Pool Deck Resurfacing | Deck Resurfacing | Pool Resurfacing | Pool Remodeling
Rims forum 2013 using job management systems for resurfacing contracts - fiona derrick downer
-
Upload
ingeniumrims -
Category
Technology
-
view
309 -
download
0
description
Transcript of Rims forum 2013 using job management systems for resurfacing contracts - fiona derrick downer
Standardising Reseal
Contracts
Project Commencement 2010/11 Season
Why?
Solving the problems with poor data quality c_surface records
Integrating data capture
Gaining efficiency in contract set up and job management
Tool Set
Site location, treatment selection, activities, costs
Customised tables:- stockpile information, lookups
Complex reporting drawing from multiple sources
Customised – Stockpile Sites
Visualising Sites by Chip Size
Contract Set up - Material Items
Work Site, it’s in the detail…
Quick Estimating
Stockpile Sites v Reseal Sites
Completing Sites
Is the location correct?
Use of dropdowns
Binder, Adhesion and Cutter
Retrievable Documentation
Customised Reporting - Progress
Customised Reporting - Claims
Data Delivery – Completing the Process