ISGF Technology Session Improving System Reliability through Automating Rural Feeders and Substations Amit Sharma 27 th April 2012

description

Presentation of Autorecloser / Sectionaliser- Schneider Electric

Transcript of Schneider PPT Autorecloser Sectionalizer

Page 1: Schneider PPT Autorecloser Sectionalizer

ISGF Technology Session

Improving System Reliability throughAutomating Rural Feeders and

Substations

Amit Sharma27th April 2012

Page 2: Schneider PPT Autorecloser Sectionalizer

Automatic Circuit Reclosers and Sectionalizers

Amit Sharma24th Nov 2011

Page 3: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 3- Energy – MONTHLY REVIEW

Overhead Faults ● 60% - 70% of faults are of a transient (temporary) nature:

•Conductors clashing in the wind

•Tree branches falling on overhead conductors

•Animals or birds getting curious

•Careless motor vehicle drivers

•Lightning strikes

•Operating error : leaving earths connected etc

• Some are more permanent:

An “auto-reclose” cycle should clear the fault

“lock out” of the section

Page 4: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 4- Energy – MONTHLY REVIEW

What is a Recloser ?

● A Recloser is a protection device:● For overhead power lines● It is a circuit breaker with more arduous

test & install conditions● Designed to RECLOSE on to a fault.

● Terminology● The “auto-reclose” cycle

●Will detect a fault and open for a pre-programmed time, before closing again automatically●This cycle can be repeated 3 times●Lockout typically on the fourth trip

Page 5: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 5- Energy – MONTHLY REVIEW

What is a Sectionaliser ?

● A Sectionaliser is a switch:● It is used in conjunction with an upstream “recloser” or “circuit breaker”● It counts the interruption created by a recloser during a fault sequence.

● On a preset count●trips during the dead time of the up stream recloser●Isolates a faulty network section

Page 6: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 6- Energy – MONTHLY REVIEW

Benefit to the Customer● Improved reliability of power supply

● Quality of supply● Automatic recloser function - supply restoration after temporary faults

● Reduced outage time ● Minimise revenue loss

● Event Log and Remote control ● Reduce cost of fault finding● Better knowledge of the network

● Reduction in the number of customer complaints

Page 7: Schneider PPT Autorecloser Sectionalizer

MV NETWORK MANAGEMENT

Page 8: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 8- Energy – MONTHLY REVIEW

- why improve MV distribution?

● To obtain the best possible power quality

The main issue is to reduce outage time and cost to the utility and its customers

Page 9: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 9- Energy – MONTHLY REVIEW

- how can outage time be reduced?

● By improving MV networks:

● By improving the MV networks management:

Large number of shortsections

Redundant networks Reliable components…

With Fault Passage Indicators (FPI’s) Or with remote controlled load break switches Or with fully automated reclosers and sectionalizers

Page 10: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 10- Energy – MONTHLY REVIEW

R

- different types of devices

R2

Page 11: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 11- Energy – MONTHLY REVIEW

- overhead networks: types of faults● Temporary

faults● Permanent

faults

80% 20%

Page 12: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 12- Energy – MONTHLY REVIEW

- temporary faults

● Temporary faults can be cleared by the use of Automatic Circuit Reclosers (ACRs)

Page 13: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 13- Energy – MONTHLY REVIEW

R

- temporary fault: one recloser

Page 14: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 14- Energy – MONTHLY REVIEW

R

15 s

C

O

Time

100%

- temporary fault: one recloser

Page 15: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 15- Energy – MONTHLY REVIEW

R

15 s

C

O15 s

Time

100%

- temporary fault: one recloser

Page 16: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 16- Energy – MONTHLY REVIEW

R

15 s

C

O15 s

Time

100%

- temporary fault: one recloser

Page 17: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 17- Energy – MONTHLY REVIEW

R

15 s

C

O15 s

15 s

Time

100%

- temporary fault: one recloser

Page 18: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 18- Energy – MONTHLY REVIEW

R

15 s

C

O15 s

15 s

Time2 mn

100%

- temporary fault: one recloser

Page 19: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 19- Energy – MONTHLY REVIEW

R1

- temporary fault: TWO reclosers

R2

Page 20: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 20- Energy – MONTHLY REVIEW

R1Network A- 50%

Network B- 50%

Network B

Time

- temporary fault: TWO reclosers

R2

Page 21: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 21- Energy – MONTHLY REVIEW

- permanent faults

Permanent faults cannot be cleared by automatic reclosing

To manage “permanent faults”, the best solution is to add some

“sectionalizers”

Page 22: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 22- Energy – MONTHLY REVIEW

R

5H – 6H

100%

- case 1: no network automationPermanent fault

Page 23: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 23- Energy – MONTHLY REVIEW

R

5H – 6H

100% 95%

- case 1: no network automationPermanent fault

Page 24: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 24- Energy – MONTHLY REVIEW

R

- case 2: addition of non-communicating fault passage indicators (FPI)An FPI for each branch of the network

Add an FPI around each major «obstacle»…

Page 25: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 25- Energy – MONTHLY REVIEW

- case 3: addition of communicating FPIs

R

Put several communicating FPIs in strategic locations

Page 26: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 26- Energy – MONTHLY REVIEW

- case 4: addition of communicating FPIs and remote controlled load break switches

RT

TT

T

T remote controlled load break switchesCommunicating FPI

Page 27: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 27- Energy – MONTHLY REVIEW

- case 5: recloser and sectionalizer load break switches

R

Page 28: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 28- Energy – MONTHLY REVIEW

- case 5: recloser and sectionalizer load break switches

● S1 = opens after ONE reclosing operation ● S2 = opens after TWO reclosing operations● S3 = opens after THREE reclosing operations● S4 = opens after FOUR reclosing operations

Sectionaliser load break switches are always associated with a recloser or circuit breaker:

Page 29: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 29- Energy – MONTHLY REVIEW

S4

S3

S3

S2

S1

1 1

1 S2

- case 5: recloser and sectionalizer load break switches

R

Permanent fault

Page 30: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 30- Energy – MONTHLY REVIEW

S4

S3

S3

S2

S1

2 2

2 S2

- case 5: recloser and sectionalizer load break switches

R

Permanent fault

Page 31: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 31- Energy – MONTHLY REVIEW

S4

S3

S3

S2

S1

2 2

2 S2

- case 5: recloser and sectionalizer load break switches

R

Permanent fault

2’

Page 32: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 32- Energy – MONTHLY REVIEW

S4

S3

S3 S2

S2

S1

- case 5: recloser and sectionalizer load break switches

R

Permanent fault

2’ 60’

75%

95%

Page 33: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 33- Energy – MONTHLY REVIEW

- summary of overhead networks 1/2Permanent fault

95%Case 2

A recloser

+ FPIs3 h

6 h

95%

Case 1

A recloser

95%Case 3

A recloser

+ FPI with Com1h30

Page 34: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 34- Energy – MONTHLY REVIEW

- summary of overhead networks 2/2Permanent fault

95%

1h

2’

75 %Case 5

A recloser

and sectionalizers

95%

1h

10’

70 %Case 4: A recloser,

remote controlled switches

and FPI with Com

Page 35: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 35- Energy – MONTHLY REVIEW

●SAIDI (System Average Interruption Duration Index) can vary from a few minutes to several hours,

●SAIFI (System Average Interruption Frequency Index) can vary from 1 to 10 and more, depending on :

● population density (rural or urban area)● proportion between underground and overhead distribution● maximum accepted costs for non distributed energy

Excellent Average Poor Urban area < 10 mn 30 mn >2 hrsRural area < 30 mn 2 hrs >10 hrs

Permanent Interruptions (>1 mn)

SAIDI/SAIFI variations – Quality Power

Page 36: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 36- Energy – MONTHLY REVIEW

33/11 KV Unmanned Remote Controlled S/s

Page 37: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 37- Energy – MONTHLY REVIEW

Compact, Unmanned, Remote controlled 33/11 KV S/s with 2 transformers each up to 10 MVA.

● Half space than a conventional s/s.● Economic as very less civil work.● Saving in execution time and costly land in urban areas app. ● Remote regular maintenance.● CB,Current & Voltage sensors are life sealed ,insensitive to the environment.● All types of protection OC,EF,UV,OV,OF,UF,DF, measurement

KW,KWH,KVArH, data logging and event recording & self diagnostic facility helps to analyze the system and energy consumption.

● Delivers quality power.● Automatic callout to the remote control station in case of predefined critical

alarms.● Communication with the remote central control station using GPRS Network

or other media like GSM, 3G, PSTN, Leased Lines, Radio, VSAT etc. using established and field proven IEC 60870-5-104. Scalable to SCADA.

● Sub-station will have a unique aesthetic view in a crowded city.

Page 38: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 39- Energy – MONTHLY REVIEW

33/11 KV unmannedRemote controlled s/s within 25Mx15M space

Page 39: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 40- Energy – MONTHLY REVIEW

33/11 KV s/s at Judges Filed Guwahati with 2 Nos. 5 MVA Transformers.

Page 40: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 41- Energy – MONTHLY REVIEW

33/11 KV S/s at Kamakhya, Guwahati with 2x5MVA Trfr.

Page 41: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 42- Energy – MONTHLY REVIEW

Unmanned 33/11 KV , 10 MVA s/s at Nalagarh, HP

Page 42: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 43- Energy – MONTHLY REVIEW

Pole mounted 11 KV Breakers/AR ( Sub station Application)

Page 43: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 44- Energy – MONTHLY REVIEW

Channel Mounted 33 KV Breakers (SS Aplication)

Page 44: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 45- Energy – MONTHLY REVIEW

Typical layout of 33/11 KV s/s with 2 Nos. 5 MVA Trfr.

Page 45: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 46- Energy – MONTHLY REVIEW

Architecture – GPRS

Future Substations (up to 30 nos.)

14 ” L C D

Remote Accessto maintenance

staff

ADSL Line

Substation # 1

Ethernet Switch

Leased Line

B r e a k e rC on t ro lC ub ic le

B r e a k e rC o n t ro lC u b ic le

B r e a k e rC o n t ro lC u b ic le

B r e a k e rC o n t ro lC u b ic le

B r e a k e rC on t ro lC ub ic le

Rs232 toEthernet

Converters(If required)

RS 232or

Ethernet Port

RS 232Nulec Direct

Protocol

RS 232Nulec Direct

Protocol

RS 232Nulec Direct

Protocol

RS 232Nulec Direct

Protocol

1

SEPAMT-87

EnergyMeters

Twisted Pair Cu

CA

T 5

RS 485 (Modbus)

2 3 4 n

GPRS Router

Ethernet Switch

Leased Line

CA

T 5

GPRS Router

14 ” L C D

Control Center

ADSL Line

M2MGateway

GPRS Cloud

Page 46: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 47- Energy – MONTHLY REVIEW

Architecture – ASEB (Judge’s Field S/S)

GPRS(DHBVN’s Scope)

GPRS M2M Gateway Leased Line with Static IP

VPN Tunnel

Nulec Direct TCP/Modbus

VPN Tunnel using Remote Moblie VPN

WSOSSMS

or3rd party SCADA

Judge’s Field S/S

Judge’s Field S/S

Protocol GatewayTwo way with Dynamic IPsService provider independent VPNData encryptionFirewallScalable to any third party SCADA

Page 47: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 48- Energy – MONTHLY REVIEW

33KV Remote controlled VCB- substation application

Page 48: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 49- Energy – MONTHLY REVIEW

33KV substation and feeder breaker

Page 49: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 50- Energy – MONTHLY REVIEW

33 KV breaker in 33/11 KV S/S with 33/11 KV transformer

Page 50: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 51- Energy – MONTHLY REVIEW

33KV outdoor VCB Breaker in Pandav-Nagar ( Delhi)

Page 51: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 52- Energy – MONTHLY REVIEW

33KV Pole Mounted Breaker protecting a 10 MVA 33/11 KV Transformer

Page 52: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 62- Energy – MONTHLY REVIEW

Make the mostof your energy™

Page 53: Schneider PPT Autorecloser Sectionalizer

Schneider Electric 63- Energy – MONTHLY REVIEW

Thank You!!