RPT OF FIELD WORK ON THE GLATZ OPT PROP

15
Introduction S2F09SEee25 2 .5679 HYNDMAN This report details the results of field work completed on the Glatz Option Property. This exploration program has been approved, certified and registered as a Designated Program under the Ontario Mineral Exploration Program Act, 1980. The Registration Number for this Designated Program is OM82-3-C-112. Field work consisted of stripping, geological mapping, and rock sampling. Also contained in this report are the assay results and recommendations for follow-up exploration. Location/Access The property is located in Hyndman Township approximately 3KM West of Garneau Lake. Hyndman Township is situated within NTS Map 52F/9C (Dyment). The property is accessable to within 1.5 KM by 2 wheel-drive truck. Truck access is via the Tache Siding-Forest Access Road which trends North from Highway 17, 9KM East of Borups Corners. From the end of the road access is by foot along a well defined bulldozer trail. Claims 010 The property consists of 18 unpatended contiguous mining claims numbered. K 594453 - K 561293 - K 533290 K 533405 K 594052 - K 589154 K 594458 - K 594457 - K 594456 inclusive K 561295 inclusive K 594054 inclusive K 599461 inclusive RECEIVED .Mil 1 1 1983 MINING LANDS SECTION All claims are recorded in the Kenora Mining Division on Plan No. M 1990 (Township of Hyndman).

Transcript of RPT OF FIELD WORK ON THE GLATZ OPT PROP

Page 1: RPT OF FIELD WORK ON THE GLATZ OPT PROP

IntroductionS2F09SEee25 2 .5679 HYNDMAN

This report details the results of field work completed on the Glatz Option Property. This exploration program has been approved, certified and registered as a Designated Program under the Ontario Mineral Exploration Program Act, 1980. The Registration Number for this Designated Program is OM82-3-C-112.

Field work consisted of stripping, geological mapping, and rock sampling. Also contained in this report are the assay results and recommendations for follow-up exploration.

Location/Access

The property is located in Hyndman Township approximately 3KM West of Garneau Lake. Hyndman Township is situated within NTS Map 52F/9C (Dyment).

The property is accessable to within 1.5 KM by 2 wheel-drive truck. Truck access is via the Tache Siding-Forest Access Road which trends North from Highway 17, 9KM East of Borups Corners. From the end of the road access is by foot along a well defined bulldozer trail.

Claims

010

The property consists of 18 unpatended contiguous mining claimsnumbered.

K 594453 - K 561293 - K 533290 K 533405 K 594052 - K 589154 K 594458 - K 594457 -

K 594456 inclusive K 561295 inclusive

K 594054 inclusive

K 599461 inclusive

RECEIVED.Mil 1 1 1983

MINING LANDS SECTION

All claims are recorded in the Kenora Mining Division on Plan No. M 1990 (Township of Hyndman).

Page 2: RPT OF FIELD WORK ON THE GLATZ OPT PROP

-2-

Regional Geology

The property occurs within the Wabigoon Subprovince-of the Superior Geological Province. The area is underlain by a series of basic volcanic flows and tuffs with numerous thin interbedded, conformable bands of reworked felsic crystal tuffs. The felsic beds are lenticular in habit and are often cut by high angle faults with dextral offset of »= 2 metres.

The volcanic rocks form a northwest-southeast trending "arm" of rock between two granatoid batholiths, one to the northeast, the other to the southwest.

Stripping program

An area, on claim K 561295, of approximately 100M X 50M was cleared of bush and overburden by a Caterpillar D6. This area was cleared to determine the extent of mineralization exposed in two separate showings.

The stipping was performed by Gamble Contractors, Oxdrift. A total of 27 hours of machine time was used.

Geology

An area of approximately 5000 square meters was cleared of bush and overburden. A geological map at a scale of 1" = 10' has been produced for the area.

The area is underlain by a series of northeast to north trending basic volcanic (spilites) and interbedded sericitic felsic crystal tuffs. The felsic tuffs are generally «= 9m thick and are lenticular in habit. The felsic beds are often cut by high angle dextral faults with observable offsets of «= 5m. The contacts between the felsic and basic units are sharp and well defined. Along one contact (the most easterly). There is developed a thin {«» .2m) band of very friable oxidized mafic mudstone.

Page 3: RPT OF FIELD WORK ON THE GLATZ OPT PROP

-3-

Two showings occur within the mapped area. Both showings consist of mineralized (pyrite) quartz vein within felsic tuff. The east showing consists of an undulating quartz vein which varies in width from .30 m to .90 m along its 10m length. This vein trends Az 340 /Vert. The vein consists of milky white quartz that is only weakly mineralized. Assays of material from this vein returned « .005 Oz/Ton.

The west showing consists of thin stringers of white quartz that form a zone «- ,6m wide and 9m in length. Three samples taken along strike on this zone returned « 0.005, 0.074 and 0.132 Oz/ton. The zone trends Az 346 /80 W.

Sampling

A total of 21 "powdered rock" samples were collected from the property. Samples were obtained by collecting rock chips and rock powder produced by an Atlas Copco Cobra hand held rotary percussion drill. Holes were drilled at 70 for .6m producing an average of 1 to 1.5 Ibs of sample.

Samples were collected from the two showings as well as from each felsic tuff bed.

Assay Results

The samples were analyzed by the standard fire assay method at Technical Service Laboratories, Mississauga. The results are listed below:

SAMPLE #AG-10 AG-11 AG-12 AG-13 AG-14 AG-15 AG-16 AG-17 AG-18 AG-19

GOLD Oz/Ton« 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005

0.074 0.132

« 0.005

SAMPLE #AG-20 AG-21 AG-22 AG-23 AG-24 AG-25 AG-26 AG-27 AG-28 AG-29 AG-30

GOLD Oz/Ton« 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005 « 0.005

Page 4: RPT OF FIELD WORK ON THE GLATZ OPT PROP

-4-

Sample locations are indicated on the accompanying map.

Assays results are very low and not compatible with assays obtained in grab samples obtained by Alex Glatz.

This suggests that sampling by collecting rock chips and powder from the drill cuttings does not give representative samples.

Recommendations

1. Resample both showings and each felsic tuff band. Channel samples should be collected by using a cut-out saw.

2. Recon mapping throughout Hyndman, Revel and Melgund Townships to locate and sample felsic tuff horizons interbedded with the basic volcanics.

Respectfully submitted by

/,W-^lV'RANDY CROWLEY ^

Page 5: RPT OF FIELD WORK ON THE GLATZ OPT PROP

MinistryofNatural Resources

Ontario

Report of Work,_ ,-,,-.,., (Geophysical, Geological,Geochemical and Expenditures)

75--

The MiniiType of Survey(s) , ,._ ——— ——————— S2F89SEM2S 2.5679 HVNUMAN 900

?& c. o 5. / o /; L- /r */<//> A* &jj r~zt//j jn "i 770Claim Holder's)

Ad

Suf

3ress

IS' ?vay Company

Prospector's Licence Np.

*&* Cc..&C.<r~T >>,^XP5^, 6>^T- \1 Date of 'Survey (from & to£

Day | Mo. | Yr. | Day ! Mo. | Yr."*

Total Miles of line Cut

1 2>Name and Address of Author {of Geo-Technical report) ^ ^

fcT'/v >•,'_;"> y £?iQ o .-Jl.'cy ( S 2O-*^2£~ /j"j^ri/}/ Q£ Jr^T. ^~, /r~i^i2-£>xv/ /f~^>Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total(s) here

Airborne Credits

Note: Special provision*^ 9 credits do not apfV E to Airborne Surveys.

.)

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemica

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Magnetometer

Days per Claim

L&~°

Days per Claim

Days per Claim

Expenditures (excludes power stripping) _^_,^ tlType of Work Performfcdrt W

Perf

Cak

ormed on Claim(s)

ING LANDS ̂ tt-iiw»

ulation of Expenditure Days Credits Total

Total Expenditures Days Credits

$ * 16 -1Instructions

Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

Date /

It) \]£: /&/&•*Recorded Holde'r or^Agent (Signature)

Certification Verifying Report of Work / , /..

Mining Claims Traversed (List in numerical sequence) iMining Claim

Prefix

/f

. , -

T

Number

<r^/-2^.r"

i9^ ̂ ^tflLjfir^ -J

Expend. Days Cr.

2,0

——— L

~&-

v

—— ._

£T / /O9^ ^ to f oL ( J

Total Hnr FKtforded

For nffjn iiim nurr ———fff. Bate Recorded y

CrUAr/Fl3/$3 ,

^

Mining ClaimPrefix

if

! *

Numbei

|

—— ——

- •. ; O!"R A. i-.-i.:-.: .';io "piv. .

; ' • ' ' it i \l i

.ii*N 1-^198•* •! l ^J -~

; tvjllil2ilji2!«9.'

_-. ..... . :....._.

Expend. Days Cr.

•' I

9 ———

1**- • — •

%

....._.._.

Total number of mining claims covered by this i report of work. '

"—— — ——

Minin^Morfier /V ^"7"-^

^-^Oa^uocO)

hereby certify that 1 have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having perforrned the work or witnessed same during and/or after its completion and the annexed report is true. ;

Name and Postal Address of Person Certifying f

7• • • '.' - /' - ~ • T , 'T "* ' . r, > ~ • • . ' '{ <• s» / - T -/ riate Certified • ICertifiettby (Signature) S

^1,'f.f'- • y- / ' ' ~? f' •£ '; " ' £&' .-"" ~.L.^-.:.? •• ". __ £...-?.-. -\ ___ U - _...^ '•- '

Page 6: RPT OF FIELD WORK ON THE GLATZ OPT PROP

1963 10 2875-83 2.5679

Mining RecorderMinistry of Natural Resources808 Robertson StreetBox 5160Kenora, OntarioP9N 3X9

Dear Sir:

RE: Geological Survey on Mining Claims K S61Z95 In the Township of Hyndraan.

The Geological Survey assessment work credits as shown on the attached statement have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours very truly.

E.F. AndersonDirectorLand Management Branch

klMtncy Block, Room 6643Queen's ParkToronto, OntarioM7A 1W3Phone: 413/965-1380

cc: Mr. Alex Glatz Dryden, Ontario

cc: Mr. Randy Crowley Toronto, Ontario

cc: Resident Geologist Kenora, Ontario

D. K1nv1g:sc

Page 7: RPT OF FIELD WORK ON THE GLATZ OPT PROP

/l_2v Ministry ot Technical Assess WJ R^urces Work CreditsOntario ^B

ment F <* 2.5679

Date Minmo Recorder'! Report of

1983 10 28 Work S5-83

Recorded Holder

ALEX GLATZTownship or Area

HYNDMAN

Type of survey and number of Assessment day* credit per claim

Geophysical

f lertrom^gnMie d«y«

Inrtiicerl polarisation . dayt

n^hdr riays

Section 77 (19) SǤ "Mining Cliirm Aliened" column

35fipnlngiral day«

Geochemical ..days

Man days 0 Airborne CH

Special provision CD Ground L_!

l~l Credits have been reduced because of partial coverage of claims.

LJ Credits have been reduced because of corrections to work dates and figures of applicant.

Mining Claims Assessed

K 561295

Special credits under section 77 (16) for the following mining claims

No credits have been allowed for the following mining claims

LJ not sufficiently covered by the survey I _ I Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — 80; Geological — 40; Geochemical — 40; Section 77(19)—60:828 (83/6)

Page 8: RPT OF FIELD WORK ON THE GLATZ OPT PROP

-x M.mstryoi Geotechnical *»•_» _ ?) 2SL. Report £.S\

Ontario ^ Approval

i D

!

B

\

t

i ii

i

i D

! n

Mining Lands Comments_ f j

A / "N^ / // / /[ $ $

, , C/ " •• »/••-'• • rf / J J / /L^", ^., j ));//C. t 'L(.<r<> ' ^ .Y'Ass'-il, &j3Je.cjc/ ^cfo-O.v/v/ fUtsO* > *£ jJj

•r- >,-:., >o/^, «.^ 5 ^. ,,^ 7fatfL^.^y

^

To: Geophysics

Comments

Dete Signeture {j Approved Q Wish to tee egein with correctiont

To: Geology • Expenditures "7^^« jAV _Z_^Comments

*^£-&-£^' /jb^fSf ^"*iS

Date / SlgnatuJrk^ Q^Approved Q^] With to tee again with correctiont /?0 lA^7 / /7 t^ /" Jf^ f\*

To: Geochemistry

Comments

-

Date Signature Q Approved Qwith toteeegaln with correctiont

To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

*77.

f^Jn

1S93 (81/10)

Page 9: RPT OF FIELD WORK ON THE GLATZ OPT PROP

Ministry of Natural Re sauces

*

GeotechnicalReportApproval

Mining Lands Comments

f/!c / ,,.-- ' V ' 1• /u f 'i .0 ' '-7 m-r:-?

( / " S-/0'

To: Geophysics

Comments

Lj Approved |~| With to see again with correctionsDate Signature

Comments

|~] Approved Pi W ish to see again with correctionsDate Signature

To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

Page 10: RPT OF FIELD WORK ON THE GLATZ OPT PROP

Ministry ofNaturalResources

Ontario

AssessmentWorkBreakdown

Re: 2.5679

1. Type of Survey ....AEPkPPJ.CAL_.

2. Township or Area ..JA^A^.Jit

3. Numbers of Mining Claims Traversed by Survey ___________________________

............_K__5j5_l_295 .........._.................._................_.. ~>

4. Number of Miles of Line Cut _______________________ Flown _______

*5. Number of Stations Established _-_0_____________._._._._.__.._.-_....__

*6. Make and type of Instrument Used

*7. Scale Constant or Sensitivity ,_.

*8. Frequency Used and Power Output _

9. Summary of Assessment Credits (details on reverse side)

Total 8 hour Technical Days (Include Consultants, Draughting etc.) _____!_____________

Total 8 hour Line-Cutting Days __.__.Q.___________

Calculation

5 x 7 = 35 + 0_____ = 35 _s. _J___ = 35________ Technical Line-cutting Number Assessment credits

of claims per claim

The dates listed on this form represent working time spent entirely within the limits of the above listed claims j | Checkif otherwise, please explain ...____._days_gn_Prggerty_and_l_day_draugh_ing______.

off property.

Dated: ___Qctober_2__1983____________ Signed: _^-WL._V?SftM-/.

\

Note: (A) * Complete only if applicable.(B) Complete list of names, addresses and dates on reverse side,(C) Submit separate breakdown for each type of survey.(D) Submit in duplicate.

827 (81/3)

Page 11: RPT OF FIELD WORK ON THE GLATZ OPT PROP

Details of Assessment Work BreakdownRe: 2.5679

FIELD WORK

Type of Work Name & Address Dates WorkedNumber of 8 hour days

CONSULTANTSNumber of

Name & Address Dates Worked (specify in field or office) 8 hour days

Rexdale, Ontario

DRAUGHTSMAN, TYPING, OTHERS (specify)

Number of Name & Address Type of Work Dates Worked 8 hour days

Tng" "AvV." TOE" "

1

TOTAL 8 HOUR TECHNICAL DAYS "$""

LINE-CUTTING

Number of Name Address Dates Worked 8 hour days

TOTAL 8 HOUR LINE-CUTTING DAYS

Page 12: RPT OF FIELD WORK ON THE GLATZ OPT PROP

August 30, 1983 2.5679

Alex Glatz 15 Park Crescent Dryden, Ontario P8N 1T7

Dear Sir:

RE: Geological Survey submitted on Mining Claim K 561295 1n the Township of Hyndman

The Special Provisions method of calculating assessment work credits 1s normally used where a survey systematically covers the entire claim. The above-mentioned survey does not quillfy for work credits under the Special Provisions method. Please therefore, provide a man-days breakdown listing the names and addresses of the employees and the dates that each man worked on the various phases of the geological survey. The survey will then be assessed under the provisions of sub-section (11) of Section 77 of the Mining Act R.S.O. 1980.

In addition, enclosed 1s the final page of the report* 1n duplicate. Please have Mr. R. Crowley sign each page and return them to this office.

For further Information, please contact Mr. F.W. Matthews at (416)965-1380.

Yours very truly,

\ > ,

B.FKIAidgrsonDirectorLand Management Branch

WhUney Block, Room 4450 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-1380

D. K1nv1g:mc

End.

cc: Mining Recorder Kenora, Ontario

r /•<•

rvH"&r

cor i '." ^ 4 ',.

cc: Mr. Randy Crowley Suite 52025 Adelaide Street West Toronto, Ontario

Page 13: RPT OF FIELD WORK ON THE GLATZ OPT PROP

1983 07 14

75-83 561293

2.5679

Mr. Wade MathewMining RecorderMinistry of Natural Resources808 Robertson StreetBox 5160Kenora, OntarioP9N 3X9

Dear Sir:

We have received reports and maps for a Geological survey submitted under Special Provisions (credit for Performance and Coverage) on mining claim ̂ 561295 In the Township of Hyndman.

This material will be examined and assessed and a statement of assessment work credits will be Issued.

Yours very truly,

E.F. AndersonDirectorLand Managnunt Branch

Whltney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-1380

A. Barr:mc

cc: Mr. Alex Glatz 15 Park Crescent Dryden, Ontario P8N 1T7

cc: Mr. Randy Crowley Suite 52025 Adelaide Street East Toronto, Ontario M5C 1Y2

Page 14: RPT OF FIELD WORK ON THE GLATZ OPT PROP

CL

LJ

LUor

4M

PROJECTED LINE

V I*

705497 590315 1 590316

705498 5 90314 5 90317 *

_ _ L____L____JK ,K | K |

- [.705501 ,

705499

7622 13

J

6M 9M: IOM.

DGSON TWP

I2M

52F89SE002S 2.5679 HYNDMAN £00

THE TOWNSHIP OF

HYNDMANDISTRICT OF

KENORA

KENORA MINING DIVISION

SCALE:1-INCH-4O CHAINS

LEGEND

PATENTED LAND

CROWN LAND SALELEASESLOCATED LANDLICENSE OF OCCUPATION

MINING RIGHTS ONLY

SURFACE RIGHTS ONLYROADS

IMPROVED ROADSKING'S HIGHWAYS

RAILWAYSPOWER LINES

MARSH OR MUSKEG

MINES

CANCELLED

C.S.

Loc-

L.O.

MRO

S RO

NOTES400' Surface Rights Reservation along the shores of all lakes and rivers.

DATE OF ISSUE

JUL201983

Minis'.ry of Nalural ResourcesTORONTO

SAND a GRAVEL

(Q\) G RAVEL

(6i) G RAVEL E 2

File: , 37297

File 1 37297

PLAN NO. 1990

ONTARIO

MINISTRY OF NATURAL RESOURCES

SURVEYS AND MAPPING BRANCH

Page 15: RPT OF FIELD WORK ON THE GLATZ OPT PROP

3 Quartz Vein

Felsic Tuff

Mafic Tuff

Sample Location

1

1

23

1

1

1

MUD COVERED

FLOODEDLYNX CANADA EXPLORATIONS LIMITED

GLATZ OPTION

HYDMAN TOWNSHIP

by

drawn cyRC

RC

dateOCT/82

scale1"=10

52F09SE0825 2 .5679 HYNDMAN S1O