Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation....

34
Replacement Pipeline Route Consultation Response Form We are committed to listening to organisations, communities, landowners and members of the public as the project progresses. Have your say. It’s easy to contribute to this consultation, and we do hope you will. We welcome your views, ideas and opinions. The fastest way to respond is online. Simply go to www.slpproject.co.uk This consultation closes at 23:45 on 19 October 2018. If you are unable to respond online, you can also: Email [email protected] - If possible, please use this Word document version of our response form. This can also be downloaded on our website. Post FREEPOST SLP PROJECT - If possible, please use this Word document version of our response form. This can also be downloaded on our website. If you post your submission, please include your name and postcode to avoid double counting of responses. Please respond using one of the approved channels listed. These have been set up specifically to receive responses to this consultation. We cannot accept responsibility for ensuring responses that are sent to addresses other than those listed are included in the consultation process. When submitting your response, please note the privacy statement on the response form, which explains how the information that you provide will be processed and used. If you would like a large text, a print copy or alternative format of this document, please contact us by email on [email protected] or telephone on 07925 068 905. Requests for 1

Transcript of Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation....

Page 1: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

Replacement Pipeline Route ConsultationResponse FormWe are committed to listening to organisations, communities, landowners and members of the public as the project progresses.

Have your say.It’s easy to contribute to this consultation, and we do hope you will. We welcome your views, ideas and opinions.

The fastest way to respond is online. Simply go to www.slpproject.co.uk

This consultation closes at 23:45 on 19 October 2018.

If you are unable to respond online, you can also:

Email [email protected] - If possible, please use this Word document version of our response form. This can also be downloaded on our website.

Post FREEPOST SLP PROJECT - If possible, please use this Word document version of our response form. This can also be downloaded on our website. If you post your submission, please include your name and postcode to avoid double counting of responses.

Please respond using one of the approved channels listed. These have been set up specifically to receive responses to this consultation. We cannot accept responsibility for ensuring responses that are sent to addresses other than those listed are included in the consultation process.

When submitting your response, please note the privacy statement on the response form, which explains how the information that you provide will be processed and used.

If you would like a large text, a print copy or alternative format of this document, please contact us by email on [email protected] or telephone on 07925 068 905. Requests for alternative formats will be considered on a case-by-case basis. We will, as far as possible and proportionate, respond to any requests that help you to take part in this consultation.

1

Page 2: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

Your detailsa) Please provide your name (required)

Title: ………………………………………………………………………….

First Name: ……………………………………………………………………………………

Last Name: ……………………………………………………………………………………

ii) Please tell us your address (required)

…………………………………………………………………………………………………

…………………………………………………………………………………………………

…………………………………………………………………………………………

…………………………………………………………………………………………………

iii) Please tell us your postcode (required)

………………………….………………………………………………………

iv) Please provide your email address

…………………………………………………………………………………………………

v) Are you a landowner (Person with Interest in Land) who has received a Section 42 notification letter?

☐ Yes☐ No

vi) Are you completing this questionnaire as:

☐ An individual☐ An organisation

vii) If you are responding on behalf of an organisation, please tell us:

The name of the organisation:

…………………………………………………………………………………………………

The category of your organisation:

☐ A County, District or Parish Council☐ A statutory body (e.g. the Environmental Agency, the National Trust or a community group)☐ A Voluntary or Community Sector Organisation (VCS)☐ A business ☐ Other (Please specify below)

2

Page 3: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

Privacy and use of the information you provide.

Esso Petroleum Company, Limited and our 3rd party project partners will store and process your data in full compliance with our legal obligations for the purposes of the application, development and operation of the proposed Southampton London Pipeline. Further details about how your data will be used can be found on the website (www.slpproject.co.uk), or by contacting us by email ([email protected]) or telephone (07925 068905).

Please do not provide personal information about other individuals. However, if you provide any details of other individuals or organisations within the text body of your consultation response, we will assume that you have obtained the consent of such individuals for such disclosure.

If you would prefer that your response is not quoted within the consultation report, including anonymously, please tick the box below.

☐ Please do not quote from my response within the consultation report.

Your Views on the Preferred Pipeline Route

As set out in the consultation brochure (Chapter 8), the consultation leaflet and our website, the preferred route has been divided into eight separate sections, ‘A’ to ‘H’.

Some sections include sub-options. There are separate questions that ask for your comments on each sub-option. You only need to complete the questions that relate to the section and/or sub-option you are interested in.

A separate question asks for your comments about the section, as a whole. These are at the end of each group of questions.

3

Page 4: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

1) Section A: Boorley Green to Bramdean

A separate question asks for your comments about Section A as a whole. This is after the sub-option questions.

1.1) Sub-option A1: Boorley Green

1.1.1) Do you favour the sub-option A1a or A1b?

☐ A1a☐ A1b☐ No preference between sub-options☐ Neither sub-option

1.1.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

1.1.3) Please give any further details about your response on sub-option A1, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

1.2) Sub-option A2: Hinton Ampner

1.2.1) Do you favour sub option A2a or A2b?

☐ A2a☐ A2b☐ No preference between sub-options☐ Neither sub-option

4

Page 5: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

1.2.2) On which of the following main issues are your views based? (Please pick as many as apply).

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

1.2.3) Please give any further details about your response on sub-option A2, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

1.3) Please give your comments about section A as a whole or outside the sub-options, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

1.3.1) On which of the following main issues are your views based? (Please pick as many as apply).

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)

5

Page 6: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

☐ Other

6

Page 7: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

2) Section B: Bramdean to South of Alton

2.1) Please give your comments about section B, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

2.1.1) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

3) Section C: South of Alton to Crondall

3.1) Please give your comments about section C, in particular information about specific locations?

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

7

Page 8: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

3.1.1) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

8

Page 9: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

4) Section D: Crondall to Farnborough

4.1) Sub-option D1: Oak Park Golf Course

4.1.1) Do you favour sub option D1a or D1b?

☐ D1a☐ D1b☐ No preference between sub-options☐ Neither sub-option

4.1.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

4.1.3) Please give any further details about your response on sub-option D1, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

4.2) Sub-option D2: Fleet Business Park

4.2.1) Do you favour sub option D2a or D2b?

☐ D2a☐ D2b☐ No preference between sub-options☐ Neither sub-option

9

Page 10: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

4.2.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

4.2.3) Please give any further details about your response on sub-option D2, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

4.3) Sub-option D3: Beacon Hill Road

4.3.1) Do you favour sub option D3a or D3b?

☐ D3a☐ D3b☐ No preference between sub-options☐ Neither sub-option

4.3.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

10

Page 11: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

4.3.3) Please give any further details about your response on sub-option D3, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

4.4) Sub-option D4: Norris Hill

4.4.1) Do you favour sub option D4a or D4b?

☐ D4a☐ D4b☐ No preference between sub-options☐ Neither sub-option

4.4.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

4.4.3) Please give any further details about your response on sub-option D4, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

11

Page 12: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

4.5) Please give your comments about section D as a whole or outside the sub-options, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

4.5.1) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

12

Page 13: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

5) Section E: Farnborough to Bisley and Pirbright Ranges

5.1) Sub-option E1: Cove Brook Park area

5.1.1) Do you favour sub option E1a or E1b?

☐ E1a☐ E1b☐ No preference between sub-options☐ Neither sub-option

5.1.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

5.1.3) Please give any further details about your response on sub-option E1, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

5.2) Sub-option E2: Cove Road

5.2.1) Do you favour sub option E2a or E2b?

☐ E2a☐ E2b☐ No preference between sub-options☐ Neither sub-option

5.2.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)

13

Page 14: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

5.2.3) Please give any further details about your response on sub-option E2, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

5.3) Sub-option E3: Cabrol Road

5.3.1) Do you favour sub option E3a, E3b or E3c?

☐ E3a☐ E3b☐ E3c☐ No preference between sub-options☐ None of the sub-options

5.3.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

5.3.3) Please give any further details about your response on sub-option E3, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

14

Page 15: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

5.4) Sub-option E4: Farnborough North

5.4.1) Do you favour sub option E4a or E4b?

☐ E4a☐ E4b☐ No preference between sub-options☐ Neither sub-option

5.4.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

5.4.3) Please give any further details about your response on sub-option E4, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

5.5) Sub-option E5: Pine Ridge Golf Course

5.5.1) Do you favour sub option E5a or E5b?

☐ E5a☐ E5b☐ No preference between sub-options☐ Neither sub-option

15

Page 16: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

5.5.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

5.5.3) Please give any further details about your response on sub-option E5, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

5.6) Please give your comments about section E as a whole or outside the sub-options, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

5.6.1) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

16

Page 17: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

6) Section F: Bisley and Pirbright Ranges to M25

6.1) Sub-option F1: Red Road

6.1.1) Do you favour sub option F1a, F1b or F1c?

☐ F1a☐ F1b☐ F1c☐ No preference between sub-options☐ None of the sub-options

6.1.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

6.1.3) Please give any further details about your response on sub-option F1, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

6.2) Sub-option F2: Chobham Common

6.2.1) Do you favour sub option F2a or F2b?

☐ F2a☐ F2b☐ No preference between sub-options☐ Neither sub-option

17

Page 18: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

6.2.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

6.2.3) Please give any further details about your response on sub-option F2, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

6.3) Sub-option F3: Silverlands

6.3.1) Do you favour sub option F3a or F3b?

☐ F3a☐ F3b☐ No preference between sub-options☐ Neither sub-option

6.3.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

18

Page 19: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

6.3.3) Please give any further details about your response on sub-option F3, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

6.4) Sub-option F4: Guildford Road and M25

6.4.1) Do you favour sub option F4a or F4b?

☐ F4a☐ F4b☐ No preference between sub-options☐ Neither sub-option

6.4.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

6.4.3) Please give any further details about your response on sub-option F4, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

19

Page 20: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

6.5) Please give your comments about section F as a whole or outside the sub-options, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

6.5.1) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

20

Page 21: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

7) Section G: M25 to M3

7.1) Sub-option G1: Chertsey railway

7.1.1) Do you favour sub option G1a or G1b?

☐ G1a☐ G1b☐ No preference between sub-options☐ Neither sub-option

7.1.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

7.1.3) Please give any further details about your response on sub-option G1, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

7.2) Sub-option G2: River Thames

7.2.1) Do you favour sub option G2a or G2b?

☐ G2a☐ G2b☐ No preference between sub-options☐ Neither sub-option

21

Page 22: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

7.2.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

7.2.3) Please give any further details about your response on sub-option G2, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

7.3) Please give your comments about section G as a whole or outside the sub-options, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

7.3.1) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)

22

Page 23: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

☐ Other

23

Page 24: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

8) Section H: M3 to West London Terminal storage facility

8.1) Sub-option H1: Queen Mary Reservoir

8.1.1) Do you favour sub option H1a or H1b?

☐ H1a (the eastern sub-option, following the toe (bottom) of the Queen Mary Reservoir embankment)☐ H1b (the western sub-option, which diverts from the western edge of the reservoir before turning north)☐ No preference between sub-options☐ Neither sub-option

8.1.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

8.1.3) Please give any further details about your response on sub-option H1, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

8.2) Sub-option H2: Ashford Station

8.2.1) Do you favour sub option H2a, H2b or H2c?

☐ H2a☐ H2b☐ H2c☐ No preference between sub-options☐ None of the sub-options

24

Page 25: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

8.2.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

8.2.3) Please give any further details about your response on sub-option H2, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

8.3) Sub-option H3: Thomas Knyvett College

8.3.1) Do you favour sub option H3a or H3b?

☐ H3a☐ H3b☐ No preference between sub-options☐ Neither sub-option

8.3.2) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

25

Page 26: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

8.3.3) Please give any further details about your response on sub-option H3, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

8.4) Please give your comments about section H as a whole or outside the sub-options, in particular information about specific locations.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

8.4.1) On which of the following main issues are your views based? (Please pick as many as apply)

☐ Environment (including heritage and historic environment, landscape and visual effects and land use)☐ Community (including local businesses, Rights of Way and local amenities)☐ Installation (including engineering and maintenance)☐ Safety (during and after installation)☐ Other

26

Page 27: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

27

Page 28: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

Your views on the Project

9) Do you have any other comments?

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………

28

Page 29: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

Your Views on the Preliminary Environmental Information

10) Do you have any comments on the Preliminary Environmental Information?

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

………………………………………………………………………………………

29

Page 30: Response Form in Word - UPDATED FOR CHOBHAM  · Web viewReplacement Pipeline Route Consultation. Response Form. We are committed to listening to organisations, communities, landowners

Your views on the consultation process

11) Please rate the following areas of the consultation:

Area of consultation Very good

Good Average Poor Very poor

Not Applicable

Materials – were the materials clear and easy to understand?Information – was enough information made available for you to respond?Promotion – was the consultation promoted well and to the right people?Events – were the events of good quality and suitably located?

12) Please provide any further comments about the consultation.

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

…………………………………………………………………………………………………………

……………………………………………………

30