SAP ECC 6.0 PP Routing -

30
Testing: Unit Testing / User Manual Module: Production & Planning ENVIRONMENT SYSTEM : SAP R/3 ECC 6.0 CLIENT : 200 UNIT TESTING SCENARIO SCENARIO NUMBER : PP-12 DESCRIPTION : Routing PREPARED BY NAME : D.Halder DATE : TEAM : Production Planning APPROVED & TESTED BY NAME : Nanhe Babu (PwC) DATE : TEAM : Production Planning Page 1 of 30

description

Download this and other great SAP PP End-User manuals from http://sapdocs.info/sap/production-planning/sap-r3-ecc-6-0-pp-end-user-guides/You can find more SAP PP documents at http://sapdocs.info/category/sap/production-planning/

Transcript of SAP ECC 6.0 PP Routing -

Page 1: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

ENVIRONMENT

SYSTEM : SAP R/3 ECC 6.0

CLIENT : 200

UNIT TESTING SCENARIO

SCENARIO NUMBER : PP-12

DESCRIPTION : Routing

PREPARED BY

NAME : D.Halder

DATE :

TEAM : Production Planning

APPROVED & TESTED BY

NAME : Nanhe Babu (PwC)

DATE :

TEAM : Production Planning

Page 1 of 30

Page 2: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

1. Transaction Code/ Path

Enter the menu path of the transaction code, which is going to be tested by the user.

Menu Path Logistics Production Master Data Routings RoutingsStandard Routings CA01 - Create

T.Code CA01

2. Input Data

1. Enter the Input parameters, which need to be given by the user during the testing of this scenario.

2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table.

3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2 for every screen.

2.1 Input Screen Name – Create Routing: Initial Screen

Description of the Field

Nature of the Field Value of the Field

Material Mandatory Material code9250230002

Plant Mandatory Plant Code2120

Group Optional 4321

Press on Tab

Page 2 of 30

Page 3: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Manu Path Of Creating Routing

Page 3 of 30

Page 4: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

2.2 Creating Routing Header Details

Description of the Field

Nature of the Field Value of the Field

Group Counter Mandatory 1

Page 4 of 30

Page 5: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Usage Mandatory 1(F4 value)Status Mandatory 4(F4 value)Planner Group Optional F4 value

Click on Routing

Page 5 of 30

Page 6: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Click on Operations

Description of the Field

Nature of the Field Value of the Field

Page 6 of 30

Page 7: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Description of the Field

Nature of the Field Value of the Field

Description Mandatory Milling top face and bottom face

Control Key Mandatory PP01Work Centre Mandatory JT-MILL

Click on torch of the work centre field

Put the cursor on work centre and Press on Tab

Page 7 of 30

Page 8: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Page 8 of 30

Page 9: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Select the required work centre

Press on Tab

Page 9 of 30

Page 10: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Put the value in the standard value of machine for machining

Press on Tab

Page 10 of 30

Page 11: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Press on Save

Page 11 of 30

Page 12: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

1. Transaction Code/ Path

Enter the menu path of the transaction code, which is going to be tested by the user.

Menu Path Logistics Production Master Data Routings RoutingsStandard Routings CA02Change Routing

T.Code CA02

2. Input Data

Page 12 of 30

Page 13: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

1. Enter the Input parameters,which need to be given by the user during the testing of this scenario.

2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table.

3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2 for every screen.

2.1 Input Screen Name – Change Routing: Initial Screen

Description of the Field

Nature of the Field Value of the Field

Material Mandatory Material code9250230002

Plant Mandatory Plant Code2120

Press on Tab

Page 13 of 30

Page 14: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Page 14 of 30

Page 15: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

REMOVE THE GROUP NUMBER

Page 15 of 30

Page 16: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

PRESS ENTER

Page 16 of 30

Page 17: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

HERE WE CAN CHANGE

1. DESCRIPTION2. CONTROL KEY3 WORK CENTER4. MACHINE TIME

CLICK ON SAVE BUTTON

Page 17 of 30

Page 18: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

1. Transaction Code/ Path

Enter the menu path of the transaction code, which is going to be tested by the user.

Menu Path Logistics Production Master Data Routings RoutingsStandard Routings CA03Display

Page 18 of 30

Page 19: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

T.Code CA03

2. Input Data

1. Enter the Input parameters,which need to be given by the user during the testing of this scenario.

2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table.

3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2 for every screen.

2.1 Input Screen Name --Display Routing: Initial Screen

Description of the Field

Nature of the Field Value of the Field

Material Mandatory Material code9250230002

Plant Mandatory Plant Code2120

Press on Tab

Page 19 of 30

Page 20: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

CLICK ON ENTER

REMOVE GROUP NUMBER

Page 20 of 30

Page 21: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

1. Transaction Code/ Path

Enter the menu path of the transaction code, which is going to be tested by the user.

Page 21 of 30

Page 22: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Menu Path Logistics Production Master Data Routings RoutingsStandard Routings CA02Change Routing

T.Code CA02

2. Input Data

1. Enter the Input parameters,which need to be given by the user during the testing of this scenario.

2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table.

3. If the scenario has multiple screen inputs, which needs to be processed, repeat the step 2 for every screen.

2.1 Input Screen Name – Change Routing: Initial Screen

Description of the Field

Nature of the Field Value of the Field

Material Mandatory Material codeR20004000020L00C

Plant MandatoryPlant Code2120

REMOVE GROUP NUMBER

Press on Tab

Page 22 of 30

Page 23: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

CLICK ON ENTER

Page 23 of 30

Page 24: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

CLICK ON COMPONENT ALLOCATION TAB

Page 24 of 30

Page 25: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

SELECT BILL OF MATERIAL ITEMS WHICH YOU WANT TO ALLOCATE FOR A PARTICULAR OPERATION OF A ROUTING AND CLICK ON NEW ASSIGNMENT TAB.

Page 25 of 30

Page 26: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Page 26 of 30

Page 27: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

CLICK ON OPER/ACT. LIST

Page 27 of 30

Page 28: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

IN CHOOSE OPERATION SCREEN SELECT THE OPERATION SEQUENCE WHERE YOU WANT TO ALLOCATE THE BILL OF MATERIAL ITEMS AND CLICK ON ENTER BUTTON.

Page 28 of 30

Page 29: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

BILL OF MATERIAL ITEMS 0010 TO 0060 ARE ALLOCATED FOR OPERATION NO 0020.

CLICK ON SAVE BUTTON.

Page 29 of 30

Page 30: SAP ECC 6.0 PP Routing -

Testing: Unit Testing / User Manual Module: Production & Planning

Page 30 of 30