The stated preferred times are:

1. March and April; and

2. October and November.

This report is the first of two immission audit reports. Sound level measurements at point of reception A

and the weather station commenced on April 23rd, 2013 and on April 24th, 2013 for the remaining points

of reception.

The spring measurement program ended on August 2, 2013. The lack of data points in each integer wind

speed bin for both the turbine operational and parked scenarios required the continuation of the sampling

program well past the end of April. As of the program end date, the required data set still had not been

obtained for the three points of reception for both operating scenarios.

6. DATA PROCESSING

6.1 Data Reduction and Filtering

The measurement data must be filtered in accordance with the requirements of Part D – Section D5.2 of

the Protocol. This requirement applies to both the turbine operational and parked scenarios. As

explained in Section 5.1, the REA requires the points of reception to be located in the direction of the

Page 233: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 7

prevailing winds. Additional filters including wind direction and individual events were applied to the

measurement data as required by the REA and suggested in the Protocol, respectively. The following

filters were applied to the measured data and only the data that satisfied all four conditions were used in

the subsequent analysis:

1. Measurements between 22:00 and 05:00;

2. Rainfall did not occur within one (1) hour of the measurement interval;

3. The maximum and minimum wind speed during the interval did not differ from the average by

more than 2 m/s; and

4. Removal of extraneous high level events (example: wind over microphone, traffic pass-bys,

human activities, etc.).

Precipitation data for the Elora Research Station was obtained from Environment Canada and used to

filter valid data points. Conditions during the measurement period are presented in Appendix E.

6.2 Effects of Insects and Fauna

The audio recordings were reviewed for the measurement periods and sounds from insects and fauna

were not audible. Therefore, no further data processing was completed.

6.3 Data Analysis

Following the guidance in Part D – Section D5.5 of the Protocol, the “binning method” is used to analyse

one-minute sound level data. All sound level data that correlates to wind speeds between 4 to 7 m/s

need to be grouped into integer wind speed bins. Data within each bin is +/- 0.5 m/s of the specified

integer wind speed. Data within these bins are subsequently filtered and used for further analysis as

detailed in Section 6.4.

6.4 Determination of Turbine Sound Level

The determination of the turbine sound level follows the method as described in Part D – Section D5.4 of

the Protocol. The measured data obtained for both the total sound (turbines operational) and ambient

sound (turbines parked) are first reduced and filtered as described in Section 6.1. The resulting sound

levels generated by the turbines only is the logarithmic subtraction of the measured total sound minus the

ambient sound.

The resulting valid data is plotted in Figures 2, 3 and 4 for point of receptions A through C, respectively.

Each graph is a plot of valid sound level data versus wind speed measured at the weather station. Each

plot shows the total sound, the ambient sound, and the resulting turbine only sound levels. Valid data for

each point of reception can be found in Tables 1 through 3 total sound, Tables 4 through 6 for ambient

sound, and Tables 7 through 9 for the resulting turbine only sound levels.

Page 234: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing

Acoustic Audit Report

Project #1301142

August 8, 2013

Page 8

6.5 Tonal Assessment

An assessment of tonality should be completed as per Part D, Section D5.6 of the Protocol, if it is found

to be present. Based on onsite observations during the weekly visits to the site for maintenance of the

equipment, no tones were detected at each point of reception. In addition, tonality and tonal audibility

were provided by Siemens Canada. The data presented showed that the turbines have a negative tonal

audibility which is below the positive value of 3 used for the criteria as per Part D, Section D3.8.3 of the

Protocol. As a result, the turbines are not anticipated to have a tonal component associated with their

operations.

7. ASSESSMENT OF COMPLIANCE

The facility is required to meet the sound level limits identified in the REA. For an audit scenario, the

Protocol requires a minimum of 120 one-minute intervals between 4 to 7 m/s integer wind speeds

inclusively. The applicable sound level limits and resulting turbine sound levels at each point of reception

are presented in Tables 7 through 9 for points of reception A through C, respectively.

A facility is deemed to be in compliance if the resulting turbine sound levels do not exceed the sound level

limit at each integer wind speed provided that the minimum number of one-minute measurement intervals

are achieved.

Due to weather conditions, the minimum number of measurement intervals was not obtained for both the

turbine operational and parked conditions. However, based on the available data, the facility appears to

be in compliance with the sound level limits identified in the REA.

8. RECOMMENDATIONS

For the second acoustic audit – immission test for the October – November time period, the following

recommendations are made based on feedback received from the MOE during this test measurement

program:

• Weather instrumentation will be co-located with the sound level meters (instead of a centrally

located weather station); and

• The equipment will be mobilized by September 1, 2013 in advance of the October – November

time period.

Feedback from the MOE District Office and Approvals Branch should be sought before September on the

acceptability of sampling early, and what conditions they may have regarding the use of measured

interval data before the October – November time period.

Page 235: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

TABLES

Page 236: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 1 - Valid Total Sound Data for Point of Reception A

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

4/23/2013 23:36 5.6 41.3

4/24/2013 23:01 5.2 41.8

4/24/2013 23:04 4.4 42.2

4/24/2013 23:09 4.5 40.8

4/24/2013 23:10 4.1 41.4

4/24/2013 23:14 4.7 41.9

4/24/2013 23:22 4.9 42.4

4/24/2013 23:24 4.6 41.5

4/24/2013 23:26 3.9 41.7

4/24/2013 23:29 4.2 41.0

4/24/2013 23:32 3.8 41.1

4/24/2013 23:45 4.2 41.9

4/24/2013 23:47 3.8 40.7

4/24/2013 23:49 3.7 39.9

4/24/2013 23:51 4.0 42.1

4/24/2013 23:52 4.3 40.1

4/24/2013 23:53 3.8 40.7

4/24/2013 23:54 4.0 40.6

4/24/2013 23:55 3.9 40.6

4/24/2013 23:56 3.7 41.6

4/24/2013 23:57 4.7 40.5

4/24/2013 23:59 4.5 41.0

4/25/2013 0:01 3.6 41.7

4/25/2013 0:02 3.8 38.8

4/25/2013 0:03 3.8 38.5

4/25/2013 0:04 3.5 40.4

4/25/2013 0:18 3.9 39.6

4/25/2013 0:42 3.7 38.0

4/25/2013 0:56 4.1 40.7

4/25/2013 0:58 3.9 38.8

4/25/2013 0:59 4.1 37.2

4/25/2013 1:00 3.8 38.9

4/25/2013 1:01 3.5 38.1

4/25/2013 1:02 3.8 38.4

4/25/2013 1:03 3.8 37.8

4/25/2013 1:04 4.2 38.6

4/25/2013 1:05 3.9 38.6

4/25/2013 1:06 4.4 38.8

4/25/2013 1:07 3.7 38.3

4/25/2013 1:11 3.8 38.8

4/25/2013 1:12 4.3 39.1

Day and Time of

Measurement

Page 237: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

4/25/2013 1:16 4.1 39.7

4/25/2013 1:19 4.8 40.0

4/25/2013 1:20 4.4 40.2

4/25/2013 1:21 3.9 39.3

4/25/2013 1:22 4.3 39.3

4/25/2013 1:23 3.8 38.5

4/25/2013 1:25 4.0 38.9

4/25/2013 1:26 3.6 38.7

4/25/2013 1:27 3.8 39.0

4/25/2013 1:28 3.8 38.8

4/25/2013 1:29 3.7 41.9

4/25/2013 1:30 3.7 41.0

4/25/2013 1:31 3.8 38.4

4/25/2013 1:32 4.2 38.5

4/25/2013 1:37 3.6 39.7

4/25/2013 1:38 3.6 39.9

4/25/2013 1:39 4.1 39.4

4/25/2013 1:40 4.2 39.5

4/25/2013 1:42 4.2 40.5

4/25/2013 1:43 4.7 40.3

4/25/2013 1:44 3.7 40.5

4/25/2013 1:48 4.8 39.9

4/25/2013 1:49 4.4 39.1

4/25/2013 1:50 3.8 40.2

4/25/2013 1:51 4.0 40.0

4/25/2013 1:52 4.4 40.0

4/25/2013 1:53 4.0 39.5

4/25/2013 1:54 4.6 40.3

4/25/2013 1:55 4.2 39.7

4/25/2013 1:56 4.5 39.6

4/25/2013 1:57 4.1 40.2

4/25/2013 1:58 3.8 40.3

4/25/2013 1:59 3.9 40.3

4/25/2013 2:00 3.6 39.9

4/25/2013 2:02 4.6 40.0

4/25/2013 2:03 4.5 40.5

4/25/2013 2:07 4.9 38.8

4/25/2013 2:08 3.9 39.1

4/25/2013 2:09 4.3 39.3

4/25/2013 2:10 3.8 39.1

4/25/2013 2:11 3.9 37.9

4/25/2013 2:13 4.4 39.2

4/25/2013 2:14 4.4 37.9

4/25/2013 2:15 4.1 37.5

Page 238: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

4/25/2013 2:20 3.8 36.4

4/25/2013 2:34 3.7 33.3

4/25/2013 2:50 3.7 33.5

4/25/2013 3:04 3.8 35.5

4/25/2013 3:05 3.7 34.8

4/25/2013 3:06 3.9 38.1

4/25/2013 3:14 4.1 32.9

4/25/2013 3:15 4.6 34.4

4/25/2013 3:16 4.3 36.3

4/25/2013 3:18 3.6 35.4

4/25/2013 3:22 3.7 34.1

4/25/2013 3:29 3.8 34.3

4/25/2013 3:30 4.5 36.4

4/25/2013 3:31 4.1 32.7

4/25/2013 3:32 4.0 32.2

4/25/2013 3:45 3.8 32.8

4/25/2013 3:52 3.6 35.2

4/25/2013 3:59 4.2 32.9

4/25/2013 4:24 3.7 30.0

4/25/2013 4:25 4.0 31.7

4/25/2013 4:26 3.6 31.2

4/25/2013 22:19 3.5 34.3

5/10/2013 22:33 4.1 34.6

5/10/2013 22:34 4.3 35.9

5/10/2013 22:35 3.7 41.2

5/10/2013 22:36 4.0 37.9

5/10/2013 22:37 3.7 36.4

5/10/2013 22:42 3.9 31.3

5/10/2013 22:43 4.5 30.9

5/10/2013 22:45 4.2 37.3

5/10/2013 22:48 3.9 34.8

5/10/2013 22:49 4.3 39.6

5/10/2013 22:53 4.7 30.8

5/10/2013 22:54 4.4 33.8

5/10/2013 22:57 4.3 35.7

5/11/2013 3:26 5.3 39.4

5/11/2013 3:27 5.1 37.8

5/11/2013 3:28 4.4 36.4

5/11/2013 3:31 5.9 38.9

5/11/2013 3:34 4.3 38.2

5/11/2013 3:36 3.9 39.1

5/11/2013 3:37 5.4 38.4

5/11/2013 3:38 5.1 38.5

5/11/2013 3:39 4.4 38.4

Page 239: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

5/11/2013 3:40 5.2 39.0

5/11/2013 3:46 4.9 36.7

5/11/2013 3:47 4.8 36.3

5/11/2013 3:48 3.9 37.3

5/11/2013 4:01 4.7 37.4

5/11/2013 4:17 3.7 34.5

5/11/2013 4:18 3.6 35.4

5/11/2013 4:24 5.5 35.6

5/11/2013 4:31 4.8 36.2

5/11/2013 4:32 5.0 36.1

5/11/2013 4:33 5.3 36.5

5/11/2013 4:37 4.6 35.5

5/11/2013 4:38 5.0 38.7

5/11/2013 4:39 5.8 39.4

5/11/2013 4:41 4.2 41.6

5/11/2013 4:42 5.2 41.9

5/11/2013 4:43 5.1 41.2

5/11/2013 4:47 5.8 38.0

5/11/2013 4:53 3.7 37.8

5/11/2013 4:54 3.9 38.2

5/11/2013 4:55 4.0 38.1

5/11/2013 4:56 5.0 39.9

5/11/2013 4:57 4.8 36.6

5/11/2013 4:58 4.0 40.4

6/3/2013 3:34 4.3 40.3

6/3/2013 4:06 5.3 38.8

6/3/2013 4:43 4.5 35.3

6/3/2013 4:48 4.1 40.4

6/4/2013 2:29 3.6 38.4

6/4/2013 2:33 3.5 39.5

6/4/2013 2:34 3.7 38.6

Page 240: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 2 - Valid Total Sound Data for Point of Reception B

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

4/24/2013 22:00 5.1 47.6

4/24/2013 22:01 5.0 48.5

4/24/2013 22:02 5.4 49

4/24/2013 22:03 5.2 48.7

4/24/2013 22:06 5.1 49.1

4/24/2013 22:07 4.6 49.5

4/24/2013 22:08 5.3 48.3

4/24/2013 22:09 4.1 49.5

4/24/2013 22:12 6.3 48.6

4/24/2013 22:13 5.6 48.4

4/24/2013 22:14 5.3 47.7

4/24/2013 22:15 7.2 48.1

4/24/2013 22:16 5.9 48.1

4/24/2013 22:19 6.5 48.5

4/24/2013 22:24 5.4 48

4/24/2013 22:25 6.0 48.8

4/24/2013 22:26 4.5 48.7

4/24/2013 22:27 5.3 47.8

4/24/2013 22:28 4.7 49.4

4/24/2013 22:30 6.7 48.2

4/24/2013 22:34 4.3 50.9

4/24/2013 22:36 6.2 48.6

4/24/2013 22:37 5.1 49.5

4/24/2013 22:38 4.5 49.3

4/24/2013 22:39 4.5 49

4/24/2013 22:40 4.5 48.9

4/24/2013 22:41 4.4 47.6

4/24/2013 22:42 5.3 48.7

4/24/2013 22:43 5.2 49.3

4/24/2013 22:44 4.6 48.6

4/24/2013 22:45 4.6 48.4

4/24/2013 22:46 4.9 47.8

4/24/2013 22:47 5.0 48.1

4/24/2013 22:48 5.9 47.9

4/24/2013 22:50 4.5 48.3

4/24/2013 22:51 4.7 49.8

4/24/2013 22:52 4.3 48.2

4/24/2013 22:53 4.2 48.2

4/24/2013 22:54 4.7 48

4/24/2013 22:55 4.2 48

4/24/2013 22:56 3.9 47.9

4/24/2013 22:57 4.3 47.4

Day and Time of

Measurement

Page 241: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

4/24/2013 22:58 5.3 48.6

4/24/2013 22:59 5.1 47.5

4/24/2013 23:00 4.3 47.1

4/24/2013 23:01 5.2 47.3

4/24/2013 23:02 4.6 47.3

4/24/2013 23:03 5.0 48.1

4/24/2013 23:04 4.4 47.5

4/24/2013 23:05 5.3 47.2

4/24/2013 23:06 4.5 48.7

4/24/2013 23:07 4.1 47.4

4/24/2013 23:08 4.8 47.3

4/24/2013 23:09 4.5 47.9

4/24/2013 23:10 4.1 47.5

4/24/2013 23:11 4.3 47.9

4/24/2013 23:13 4.4 47.1

4/24/2013 23:14 4.7 47.4

4/24/2013 23:15 3.8 47.3

4/24/2013 23:16 3.8 47.1

4/24/2013 23:17 4.9 47.2

4/24/2013 23:18 5.1 47.9

4/24/2013 23:19 4.5 47.7

4/24/2013 23:20 5.5 47.7

4/24/2013 23:21 5.3 47.5

4/24/2013 23:22 4.9 47.9

4/24/2013 23:23 4.4 47.7

4/24/2013 23:24 4.6 48.2

4/24/2013 23:25 4.1 47.3

4/24/2013 23:26 3.9 47.7

4/24/2013 23:27 3.8 47.5

4/24/2013 23:28 4.1 47.5

4/24/2013 23:29 4.2 47.4

4/24/2013 23:30 4.8 48.4

4/24/2013 23:31 3.8 47.4

4/24/2013 23:32 3.8 47.9

4/24/2013 23:33 3.6 47.8

4/24/2013 23:34 4.8 47.6

4/24/2013 23:35 4.5 48.5

4/24/2013 23:36 4.3 47.8

4/24/2013 23:38 4.2 48

4/24/2013 23:39 4.7 47.6

4/24/2013 23:40 4.9 48.6

4/24/2013 23:41 4.4 48.1

4/24/2013 23:42 3.8 47.5

4/24/2013 23:43 4.1 47.7

Page 242: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

4/24/2013 23:44 4.3 48

4/24/2013 23:45 4.2 47.7

4/24/2013 23:46 4.2 47.5

4/24/2013 23:47 3.8 47.3

4/24/2013 23:48 4.6 47.1

4/24/2013 23:49 3.7 47.4

4/24/2013 23:50 3.9 48.2

4/24/2013 23:51 4.0 47.5

4/24/2013 23:52 4.3 47.2

4/24/2013 23:53 3.8 47.4

4/24/2013 23:54 4.0 47.1

4/24/2013 23:55 3.9 47.6

4/24/2013 23:56 3.7 47.9

4/24/2013 23:57 4.7 47.2

4/24/2013 23:58 4.5 47.1

4/24/2013 23:59 4.5 47.3

4/25/2013 0:01 3.6 47

4/25/2013 0:02 3.8 47.1

4/25/2013 0:03 3.8 47.2

4/25/2013 0:04 3.5 47

4/25/2013 0:18 3.9 46.9

4/25/2013 0:42 3.7 47.4

4/25/2013 0:56 4.1 47

4/25/2013 0:58 3.9 46.9

4/25/2013 1:00 3.8 46.9

4/25/2013 1:01 3.5 46.9

4/25/2013 1:03 3.8 47

4/25/2013 1:04 4.2 46.9

4/25/2013 1:05 3.9 47

4/25/2013 1:06 4.4 46.9

4/25/2013 1:07 3.7 47

4/25/2013 1:11 3.8 47

4/25/2013 1:12 4.3 47

4/25/2013 1:16 4.1 47.1

4/25/2013 1:17 4.3 47.3

4/25/2013 1:18 4.5 47.3

4/25/2013 1:19 4.8 47.2

4/25/2013 1:20 4.4 47.2

4/25/2013 1:21 3.9 47.2

4/25/2013 1:22 4.3 47.1

4/25/2013 1:23 3.8 47

4/25/2013 1:26 3.6 47

4/25/2013 1:27 3.8 47.1

4/25/2013 1:28 3.8 47.2

Page 243: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

4/25/2013 1:29 3.7 47.1

4/25/2013 1:38 3.6 47.1

4/25/2013 1:39 4.1 47.2

4/25/2013 1:42 4.2 47.1

4/25/2013 1:43 4.7 47.2

4/25/2013 1:44 3.7 47.1

4/25/2013 1:45 4.2 47.1

4/25/2013 1:46 4.5 47.2

4/25/2013 1:47 4.2 47.5

4/25/2013 1:48 4.8 47

4/25/2013 1:49 4.4 47

4/25/2013 1:50 3.8 47

4/25/2013 1:51 4.0 47.1

4/25/2013 1:53 4.0 47.1

4/25/2013 1:54 4.6 47.1

4/25/2013 1:55 4.2 47.2

4/25/2013 1:56 4.5 47.1

4/25/2013 1:58 3.8 47.1

4/25/2013 1:59 3.9 47.1

4/25/2013 2:00 3.6 47

4/25/2013 2:03 4.5 47.3

4/25/2013 2:06 3.6 47.3

4/25/2013 2:07 4.9 47.5

4/25/2013 2:08 3.9 47.1

4/25/2013 2:09 4.3 47.1

4/25/2013 2:11 3.9 47

4/25/2013 2:12 4.4 47

4/25/2013 2:14 4.4 47.1

4/25/2013 2:15 4.1 46.9

4/25/2013 2:20 3.8 46.9

4/25/2013 2:34 3.7 46.7

4/25/2013 2:50 3.7 46.7

4/25/2013 3:04 3.8 47

4/25/2013 3:05 3.7 46.9

4/25/2013 3:06 3.9 47.3

4/25/2013 3:07 4.0 46.9

4/25/2013 3:13 3.7 46.8

4/25/2013 3:14 4.1 46.8

4/25/2013 3:15 4.6 47.2

4/25/2013 3:16 4.3 47

4/25/2013 3:18 3.6 46.7

4/25/2013 3:45 3.8 46.7

4/25/2013 3:52 3.6 46.7

4/25/2013 3:59 4.2 46.7

Page 244: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

4/25/2013 4:24 3.7 46.7

4/25/2013 4:26 3.6 46.7

4/25/2013 22:19 3.5 46.7

5/10/2013 22:59 3.5 46.1

5/11/2013 3:14 3.7 46.5

5/11/2013 3:15 4.3 47.3

5/11/2013 3:24 4.4 47.8

5/11/2013 3:26 5.3 47.1

5/11/2013 3:27 5.1 47.4

5/11/2013 3:28 4.4 47.4

5/11/2013 3:29 4.2 47.5

5/11/2013 3:30 5.2 48.8

5/11/2013 3:31 5.9 48.2

5/11/2013 3:32 4.8 47.5

5/11/2013 3:33 4.9 49.6

5/11/2013 3:34 4.3 48.1

5/11/2013 3:35 4.2 48.4

5/11/2013 3:36 3.9 47.3

5/11/2013 3:37 5.4 47.2

5/11/2013 3:38 5.1 46.9

5/11/2013 3:39 4.4 47.1

5/11/2013 3:40 5.2 50.2

5/11/2013 3:41 5.1 47.7

5/11/2013 3:44 5.2 47.4

5/11/2013 3:46 4.9 46.9

5/11/2013 3:47 4.8 46.5

5/11/2013 3:48 3.9 47

5/11/2013 3:49 3.9 47.1

5/11/2013 4:01 4.7 47.5

5/11/2013 4:14 5.5 46.5

5/11/2013 4:15 5.3 47.1

5/11/2013 4:16 4.9 48.2

5/11/2013 4:17 3.7 47.6

5/11/2013 4:18 3.6 47.4

5/11/2013 4:20 4.7 46.6

5/11/2013 4:23 4.7 46.9

5/11/2013 4:24 5.5 47.8

5/11/2013 4:31 4.8 48.3

5/11/2013 4:32 5.0 48.6

5/11/2013 4:33 5.3 47.7

5/11/2013 4:36 4.9 48

5/11/2013 4:37 4.6 48.3

5/11/2013 4:38 5.0 46.6

5/11/2013 4:39 5.8 46.8

Page 245: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

5/11/2013 4:40 5.3 47.6

5/11/2013 4:41 4.2 47

5/11/2013 4:42 5.2 48.1

5/11/2013 4:43 5.1 47.6

5/11/2013 4:44 4.3 46.7

5/11/2013 4:45 4.9 48.5

5/11/2013 4:46 5.4 51.7

5/11/2013 4:47 5.8 48.2

5/11/2013 4:48 5.9 48.7

5/11/2013 4:52 4.5 47.3

5/11/2013 4:53 3.7 51.2

5/11/2013 4:54 3.9 48.3

5/11/2013 4:55 4.0 50.6

5/11/2013 4:56 5.0 47.6

5/11/2013 4:57 4.8 49.7

5/11/2013 4:58 4.0 50.9

6/2/2013 22:49 5.9 48.1

6/2/2013 23:06 5.1 47

6/2/2013 23:12 4.3 47.1

6/3/2013 3:07 4.3 47.5

6/3/2013 3:32 4.8 47.1

6/3/2013 3:34 4.3 47.3

6/3/2013 3:36 4.2 47

6/3/2013 3:43 3.8 47.9

6/3/2013 3:59 6.4 47.1

6/3/2013 4:00 5.9 47.1

6/3/2013 4:04 3.6 47.9

6/3/2013 4:05 3.5 47.3

6/3/2013 4:06 5.3 47.7

6/3/2013 4:07 5.3 47.4

6/3/2013 4:09 5.5 47.3

6/3/2013 4:12 6.2 47.2

6/3/2013 4:14 4.6 47.3

6/3/2013 4:19 4.7 47.5

6/3/2013 4:22 4.1 47.3

6/3/2013 4:42 4.3 47

6/3/2013 4:48 4.1 46.9

6/3/2013 4:52 4.0 47

6/3/2013 4:53 4.4 46.9

6/4/2013 2:29 3.6 47.1

6/4/2013 2:33 3.5 47.2

6/4/2013 2:34 3.7 47.1

Page 246: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 3 - Valid Total Sound Data for Point of Reception C

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

4/26/2013 22:55 3.6 35.7

4/26/2013 23:00 3.5 36.8

4/26/2013 23:01 3.6 36.4

4/26/2013 23:02 3.9 39.9

4/26/2013 23:03 3.8 35.8

4/26/2013 23:17 3.6 34.4

4/26/2013 23:19 3.6 35.8

4/26/2013 23:35 3.7 33.2

4/26/2013 23:36 3.7 33.0

4/26/2013 23:37 3.9 33.3

4/26/2013 23:38 3.6 33.7

4/26/2013 23:39 4.2 33.9

4/26/2013 23:40 3.8 35.1

4/26/2013 23:41 3.7 36.5

4/26/2013 23:42 3.6 36.1

4/26/2013 23:43 3.7 37.2

4/26/2013 23:45 3.7 37.6

4/26/2013 23:46 3.7 38.3

4/26/2013 23:47 3.6 37.7

4/26/2013 23:49 3.9 40.1

4/26/2013 23:50 3.9 38.4

4/26/2013 23:51 3.9 41.9

4/26/2013 23:52 4.0 37.0

4/26/2013 23:53 3.9 38.4

4/26/2013 23:54 3.9 40.1

4/26/2013 23:55 3.8 36.6

4/26/2013 23:56 4.1 40.5

4/26/2013 23:57 3.9 36.3

4/26/2013 23:58 4.0 37.1

4/26/2013 23:59 3.9 37.4

4/27/2013 0:00 3.9 36.1

4/27/2013 0:02 3.8 36.0

4/27/2013 0:04 3.5 36.7

4/27/2013 0:17 3.9 38.1

4/27/2013 0:19 3.7 39.9

4/27/2013 0:20 4.0 39.9

4/27/2013 0:21 3.9 40.9

4/27/2013 0:22 3.6 40.1

4/27/2013 0:23 3.9 39.4

4/27/2013 0:24 4.2 39.8

4/27/2013 0:25 4.0 38.8

4/27/2013 0:26 4.0 38.4

Day and Time of Measurement

Page 247: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

4/27/2013 0:27 4.1 38.3

4/27/2013 0:28 3.7 39.4

4/27/2013 1:15 3.7 36.4

4/27/2013 1:16 3.5 37.9

4/27/2013 1:17 3.7 37.3

4/27/2013 1:18 3.7 38.9

4/27/2013 1:19 3.5 37.9

4/27/2013 1:20 3.6 36.8

4/27/2013 1:21 3.8 36.3

4/27/2013 1:22 3.8 36.2

4/27/2013 1:23 3.7 36.0

4/27/2013 1:24 3.9 38.9

4/27/2013 1:25 3.7 37.3

4/27/2013 1:26 3.7 38.2

4/27/2013 1:27 3.7 39.0

4/27/2013 1:28 3.7 38.9

4/27/2013 1:29 3.7 38.7

4/27/2013 1:30 3.7 37.7

4/27/2013 1:39 3.6 41.0

4/27/2013 1:57 4.1 40.5

4/27/2013 2:04 3.6 40.1

4/27/2013 2:18 6.7 42.3

4/27/2013 2:25 4.8 39.4

4/27/2013 2:26 5.1 41.3

4/27/2013 2:27 4.9 40.4

4/27/2013 2:28 5.2 39.9

4/27/2013 2:29 5.2 40.8

4/27/2013 2:31 5.3 38.3

4/27/2013 2:32 5.4 37.5

4/27/2013 2:33 5.9 37.6

4/27/2013 2:34 5.3 35.8

4/27/2013 2:35 4.6 35.8

4/27/2013 2:36 4.5 37.2

4/27/2013 2:37 3.6 36.6

4/27/2013 2:38 3.9 36.4

4/27/2013 2:40 4.5 34.7

4/27/2013 2:41 3.7 34.7

4/27/2013 2:42 3.6 34.0

4/27/2013 4:36 3.5 40.6

4/27/2013 4:40 3.7 42.2

5/12/2013 4:54 4.3 38.2

5/20/2013 2:34 3.7 37.3

5/20/2013 2:36 3.7 36.5

5/20/2013 4:47 3.6 38.7

5/20/2013 23:23 3.7 32.7

5/20/2013 23:25 3.5 33.2

Page 248: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/20/2013 23:26 4.3 33.1

5/21/2013 1:37 4.4 32.1

5/21/2013 1:50 3.6 31.4

5/21/2013 2:06 3.7 32.0

5/21/2013 2:07 3.5 32.0

5/21/2013 2:08 3.6 32.5

5/21/2013 2:18 3.6 33.9

5/21/2013 2:19 3.9 34.2

5/21/2013 2:20 4.1 34.8

5/21/2013 2:21 3.6 34.8

5/29/2013 0:30 3.5 32.6

5/29/2013 1:40 5.1 36.4

5/29/2013 1:59 4.2 36.1

5/29/2013 2:16 4.0 36.6

5/29/2013 2:18 4.0 36.0

5/29/2013 2:19 4.1 39.8

5/29/2013 2:20 4.0 39.8

5/29/2013 2:22 4.1 38.2

5/29/2013 2:23 4.7 37.4

5/29/2013 2:24 4.6 38.4

5/29/2013 2:26 5.0 37.5

5/29/2013 2:29 4.8 38.0

5/29/2013 2:37 4.7 38.0

5/29/2013 2:38 4.0 36.4

5/29/2013 2:39 4.7 38.0

5/29/2013 2:40 4.6 38.2

5/29/2013 2:41 4.2 39.0

5/29/2013 2:42 4.8 39.2

5/29/2013 2:43 4.6 39.3

5/29/2013 2:45 3.9 40.4

5/29/2013 2:46 3.8 39.7

5/29/2013 2:47 3.6 39.0

5/29/2013 2:48 4.4 37.8

5/29/2013 2:49 3.7 38.8

5/29/2013 2:50 3.8 37.2

5/29/2013 2:51 3.8 39.6

5/29/2013 2:52 3.9 39.7

5/29/2013 2:53 4.0 37.7

5/29/2013 2:54 4.3 37.0

5/29/2013 2:55 4.1 37.2

5/29/2013 2:56 4.0 39.0

5/29/2013 3:01 3.5 37.0

5/29/2013 3:05 3.9 36.9

5/29/2013 3:06 3.7 35.9

5/29/2013 3:08 4.0 36.2

5/29/2013 3:16 3.5 38.2

Page 249: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/29/2013 3:17 3.6 39.6

5/29/2013 3:18 4.1 39.5

5/29/2013 3:19 4.2 39.8

5/29/2013 3:20 4.1 40.5

5/29/2013 3:21 4.9 39.4

5/29/2013 3:22 4.6 39.5

5/29/2013 3:23 4.3 39.8

5/29/2013 3:24 4.4 39.5

5/29/2013 3:25 4.3 39.3

5/29/2013 3:26 4.2 41.3

5/29/2013 3:27 3.7 39.1

5/29/2013 3:28 4.0 43.8

5/29/2013 3:29 4.7 40.4

5/29/2013 3:30 4.7 40.2

5/29/2013 3:31 3.8 38.9

5/29/2013 3:32 4.1 39.3

5/29/2013 3:34 3.7 38.9

5/29/2013 3:35 3.6 37.7

5/29/2013 3:36 4.0 39.3

5/29/2013 3:40 4.2 40.0

5/29/2013 3:41 3.7 39.1

5/29/2013 3:42 4.6 38.7

5/29/2013 3:43 4.5 38.5

5/29/2013 3:44 4.5 49.4

5/29/2013 3:45 3.8 38.6

5/29/2013 3:46 3.6 40.2

5/29/2013 3:51 3.6 46.6

5/29/2013 3:52 4.0 47.6

5/29/2013 3:53 3.7 47.6

5/29/2013 3:54 4.6 47.9

5/29/2013 3:55 4.6 46.5

5/29/2013 3:57 4.8 47.8

5/29/2013 3:58 3.9 48.3

5/29/2013 3:59 4.7 48.1

5/29/2013 4:00 4.0 48.5

5/29/2013 4:05 3.8 45.0

5/29/2013 4:14 4.2 35.8

5/29/2013 4:15 3.9 36.6

5/29/2013 4:16 3.9 37.7

5/29/2013 4:17 3.6 36.8

5/29/2013 4:44 3.9 37.5

5/29/2013 4:45 3.8 38.3

5/29/2013 4:46 4.0 38.8

5/29/2013 4:47 4.2 40.1

5/29/2013 4:48 3.6 38.9

5/29/2013 4:54 3.9 37.5

Page 250: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/29/2013 4:56 4.0 36.3

5/29/2013 4:58 4.2 34.8

5/29/2013 4:59 3.5 41.3

5/30/2013 4:36 3.7 36.5

5/30/2013 4:37 3.7 36.0

5/30/2013 4:38 3.6 36.0

5/30/2013 4:40 3.5 43.4

5/30/2013 22:11 4.7 39.8

5/30/2013 22:27 3.9 40.5

5/30/2013 22:31 3.9 40.1

5/30/2013 22:36 4.0 41.1

5/30/2013 22:37 4.2 40.3

5/30/2013 22:38 4.3 40.7

5/30/2013 22:39 4.4 43.0

5/30/2013 22:40 4.6 40.5

5/30/2013 22:41 5.2 41.6

5/30/2013 22:42 4.6 41.8

5/30/2013 22:43 4.5 42.3

5/30/2013 22:44 4.8 41.3

5/30/2013 22:45 4.8 40.4

5/30/2013 22:46 4.7 40.8

5/30/2013 22:47 4.6 40.5

5/30/2013 22:52 4.4 40.8

5/30/2013 22:54 4.5 41.4

5/30/2013 22:56 4.3 41.2

5/30/2013 22:58 4.5 41.1

5/30/2013 22:59 4.1 40.6

5/30/2013 23:00 4.4 42.1

5/30/2013 23:01 4.1 41.7

5/30/2013 23:02 4.2 41.0

5/30/2013 23:04 3.7 40.1

5/30/2013 23:27 3.5 40.5

5/30/2013 23:28 3.9 40.9

5/30/2013 23:29 4.3 40.2

5/30/2013 23:30 4.2 40.3

5/30/2013 23:31 4.4 40.4

5/30/2013 23:32 4.3 39.6

5/30/2013 23:33 4.0 40.2

5/30/2013 23:34 4.1 40.8

5/30/2013 23:35 4.2 41.2

5/30/2013 23:36 4.0 39.7

5/30/2013 23:37 4.0 39.8

5/30/2013 23:38 3.9 39.9

5/30/2013 23:43 4.2 41.1

5/30/2013 23:46 3.7 40.0

5/30/2013 23:47 4.3 38.9

Page 251: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/30/2013 23:48 3.9 39.1

5/30/2013 23:49 4.0 40.9

5/30/2013 23:50 3.6 40.4

5/30/2013 23:51 3.7 41.0

5/30/2013 23:52 3.9 41.4

5/30/2013 23:53 4.2 41.5

5/30/2013 23:55 4.2 43.0

5/31/2013 0:03 4.6 44.2

5/31/2013 0:06 4.7 40.5

5/31/2013 0:08 4.5 42.2

5/31/2013 0:09 4.8 41.2

5/31/2013 0:10 4.7 40.5

5/31/2013 0:11 4.5 40.6

5/31/2013 0:12 4.7 40.4

5/31/2013 0:13 4.6 40.3

5/31/2013 0:14 4.5 40.4

5/31/2013 0:15 4.4 40.5

5/31/2013 0:16 4.6 42.2

5/31/2013 0:17 4.3 40.7

5/31/2013 0:18 4.2 40.0

5/31/2013 0:19 4.4 40.0

5/31/2013 0:20 4.3 40.6

5/31/2013 0:21 4.4 40.0

5/31/2013 0:22 4.3 39.8

5/31/2013 0:23 4.2 40.3

5/31/2013 0:24 3.7 39.2

5/31/2013 0:26 3.8 40.0

5/31/2013 0:27 3.9 39.8

5/31/2013 0:28 4.2 39.0

5/31/2013 0:29 4.0 39.8

5/31/2013 0:30 3.8 39.8

5/31/2013 0:31 4.1 39.0

5/31/2013 0:32 4.4 39.8

5/31/2013 0:33 4.2 40.5

5/31/2013 0:34 3.8 40.3

5/31/2013 0:35 3.6 40.9

5/31/2013 0:36 4.4 41.0

5/31/2013 0:37 4.7 40.7

5/31/2013 0:38 4.3 40.8

5/31/2013 0:39 3.8 39.8

5/31/2013 0:40 3.6 39.8

5/31/2013 0:43 3.6 40.2

5/31/2013 0:44 3.7 40.4

5/31/2013 0:46 3.5 39.8

5/31/2013 0:47 3.7 40.5

5/31/2013 0:49 3.8 40.6

Page 252: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/31/2013 0:51 3.6 40.0

5/31/2013 0:53 4.0 40.2

5/31/2013 0:54 4.1 40.7

5/31/2013 0:55 3.8 40.0

5/31/2013 0:56 3.6 40.3

5/31/2013 0:59 3.9 40.5

5/31/2013 1:01 3.5 40.3

5/31/2013 1:03 3.7 38.7

5/31/2013 1:06 3.5 40.1

5/31/2013 1:08 3.7 39.7

5/31/2013 1:18 3.5 40.5

5/31/2013 1:25 3.5 40.1

5/31/2013 1:26 3.6 39.9

5/31/2013 1:27 3.6 40.3

5/31/2013 1:32 3.6 40.3

5/31/2013 1:33 3.7 40.0

5/31/2013 1:34 3.8 39.6

5/31/2013 1:35 3.7 39.3

5/31/2013 1:36 4.0 40.3

5/31/2013 1:37 3.9 39.4

5/31/2013 1:38 4.1 39.1

5/31/2013 1:39 3.9 39.3

5/31/2013 1:40 4.1 38.6

5/31/2013 1:41 3.8 38.5

5/31/2013 1:42 3.6 39.6

5/31/2013 1:43 3.6 39.0

5/31/2013 1:44 4.2 39.0

5/31/2013 1:45 4.2 39.2

5/31/2013 1:46 4.2 38.9

5/31/2013 1:47 4.3 39.7

5/31/2013 1:48 4.3 40.1

5/31/2013 1:49 4.6 41.3

5/31/2013 1:50 4.4 40.8

5/31/2013 1:51 4.2 39.1

5/31/2013 1:52 4.6 41.3

5/31/2013 1:53 4.6 39.1

5/31/2013 1:54 4.6 38.9

5/31/2013 1:55 4.6 39.4

5/31/2013 1:57 4.3 39.6

5/31/2013 1:58 4.4 40.3

5/31/2013 1:59 4.8 40.1

5/31/2013 2:00 4.6 40.2

5/31/2013 2:01 4.7 40.0

5/31/2013 2:02 4.6 39.9

5/31/2013 2:03 4.9 39.2

5/31/2013 2:04 4.8 40.1

Page 253: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/31/2013 2:05 4.5 40.0

5/31/2013 2:06 5.0 40.1

5/31/2013 2:07 4.4 40.1

5/31/2013 2:08 4.3 40.5

5/31/2013 2:09 4.1 40.1

5/31/2013 2:10 4.4 40.0

5/31/2013 2:11 4.3 40.3

5/31/2013 2:12 3.9 40.1

5/31/2013 2:13 4.0 40.3

5/31/2013 2:14 4.0 40.1

5/31/2013 2:15 3.8 39.9

5/31/2013 2:16 3.9 39.7

5/31/2013 2:17 3.8 40.4

5/31/2013 2:18 3.8 39.9

5/31/2013 2:19 4.0 41.7

5/31/2013 2:20 4.0 40.8

5/31/2013 2:21 4.1 40.1

5/31/2013 2:22 4.0 41.1

5/31/2013 2:23 4.2 41.3

5/31/2013 2:25 4.6 39.8

5/31/2013 2:26 4.8 40.0

5/31/2013 2:27 4.3 42.5

5/31/2013 2:28 4.6 40.6

5/31/2013 2:29 4.9 40.5

5/31/2013 2:30 4.3 40.1

5/31/2013 2:31 4.4 40.8

5/31/2013 2:32 4.4 40.1

5/31/2013 2:33 4.3 40.6

5/31/2013 2:34 4.4 40.6

5/31/2013 2:35 3.9 40.6

5/31/2013 2:36 4.2 40.1

5/31/2013 2:37 3.9 40.1

5/31/2013 2:38 4.0 39.7

5/31/2013 2:39 4.0 39.7

5/31/2013 2:40 4.1 40.3

5/31/2013 2:41 3.8 39.9

5/31/2013 2:42 3.9 39.5

5/31/2013 2:43 3.9 40.1

5/31/2013 2:44 3.8 40.1

5/31/2013 2:45 3.9 40.0

5/31/2013 2:46 3.9 38.8

5/31/2013 2:47 4.1 39.8

5/31/2013 2:48 3.8 40.0

5/31/2013 2:49 3.8 40.0

5/31/2013 2:51 3.6 39.8

5/31/2013 2:55 3.6 40.3

Page 254: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/31/2013 2:56 3.7 39.8

5/31/2013 2:57 3.7 40.8

5/31/2013 3:01 3.6 39.8

5/31/2013 3:02 3.8 40.2

5/31/2013 3:07 3.7 40.6

5/31/2013 3:08 3.6 41.0

5/31/2013 3:09 3.9 40.7

5/31/2013 3:12 3.6 40.6

5/31/2013 3:13 3.7 41.4

5/31/2013 3:14 3.6 41.2

5/31/2013 3:15 3.7 41.5

5/31/2013 3:16 4.0 41.4

5/31/2013 3:17 3.8 40.6

5/31/2013 3:18 4.0 40.9

5/31/2013 3:19 3.8 41.0

5/31/2013 3:20 4.0 40.8

5/31/2013 3:21 3.8 41.2

5/31/2013 3:22 3.9 41.5

5/31/2013 3:23 3.9 41.2

5/31/2013 3:24 4.1 41.5

5/31/2013 3:25 3.9 40.6

5/31/2013 3:26 3.9 41.1

5/31/2013 3:27 3.7 40.9

5/31/2013 3:28 3.7 40.6

5/31/2013 3:29 3.7 41.0

5/31/2013 3:30 3.7 40.7

5/31/2013 3:31 4.0 40.6

5/31/2013 3:32 4.4 42.1

5/31/2013 3:33 4.3 41.2

5/31/2013 3:34 4.4 41.2

5/31/2013 3:35 4.3 40.7

5/31/2013 3:36 4.5 41.0

5/31/2013 3:37 4.2 41.7

5/31/2013 3:38 4.3 40.6

5/31/2013 3:39 4.3 41.1

5/31/2013 3:40 4.4 41.1

5/31/2013 3:41 4.6 40.7

5/31/2013 3:42 4.5 40.7

5/31/2013 3:43 4.8 41.1

5/31/2013 3:44 4.5 41.2

5/31/2013 3:45 4.5 41.0

5/31/2013 3:46 4.2 40.7

5/31/2013 3:47 4.4 41.1

5/31/2013 3:48 4.7 41.8

5/31/2013 3:49 4.9 41.3

5/31/2013 3:50 4.7 41.4

Page 255: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/31/2013 3:51 4.4 41.6

5/31/2013 3:52 4.7 41.7

5/31/2013 3:53 4.7 42.3

5/31/2013 3:54 4.4 41.8

5/31/2013 3:55 4.4 41.6

5/31/2013 3:56 4.5 41.0

5/31/2013 3:57 4.4 41.1

5/31/2013 3:58 4.9 41.5

5/31/2013 3:59 4.4 41.1

5/31/2013 4:00 4.9 41.1

5/31/2013 4:01 4.7 41.0

5/31/2013 4:02 5.0 40.9

5/31/2013 4:03 4.8 41.3

5/31/2013 4:04 4.5 41.0

5/31/2013 4:05 5.1 40.9

5/31/2013 4:06 4.4 41.0

5/31/2013 4:07 4.1 41.0

5/31/2013 4:08 4.0 40.9

5/31/2013 4:09 4.1 40.7

5/31/2013 4:10 4.3 40.8

5/31/2013 4:11 4.6 41.0

5/31/2013 4:12 4.3 40.8

5/31/2013 4:13 3.8 40.7

5/31/2013 4:14 4.1 40.4

5/31/2013 4:15 4.5 40.8

5/31/2013 4:16 3.6 41.5

5/31/2013 4:17 4.0 40.8

5/31/2013 4:18 4.2 39.8

5/31/2013 4:19 4.5 39.8

5/31/2013 4:20 4.0 40.6

5/31/2013 4:21 3.6 39.7

5/31/2013 4:22 3.8 40.2

5/31/2013 4:23 4.1 39.7

5/31/2013 4:24 4.4 39.8

5/31/2013 4:25 4.1 39.3

5/31/2013 4:26 3.8 39.5

5/31/2013 4:28 3.9 39.4

5/31/2013 4:29 3.6 38.9

5/31/2013 4:30 4.1 39.5

5/31/2013 4:31 3.6 39.4

5/31/2013 4:32 3.6 40.5

5/31/2013 4:33 3.7 39.4

5/31/2013 4:34 4.0 40.1

5/31/2013 4:35 3.7 39.5

5/31/2013 4:36 3.7 39.7

5/31/2013 4:37 3.6 39.1

Page 256: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/31/2013 4:38 3.8 39.7

5/31/2013 4:40 4.2 39.8

5/31/2013 4:41 3.5 39.9

5/31/2013 4:42 3.9 40.5

5/31/2013 4:43 3.8 40.6

5/31/2013 4:44 3.8 40.2

5/31/2013 4:49 3.8 40.1

5/31/2013 4:54 3.6 44.6

5/31/2013 22:00 4.1 38.5

5/31/2013 22:01 3.9 37.3

5/31/2013 22:02 3.8 38.1

5/31/2013 22:03 3.8 38.2

5/31/2013 22:04 3.7 37.8

5/31/2013 22:05 4.2 39.4

5/31/2013 22:06 4.5 38.6

5/31/2013 22:08 4.5 39.1

5/31/2013 22:09 4.1 38.5

5/31/2013 22:10 4.1 37.7

5/31/2013 22:11 3.8 37.6

5/31/2013 22:12 5.0 39.2

5/31/2013 22:13 4.2 39.7

5/31/2013 22:14 4.2 37.8

5/31/2013 22:15 4.4 36.7

5/31/2013 22:16 4.2 37.2

5/31/2013 22:17 4.0 38.8

5/31/2013 22:18 4.4 38.4

5/31/2013 22:19 4.7 38.9

5/31/2013 22:20 4.1 39.6

5/31/2013 22:21 4.2 39.4

5/31/2013 22:22 4.8 39.5

5/31/2013 22:23 4.8 39.2

5/31/2013 22:24 4.8 38.9

5/31/2013 22:25 5.0 39.0

5/31/2013 22:26 5.7 39.5

5/31/2013 22:27 4.6 39.7

5/31/2013 22:28 5.4 40.0

5/31/2013 22:29 5.1 39.1

5/31/2013 22:30 4.2 41.8

5/31/2013 22:31 4.4 40.3

5/31/2013 22:32 4.8 39.9

5/31/2013 22:33 4.8 39.9

5/31/2013 22:34 4.7 40.7

5/31/2013 22:35 4.6 39.2

5/31/2013 22:36 4.6 39.6

5/31/2013 22:37 4.5 41.2

5/31/2013 22:38 4.8 39.8

Page 257: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/31/2013 22:39 5.1 40.8

5/31/2013 22:40 5.1 43.3

5/31/2013 22:41 5.5 45.8

5/31/2013 22:42 5.0 42.0

5/31/2013 22:43 5.8 50.4

5/31/2013 22:44 6.4 45.6

5/31/2013 22:45 7.1 44.3

5/31/2013 22:46 7.0 48.5

5/31/2013 22:47 6.3 44.9

5/31/2013 22:48 6.1 44.8

5/31/2013 22:49 6.4 46.6

5/31/2013 22:50 7.4 41.8

5/31/2013 22:51 7.3 44.3

5/31/2013 22:52 7.0 47.1

5/31/2013 22:53 6.5 47.6

5/31/2013 22:54 6.3 42.9

5/31/2013 22:55 6.7 44.1

5/31/2013 22:56 6.6 42.8

5/31/2013 22:57 7.2 41.3

5/31/2013 22:58 6.6 42.5

5/31/2013 22:59 5.4 43.4

5/31/2013 23:00 6.3 42.4

5/31/2013 23:01 5.8 40.4

5/31/2013 23:03 7.0 39.9

5/31/2013 23:05 5.9 45.8

5/31/2013 23:06 6.1 49.2

5/31/2013 23:07 6.4 49.6

5/31/2013 23:08 5.8 45.0

5/31/2013 23:09 6.1 44.1

5/31/2013 23:10 6.2 42.3

5/31/2013 23:11 6.7 41.0

5/31/2013 23:12 6.6 41.0

5/31/2013 23:13 6.7 41.0

5/31/2013 23:14 7.3 42.2

5/31/2013 23:15 7.4 43.8

5/31/2013 23:16 6.6 42.0

5/31/2013 23:17 6.0 42.1

5/31/2013 23:18 5.4 41.2

5/31/2013 23:19 6.4 43.8

5/31/2013 23:20 6.8 40.8

5/31/2013 23:21 6.5 39.1

5/31/2013 23:22 5.8 39.0

5/31/2013 23:23 6.2 38.1

5/31/2013 23:24 5.6 38.2

5/31/2013 23:25 5.8 38.0

5/31/2013 23:26 6.2 38.6

Page 258: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

5/31/2013 23:27 6.2 38.9

5/31/2013 23:28 5.7 40.4

5/31/2013 23:29 5.5 38.5

5/31/2013 23:30 5.7 38.0

5/31/2013 23:31 5.4 39.5

5/31/2013 23:32 5.5 37.7

5/31/2013 23:33 5.8 38.3

5/31/2013 23:34 5.1 37.4

5/31/2013 23:35 4.6 38.2

5/31/2013 23:36 4.6 35.2

5/31/2013 23:37 3.8 35.4

5/31/2013 23:38 4.6 39.7

5/31/2013 23:39 5.0 35.9

5/31/2013 23:40 4.8 35.4

5/31/2013 23:41 4.6 35.4

5/31/2013 23:42 3.9 34.9

5/31/2013 23:43 4.2 33.8

5/31/2013 23:44 3.7 34.4

5/31/2013 23:45 4.0 33.4

5/31/2013 23:46 3.8 34.1

5/31/2013 23:47 4.5 33.7

5/31/2013 23:48 3.9 34.1

5/31/2013 23:49 3.9 33.5

5/31/2013 23:50 3.9 33.5

5/31/2013 23:51 3.5 33.1

5/31/2013 23:56 3.5 34.2

5/31/2013 23:57 3.7 32.4

5/31/2013 23:58 4.0 33.0

5/31/2013 23:59 4.5 33.8

6/1/2013 0:00 3.7 34.2

6/1/2013 0:02 3.8 33.4

6/1/2013 0:03 3.6 33.2

6/1/2013 0:04 3.7 33.6

6/1/2013 0:05 3.7 34.0

6/1/2013 0:06 3.8 34.6

6/1/2013 0:07 4.6 34.9

6/1/2013 0:08 4.3 35.0

6/1/2013 0:09 4.2 35.2

6/1/2013 0:10 4.4 35.9

6/1/2013 0:11 3.6 36.1

6/1/2013 0:12 4.0 35.8

6/1/2013 0:13 4.2 36.2

6/1/2013 0:14 4.7 36.1

6/1/2013 0:15 4.8 37.9

6/1/2013 0:16 4.6 36.8

6/1/2013 0:17 4.4 38.8

Page 259: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

6/1/2013 0:18 4.1 48.5

6/1/2013 0:19 4.6 41.0

6/1/2013 0:20 4.7 40.5

6/1/2013 0:21 5.1 39.5

6/1/2013 0:22 5.6 38.5

6/1/2013 0:23 5.0 38.9

6/1/2013 0:24 4.6 39.1

6/1/2013 0:25 4.6 39.5

6/1/2013 0:26 5.1 38.9

6/1/2013 0:27 4.4 38.5

6/1/2013 0:28 4.7 38.7

6/1/2013 0:29 4.4 38.8

6/1/2013 0:30 5.3 37.5

6/1/2013 0:31 4.7 39.3

6/1/2013 0:32 4.4 39.7

6/1/2013 0:33 4.6 37.8

6/1/2013 0:34 5.8 37.0

6/1/2013 0:35 4.4 37.7

6/1/2013 0:36 4.1 37.9

6/1/2013 0:37 5.2 36.3

6/1/2013 0:38 4.4 36.0

6/1/2013 0:39 4.8 36.4

6/1/2013 0:40 5.1 35.3

6/1/2013 0:41 3.9 36.6

6/1/2013 0:42 3.9 37.2

6/1/2013 0:43 4.5 36.9

6/1/2013 0:44 3.7 37.7

6/1/2013 0:45 4.3 38.2

6/1/2013 0:46 4.1 39.1

6/1/2013 0:47 4.0 39.4

6/1/2013 0:48 4.2 39.5

6/1/2013 0:49 4.4 39.2

6/1/2013 0:50 4.3 40.4

6/1/2013 0:51 4.6 39.8

6/1/2013 0:52 4.8 39.0

6/1/2013 0:53 5.0 38.9

6/1/2013 0:54 4.6 39.1

6/1/2013 0:55 4.9 38.8

6/1/2013 0:56 4.2 37.9

6/1/2013 0:57 4.9 38.6

6/1/2013 0:58 4.6 38.8

6/1/2013 0:59 4.3 38.4

6/1/2013 1:00 5.0 38.3

6/1/2013 1:01 5.3 38.8

6/1/2013 1:02 4.5 39.3

6/1/2013 1:03 4.8 39.4

Page 260: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

6/1/2013 1:04 4.4 40.1

6/1/2013 1:06 4.6 39.9

6/1/2013 1:07 4.1 39.5

6/1/2013 1:08 3.8 39.0

6/1/2013 1:09 4.1 39.0

6/1/2013 1:10 4.2 38.5

6/1/2013 1:11 5.2 39.3

6/1/2013 1:12 4.1 38.1

6/1/2013 1:13 4.6 37.7

6/1/2013 1:14 5.4 39.2

6/1/2013 1:15 5.1 38.5

6/1/2013 1:16 6.6 39.9

6/1/2013 1:17 5.5 39.3

6/1/2013 1:18 5.9 41.6

6/1/2013 1:19 5.6 41.5

6/1/2013 1:20 5.7 40.7

6/1/2013 1:21 6.0 40.6

6/1/2013 1:22 5.7 39.3

6/1/2013 1:23 5.5 40.2

6/1/2013 1:24 6.1 40.7

6/1/2013 1:25 6.2 39.6

6/1/2013 1:26 6.3 40.7

6/1/2013 1:27 6.0 41.5

6/1/2013 1:28 5.4 40.9

6/1/2013 1:29 5.9 39.8

6/1/2013 1:30 6.9 40.9

6/1/2013 1:31 6.0 40.6

6/1/2013 1:32 6.5 40.6

6/1/2013 1:33 4.9 41.7

6/1/2013 1:35 5.8 39.9

6/1/2013 1:36 6.5 42.7

6/1/2013 1:37 6.4 41.4

6/1/2013 1:38 5.1 42.1

6/1/2013 1:40 7.0 40.6

6/1/2013 1:41 7.2 41.9

6/1/2013 1:42 6.8 40.4

6/1/2013 1:44 5.6 40.8

6/1/2013 1:45 6.7 41.3

6/1/2013 1:46 6.3 41.0

6/1/2013 1:47 6.2 39.3

6/1/2013 1:48 6.3 39.6

6/1/2013 1:50 5.7 42.3

6/1/2013 1:52 5.9 44.4

6/1/2013 1:53 7.4 43.6

6/1/2013 1:54 6.8 43.1

6/1/2013 1:55 7.3 43.5

Page 261: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

6/1/2013 1:57 6.0 43.7

6/1/2013 1:58 7.0 40.2

6/1/2013 1:59 7.1 42.8

6/1/2013 2:00 7.3 39.9

6/1/2013 2:01 6.8 40.4

6/1/2013 2:02 5.9 43.1

6/1/2013 2:03 6.5 44.4

6/1/2013 2:04 6.1 43.1

6/1/2013 2:05 6.7 40.6

6/1/2013 2:06 6.9 42.2

6/1/2013 2:07 6.2 40.3

6/1/2013 2:08 6.0 39.4

6/1/2013 2:10 7.1 39.9

6/1/2013 2:11 5.4 39.4

6/1/2013 2:12 6.1 39.8

6/1/2013 2:13 6.9 40.7

6/1/2013 2:16 7.0 40.0

6/1/2013 2:17 7.3 39.8

6/1/2013 2:18 7.3 40.2

6/1/2013 2:19 7.3 41.9

6/1/2013 2:20 5.4 42.6

6/1/2013 2:21 6.4 39.8

6/1/2013 2:22 6.8 39.8

6/1/2013 2:24 5.4 39.6

6/1/2013 2:26 6.1 37.3

6/1/2013 2:27 6.0 38.1

6/1/2013 2:28 6.3 36.4

6/1/2013 2:29 6.7 35.4

6/1/2013 2:30 6.3 38.0

6/1/2013 2:31 5.1 38.0

6/1/2013 2:32 5.8 38.6

6/1/2013 2:33 5.5 36.8

6/1/2013 2:34 5.0 38.3

6/1/2013 2:35 6.0 38.6

6/1/2013 2:36 7.3 38.9

6/1/2013 2:37 5.7 39.9

6/1/2013 2:38 5.4 39.1

6/1/2013 2:39 5.0 38.7

6/1/2013 2:40 5.1 39.1

6/1/2013 2:41 5.5 36.8

6/1/2013 2:42 4.4 37.1

6/1/2013 2:43 4.7 37.3

6/1/2013 2:44 6.5 36.9

6/1/2013 2:45 7.0 37.6

6/1/2013 2:46 6.4 38.6

6/1/2013 2:47 7.0 41.1

Page 262: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

6/1/2013 2:48 6.7 39.9

6/1/2013 2:49 5.8 38.1

6/1/2013 2:50 5.9 37.9

6/1/2013 2:51 5.4 38.5

6/1/2013 2:52 5.0 40.0

6/1/2013 2:53 5.1 40.2

6/1/2013 2:54 5.1 40.3

6/1/2013 2:56 6.1 39.0

6/1/2013 2:57 4.1 38.5

6/1/2013 2:58 4.6 38.4

6/1/2013 2:59 5.5 38.2

6/1/2013 3:00 5.1 36.3

6/1/2013 3:01 5.3 36.3

6/1/2013 3:02 4.1 36.6

6/1/2013 3:03 4.4 36.4

6/1/2013 3:04 4.0 35.8

6/1/2013 3:05 5.0 36.5

6/1/2013 3:06 5.1 37.6

6/1/2013 3:07 4.8 35.7

6/1/2013 3:08 5.0 35.1

6/1/2013 3:09 4.3 35.2

6/1/2013 3:10 4.8 38.1

6/1/2013 3:11 4.5 36.0

6/1/2013 3:12 4.4 34.3

6/1/2013 3:13 3.9 34.4

6/1/2013 3:14 3.8 32.2

6/1/2013 3:16 4.8 33.7

6/1/2013 3:17 4.5 34.5

6/1/2013 3:18 5.1 34.6

6/1/2013 3:19 5.0 34.6

6/1/2013 3:20 4.4 32.7

6/1/2013 3:21 4.4 33.5

6/1/2013 3:22 5.0 35.3

6/1/2013 3:23 3.6 35.8

6/1/2013 3:26 3.6 33.1

6/1/2013 3:30 3.6 32.7

6/1/2013 3:31 3.8 31.8

6/1/2013 3:32 3.9 31.9

6/1/2013 3:33 3.6 31.8

6/1/2013 3:34 3.7 33.6

6/1/2013 3:35 3.6 31.6

6/1/2013 3:36 3.5 32.6

6/1/2013 3:39 3.8 32.6

6/1/2013 3:41 4.3 33.4

6/1/2013 3:42 3.8 32.0

6/1/2013 3:44 3.9 31.5

Page 263: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

6/1/2013 3:45 4.0 32.0

6/1/2013 4:46 4.1 35.5

6/1/2013 4:48 3.9 35.4

6/1/2013 4:49 3.6 35.0

6/1/2013 4:52 3.9 35.8

6/1/2013 4:59 3.9 37.8

6/1/2013 22:14 3.5 34.6

6/1/2013 22:17 3.6 37.3

6/1/2013 22:29 4.0 37.0

6/1/2013 22:31 3.6 34.8

6/1/2013 22:33 4.2 35.1

6/1/2013 22:35 3.8 36.6

6/1/2013 22:36 3.7 34.2

6/1/2013 22:37 3.7 33.7

6/1/2013 22:45 3.5 35.5

6/1/2013 22:46 4.0 35.8

6/1/2013 22:48 3.7 36.1

6/1/2013 22:54 3.7 33.9

6/1/2013 22:55 4.2 35.3

6/1/2013 22:56 4.1 34.7

6/1/2013 22:59 4.1 35.6

6/1/2013 23:01 3.7 35.3

6/1/2013 23:02 3.8 34.8

6/1/2013 23:03 3.9 34.1

6/1/2013 23:04 3.7 32.9

6/1/2013 23:05 4.0 32.1

6/2/2013 1:24 3.7 32.2

6/2/2013 1:49 3.9 31.7

6/2/2013 1:52 3.8 32.4

6/2/2013 1:53 3.5 32.2

6/2/2013 1:54 3.6 31.7

6/2/2013 1:55 3.9 32.4

6/2/2013 1:56 3.9 31.6

6/2/2013 1:57 3.6 33.0

6/2/2013 1:58 3.6 35.0

6/2/2013 2:01 3.7 35.3

6/2/2013 2:02 3.7 34.2

6/2/2013 2:04 3.8 35.3

6/2/2013 2:05 3.7 35.5

6/2/2013 2:06 3.8 37.0

6/2/2013 2:07 3.7 36.4

6/2/2013 2:10 4.0 37.0

6/2/2013 2:13 3.9 36.9

6/2/2013 2:19 4.4 40.8

6/2/2013 2:20 4.2 40.3

6/2/2013 2:21 3.6 40.8

Page 264: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

6/2/2013 2:22 3.8 40.6

6/2/2013 2:23 4.0 40.2

6/2/2013 2:24 3.7 40.4

6/2/2013 2:26 3.8 38.6

6/2/2013 2:27 4.2 38.2

6/2/2013 2:28 4.3 38.6

6/2/2013 2:29 4.1 39.1

6/2/2013 2:30 4.2 39.4

6/2/2013 2:31 4.2 39.8

6/2/2013 2:32 4.6 38.6

6/2/2013 2:35 4.1 37.7

6/2/2013 2:36 4.3 38.2

6/2/2013 2:37 4.0 37.6

6/2/2013 2:39 3.7 37.0

6/2/2013 2:41 3.9 36.7

6/2/2013 3:02 4.4 37.6

6/2/2013 3:03 4.7 38.2

6/2/2013 3:35 3.8 35.1

6/2/2013 3:46 3.9 32.4

6/2/2013 3:47 3.7 33.2

6/2/2013 3:48 3.5 32.2

6/2/2013 3:50 3.7 32.9

6/2/2013 3:51 4.1 33.0

6/2/2013 3:53 4.0 34.2

6/2/2013 3:54 3.9 34.7

6/2/2013 3:55 3.6 34.2

6/2/2013 3:56 4.5 34.8

6/2/2013 3:57 4.1 35.0

6/2/2013 3:58 3.8 34.7

6/2/2013 3:59 3.8 34.8

6/2/2013 4:00 3.8 34.7

6/2/2013 4:01 4.4 34.5

6/2/2013 4:02 4.3 35.4

6/2/2013 4:03 3.7 35.9

6/2/2013 4:04 3.9 36.5

6/2/2013 4:05 4.0 35.9

6/2/2013 4:06 4.7 36.4

6/2/2013 4:07 5.1 36.6

6/2/2013 4:08 4.8 35.6

6/2/2013 4:09 5.3 35.9

6/2/2013 4:10 5.0 36.2

6/2/2013 4:11 6.2 39.4

6/2/2013 4:12 5.5 39.4

6/2/2013 4:13 5.1 39.6

6/2/2013 4:14 4.3 40.2

6/2/2013 4:15 4.9 41.8

Page 265: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)Day and Time of Measurement

6/2/2013 4:16 5.3 38.2

6/2/2013 4:17 5.2 38.8

6/2/2013 4:18 4.8 41.3

6/2/2013 4:19 5.1 40.2

6/2/2013 4:20 5.0 41.1

6/2/2013 4:21 5.9 42.0

6/2/2013 4:22 4.8 41.5

6/2/2013 4:23 5.1 40.7

6/2/2013 4:24 4.7 39.8

6/2/2013 4:25 4.7 39.2

6/2/2013 4:26 5.4 40.5

6/2/2013 4:27 4.8 39.9

6/2/2013 4:28 5.6 40.8

6/2/2013 4:29 5.4 39.0

6/2/2013 4:30 4.7 37.7

6/2/2013 4:31 4.4 38.1

6/2/2013 4:32 4.7 38.6

6/2/2013 4:33 4.1 39.3

6/2/2013 4:34 4.1 40.0

6/2/2013 4:35 4.8 41.0

6/2/2013 4:36 5.1 39.9

6/2/2013 4:37 4.7 40.7

6/2/2013 4:38 4.8 38.2

6/2/2013 4:39 4.4 39.4

6/2/2013 4:40 5.4 40.0

6/2/2013 4:41 4.8 39.7

6/2/2013 4:42 4.9 40.0

6/2/2013 4:43 5.4 39.7

6/2/2013 4:44 5.7 40.4

6/2/2013 4:45 5.5 41.1

6/2/2013 4:46 4.9 41.1

6/2/2013 4:47 5.3 39.6

6/2/2013 4:48 5.0 38.8

6/2/2013 4:49 5.8 38.8

6/2/2013 4:50 5.8 39.7

6/2/2013 4:51 5.6 40.4

6/2/2013 4:52 5.7 40.6

6/2/2013 4:53 5.2 47.3

6/2/2013 4:59 4.3 49.4

Page 266: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 4 - Valid Ambient Sound Data for Point of Reception A

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

5/24/2013 1:18 6.7 42.5

5/24/2013 1:26 7.4 42.8

5/24/2013 1:38 7.0 39.9

5/24/2013 1:39 6.4 39.8

5/24/2013 1:54 6.9 43.6

5/24/2013 2:02 6.4 43.7

5/24/2013 2:03 6.4 41.9

5/24/2013 2:07 7.4 43.6

5/24/2013 2:08 6.3 46.6

5/24/2013 2:09 6.7 41.6

5/24/2013 2:10 7.4 40.2

5/24/2013 2:13 7.3 46.5

5/24/2013 2:15 7.2 42.5

5/24/2013 2:16 5.7 39.6

5/24/2013 2:17 6.4 42.7

5/24/2013 2:18 7.1 43.7

5/24/2013 2:19 6.4 45.2

5/24/2013 2:31 7.3 43.9

5/24/2013 2:32 7.3 43.4

5/24/2013 2:35 6.9 43.6

5/24/2013 2:51 7.0 42.0

5/24/2013 2:54 7.2 40.2

5/24/2013 3:01 7.2 37.0

5/24/2013 3:24 7.5 37.5

5/24/2013 3:34 6.6 40.4

5/24/2013 3:37 7.4 44.6

5/24/2013 3:41 7.1 36.6

5/24/2013 3:44 7.2 37.0

5/24/2013 3:51 6.8 38.2

5/24/2013 3:52 6.7 39.1

5/24/2013 3:53 6.6 38.6

5/24/2013 3:59 7.4 40.1

5/24/2013 4:00 7.5 39.7

5/24/2013 4:01 6.2 40.0

5/24/2013 4:03 6.9 41.9

5/24/2013 4:07 6.1 38.7

5/24/2013 4:08 5.1 37.0

5/24/2013 4:09 5.8 36.4

5/24/2013 4:10 5.9 37.9

5/24/2013 4:11 6.4 42.7

5/24/2013 4:12 6.5 38.1

Day and Time of

Measurement

Page 267: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

5/24/2013 4:13 6.6 37.4

5/24/2013 4:14 5.8 39.5

5/24/2013 4:15 4.9 35.9

5/24/2013 4:16 5.5 36.6

5/24/2013 4:17 5.5 38.9

5/24/2013 4:19 6.2 39.9

5/24/2013 4:20 6.3 40.7

5/24/2013 4:21 6.1 40.7

5/24/2013 4:22 6.3 39.9

5/24/2013 4:23 6.5 43.2

5/24/2013 4:24 6.7 38.4

5/24/2013 4:25 6.8 38.6

5/24/2013 4:26 7.1 37.3

5/24/2013 4:27 6.5 35.3

5/24/2013 4:28 7.2 36.1

5/24/2013 4:29 6.5 33.4

5/24/2013 4:30 6.9 36.4

5/24/2013 4:31 5.7 34.7

5/24/2013 4:32 6.5 34.9

5/24/2013 4:33 7.3 35.9

5/24/2013 4:34 6.8 36.8

5/24/2013 4:35 5.9 36.8

5/24/2013 4:36 5.6 37.8

5/24/2013 4:37 6.2 36.4

5/24/2013 4:41 7.0 35.4

5/24/2013 4:42 7.0 36.7

5/24/2013 4:43 7.5 37.7

5/24/2013 4:44 7.0 39.4

5/24/2013 4:45 6.5 36.3

5/24/2013 4:46 6.1 36.9

5/24/2013 4:47 7.5 35.3

5/24/2013 4:48 5.7 38.8

5/24/2013 4:49 5.4 40.1

5/24/2013 4:50 5.8 36.6

5/24/2013 4:51 5.7 36.3

5/24/2013 4:52 5.8 36.5

5/24/2013 4:53 6.9 37.4

5/24/2013 4:54 5.9 37.3

5/24/2013 4:57 7.3 41.7

Page 268: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 5 - Valid Ambient Sound Data for Point of Reception B

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

5/24/2013 1:18 6.7 48.4

5/24/2013 1:26 7.4 47.9

5/24/2013 1:38 7.0 48.3

5/24/2013 1:39 6.4 47.6

5/24/2013 1:53 7.0 49.4

5/24/2013 1:54 6.9 50.2

5/24/2013 2:02 6.4 49

5/24/2013 2:03 6.4 48.2

5/24/2013 2:07 7.4 48.7

5/24/2013 2:08 6.3 48

5/24/2013 2:09 6.7 49.5

5/24/2013 2:10 7.4 48

5/24/2013 2:13 7.3 50.6

5/24/2013 2:15 7.2 50.4

5/24/2013 2:16 5.7 48.7

5/24/2013 2:17 6.4 50.3

5/24/2013 2:18 7.1 49.5

5/24/2013 2:19 6.4 50.2

5/24/2013 2:31 7.3 49.3

5/24/2013 2:32 7.3 48.1

5/24/2013 2:51 7.0 47.4

5/24/2013 2:54 7.2 48.1

5/24/2013 3:01 7.2 48

5/24/2013 3:24 7.5 47.6

5/24/2013 3:37 7.4 48.9

5/24/2013 3:38 6.2 47.8

5/24/2013 3:41 7.1 47.2

5/24/2013 3:42 6.4 47.2

5/24/2013 3:44 7.2 47.9

5/24/2013 3:51 6.8 47.9

5/24/2013 3:59 7.4 47.9

5/24/2013 4:03 6.9 49.4

5/24/2013 4:07 6.1 48

5/24/2013 4:09 5.8 47.2

5/24/2013 4:10 5.9 47.3

5/24/2013 4:11 6.4 47.6

5/24/2013 4:12 6.5 47.6

5/24/2013 4:14 5.8 47.3

5/24/2013 4:17 5.5 47.5

5/24/2013 4:19 6.2 47.8

5/24/2013 4:20 6.3 47.6

Day and Time of

Measurement

Page 269: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

5/24/2013 4:21 6.1 48.3

5/24/2013 4:22 6.3 48.1

5/24/2013 4:25 6.8 47.3

5/24/2013 4:26 7.1 47.2

5/24/2013 4:28 7.2 47.2

5/24/2013 4:33 7.3 47.1

5/24/2013 4:34 6.8 47.2

5/24/2013 4:35 5.9 47.3

5/24/2013 4:35 5.9 47.3

5/24/2013 4:36 5.6 47.5

5/24/2013 4:36 5.6 47.5

5/24/2013 4:37 6.2 47.7

5/24/2013 4:37 6.2 47.7

5/24/2013 4:38 6.5 48.2

5/24/2013 4:38 6.5 48.2

5/24/2013 4:41 7.0 47.2

5/24/2013 4:43 7.5 47.6

5/24/2013 4:45 6.5 47.4

5/24/2013 4:48 5.7 47.2

5/24/2013 4:50 5.8 47.5

5/24/2013 4:51 5.7 47.4

5/24/2013 4:52 5.8 47.4

Page 270: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 6 - Valid Ambient Sound Data for Point of Reception C

Conestogo Wind Farm, 1301142

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

5/24/2013 1:18 6.7 44.2

5/24/2013 1:26 7.4 49.4

5/24/2013 1:38 7.0 45.7

5/24/2013 1:39 6.4 44.0

5/24/2013 1:53 7.0 53.6

5/24/2013 1:54 6.9 50.1

5/24/2013 2:02 6.4 44.6

5/24/2013 2:03 6.4 44.2

5/24/2013 2:07 7.4 44.8

5/24/2013 2:08 6.3 43.1

5/24/2013 2:09 6.7 43.8

5/24/2013 2:10 7.4 40.6

5/24/2013 2:13 7.3 43.0

5/24/2013 2:15 7.2 43.9

5/24/2013 2:16 5.7 50.5

5/24/2013 2:19 6.4 55.1

5/24/2013 2:31 7.3 52.1

5/24/2013 2:32 7.3 49.2

5/24/2013 2:35 6.9 46.0

5/24/2013 2:51 7.0 51.3

5/24/2013 2:54 7.2 43.2

5/24/2013 3:24 7.5 52.4

5/24/2013 3:34 6.6 44.4

5/24/2013 3:37 7.4 43.8

5/24/2013 3:38 6.2 41.5

5/24/2013 3:41 7.1 48.0

5/24/2013 3:42 6.4 49.8

5/24/2013 3:44 7.2 43.6

5/24/2013 3:51 6.8 49.0

5/24/2013 3:52 6.7 49.9

5/24/2013 3:53 6.6 47.6

5/24/2013 3:59 7.4 44.8

5/24/2013 4:00 7.5 44.2

5/24/2013 4:01 6.2 49.2

5/24/2013 4:03 6.9 38.2

5/24/2013 4:07 6.1 37.3

5/24/2013 4:08 5.1 40.3

5/24/2013 4:09 5.8 42.9

5/24/2013 4:10 5.9 40.8

5/24/2013 4:11 6.4 37.8

5/24/2013 4:12 6.5 38.3

5/24/2013 4:13 6.6 36.5

Day and Time of

Measurement

Page 271: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Average Wind Speed Measured Leq

(1 Minute Average) (dBA)

Day and Time of

Measurement

5/24/2013 4:14 5.8 41.4

5/24/2013 4:15 4.9 44.6

5/24/2013 4:16 5.5 45.5

5/24/2013 4:17 5.5 45.9

5/24/2013 4:20 6.3 43.4

5/24/2013 4:21 6.1 40.4

5/24/2013 4:22 6.3 40.8

5/24/2013 4:23 6.5 39.8

5/24/2013 4:24 6.7 40.5

5/24/2013 4:25 6.8 42.0

5/24/2013 4:26 7.1 39.6

5/24/2013 4:27 6.5 40.5

5/24/2013 4:28 7.2 41.8

5/24/2013 4:29 6.5 39.8

5/24/2013 4:30 6.9 40.6

5/24/2013 4:31 5.7 40.7

5/24/2013 4:32 6.5 37.8

5/24/2013 4:33 7.3 39.9

5/24/2013 4:34 6.8 38.8

5/24/2013 4:35 5.9 43.6

5/24/2013 4:36 5.6 43.6

5/24/2013 4:37 6.2 42.9

5/24/2013 4:38 6.5 43.9

5/24/2013 4:39 6.8 44.8

5/24/2013 4:40 7.3 42.7

5/24/2013 4:41 7.0 43.0

5/24/2013 4:42 7.0 42.8

5/24/2013 4:43 7.5 44.4

5/24/2013 4:44 7.0 37.3

5/24/2013 4:45 6.5 39.3

5/24/2013 4:46 6.1 39.8

5/24/2013 4:47 7.5 40.8

5/24/2013 4:49 5.4 40.6

5/24/2013 4:50 5.8 45.6

5/24/2013 4:51 5.7 47.2

5/24/2013 4:52 5.8 41.6

5/24/2013 4:53 6.9 41.3

5/24/2013 4:54 5.9 45.3

5/24/2013 4:57 7.3 50.9

Page 272: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 7 - Summary of Sound Levels at Point of Reception A

Conestogo Wind Farm, 1301142

Wind

Speed

Average LEQ for Total

Sound Condition

Average LEQ for Ambient

Sound Condition

Turbine Only Sound

Levels

REA Sound Level

Limits

Over REA

Limits?

(m/s) (dBA) (dBA) (dBA) (dBA) (Yes/No)

4 38.9 121 - 0 39 [1] 40 No

5 39.1 35 38.0 3 32 40 No

6 39.6 4 40.2 31 30 [2] 40 No

7 - 0 40.7 46 31 [2] 43 No

Notes [1] The total sound level condition is at or below the limit, so it could conservatively be assumed to be all turbine only impacts.

[2] As the ambient condition is higher than the total sound level condition, the total sound and ambient sound levels are assumed equal and therefore the

turbine only sound levels are estimated to be 10 dB lower than the ambient condition.

Total # of Valid Intervals

for Ambient Sound

Condition

Total # of Valid Intervals

for Total Sound Condition

Page 273: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 8 - Summary of Sound Levels at Point of Reception B

Conestogo Wind Farm, 1301142

Wind

Speed

Average LEQ for Total

Sound Condition

Average LEQ for Ambient

Sound Condition

Turbine Only

Sound Levels

REA Sound

Level Limits

Over REA

Limits?

(m/s) (dBA) (dBA) (dBA) (dBA) (Yes/No)

4 47.5 151 47 [1] 0 38 40 No

5 48.0 90 47.4 3 40 40 No

6 47.9 16 48.0 27 38 [2] 40 No

7 48.3 3 48.4 32 38 [2] 43 No

Notes: [1] Assumes the value is average difference between each integer wind speed (0.5 dB loss).

[2] As the ambient condition is higher than the total sound level condition, the total sound and ambient sound levels are assumed equal and therefore the

turbine only sound levels are estimated to be 10 dB lower than the ambient condition.

Total # of Valid Intervals

for Ambient Sound

Condition

Total # of Valid Intervals

for Total Sound

Page 274: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Table 9 - Summary of Sound Levels at Point of Reception C

Conestogo Wind Farm, 1301142

Wind

Speed

Average LEQ for Total

Sound Condition

Average LEQ for Ambient

Sound Condition

Turbine Only Sound

Levels

REA Sound Level

LimitsOver REA Limits?

(m/s) (dBA) (dBA) (dBA) (dBA) (Yes/No)

4 40.0 563 - 0 40 [1] 40 No

5 40.1 218 42.3 3 32 [2] 40 No

6 42.1 80 45.8 31 36 [2] 40 No

7 42.3 49 46.3 47 36 [2] 43 No

Notes: [1] The total sound level condition is at or below the limit, so it could conservatively be assumed to be all turbine only impacts

[2] As the ambient condition is higher than the total sound level condition, the total sound and ambient sound levels are assumed equal and therefore the

turbine only sound levels are estimated to be 10 dB lower than the ambient condition.

Total # of Valid

Intervals for Ambient

Sound Condition

Total # of Valid

Intervals for Total

Sound Condition

Page 275: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

FIGURES

Page 276: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

#* #*#*

#*#*#*#* #*

#*

#*

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!!

!

!

!

!!

!

!! !

!!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!!

!!

!

!!

")

")

")

16th Line

14th Line

Wellington Road 7

Side

road 1

5

18th Line

Side

road 3

Side

road 6

Side

road 1

2

15th

Sidero

ad

Charles

St W

6th Si

deroad

12th

Sidero

ad

Regio

nal R

d

C

B

A9

87 65

4

321

10

9 7

6

5

4

32

1

9594

93

92 91

90

96

88

87 8685

83

7574

73

72

71

70

69

68

67

6665

64

6362

616059

58

5756

55

52 51

32

3130

29

27

26

25

2423

22

21

20

19

18

17

16

15

14

13

12

1110

110

116120

119118

117

114

112

111

109

108

107

106

105

101

103

102

8

89

28

531000

531000

532000

532000

533000

533000

534000

534000

535000

535000

536000

536000

537000

537000

4843

800

4843

800

4844

800

4844

800

4845

800

4845

800

4846

800

4846

800

4847

800

4847

800

4848

800

4848

800

4849

800

4849

800

4850

800

4850

800

4851

800

4851

800

4852

800

4852

800

Conestogo Wind Farm - Noise Monitor Locations

Conestoga Noise Assessment, Arthur, Ontario Project #1301142

[True North

Date Revised: Aug. 7, 2013

Approx. Scale:

Figure:Drawn by: NBN

1:42,5001

Map Projection: UTM NAD 83 Zone 17N.

0 500 1,000 1,500 mService Layer Credits: FBS Imagery, 2010.Road Data: Esri v 10.0.

Legend") Noise Monitors! Offsite Noise Receptor! Onsite Noise Receptor! Vacant Lot Receptor

#* Wind TurbinesRoads

Page 277: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid

LE

Q (

dB

A)

Wind Speed (m/s)

Figure 2 - Valid LEQ Data at Point of Reception A

Operating

Parked

Turbine Only

Legend

Page 278: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

25

30

35

40

45

50

55

60

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid

LE

Q(d

BA

)

Wind Speed (m/s)

Figure 3 - Valid LEQ Data for Point of Reception B

Total Sound

Ambient Sound

Turbine Only Sound

Legend

Page 279: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid

LE

Q(d

BA

)

Wind Speed (m/s)

Figure 4 - Valid LEQ Data at Point of Reception C

Total Sound

Ambient Sound

Turbine Only Sound

Legend

Page 280: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Aug. 7, 2013Conestogo Wind Farm

ELSDrawn by: Figure:

Project #1301142 Date Revised:

5Wind Rose Plot

Page 281: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX A

Page 282: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Township ofMapleton

Parcels - Teranet 2002. County of Wellington 2010.Date: October 18, 2012Date Printed: November 19, 2012NE layer comprised of MNR Wetlands 2009GRCA Wetlands, Steep Slopes & Floodplain 2009F:\LIS\Mapleton Zoning\Mapleton Zoning - E size.mxd

Schedule A-1

WELLINGTON RD 86WELLINGTON RD 86

0 1,250 2,500 3,750 5,000625Meters

1:50,000

M1

EI

IN

INEI

EI

INININ

IN

INEI

OS1OS1

EI EI IN

IN

OS2

OS2

M1

IN

INININ

IN

ININ

IN

OS2

OS2

OS2

OS2

OS2

OS2

OS2

R1A

ININ

OS2EI

EI

IN

M1C2

C2 IN INWELLINGTON RD 86

CONC 3

CONC 4 CONC 5

CONC 6

CONC 8 EIGHTH LINE

WELLINGTON RD 8

CONC 12

WELLINGTON RD 7

CONC 14

CONC 16 SIXTEENTH LINE

FOURTEENTH LINE

WELLINGTON RD 7

TWELFTH LINE

WELLINGTON RD 8

EIGHTH LINE

SIXTH LINE

HOLLEN RD

FOURTH LINE

CONC 3 WELLINGTON RD 45

EIGHTEENTH LINEWELLINGTON RD 109 HIGHWAY 6

JONES BASELINE

WELL

INGT

ON R

D 9

SR 6

WELL

INGT

ON R

D 10

SR 15

WELL

INGT

ON R

D 11

SR 16 SR

17

WELL

INGT

ON R

D 12

SR 18

SR 19

YATT

ON SR

THIRD LINE

BLIND LINE

REID WOODS DR

SR 19SR

18

SR 16

SR 17

SR 15

SR 12

WELL

INGT

ON R

D 10

SR 6

SR 3WE

LLIN

GTON

RD

9WE

LLIN

GTON

RD

9

SR 3

SR 6

WELL

INGT

ON R

D 10

SR 12

SR 15

WELL

INGT

ON R

D 11

SR 16

SR 17

WELL

INGT

ON R

D 12

SR 18

SR 19

SR 21

SR 21

SR 19

SR 19

SR 18

SR 17

Rothsay

Moorefield

Drayton

Glen Allen

Lebanon

WallensteinWallenstein

Yatton

Alma

IN

18 17 16 15 14 13 12 11 109

87

65 2 134

23

31.212

31.2831.50

31.208

31.213

31.213

31.24

31.40

31.17

7

31.20

9

31.202

31.20

31.20

31.18

31.26

31.244

31.3831.15

31.2

31.12

31.197

31.200

31.9

31.35

31.18

131

.170

31.22

3

31.20

7

31.21531.55

31.17

31.23

31.193

31.19

0

31.6

31.5

31.32

31.78

31.118

31.1931.128

31.178

31.185

31.47

31.13

4

31.11

1

31.96

31.131.113

31.9

31.4

31.37

31.52

31.14

31.42

31.52

31.3

31.99

31.11

31.46

31.245

31.43

31.201

31.10

7

31.10

731.117

31.171

31.7

31.10

3

31.39

31.39

31.219

31.123

31.65

31.19

9

31.10

4

31.123

31.93

31.9431.119

31.173

31.199

31.100

31.143

31.83

31.10

1

31.18

3

31.21

1

31.220

31.88

31.85

31.77

31.60

31.11

6

31.81

31.7931.66

31.80

31.18

0

31.249

31.176

31.147

31.132

31.21

0

31.20

6

31.21

7

31.11

0

31.57

31.61 31.13

7

31.14

4 31.84 31.10

8

31.16

8

31.87

31.148

31.125

31.67

31.12

0

31.23

5

31.71

31.109

31.9531.131

31.16

7

31.14

131.175

31.75

31.13

0

31.19

8

31.7531

.97

31.175

31.18

7

31.9831.188

31.16

9

31.14

9

31.17

2

31.17931.69

31.62

31.63

31.18

9

31.18

2

31.150

31.68

31.74

31.91

31.101

31.56

31.12

7

31.12

2 31.102

31.40

31.40

31.127 31.40

31.7031.205

31.14531.145

31.115

31.12

431.216

31.72

31.90

31.22831.142

C1

31.139

31.231

31.23

2

31.234

31.23

3

31.23

7

31.236

31.23

8

31.239

31.2931.30C2

31.54

31.204

31.195

31.2231.36

31.21

31.166

31.14631.226

31.91

31.92

31.143

31.139

31.163

31.40

IN

OS2OS2

OS2

HOLLEN

31.241

22212019181716151413121110987654321

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

IX

VIII

VII

VI

V

IV

III

II

I

AGRICULTURAL UNSERVICED RESIDENTIAL LOW DENSITY RESIDENTIALLOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIALHIGH DENSITY RESIDENTIAL RESIDENTIAL TRANSITIONCENTRAL COMMERCIAL HIGHWAY COMMERCIALNEIGHBOURHOOD COMMERCIAL SHOPPING CENTRE COMMERCIAL AGRICULTURAL COMMERCIAL GENERAL INDUSTRIAL LIGHT INDUSTRIAL RURAL INDUSTRIALEXTRACTIVE INDUSTRIALINSTITUTIONAL OPEN SPACE OPEN SPACE CONESTOGA LAKE FUTURE DEVELOPMENT NATURAL ENVIRONMENT FLOODWAY(f) Flood SPECIAL POLICY AREA EXCEPTION ZONES

AR1AR1BR1CR2R3RTC1C2C3C4ACM1M2RINEIINOS1OS2FDNEFL(f)

XVII

XVI

XV

XIV

XIII

XII

XI

X

XVIII

XVII

XVI

XV

XIV

XIII

XII

XI

X

IX

VIII

VII

VI

V

IV

III

II

I

31.51

ABCD

31.243

31.44

31.246

AC

31.251

31.25

3

31.25

4

31.257

31.258

Con B

Con A

Page 283: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX B

Page 284: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Ministry of the EnvironmentMinistère de l’Environnement

RENEWABLE ENERGY APPROVAL

NUMBER 3558-8KTHJP

Issue Date: December 8, 2011

Conestogo Wind, LP5500 North Service Rd, No. Suite 205Burlington, OntarioL7L 6W6

ProjectLocation:

Conestogo Wind Energy CentreBounded by SR 16, SR 18, 14th Line and Highway 6Mapleton Township, County of WellingtonN0G 1A0

You have applied in accordance with Section 47.4 of the Environmental Protection Act for approval to engage in arenewable energy project in respect ofClass 4 wind facilityconsisting of the following:

- the construction, installation, operation, use and retiring of:

(a) nine (9) wind turbine generators each rated at 2.3 megawatts (MW) generating output capacity and one (1) windturbine generator rated at 2.22 MW generating output capacity with a total name plate capacity of 22.92 MW,designated as source ID Nos.T1 to T10, each with a hub height of 80 above grade, and sited at the locations shownin Schedule A and as indicated in the supporting documentation submitted with the application; and

(b) associated ancillary equipment, systems and technologies including ten (10) 690V/34.5 kV pad mountedtransformers, distribution lines, one (1) transformer substation to connect to the Hydro One distribution system,distribution lines and access roads;

all in accordance with the application for a Renewable Energy Approval dated December 16, 2010 and signed by F. AllenWiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with the application,including amended documentation submitted up to November 30, 2011.

For the purpose of this renewable energy approval, the following definitions apply:

"Acoustic Audit - Emission" means an investigative procedure that is compliant with the IEC Standard 61400-11 andconsisting of measurements and/or acoustic modelling of noise emissions produced by wind turbine generators,assessed to determine compliance with the manufacturer's noise (acoustic) equipment specifications and emissiondata of the wind turbine generators, included in the Noise Report;

1.

"Acoustic Audit - Immission" means an investigative procedure consisting of measurements and/or acousticmodelling of all sources of noise emissions due to the operation of the Equipment, assessed to determine compliancewith the Noise Performance Limits set out in this Approval;

2.

"Acoustic Audit Report - Emission" means a report presenting the results of the Acoustic Audit - Emission;3."Acoustic Audit Report - Immission" means a report presenting the results of the Acoustic Audit - Immission;4."Acoustical Consultant" means a person currently active in the field of environmental acoustics and noise/vibrationcontrol, who is familiar with Ministry noise guidelines and procedures and has a combination of formal universityeducation, training and experience necessary to assess noise emissions from wind facilities;

5.

"Act" means the Environmental Protection Act, R.S.O 1990, c.E.19, as amended;6."Adverse Effect" has the same meaning as in the Act;7."Application" means the application for a Renewable Energy Approval dated December 16, 2010 and signed by F.8.

9.

CONTENT COPY OF ORIGINAL

Page 285: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

6.7.

Allen Wiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with theapplication including amended documentation submitted up to November 30, 2011;

8.

"Approval" means this Renewable Energy Approval issued in accordance with Section 47.4 of the Act, including anyschedules to it;

9.

"A-weighting" means the frequency weighting characteristic as specified in the International ElectrotechnicalCommission (IEC) Standard 61672, and intended to approximate the relative sensitivity of the normal human ear todifferent frequencies (pitches) of sound . It is denoted as “A”;

10.

"A-weighted Sound Pressure Level" means the Sound Pressure Level modified by application of an A-weightingnetwork. It is measured in decibels, A-weighted, and denoted “dBA”;

11.

"Class 1 Area" means an area with an acoustical environment typical of a major population centre, where thebackground sound level is dominated by the activities of people, usually road traffic, often referred to as “urbanhum;

12.

"Class 2 Area" means an area with an acoustical environment that has qualities representative of both Class 1 andClass 3 Areas:

(a) sound levels characteristic of Class 1 during daytime (07:00 to 19:00 or to 23:00 hours);

(b) low evening and night background sound level defined by natural environment andinfrequent human activity starting as early as 19:00 hours (19:00 or 23:00 to 07:00hours);

(c) no clearly audible sound from Stationary Sources other than from those under impactassessment.

13.

"Class 3 Area" means a rural area with an acoustical environment that is dominated by natural sounds having little orno road traffic, such as the following:

(a) a small community with less than 1000 population;

(b) agricultural area;

(c) a rural recreational area such as a cottage or a resort area; or

(d) a wilderness area.

14.

"Company" means Conestogo Wind GP, Inc. (general partner) and Conestogo Wind, LP (limited partner) operatingin partnership as Conestogo Wind, LP, and includes it successors and assignees;

15.

"Compliance Protocol for Wind Turbine Noise" means the Ministry document Compliance Protocol for WindTurbine Noise, Guideline for Acoustic Assessment and Measurement, PIBS 8540e;

16.

"Decibel" means a dimensionless measure of Sound Level or Sound Pressure Level, denoted as dB;17."Director" means a person appointed in writing by the Minister of the Environment pursuant to section 5 of the Actas a Director for the purposes of section 47.5 of the Act;

18.

"District Manager" means the District Manager of the appropriate local district office of the Ministry where theFacility is geographically located;

19.

"Equipment" means the ten (10) wind turbine generators and associated ancillary equipment identified in thisApproval and as further described in the Application, to the extent approved by this Approval;

20.

"Equivalent Sound Level" is the value of the constant sound level which would result in exposure to the same total A-weighted energy as would the specified time-varying sound, if the constant sound level persisted over an equal timeinterval. It is denoted Leq and is measured in dB A-weighting (dBA);

21.

"Facility" means the renewable energy generation facility, including the Equipment, as described in this Approval andas further described in the Application, to the extent approved by this Approval;

22.

"IEC Standard 61400-11" means the International Standard IEC Standard 61400-11, Wind turbine generator systems– Part 11: Acoustic noise measurement techniques, 2006;

23.

"Independent Acoustical Consultant" means an Acoustical Consultant who is not representing the Company and wasnot involved in preparing the Noise Report. The Independent Acoustical Consultant shall not be retained by theAcoustical Consultant involved in the noise impact assessment;

24.

"Ministry" means the Ontario Ministry of the Environment;25."Noise Guidelines for Wind Farms" means the Ministry document entitled, Noise Guidelines for Wind Farms -26.

27.28.

CONTENT COPY OF ORIGINAL

Page 286: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

25.

Interpretation for Applying MOE NPC Publications to Wind Power Generation Facilities, dated October 2008;26.

"Noise Receptor" has the same meaning as in O. Reg. 359/09;27."Noise Report" means the report, included in the Application and entitled "Conestogo Wind Farm Noise Assessment",prepared by GENIVAR Inc., dated July 2011;

28.

"O. Reg. 359/09" means Ontario Regulation 359/09 “Renewable Energy Approvals under Part V.0.1 of the Act”made under the Act;

29.

"Point of Reception" has the same meaning as in the Noise Guidelines for Wind Farms and is subject to the samequalifications described in that document;

30.

"Sound Level" means the A-weighted Sound Pressure Level;31."Sound Level Limit" is the limiting value described in terms of the one hour A-weighted Equivalent Sound Level Leq;32."Sound Pressure" means the instantaneous difference between the actual pressure and the average or barometricpressure at a given location. The unit of measurement is the micro pascal (µPa);

33.

"Sound Pressure Level" means twenty times the logarithm to the base 10 of the ratio of the effective pressure (µPa)of a sound to the reference pressure of 20 µPa;

34.

"UTM" means Universal Transverse Mercator coordinate system.35.

You are hereby notified that this approval is issued to you subject to the terms and conditions outlined below:

TERMS AND CONDITIONS

GENERAL

1. The Company shall construct, install, use, operate, maintain and retire the Facility in accordance with the terms andconditions of this Approval and the Application.

2. Where there is a conflict between a provision of this Approval and any document submitted by the Company, theconditions in this Approval shall take precedence. Where there is a conflict between one or more of the documentssubmitted by the Company, the document bearing the most recent date shall take precedence.

3. The Company shall ensure a copy of this Approval is:

(1) accessible, at all times, by Company staff operating the Facility and;

(2) submitted to the clerk of each local municipality and upper-tier municipality in which the Facility is situated alongwith the Application.

4. If the Company has a website, the Company shall ensure that the Approval and the Application are posted on theCompany's publicly accessible website within five (5) business days of receiving this Approval.

5. The Company shall, at least six (6) months prior to the anticipated retirement date of the entire Facility, or part of theFacility, review its Decommissioning Plan Report to ensure that it is still accurate. If the Company determines that theFacility cannot be decommissioned in accordance with the Decommissioning Plan Report, the Company shall provide theDirector and District Manager a written description of plans for the decommissioning of the Facility.

6. The Facility shall be retired in accordance with the Decommissioning Plan Report and any directions provided by theDirector or District Manager.

7. The Company shall, at least six (6) months prior to the anticipated retirement date of the entire Facility, or part of theFacility, the Company shall contact the Ministry of Agriculture, Food and Rural Affairs plans for the decommissioning ofthe Facility, and follow any directions provided by that ministry in respect of the Company’s plans to restore the projectlocation to its previous agricultural capacity.

EXPIRY OF APPROVAL

8. Construction and installation of the Facility must be completed within two (2) years of the later of:

CONTENT COPY OF ORIGINAL

Page 287: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(1) the date this Approval is issued; or

(2) if there is a hearing or other litigation in respect of the issuance of this Approval, the date that this hearing orlitigation is disposed of, including all appeals.

9. This Approval ceases to apply in respect of any portion of the Facility not constructed or installed before the later of thedates identified in Condition No. 8.

NOISE PERFORMANCE LIMITS

10. The Company shall ensure that:

(1) the Sound Levels from the Equipment, at the Points of Reception identified the Noise Report, comply with theSound Level Limits set in the Noise Guidelines for Wind Farms, as applicable, and specifically as stated in the tablebelow:

Wind Speed (m/s) at 10 m height 4 5 6 7 8 9 10

Wind Turbine Sound Level Limits, dBA 40.0 40.0 40.0 43.0 45.0 49.0 51.0

(2) the Equipment is constructed and installed at either of the following locations:

a) at the locations identified in Schedule A of this Approval; or

b) at a location that does not vary by more than 10 metres from the locations identified in Schedule A ofthis Approval and provided that,

i) the Equipment will comply with Condition No. 10 (1) and

ii) all setback prohibitions established under O.Reg. 359/09 are complied with.

11. The locations identified in Table 7 of the Noise Report as “Point of Reception ID” numbers 102, 103, 105-112, and114-117 are specified as Noise Receptors for the purposes of paragraph 2 of subsection 54 (1.1) of O. Reg. 359/09 andsubclause 35 (1) (a) (ii) of O. Reg. 359/09.

12. If the Company determines that some or all of the Equipment cannot be constructed in accordance with Condition No.10 (2), prior to the construction and installation of the Equipment in question, the Company shall apply to the Director foran amendment to the terms and conditions of the Approval.

13. Within three (3) months of the completion of the construction of the Facility, the Company shall submit to the Directora written confirmation signed by the Vice President, Development, Conestogo Wind, LP that the UTM coordinates of the“as constructed” Equipment comply with the requirements of Condition No. 10 (2).

ACOUSTIC AUDIT - IMMISSION

14. The Company shall carry out an Acoustic Audit - Immission of the sound levels produced by the operation of theEquipment in accordance with the following:

(1) the acoustic audit measurements shall be undertaken in accordance with Part D of the Compliance Protocol forWind Turbine Noise;

(2) the acoustic audit measurements shall be performed by an Independent Acoustical Consultant at three (3)different Points of Reception that have been selected using the following criteria:

(a) the Points of Reception should represent the location of the greatest predicted noise impact, i.e. thehighest predicted sound level; and

CONTENT COPY OF ORIGINAL

Page 288: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(b) the Points of Reception should be located in the direction of prevailing winds from the Facility;

(3) the acoustic audit measurements shall be performed on two (2) separate occasions within a period of twelve (12)months that represent the lowest annual ambient sound levels, preferably:

(a) March and April, and

(b) October and November

15. The Company shall submit to the District Manager and the Director an Acoustic Audit Report-Immision, prepared byan Independent Acoustical Consultant, at the following points in time:

(1) no later than six (6) months after the commencement of the operation of the Facility for the first of the two (2)acoustic audit measurements at the three (3) Points of Reception; and

(2) no later than twelve (12) months after the commencement of the operation of the Facility for the second of thetwo (2) acoustic audit measurements at the three (3) Points of Reception.

ACOUSTIC AUDIT - EMISSION

16. The Company shall carry out an Acoustic Audit - Emission of the acoustic emissions produced by the operation of thewind turbine generators in accordance with the following:

(1) the acoustic emission measurements shall be undertaken in accordance with the IEC Standard 61400-11;

(2) the acoustic emission measurements shall be performed by an Independent Acoustical Consultant; and

(3) the acoustic emission measurements shall be performed on the wind turbine generator rated at 2.22 MWgenerating output capacity, and any one of the other wind turbine generators rated at 2.3 MW generating outputcapacity, used in the Facility.

17. The Company shall submit to the District Manager and the Director an Acoustic Audit Report-Emission, prepared inaccordance with Section 9 of the IEC Standard 61400-11 by an Independent Acoustical Consultant, no later than six (6)months after the commencement of the operation of the Facility.

STORMWATER MANAGEMENT

18. The Company shall employ best management practices for stormwater management and sediment and erosion controlduring construction, installation, use, operation, maintenance and retiring of the Facility, as outlined in the Application.

SEWAGE WORKS OF THE TRANSFORMER SPILL CONTAINMENT FACILITY

19. The Company shall design and construct a transformer spill containment facility which meets the followingrequirements:

(1) the spill containment area serving the transformer shall have a minimum volume equal to the volume oftransformer oil and lubricants plus the volume equivalent to providing a minimum 24-hour duration, 25-year returnstorm capacity for the stormwater drainage area around the transformer under normal operating conditions;

(2) the containment facility shall have an impervious concrete floor and walls sloped toward an outlet, maintaining afreeboard of 0.25 metres terminating approximately 0.30 metres above grade, with an impervious plastic liner orequivalent, and 1.0 metre layer of crushed stoned within;

(3) the containment pad shall drain to an oil control device, such as an oil/water separator, a pump-out sump, an oilabsorbing material in a canister or a blind sump; and

CONTENT COPY OF ORIGINAL

Page 289: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(4) the oil control device shall be equipped with an oil detection system and appropriate sewage appurtenances asnecessary (pumpout manhole, submersible pumps, level controllers, floating oil sensors, etc.) that allows for batchdischarges or direct discharges and for proper implementation of the monitoring program described in Condition No.22.

20. The Company shall:

(1) as a minimum, check the oil detection system on a monthly basis and create a written record of the inspections;

(2) ensure that the effluent is essentially free of floating and settle-able solids and does not contain oil or any othersubstance in amounts sufficient to create a visible film, sheen or foam on the receiving waters;

(3) immediately identify and clean-up all losses of oil from the transformer;

(4) upon identification of oil in the effluent pumpout, take immediate action to prevent the further occurrence ofsuch loss; and

(5) ensure that equipment and material for the containment, clean-up and disposal of oil and materials contaminatedwith oil are kept within easy access and in good repair for immediate use in the event of:

(a) loss of oil from the transformer,(b) a spill within the meaning of Part X of the Act, or(c) the identification of an abnormal amount of oil in the effluent.

21. The Company shall design, construct and operate the sewage works such that the concentration of the effluentparameter named in the table below does not exceed the maximum concentration objective shown for that parameter in theeffluent, and shall comply with the following requirements:

Effluent Parameters Maximum Concentration ObjectiveOil and Grease 15mg/L

(1) notify the District Manager as soon as reasonably possible of any exceedance of the maximum concentrationobjective set out in the table above;

(2) take immediate action to identify the cause of the exceedance; and

(3) take immediate action to prevent further exceedances.

22. Upon commencement of the operation of the Facility, the Company shall establish and carry out the followingmonitoring program for the sewage works:

(1) the Company shall collect and analyse the required set of samples at the sampling points listed in the table belowin accordance with the measurement frequency and sample type specified for the effluent parameter, oil and grease,and create a written record of the monitoring:

EffluentParameters

Measurement Frequencyand Sample Points

Sample Type

Oil and Grease B – Batch, i.e., for each discrete volume in the sump prior topumpout; orQ – Quarterly for direct effluent discharge, i.e., four timesover a year, relatively evenly spaced.

Grab

(2) in the event of an exceedance of the maximum concentration objective set out in the table in Condition No. 21,the Company shall:

(a) increase the frequency of sampling to once per month, for each month that effluent discharge

CONTENT COPY OF ORIGINAL

Page 290: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

occurs, and

(b) provide the District Manager, on a monthly basis, with copies of the written record created for themonitoring until the District Manager provides written direction that monthly sampling and reporting isno longer required; and

(3) if over a period of twenty-four (24) months of effluent monitoring under Condition No. 22(1), there are noexceedances of the maximum concentration set out in the table in Condition No. 21, the Company may reduce themeasurement frequency of effluent monitoring to a frequency as the District Manager may specify in writing,provided that the new specified frequency is never less than annual.

23. The Company shall comply with the following methods and protocols for any sampling, analysis and recordingundertaken in accordance with Condition No. 22:

(1) Ministry of the Environment publication "Protocol for the Sampling and Analysis of Industrial/ MunicipalWastewater", January 1999, as amended from time to time by more recently published editions, and

(2) the publication "Standard Methods for the Examination of Water and Wastewater", 21st edition, 2005, asamended from time to time by more recently published editions.

WATER TAKING ACTIVITIES

24. The Company shall not take more than 50,000 litres of water on any day by any means during the construction,installation, use, operation, maintenance and retiring of the Facility.

BIRD AND BAT MONITORING

25. The Company shall implement its Post Construction Follow-up Plan submitted as part of the Application.

26. If the Company determines that it must deviate from its Post Construction Follow-up Plan, the Company shall contactthe District Manager at the Guelph District Office of the Ministry of Natural Resources and the Director, prior to makingany changes to the methodology in the Post Construction Follow-up Plan, and follow any directions provided.

27. The Company shall contact the District Manager at the Guelph District Office of the Ministry of Natural Resources andthe Director if the mortality thresholds stated in its Post Construction Follow-up Plan are reached for either bird or bats.

TRAFFIC MANAGEMENT PLANNING

28. Within three (3) months of receiving this Approval, the Company shall prepare a Traffic Management Plan and provideit to the Township of Mapleton and the County of Wellington.

29. Within three (3) months of having provided the Traffic Management Plan to the Township of Mapleton and the Countyof Wellington, the Company shall make reasonable efforts to enter into a Development Agreement and a Road UsersAgreement with the Township of Mapleton.

30. If a Development Agreement or a Road Users Agreement has not been signed with the Township of Mapleton withinthree (3) months of having provided the Traffic Management Plan to the Township of Mapleton and the County ofWellington, the Company shall provide a written explanation to the Director as to why this has not occurred.

31. The Company shall distribute a notice to every assessed owner of land within five (5) kilometres of the projectlocation, notifying them of the expected start date of construction, at least ten (10) days prior to the commencement ofany construction or installation activities at the project location.

ARCHAEOLOGICAL RESOURCES

32. The Company shall implement all of the recommendations for further archaeological fieldwork and for the protectionof archaeological sites found in the consultant archaeologist's report included in the Application, and which the Company

CONTENT COPY OF ORIGINAL

Page 291: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

submitted to the Ministry of Tourism and Culture in order to comply with clause 22 (2) (b) of O. Reg. 359/09.

33. Should any previously undocumented archaeological resources be discovered, the Company shall:

(1) cease all alteration of the area in which the resources were discovered immediately;

(2) engage a consultant archaeologist to carry out the archaeological fieldwork necessary to further assess the areaand to either protect and avoid or excavate any sites in the area in accordance with the Ontario Heritage Act, theregulations under that act and the Ministry of Tourism and Culture's Standards and Guidelines for ConsultantArchaeologists; and

(3) notify the Director as soon as reasonably possible.

COMMUNITY LIAISON COMMITTEE

34. Within three (3) months of receiving this Approval, the Company shall make reasonable efforts to establish aCommunity Liaison Committee. The Community Liaison Committee shall be a forum to exchange ideas and shareconcerns with interested residents and members of the public. The Community Liaison Committee shall be established by:

(1) publishing a notice in a newspaper with general circulation in each local municipality in which the project locationis situated; and

(2) posting a notice on the Company’s publicly accessible website, if the Company has a website;to notify members of the public about the proposal for a Community Liaison Committee and invite residents livingwithin a one (1) kilometre radius of the Facility that may have an interest in the Facility to participate on theCommunity Liaison Committee.

35. The Company may invite other members of stakeholders to participate in the Community Liaison Committee, including,but not limited to, local municipalities, local conservation authorities, Aboriginal communities, federal or provincialagencies, and local community groups.

36. The Community Liaison Committee shall consist of at least one Company representative who shall attend all meetings.

37. The purpose of the Community Liaison Committee shall be to:

(1) act as a liaison facilitating two way communications between the Company and members of the public withrespect to issues relating to the construction, installation, use, operation, maintenance and retirement of the Facility;

(2) provide a forum for the Company to provide regular updates on, and to discuss issues or concerns relating to,the construction, installation, use, operation, maintenance and retirement of the Facility with members of the public;and

(3) ensure that any issues or concerns resulting from the construction, installation, use, operation, maintenanceand retirement of the Facility are discussed and communicated to the Company.

38. The Company shall provide administrative support for the Community Liaison Committee including, at a minimum:

(1) providing a meeting space for Community Liaison Committee meetings; and

(2) providing access to resources, such as a photocopier, so that the Community Liaison Committee can:

(a) prepare and distribute meeting notices;

(b) record and distribute minutes of each meeting; and

(c) prepare reports about the Community Liaison Committee’s activities.

CONTENT COPY OF ORIGINAL

Page 292: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

39. The Company shall submit any reports of the Community Liaison Committee to the Director and post it on theCompany’s publicly accessible website, if the Company has a website.

40. The Community Liaison Committee shall meet at a minimum of twice per year or more frequently as determined to beappropriate.

41. All Community Liaison Committee meetings shall be open to the general public.

42. The Community Liaison Committee shall operate for a minimum period of two (2) years from the date of formation. At the end of the two (2) year period, the Company shall determine in consultation with the Director whether theCommunity Liaison Committee should continue operating.

43. If a Community Liaison Committee has not been established within three (3) months of receiving this Approval, theCompany shall provide a written explanation to the Director as to why this has not occurred.

OPERATION AND MAINTENANCE

44. Before construction and installation of the Equipment, including the sewage works of the transformer spill containmentfacility, the Company shall prepare a written manual for use by Company staff outlining the operating procedures and amaintenance program for the Equipment that includes as a minimum the following:

(1) routine operating and maintenance procedures in accordance with good engineering practices and asrecommended by the Equipment suppliers;

(2) inspection programs including frequency of inspection and the methods or tests employed to detect whenmaintenance is necessary;

(3) repair and maintenance programs, including the frequency of repair and maintenance;

(4) emergency procedures;

(5) procedures for any record keeping activities relating to operation and maintenance of the Equipment, includingthe sewage works of the transformer spill containment facility;

(6) all appropriate measures to minimize noise emissions from the Equipment; and

(7) any additional information requested in writing by the District Manager from time to time.

45. The Company shall;

(1) update as required the manual described in Condition No. 44; and

(2) make the manual described in Condition No. 44 available for review by staff of the Ministry upon request.

46. The Company shall ensure that the Facility is operated and maintained in accordance with the Approval and the manualdescribed in Condition No. 44.

RECORD CREATION AND RETENTION

47. The Company shall create written records consisting of the following:

(1) an operations log summarizing the operation and maintenance activities of the Facility;

(2) within the operations log, a summary of routine and Ministry staff inspections of the Facility; and

CONTENT COPY OF ORIGINAL

Page 293: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(3) a record of any complaint alleging an Adverse Effect caused by the construction, installation, use, operation,maintenance or retirement of the Facility.

48. A record described under Condition No. 47 shall include:

(1) a description of the complaint that includes as a minimum the following:

a) the date and time the complaint was made;

b) the name, address and contact information of the person who submitted the complaint;

(2) a description of each incident to which the complaint relates that includes as a minimum the following:

a) the date and time of each incident;

b) the duration of each incident;

c) the wind direction and wind speed at the time of each incident;

d) the ID of the Equipment involved in each incident and its output at the time of each incident;

e) the location of the person who submitted the complaint at the time of each incident; and(3) a description of the measures taken to address the cause of each incident to which the complaint relates and toprevent a similar occurrence in the future.

49. The Company shall retain, for a minimum of five (5) years from the date of their creation, all records described inCondition No. 20, 22 and 47, and make these records available for review by staff of the Ministry upon request.

NOTIFICATION OF COMPLAINTS

50. The Company shall notify the District Manager of each complaint within two (2) business days of the receipt of thecomplaint.

51. The Company shall provide the District Manager with the written records created under Condition No. 47 within eight(8) business days of the receipt of the complaint.

52. If the Company receives a complaint related to groundwater, the Company shall contact the District Manager withinone (1) business day of the receipt of the complaint, to discuss appropriate measures to manage any potential groundwaterissues.

CHANGE OF OWNERSHIP

53. The Company shall notify the Director in writing, and forward a copy of the notification to the District Manager,within thirty (30) days of the occurrence of any of the following changes:

(1) the ownership of the Facility;

(2) the operator of the Facility;

(3) the address of the Company;

(4) the partners, where the Company is or at any time becomes a partnership and a copy of the most recentdeclaration filed under the Business Names Act, R.S.O. 1990, c.B.17, as amended, shall be included in thenotification; and

(5) the name of the corporation where the Company is or at any time becomes a corporation, other than a municipalcorporation, and a copy of the most current information filed under the Corporations Information Act, R.S.O. 1990,c. C.39, as amended, shall be included in the notification.

CONTENT COPY OF ORIGINAL

Page 294: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

NOTIFICATION TO THE MINISTRY

54. The Company shall notify in writing the District Manager and the Director of the following commencement dates:

(1) Construction of the Facility; and,

(2) Operation of the Facility.

SCHEDULE A

Coordinates of the Equipment are listed below in UTM17-NAD83 projection:

The UTM coordinates of the wind turbines are:

Identifier Make and Model UTM CoordinatesEasting X (m)

UTM CoordinatesNorthing Y (m)

Elevation (m) Hub Height (m)

Turbine T1 SWT-2.3-101 532473 4849525 437 80

Turbine T2 SWT-2.3-101 532805 4849467 437 80

Turbine T3 SWT-2.3-101 533042 4849278 438 80

Turbine T4 SWT-2.3-101 533192 4848833 440 80

Turbine T5 SWT-2.3-101 533541 4849083 440 80

Turbine T6 SWT-2.3-101 533584 4848820 442 80

Turbine T7 SWT-2.3-101 532370 4848809 437 80

Turbine T8 SWT-2.3-101 532759 4848778 437 80

Turbine T9 SWT-2.221-101 533684 4847742 451 80

Turbine T10 SWT-2.3-101 533723 4847213 460 80

The manufacturer of the SWT-2.3-101 and SWT-2.221-101 turbines is Siemens.

The transformer substation UTM coordinates are:

UTM X Easting (m) UTM Y Northing (m) Elevation (m)

533085 4849117 437

The reasons for the imposition of these terms and conditions are as follows:

REASONS

1. Condition Nos. 1 and 2 are imposed to ensure that the Facility is constructed, installed, used, operated, maintained andretired in the manner in which it was described for review and upon which Approval was granted. These conditions arealso included to emphasize the precedence of Conditions in the Approval and the practice that the Approval is based on themost current document, if several conflicting documents are submitted for review.

2. Condition Nos. 3 and 4 are included to require the Company to provide information to the public and the localmunicipality.

3. Condition Nos. 5, 6 and 7 are included to ensure that final retirement of the Facility is completed in an aestheticallypleasing manner, in accordance with Ministry standards, and to ensure long-term protection of the health and safety of thepublic and the environment.

CONTENT COPY OF ORIGINAL

Page 295: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

4. Condition Nos. 8 and 9 are intended to limit the time period of the Approval.

5. Condition Nos. 10 and 11 are included to provide the minimum performance requirement considered necessary toprevent an Adverse Effect resulting from the operation of the Equipment and to ensure that the noise emissions from theEquipment will be in compliance with applicable limits set in the Ministry's Noise Guidelines for Wind Farms (2008).

6. Condition Nos. 12 and 13 are included to ensure that the Equipment is constructed, installed, used, operated, maintainedand retired in a way that meets the regulatory setback prohibitions set out in O. Reg, 359/09 under the Act.

7. Condition Nos. 14, 15, 16 and 17 are included to require the Company to gather accurate information so that theenvironmental noise impact and subsequent compliance with the Act, O. Reg. 359/09, the Noise Guidelines for WindFarms and this Approval can be verified.

8. Condition Nos. 18, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32 and 33 are included to ensure that the Facility is constructed,installed, used, operated, maintained and retired in a way that does not result in an Adverse Effect or hazard to the naturalenvironment or any persons.

9. Condition No. 19 is included to ensure that the sewage works of the transformer spill containment facility are designedto have adequate capacity to provide spill control. This condition is also included to enable compliance with this Approval,such that the environment is protected and deterioration, loss, injury or damage to any person, property or the environmentis minimized and/or prevented.

10. Condition No. 20 is included to ensure that the sewage works of the transformer spill containment facility will beoperated and maintained in accordance with the information submitted by the Company, and to adequately manage andclean-up any oil spill from the transformer.

11. Condition No. 21 is included to establish non-enforceable effluent quality objectives which the Company is required tostrive towards on an ongoing basis. These objectives are to be used as a mechanism to trigger corrective action proactivelyand voluntarily before environmental impairment occurs.

12. Condition Nos. 22 and 23 are included to require the Company to demonstrate that the performance of the sewageworks of the transformer spill containment facility is at a level consistent with the design and effluent objectives specifiedin the Approval and is not causing any impairment to the environment.

13. Condition Nos. 34, 35, 36, 37, 38, 39, 40, 41, 42 and 43 are imposed to ensure continued communication between theCompany and the local residents.

14. Condition Nos. 44, 45 and 46 are included to emphasize that the Equipment must be maintained and operated accordingto a procedure that will result in compliance with the Act, O. Reg. 359/09 and this Approval.

15. Condition Nos. 47, 48 and 49 are included to require the Company to keep records and provide information to staff ofthe Ministry so that compliance with the Act, O. Reg. 359/09 and this Approval can be verified.

16. Condition Nos. 50, 51 and 52 are included to ensure that any complaints regarding the construction, installation, use,operation, maintenance or retirement of the Facility are responded to in a timely and efficient manner.

17. Condition No. 53 is included to ensure that the Facility is operated under the corporate name which appears on theapplication form submitted for this Approval and to ensure that the Director is informed of any changes.

18. Condition No. 54 is included to inform the Ministry of major milestone dates for the Facility.

NOTICE REGARDING HEARINGS

In accordance with Section 139 of the Environmental Protection Act, within 15 days after the service of this notice, you

CONTENT COPY OF ORIGINAL

Page 296: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

may by further written notice served upon the Director, the Environmental Review Tribunal and the EnvironmentalCommissioner, require a hearing by the Tribunal.

In accordance with Section 47 of the Environmental Bill of Rights, 1993, the Environmental Commissioner will placenotice of your request for a hearing on the Environmental Registry.

Section 142 of the Environmental Protection Act provides that the notice requiring the hearing shall state:

1. The portions of the renewable energy approval or each term or condition in the renewable energy approval in respect of which the hearing isrequired, and;2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

The signed and dated notice requiring the hearing should also include:

3. The name of the appellant;4. The address of the appellant;5. The renewable energy approval number;6. The date of the renewable energy approval;7. The name of the Director;8. The municipality or municipalities within which the project is to be engaged in;

This notice must be served upon:

The Secretary*Environmental Review Tribunal655 Bay Street, 15th FloorToronto, OntarioM5G 1E5

AND The Environmental Commissioner1075 Bay Street, 6th FloorSuite 605Toronto, OntarioM5S 2B1

AND The DirectorSection 47.5, Environmental Protection ActMinistry of the Environment2 St. Clair Avenue West, Floor 12AToronto, OntarioM4V 1L5

* Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from theTribunal at: Tel: (416) 314-4600, Fax: (416) 314-4506 or www.ert.gov.on.ca

Under Section 142.1 of the Environmental Protection Act, residents of Ontario may require a hearing by theEnvironmental Review Tribunal within 15 days after the day on which notice of this decision is published in theEnvironmental Registry. By accessing the Environmental Registry at www.ebr.gov.on.ca, you can determine when thisperiod ends.

Approval for the above noted renewable energy project is issued to you under Section 47.5 of the EnvironmentalProtection Act subject to the terms and conditions outlined above.

DATED AT TORONTO this 8th day of December, 2011Mansoor Mahmood, P.Eng.DirectorSection 47.5, Environmental Protection Act

SM/c: District Manager, MOE GuelphThomas Bird, NextEra Energy Canada

CONTENT COPY OF ORIGINAL

Page 297: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Ministry of the EnvironmentMinistère de l’Environnement

AMENDMENT TO RENEWABLE ENERGY APPROVAL

NUMBER 3558-8KTHJP

Issue Date: July 15, 2013

Conestogo Wind, LP390 Bay St, Suite 1720Toronto, OntarioM5H 2Y2

Site Location: Conestogo Wind Energy CentreBounded by SR 16, SR 18, 14th Line and Highway 6Mapleton Township, County of WellingtonN0G 1A0

You are hereby notified that I have amended Approval No. 3558-8KTHJP issued on December 8, 2011 for a class four (4)wind facility with a total name plate capacity of 22.92 MW , as follows:

A. The definition of Application on page 2 of the Approval is deleted and replaced with the following:

8. "Application" means the application for a Renewable Energy Approval dated December 16, 2010 and signed by F. AllenWiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with the applicationincluding amended documentation submitted up to November 30, 2011; and the amendment application dated March 18,2013 and signed by F. Allen Wiley, Vice President, Development, Conestogo Wind, LP, and all supporting documentationsubmitted with the Application, including amended documentation submitted up to the date this Approval is issued;

B. The location of the centre of the transformer substation as detailed in Schedule B of the Approval has beenmodified as noted below:

UTM X Easting (m) UTM Y Northing (m) Elevation (m)533,072 4,849,126 440

This Notice shall constitute part of the approval issued under Approval No. 3558-8KTHJP dated December 8, 2011

NOTICE REGARDING HEARINGS

In accordance with Section 139 of the Environmental Protection Act, within 15 days after the service of this notice, youmay by further written notice served upon the Director, the Environmental Review Tribunal and the EnvironmentalCommissioner, require a hearing by the Tribunal.

In accordance with Section 47 of the Environmental Bill of Rights, 1993, the Environmental Commissioner will placenotice of your request for a hearing on the Environmental Registry.

Section 142 of the Environmental Protection Act provides that the notice requiring the hearing shall state:

1. The portions of the renewable energy approval or each term or condition in the renewable energy approval in respect of which the hearing is

CONTENT COPY OF ORIGINAL

Page 298: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

required, and;2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

The signed and dated notice requiring the hearing should also include:

3. The name of the appellant;4. The address of the appellant;5. The renewable energy approval number;6. The date of the renewable energy approval;7. The name of the Director;8. The municipality or municipalities within which the project is to be engaged in;

This notice must be served upon:

The Secretary*Environmental Review Tribunal655 Bay Street, 15th FloorToronto, OntarioM5G 1E5

AND The Environmental Commissioner1075 Bay Street, 6th FloorSuite 605Toronto, OntarioM5S 2B1

AND The DirectorSection 47.5, Environmental Protection ActMinistry of the Environment2 St. Clair Avenue West, Floor 12AToronto, OntarioM4V 1L5

* Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from theTribunal at: Tel: (416) 212-6349, Fax: (416) 314-3717 or www.ert.gov.on.ca

Under Section 142.1 of the Environmental Protection Act, residents of Ontario may require a hearing by theEnvironmental Review Tribunal within 15 days after the day on which notice of this decision is published in theEnvironmental Registry. By accessing the Environmental Registry at www.ebr.gov.on.ca, you can determine when thisperiod ends.

Approval for the above noted renewable energy project is issued to you under Section 47.5 of the EnvironmentalProtection Act subject to the terms and conditions outlined above.DATED AT TORONTO this 15th day of July, 2013

Vic Schroter, P.Eng.DirectorSection 47.5, Environmental Protection Act

DM/c: District Manager, MOE GuelphThomas Bird, NextEra Energy Canada, ULC

CONTENT COPY OF ORIGINAL

Page 299: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX C

Page 300: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2250 Kit 1

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250 Investigator

Serial No. 2749842

Preamplifier

Make and Type Brüel & Kjær Duel Preamplifier Type ZC-0032

Serial No. 14383

Microphone

Make and Type Brüel & Kjær Sound Intensity Microphone pair Type 4189

Serial No. 2741422

Calibrator

Make and Type Brüel & Kjær Sound Calibrator Type 4226

Serial No. 2433680

Page 301: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2250 Kit 2

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250 Investigator

Serial No. 2749843

Preamplifier

Make and Type Brüel & Kjær Duel Preamplifier Type ZC-0032

Serial No. 15128

Microphone

Make and Type Brüel & Kjær Sound Intensity Microphone pair Type 4189

Serial No. 2741421

Calibrator

Make and Type Brüel & Kjær Sound Calibrator Type 4226

Serial No. 2433680

Page 302: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: January 9, 2007

Sound Level Meter 824 Kit 1Sound Level Meter

Make and Model Larson-Davis Model 824 SLM and RTA

Serial No. 824A0450

Pre-amplifier

Make and Model Larson-Davis Model PRM902

Serial No. 0836

Microphone

Make and Model Larson-Davis Model 2559 precision air-condenser microphone

Serial No. 3020

Calibrator

Make and Model Larson-Davis CAL200 precision acoustic calibrator (1000 Hz)

Serial No. 3192

Page 303: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX D

Page 304: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

I can confirm on behalf of Conestgo Wind, LP that the wind turbines located within the Conestogo Wind

Energy Centre were operating normally for the duration of the measurement campaign from April 23rd

to

August 2nd

, 2013. More specifically, all wind turbines were in operation and operating normally during the

valid data time periods indicated in this report.

Company Name:

Conestogo Wind, LP

Name Of Company Representative:

Doug McIntosh

Title:

Signature of Company Representative:

Date:

August 8, 2013

Page 305: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX E

Page 306: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Conestogo Wind Farm, 1301142Measurement Duration April 23, 2013 - August 2, 2013Wind Speed 0 to 15 m/sTemperature -2 to 28˚CGeneral Weather Conditions Weather conditions varied significantly over the measurement campaignWind Rose Plot Found in Figure 5 Signed Statement by the Operator Found in Appendix D

Table E1 - Summary of Measurement Conditions

Page 307: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX G Fall 2013 Audit Report

Page 308: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or confidential. If you have received this in error, please notify us immediately.

® RWDI name and logo are registered trademarks in Canada and the United States of America

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Tel: 519.823.1311 Fax: 519.823.1316 RWDI AIR Inc. 650 Woodlawn Road West Guelph, Ontario, Canada N1K 1B8

Final Report Conestogo Wind Farm

Acoustic Audit Report - Immission Fall 2013 Audit Report

RWDI # 1301142

December 19, 2013

SUBMITTED TO

Douglas McIntosh NextEra Energy Canada

390 Bay Street, Suite 1720 Toronto, ON M5H 2Y2

[email protected]

SUBMITTED BY

Greg Conley, M.Eng., P.Eng. Senior Project Manager / Principal

[email protected]

Benjamin J. Coulson, M.A.Sc., P.Eng. Senior Consultant

[email protected]

Aaron Haniff, B.A.Sc., EIT Senior Acoustical Scientist

[email protected]

Page 309: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

EXECUTIVE SUMMARY

Conestogo Wind, LP retained RWDI AIR Inc. to conduct an acoustic audit - immission of the Conestogo Wind Energy Centre located in Mapleton Township, Ontario. The purpose of this audit is to capture long-term acoustic measurements of the sound level produced by the operation of the wind turbines for comparison with the applicable Ministry of the Environment sound level limits. This audit report is the second of two immission audit reports as required by the Renewable Energy Approval (REA) for the facility.

The project was developed by NextEra Energy Canada, ULC. The facility is owned by Conestogo Wind, LP, a wholly owned subsidiary of NextEra Energy Canada, ULC. The wind farm consists of nine (9) Siemens AG 2.3 MW wind turbines, one (1) Siemens AG 2.22 MW wind turbine, and one (1) transformer substation. The total nameplate capacity of the wind farm is 22.92 MW.

Unattended measurements were conducted at three (3) representative points of reception to assess sound immissions from the wind turbine site. Due to the absence of suitable weather conditions and the resulting lack of valid data points in the spring sampling program, the fall sampling program was extended beyond the October – November time period as recommended in the REA. The fall measurement program began on September 1, 2013 and ended on December 13, 2013. Even with the extended sampling program the full data set was not obtained at the three points of reception for both the turbine operational and parked scenarios due to a lack of suitable weather conditions.

Based on feedback provided by the Ministry of the Environment after the completion of the spring immissions audit report, weather instrumentation was co-located with the sound level meters instead of a centrally located weather station.

The facility is required to meet the sound level limits identified in the REA. The minimum number of measurement intervals was not obtained for all the wind bins for both the turbine operational and parked conditions. However, based on the available data, including those wind bins that meet the minimum number of valid data points, the facility appears to be in compliance with the sound level limits identified in the REA.

Page 310: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................................................... 1

2. FACILITY DESCRIPTION .................................................................................................................... 1

3. INSTRUMENTATION ........................................................................................................................... 2

3.1 Acoustic Instrumentation ............................................................................................................... 2

3.2 Non-Acoustic Instrumentation ....................................................................................................... 2

3.3 Calibration ..................................................................................................................................... 3

4. MEASUREMENT PROCEDURE .......................................................................................................... 3

4.1 Noise Measurement Location ....................................................................................................... 3

4.2 Wind Measurement Location ........................................................................................................ 3

4.3 Acoustic Measurements ................................................................................................................ 3

4.4 Non-Acoustic Measurements ........................................................................................................ 4

4.5 Number of Measurement Intervals ................................................................................................ 4

5. ACOUSTIC AUDIT PROCEDURE ....................................................................................................... 5

5.1 Points of Reception ....................................................................................................................... 5

5.2 Time of Measurements ................................................................................................................. 6

6. DATA PROCESSING ........................................................................................................................... 7

6.1 Data Reduction and Filtering ......................................................................................................... 7

6.2 Effects of Insects and Fauna ......................................................................................................... 7

6.3 Data Analysis ................................................................................................................................ 7

6.4 Determination of Turbine Sound Level ......................................................................................... 7

6.5 Tonal Assessment ......................................................................................................................... 8

7. ASSESSMENT OF COMPLIANCE ...................................................................................................... 8

Page 311: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Tables

Table 1: Valid Total Sound Data for Point of Reception A Table 2: Valid Total Sound Data for Point of Reception B Table 3: Valid Total Sound Data for Point of Reception C Table 4: Valid Ambient Sound Data for Point of Reception A Table 5: Valid Ambient Sound Data for Point of Reception B Table 6: Valid Ambient Sound Data for Point of Reception C Table 7: Summary of Sound Levels at Point of Reception A Table 8: Summary of Sound Levels at Point of Reception B Table 9: Summary of Sound Levels at Point of Reception C

Figures

Figure 1: Conestogo Wind Farm - Noise Monitor Locations Figure 2: Valid LEQ Data - Point of Reception A Figure 3: Valid LEQ Data - Point of Reception B Figure 4: Valid LEQ Data - Point of Reception C Figure 5: Wind Rose Plot - Point of Reception A Figure 6: Wind Rose Plot - Point of Reception B Figure 7: Wind Rose Plot - Point of Reception C

Appendices Appendix A: Zoning Information Appendix B: Renewable Energy Approval Appendix C: Equipment List Appendix D: Signed Statement Appendix E: Conditions during the Measurements

Page 312: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 1

1. INTRODUCTION

Conestogo Wind, LP retained RWDI AIR Inc. (RWDI) to conduct an acoustic audit - immission of the Conestogo Wind Energy Centre (Conestogo) located in Mapleton Township, Ontario. The purpose of this audit is to capture long-term acoustic measurements of the sound level at nearby receptors produced by the operation of the wind turbines for comparison with the applicable Ministry of the Environment (MOE) sound level limits. This immission audit is intended to meet the requirements of Part D of the MOE publication “Compliance Protocol for Wind Turbine Noise PIBS# 85402 (undated)” (Protocol).

The wind turbines and ancillary equipment are located on privately owned farmland through a legal agreement between the landowner and Conestogo. The zoning within the project area and surrounding areas is agricultural. The acoustic environment surrounding the project area is rural and is influenced primarily by road traffic, farming activities, and sounds of nature. There are also isolated industrial manufacturing businesses that would affect local acoustic environments. Zoning information is included in Appendix A.

The facility’s Renewable Energy Approval (REA) number 3558-8KTHJP dated December 8, 2011 and an amendment dated July 15, 2013 are provided in Appendix B. Condition 14 of the REA requires Conestogo to complete two acoustic audit – immission tests; one test in the spring and the second in the fall. This is the second of two reports presenting the results of the fall period immission audit test.

Unattended measurements were conducted at three (3) representative points of reception to assess sound immissions from the wind turbine site. The points of reception were selected based on historical weather data for the area and the modelling results provided in the “Conestogo Wind Farm Noise Assessment" (Noise Report), dated December 2010 and prepared by GENIVAR Consultants LP.

A detailed discussion of the audit procedures and data analysis is provided in the subsequent sections.

2. FACILITY DESCRIPTION

The project was developed by NextEra Energy Canada, ULC. The facility is owned by Conestogo Wind, LP, a wholly owned subsidiary of NextEra Energy Canada, ULC. The Conestogo wind farm became operational on December 20 of 2012.

For the purposes of this audit, the project site is generally bounded by Side Road 16 to the west, Wellington Road 12 to the east, 14th Line to the south, and 16th Line to the north, in Mapleton Township, County of Wellington.

The Conestogo wind farm consists of nine (9) Siemens AG 2.3 MW wind turbines, one (1) Siemens AG 2.22 MW wind turbine, and one (1) transformer substation. The total nameplate capacity of the wind farm is 22.92 MW. All turbines have a hub height of 80 m above local grade.

Page 313: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 2

3. INSTRUMENTATION

All instrumentation used for the immission testing followed the requirements set out in the Protocol.

3.1 Acoustic Instrumentation

The measurements were conducted using three (3) Brüel & Kjær 2250 Type 1 precision integrating sound level meters. A list of the acoustic equipment including serial numbers is provided in Appendix C. The 2250 sound level meters are capable of recording both sound level and audio. Each sound monitoring site meets the following requirements:

Type 1 sound level meter according to the IEC standard 61672-1 Sound Level Meter, Part 1: Specifications;

Class 1 or Class 2 microphone systems; The instrumentation having constant frequency response over at the 20 Hz to 20000Hz frequency

range; The filters meeting the requirements of IEC 61620 for Class 1 filters; and The instrumentation being capable of measuring audio recordings continuously during the

measurement campaign, at sampling rate of at least 8000 Hz.

All three sound monitoring locations were calibrated both before and after the measurement campaign using a Larson-Davis CAL200 precision acoustic calibrator. The calibrator's accuracy is equal to or better than +/- 0.3 dB and is Class 1 according to IEC 60942 within the temperature range of this measurement program.

In addition to the 90mm diameter primary wind screen that is commonly used for long term monitoring campaigns, a secondary 500mm diameter wind screen was deployed at each location that meets the specification as indicated in IEC 61400-11.

3.2 Non-Acoustic Instrumentation

Each sound level monitoring location was co-located with a meteorological station. The meteorological station met the system requirements as required in the Protocol. Each weather station consisted of a Campbell Scientific weather console using a CR200 data logging system and a R.M. Young 05103-10 wind anemometer. Auxiliary measurement instrumentation for temperature, relative humidity, and precipitation was located at Receptor B. This weather monitoring system meets the requirements of signal processing having a maximum deviation of +/- 0.2 m/s in the wind speed range from 4 m/s to 12 m/s. The anemometer itself has accuracy equal to or better than +/- 0.2 m/s at 10 m/s and an output resolution equal to or less than +/- 0.1 m/s. The anemometer measures wind direction within 5 degrees.

Page 314: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 3

3.3 Calibration

All relevant acoustic equipment has calibration records that are traceable to an accredited acoustic laboratory and are within the valid calibration recertification time. All other equipment is within calibration range and recertification time.

4. MEASUREMENT PROCEDURE

4.1 Noise Measurement Location

Microphone Height

The microphones were located at a height of approximately 4.5 metres above ground representing a 2 storey residence. This height is consistent with dwellings located at the points of reception in this study and the modelled receptor heights identified in the Noise Report.

Microphone Position

The microphones were located as close to the dwelling as practically possible or in an acoustically equivalent location in accordance with the Protocol as appropriate. More specifically, the microphones were located more than 5 m away from any large reflecting surface and, with the exception of point of reception A, away from trees or foliage that could affect the measurements. For point of reception A, the microphone was located about 5m from a forested area and is an equivalent sound environment to the non-participating receptor number 65. The monitor positions were not shielded from the wind turbine noise (i.e. direct line-of-sight to turbines).

4.2 Wind Measurement Location

The Protocol requires the wind measurement location be in close proximity to the sound measurement location. An anemometer was mounted to the same tower as the microphone at each of the sound measurement locations. A sensor for measuring temperature, relative humidity and precipitation was located close to Receptor B. The weather measurement location was not shielded by nearby buildings or obstructions. Wind speed and direction measurements were obtained at a height of 10 m. All monitoring locations were configured to record data on one-minute intervals.

4.3 Acoustic Measurements

Turbines Operational

All monitoring locations were configured to log one-minute statistical sound level data. The key statistical data used in the analysis is the A-weighted one-minute energy equivalent sound level (LEQ dBA). Audio recordings were also logged on a continual basis for both sound identification and tonality assessment purposes. Small interruptions in the data set occurred during daytime hours while checks and maintenance was conducted by RWDI personnel. Sound and weather measurement equipment were time synchronized with each other at each measurement location.

Page 315: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 4

Appendix D includes a statement signed by an authorized representative of the Conestogo wind farm confirming that all wind turbines were operating as normal for the duration of time periods for the valid measured data.

Turbines Parked

Turbines were parked on five different occasions to establish ambient sound levels, as per the guidance included in the Protocol. Acoustic measurements during parked conditions were obtained on:

November 5th/6th (point of reception B excluded due to equipment malfunction), November 15th/16th, November 16th/17th (point of reception C excluded due to equipment malfunction), November 20th/21st, and November 23rd/24th.

During the parked conditions, all turbines were stopped and the measured sound levels at the point of reception were representative of ambient background levels. The shutdown conditions occurred during the normal audit period between the hours of 22:00 and 05:00, with the exception of November 21st when turbines returned to operation after 02:20. The sound level and meteorological monitoring stations were fully operational and logging the same statistical data as during turbine operations. Ambient measurements were completed during the same general measurement period as for the turbine operation time period.

4.4 Non-Acoustic Measurements

The meteorological station was configured to continuously log the appropriate statistical parameters and outputted one-minute averaged data or instantaneous data where applicable. The station was configured to log the following data on one-minute intervals:

average wind speed (m/s); maximum wind speed (m/s); minimum wind speed (m/s); average wind direction (azimuth degrees); average temperature (degrees Celsius); and average relative humidity (percentage).

As was mentioned previously, all stations (sound and weather) were time synchronized.

4.5 Number of Measurement Intervals

Turbines Operational

The Protocol requires that no less than 120 one-minute intervals are required to be measured for each integer wind speed for the data set to be considered large enough to conduct the analysis and to be able to assess compliance. Wind speed measurements are rounded to the nearest integer prior to “binning”.

Page 316: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 5

Turbines Parked

Ambient sound measurements were completed with all turbines parked. The Protocol states that no less than 60 one-minute intervals are required to be measured for each integer wind speed for the data set to be considered large enough to determine the ambient sound level. Wind speed measurements are rounded to the nearest integer prior to “binning”.

5. ACOUSTIC AUDIT PROCEDURE

5.1 Points of Reception

Condition 14 (2) of the REA requires three (3) different points of reception that represent the location of the greatest predicted points of impact and that are located in the direction of the prevailing winds. Additionally, the Protocol states that the points of reception should represent worst-case non-participating receptors.

Selected points of receptions were identified based on those expected to be most impacted by sounds from the operation of the wind farm. The most impacted points of reception were determined from the noise contours provided in the Noise Report. These points of reception were further refined to downwind locations that would receive a reasonable frequency of prevailing winds for the current season (i.e., west to south to east winds). This review resulted in points of reception being ideally positioned to the northwest, north, and east of the wind farm.

Based on the above, receptor number 65, 114 and 21 (as identified in the Noise Report) were selected as the three worst-case non-participating receptor locations in the direction of the prevailing winds.

For reasons described below the sound level meters could not be located at these non-participating receptors and have been instead located at alternative locations that are acoustically equivalent or conservative (i.e. closer to wind turbines).

Point of Reception A - participating receptor P6 in the Noise Report (labelled 6 in Figure 1) is in an area considered acoustically equivalent to non-participating receptor 65. Receptor 65 did not want to participate in this audit and would not allow access to their property. Further, the residence is surrounded by a fairly dense woodlot that would introduce contamination of the measurements. The sound level monitor was positioned as close as possible to receptor 65 on the property of a participating receptor (P6). Fencing prevented the monitor from being located further to the southeast which would have been preferred to be more in line with receptor 65. Location A is expected to experience conservative sound levels (i.e., closer to 40 dBA contour) and allow for less interference from extraneous noise sources (i.e., less potential influence from trees), yet has similar setbacks to the same turbines and roadways as receptor 65.

Page 317: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 6

Point of Reception B - participating receptor P1 in the Noise Report (labelled 1 in Figure 1) is in an area considered acoustically equivalent to vacant lot receptor 114, and is also indicative for non-participating receptor 92. This location is considered to be conservative relative to the nearest non-participating receptors (i.e., closer to 40 dBA contour). Receptor 92 is not ideal from an acoustics perspective due to its close proximity to the road and the industrial manufacturing business located on the property that can operate 24 hours a day. Receptor P1 also has an industrial farming operation however not to the same scale as Receptor 92. Location B was therefore selected to reduce interference from noise associated with the nearby road and farm business operations at P1 and receptor 92.

Point of Reception C - participating receptor P3 in the Noise Report (labelled 3 in Figure 1) is in an area considered acoustically equivalent to non-participating receptor 21. Receptor 21 was contacted to participate in the audit however acceptable terms to locate on their property could not be attained. Location C is expected to experience similar sound levels to receptor 21.

Locations of the points of reception and on-site and off-site receptors are identified in Figure 1. The numeric values of the receptor locations are consistent with the Noise Report. The receptor locations used in this assessment are identical the receptor locations used in the spring report.

5.2 Time of Measurements

The REA requires acoustic audit – immission measurements be completed on two (2) separate occasions within a period of twelve (12) months of the commencement of operation and during the lowest annual ambient sound levels. The stated preferred times are:

1. March and April; and 2. October and November.

This report is the second of two immission audit reports. Sound level measurements at all points of reception started on September 1st, 2013.

The fall measurement program ended on November 25th, 2013 for point of receptions A and C, and December 13, 2013 for point of reception B. The monitoring program for B was extended to gather additional data. As of the program end date, the required data set still had not been obtained for the three points of reception for both operating scenarios.

Page 318: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 7

6. DATA PROCESSING

6.1 Data Reduction and Filtering

The measurement data must be filtered in accordance with the requirements of Part D – Section D5.2 of the Protocol. This requirement applies to both the turbine operational and parked scenarios. As explained in Section 5.1, the REA requires the points of reception to be located in the direction of the prevailing winds. Additional filters including wind direction and individual events were applied to the measurement data as required by the REA and suggested in the Protocol, respectively. The following filters were applied to the measured data and only the data that satisfied all four conditions were used in the subsequent analysis:

1. Measurements between 22:00 and 05:00; 2. No rainfall within the hour of the measurement interval; 3. The maximum and minimum wind speed during the interval did not differ from the average by

more than 2 m/s; and 4. Removal of extraneous high level events (example: wind over microphone, traffic pass-bys,

human activities, etc.).

Precipitation data for the Elora Research Station was obtained from Environment Canada and used to filter valid data points. Conditions during the measurement period are presented in Appendix E.

6.2 Effects of Insects and Fauna

The audio recordings were reviewed for sounds from insects and fauna. Sounds of crickets were audible at the beginning of the sampling program and this data was subsequently removed from the study.

6.3 Data Analysis

Following the guidance in Part D – Section D5.5 of the Protocol, the “binning method” is used to analyse one-minute sound level data. All sound level data that correlates to wind speeds between 4 to 7 m/s need to be grouped into integer wind speed bins. Data within each bin is +/- 0.5 m/s of the specified integer wind speed. Data within these bins are subsequently filtered and used for further analysis as detailed in Section 6.4.

6.4 Determination of Turbine Sound Level

The determination of the turbine sound level follows the method as described in Part D – Section D5.4 of the Protocol. The measured data obtained for both the total sound (turbines operational) and ambient sound (turbines parked) are first reduced and filtered as described in Section 6.1. The resulting sound levels generated by the turbines only are the logarithmic subtraction of the measured total sound minus the ambient sound.

Page 319: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 8

The resulting valid data is plotted in Figures 2, 3 and 4 for point of reception A through C, respectively. Each graph is a plot of valid sound level data versus wind speed measured at the co-located weather station. Each plot shows the total sound, the ambient sound, and the resulting turbine only sound levels. Wind rose plots for each point of reception are presented in Figures 5 through 7. Valid data for each point of reception can be found in Tables 1 through 3 for total sound and Tables 4 through 6 for ambient sound. A summary of the resulting turbine only average sound levels is provided in Tables 7 through 9.

6.5 Tonal Assessment

An assessment of tonality should be completed as per Part D, Section D5.6 of the Protocol, if it is found to be present. Based on onsite observations made during visits to the site and a review of a limited number of audio recordings, no tones were detected at each point of reception. In addition, tonality and tonal audibility data were provided by Siemens Canada. The data presented showed that the turbines have a negative tonal audibility which is below the positive value of 3 used for the criteria as per Part D, Section D3.8.3 of the Protocol. As a result, the turbines are not anticipated to have a tonal component associated with their operations.

7. ASSESSMENT OF COMPLIANCE

The facility is required to meet the sound level limits identified in the REA. For an audit scenario, the Protocol requires a minimum of 120 one-minute intervals between 4 to 7 m/s integer wind speeds inclusively.

The applicable sound level limits and resulting turbine sound levels at each point of reception are presented in Tables 7 through 9 for points of reception A through C, respectively. As explained in Section 5.1, the monitoring locations were located in close proximity to non-participating points of reception. Compliance with the REA sound level limits are met at the measurement location for points of reception A and C accounting for appropriate adjustments.

Sound levels were adjusted for point of reception B to predict the sound levels at the closest non-participating receptor for comparison purposes. Point of reception B is located closer to turbine 5 than the closest non-participating receptor. Noise propagation modelling was completed to predict the sound levels at non-participating receptor 114 as shown in Table 8. The propagated sound levels for point of reception at receptor 114 is at or below the REA sound level limits. Furthermore, location B and C are very similar with respect to distance to nearest turbine(s), land use, and exposure to roadways. However, the total sound and ambient levels are higher at location B. On some occasions nearby fans on the land owner’s barn were found to be operating at location B. This sound is difficult to distinguish from the audio files for exclusion purposes relative to incident wind noise. Hence, there is some expectation that sound levels at location B, particularly for the lower wind speeds, may be biased high.

Page 320: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Reputation Resources Results Canada | USA | UK | India | China | Hong Kong | Singapore www.rwdi.com

Conestogo Wind Farm Immission Testing Acoustic Audit Final Report Project #1301142 December 19, 2013

Page 9

A facility is deemed to be in compliance if the resulting turbine sound levels do not exceed the sound level limit at each integer wind speed provided that the minimum number of one-minute measurement intervals are achieved. The minimum number of measurement intervals was not obtained for all the wind bins for both the turbine operational and parked conditions. However, based on the available data, including those wind bins that meet the minimum number of valid data points, the facility appears to be in compliance with the sound level limits identified in the REA.

We also note that compliance has been assessed against the minimum MOE sound level limit, rather than the measured ambient which tends to be higher for most wind speed bins at all locations.

Page 321: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

TABLES

Page 322: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

FIGURES

Page 323: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

#* #*#*

#*#*#*#* #*

#*

#*

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!!

!

!

!

!!

!

!! !

!!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!

!

!

!!

!!

!

!!

")

")

")

16th Line

14th Line

Wellington Road 7

Side

road 1

5

18th Line

Side

road 3

Side

road 6

Side

road 1

2

15th

Sidero

ad

Charles

St W

6th Si

deroad

12th

Sidero

ad

Regio

nal R

d

C

B

A9

87 65

4

321

10

9 7

6

5

4

32

1

9594

93

92 91

90

96

88

87 8685

83

7574

73

72

71

70

69

68

67

6665

64

6362

616059

58

5756

55

52 51

32

3130

29

27

26

25

2423

22

21

20

19

18

17

16

15

14

13

12

1110

110

116120

119118

117

114

112

111

109

108

107

106

105

101

103

102

8

89

28

531000

531000

532000

532000

533000

533000

534000

534000

535000

535000

536000

536000

537000

537000

4843

800

4843

800

4844

800

4844

800

4845

800

4845

800

4846

800

4846

800

4847

800

4847

800

4848

800

4848

800

4849

800

4849

800

4850

800

4850

800

4851

800

4851

800

4852

800

4852

800

Conestogo Wind Farm - Noise Monitor Locations

Conestoga Noise Assessment, Arthur, Ontario Project #1301142

[True North

Date Revised: Dec. 17, 2013

Approx. Scale:

Figure:Drawn by: NBN

1:42,5001

Map Projection: UTM NAD 83 Zone 17N.

0 500 1,000 1,500 mService Layer Credits: FBS Imagery, 2010.Road Data: Esri v 10.0.

Legend") Monitoring Locations! Offsite Noise Receptor! Onsite Noise Receptor! Vacant Lot Receptor

#* Wind TurbinesRoads

Page 324: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 17, 2013

Conestogo Wind Farm, Mapleton Township, Ontario

AKHDrawn by: Figure:

Project #1301142

Date Revised:

2Valid LEQ Data - Point of Reception A

25

30

35

40

45

50

55

60

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid

LE

Q(d

BA

)

Wind Speed (m/s)

Figure 2 - Valid LEQ Data for Point of Reception A

Total Sound

Ambient Sound

Turbine Only Sound

Legend

Page 325: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 17, 2013

Conestogo Wind Farm, Mapleton Township, Ontario

AKHDrawn by: Figure:

Project #1301142

Date Revised:

3Valid LEQ Data - Point of Reception B

25

30

35

40

45

50

55

60

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid L

EQ

(dB

A)

Wind Speed (m/s)

Figure 3 - Valid LEQ Data for Point of Reception B

Total Sound

Ambient Sound

Turbine Only Sound

Legend

Page 326: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 17, 2013

Conestogo Wind Farm, Mapleton Township, Ontario

AKHDrawn by: Figure:

Project #1301142

Date Revised:

4Valid LEQ Data - Point of Reception C

25

30

35

40

45

50

55

60

3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5

Va

lid

LE

Q(d

BA

)

Wind Speed (m/s)

Figure 4 - Valid LEQ Data for Point of Reception C

Total Sound

Ambient Sound

Turbine Only Sound

Legend

Page 327: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 17, 2013

Conestogo Wind Farm, Mapleton Township, Ontario

ELSDrawn by: Figure:

Project #1301142

Date Revised:

5Wind Rose Plot – Point of Reception A

Page 328: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec 17, 2013

Conestogo Wind Farm, Mapleton Township, Ontario

ELSDrawn by: Figure:

Project #1301142

Date Revised:

6Wind Rose Plot – Point of Reception B

Page 329: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Dec. 17, 2013

Conestogo Wind Farm, Mapleton Township, Ontario

ELSDrawn by: Figure:

Project #1301142

Date Revised:

7Wind Rose Plot – Point of Reception C

Page 330: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX A

Page 331: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Township ofMapleton

Parcels - Teranet 2002. County of Wellington 2010.Date: October 18, 2012Date Printed: November 19, 2012NE layer comprised of MNR Wetlands 2009GRCA Wetlands, Steep Slopes & Floodplain 2009F:\LIS\Mapleton Zoning\Mapleton Zoning - E size.mxd

Schedule A-1

WELLINGTON RD 86WELLINGTON RD 86

0 1,250 2,500 3,750 5,000625Meters

1:50,000

M1

EI

IN

INEI

EI

INININ

IN

INEI

OS1OS1

EI EI IN

IN

OS2

OS2

M1

IN

INININ

IN

ININ

IN

OS2

OS2

OS2

OS2

OS2

OS2

OS2

R1A

ININ

OS2EI

EI

IN

M1C2

C2 IN INWELLINGTON RD 86

CONC 3

CONC 4 CONC 5

CONC 6

CONC 8 EIGHTH LINE

WELLINGTON RD 8

CONC 12

WELLINGTON RD 7

CONC 14

CONC 16 SIXTEENTH LINE

FOURTEENTH LINE

WELLINGTON RD 7

TWELFTH LINE

WELLINGTON RD 8

EIGHTH LINE

SIXTH LINE

HOLLEN RD

FOURTH LINE

CONC 3 WELLINGTON RD 45

EIGHTEENTH LINEWELLINGTON RD 109 HIGHWAY 6

JONES BASELINE

WELL

INGT

ON R

D 9

SR 6

WELL

INGT

ON R

D 10

SR 15

WELL

INGT

ON R

D 11

SR 16 SR

17

WELL

INGT

ON R

D 12

SR 18

SR 19

YATT

ON SR

THIRD LINE

BLIND LINE

REID WOODS DR

SR 19SR

18

SR 16

SR 17

SR 15

SR 12

WELL

INGT

ON R

D 10

SR 6

SR 3WE

LLIN

GTON

RD

9WE

LLIN

GTON

RD

9

SR 3

SR 6

WELL

INGT

ON R

D 10

SR 12

SR 15

WELL

INGT

ON R

D 11

SR 16

SR 17

WELL

INGT

ON R

D 12

SR 18

SR 19

SR 21

SR 21

SR 19

SR 19

SR 18

SR 17

Rothsay

Moorefield

Drayton

Glen Allen

Lebanon

WallensteinWallenstein

Yatton

Alma

IN

18 17 16 15 14 13 12 11 109

87

65 2 134

23

31.212

31.2831.50

31.208

31.213

31.213

31.24

31.40

31.17

7

31.20

9

31.202

31.20

31.20

31.18

31.26

31.244

31.3831.15

31.2

31.12

31.197

31.200

31.9

31.35

31.18

131

.170

31.22

3

31.20

7

31.21531.55

31.17

31.23

31.193

31.19

0

31.6

31.5

31.32

31.78

31.118

31.1931.128

31.178

31.185

31.47

31.13

4

31.11

1

31.96

31.131.113

31.9

31.4

31.37

31.52

31.14

31.42

31.52

31.3

31.99

31.11

31.46

31.245

31.43

31.201

31.10

7

31.10

731.117

31.171

31.7

31.10

3

31.39

31.39

31.219

31.123

31.65

31.19

9

31.10

4

31.123

31.93

31.9431.119

31.173

31.199

31.100

31.143

31.83

31.10

1

31.18

3

31.21

1

31.220

31.88

31.85

31.77

31.60

31.11

6

31.81

31.7931.66

31.80

31.18

0

31.249

31.176

31.147

31.132

31.21

0

31.20

6

31.21

7

31.11

0

31.57

31.61 31.13

7

31.14

4 31.84 31.10

8

31.16

8

31.87

31.148

31.125

31.67

31.12

0

31.23

5

31.71

31.109

31.9531.131

31.16

7

31.14

131.175

31.75

31.13

0

31.19

8

31.7531

.97

31.175

31.18

7

31.9831.188

31.16

9

31.14

9

31.17

2

31.17931.69

31.62

31.63

31.18

9

31.18

2

31.150

31.68

31.74

31.91

31.101

31.56

31.12

7

31.12

2 31.102

31.40

31.40

31.127 31.40

31.7031.205

31.14531.145

31.115

31.12

431.216

31.72

31.90

31.22831.142

C1

31.139

31.231

31.23

2

31.234

31.23

3

31.23

7

31.236

31.23

8

31.239

31.2931.30C2

31.54

31.204

31.195

31.2231.36

31.21

31.166

31.14631.226

31.91

31.92

31.143

31.139

31.163

31.40

IN

OS2OS2

OS2

HOLLEN

31.241

22212019181716151413121110987654321

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

IX

VIII

VII

VI

V

IV

III

II

I

AGRICULTURAL UNSERVICED RESIDENTIAL LOW DENSITY RESIDENTIALLOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIALHIGH DENSITY RESIDENTIAL RESIDENTIAL TRANSITIONCENTRAL COMMERCIAL HIGHWAY COMMERCIALNEIGHBOURHOOD COMMERCIAL SHOPPING CENTRE COMMERCIAL AGRICULTURAL COMMERCIAL GENERAL INDUSTRIAL LIGHT INDUSTRIAL RURAL INDUSTRIALEXTRACTIVE INDUSTRIALINSTITUTIONAL OPEN SPACE OPEN SPACE CONESTOGA LAKE FUTURE DEVELOPMENT NATURAL ENVIRONMENT FLOODWAY(f) Flood SPECIAL POLICY AREA EXCEPTION ZONES

AR1AR1BR1CR2R3RTC1C2C3C4ACM1M2RINEIINOS1OS2FDNEFL(f)

XVII

XVI

XV

XIV

XIII

XII

XI

X

XVIII

XVII

XVI

XV

XIV

XIII

XII

XI

X

IX

VIII

VII

VI

V

IV

III

II

I

31.51

ABCD

31.243

31.44

31.246

AC

31.251

31.25

3

31.25

4

31.257

31.258

Con B

Con A

Page 332: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX B

Page 333: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Ministry of the EnvironmentMinistère de l’Environnement

RENEWABLE ENERGY APPROVAL

NUMBER 3558-8KTHJPIssue Date: December 8, 2011

Conestogo Wind, LP5500 North Service Rd, No. Suite 205Burlington, OntarioL7L 6W6

ProjectLocation:

Conestogo Wind Energy CentreBounded by SR 16, SR 18, 14th Line and Highway 6Mapleton Township, County of WellingtonN0G 1A0

You have applied in accordance with Section 47.4 of the Environmental Protection Act for approval to engage in arenewable energy project in respect ofClass 4 wind facilityconsisting of the following:

- the construction, installation, operation, use and retiring of:

(a) nine (9) wind turbine generators each rated at 2.3 megawatts (MW) generating output capacity and one (1) windturbine generator rated at 2.22 MW generating output capacity with a total name plate capacity of 22.92 MW,designated as source ID Nos.T1 to T10, each with a hub height of 80 above grade, and sited at the locations shownin Schedule A and as indicated in the supporting documentation submitted with the application; and

(b) associated ancillary equipment, systems and technologies including ten (10) 690V/34.5 kV pad mountedtransformers, distribution lines, one (1) transformer substation to connect to the Hydro One distribution system,distribution lines and access roads;

all in accordance with the application for a Renewable Energy Approval dated December 16, 2010 and signed by F. AllenWiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with the application,including amended documentation submitted up to November 30, 2011.

For the purpose of this renewable energy approval, the following definitions apply:

"Acoustic Audit - Emission" means an investigative procedure that is compliant with the IEC Standard 61400-11 andconsisting of measurements and/or acoustic modelling of noise emissions produced by wind turbine generators,assessed to determine compliance with the manufacturer's noise (acoustic) equipment specifications and emissiondata of the wind turbine generators, included in the Noise Report;

1.

"Acoustic Audit - Immission" means an investigative procedure consisting of measurements and/or acousticmodelling of all sources of noise emissions due to the operation of the Equipment, assessed to determine compliancewith the Noise Performance Limits set out in this Approval;

2.

"Acoustic Audit Report - Emission" means a report presenting the results of the Acoustic Audit - Emission;3."Acoustic Audit Report - Immission" means a report presenting the results of the Acoustic Audit - Immission;4."Acoustical Consultant" means a person currently active in the field of environmental acoustics and noise/vibrationcontrol, who is familiar with Ministry noise guidelines and procedures and has a combination of formal universityeducation, training and experience necessary to assess noise emissions from wind facilities;

5.

"Act" means the Environmental Protection Act, R.S.O 1990, c.E.19, as amended;6."Adverse Effect" has the same meaning as in the Act;7."Application" means the application for a Renewable Energy Approval dated December 16, 2010 and signed by F.8.

9.

CONTENT COPY OF ORIGINAL

Page 334: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

6.7.

Allen Wiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with theapplication including amended documentation submitted up to November 30, 2011;

8.

"Approval" means this Renewable Energy Approval issued in accordance with Section 47.4 of the Act, including anyschedules to it;

9.

"A-weighting" means the frequency weighting characteristic as specified in the International ElectrotechnicalCommission (IEC) Standard 61672, and intended to approximate the relative sensitivity of the normal human ear todifferent frequencies (pitches) of sound . It is denoted as “A”;

10.

"A-weighted Sound Pressure Level" means the Sound Pressure Level modified by application of an A-weightingnetwork. It is measured in decibels, A-weighted, and denoted “dBA”;

11.

"Class 1 Area" means an area with an acoustical environment typical of a major population centre, where thebackground sound level is dominated by the activities of people, usually road traffic, often referred to as “urbanhum;

12.

"Class 2 Area" means an area with an acoustical environment that has qualities representative of both Class 1 andClass 3 Areas:

(a) sound levels characteristic of Class 1 during daytime (07:00 to 19:00 or to 23:00 hours);

(b) low evening and night background sound level defined by natural environment andinfrequent human activity starting as early as 19:00 hours (19:00 or 23:00 to 07:00hours);

(c) no clearly audible sound from Stationary Sources other than from those under impactassessment.

13.

"Class 3 Area" means a rural area with an acoustical environment that is dominated by natural sounds having little orno road traffic, such as the following:

(a) a small community with less than 1000 population;

(b) agricultural area;

(c) a rural recreational area such as a cottage or a resort area; or

(d) a wilderness area.

14.

"Company" means Conestogo Wind GP, Inc. (general partner) and Conestogo Wind, LP (limited partner) operatingin partnership as Conestogo Wind, LP, and includes it successors and assignees;

15.

"Compliance Protocol for Wind Turbine Noise" means the Ministry document Compliance Protocol for WindTurbine Noise, Guideline for Acoustic Assessment and Measurement, PIBS 8540e;

16.

"Decibel" means a dimensionless measure of Sound Level or Sound Pressure Level, denoted as dB;17."Director" means a person appointed in writing by the Minister of the Environment pursuant to section 5 of the Actas a Director for the purposes of section 47.5 of the Act;

18.

"District Manager" means the District Manager of the appropriate local district office of the Ministry where theFacility is geographically located;

19.

"Equipment" means the ten (10) wind turbine generators and associated ancillary equipment identified in thisApproval and as further described in the Application, to the extent approved by this Approval;

20.

"Equivalent Sound Level" is the value of the constant sound level which would result in exposure to the same total A-weighted energy as would the specified time-varying sound, if the constant sound level persisted over an equal timeinterval. It is denoted Leq and is measured in dB A-weighting (dBA);

21.

"Facility" means the renewable energy generation facility, including the Equipment, as described in this Approval andas further described in the Application, to the extent approved by this Approval;

22.

"IEC Standard 61400-11" means the International Standard IEC Standard 61400-11, Wind turbine generator systems– Part 11: Acoustic noise measurement techniques, 2006;

23.

"Independent Acoustical Consultant" means an Acoustical Consultant who is not representing the Company and wasnot involved in preparing the Noise Report. The Independent Acoustical Consultant shall not be retained by theAcoustical Consultant involved in the noise impact assessment;

24.

"Ministry" means the Ontario Ministry of the Environment;25."Noise Guidelines for Wind Farms" means the Ministry document entitled, Noise Guidelines for Wind Farms -26.

27.28.

CONTENT COPY OF ORIGINAL

Page 335: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

25.

Interpretation for Applying MOE NPC Publications to Wind Power Generation Facilities, dated October 2008;26.

"Noise Receptor" has the same meaning as in O. Reg. 359/09;27."Noise Report" means the report, included in the Application and entitled "Conestogo Wind Farm Noise Assessment",prepared by GENIVAR Inc., dated July 2011;

28.

"O. Reg. 359/09" means Ontario Regulation 359/09 “Renewable Energy Approvals under Part V.0.1 of the Act”made under the Act;

29.

"Point of Reception" has the same meaning as in the Noise Guidelines for Wind Farms and is subject to the samequalifications described in that document;

30.

"Sound Level" means the A-weighted Sound Pressure Level;31."Sound Level Limit" is the limiting value described in terms of the one hour A-weighted Equivalent Sound Level Leq;32."Sound Pressure" means the instantaneous difference between the actual pressure and the average or barometricpressure at a given location. The unit of measurement is the micro pascal (µPa);

33.

"Sound Pressure Level" means twenty times the logarithm to the base 10 of the ratio of the effective pressure (µPa)of a sound to the reference pressure of 20 µPa;

34.

"UTM" means Universal Transverse Mercator coordinate system.35.

You are hereby notified that this approval is issued to you subject to the terms and conditions outlined below:

TERMS AND CONDITIONS

GENERAL

1. The Company shall construct, install, use, operate, maintain and retire the Facility in accordance with the terms andconditions of this Approval and the Application.

2. Where there is a conflict between a provision of this Approval and any document submitted by the Company, theconditions in this Approval shall take precedence. Where there is a conflict between one or more of the documentssubmitted by the Company, the document bearing the most recent date shall take precedence.

3. The Company shall ensure a copy of this Approval is:

(1) accessible, at all times, by Company staff operating the Facility and;

(2) submitted to the clerk of each local municipality and upper-tier municipality in which the Facility is situated alongwith the Application.

4. If the Company has a website, the Company shall ensure that the Approval and the Application are posted on theCompany's publicly accessible website within five (5) business days of receiving this Approval.

5. The Company shall, at least six (6) months prior to the anticipated retirement date of the entire Facility, or part of theFacility, review its Decommissioning Plan Report to ensure that it is still accurate. If the Company determines that theFacility cannot be decommissioned in accordance with the Decommissioning Plan Report, the Company shall provide theDirector and District Manager a written description of plans for the decommissioning of the Facility.

6. The Facility shall be retired in accordance with the Decommissioning Plan Report and any directions provided by theDirector or District Manager.

7. The Company shall, at least six (6) months prior to the anticipated retirement date of the entire Facility, or part of theFacility, the Company shall contact the Ministry of Agriculture, Food and Rural Affairs plans for the decommissioning ofthe Facility, and follow any directions provided by that ministry in respect of the Company’s plans to restore the projectlocation to its previous agricultural capacity.

EXPIRY OF APPROVAL

8. Construction and installation of the Facility must be completed within two (2) years of the later of:

CONTENT COPY OF ORIGINAL

Page 336: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(1) the date this Approval is issued; or

(2) if there is a hearing or other litigation in respect of the issuance of this Approval, the date that this hearing orlitigation is disposed of, including all appeals.

9. This Approval ceases to apply in respect of any portion of the Facility not constructed or installed before the later of thedates identified in Condition No. 8.

NOISE PERFORMANCE LIMITS

10. The Company shall ensure that:

(1) the Sound Levels from the Equipment, at the Points of Reception identified the Noise Report, comply with theSound Level Limits set in the Noise Guidelines for Wind Farms, as applicable, and specifically as stated in the tablebelow:

Wind Speed (m/s) at 10 m height 4 5 6 7 8 9 10

Wind Turbine Sound Level Limits, dBA 40.0 40.0 40.0 43.0 45.0 49.0 51.0

(2) the Equipment is constructed and installed at either of the following locations:

a) at the locations identified in Schedule A of this Approval; or

b) at a location that does not vary by more than 10 metres from the locations identified in Schedule A ofthis Approval and provided that,

i) the Equipment will comply with Condition No. 10 (1) and

ii) all setback prohibitions established under O.Reg. 359/09 are complied with.

11. The locations identified in Table 7 of the Noise Report as “Point of Reception ID” numbers 102, 103, 105-112, and114-117 are specified as Noise Receptors for the purposes of paragraph 2 of subsection 54 (1.1) of O. Reg. 359/09 andsubclause 35 (1) (a) (ii) of O. Reg. 359/09.

12. If the Company determines that some or all of the Equipment cannot be constructed in accordance with Condition No.10 (2), prior to the construction and installation of the Equipment in question, the Company shall apply to the Director foran amendment to the terms and conditions of the Approval.

13. Within three (3) months of the completion of the construction of the Facility, the Company shall submit to the Directora written confirmation signed by the Vice President, Development, Conestogo Wind, LP that the UTM coordinates of the“as constructed” Equipment comply with the requirements of Condition No. 10 (2).

ACOUSTIC AUDIT - IMMISSION

14. The Company shall carry out an Acoustic Audit - Immission of the sound levels produced by the operation of theEquipment in accordance with the following:

(1) the acoustic audit measurements shall be undertaken in accordance with Part D of the Compliance Protocol forWind Turbine Noise;

(2) the acoustic audit measurements shall be performed by an Independent Acoustical Consultant at three (3)different Points of Reception that have been selected using the following criteria:

(a) the Points of Reception should represent the location of the greatest predicted noise impact, i.e. thehighest predicted sound level; and

CONTENT COPY OF ORIGINAL

Page 337: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(b) the Points of Reception should be located in the direction of prevailing winds from the Facility;

(3) the acoustic audit measurements shall be performed on two (2) separate occasions within a period of twelve (12)months that represent the lowest annual ambient sound levels, preferably:

(a) March and April, and

(b) October and November

15. The Company shall submit to the District Manager and the Director an Acoustic Audit Report-Immision, prepared byan Independent Acoustical Consultant, at the following points in time:

(1) no later than six (6) months after the commencement of the operation of the Facility for the first of the two (2)acoustic audit measurements at the three (3) Points of Reception; and

(2) no later than twelve (12) months after the commencement of the operation of the Facility for the second of thetwo (2) acoustic audit measurements at the three (3) Points of Reception.

ACOUSTIC AUDIT - EMISSION

16. The Company shall carry out an Acoustic Audit - Emission of the acoustic emissions produced by the operation of thewind turbine generators in accordance with the following:

(1) the acoustic emission measurements shall be undertaken in accordance with the IEC Standard 61400-11;

(2) the acoustic emission measurements shall be performed by an Independent Acoustical Consultant; and

(3) the acoustic emission measurements shall be performed on the wind turbine generator rated at 2.22 MWgenerating output capacity, and any one of the other wind turbine generators rated at 2.3 MW generating outputcapacity, used in the Facility.

17. The Company shall submit to the District Manager and the Director an Acoustic Audit Report-Emission, prepared inaccordance with Section 9 of the IEC Standard 61400-11 by an Independent Acoustical Consultant, no later than six (6)months after the commencement of the operation of the Facility.

STORMWATER MANAGEMENT

18. The Company shall employ best management practices for stormwater management and sediment and erosion controlduring construction, installation, use, operation, maintenance and retiring of the Facility, as outlined in the Application.

SEWAGE WORKS OF THE TRANSFORMER SPILL CONTAINMENT FACILITY

19. The Company shall design and construct a transformer spill containment facility which meets the followingrequirements:

(1) the spill containment area serving the transformer shall have a minimum volume equal to the volume oftransformer oil and lubricants plus the volume equivalent to providing a minimum 24-hour duration, 25-year returnstorm capacity for the stormwater drainage area around the transformer under normal operating conditions;

(2) the containment facility shall have an impervious concrete floor and walls sloped toward an outlet, maintaining afreeboard of 0.25 metres terminating approximately 0.30 metres above grade, with an impervious plastic liner orequivalent, and 1.0 metre layer of crushed stoned within;

(3) the containment pad shall drain to an oil control device, such as an oil/water separator, a pump-out sump, an oilabsorbing material in a canister or a blind sump; and

CONTENT COPY OF ORIGINAL

Page 338: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(4) the oil control device shall be equipped with an oil detection system and appropriate sewage appurtenances asnecessary (pumpout manhole, submersible pumps, level controllers, floating oil sensors, etc.) that allows for batchdischarges or direct discharges and for proper implementation of the monitoring program described in Condition No.22.

20. The Company shall:

(1) as a minimum, check the oil detection system on a monthly basis and create a written record of the inspections;

(2) ensure that the effluent is essentially free of floating and settle-able solids and does not contain oil or any othersubstance in amounts sufficient to create a visible film, sheen or foam on the receiving waters;

(3) immediately identify and clean-up all losses of oil from the transformer;

(4) upon identification of oil in the effluent pumpout, take immediate action to prevent the further occurrence ofsuch loss; and

(5) ensure that equipment and material for the containment, clean-up and disposal of oil and materials contaminatedwith oil are kept within easy access and in good repair for immediate use in the event of:

(a) loss of oil from the transformer,(b) a spill within the meaning of Part X of the Act, or(c) the identification of an abnormal amount of oil in the effluent.

21. The Company shall design, construct and operate the sewage works such that the concentration of the effluentparameter named in the table below does not exceed the maximum concentration objective shown for that parameter in theeffluent, and shall comply with the following requirements:

Effluent Parameters Maximum Concentration ObjectiveOil and Grease 15mg/L

(1) notify the District Manager as soon as reasonably possible of any exceedance of the maximum concentrationobjective set out in the table above;

(2) take immediate action to identify the cause of the exceedance; and

(3) take immediate action to prevent further exceedances.

22. Upon commencement of the operation of the Facility, the Company shall establish and carry out the followingmonitoring program for the sewage works:

(1) the Company shall collect and analyse the required set of samples at the sampling points listed in the table belowin accordance with the measurement frequency and sample type specified for the effluent parameter, oil and grease,and create a written record of the monitoring:

EffluentParameters

Measurement Frequencyand Sample Points

Sample Type

Oil and Grease B – Batch, i.e., for each discrete volume in the sump prior topumpout; orQ – Quarterly for direct effluent discharge, i.e., four timesover a year, relatively evenly spaced.

Grab

(2) in the event of an exceedance of the maximum concentration objective set out in the table in Condition No. 21,the Company shall:

(a) increase the frequency of sampling to once per month, for each month that effluent discharge

CONTENT COPY OF ORIGINAL

Page 339: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

occurs, and

(b) provide the District Manager, on a monthly basis, with copies of the written record created for themonitoring until the District Manager provides written direction that monthly sampling and reporting isno longer required; and

(3) if over a period of twenty-four (24) months of effluent monitoring under Condition No. 22(1), there are noexceedances of the maximum concentration set out in the table in Condition No. 21, the Company may reduce themeasurement frequency of effluent monitoring to a frequency as the District Manager may specify in writing,provided that the new specified frequency is never less than annual.

23. The Company shall comply with the following methods and protocols for any sampling, analysis and recordingundertaken in accordance with Condition No. 22:

(1) Ministry of the Environment publication "Protocol for the Sampling and Analysis of Industrial/ MunicipalWastewater", January 1999, as amended from time to time by more recently published editions, and

(2) the publication "Standard Methods for the Examination of Water and Wastewater", 21st edition, 2005, asamended from time to time by more recently published editions.

WATER TAKING ACTIVITIES

24. The Company shall not take more than 50,000 litres of water on any day by any means during the construction,installation, use, operation, maintenance and retiring of the Facility.

BIRD AND BAT MONITORING

25. The Company shall implement its Post Construction Follow-up Plan submitted as part of the Application.

26. If the Company determines that it must deviate from its Post Construction Follow-up Plan, the Company shall contactthe District Manager at the Guelph District Office of the Ministry of Natural Resources and the Director, prior to makingany changes to the methodology in the Post Construction Follow-up Plan, and follow any directions provided.

27. The Company shall contact the District Manager at the Guelph District Office of the Ministry of Natural Resources andthe Director if the mortality thresholds stated in its Post Construction Follow-up Plan are reached for either bird or bats.

TRAFFIC MANAGEMENT PLANNING

28. Within three (3) months of receiving this Approval, the Company shall prepare a Traffic Management Plan and provideit to the Township of Mapleton and the County of Wellington.

29. Within three (3) months of having provided the Traffic Management Plan to the Township of Mapleton and the Countyof Wellington, the Company shall make reasonable efforts to enter into a Development Agreement and a Road UsersAgreement with the Township of Mapleton.

30. If a Development Agreement or a Road Users Agreement has not been signed with the Township of Mapleton withinthree (3) months of having provided the Traffic Management Plan to the Township of Mapleton and the County ofWellington, the Company shall provide a written explanation to the Director as to why this has not occurred.

31. The Company shall distribute a notice to every assessed owner of land within five (5) kilometres of the projectlocation, notifying them of the expected start date of construction, at least ten (10) days prior to the commencement ofany construction or installation activities at the project location.

ARCHAEOLOGICAL RESOURCES

32. The Company shall implement all of the recommendations for further archaeological fieldwork and for the protectionof archaeological sites found in the consultant archaeologist's report included in the Application, and which the Company

CONTENT COPY OF ORIGINAL

Page 340: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

submitted to the Ministry of Tourism and Culture in order to comply with clause 22 (2) (b) of O. Reg. 359/09.

33. Should any previously undocumented archaeological resources be discovered, the Company shall:

(1) cease all alteration of the area in which the resources were discovered immediately;

(2) engage a consultant archaeologist to carry out the archaeological fieldwork necessary to further assess the areaand to either protect and avoid or excavate any sites in the area in accordance with the Ontario Heritage Act, theregulations under that act and the Ministry of Tourism and Culture's Standards and Guidelines for ConsultantArchaeologists; and

(3) notify the Director as soon as reasonably possible.

COMMUNITY LIAISON COMMITTEE

34. Within three (3) months of receiving this Approval, the Company shall make reasonable efforts to establish aCommunity Liaison Committee. The Community Liaison Committee shall be a forum to exchange ideas and shareconcerns with interested residents and members of the public. The Community Liaison Committee shall be established by:

(1) publishing a notice in a newspaper with general circulation in each local municipality in which the project locationis situated; and

(2) posting a notice on the Company’s publicly accessible website, if the Company has a website;to notify members of the public about the proposal for a Community Liaison Committee and invite residents livingwithin a one (1) kilometre radius of the Facility that may have an interest in the Facility to participate on theCommunity Liaison Committee.

35. The Company may invite other members of stakeholders to participate in the Community Liaison Committee, including,but not limited to, local municipalities, local conservation authorities, Aboriginal communities, federal or provincialagencies, and local community groups.

36. The Community Liaison Committee shall consist of at least one Company representative who shall attend all meetings.

37. The purpose of the Community Liaison Committee shall be to:

(1) act as a liaison facilitating two way communications between the Company and members of the public withrespect to issues relating to the construction, installation, use, operation, maintenance and retirement of the Facility;

(2) provide a forum for the Company to provide regular updates on, and to discuss issues or concerns relating to,the construction, installation, use, operation, maintenance and retirement of the Facility with members of the public;and

(3) ensure that any issues or concerns resulting from the construction, installation, use, operation, maintenanceand retirement of the Facility are discussed and communicated to the Company.

38. The Company shall provide administrative support for the Community Liaison Committee including, at a minimum:

(1) providing a meeting space for Community Liaison Committee meetings; and

(2) providing access to resources, such as a photocopier, so that the Community Liaison Committee can:

(a) prepare and distribute meeting notices;

(b) record and distribute minutes of each meeting; and

(c) prepare reports about the Community Liaison Committee’s activities.

CONTENT COPY OF ORIGINAL

Page 341: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

39. The Company shall submit any reports of the Community Liaison Committee to the Director and post it on theCompany’s publicly accessible website, if the Company has a website.

40. The Community Liaison Committee shall meet at a minimum of twice per year or more frequently as determined to beappropriate.

41. All Community Liaison Committee meetings shall be open to the general public.

42. The Community Liaison Committee shall operate for a minimum period of two (2) years from the date of formation. At the end of the two (2) year period, the Company shall determine in consultation with the Director whether theCommunity Liaison Committee should continue operating.

43. If a Community Liaison Committee has not been established within three (3) months of receiving this Approval, theCompany shall provide a written explanation to the Director as to why this has not occurred.

OPERATION AND MAINTENANCE

44. Before construction and installation of the Equipment, including the sewage works of the transformer spill containmentfacility, the Company shall prepare a written manual for use by Company staff outlining the operating procedures and amaintenance program for the Equipment that includes as a minimum the following:

(1) routine operating and maintenance procedures in accordance with good engineering practices and asrecommended by the Equipment suppliers;

(2) inspection programs including frequency of inspection and the methods or tests employed to detect whenmaintenance is necessary;

(3) repair and maintenance programs, including the frequency of repair and maintenance;

(4) emergency procedures;

(5) procedures for any record keeping activities relating to operation and maintenance of the Equipment, includingthe sewage works of the transformer spill containment facility;

(6) all appropriate measures to minimize noise emissions from the Equipment; and

(7) any additional information requested in writing by the District Manager from time to time.

45. The Company shall;

(1) update as required the manual described in Condition No. 44; and

(2) make the manual described in Condition No. 44 available for review by staff of the Ministry upon request.

46. The Company shall ensure that the Facility is operated and maintained in accordance with the Approval and the manualdescribed in Condition No. 44.

RECORD CREATION AND RETENTION

47. The Company shall create written records consisting of the following:

(1) an operations log summarizing the operation and maintenance activities of the Facility;

(2) within the operations log, a summary of routine and Ministry staff inspections of the Facility; and

CONTENT COPY OF ORIGINAL

Page 342: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

(3) a record of any complaint alleging an Adverse Effect caused by the construction, installation, use, operation,maintenance or retirement of the Facility.

48. A record described under Condition No. 47 shall include:

(1) a description of the complaint that includes as a minimum the following:

a) the date and time the complaint was made;

b) the name, address and contact information of the person who submitted the complaint;

(2) a description of each incident to which the complaint relates that includes as a minimum the following:

a) the date and time of each incident;

b) the duration of each incident;

c) the wind direction and wind speed at the time of each incident;

d) the ID of the Equipment involved in each incident and its output at the time of each incident;

e) the location of the person who submitted the complaint at the time of each incident; and(3) a description of the measures taken to address the cause of each incident to which the complaint relates and toprevent a similar occurrence in the future.

49. The Company shall retain, for a minimum of five (5) years from the date of their creation, all records described inCondition No. 20, 22 and 47, and make these records available for review by staff of the Ministry upon request.

NOTIFICATION OF COMPLAINTS

50. The Company shall notify the District Manager of each complaint within two (2) business days of the receipt of thecomplaint.

51. The Company shall provide the District Manager with the written records created under Condition No. 47 within eight(8) business days of the receipt of the complaint.

52. If the Company receives a complaint related to groundwater, the Company shall contact the District Manager withinone (1) business day of the receipt of the complaint, to discuss appropriate measures to manage any potential groundwaterissues.

CHANGE OF OWNERSHIP

53. The Company shall notify the Director in writing, and forward a copy of the notification to the District Manager,within thirty (30) days of the occurrence of any of the following changes:

(1) the ownership of the Facility;

(2) the operator of the Facility;

(3) the address of the Company;

(4) the partners, where the Company is or at any time becomes a partnership and a copy of the most recentdeclaration filed under the Business Names Act, R.S.O. 1990, c.B.17, as amended, shall be included in thenotification; and

(5) the name of the corporation where the Company is or at any time becomes a corporation, other than a municipalcorporation, and a copy of the most current information filed under the Corporations Information Act, R.S.O. 1990,c. C.39, as amended, shall be included in the notification.

CONTENT COPY OF ORIGINAL

Page 343: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

NOTIFICATION TO THE MINISTRY

54. The Company shall notify in writing the District Manager and the Director of the following commencement dates:

(1) Construction of the Facility; and,

(2) Operation of the Facility.

SCHEDULE A

Coordinates of the Equipment are listed below in UTM17-NAD83 projection:

The UTM coordinates of the wind turbines are:

Identifier Make and Model UTM CoordinatesEasting X (m)

UTM CoordinatesNorthing Y (m)

Elevation (m) Hub Height (m)

Turbine T1 SWT-2.3-101 532473 4849525 437 80

Turbine T2 SWT-2.3-101 532805 4849467 437 80

Turbine T3 SWT-2.3-101 533042 4849278 438 80

Turbine T4 SWT-2.3-101 533192 4848833 440 80

Turbine T5 SWT-2.3-101 533541 4849083 440 80

Turbine T6 SWT-2.3-101 533584 4848820 442 80

Turbine T7 SWT-2.3-101 532370 4848809 437 80

Turbine T8 SWT-2.3-101 532759 4848778 437 80

Turbine T9 SWT-2.221-101 533684 4847742 451 80

Turbine T10 SWT-2.3-101 533723 4847213 460 80

The manufacturer of the SWT-2.3-101 and SWT-2.221-101 turbines is Siemens.

The transformer substation UTM coordinates are:

UTM X Easting (m) UTM Y Northing (m) Elevation (m)

533085 4849117 437

The reasons for the imposition of these terms and conditions are as follows:

REASONS

1. Condition Nos. 1 and 2 are imposed to ensure that the Facility is constructed, installed, used, operated, maintained andretired in the manner in which it was described for review and upon which Approval was granted. These conditions arealso included to emphasize the precedence of Conditions in the Approval and the practice that the Approval is based on themost current document, if several conflicting documents are submitted for review.

2. Condition Nos. 3 and 4 are included to require the Company to provide information to the public and the localmunicipality.

3. Condition Nos. 5, 6 and 7 are included to ensure that final retirement of the Facility is completed in an aestheticallypleasing manner, in accordance with Ministry standards, and to ensure long-term protection of the health and safety of thepublic and the environment.

CONTENT COPY OF ORIGINAL

Page 344: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

4. Condition Nos. 8 and 9 are intended to limit the time period of the Approval.

5. Condition Nos. 10 and 11 are included to provide the minimum performance requirement considered necessary toprevent an Adverse Effect resulting from the operation of the Equipment and to ensure that the noise emissions from theEquipment will be in compliance with applicable limits set in the Ministry's Noise Guidelines for Wind Farms (2008).

6. Condition Nos. 12 and 13 are included to ensure that the Equipment is constructed, installed, used, operated, maintainedand retired in a way that meets the regulatory setback prohibitions set out in O. Reg, 359/09 under the Act.

7. Condition Nos. 14, 15, 16 and 17 are included to require the Company to gather accurate information so that theenvironmental noise impact and subsequent compliance with the Act, O. Reg. 359/09, the Noise Guidelines for WindFarms and this Approval can be verified.

8. Condition Nos. 18, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32 and 33 are included to ensure that the Facility is constructed,installed, used, operated, maintained and retired in a way that does not result in an Adverse Effect or hazard to the naturalenvironment or any persons.

9. Condition No. 19 is included to ensure that the sewage works of the transformer spill containment facility are designedto have adequate capacity to provide spill control. This condition is also included to enable compliance with this Approval,such that the environment is protected and deterioration, loss, injury or damage to any person, property or the environmentis minimized and/or prevented.

10. Condition No. 20 is included to ensure that the sewage works of the transformer spill containment facility will beoperated and maintained in accordance with the information submitted by the Company, and to adequately manage andclean-up any oil spill from the transformer.

11. Condition No. 21 is included to establish non-enforceable effluent quality objectives which the Company is required tostrive towards on an ongoing basis. These objectives are to be used as a mechanism to trigger corrective action proactivelyand voluntarily before environmental impairment occurs.

12. Condition Nos. 22 and 23 are included to require the Company to demonstrate that the performance of the sewageworks of the transformer spill containment facility is at a level consistent with the design and effluent objectives specifiedin the Approval and is not causing any impairment to the environment.

13. Condition Nos. 34, 35, 36, 37, 38, 39, 40, 41, 42 and 43 are imposed to ensure continued communication between theCompany and the local residents.

14. Condition Nos. 44, 45 and 46 are included to emphasize that the Equipment must be maintained and operated accordingto a procedure that will result in compliance with the Act, O. Reg. 359/09 and this Approval.

15. Condition Nos. 47, 48 and 49 are included to require the Company to keep records and provide information to staff ofthe Ministry so that compliance with the Act, O. Reg. 359/09 and this Approval can be verified.

16. Condition Nos. 50, 51 and 52 are included to ensure that any complaints regarding the construction, installation, use,operation, maintenance or retirement of the Facility are responded to in a timely and efficient manner.

17. Condition No. 53 is included to ensure that the Facility is operated under the corporate name which appears on theapplication form submitted for this Approval and to ensure that the Director is informed of any changes.

18. Condition No. 54 is included to inform the Ministry of major milestone dates for the Facility.

NOTICE REGARDING HEARINGS

In accordance with Section 139 of the Environmental Protection Act, within 15 days after the service of this notice, you

CONTENT COPY OF ORIGINAL

Page 345: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

may by further written notice served upon the Director, the Environmental Review Tribunal and the EnvironmentalCommissioner, require a hearing by the Tribunal.

In accordance with Section 47 of the Environmental Bill of Rights, 1993, the Environmental Commissioner will placenotice of your request for a hearing on the Environmental Registry.

Section 142 of the Environmental Protection Act provides that the notice requiring the hearing shall state:

1. The portions of the renewable energy approval or each term or condition in the renewable energy approval in respect of which the hearing isrequired, and;2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

The signed and dated notice requiring the hearing should also include:

3. The name of the appellant;4. The address of the appellant;5. The renewable energy approval number;6. The date of the renewable energy approval;7. The name of the Director;8. The municipality or municipalities within which the project is to be engaged in;

This notice must be served upon:

The Secretary*Environmental Review Tribunal655 Bay Street, 15th FloorToronto, OntarioM5G 1E5

AND The Environmental Commissioner1075 Bay Street, 6th FloorSuite 605Toronto, OntarioM5S 2B1

AND The DirectorSection 47.5, Environmental Protection ActMinistry of the Environment2 St. Clair Avenue West, Floor 12AToronto, OntarioM4V 1L5

* Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from theTribunal at: Tel: (416) 314-4600, Fax: (416) 314-4506 or www.ert.gov.on.ca

Under Section 142.1 of the Environmental Protection Act, residents of Ontario may require a hearing by theEnvironmental Review Tribunal within 15 days after the day on which notice of this decision is published in theEnvironmental Registry. By accessing the Environmental Registry at www.ebr.gov.on.ca, you can determine when thisperiod ends.

Approval for the above noted renewable energy project is issued to you under Section 47.5 of the EnvironmentalProtection Act subject to the terms and conditions outlined above.

DATED AT TORONTO this 8th day of December, 2011Mansoor Mahmood, P.Eng.DirectorSection 47.5, Environmental Protection Act

SM/c: District Manager, MOE GuelphThomas Bird, NextEra Energy Canada

CONTENT COPY OF ORIGINAL

Page 346: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Ministry of the EnvironmentMinistère de l’Environnement

AMENDMENT TO RENEWABLE ENERGY APPROVAL

NUMBER 3558-8KTHJPIssue Date: July 15, 2013

Conestogo Wind, LP390 Bay St, Suite 1720Toronto, OntarioM5H 2Y2

Site Location: Conestogo Wind Energy CentreBounded by SR 16, SR 18, 14th Line and Highway 6Mapleton Township, County of WellingtonN0G 1A0

You are hereby notified that I have amended Approval No. 3558-8KTHJP issued on December 8, 2011 for a class four (4)wind facility with a total name plate capacity of 22.92 MW , as follows:

A. The definition of Application on page 2 of the Approval is deleted and replaced with the following:

8. "Application" means the application for a Renewable Energy Approval dated December 16, 2010 and signed by F. AllenWiley, Vice President, Development, Conestogo Wind, LP and all supporting documentation submitted with the applicationincluding amended documentation submitted up to November 30, 2011; and the amendment application dated March 18,2013 and signed by F. Allen Wiley, Vice President, Development, Conestogo Wind, LP, and all supporting documentationsubmitted with the Application, including amended documentation submitted up to the date this Approval is issued;

B. The location of the centre of the transformer substation as detailed in Schedule B of the Approval has beenmodified as noted below:

UTM X Easting (m) UTM Y Northing (m) Elevation (m)533,072 4,849,126 440

This Notice shall constitute part of the approval issued under Approval No. 3558-8KTHJP dated December 8, 2011

NOTICE REGARDING HEARINGS

In accordance with Section 139 of the Environmental Protection Act, within 15 days after the service of this notice, youmay by further written notice served upon the Director, the Environmental Review Tribunal and the EnvironmentalCommissioner, require a hearing by the Tribunal.

In accordance with Section 47 of the Environmental Bill of Rights, 1993, the Environmental Commissioner will placenotice of your request for a hearing on the Environmental Registry.

Section 142 of the Environmental Protection Act provides that the notice requiring the hearing shall state:

1. The portions of the renewable energy approval or each term or condition in the renewable energy approval in respect of which the hearing is

CONTENT COPY OF ORIGINAL

Page 347: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

required, and;2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.

The signed and dated notice requiring the hearing should also include:

3. The name of the appellant;4. The address of the appellant;5. The renewable energy approval number;6. The date of the renewable energy approval;7. The name of the Director;8. The municipality or municipalities within which the project is to be engaged in;

This notice must be served upon:

The Secretary*Environmental Review Tribunal655 Bay Street, 15th FloorToronto, OntarioM5G 1E5

AND The Environmental Commissioner1075 Bay Street, 6th FloorSuite 605Toronto, OntarioM5S 2B1

AND The DirectorSection 47.5, Environmental Protection ActMinistry of the Environment2 St. Clair Avenue West, Floor 12AToronto, OntarioM4V 1L5

* Further information on the Environmental Review Tribunal’s requirements for an appeal can be obtained directly from theTribunal at: Tel: (416) 212-6349, Fax: (416) 314-3717 or www.ert.gov.on.ca

Under Section 142.1 of the Environmental Protection Act, residents of Ontario may require a hearing by theEnvironmental Review Tribunal within 15 days after the day on which notice of this decision is published in theEnvironmental Registry. By accessing the Environmental Registry at www.ebr.gov.on.ca, you can determine when thisperiod ends.

Approval for the above noted renewable energy project is issued to you under Section 47.5 of the EnvironmentalProtection Act subject to the terms and conditions outlined above.DATED AT TORONTO this 15th day of July, 2013

Vic Schroter, P.Eng.DirectorSection 47.5, Environmental Protection Act

DM/c: District Manager, MOE GuelphThomas Bird, NextEra Energy Canada, ULC

CONTENT COPY OF ORIGINAL

Page 348: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX C

Page 349: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2250

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250

Serial No. 3003742

Preamplifier

Make and Type Brüel & Kjær Preamplifier Type ZC-0032

Serial No. 19193

Microphone

Make and Type Brüel & Kjær ½” Sound Microphone Type 4189

Serial No. 2866261

Calibrator

Make and Type Larson-Davis CAL200 precision acoustic calibrator (1000 Hz)

Serial No. Various

Page 350: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2250

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250

Serial No. 3003130

Preamplifier

Make and Type Brüel & Kjær Preamplifier Type ZC-0032

Serial No. 18932

Microphone

Make and Type Brüel & Kjær ½” Sound Microphone Type 4189

Serial No. 2858841

Calibrator

Make and Type Larson-Davis CAL200 precision acoustic calibrator (1000 Hz)

Serial No. Various

Page 351: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

MEASUREMENT EQUIPMENT

Last Modified: May 06, 2009

Sound Level Meter 2250

Sound Level Meter

Make and Model Brüel & Kjær Modular Precision Sound Analyzer Type 2250

Serial No. 3003128

Preamplifier

Make and Type Brüel & Kjær Preamplifier Type ZC-0032

Serial No. 18929

Microphone

Make and Type Brüel & Kjær ½” Sound Microphone Type 4189

Serial No. 2858840

Calibrator

Make and Type Larson-Davis CAL200 precision acoustic calibrator (1000 Hz)

Serial No. Various

Page 352: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX D

Page 353: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or
Page 354: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

APPENDIX E

Page 355: Senior Project Administrator - Cordelio Power...This document is intended for the sole use of the party to whom it is addressed and may contain information that is privileged and/or

Measurement Duration September 1, 2013 - November 25, 2013 [1]

Wind Speed 0 to 20 m/s , With gusts up to 25 m/s

Temperature -15 to 32˚C

General Weather Conditions Weather conditions varied significantly over the measurement campaign

Wind Rose Plot Found in Figures 5 to 7

Signed Statement by the Operator Found in Appendix D

Notes: [1] Duration for location B was extended until December 13, 2013.

Table E1 - Summary of Measurement Conditions

Conestogo Wind Farm, 1301142

12/17/2013