Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO...

16
4/15-17/2014 DRAFT – SUBJECT TO REVISION 1 Study 8.5 Technical Team Meeting Riverine Modeling Proof of Concept Version 2 HEC-RAS Open-water Flow Routing Model April 15-17, 2014 Prepared by R2 Resource Consultants, Brailey Hydrologic, Geovera, Tetra Tech, and HDR

Transcript of Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO...

Page 1: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 1 Study 8.5

Technical Team Meeting

Riverine Modeling Proof of Concept

Version 2 – HEC-RAS Open-water Flow

Routing Model

April 15-17, 2014

Prepared by R2 Resource Consultants, Brailey Hydrologic, Geovera, Tetra Tech, and HDR

Page 2: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 2 Study 8.5

Open-water HEC-RAS Flow Routing Model – V2

Page 3: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 3 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

• Improvements

– Coverage

• New Cross-sections – Middle and Lower River

• Extended Domain - Dam Site (PRM 187.2) to Susitna

Station (PRM 29.9)

• Floodplain coverage – XS extended with LiDAR

– Devils Canyon

» LiDAR + Estimated Channel

Page 4: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 4 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

Page 5: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 5 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

• Improvements

– Coverage • New Cross-sections – Middle and Lower River

• Extended Domain - Dam Site (PRM187.2) to Susitna Station

(PRM 29.9)

• Floodplain coverage – XS extended with LiDAR

– Devils Canyon

– Refined Calibration

• New XS rating curves and additional points for 2012

XS

Page 6: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 6 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

Middle River Lower River

Refined Calibration

Page 7: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 7 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

• Improvements

– Coverage • New Cross-sections – Middle and Lower River

• Extended Domain - Dam Site (PRM187.2) to Susitna Station

(PRM 29.9)

• Floodplain coverage – XS extended with LiDAR

– Devils Canyon

– Refined Calibration

– Synthesized Tributary Flows

• Hourly Accretion

• 61 year record

Page 8: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 8 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

30,000

Ho

url

y F

low

(cf

s)Susitna River at Gold Creek Gage (PRM 140.0)

Simulated

USGS Measured

Page 9: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 9 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

40,000

45,000

50,000

55,000

60,000

65,000

70,000

75,000

Ho

url

y F

low

(cf

s)Susitna River at Sunshine Gage (PRM 88.0)

Simulated

USGS Measured

Page 10: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 10 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

90,000

95,000

100,000

105,000

110,000

115,000

120,000

125,000

130,000

135,000

Ho

url

y F

low

(cf

s)Susitna River at Susitna Station Gage (PRM 29.9)

Simulated

USGS Measured

Page 11: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 11 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

• Outputs

– Hourly flow hydrographs of the Susitna River at any

location (including Focus Areas) between the proposed

dam site (PRM 187.2) and just downstream from the

Yentna River confluence (PRM 29.9).

– Hourly stage hydrographs of the Susitna River at

surveyed river cross-sections (total = 212).

Page 12: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 12 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

Jul 1

, 197

5

Oct

1, 1

975

Jan

1, 1

976

Apr

1, 1

976

Jul 1

, 197

6

Oct

1, 1

976

Ho

url

y F

low

(cf

s)

0

20000

40000

60000 Existing Conditions

Scenario OS-1b

Susitna River at Dam Site

PRM 187.2

Dry Year - 1976

Page 13: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 13 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

Jul 1

, 197

5

Oct

1, 1

975

Jan

1, 1

976

Apr

1, 1

976

Jul 1

, 197

6

Oct

1, 1

976

Ho

url

y F

low

(cf

s)

0

20000

40000

60000 Existing Conditions

Scenario OS-1b

Susitna River at FA-128

PRM 129.7

Dry Year - 1976

Page 14: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 14 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

Jul 1

, 198

0

Oct

1, 1

980

Jan

1, 1

981

Apr

1, 1

981

Jul 1

, 198

1

Oct

1, 1

981

Ho

url

y F

low

(cf

s)

0

20000

40000

60000 Existing Conditions

Scenario OS-1b

Susitna River at Dam Site

PRM 187.2

Wet Year - 1981

Page 15: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 15 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

Jul 1

, 198

0

Oct

1, 1

980

Jan

1, 1

981

Apr

1, 1

981

Jul 1

, 198

1

Oct

1, 1

981

Ho

url

y F

low

(cf

s)

0

20000

40000

60000 Existing Conditions

Scenario OS-1b

Susitna River at FA-128

PRM 129.7

Wet Year 1981

Page 16: Riverine Modeling Proof of Concept - Susitna-Watana Hydro€¦ · 4/15-17/2014 DRAFT – SUBJECT TO REVISION Study 8.5 3 HEC-RAS Open-water Flow Routing Model – V2 •Improvements

4/15-17/2014 DRAFT – SUBJECT TO REVISION 16 Study 8.5

HEC-RAS Open-water Flow Routing Model – V2

• Limitations

– Not applicable during ice covered conditions (October 28

through May 22)

– One-dimensional

– Devils Canyon bathymetry estimated

– No water surface elevations at locations in between

surveyed cross-sections.

• The 2D hydraulic model in the Focus Areas will rely on input from

the HEC-RAS Open-water Flow Routing Model to determine

water surface elevations in Focus Areas.

• Output from the HEC-RAS Open-water Flow Routing Model,

combined with LiDAR data, may be used to estimate areas of

inundation in riparian floodplain zones.