Transcript of Se Puerto Maldonado 2013
Out of CalculationDe-energized
Voltages / Loading
Lower Voltage Range0.95 p.u.
Upper Voltage Range1.05 p.u.
Loading Range100. %
PTO_MDO138
Ul=132.31 kVu=0.96 p.u.
phiu=139.00 deg
PTO_MDO22.9
Ul=21.78 kVu=0.95 p.u.
phiu=133.35 deg
PTO_MDO10
Ul=9.64 kVu=0.96 p.u.
phiu=-15.67 d..
PowerFactory 15.1.6
SIMULACION DEL SIST. ELECT. DE PUERTO MAL
BR. JUAN JOSE BELTRAN PALOMINO BR. NATALY MARY ESPINOZA SURCO
Project: 2013
Graphic: Sistema Electrico
Date: 8/4/2015
Annex:
Load Flow Balanced
Nodes
Line-Line Voltage, Magnitude [kV]
Voltage, Magnitude [p.u.]
Voltage, Angle [deg]
Branches
Active Power [MW]
Reactive Power [Mvar]
Maximum Loading [%]
PM-07
P=2.34 MWQ=1.18 Mvar
=
PM-06
P=0.95 MWQ=0.71 Mvar
=
PM-03
P=4.17 MWQ=1.65 Mvar
=
PM-02
P=3.77 MWQ=1.91 Mvar
=
PM-01
P=2.53 MWQ=1.22 Mvar
=
P=13.90 MWQ=8.40 Mvar
loading=50.85 %
P=-3.30 MWQ=-1.88 Mvar
loading=50.85 %
P=-10.48 MWQ=-4.78 Mvar
loading=50.85 %
-10
0
0
SISTEMA ELECTRICO DE PUERTO MALDONADO AÑO 2013
DIgSILENT