Dr Richard L Brown Vice Chancellor Finance Operations and IT December 2009
RICHARD BROWN
Transcript of RICHARD BROWN
![Page 1: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/1.jpg)
RICHARD BROWN
UPF Procurement Director
CONSTRUCTION OPPORTUNITIES CONFERENCE
February 28, 2013
![Page 2: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/2.jpg)
Y-12: America’s Uranium Center of Excellence
![Page 3: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/3.jpg)
9212 The Nation’s Warhorse
1945
![Page 4: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/4.jpg)
9212 The Nation’s Warhorse
2013
![Page 5: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/5.jpg)
The Nation’s New Uranium Processing Facility
![Page 6: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/6.jpg)
UPF’s Diverse Uranium Missions
Stockpile
Refurbishments
Weapons Surveillance Nuclear Nonproliferation Disassembly/Dismantlement
Medical Isotopes
Naval Reactors Nuclear Power
![Page 7: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/7.jpg)
Capital Investments in the Region
![Page 8: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/8.jpg)
Poised for the Field
![Page 9: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/9.jpg)
![Page 10: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/10.jpg)
![Page 11: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/11.jpg)
UPF Cost Breakdown
Engineering - 19%
Other Non Manual - 9%
Construction - 12%
Construction Subcontracts - 18%
Material/Equipment - 42%
19%
9%
12%
18%
42%
![Page 12: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/12.jpg)
UPF Procurement Needs
$1.6B–$2.8B
Materials & Equipment
![Page 13: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/13.jpg)
Widespread Interest in Becoming a UPF Supplier
![Page 14: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/14.jpg)
UPF Tennessee Subcontractors
![Page 15: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/15.jpg)
Procurement Schedule
![Page 16: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/16.jpg)
UPF Procurement Actions
• SITE (Subcontracts)
- Electrical Demo - AWARDED
- Spoils - AWARDED
- Relocate Bear Creek Road (USACE)
- Building Demolition
- Caisson Drilling
- Concrete Batch Plant
- Electrical Phase 2
- Jack & Bore
- Monitoring Wells
- Geological Testing
- West Barrow
- Portal 19
- Standard Penetration Testing
- Fire Protection
- Fire Proofing
- Insulation
- Painting and Coating
- HVAC
- Cooling Towers
- Siding and Roofing
- Administration Building
- Process Support Facility
- Asphalt Paving
![Page 17: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/17.jpg)
UPF Procurement Actions
• SITE (Non-Permanent)
- Construction Trailers (OUT TO BID)
- Warehouse Upgrade
- Safety Supplies
- Janitorial Supplies
- Safely Supplies
- Small Tools
- Construction Equipment
- Tower Cranes
- Modular Offices
![Page 18: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/18.jpg)
Upcoming Procurement Solicitations
• FACILITY
- Electrical Bulks
- Embeds
- Fasteners
- Formwork
- Piping Bulks
- Rebar
- Structural Steel
- Vehicle Arresting System
- Pipe Spooling
![Page 19: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/19.jpg)
Upcoming Procurement Solicitations
- Hydraulic Break Shear Press
- Centrifuges
- Caliciner
- Phase Separators and Coalescers
• PROCESS EQUIPMENT
- Electric Oxide Furnace
- Electric Tube Conversion Furnaces
- Microwave Casting Furnaces
- Vacuum Annealing Furnace
- Bottom Loading Furnace
- Flex Tube Conversion Furnace
- Gloveboxes
- Low-Equity Calciner
- Process Skids
- Scrubbers
![Page 20: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/20.jpg)
How Do Vendors Sign Up??
• Register: http://supplier.bechtel.com
• Look for the latest procurements: http://www.y12.gov
• Check out FedBizOpps’ website: https://www.fbo.gov
![Page 21: RICHARD BROWN](https://reader031.fdocuments.net/reader031/viewer/2022012417/6171e41f3ea1d2737e474ddc/html5/thumbnails/21.jpg)
Procurement Questions:
• Equipment: Elaine Najmola
865-241-0818
• Construction: Ralph Helton
865-576-9097
• Y-12 Small Business Program: Lisa Copeland
865-241-2090
• Other: 865-574-0079