Projects
Switzerland: 22 plants
Austria: 1 plant
Latvia: 3 plants
Lithuania: 2 plants
Poland: 1 plant
Sweden: 3 plants
Finland: 1 plant
France: 3 plants
Germany: 1 plant
SaveEnergy Group www.saveenergy.ch
• CH- Affoltern am Albis, 7 MW
• CH- Stadtspital Triemli, 2.4 MW
• CH- Eischoll, 2 MW
• CH- Bissau, 2.7 MW
• CH- Tagelswangen, 2 MW
• CH- Zinzikon, 1.8 MW
• CH- Hedingen, 2.5 MW
• CH- Wittenbach, 3.5 MW
• CH- Schüpfen, 2.2 MW
• CH- Hettlingen, 1.6 MW
• LV- Jaunolaine, 3 MW
• CH- Aarburg, 2.3 MW
• CH- Huttwil, 4.1 MW
• LV- Zasulauks, 20 MW
• LV- Cesis, 7 MW
• LT- Druskininkai, 10 MW
• LT- Zietelos, 20 MW
• DE- Oberhonnefeld, 8 MW
• CH- Elgg, 2.4 MW
• AT- Rauris, 5.2 MW
• FR- Cernay, 4.2 MW
• CH- Ibach, 10 MW
• PL- Stelmet, 10 MW
• SE- Bjuv, 3 MW
• CH- Speicher, 6 MW
• SE- Sorsele, 5.5 MW
• SE- Malmköping, 3.4 MW
Projects Condenser, boiler load
SaveEnergy Group www.saveenergy.ch
• FI- Korkeakoski, 8 MW
• FR- Le Sen, 8 MW
• FR- Firminy, 6 MW
• CH- Cernier, 4 MW
• CH- Wangen, 3.3 MW
• CH- Regensdorf, 3.6 MW
• CH- Broc, 2.5 MW
• CH- Losone, 3.3 MW
• CH- Uzwil, 1.6 MW
• CH- Düdingen, 2 MW
Projects DESP, boiler load
SaveEnergy Group www.saveenergy.ch
CH- Affoltern am Albis Operator: HEA Holzenergie AG Consultants: Durena AG Wood firing system: 7 [MW] (5 [MW] / 2 [MW]) Heat recovery : approx. 1.1 [MW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Devaporization: to -5 [°C] Commissioning: February 2013 Products: Flue gas condenser, K07 Wet electrostatic
precipitator, N07 Water treatment system, W07 Bypass- damper, B04 Big-Bag Handlingsystem, S07 Devaporisor, E07
SaveEnergy Group www.saveenergy.ch
LV - Zasulauks General contractor: UAB Axis Industries Wood firing system: 20 [MW] Heat recovery: approx. 5.8 [MW] Commissioning: May 2013 Products: Flue gas condenser, K22 Water treatment system, W11
SaveEnergy Group www.saveenergy.ch
LV - Cesis General contractor: UAB Axis Industries Wood firing system: 7 [MW] Heat recovery: approx. 2 [MW] Commissioning: February 2013 Products: Flue gas condenser, K07 Water treatment system, W07
SaveEnergy Group www.saveenergy.ch
CH - Eischoll Operator : Eischoll Energie AG Consultants: Renercon Anlagen AG Wood firing system: 2 [MW] Heat recovery: approx. 300 [kW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: January 2013 Products: Flue gas condenser, K02 Wet electrostatic
precipitator, N02 Water treatment system, W07 Bypass- damper, B02 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
CH- Tagelswangen Operator: HHE Heider Holzenergie AG Wood firing system: 2 [MW] Heat recovery: approx. 380 [kW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: December 2013 Products: Flue gas condenser, K02 Wet electrostatic
precipitator, N02 Water treatment system, W07 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
CH - Bissau Operator : Wärmeverbund Bissau Consultants: NRG A AG Wood firing system: 2.7 [MW] Heat recovery: approx. 500 [kW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: January 2013 Products: Flue gas condenser, K04 Wet electrostatic
precipitator, N04 Water treatment system, W07 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
CH- Hedingen Operator : Wärmeverbund Hedingen Consultants: Renercon Anlagen AG Wood firing system: 2.5 [MW] Heat recovery: approx. 480 [kW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: January 2013 Products: Flue gas condenser, K02 Wet electrostatic
precipitator, N04 Water treatment system, W07 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
LT- Druskininkai General contractor: UAB Axis Industries Wood firing system: 10 [MW] Heat recovery: approx. 2.5 [MW] Commissioning: December 2013 Products: Flue gas condenser, K11 Water treatment system, W11
SaveEnergy Group www.saveenergy.ch
CH- Zinzikon Operator : Stadtwerk Winterthur Consultants: Kurt Rothweiler Wood firing system: 1.8 [MW] Heat recovery: approx. 460 [kW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: June 2013 Products: Flue gas condenser, K02 Wet electrostatic
precipitator, N02 Water treatment system, W07 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
LT- Zietelos General contractor: UAB Axis Industries Wood firing system: 20 [MW] Heat recovery: approx. 5.5 [MW] Commissioning: September 2013 Products: Flue gas condenser, K22 Water treatment system, W11
SaveEnergy Group www.saveenergy.ch
DE- Oberhonnefeld Operator : I. van Roje und Sohn Consultants: Plant Engineering GmbH Wood firing system: 8 [MW] Heat recovery: approx. 2.1 [MW] Commissioning: May 2013 Products: Flue gas condenser, K07 Water treatment system, W07
SaveEnergy Group www.saveenergy.ch
CH- Wittenbach Operator : SAK AG Consultants: Hälg & Co. AG Wood firing system: 5.8 [MW] Heat recovery: approx. 1.1 [MW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: March 2014 Products: Flue gas condenser, K07 Wet electrostatic
precipitator, N07 Water treatment system, W07 Bypass- damper, B04 Big-Bag Handlingsystem, S07
SaveEnergy Group www.saveenergy.ch
AT- Rauris Operator : Hackschnitzel und Heizgenossenschaft Rauris reg.GenmbH Consultants: SEEGEN Wood firing system: 5.2 [MW] (2.2 [MW] / 3.0 [MW]) Heat recovery: approx. 1.5 [MW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Devaporization: to -5 [°C] Commissioning: July 2014 Products: Flue gas condenser, K07 Wet electrostatic
precipitator, N07 Water treatment system, W07 Bypass- damper, B04 Big-Bag Handlingsystem, S07 Devaporisor, E07
SaveEnergy Group www.saveenergy.ch
CH- Hettlingen Operator : Politische Gemeinde Hettlingen Consultants: Müller + Pletscher AG Wood firing system: 1.6 [MW] Heat recovery: approx. 400 [kW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: April 2014 Products: Flue gas condenser, K02 Wet electrostatic
precipitator, N02 Water treatment system, W07 Bypass- damper, B02 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
CH- Schüpfen Operator : Wärmeverbund Lyssbach Schüpfen AG Consultants: a energie AG Wood firing system: 2.2 [MW] Heat recovery: approx. 400 [kW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: March 2014 Products: Flue gas condenser, K02 Wet electrostatic
precipitator, N02 Water treatment system, W07 Bypass- damper, B02
SaveEnergy Group www.saveenergy.ch
SE- Bjuv Operator : Neova AB Consultants: Hotab Group AB Wood firing system: 3 [MW] Heat recovery: approx. 600 [kW] Dust content: < 100 [mg/Nm3] (at 6 vol-% O2) Commissioning: November 2013 Products: Flue gas condenser, K04 Water treatment system, W07 Bypass- damper, B04 Big-Bag Handlingsystem, S07
SaveEnergy Group www.saveenergy.ch
PL- Stelmet Operator : Stelmet sp. z o.o. S.K.A. Consultants: IS SaveEnergy AG Wood firing system: 10 [MW] Heat recovery: approx. 4 [MW] Commissioning: November 2013 Products: Flue gas condenser, K11 Water treatment system, W11 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
CH- Stadtspital-Triemli Operator : EWZ Consultants: Gruner Gruneko AG Wood firing system: 2.6 [MW] Heat recovery: approx. 800 [KW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: September 2014 Products: Flue gas condenser, K04 Wet electrostatic
precipitator, N04 Water treatment system, W04 Bypass- damper, B02 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
CH- Ibach Operator : AGRO Energie Schwyz AG Consultants: erwin betschart energie + haustechnik Wood firing system: 9.7 [MW] (3.2 [MW] / 6.5 [MW]) Heat recovery: approx. 1.8 [MW] Dust content: < 10 [mg/Nm3] (at 11 vol-% O2) Commissioning: October 2014 Products: Flue gas condenser, K11 Wet electrostatic
precipitator, N11 Water treatment system, W11 Big-Bag Handlingsystem, S07
SaveEnergy Group www.saveenergy.ch
FR- Cernay Operator : Cofely Wood firing system: 4.2 [MW] Heat recovery: approx. 800 [KW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: September 2014 Products: Flue gas condenser, K04 Wet electrostatic
precipitator, N04 Water treatment system, W07 Bypass- damper, B04 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
CH- Elgg Operator : Gemeinde Elgg Consultants: Hälg & Co. AG Wood firing system: 2.4 [MW] Heat recovery: approx. 350 [KW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Commissioning: October 2014 Products: Flue gas condenser, K04 Wet electrostatic
precipitator, N04 Water treatment system, W07 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
LV- Jaunolaine General contractor: SIA LER Baltic Group Wood firing system: 3 [MW] Heat recovery: approx. 800 [KW] Dust content: < 80 [mg/Nm3] (at 6 vol-% O2) Commissioning: Dezember 2014 Products: Flue gas condenser, K04 Wet electrostatic
precipitator, N02 Water treatment system, W07 Bypass- damper, B04
SaveEnergy Group www.saveenergy.ch
CH- Speicher Operator : SAK AG Consultants: Hälg & Co. AG Wood firing system: 6.0 [MW] Heat recovery: approx. 1.1 [MW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Expected comm.: September 2014 Products: Flue gas condenser, K07 Wet electrostatic
precipitator, N07 Water treatment system, W07 Bypass- damper, B04 Big-Bag Handlingsystem, S07
SaveEnergy Group www.saveenergy.ch
CH- Aarburg Operator : Franke Schweiz AG Consultants: Carnotech AG Wood firing system: 2.25 [MW] Heat recovery: approx. 750 [KW] Dust content: < 20 [mg/Nm3] (at 11 vol-% O2) Devaporization : to -5 [°C] Commissioning: February 2015 Products: Flue gas condenser, K02 Wet electrostatic
precipitator, N02 Water treatment system, W07 Bypass- damper, B02 Big-Bag Handlingsystem, S04 Devaporisor, E02
SaveEnergy Group www.saveenergy.ch
SE- Sorsele Operator : Gemeinde Sorsele Consultants: Hotab Bio Energy AB Wood firing system: 5.5 [MW] Heat recovery: approx. 750 [KW] Commissioning: October 2014 Products: Flue gas condenser, K07 Water treatment system, W07 Big-Bag Handlingsystem, S04
SaveEnergy Group www.saveenergy.ch
SE- Malmkoeping General contractor: Hotab Bio Energy AB Wood firing system: 3.4 [MW] Heat recovery: approx. 700 [KW] Commissioning: October 2014 Produkte: Flue gas condenser, K04 Water treatment system, W07