SAP BW-BPSFeatures, Functions & Futures
Product Management SAP NetWeaver (BI)
The information contained herein reflects current planningand may be changed at any time without prior notice
SAP AG 2004, Strategy_Planning_BW_e 2
Clarification about Releases/Terminology
SAP SEM is an Add-On on top of SAP BW
SAP SEM and SAP BW have different release cycles and release names
SAP SEM 3.1B is based on a SAP BW 3.0B system
SAP SEM 3.2 can be based on SAP BW 3.1 Content, BI Content 3.2, BI Content 3.3
SAP SEM 3.5 can be based on SAP BW 3.1 Content, BI Content 3.2, BI Content 3.3
SAP SEM 4.0 is based on a SAP BW 3.5 system
SAP BW 3.5 is a component of SAP NetWeaver 2004
SAP NetWeaver BI 7.0 will be the next release of SAP BI delivered with SAPNetWeaver 2005.
SAP AG 2004, Strategy_Planning_BW_e 3
AgendaRoadmap SAP Business Planning
SAP‘s strategy in the business planning area
Why a new business planning environment?
Generic planning in SAP NetWeaver today and tomorrowOverviewExample from the systemComparison of functionalities
Recommended strategyExisting SEM-CustomerImplementation 2004 (Customer in Ramp-Up)Implementation 2004 (Customer not in Ramp-Up)Implementation after 2004
SAP AG 2004, Strategy_Planning_BW_e 4
Roadmap SAP Business Planning
2005
Integration ofmaster andtransactional dataExcel integrationAccess to plan datavia webIntegration tooperationalsystems viaretractorsProcess monitoringReporting andanalysis in SAPBW
SAP SEM-BPS
Q1/04
Additional featuresStatus and TrackingMonitorStatistical ForecastEnhancementsfor characteristiccombinationsPredefined totalsin rows and columnsFrontend-Locking
SAP BW-BPS
Web Dynpro baseddesign of planningapplicationsApplication designfor integratedplanning in BExWeb and ExcelOpen serviceframeworkCollaborationfeatures
SAP BI integratedBusiness Planning
SAP BW-BPS
SAP SEM 3.5/BW3.1 SAP NetWeaver 2004 SAP NetWeaver 2005 > SAP NetWeaver 2005
Offline PlanningMaster DataPlanningPlanning on ODSObject...
SAP BI integratedBusiness Planning
SAP BW-BPS
SAP AG 2004, Strategy_Planning_BW_e 5
AgendaRoadmap SAP Business Planning
SAP‘s strategy in the business planning area
Why a new business planning environment?
Generic planning in SAP NetWeaver today and tomorrowOverviewExample from the systemComparison of functionalities
Recommended strategyExisting SEM-CustomerImplementation 2004 (Customer in Ramp-Up)Implementation 2004 (Customer not in Ramp-Up)Implementation after 2004
SAP AG 2004, Strategy_Planning_BW_e 6
Business Planning with SAP NetWeaver – Strategy*
Q1/2004 Q2/2005
SAP NetWeaver2004
SAP NetWeaver2005
*current as of april 2004
SEM - BPSSEM - BPS
BW-BPS remainsfunctional. Maintenance isensured by SAP.
BI integrated Planning
BW - BPS
SEM-BPS becomes BW-BPS
SAP AG 2004, Strategy_Planning_BW_e 7
How does SAP secure customer investments in SAPBW-BPS?
Customers will not be forced to upgrade. All scenarioscreated with SAP BW-BPS* will still run, when SAP BIintegrated business planning was delivered.SAP BW-BPS will continue to be delivered andmaintained with SAP BI releases equal or higher thanSAP NetWeaver 2005.Planning scenarios built with SAP BW-BPS can coexistand integrate with planning scenarios built with SAP BIintegrated business planningApart from this fact, SAP will offer a migration path forthe move from SAP BW-BPS to SAP BI integratedbusiness planning if needed
The critical and time consuming part for modeling theplanning application (characteristics, keyfigures,authorizations, locking concept, ...) can be reused in BIintegrated business planningMore frontend related objects like planning layouts, webinterfaces etc. have to be rebuilt manually
* applies for SAP SEM-BPS, too
SAP AG 2004, Strategy_Planning_BW_e 8
AgendaRoadmap SAP Business Planning
SAP‘s strategy in the business planning area
Why a new business planning environment?
Generic planning in SAP NetWeaver today and tomorrowOverviewExample from the systemComparison of functionalities
Recommended strategyExisting SEM-CustomerImplementation 2004 (Customer in Ramp-Up)Implementation 2004 (Customer not in Ramp-Up)Implementation after 2004
SAP AG 2004, Strategy_Planning_BW_e 9
Why a New Business Planning Environment?
One generic planning tool for all solutions
Homogeneous analysis and planning user interface
Usage of BW OLAP features (e.g. drill-down, alerting, calculatedkeyfigures, …) for planning
Simplification of system operation using componentconsolidation
Web Dynpro based modeling environment
This step is a part of consistent alignmentwith the Enterprise Service Architecture(ESA) strategy, which is a corecomponent of SAP NetWeaver™
SAP AG 2004, Strategy_Planning_BW_e 10
AgendaRoadmap SAP Business Planning
SAP‘s strategy in the business planning area
Why a new business planning environment?
Generic planning in SAP NetWeaver today and tomorrowOverviewExample from the systemComparison of functionalities
Recommended strategyExisting SEM-CustomerImplementation 2004 (Customer in Ramp-Up)Implementation 2004 (Customer not in Ramp-Up)Implementation after 2004
SAP AG 2004, Strategy_Planning_BW_e 11
SAP Planning Environment Today
System ExampleSAP BW-BPS
(SAP NetWeaver 2004)
SAP AG 2004, Strategy_Planning_BW_e 12
SAP Planning Environment Tommorrow
System ExampleSAP BI
integrated Planning(SAP NetWeaver 2005)
SAP AG 2004, Strategy_Planning_BW_e 13
Modelling AutomaticPlanning
Manual Planning/Analysis
Process control
Acceptance ofplan data
Plan data entryExcel, Web, ALV
Application DesignPlanning folders(GUI)Web Interfaces
UI functionsDocumentsHierarchies in rows
AnalysisAnalysis in BusinessExplorer(Excel + Web)
Flexibility andpromptness
Planning functionsSimulation/What IfTop DowndistributionBottom upaggregationCurrency translationFormulasRevaluation...Event-basedexecution ofplanning functions
Coordination of theplanning process
Process managementStatus andTracking MonitorVersions
Distribution of dataRetractors for writeback of data to SAPR/3
Planning in SAP NetWeaver 2004 – SAP BW-BPS
Reliability ofplan data
Planning frameworkInfoCube (transact.):Integration of masterand transaction dataDefinition of workpackagesHierarchiesCharacteristiccombinations
Authorizations
SAP AG 2004, Strategy_Planning_BW_e 14
Coordination of theplanning process
ProcessmanagementStatus andTracking monitorVersionsProcess chains
Distribution of dataRetractors forwrite back of datato SAP R/3
XI for distributionof data tooperationalsystems
Flexibility andpromptness
Planning andanalysis services
Simulation/What IfTop downdistributionBottom upaggregationCurrency translationFormulasRevaluationAnalyse (z.B. ABC...)...
Event basedexecution ofplanning functionsBackgroundprocessing
Acceptance ofplan data
Plan data entry andanalysis
Excel, Web (BExQuery Builder)
Application DesignWeb Interface DesignExcel Interface Design
UI functionsDocumentsHierarchies in rowsand columnsDrill DownGraphicsCalculated key figuresad hoc currencytranslationAlertsStructuresConditions
Planning in SAP NetWeaver 2005 – SAP BI Integrated Planning
Modelling AutomaticPlanning
Manual Planning/Analysis
Process control
Reliability ofplan data
Planning framework
InfoCube (transact.):Integration of master/transaction dataDefinition of workpackages
HierarchiesCharacteristiccombinations
Authorizations
SAP AG 2004, Strategy_Planning_BW_e 15
Acceptance ofplan data
Plan data entry andanalysis
Excel, Web (BEx QueryBuilder)
Application DesignWeb Interface DesignExcel Interface Design
UI functionsDocumentsHierarchies in rowsand columnsDrill DownGraphicsCalculated key figuresad hoc currencytranslationAlertsStructuresConditions
ConsistentFrontendfunctions
(User interfacesand OLAP)
Coordination of theplanning process
ProcessmanagementStatus andTracking monitorVersionsProcess chains
Distribution of dataRetractors forwrite back of datato SAP R/3
XI for distributionof data tooperationalsystems
Flexibility andpromptness
Planning andanalysis services
Simulation/What IfTop downdistributionBottom upaggregationCurrency translationFormulasRevaluationAnalyse (z.B. ABC...)...
Event basedexecution ofplanning functionsBackgroundprocessing
AutomaticPlanning
Manual Planning/Analysis
Process control
EnterpriseService
Architecture
Collaboration,process chains
and XI
Reliability ofplan data
Planning framework
InfoCube (transact.):Integration ofmaster /transactiondata
Definition of workpackages
HierarchiesCharacteristic
combinationsAuthorizations
Web Dynpro
Modelling
Planning in SAP NetWeaver 2005 – SAP BI Integrated Planning
SAP AG 2004, Strategy_Planning_BW_e 16
AgendaRoadmap SAP Business Planning
SAP‘s strategy in the business planning area
Why a new business planning environment?
Generic planning in SAP NetWeaver today and tomorrowOverviewExample from the systemComparison of functionalities
Recommended strategyExisting SEM-CustomerImplementation 2004 (Customer in Ramp-Up)Implementation 2004 (Customer not in Ramp-Up)Implementation after 2004
SAP AG 2004, Strategy_Planning_BW_e 17
How to use these recommendations
These recommendations focus on the choicesavailable when implementing SAP BI planningfunctionality.The slides contain recommendations to help customers decidewhat combination of SAP BW and/or SEM applications to installwhen they are interested in using planning functionality in thecontext of SAP BI.
The different options presented describe the options availabledepending on whether customers want to implement just theplanning functionality or if they plan to use other SEM keycapabilities such as Consolidations or Corporate PerformanceManagement.
Please consider the option that applies to your currentimplementation plans.
SAP AG 2004, Strategy_Planning_BW_e 18
AgendaSAP‘s strategy in the business planning area
Why a new business planning environment?
Generic planning in SAP NetWeaver today and tomorrowOverviewExample from the systemComparison of functionalities
Recommended strategyExisting SEM-CustomerImplementation 2004 (Customer in Ramp-Up)Implementation 2004 (Customer not in Ramp-Up)Implementation after 2004
SAP AG 2004, Strategy_Planning_BW_e 19
Explanations
Planning functionalityCore planning capabilities delivered either with SEM-BPS up to SAP BW 3.5 or BW-BPS(planning workbench, generic planning functions, manual planning, status andtracking system, retractors) starting with SAP BW 3.5
Other SEM capabilitiesSEM-CPM: e.g. Balanced Scorecard, Management Cockpit, Measure BuilderSEM-BCS: Business ConsolidationSEM-BPS: Financial planning content (balance sheet planning, cost centerplanning,...) and business specific planning functions (allocation, amortization,depreciation, time lag, offsetting entry, account based currency conversion,rounding, net present value, internal rate of return, calculate inventory, valuation)
Note:BW-BPS will include full capabilities necessary to implement financial planning.SEM-BPS will be content and business specific planning functions for financialplanning applications based and built upon BW-BPS.
ContentThe content of all other planning applications besides financial planning content willbe delivered with SAP BW content starting with SAP BW 3.5
SAP AG 2004, Strategy_Planning_BW_e 20
Possible Implementation Scenarios
Existing SEM-CustomerImplementation 2004 (Customer in Ramp-Up)Implementation 2004 (Customer not inRamp-Up)Implementation after 2004
SAP AG 2004, Strategy_Planning_BW_e 21
Existing SAP SEM customer
SEM Add-On on top of SAP BW (Planning functionality SEM-BPS)
2005
July 2004 (Q1 2005 for customers not participating in ramp up)
Upgrade to SAP BI 7.0 (incl. SAP BW integrated planning and BW-BPS)Upgrade to corresponding SAP SEM releaseNote: Upgrade to SAP BW 7.0 in this constellation requires the availability of the corresponding SEM Add-On
Migration to fully SAP BI integrated planning with upgrade to SAPBW 7.0 is not a must!Implemented BW-BPS scenarios still workUsage of new features of SAP BI integrated planning requires migration
Upgrade to SAP BW 3.5 (Planning functionality BW-BPS)Upgrade to SAP SEM 4.0Note: Upgrade to SAP BW 3.5 in this constellation requires the availability of the SEM 4.0 Add-On
No migration necessary
Planning only/Planning and other SAP SEM key capabilities
Back
SAP AG 2004, Strategy_Planning_BW_e 22
Implementation 2004 (Customer in Ramp Up)
2005
July 2004Q1 2004
Upgrade to SAP BI 7.0 (incl. SAPBI integrated planning and BW-BPS)Upgrade to corresponding SEMreleaseNote: Upgrade to SAP BW 7.0 in thisconstellation requires the availability of thecorresponding SEM Add-On
Upgrade to SAP BI 7.0 (incl. SAPBI integrated planning and BW-BPS)
Migration to fully SAP BI integrated planning with upgrade to SAPBW 7.0 is not a must!Implemented BW-BPS scenarios still workUsage of new features of SAP BI integrated planning requires migration
Install SAP BW 3.5 (incl. BW-BPS)Install SEM 4.0
Install SAP BW 3.5 (incl. BW-BPS)No SEM Add-On necessary
Planning and SEM key capabilitiesPlanning only
Back
SAP AG 2004, Strategy_Planning_BW_e 23
Implementation 2004 (Customer not in Ramp Up)
Q1 – Q3 2004
Install SAP SEM 3.5/SAP BW 3.1 (Planning functionality SEM-BPS) onone instance
2005
Q1 2005
Upgrade to SAP BI 7.0 (incl. SAP BW integrated planning and BW-BPS)Upgrade to corresponding SEM releaseNote: Upgrade to SAP BW 7.0 in this constellation requires the availability of the corresponding SEM Add-On
Migration to fully SAP BI integrated planning with upgrade to SAPBW 7.0 is not a must!Implemented BW-BPS scenarios still workUsage of new features of SAP BI integrated planning requires migration
Upgrade to SAP BW 3.5 (Planning functionality BW-BPS)Upgrade to SAP SEM 4.0Note: Upgrade to SAP BW 3.5 in this constellation requires the availability of the SEM 4.0 Add-On
No migration necessary
Planning only/Planning and other SAP SEM key capabilities
Back
SAP AG 2004, Strategy_Planning_BW_e 24
Implementation after 2004
Mid 2005 (ramp-up)
Install SAP BW 7.0 (incl. SAP BIintegrated planning)Use SAP BI integrated planningInstall corresponding SEMrelease for other SEM keycapabilities
Install SAP BW 7.0 (incl. SAP BIintegrated planning)Use SAP BI integrated planning
Planning and SEM key capabilitiesPlanning only
Back
SAP AG 2004, Strategy_Planning_BW_e 25
Contacts
For further informations please contact:
Americas:
EMEA, APA:
SAP AG 2004, Strategy_Planning_BW_e 26
No part of this publication may be reproduced or transmitted in any form or for any purpose without the expresspermission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of othersoftware vendors.
Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks ofMicrosoft Corporation.
IBM®, DB2®, DB2 Universal Database, OS/2®, Parallel Sysplex®, MVS/ESA, AIX®, S/390®, AS/400®, OS/390®,OS/400®, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere®, Netfinity®, Tivoli®,Informix and Informix® Dynamic ServerTM are trademarks of IBM Corporation in USA and/or other countries.
ORACLE® is a registered trademark of ORACLE Corporation.
UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group.
Citrix®, the Citrix logo, ICA®, Program Neighborhood®, MetaFrame®, WinFrame®, VideoFrame®, MultiWin® andother Citrix product names referenced herein are trademarks of Citrix Systems, Inc.
HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium,Massachusetts Institute of Technology.
JAVA® is a registered trademark of Sun Microsystems, Inc.
JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology inventedand implemented by Netscape.
MarketSet and Enterprise Buyer are jointly owned trademarks of SAP AG and Commerce One.
SAP, SAP Logo, R/2, R/3, mySAP, mySAP.com and other SAP products and services mentioned herein as well astheir respective logos are trademarks or registered trademarks of SAP AG in Germany and in several othercountries all over the world. All other product and service names mentioned are trademarks of their respectivecompanies.
Copyright 2004 SAP AG. All Rights Reserved