Sample Resume for HSE Supervisor

8
C.V: Yawar Jamil Page 1-8 YAWAR JAMIL PERSONAL Personal address 94/C, 10th Commercial Street, Phase IV, DHA, Karachi-75500 Pakistan. Phone: 021-35885583 Mobile: 0322-2012280 Email: [email protected] Date of Birth: 27 th February 1977 Marital Status: Married PROFILE More than nine years working experience on environmental projects and management/consultancy of HSE Management System in the oil, power plant (independent power producer), pharmaceutical and automotive sectors. More than 3.5 years experience as Head of HSE Department in oil and energy (power) sectors. Good knowledge of chemical engineering/applied chemistry, environmental engineering, engineering management and business management. Have key technical skills in project management softwares (Primavera and Microsoft Project), and some basic knowledge of Dynamic simulation software tool (Powersim and Arena) and engineering design software (Pro-e). Very good knowledge of ISO, 9001, 14001 and OHSAS 18001Management Systems. Good knowledge of ISO 9001, 14001 and OHSAS 18001 Management Systems Audits. Have very good knowledge of Hazard Identification and Risk Assessment (HIRA), Environmental Aspects/Impacts, Process Hazard Analysis (PHA), Process Safety Management, Job Safety Analysis (JSA), etc. An excellent HSE Trainer and conducted more than 100 training sessions on different HSE topics. Good knowledge of Power Plants, Oil Depots/Terminals and Pipeline, Pharmaceutical and Automotive industries’ HSE requirements. Very good knowledge of Pakistan & UAE environmental laws. Very good knowledge of prequalification and proposal development, and have completed more than 200 proposals/ prequalification documents for IEE/ EIA, ESA, Waste Management, Waste water treatment plant’s optimization, QC laboratory setup consultancy, Environmental Baseline, Environmental Monitoring, HSE trainings and other environmental/safety projects. Have sound skills of report writing and completed around 70 technical reports on environmental site assessments (Phase I, II & III), Ground Water Monitoring, Crops Protection Program, Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Solid Waste Management. Also developed HSE manuals and audit reports for pharmaceutical, automotive and oil storage and transportation companies. Good knowledge of Security Management System, Business Continuity Plan and Emergency/Disaster Response Plan for oil storage/transportation company and power plant. Good communication, people management, training and leadership skills. WORK EXPERIENCE January 2011- Present Asia Petroleum Limited (Oil Storage & Transportation Company) Position Hold A.M HSE (Head of HSE Department)

description

the document shows how to prepare resume for HSE supervisor

Transcript of Sample Resume for HSE Supervisor

C.V: Yawar J amil Page 1-8 YAWAR JAMIL PERSONAL Personal address 94/C, 10th Commercial Street, Phase IV, DHA, Karachi-75500 Pakistan. Phone: 021-35885583 Mobile: 0322-2012280 Email: [email protected] Date of Birth: 27th February 1977 Marital Status: Married PROFILE More than nine years working experience on environmental projects and management/consultancy of HSE Management System in the oil, power plant (independent power producer), pharmaceutical and automotive sectors.More than 3.5 years experience as Head of HSE Department in oil and energy (power) sectors. Goodknowledgeofchemicalengineering/appliedchemistry,environmentalengineering, engineering management and business management. Have key technical skills in project management softwares (Primavera and Microsoft Project),and some basic knowledge of Dynamic simulation software tool (Powersim and Arena) and engineering design software (Pro-e). Very good knowledge of ISO, 9001, 14001 and OHSAS 18001Management Systems. Good knowledge of ISO 9001, 14001 and OHSAS 18001 Management Systems Audits. Have very good knowledge of Hazard Identification and Risk Assessment (HIRA), Environmental Aspects/Impacts,ProcessHazardAnalysis(PHA),ProcessSafetyManagement,JobSafety Analysis (JSA), etc.An excellent HSE Trainer and conducted more than 100 training sessions on different HSE topics.GoodknowledgeofPowerPlants,OilDepots/TerminalsandPipeline,Pharmaceuticaland Automotive industries HSE requirements.Very good knowledge of Pakistan & UAE environmental laws. Verygoodknowledgeofprequalificationandproposaldevelopment,andhavecompletedmore than200proposals/prequalificationdocumentsforIEE/EIA,ESA,WasteManagement,Waste watertreatmentplantsoptimization,QClaboratorysetupconsultancy,EnvironmentalBaseline, Environmental Monitoring, HSE trainings and other environmental/safety projects.Havesoundskillsofreportwritingandcompletedaround70technicalreportsonenvironmental siteassessments(PhaseI,II&III),GroundWaterMonitoring,CropsProtectionProgram,Initial EnvironmentalExamination(IEE),EnvironmentalImpactAssessment(EIA)andSolidWaste Management.AlsodevelopedHSEmanualsandaudit reportsforpharmaceutical, automotiveand oil storage and transportation companies. GoodknowledgeofSecurityManagementSystem,BusinessContinuityPlanand Emergency/Disaster Response Plan for oil storage/transportation company and power plant. Good communication, people management, training and leadership skills. WORK EXPERIENCE January 2011- Present Asia Petroleum Limited(Oil Storage & Transportation Company) Position HoldA.M HSE (Head of HSE Department) C.V: Yawar J amil Page 2-8 ResponsibilitiesThemainresponsibilitiesinAsiaPetroleumlimitedisto monitor the performance of HSE Management System, update theenvironmentalaspects/impactsandriskassessmentfor process/auxiliariesequipmentandroutine/non-routinejobsby the help of other team members. Other responsibilities include theHSE trainings to APL andcontractual employees,internal QHSE audits and their reporting to company management and environmentalmonitoringofplantbythehelpofthirdparty laboratory.Thedetailsofresponsibilitiesaregivenin following table. S.No.HSE AreasResponsibilities Details 1Gap Analysis Carried out Gap Analysis for ISO 14001:2004 and OHSAS 18001:2007 Management Systems. 2 QHSE Procedures Development & Implementation Developed/finalizedtheproceduresaccordingtoclausesofISO 9001:2008,ISO14001&OHSAS18001andassistedmanagementin implementing them within Asia Petroleum Limited. 3 HIRA and Environmental Aspects/Impacts Carriedouthazardidentificationandriskassessmentandenvironmental aspects/impactsforallequipment,processandroutine/non-routine activitieswiththehelpofteamofengineers,supervisorsandchemist. Also review them on on-going basis.4 HAZOP and PHA Reviewedalreadyexistinghazardoperabilityandprocesshazard assessmentstudiesofplantandassistedmanagementincomplete implementation of said studies. 5 Employees Health Management Co-ordinates with HR Department for pre-employment health assessment of new employees and periodic medical check-up of existing employees. 6InspectionMake sure that fire fighting, safety and emergency items are inspected on periodic basis.7 Environmental Monitoring Coordinatewiththirdpartylaboratoryformonitoringofgaseous emissions, waste water, noise, etc. 8 HSE Incident Investigation and Reporting ToassistsupervisorsandsectionalheadsincarryouttheHSEincidents investigations and determination of root causes. 9 Emergency Management Organisation Lead the emergency management organisation of Asia Petroleum Limited10Reporting Report HSE performance of Company to management on monthly and quarterly basis. 11TrainingConduct trainings for employees on different HSE topics 12Internal Audit CarryoutInternalAuditsofISO9001:2008,ISO14001:2004&OHSAS 18001:2007ManagementSystemsbythehelpofinternalauditors.Also prepare internal audit reports for management review. June 2009- January, 2011DHA Cogen Limited(Desalination & Power Generation Company)Ashmore Energy Internationals (USA Based Firm) Holding Position HeldEHS Manager (Head of EHS Department) ResponsibilitiesIn DHA Cogen Limited, I was responsible for implementation ofenvironmentalhealthandsafetyprocedures,leadingthe EHSTeam,providetrainingondifferentEHStopics, compliancewithallapplicableenvironmentalandsafety C.V: Yawar J amil Page 3-8 laws/regulations,performauditsandpreparationofmonthly, quarterly and yearly EHS reports. The details of EHS activities in DCL are given in following table. S.No.EHS AreasResponsibilities Details 1EHS Procedures Development & Implementation Developed the standard operating procedures according to clauses of ISO 14001, OHSAS 18001 and Ashmore Energy (main assets holder of DCL) guidelines and also implemented them. 2Coordination with Sindh EPA Co-ordinatewiththeSindhEnvironmentalProtectionAgencyfor compliance of applicable environmental laws/ regulations. 3EHS Compliance Calendar InordertoensurethatEHSproceduresarefollowedstrictlybyall departmentssuchasOperation,Maintenance,Procurement&Store, LaboratoryandAdmin.,IdevelopedandimplementedtheEHS Compliance Calendar. 4Inspection & Audits Forpersonnelandplantsafety,Ihaveimplementedthefollowing inspection/ audit programs at DHA Cogen Limited. Portable Fire Extinguishers Fire Hydrants/Hoses House Keeping Portable/Fixed Ladder Rigging Tools such as Slings, Shackles, Eye Bolt, Chain Long, Jacks, etc. Safety Walkdown of Plant Hoist and Cranes PPEs Compliance Fork Lifter Power Tools Safety Valves 5 EHS Incident Investigation & Reporting To help Managers/Supervisor in carrying out the incidents investigations, determination of root cause of all incidents, their findings, closeouts and reporting 6 Reporting Preparationofmonthly,quarterlyandAnnualEHSReportsandtheir reporting to Ashmore Energy International7 TrainingProvidetrainingstoDCLandcontractualemployeesondifferentEHS issuessuchasJobSafetyAnalysis,Hazmat,WorkPermitSystem, ConfinedSpace,ChemicalManagement,HotWork,WorkingatHeight, Electrical Safety, Emergency Evacuation and Response Plan, MSDS, Fire Fighting, etc. May 2008-June 2009SGS Pakistan (Pvt.) Ltd. (Switzerland Based Firm) Position HeldExecutive Officer (Mineral & Environmental Department) ResponsibilitiesInSGSPakistan,IworkedasEnvironmentalExpertfor differentInitialEnvironmentalExamination(IEE), EnvironmentalImpactAssessment(EIA),EnvironmentalSite Assessment(ESA)andEnvironmentalBaselineProjects.The brief description of these projects is given in following table. S.No.ClientProject Details 1KESCSupervisedtheenvironmentalmonitoringactivitiesof KESCPowerPlantsbyfollowingtheSelfMonitoringand ReportingTool(SMART)program.Thelocationsofthese C.V: Yawar J amil Page 4-8 plantsareKorangi,BinQasimTownandSITEIndustrial areas.Themainpurposeofthisprojectwastodeterminethe powerplantscompliancewithPakistanNational EnvironmentalQualityStandards(NEQS)andother internationalstandards.Thescopeofenvironmental monitoringincludedthecheckingofwastewaterquality, gaseousemissionsqualityfromstacks,ambientairquality andsoundlevelrecording.Suggestionofmitigation measures/control measures for these environmental impacts was also included in the scope of work. 2KESCConductedtheEnvironmentalImpactAssessment(EIA)Study for132KVHybridGridStationsandUnderground TransmissionLinesProject,locatedinAzizabad,Gulshal-e-Iqbal and Liaquatabad.3KESCConductedtheEIAstudyfor132KVHybridGridStations, located in different areas of Karachi City. 4KESCConducted the EIA Study for Hybrid Grid Station, located in Memon Goth.5KESCConducted the EIA Study for Overhead Transmission Lines and Hybrid Grid Station, located in Airport and Korangi Areas.6KESCConducted the EIA Study for Hybrid Grid Station, located in Gulshan-e-Maymar. 7Nestle PakistanCompletedtheInitialEnvironmentalExamination(IEE)Study for06Hydrocarbonstoragetankswhichwereproposedto construct/commissioned in existing Nestle Sheikhupura Plant. 8Pakistan Cosmetics In Pakistan Cosmetics, I conducted the Gap Analysis against the principalrequirementsofISO14001andOHSAS18001:2007 by visiting the site, observing the potential risk and examine the existing organization policies and procedures. 9Nestle PakistanCompletedEIAStudyforNestleWasteWater TreatmentPlant located in Kabirwala City, Punjab. 10Nestle PakistanCompleted IEE Study for Nestle Power House, Butter Oil Store & Rework Processing Plant, located in Kabirwala City, Punjab. 11PARCOCompletedEIAStudyforAirAsphaltBlowingUnitand HydrodesulphurizationUnitlocatedinMidCountryRefinery (MCR), Mehmood Kot, Punjab. 12RAK Gas, UAECompleted the EIA Study for Waste Water Treatment Plant, located in RAK Gas Plant, Ras Al Khaimah, U.A.E.CarriedouttheEnvironmentalRiskAssessmentofall availabledisposaloptionsforhighlyconcentratedbrine waste water. Alsohelpedtheprojectdesignerinselectingthemost environmental friendly option for disposing the waste water September 2007- April 2008Environmental Management Consultants Position HeldEnvironmental Engineer ResponsibilitiesThemainresponsibilityinEnvironmentalManagement Consultants(EMC)wasthetechnicalreportwritingofIEE& EIAProjects.Otherresponsibilitiesincludedtheproject management,ISO14001andOHSAS18001systems implementationandtheirstandardoperatingprocedures development,ProposalsdevelopmentfordifferentIEE/EIA, WastewatertreatmentplantandSolidWasteProjects.The C.V: Yawar J amil Page 5-8 detailsofprojectscompletedinrecentpastaregiveninthe following table. S.NoClientProjectDetails 1HinoPak Motors Limited SuccessfullydevelopedandimplementedtheOccupationalHealthand Safety (OHSAS 18001-2007) system at HinoPak Motors in 07 months time. During implementation stage, completed the following tasks: Developedandimplementedstandardoperatingandcontrol proceduresrelatedtoOccupationalHealth&SafetyManagement System TrainedPeopleonOHSAS-2007System,BasicHealth&Safety, OH&Slegalandregulatoryrequirements,OH&Sinternalaudit, Permit to work, Emergency Response Plan Driving Safety, etcConducted several Occupational Health & safety audits of HinoPak differentshopsanddepartmentsduringOHSAS18001-2007 implementation phase SimilarlyconductedtheinternalauditforallshopsofAssembly andBodyPlantsofHinoPakMotors,justpriortoOHSAS18001-2007 Certificate Stage-1 Assessment Program. 2Al Tuwairqi GroupCompletedEIAReportforTuwairqiSteelMill.Thisprojectis proposedtoset-upinPortQasimIndustrialArea,andDryReduced Iron and Rolling Mill will be the main features of the Project. 3Fauji Akbar Portia Limited CompletedEIAReportforFaujiAkbarPortiaTerminalwhichis proposed to setup in Port Qasim, just adjacent to QICT, for the storage of Grains, Fertiliser, Oilseeds and Rice. 4National Gasses Limited CompletedtheInitialEnvironmentalExaminationReportonNGL proposed LPG-Plant in Hub Industrial Estates, Balauchistan. 5Pakistan Textile City Limited CompletedtheEnvironmentalImpactAssessment(EIA)DraftReport onPakistanTextileCityProject,whichwillbesetupinPortQasim Industrial Area. 6McDonalds Pakistan CompletedInitialEnvironmentalExamination(IEE)Reporton McDonalds, which is in operation in Islamabad F-9 Park. 7Bosicor Pakistan Limited CompletedIEEReportonAdditionalOilStorageTankatBosicor Pakistan Limited near Hub, Balauchistan. 8National Refinery Limited CompletedIEEDraftReportforExpansionofNationalRefinery Limited. 9SHV Energy Pakistan CompletedIEEDraftReportonExpansionofLPGStorageby Additional Storage Tanks at Port Qasim 10Chevron PakistanSuccessfullysupervisedthesolidwastemanagementactivityfor ChevronPakistan.Thisprojectwasaboutthedisposalofoil contaminated soil in environmental friendly manner.11Orix Properties (Pvt.) Limited CompletedtheIEEReportonServiceApartmentsprojectwhichis proposed to construct in Gulberg, Lahore. May 2005- August 2007Tekcellent (Pvt.) Ltd. Position HeldReport Writer (Environmental Projects) ResponsibilitiesThemainresponsibilityinTekcellentwasthetechnicalreport writinganddevelopmentandimplementationofHSE proceduresfordifferentactivitiesofcompanyprojects.In Tekcellent,IalsopreparedandimplementedtheHSE procedures in well known pharmaceutical company. The detail of projects completed in Tekcellent is given in following table: C.V: Yawar J amil Page 6-8 S.NoClientsProject Details 1Chevron PakistanPerformed Environmental Site Assessments (Phase I & II) for two sites in Karachi. Completed six factual reports on Environmental Site Assessments (PhaseI&II)forsitesinDhurnal,Shikarpur,TaruJabba, Rawalpindi, Karachi and Machike. 2Shell PakistanCompletedtencomprehensivereportsonGroundwaterMonitoring Events(GMEs)forsitesinShikarpur,Machike,Bakkar,Sargodha, Vehari, Shershah Islamabad, Daulatpur, Karachi and Multan. 3 Shell PakistanCompleted two reports on Environmental Site Assessments (Phase II) for sites in Faisalabad and Sahiwal. 4Shell PakistanCompletedthreefactualreportsonEnvironmentalSiteAssessments (ESAs),alsocalledCropsProtectionProgram(CPP)forsitesin Lahore, Faisalabad and Multan. 5Shell PakistanCompletedtwoQuarterlycomprehensivereportsonPhaseSeparated Hydrocarbon(PSH)RecoveryinShellDP,NDP,Bakkar,Sargodha and Shershah. 6Qasim International Container Terminal(QICT) Conducted a continuous 48 hour survey to monitor fitness of Trailers onthe terminal inaccordance withchecklist andof thebona fides of the vehicle operators as per given specifications. 7HuntsmanPerformedPhaseIenvironmentalsiteassessment(ESA)on HuntsmanandGulAhmedsjointtextilechemicalsblending plant.Thisassessmentaddressedthesoilandgroundwater, surfacewater and wastewater, airemissions, solid and hazardous waste,asbestos,lead,PCBs,storagetanks,processsafety management, life and fire protections. These ESAs follow ASTM E1527standards,andaddressenvironmentalissuesand regulatory compliance, including a historical site review.CompletedcomprehensivereportonESA-1byfollowingASTM E 1527 standards 8Johnson & JohnsonAssistedtheTekcellentPrincipalConsultantindevelopingthe safetyandenvironmentaloperatingproceduresforwellknown pharmaceutical company. Duringimplementationphase,Iprovidedseveraltrainingsto management and non management staff on Work PermitSystem, LOTO, Confined Space, Hot Work, Waste Management, Working atHeight,ChemicalManagement,etc.Ialsohelpedthe managementinidentifyingtheHSEgapsintheirsystemby conducting the surveys, and meeting with company staff. May 2003-April 2005Envirotek Consulting Services (Pvt.) Ltd. Position HeldProject Engineer ResponsibilitiesThe details of responsibilities in ECSL were as follows: S.No.ClientProject Details 1Beltexco Ltd.Supervised the environmental monitoring of entire plant, located in Export Promotion Zone, Karachi.2MNA EnergyCompletedtheInitialEnvironmentalExaminationforLPGPlant, located in Port Qasim, Karachi. C.V: Yawar J amil Page 7-8 3Haschome (Oil Marketing Company) CompletedtheInitialEnvironmentalExaminationforAutoGas Pump, located on Shahrae Faisal, Karachi. 4Pakistan State OilCompletedtheEnvironmentalSiteAssessment(PhaseI&II)for Oil Terminal, located in Keamari, Sindh. 5Pakistan State OilCompletedtheEnvironmentalSiteAssessment(PhaseI&II)for Oil Terminal, located in Pipri, Sindh. 6Pakistan State OilCompletedtheEnvironmentalSiteAssessment(PhaseI&II)for Oil Terminal, located in Sihala, Punjab. 7Pakistan State OilCompletedtheEnvironmentalSiteAssessment(PhaseI&II)for Oil Terminal, located in Mehmood Kot, Punjab. EDUCATION 2001-2002MSc Engineering Management University of Sunderland, United Kingdom. 1996-2000Bachelor of Chemical Technology/Engineering Chemical Technology & Engineering Dept, Karachi University.

RESEARCH & DESIGN PROJECTS Completed M.Sc Project on the Investigation and evaluating the current position regarding Supply Chaintrendsinautomotiveindustries,withparticularemphasisonModularconcept.Themain areas of this project are mentioned below. CurrentSupplyChaintrendssuchaspullsystem,builttoorder,integratingsystem,justin sequences, market places, strategic alliances, etc.Modular concept Future modular activities Automotive quality system-QS9000 OperationstrategiesforimplementingmodularconceptsuchasCellularManufacturing System, Just in Time, Kanban, FMS, Concurrent Engineering, etc. DesignedanddevelopedbachelorprojectFluidizeCatalyticCrackingUnitforthecatalytic cracking ofcrudeoilandalsopreparedaresearchreport on different catalystswhichcanbeused safelyin thisunit andalso available easily at reasonablecost.Themotivation behind thisproject wastodesignsuchaunitthatcancrackthecrudeoilreadilyandalsousefewerofcatalysts. BalancedMaterial&EnergyforseveralunitsofRefineryforprocessing20,000bbl/dayofcrude oil. TECHNICAL & COMPUTER SKILLS Project Planner Primavera 3 (Project Management Software) Microsoft Project (Project Management Software) Microsoft Office(Word, Excel, PowerPoint, Front Page, Publisher) FORTRAN (Can use it for translating mathematical formulae into computer programs) Internet (World Wide Web, E-mail, Discussions Groups, etc) Powersim, Arena (Dynamic Simulation Software Tool) Pro-e (Professional Engineering Software) MEMBERSHIP Member of Society of Chemical Engineering and Technology, Pakistan Member of Engineering Management Council, United Kingdom C.V: Yawar J amil Page 8-8 LANGUAGES SpeakingWritingListeningReading English ExcellentExcellentExcellentExcellent Urdu ExcellentExcellentExcellentExcellent TRAININGS NEBOSH IGC (Result is expected in first quarter of 2013). IRCA approved Lead Auditor Course on OHSAS 18001:2007 ISO 9001:2008 Internal Auditor Course by PIQC ISO 14001 & OHSAS 18001 Internal Auditor Course by Future Tech ConsultingTwoDaysSeminaronOccupational,HealthandSafety,organizedbyTheInstitutionsof Engineers Pakistan. 06 Weeks Internship in Gul Ahmed Textile Mill 02 Days Conference on Marketing in Sheraton Hotel, conducted by MAP 01 Day Conference on Quality Control in PC Hotel, conducted by PIQC 01 Day Fire Fighting Training Course by Haseen Habib 01 Day First Aid Training Course by Haseen Habib 02 Days First Aid Training Course by St John Ambulance ISO 9001:2008 (Quality Management System) basic awareness course by PIQC REFERENCES References will be provided on demand.