    The   4-‐MW   Landfill   Methane   Recovery  and   Power   Genera9on   Project   is  located   in   San   Pedro,   Laguna.     It   is  18km  from  Maka9  City          

  • -‐  Owned  and  operated  by  Pilotage  Trading  and  Construc7on  

    -‐  The  San  Pedro  Sanitary  Landfill  has  been  receiving  waste  since  2003  

    -‐  Cell  1-‐5  =  18  Has    

    -‐  Currently  receiving  waste  from  Municipalites  of  Laguna  

     -‐  BEI  has  installed  84  

    collec7ng  wells  throughout  cell  1-‐4  

  • Installed  Capacity   4,212  MW  (4MW)  

    Engine  Specs   4  Jenbacher  Gas  Engines  (J320)  each  with  a  design  capacity  of  1053  kW  (1MW),  contained  in  20S  containers  

    Engine  Efficiency   40.32%  

    Fuel  Gas  LHV   100%  (Full  load)  

    75%  (Par7al  load)  

    50%  (Half  load)  

    Gas  Volume   Nm3   679   528   376  

    Electrical  output  

    kW   1053   789   523  

  • MILESTONE   DATE  

    Incorpora9on  of  BEI   July  2007  

    Commenced  Drilling  of  Wells     November  2007  

    Approval  of  Loan  from  DBP   June  2009  

    Onsite  Groundbreaking  for  construc9on  of  Power  Plant   November  2009  

    Comple9on  of  PDD  (for  CDM)   December  2009  

    Received  ECC  from  DENR   June  25  2009  

    Awarded  a  Biomass  RE  Opera9ng  Contract  from  DOE   February  1  2010  

    Signed  a  Power  Purchase  Agreement  with  MERALCO     November  12  2010    

    Comple9on  of  Plant  Commissioning   December  13  2010  

    Received  COC  from  ERC   Jan  31  2011  

    Received  Le`er  of  Approval  from  Host  DNA  (DENR)   March  7  2011  

    Start  of  Commercial  Opera9on   March  15  2011  

  • [clean]    

    LAND FILLING GAS WELL DRILLING & INSTALATION

    LFG PROCESSING & EXTRACTION UNIT

    LFG POWER GENERATION

    ELECTRIC DISTRIBUTION TO THE GRID END USERS

  • BALANCING  THE  GAS  FIELD  à  Involves  Balancing  flow,  oxygen,  methane  and  pressure    Primary  Considera7ons  in  Managing  Landfill  Gas  Extrac9on:  

    –  Mi9ga9on  Escape  of  GHG    –  Maximize  u9lisa9on  of  CH4  (CH4  ≥  50  %volume)  –  Minimize  O2  levels  (O2%volume)  

  •    Classified  as  a  Clean  Development  Mechanism  Project   (“CDM”)  and   is  expected   to   receive   cer9fied   emission   reduc9on   (“CER”)   cer9ficates  from:    1)   The   Collec9on   and   Destruc9on   of   methane   generated   from   the  landfill  

    2)   The   Displacement   of   pollu9ng   fuel   sources   used   in   electricity  genera9on.    Expected   to   generate   upto   130,000   tCO2e   over   a   10   year   Credi9ng  period      

  • We  are  Here!  

       

    PDD   • BEI  

    Host  Country  Approval  

    • DENR  

    Valida9on  of  Project   • SIRIM  QAS  

    Submission  of  Valida9on  Report  

    and  PDD  

    • CDM  Execu9ve  Board  

    Registra9on  of  CDM  project  

    • CDM  Execu9ve  Board  

    Verifica9on  and  Cer9fica9on   • DOE  

    Issuance  of  CERS  to  BEI