RO Waste Water Recover_Presentation CWB

1
Water - Sustainability Q = 20 m 3 /h V = 60 m 3 V = 10 m 3 Q = 20 m 3 /h REJEITO (5 m TQ REJEITO MAKE-UP TORRE 10 m 3 /h OUTROS 5 m 3 /h TORRE NOVA BANHEIROS – x m 3 FASE 1 - IMEDIATO FASE 2 DESCARTE MEIO AMBIENTE V = 20 m 3 PERMEADO (15 m 3 /h) ETE Oxidação - dosagem de oxidante e coagulante ULTRAFILTRAÇÃO Remover Ferro : < 0,1 ppm Remover material oxidado DESMINERALIZAÇÃO Lagoa de peixes Summary: Eliminate Discard of Water Investment: R$ 1,3 MM Saving: R$ 0,561 MM / year Water Saving: 130.000 m3 / year Payback: 2,5 year Start: 2013 Delivery Time: 8 months 1. INVESTMENT CAPEX – KRAFT 2. INVESTMENT OPEX NALCO (10 anos) – Design/Building/Transfer R$/m 3 – 1,38 (Actual R$ 4,33/m3 – Sanepar) Cost Monthly - R$ 20.000,00/month For production of 20m 3 /h Reduction of the bill of water in 40%

description

RO Waste Water Recover_Presentation CWB

Transcript of RO Waste Water Recover_Presentation CWB

  • Water - SustainabilityQ = 20 m3/hV = 60 m3V = 10 m3Q = 20 m3/h REJEITO (5 m3/h)TQ REJEITOMAKE-UP TORRE 10 m3/hOUTROS 5 m3/hTORRE NOVABANHEIROS x m3FASE 1 - IMEDIATOFASE 2DESCARTE MEIO AMBIENTEV = 20 m3 PERMEADO (15 m3/h)ETEOxidao - dosagem de oxidante e coagulanteULTRAFILTRAO Remover Ferro : < 0,1 ppm Remover material oxidado

    DESMINERALIZAOLagoa de peixesSummary: Eliminate Discard of WaterInvestment: R$ 1,3 MMSaving: R$ 0,561 MM / yearWater Saving: 130.000 m3 / yearPayback: 2,5 yearStart: 2013 Delivery Time: 8 months1. INVESTMENT CAPEX KRAFT2. INVESTMENT OPEX NALCO (10 anos) Design/Building/Transfer

    R$/m3 1,38(Actual R$ 4,33/m3 Sanepar)

    Cost Monthly - R$ 20.000,00/month For production of 20m3/hReduction of the bill of water in 40%